What can we learn from the
Hoover Dam project that
influenced modern project
management?
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT VOL.32(2014) P.256-264
YOUNG HOON KWAK, JOHN WALEWSKI, DANA SLEEPER AND HESSAM SADATSAFAVI
102034550 簡翊真
102034611 董咨均
Index
 Introduce
 Video
 Abstract
 Background
 History of the Hoover Dam project by project phases
 Hoover Dam Project challenges and innovative
management
 Lessons learned from comparing megaproject
framework by the Department of Energy (DOE)
 Conclusion
Introduction
 Location: Clark County/ Arizona, US
 Duration: 1931 ~ 1936 (2 yrs earlier)
 Life cost: 112 person
 Cost: $ 833 million with inflation
 Length: 379m, Height: 221.4m, Width: 200m
 Company: Six Companies, Inc.
 Purpose: control floods, provide irrigation water and
produce hydroelectric power for Nevada, Arizona, and
California.
Introduction
Why Hoover Dam is so special?
Reason1 - Breakthrough
• Never built such large dam before
• Techniques were unproven
Reason2 – Time limit
• Get fund if not on time
• Built the road on canyon before start
Video
 One is from the history aspect
 One is from the construction aspect
Abstract
 This paper examines project and program management
practices applied to the building of the Hoover Dam,
and discusses how these factors contributed to the
establishment and evolution of modern project
management principles, tools, and techniques.
Background
The greatest engineering and construction projects
In the Great Depression
 Completed in 1936
 Two years ahead of schedule and under
budget
History of the Hoover Dam project
by project phases
Conceptual
phase
Planning,
execution
and
construction
phase
Close out
phase
History of the Hoover Dam project
by project phases
 Colorado River Compact
 In Black Canyon
 dividing generated electricity
Fourth version of the Boulder
Canyon Project Act
1920 1928
12190419
History of the Hoover Dam project
by project phases
Frank T. Crowe
 Work on the foundation
 Technical and productivity innovations
 Electric lighting
 Aerial tramways
Planning, execution and construction phase
1931
General Superintendent
30192919
History of the Hoover Dam project
by project phases  The dam and power house were
turned over to the Interior
Department in February 1936,
26 months ahead of schedule
and $15 million under budget.
 Six Companies, Inc. was also
able to overcome many obstacles
in the construction of the dam
and secure a profit of $13 million.
Close out phase
1936
35193419
Hoover Dam Project challenges
and innovative management
Human
resources
Innovative
project
management
There are various issues, including organizational, managerial,
planning, and implemental challenges, obstacles, solutions,
and suggestions related to the Hoover Dam project.
Strategic
value
creation
 Economical and managerial challenges
 Ensuring the profitability of the project
 Determining the hydroelectric power rate
 Dividing the water and power to seven Basin states
 Supporting the construction activities
 Safety and health issues
Hoover Dam Project challenges
and innovative management Strategic
value
creation
 Government relations
 Hoover Dam project was one of the first examples
of a partnership between public and private sectors
 Joint ventures
 Foremost among innovative managerial solutions
was the employment of a joint venture involving
eight different firms, organized into six partners.
Hoover Dam Project challenges
and innovative management Strategic
value
creation
 Innovative resources allocations
 Unbalanced bid
 Technological innovations
 Overhead cableway
 Jumbo Drill
 Concrete mixing plant
Innovative
project
management
Hoover Dam Project challenges
and innovative management
 Human Resources
 Managing workers relations
 Pushing workers on output
 Taking a non-negotiation stance with unions
 providing healthcare
Special medical dispensaries
 lack of safety programs
Human
resources
Hoover Dam Project challenges
and innovative management
Lessons learned from comparing megaproject
framework by the Department of Energy (DOE)
Method
 Frame Work developed by the Department of Energy (DOE)
Four Major phases:
 Key factors that were common to large construction projects delivered
successfully from the standpoint of cost, schedule, and scope.
Purpose
 Checklist can be used in different types of projects as a benchmark
against generally accepted characteristics of successful project.
Preconcepti
on
Conception Execution Closeout
 Clear define everything (1/6)
 Project Champion (2/6)
 Relationship (3/6)
 Leadership (4/6)
 Contract (5/6)
 Government (6/6)
Condition cited as essential to success by
DOE & Hoover Dam project
Clear define everything (1/6)
DOE
1. Project sponsors know what
they need and afford.
2. Has a purpose and benefits
are clearly defined.
Hoover Dam
1. All the essential need understood
by both public and private
agencies.
2. All revenue were divided long
before the operation of the dam.
Project Champion (2/6)
DOE
Has one project champion
whose position and behavior
can benefits the project.
Hoover Dam
Agency maintain a close relationship
with parties, state and labors.
For instance:
• Address conflicts between public
against private interests and states
benefits.
• Deal with the strike problem.
• Secure adequately annual funds.
Relationship (3/6)
DOE
Open communications, mutual
trust, and close coordination are
maintained between
owner/users and project.
Hoover Dam
Government (Parties, Federal..)
Bureau of Reclamation
Contractor of the project
( Six Companies, resident
construction engineer…)r
Project manager (4/6)
DOE
1. Experienced project
manager
2. Project builder, possesses
the requisite technical,
managerial, and
communications skills, and
is brought into the project
early.
Hoover Dam
1. Interior secretary : addressing
financial and political considerations
of the project
2. Commissioner of the Bureau
of Reclamation : playing the role
of project champion .
3. Resident construction
engineer : strengthen the chain of
command between site superintendent
and company's senior management.
Contract (5/6)
DOE
1. Contract incentives are clear
and unambiguous,
appropriate to the
performance objectives.
2. Adequately compensate the
contractor for the use of
resources, risks.
Hoover Dam
1. Construction phase is divided into
major sub-phase and deadline
were set for each one of them.
2. Penalty for each delay
For instance:
• The deadline for diversion of the
Colorado River was set as October
1st, 1933. Had to pay $3000 for
each day passing this deadline.
Government(6/6)
DOE
The half life of the political
sponsors that decided to
proceed with the project
exceeds the half life of the
project.
Hoover Dam
Mainly support by federal
government from the initiation to the
final.
Conclusion
 Project need to satisfying legislative requirements as the
result of which challenges can overcome by the parties
involved.
 Both Bureau of Reclamation and Six Companies, Inc. at the
field level and the executive level.
 Ensuring the construction are review board which
minimized rework and delay during construction.
 Establishing a clear chain of command in the owner and
contractor.
 Securing adequate annual funding and relevant legislative
and regulatory facilities.
Thank for your attention.
Thank for your attention.

Más contenido relacionado

La actualidad más candente

Dell case study final presentation
Dell case study final presentationDell case study final presentation
Dell case study final presentationElvia Leyva
 
Coke vs. Coke Case Study for Marketing Management
Coke vs. Coke Case Study for Marketing ManagementCoke vs. Coke Case Study for Marketing Management
Coke vs. Coke Case Study for Marketing ManagementJasmineDennis
 
Sport Obermeyer Case Study
Sport Obermeyer Case StudySport Obermeyer Case Study
Sport Obermeyer Case StudyGourav Anvekar
 
Ethical issues concerning coke
Ethical issues concerning cokeEthical issues concerning coke
Ethical issues concerning cokeSaran Chinnari
 
Salesforce.com: B2B blue ocean strategy
Salesforce.com:  B2B blue ocean strategySalesforce.com:  B2B blue ocean strategy
Salesforce.com: B2B blue ocean strategyDebojit Kumar Mondal
 
IDEO Product Development Presentation Team 4_Final
IDEO Product Development Presentation Team 4_FinalIDEO Product Development Presentation Team 4_Final
IDEO Product Development Presentation Team 4_FinalKaren He
 
Kristen's cookie company
Kristen's cookie companyKristen's cookie company
Kristen's cookie companyRahul Biradar
 
CocaCola Market entry strategy
CocaCola Market entry strategyCocaCola Market entry strategy
CocaCola Market entry strategyZaheen Bin Mahmood
 
Managing a Global Team:Greg James at Sun Microsystems, Inc. (A) & (B)
Managing a Global Team:Greg James at Sun Microsystems, Inc. (A) & (B)Managing a Global Team:Greg James at Sun Microsystems, Inc. (A) & (B)
Managing a Global Team:Greg James at Sun Microsystems, Inc. (A) & (B)Arun Kumar Trichur Varadarajan
 
Procter & Gamble Supply Chain Finance Case
Procter & Gamble Supply Chain Finance CaseProcter & Gamble Supply Chain Finance Case
Procter & Gamble Supply Chain Finance CaseYASSER ELSEDAWY
 
Nokia- A Bomb in your Pocket
Nokia- A Bomb in your PocketNokia- A Bomb in your Pocket
Nokia- A Bomb in your PocketManas Tripathy
 
The dashman company case group 8
The dashman company case group 8The dashman company case group 8
The dashman company case group 8Shanta Mohanty
 

La actualidad más candente (20)

Dell case study final presentation
Dell case study final presentationDell case study final presentation
Dell case study final presentation
 
Three georges dam
Three georges damThree georges dam
Three georges dam
 
Hoover Dam by John Howard
Hoover Dam by John HowardHoover Dam by John Howard
Hoover Dam by John Howard
 
Coke vs. Coke Case Study for Marketing Management
Coke vs. Coke Case Study for Marketing ManagementCoke vs. Coke Case Study for Marketing Management
Coke vs. Coke Case Study for Marketing Management
 
Sport Obermeyer Case Study
Sport Obermeyer Case StudySport Obermeyer Case Study
Sport Obermeyer Case Study
 
Sales and Distribution Management of Coca-Cola
Sales and Distribution Management of Coca-ColaSales and Distribution Management of Coca-Cola
Sales and Distribution Management of Coca-Cola
 
Ethical issues concerning coke
Ethical issues concerning cokeEthical issues concerning coke
Ethical issues concerning coke
 
Salesforce.com: B2B blue ocean strategy
Salesforce.com:  B2B blue ocean strategySalesforce.com:  B2B blue ocean strategy
Salesforce.com: B2B blue ocean strategy
 
Kala dera case coke
Kala dera case cokeKala dera case coke
Kala dera case coke
 
IDEO Product Development Presentation Team 4_Final
IDEO Product Development Presentation Team 4_FinalIDEO Product Development Presentation Team 4_Final
IDEO Product Development Presentation Team 4_Final
 
Kristen's cookie company
Kristen's cookie companyKristen's cookie company
Kristen's cookie company
 
ZARA Supply chain and Logistics improvements
ZARA Supply chain and Logistics improvementsZARA Supply chain and Logistics improvements
ZARA Supply chain and Logistics improvements
 
CocaCola Market entry strategy
CocaCola Market entry strategyCocaCola Market entry strategy
CocaCola Market entry strategy
 
Managing a Global Team:Greg James at Sun Microsystems, Inc. (A) & (B)
Managing a Global Team:Greg James at Sun Microsystems, Inc. (A) & (B)Managing a Global Team:Greg James at Sun Microsystems, Inc. (A) & (B)
Managing a Global Team:Greg James at Sun Microsystems, Inc. (A) & (B)
 
AIC netbooks
AIC netbooksAIC netbooks
AIC netbooks
 
Procter & Gamble Supply Chain Finance Case
Procter & Gamble Supply Chain Finance CaseProcter & Gamble Supply Chain Finance Case
Procter & Gamble Supply Chain Finance Case
 
Sport obermeyer
Sport obermeyerSport obermeyer
Sport obermeyer
 
Nokia- A Bomb in your Pocket
Nokia- A Bomb in your PocketNokia- A Bomb in your Pocket
Nokia- A Bomb in your Pocket
 
MediSys Corp- Case Study
MediSys Corp- Case Study MediSys Corp- Case Study
MediSys Corp- Case Study
 
The dashman company case group 8
The dashman company case group 8The dashman company case group 8
The dashman company case group 8
 

Destacado

Hoover dam and the negative effects on environment
Hoover dam and the negative effects on environmentHoover dam and the negative effects on environment
Hoover dam and the negative effects on environmentLengkengs
 
Student Presentation: The Hoover Dam by Sid and Vic
Student Presentation: The Hoover Dam by Sid and VicStudent Presentation: The Hoover Dam by Sid and Vic
Student Presentation: The Hoover Dam by Sid and Vicmrs_murphy_ncssm
 
Note for Hoover Dam
Note for Hoover DamNote for Hoover Dam
Note for Hoover DamLengkengs
 
Hoover dam bypass_bridge2
Hoover dam bypass_bridge2Hoover dam bypass_bridge2
Hoover dam bypass_bridge2George Martin
 
Hoover dam bypass bridge
Hoover dam bypass bridgeHoover dam bypass bridge
Hoover dam bypass bridgeBismillah Arif
 
TEHRI DAM & ITS IMPLICATIONS
TEHRI DAM & ITS IMPLICATIONSTEHRI DAM & ITS IMPLICATIONS
TEHRI DAM & ITS IMPLICATIONSA Y V CHENULU
 
Hoover dam and the negative effects on environment
Hoover dam and the negative effects on environmentHoover dam and the negative effects on environment
Hoover dam and the negative effects on environmentLengkengs
 
Herbert Hoover Presidential Library-Museum
Herbert Hoover Presidential Library-MuseumHerbert Hoover Presidential Library-Museum
Herbert Hoover Presidential Library-MuseumAidan Brady
 
The hoover dam elena's homework
The hoover dam elena's homeworkThe hoover dam elena's homework
The hoover dam elena's homeworkmrzislion
 
The hoover dam 3
The hoover dam 3The hoover dam 3
The hoover dam 3l yingling
 
Grace Cathedral - San Francisco California
Grace Cathedral  - San Francisco CaliforniaGrace Cathedral  - San Francisco California
Grace Cathedral - San Francisco CaliforniaSteven Cantler
 
Hoover Dam - Arizona & Nevada
Hoover Dam - Arizona & NevadaHoover Dam - Arizona & Nevada
Hoover Dam - Arizona & NevadaSteven Cantler
 
4M Presentation - E-learning platform
4M Presentation - E-learning platform4M Presentation - E-learning platform
4M Presentation - E-learning platformProxicon Ltd
 
Ppt on tehri dam by shubham dobhal
Ppt on tehri dam by shubham dobhalPpt on tehri dam by shubham dobhal
Ppt on tehri dam by shubham dobhalShubham Dobhal
 
Nagarjuna sagar dam
Nagarjuna sagar damNagarjuna sagar dam
Nagarjuna sagar damShubham Shah
 

Destacado (20)

Hoover dam
Hoover damHoover dam
Hoover dam
 
Hoover dam and the negative effects on environment
Hoover dam and the negative effects on environmentHoover dam and the negative effects on environment
Hoover dam and the negative effects on environment
 
Student Presentation: The Hoover Dam by Sid and Vic
Student Presentation: The Hoover Dam by Sid and VicStudent Presentation: The Hoover Dam by Sid and Vic
Student Presentation: The Hoover Dam by Sid and Vic
 
Note for Hoover Dam
Note for Hoover DamNote for Hoover Dam
Note for Hoover Dam
 
Hoover Dam
Hoover DamHoover Dam
Hoover Dam
 
HOOVER DAM DOC
HOOVER DAM DOCHOOVER DAM DOC
HOOVER DAM DOC
 
Hoover dam bypass_bridge2
Hoover dam bypass_bridge2Hoover dam bypass_bridge2
Hoover dam bypass_bridge2
 
Hoover dam bypass bridge
Hoover dam bypass bridgeHoover dam bypass bridge
Hoover dam bypass bridge
 
TEHRI DAM & ITS IMPLICATIONS
TEHRI DAM & ITS IMPLICATIONSTEHRI DAM & ITS IMPLICATIONS
TEHRI DAM & ITS IMPLICATIONS
 
Hoover dam and the negative effects on environment
Hoover dam and the negative effects on environmentHoover dam and the negative effects on environment
Hoover dam and the negative effects on environment
 
Herbert Hoover Presidential Library-Museum
Herbert Hoover Presidential Library-MuseumHerbert Hoover Presidential Library-Museum
Herbert Hoover Presidential Library-Museum
 
The hoover dam elena's homework
The hoover dam elena's homeworkThe hoover dam elena's homework
The hoover dam elena's homework
 
Hoover
HooverHoover
Hoover
 
Women
WomenWomen
Women
 
The hoover dam 3
The hoover dam 3The hoover dam 3
The hoover dam 3
 
Grace Cathedral - San Francisco California
Grace Cathedral  - San Francisco CaliforniaGrace Cathedral  - San Francisco California
Grace Cathedral - San Francisco California
 
Hoover Dam - Arizona & Nevada
Hoover Dam - Arizona & NevadaHoover Dam - Arizona & Nevada
Hoover Dam - Arizona & Nevada
 
4M Presentation - E-learning platform
4M Presentation - E-learning platform4M Presentation - E-learning platform
4M Presentation - E-learning platform
 
Ppt on tehri dam by shubham dobhal
Ppt on tehri dam by shubham dobhalPpt on tehri dam by shubham dobhal
Ppt on tehri dam by shubham dobhal
 
Nagarjuna sagar dam
Nagarjuna sagar damNagarjuna sagar dam
Nagarjuna sagar dam
 

Similar a What can we learn from the hoover dam

Nuprecon - Presentation I gave at Camp Dresser McKee
Nuprecon - Presentation I gave at Camp Dresser McKeeNuprecon - Presentation I gave at Camp Dresser McKee
Nuprecon - Presentation I gave at Camp Dresser McKeedignagni
 
State senate transpo hearings 11 13-13 backgroundpaper
State senate transpo hearings 11 13-13 backgroundpaperState senate transpo hearings 11 13-13 backgroundpaper
State senate transpo hearings 11 13-13 backgroundpaperpeggydrouet
 
Improving Megaproject Performance (2011)
Improving Megaproject Performance (2011)Improving Megaproject Performance (2011)
Improving Megaproject Performance (2011)Michael Filippich
 
Changing the Face at the Busiest Airport in the World th.docx
Changing the Face  at the Busiest Airport  in the World th.docxChanging the Face  at the Busiest Airport  in the World th.docx
Changing the Face at the Busiest Airport in the World th.docxcravennichole326
 
Project Management
Project ManagementProject Management
Project ManagementAnton Orlov
 
LEADERSHIP ROLES With a project of this magnitude, it .docx
LEADERSHIP ROLES With a project of this magnitude, it .docxLEADERSHIP ROLES With a project of this magnitude, it .docx
LEADERSHIP ROLES With a project of this magnitude, it .docxcroysierkathey
 
Changing the Face at the Busiest Airport in the World thro.docx
Changing the Face at the Busiest Airport in the World thro.docxChanging the Face at the Busiest Airport in the World thro.docx
Changing the Face at the Busiest Airport in the World thro.docxcravennichole326
 
The Channel Tunnel
The Channel TunnelThe Channel Tunnel
The Channel TunnelPriya Raj
 
megaprojects, SPUR 2022.pdf
megaprojects, SPUR 2022.pdfmegaprojects, SPUR 2022.pdf
megaprojects, SPUR 2022.pdfAdina Levin
 
Presentation_to_PMI-Calumet_Northwestern_Indiana_Region
Presentation_to_PMI-Calumet_Northwestern_Indiana_RegionPresentation_to_PMI-Calumet_Northwestern_Indiana_Region
Presentation_to_PMI-Calumet_Northwestern_Indiana_RegionKevin Lovell, PMP
 
CHAPTER 1 - Project Management.pdf
CHAPTER 1 - Project Management.pdfCHAPTER 1 - Project Management.pdf
CHAPTER 1 - Project Management.pdfMartinsAras
 
Conflict management with lessons from history by Mark Kozak-Holland, 18 Oct 2...
Conflict management with lessons from history by Mark Kozak-Holland, 18 Oct 2...Conflict management with lessons from history by Mark Kozak-Holland, 18 Oct 2...
Conflict management with lessons from history by Mark Kozak-Holland, 18 Oct 2...Association for Project Management
 
Derek Dhonau resume
Derek Dhonau resumeDerek Dhonau resume
Derek Dhonau resumeDerek Dhonau
 
Undergraduate Senior Design Brief - Climate Change Impact Assesment - Infrast...
Undergraduate Senior Design Brief - Climate Change Impact Assesment - Infrast...Undergraduate Senior Design Brief - Climate Change Impact Assesment - Infrast...
Undergraduate Senior Design Brief - Climate Change Impact Assesment - Infrast...Nicholas Phelan
 
Project Complexity (Case study)
Project Complexity (Case study)Project Complexity (Case study)
Project Complexity (Case study)Sunny Mahajan
 
Civil10
Civil10Civil10
Civil10saihem
 
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...Adam Berry
 
DSD-Kampala 2023 Modelling in support of decision making - Russell
DSD-Kampala 2023 Modelling in support of decision making - RussellDSD-Kampala 2023 Modelling in support of decision making - Russell
DSD-Kampala 2023 Modelling in support of decision making - RussellDeltares
 

Similar a What can we learn from the hoover dam (20)

Nuprecon - Presentation I gave at Camp Dresser McKee
Nuprecon - Presentation I gave at Camp Dresser McKeeNuprecon - Presentation I gave at Camp Dresser McKee
Nuprecon - Presentation I gave at Camp Dresser McKee
 
State senate transpo hearings 11 13-13 backgroundpaper
State senate transpo hearings 11 13-13 backgroundpaperState senate transpo hearings 11 13-13 backgroundpaper
State senate transpo hearings 11 13-13 backgroundpaper
 
Improving Megaproject Performance (2011)
Improving Megaproject Performance (2011)Improving Megaproject Performance (2011)
Improving Megaproject Performance (2011)
 
Changing the Face at the Busiest Airport in the World th.docx
Changing the Face  at the Busiest Airport  in the World th.docxChanging the Face  at the Busiest Airport  in the World th.docx
Changing the Face at the Busiest Airport in the World th.docx
 
Project Management
Project ManagementProject Management
Project Management
 
LEADERSHIP ROLES With a project of this magnitude, it .docx
LEADERSHIP ROLES With a project of this magnitude, it .docxLEADERSHIP ROLES With a project of this magnitude, it .docx
LEADERSHIP ROLES With a project of this magnitude, it .docx
 
projects
projectsprojects
projects
 
Changing the Face at the Busiest Airport in the World thro.docx
Changing the Face at the Busiest Airport in the World thro.docxChanging the Face at the Busiest Airport in the World thro.docx
Changing the Face at the Busiest Airport in the World thro.docx
 
The Channel Tunnel
The Channel TunnelThe Channel Tunnel
The Channel Tunnel
 
megaprojects, SPUR 2022.pdf
megaprojects, SPUR 2022.pdfmegaprojects, SPUR 2022.pdf
megaprojects, SPUR 2022.pdf
 
Presentation_to_PMI-Calumet_Northwestern_Indiana_Region
Presentation_to_PMI-Calumet_Northwestern_Indiana_RegionPresentation_to_PMI-Calumet_Northwestern_Indiana_Region
Presentation_to_PMI-Calumet_Northwestern_Indiana_Region
 
CHAPTER 1 - Project Management.pdf
CHAPTER 1 - Project Management.pdfCHAPTER 1 - Project Management.pdf
CHAPTER 1 - Project Management.pdf
 
Conflict management with lessons from history by Mark Kozak-Holland, 18 Oct 2...
Conflict management with lessons from history by Mark Kozak-Holland, 18 Oct 2...Conflict management with lessons from history by Mark Kozak-Holland, 18 Oct 2...
Conflict management with lessons from history by Mark Kozak-Holland, 18 Oct 2...
 
Derek Dhonau resume
Derek Dhonau resumeDerek Dhonau resume
Derek Dhonau resume
 
Undergraduate Senior Design Brief - Climate Change Impact Assesment - Infrast...
Undergraduate Senior Design Brief - Climate Change Impact Assesment - Infrast...Undergraduate Senior Design Brief - Climate Change Impact Assesment - Infrast...
Undergraduate Senior Design Brief - Climate Change Impact Assesment - Infrast...
 
Eschenburg Resume 1
Eschenburg  Resume 1Eschenburg  Resume 1
Eschenburg Resume 1
 
Project Complexity (Case study)
Project Complexity (Case study)Project Complexity (Case study)
Project Complexity (Case study)
 
Civil10
Civil10Civil10
Civil10
 
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
 
DSD-Kampala 2023 Modelling in support of decision making - Russell
DSD-Kampala 2023 Modelling in support of decision making - RussellDSD-Kampala 2023 Modelling in support of decision making - Russell
DSD-Kampala 2023 Modelling in support of decision making - Russell
 

Último

Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseri bangash
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdftbatkhuu1
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 

Último (20)

Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdf
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 

What can we learn from the hoover dam

  • 1. What can we learn from the Hoover Dam project that influenced modern project management? INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT VOL.32(2014) P.256-264 YOUNG HOON KWAK, JOHN WALEWSKI, DANA SLEEPER AND HESSAM SADATSAFAVI 102034550 簡翊真 102034611 董咨均
  • 2. Index  Introduce  Video  Abstract  Background  History of the Hoover Dam project by project phases  Hoover Dam Project challenges and innovative management  Lessons learned from comparing megaproject framework by the Department of Energy (DOE)  Conclusion
  • 3. Introduction  Location: Clark County/ Arizona, US  Duration: 1931 ~ 1936 (2 yrs earlier)  Life cost: 112 person  Cost: $ 833 million with inflation  Length: 379m, Height: 221.4m, Width: 200m  Company: Six Companies, Inc.  Purpose: control floods, provide irrigation water and produce hydroelectric power for Nevada, Arizona, and California.
  • 4. Introduction Why Hoover Dam is so special? Reason1 - Breakthrough • Never built such large dam before • Techniques were unproven Reason2 – Time limit • Get fund if not on time • Built the road on canyon before start
  • 5. Video  One is from the history aspect  One is from the construction aspect
  • 6. Abstract  This paper examines project and program management practices applied to the building of the Hoover Dam, and discusses how these factors contributed to the establishment and evolution of modern project management principles, tools, and techniques.
  • 7. Background The greatest engineering and construction projects In the Great Depression  Completed in 1936  Two years ahead of schedule and under budget
  • 8. History of the Hoover Dam project by project phases Conceptual phase Planning, execution and construction phase Close out phase
  • 9. History of the Hoover Dam project by project phases  Colorado River Compact  In Black Canyon  dividing generated electricity Fourth version of the Boulder Canyon Project Act 1920 1928 12190419
  • 10. History of the Hoover Dam project by project phases Frank T. Crowe  Work on the foundation  Technical and productivity innovations  Electric lighting  Aerial tramways Planning, execution and construction phase 1931 General Superintendent 30192919
  • 11. History of the Hoover Dam project by project phases  The dam and power house were turned over to the Interior Department in February 1936, 26 months ahead of schedule and $15 million under budget.  Six Companies, Inc. was also able to overcome many obstacles in the construction of the dam and secure a profit of $13 million. Close out phase 1936 35193419
  • 12. Hoover Dam Project challenges and innovative management Human resources Innovative project management There are various issues, including organizational, managerial, planning, and implemental challenges, obstacles, solutions, and suggestions related to the Hoover Dam project. Strategic value creation
  • 13.  Economical and managerial challenges  Ensuring the profitability of the project  Determining the hydroelectric power rate  Dividing the water and power to seven Basin states  Supporting the construction activities  Safety and health issues Hoover Dam Project challenges and innovative management Strategic value creation
  • 14.  Government relations  Hoover Dam project was one of the first examples of a partnership between public and private sectors  Joint ventures  Foremost among innovative managerial solutions was the employment of a joint venture involving eight different firms, organized into six partners. Hoover Dam Project challenges and innovative management Strategic value creation
  • 15.  Innovative resources allocations  Unbalanced bid  Technological innovations  Overhead cableway  Jumbo Drill  Concrete mixing plant Innovative project management Hoover Dam Project challenges and innovative management
  • 16.  Human Resources  Managing workers relations  Pushing workers on output  Taking a non-negotiation stance with unions  providing healthcare Special medical dispensaries  lack of safety programs Human resources Hoover Dam Project challenges and innovative management
  • 17. Lessons learned from comparing megaproject framework by the Department of Energy (DOE) Method  Frame Work developed by the Department of Energy (DOE) Four Major phases:  Key factors that were common to large construction projects delivered successfully from the standpoint of cost, schedule, and scope. Purpose  Checklist can be used in different types of projects as a benchmark against generally accepted characteristics of successful project. Preconcepti on Conception Execution Closeout
  • 18.  Clear define everything (1/6)  Project Champion (2/6)  Relationship (3/6)  Leadership (4/6)  Contract (5/6)  Government (6/6) Condition cited as essential to success by DOE & Hoover Dam project
  • 19. Clear define everything (1/6) DOE 1. Project sponsors know what they need and afford. 2. Has a purpose and benefits are clearly defined. Hoover Dam 1. All the essential need understood by both public and private agencies. 2. All revenue were divided long before the operation of the dam.
  • 20. Project Champion (2/6) DOE Has one project champion whose position and behavior can benefits the project. Hoover Dam Agency maintain a close relationship with parties, state and labors. For instance: • Address conflicts between public against private interests and states benefits. • Deal with the strike problem. • Secure adequately annual funds.
  • 21. Relationship (3/6) DOE Open communications, mutual trust, and close coordination are maintained between owner/users and project. Hoover Dam Government (Parties, Federal..) Bureau of Reclamation Contractor of the project ( Six Companies, resident construction engineer…)r
  • 22. Project manager (4/6) DOE 1. Experienced project manager 2. Project builder, possesses the requisite technical, managerial, and communications skills, and is brought into the project early. Hoover Dam 1. Interior secretary : addressing financial and political considerations of the project 2. Commissioner of the Bureau of Reclamation : playing the role of project champion . 3. Resident construction engineer : strengthen the chain of command between site superintendent and company's senior management.
  • 23. Contract (5/6) DOE 1. Contract incentives are clear and unambiguous, appropriate to the performance objectives. 2. Adequately compensate the contractor for the use of resources, risks. Hoover Dam 1. Construction phase is divided into major sub-phase and deadline were set for each one of them. 2. Penalty for each delay For instance: • The deadline for diversion of the Colorado River was set as October 1st, 1933. Had to pay $3000 for each day passing this deadline.
  • 24. Government(6/6) DOE The half life of the political sponsors that decided to proceed with the project exceeds the half life of the project. Hoover Dam Mainly support by federal government from the initiation to the final.
  • 25. Conclusion  Project need to satisfying legislative requirements as the result of which challenges can overcome by the parties involved.  Both Bureau of Reclamation and Six Companies, Inc. at the field level and the executive level.  Ensuring the construction are review board which minimized rework and delay during construction.  Establishing a clear chain of command in the owner and contractor.  Securing adequate annual funding and relevant legislative and regulatory facilities.
  • 26. Thank for your attention.
  • 27. Thank for your attention.