Project Appraisal and Financing<br />Analyzing the Financial Feasibility of<br />Solar Power Plants in India<br />September 9th, 2011<br />Akash Jauhari<br />Institute of Management Technology<br />Ghaziabad<br />Table of Contents<br />1. Background for Solar Power related Industries in India………..................................................3-4<br />               1.1 National Solar Mission................................................................................................3<br />               1.2 Tax, Fiscal & Other Incentives.....................................................................................3<br />               1.3 Photovoltaic Cell & Module Production in India........................................................4<br />               1.4 Solar Power Value Chain & presence in India............................................................4<br />               <br />2. Analyzing Financial Feasibility of Solar PV Power Plant...........................................................5-8<br />               2.1 Specifications of the Project.......................................................................................5<br />               2.2 Cost Structure.............................................................................................................5<br />               2.3 Expected Cash Flows & NPV.......................................................................................6<br />               2.4 Sensitivity Analysis…………………………………………………………………….…………………………6-7<br />               2.5 Scenario Analysis…………………………………………………………………………………………………..7<br />               2.6 Foreign Investment in this Sector........................................................................…...8<br />               2.7 Appropriate time for investment…………………………………………………………………………..8<br />3. Economics for Solar Power in India.......................................................................................9-12<br />               3.1 Present cost levels & comparisons...........................................................................9<br />               3.2 Key drivers for cost reduction................................................................................9-10<br /> 3.3 Grid parity with conventional power....................................................................10-11<br />               3.4 PPA revising policy for government........................................................................12<br />4. Globally operational Solar Power Plants………………………………………………………………………….13-15<br />              4.1 Solar Power in Germany…………………………………………………………………………….……..14-15<br />5. Key Findings & Recommendations……………………………………………………………………………………..16<br />6. Appendix…………………………………………………………………………………………………………………………17-18<br />1. Background for Solar Power related Industries in India<br />1.1 National Solar Mission<br />The National Solar Mission program was initiated by the Government as one of the 8 programs under the National Action Plan for Climate Change by the Prime Minister of India in 2008. In the month of November 2009, the Mission document was released as Jawaharlal Nehru National Solar Mission (JNNSM) and the Mission was formally launched by the Prime Minister on January 11 2010. The JNNSM is neutral to solar technologies and has provision for the development of all viable technologies. Apart from solar PV (crystalline and Thin Film), the already existing technology in India, JNNSM has the provision to develop solar thermal technology for large scale grid connected power plants. . The document emphasizes on the development of grid-connected applications, by offering feed-in tariffs for the power producers. The feed-in tariff is proposed to be extended to 25 years from the earlier duration of 10 years under the GBI Scheme.<br /> PeriodTarget Capacity   Phase I2009-121 - 1.5 GW          Phase II2013-176 - 7 GW       Phase III2017-2220 GW<br />1.2 Tax, Fiscal and other Incentives<br />Current cost structure for solar power makes it impossible to compete in open market. But to develop the technology for the future, government provides certain incentives and rebates to the industry. Such promises are necessary till the PV sector achieves parity with the conventional sources of energy. These are briefly described below:<br />,[object Object]
Tax holidays for first 10 years of operation for power producing firms.
Exemptions on custom and excise for goods imported required in power plants.
Levy of VAT at a discounted rate of 5%
 Provision for accelerated depreciation.1.3 Photovoltaic cell and module production in India<br />According to data obtained from MNRE, during 2009-10, 15 companies were actively engaged in the manufacture of solar cells and 20 companies in the manufacture of PV modules. In addition, about 50 companies were actively engaged in manufacturing a variety of PV systems. The overall production in the country during 2008-09 is estimated to be over 175 MWh of solar cells and 240 MWp of PV modules. According to data obtained from MNRE, during 2008-09, 15 companies were actively engaged in the manufacture of solar cells and 20 companies in the manufacture of PV modules<br />,[object Object],Source: MNRE annual Presentation 2010<br />1.4 Solar power Value chain & presence in India<br />Power PlantModulesCellsWafer&IngotPolysilicon<br />Poly Silicon Wafer & Ingot Cells Modules/ Utilities Power Plants Intermediate Technology Value Stack 18 33 48 60 100 Embedded Presence in India No No Yes Yes Yes No Suppliers China China X X X USA <br />Source: EAI research, published Mar 2010<br />As clear from above table initial two steps in value chain are non-existent in India. Hence cost of setting up a Photovoltaic Power Plant in India has a higher cost. <br />2. Analyzing Financial Feasibility of Solar PV Power Plant <br />2.1 Specifications of the project<br />,[object Object]
Life of the project is expected to be 12 years, since the technology will become obsolete after that time period
The cost of equity is assumed to be 15% with 50% weight age. The cost of debt is taken to be 11.5% (as per IREDA norms) with 50% weight age. Hence, the cost of capital is calculated to be 13.25%.
For discounting purpose, hurdle rate is taken to be 14%.
Power Purchase Agreement of Rs. 15.3/KWh is taken to be constant for the period of 12 years.
A Capacity Utilization Factor of 19% is expected from the power plant.2.2 Cost Structure<br />Central Electricity Regulatory Commission (CERC) has proposed the benchmark cost for PV power plants in India as following:<br />ParticularCapital cost (Rs. Cr./MWh)Percentage of total costPV Module8.3358Land0.151Civil & General0.957Mounting Structure1.057Conditioning1.611Evacuation Cost0.96Pre Operative cost1.4410Total Capital Cost14.421<br />Based on the above facts and figures, the initial setup cost for the power plant comes out to be Rs. 1220.85 million.<br />2.3 Expected Cash Flows and NPV<br />Our detailed calculations are mentioned in the appendix 1 of this report. Based on the calculations, following figures are obtained.<br />,[object Object]
The NPV value is $64.36
NPV as a percentage of initial outlay is 0.05%.
Return on Equity is 0.11.
Looking at these values, we conclude that the project offers low return on investment (considering the risk). To make the solar power more financially viable, conversion efficiency needs to be substantially increased. Also, the PV power plant should not be considered as a standalone project.2.4 Sensitivity Analysis:<br />We attempt to determine the deviation in NPV when following three factors are changed individually: PPA, Tax and Conversion Efficiency.<br />Case 1:<br />Changing PPAs<br />PPAsProbabilityNPVsProb.*NPVOptimistic180.15304.0045.60Most Likely15.30.7064.3645.05Pessimistic100.15-407.00-61.05Expected NPV29.60<br />Case 2:<br />Changing Tax<br />TaxProbabilityNPVsProb.*NPVTax Holidays0%0.7564.3648.27Reduce incentive15%0.15-49.22-7.383Eliminate incentive30%0.10-162.79-16.279Expected NPV24.608<br />Case 3:<br />Changing Conversion Efficiency<br />EfficiencyProbabilityNPVsProb.*NPVExpected0.190.7564.3648.27Below Expected0.140.25-294.3-73.575Expected NPV-23.305<br />From the above three cases, we conclude the following:<br />1) Solar Power Projects are majorly dependent on Govt. policies/incentive. Hence some amount of risk always exists with it.<br />2) NPV or returns are highly sensitive to Conversion factor.<br />2.5 Scenario Analysis:<br />As the sector is highly dependent on government incentives, we consider three scenarios, namely, govt. Incentive continued, govt. Incentive reduced and govt. Incentive minimized. We then determine the change in the target function NPV.<br />Scenario 1Govt. Incentive continuedScenario 2Govt. Incentive reducedScenario 3Govt. Incentive minimizedPPAs15.31210Tax00.150.30Capacity Purchased (fraction of max. Capacity)10.750.50NPV64.36-528.6-811.59Probability0.80.150.05NPV*Prob.51.488-78.29-40.5795<br />Expected NPV = -68.3815  <br />From the scenario analysis, we conclude that the existence of solar power sector will be driven by Government policies; at least in the initial stages.<br />2.6 Foreign Investment in this sector:<br />To determine the return for a Spanish Firm investing in Indian Solar Power Project, we follow the foreign currency approach.<br />The required rate of return for the Spanish firm is taken to be 14%.<br />The risk free rate in Spain is assumed to be 11.5%.<br />The risk free rate in India is taken to be 11%.<br />Equation for Spain:  (1 + Risk free rate in Spain)*(1 + Risk Premium) = (1 + Risk Adjusted rate in Spain)<br />Risk Premium is calculated to be 2%.<br />For India, the discounting rate is calculated to be 1.13%.<br />The NPV calculated from above data = $119.89<br />From above calculations, we conclude that the Indian Solar Power sector will be a good investment (FDI) for the European players.   <br />2.7 Appropriate time for Investment<br />Following three assumptions are considered:<br />1. Poly-silicon prices coming down by 20%, thus Initial setup cost down by 12%.<br />2. CUF (conversion efficiency) going up-to 22%.<br />3. Rest of the factors remaining unchanged.<br />Calculated Values: (see appendix 2 for detailed calculations)<br />Old NPV$64.36New NPV$504.45Old IRR15%New IRR21%<br />On the basis of above assumptions and values, the appropriate time for investment would be in the next 3-4 years.<br />3. Economics for Solar Power in India<br />3.1 Present cost levels and Comparisons<br />Solar power is expensive when compared to conventional sources of power and hence, the solar market development is currently dependent on Government support.<br />During the last few years, there has explored cost reduction possibilities for been significant cost reduction in solar power. Power and the cost curves of solar power are declining. On the other hand, while there are multiple solar costs of power from conventional technology options, particularly two sources are increasing due to higher technologies viz. solar crystalline and fixed costs and rising fuel prices. Solar parabolic trough are considered<br />Moreover, there is considerable mature and likely to reach grid parity research that is underway to further faster.<br />3.2 Key Drivers for Cost reduction <br />,[object Object]
Improving Efficiency (CUF)
Economies of Scale
Shifting of production units to Cheaper Cost Centers (China & India)The solar crystalline PV technology dominates the market for solar PV installations globally. Dynamic cost reductions have accelerated deployment of Solar C-Si (crystalline silicon) technology in the recent past. The module prices have dropped from around USD 3-4 per W about two years back to under USD 1.5-1.8 per W today. Consequently, the proportion of module prices in the total system price has come down significantly. The corresponding price of electricity which was upwards of INR 25 has dropped to around INR 13per unit.<br />Source: KPMG sector report May 2011<br />3.3 Grid Parity with Conventional power<br />Base scenario – Conventional Energy<br />The historical year-on-year growth rate in LCP for India in the last decade has been more than 4 percent. Going forward, the rate of increase in LCP for States would depend on internal efficiency drives towards reducing losses. Hence, States with very high loss levels today will see a relatively lower increase in LCP growth, assuming that they will improve their efficiency levels. Accordingly, we have assumed the LCP for states with low AT & C losses (less than India’s loss levels (~29 percent)) to grow at 4 percent, with moderate AT & C losses (greater than India’s loss levels but less than 50 percent) to grow at 3 percent, and for others with high AT & C losses (greater than 50 percent) at 2 percent.<br />[Source: PFC report on performance of state power utilities]<br />Level zed Cost Comparison of Utility-scale PV and Conventional Power at Grid-<br />As shown in the exhibit above, the grid from solar power with the level zed parity is likely to happen between 2019 and 20. Here, the solar utility corresponding year. Similar to what we band represents the margins –  have shown in the grid parity difference between cost and price - that projections for small-scale applications, are likely to vary depending on the we expect certain states like Rajasthan bargaining power of the developers. We to achieve grid parity well before the have compared the level zed tariffs rest of India.<br />3.4 PPA Revising Policy for Government<br />Current PPA of Rs 15.3 per unit is unrealistic, and thus cannot be sustained forever. As the cost for producing Solar PV power comes down, there is a probability that government will revise its PPA policy. Eventually when PV power achieves parity with conventional energy, PPA policy will be taken back. Looking at global scenario, PPAs stand at about 25% margin to cost of producing power. Taking the concept forward we calculate expected PPA from government<br /> 2011201220132014201520162017201820192020PV Cost (INR/Watt)11.610.749.959.218.527.887.266.696.165.67PPA expected 13.412.411.510.79.99.18.47.77.1<br />4. Globally Operational Solar Power Plants<br />Globally, Europe has taken the lead and has already installed significant solar based capacity. Germany is the largest solar market globally with total installations of around 17,000 MW. In fact, solar PV provided 12 T-Wh (billion kilowatt-hours) of electricity in Germany in 2010, about 2 percent of total electricity in that country2. A point to note is the fact that the solar isolation in Germany, at about 3.15 units per sq. meter per day, is very low when compared to India’s average of 5.50 units per sq. meter per day<br />Source: KPMG sector report, May 2011<br />Global annual installations - Germany is the market leader Globally, the solar PV market had installations of more than 17,000 MW in 2010 recording a growth of more than 3 130 percent over 2009 . While India’s share at around 1 percent is very low at present, it is likely to increase substantially in the future.<br />4.1 Solar Power in Germany <br />German Renewable Energy Act<br />(DENA, 2011) reports that as of January 2011, around 17% of electricity, 8% of heat and 6% of fuel used in Germany is generated from renewable sources, further reducing Germany’s energy imports. In addition, 110 million metric tons of CO2 emissions were cut due to the use of renewable energies only during 2010. The renewable energy industry employs today more than 350,000 people in Germany (up from 30,000 people in the year 1998) and is home to several world market leaders like Enercon, Nordex and Repower in the wind industry and Q-Cells, Schott Solar and SolarWorld in the solar industry. Germany is today among the world’s three major renewable energy economies (Renewable Energy Network 21, 2011). Due to its success, the German Renewable Energy Act can serve as an archetype of similar legislation in other countries<br />The three main principles<br />The three main principles of the EEG are:<br />Investment protection through guaranteed feed-in tariffs and connection requirement: Every kilowatt-hour that is generated from renewable energy facilities receives a fixed feed-in tariff. Furthermore, the network operators must feed in this electricity into the grid preferentially to the electricity generated by conventional sources (nuclear power, coal and gas). Renewable energy plant operators receive a 20 year, technology specific, guaranteed payment for their produced electricity. In particular, small and medium-sized enterprises SMEs have been given new access to the electricity market, along with private land owners. The Federal Ministry for Environment, Nature Conservation and Nuclear Safety (2010) argues that anyone who produces renewable energy can now sell his ‘product’ for a 20-year fixed price.<br />No charge to Germany’s public purse: as of today, the promotion of renewable electricity is still necessary. The EEG rates of remuneration clearly show what electricity from wind, hydro, solar, bio and geothermal energy actually cost. Unlike fossil fuels, there are no external costs such as damages to the environment, the climate or human health. The remuneration rates are not subsidies as such since they are not paid for by taxes. On the contrary, the “polluter pays principle” (OECD, 2006) is distributed to the consumer: who consumes more pays more. The remuneration rates are paid for by every consumer with the electricity bill.<br /> Innovation by falling feed-in-tariffs: periodically lowering rates of remuneration for new plants (digression of 1% per year) exerts cost pressure on manufacturers. Thus, technologies are becoming more efficient and less costly<br />Payment scheme<br />The EEG also differentiates between technologies such that each renewable energy source (RES) receives a different payment guaranteed price according to its generation cost, ranging from 3.58 - 9.67 €-Cents per kilowatt-hour for hydropower to 35.49 – 51.7 €-Cents per kilowatt-hour for solar power (Rickerson, et al., 2007; Hirschl, 2008). Solar power recompense in the first half of 2011 ranges from 21.11 - 28,74 €ct/ kWh depending on installation size and form, with a further decrease of 9% to 15% foreseen in June, 2011<br />Largest German photovoltaic power stations (20 MW or larger)PV Power stationNominal Power(M-Wh)Production(AnnualG-Wh)CapacityfactorNotesFinsterwalde Solar Park80.7Phase I completed 2009,phase II and III 2010 Strasskirchen Solar Park54570.12Lieberose Photovoltaic Park53530.112009Kothen Solar Park452009<br />5. Key Findings & Recommendations<br />,[object Object]
The Sector is highly driven by Government support, hence any Scenario where Government reduces or minimizes the incentives proves to be destructive to return & risk profile of the project. However, possibility of such a development is expected to be low.

Más contenido relacionado

La actualidad más candente

Solar on grid application ppt
Solar on grid application pptSolar on grid application ppt
Solar on grid application pptswati malla
 
On Grid Solar System to Create your own Electricity
On Grid Solar System to Create your own ElectricityOn Grid Solar System to Create your own Electricity
On Grid Solar System to Create your own Electricityrenewgreensolar
 
Introduction to Off Grid Solar Power system
Introduction to Off Grid Solar Power systemIntroduction to Off Grid Solar Power system
Introduction to Off Grid Solar Power systemShoeb Ali Khan
 
Solar Energy in India
Solar Energy in IndiaSolar Energy in India
Solar Energy in IndiaShivam Mittal
 
Solar Energy Presentation
Solar Energy PresentationSolar Energy Presentation
Solar Energy PresentationKurt Kublbeck
 
Solar power project
Solar power projectSolar power project
Solar power projectshazaan98
 
solar-power-plant-ppt
 solar-power-plant-ppt solar-power-plant-ppt
solar-power-plant-pptArvind Nangare
 
2. Solar Power Plant- O&M Issues
2. Solar Power Plant- O&M Issues2. Solar Power Plant- O&M Issues
2. Solar Power Plant- O&M IssuesNageswar Rao
 
Solar power in India - A financial analysis
Solar power in India - A financial analysisSolar power in India - A financial analysis
Solar power in India - A financial analysisAnkur Agarwal
 

La actualidad más candente (20)

Solar energy
Solar energySolar energy
Solar energy
 
Solar on grid application ppt
Solar on grid application pptSolar on grid application ppt
Solar on grid application ppt
 
On Grid Solar System to Create your own Electricity
On Grid Solar System to Create your own ElectricityOn Grid Solar System to Create your own Electricity
On Grid Solar System to Create your own Electricity
 
Solarpowerplant at lpu che ece
Solarpowerplant at lpu che eceSolarpowerplant at lpu che ece
Solarpowerplant at lpu che ece
 
Introduction to Off Grid Solar Power system
Introduction to Off Grid Solar Power systemIntroduction to Off Grid Solar Power system
Introduction to Off Grid Solar Power system
 
Solar Energy in India
Solar Energy in IndiaSolar Energy in India
Solar Energy in India
 
List of Clearances for Solar Project
List of Clearances for Solar ProjectList of Clearances for Solar Project
List of Clearances for Solar Project
 
Solar Energy Presentation
Solar Energy PresentationSolar Energy Presentation
Solar Energy Presentation
 
Power Market regulation
Power Market regulationPower Market regulation
Power Market regulation
 
Solar power project
Solar power projectSolar power project
Solar power project
 
solar-power-plant-ppt
 solar-power-plant-ppt solar-power-plant-ppt
solar-power-plant-ppt
 
Solar PV Sector in India: Challenges & Way Ahead
Solar PV Sector in India: Challenges & Way AheadSolar PV Sector in India: Challenges & Way Ahead
Solar PV Sector in India: Challenges & Way Ahead
 
2. Solar Power Plant- O&M Issues
2. Solar Power Plant- O&M Issues2. Solar Power Plant- O&M Issues
2. Solar Power Plant- O&M Issues
 
roof top solar
roof top solarroof top solar
roof top solar
 
A brief history of solar energy
A brief history of solar energyA brief history of solar energy
A brief history of solar energy
 
Solar Photovoltaic Energy
Solar Photovoltaic EnergySolar Photovoltaic Energy
Solar Photovoltaic Energy
 
IETE Institute Solar PPT
IETE Institute Solar PPTIETE Institute Solar PPT
IETE Institute Solar PPT
 
Solar rooftop presentation
Solar rooftop presentationSolar rooftop presentation
Solar rooftop presentation
 
Solar power in India - A financial analysis
Solar power in India - A financial analysisSolar power in India - A financial analysis
Solar power in India - A financial analysis
 
UCLA - Solar Canal Feasibility Study
UCLA - Solar Canal Feasibility StudyUCLA - Solar Canal Feasibility Study
UCLA - Solar Canal Feasibility Study
 

Destacado

10 MW Solar PV power Plant - CPM & PERT, Design
10 MW Solar PV power Plant - CPM & PERT, Design10 MW Solar PV power Plant - CPM & PERT, Design
10 MW Solar PV power Plant - CPM & PERT, DesignVignesh Sekar
 
Aoil floating solar power plant ppt 2015
Aoil floating solar power plant ppt 2015Aoil floating solar power plant ppt 2015
Aoil floating solar power plant ppt 2015Abhay Ocean India ltd.
 
On-grid PV Opportunities in University Campuses: A case study at Nazarbayev U...
On-grid PV Opportunities in University Campuses: A case study at Nazarbayev U...On-grid PV Opportunities in University Campuses: A case study at Nazarbayev U...
On-grid PV Opportunities in University Campuses: A case study at Nazarbayev U...Luis Ram Rojas-Sol
 
Study of Large Scale Grid interactive Solar PV power plant
Study of Large Scale Grid interactive Solar PV power plantStudy of Large Scale Grid interactive Solar PV power plant
Study of Large Scale Grid interactive Solar PV power plantShahbaz Makandar A.
 
Solitis electrical solutions pvt ltd consultancy electrical_2017-18
Solitis electrical solutions pvt ltd consultancy electrical_2017-18Solitis electrical solutions pvt ltd consultancy electrical_2017-18
Solitis electrical solutions pvt ltd consultancy electrical_2017-18Maxpromotion
 
Graphical Analysis of PV Plant Data
Graphical Analysis of PV Plant DataGraphical Analysis of PV Plant Data
Graphical Analysis of PV Plant DataCupertinoElectric
 
Solar PV-D.G. Hybrid Plant
Solar PV-D.G. Hybrid PlantSolar PV-D.G. Hybrid Plant
Solar PV-D.G. Hybrid PlantAvish Thakral
 
OHMS Energy Pvt. Ltd
OHMS Energy Pvt. LtdOHMS Energy Pvt. Ltd
OHMS Energy Pvt. LtdAjay Yadav
 
Project Proposal on 10 MW Solar PV Power Plant
Project Proposal on 10 MW Solar PV Power PlantProject Proposal on 10 MW Solar PV Power Plant
Project Proposal on 10 MW Solar PV Power PlantVignesh Sekar
 

Destacado (9)

10 MW Solar PV power Plant - CPM & PERT, Design
10 MW Solar PV power Plant - CPM & PERT, Design10 MW Solar PV power Plant - CPM & PERT, Design
10 MW Solar PV power Plant - CPM & PERT, Design
 
Aoil floating solar power plant ppt 2015
Aoil floating solar power plant ppt 2015Aoil floating solar power plant ppt 2015
Aoil floating solar power plant ppt 2015
 
On-grid PV Opportunities in University Campuses: A case study at Nazarbayev U...
On-grid PV Opportunities in University Campuses: A case study at Nazarbayev U...On-grid PV Opportunities in University Campuses: A case study at Nazarbayev U...
On-grid PV Opportunities in University Campuses: A case study at Nazarbayev U...
 
Study of Large Scale Grid interactive Solar PV power plant
Study of Large Scale Grid interactive Solar PV power plantStudy of Large Scale Grid interactive Solar PV power plant
Study of Large Scale Grid interactive Solar PV power plant
 
Solitis electrical solutions pvt ltd consultancy electrical_2017-18
Solitis electrical solutions pvt ltd consultancy electrical_2017-18Solitis electrical solutions pvt ltd consultancy electrical_2017-18
Solitis electrical solutions pvt ltd consultancy electrical_2017-18
 
Graphical Analysis of PV Plant Data
Graphical Analysis of PV Plant DataGraphical Analysis of PV Plant Data
Graphical Analysis of PV Plant Data
 
Solar PV-D.G. Hybrid Plant
Solar PV-D.G. Hybrid PlantSolar PV-D.G. Hybrid Plant
Solar PV-D.G. Hybrid Plant
 
OHMS Energy Pvt. Ltd
OHMS Energy Pvt. LtdOHMS Energy Pvt. Ltd
OHMS Energy Pvt. Ltd
 
Project Proposal on 10 MW Solar PV Power Plant
Project Proposal on 10 MW Solar PV Power PlantProject Proposal on 10 MW Solar PV Power Plant
Project Proposal on 10 MW Solar PV Power Plant
 

Similar a Financial Feasibility of Solar Power Plant in India

Session 13 national policy & regulatory framework & available incentives
Session 13   national policy & regulatory framework & available incentivesSession 13   national policy & regulatory framework & available incentives
Session 13 national policy & regulatory framework & available incentivesChirag Jain
 
Potential of Solar Power in India
Potential of Solar Power in IndiaPotential of Solar Power in India
Potential of Solar Power in IndiaAkash Jauhari
 
Repowering the Indian Discoms
Repowering the Indian DiscomsRepowering the Indian Discoms
Repowering the Indian DiscomsAditya Parchure
 
India - Renewables - eligible overseas capital markets candidate 2015
India - Renewables - eligible overseas capital markets candidate 2015India - Renewables - eligible overseas capital markets candidate 2015
India - Renewables - eligible overseas capital markets candidate 2015Varun Sethi
 
XYZ solar power Global IPO
XYZ solar power   Global IPOXYZ solar power   Global IPO
XYZ solar power Global IPOVarun Sethi
 
India Renewables-Eligible Overseas Capital Markets Candidate
India Renewables-Eligible Overseas Capital Markets CandidateIndia Renewables-Eligible Overseas Capital Markets Candidate
India Renewables-Eligible Overseas Capital Markets CandidateVarun Sethi
 
NCI Report on Maryland Wind and Biomass Implementation 101211r1-clean
NCI Report on Maryland Wind and Biomass Implementation 101211r1-cleanNCI Report on Maryland Wind and Biomass Implementation 101211r1-clean
NCI Report on Maryland Wind and Biomass Implementation 101211r1-cleanPaul Maxwell
 
Financial Comparative Analysis of SPV and SPT Power Plants for a Village in R...
Financial Comparative Analysis of SPV and SPT Power Plants for a Village in R...Financial Comparative Analysis of SPV and SPT Power Plants for a Village in R...
Financial Comparative Analysis of SPV and SPT Power Plants for a Village in R...IRJET Journal
 
J&K Solar policy 2010
J&K Solar policy 2010J&K Solar policy 2010
J&K Solar policy 2010Headway Solar
 
WP_SiPV Manufacturing_0.pdf
WP_SiPV Manufacturing_0.pdfWP_SiPV Manufacturing_0.pdf
WP_SiPV Manufacturing_0.pdfekosudarmanto4
 
Solar Photovoltaic Module Industry, Solar PV Module Manufacturing Plant, Deta...
Solar Photovoltaic Module Industry, Solar PV Module Manufacturing Plant, Deta...Solar Photovoltaic Module Industry, Solar PV Module Manufacturing Plant, Deta...
Solar Photovoltaic Module Industry, Solar PV Module Manufacturing Plant, Deta...Ajjay Kumar Gupta
 
Birendra Behuria ppt.pptx
Birendra Behuria ppt.pptxBirendra Behuria ppt.pptx
Birendra Behuria ppt.pptxBanaDurga
 
CERC Final Order order on Benchmark cost of Solar PV and Solar Thermal for F...
CERC Final Order  order on Benchmark cost of Solar PV and Solar Thermal for F...CERC Final Order  order on Benchmark cost of Solar PV and Solar Thermal for F...
CERC Final Order order on Benchmark cost of Solar PV and Solar Thermal for F...Ashish Verma
 
Lobel proposal for 1 mw crystalline pv solar power plant
Lobel proposal for 1 mw crystalline pv solar power plantLobel proposal for 1 mw crystalline pv solar power plant
Lobel proposal for 1 mw crystalline pv solar power plantL'Obel Solar Power System
 

Similar a Financial Feasibility of Solar Power Plant in India (20)

Session 13 national policy & regulatory framework & available incentives
Session 13   national policy & regulatory framework & available incentivesSession 13   national policy & regulatory framework & available incentives
Session 13 national policy & regulatory framework & available incentives
 
Potential of Solar Power in India
Potential of Solar Power in IndiaPotential of Solar Power in India
Potential of Solar Power in India
 
FICCI Solar Energy Task Force Report on Financing Solar Energy
FICCI Solar Energy Task Force Report on Financing Solar EnergyFICCI Solar Energy Task Force Report on Financing Solar Energy
FICCI Solar Energy Task Force Report on Financing Solar Energy
 
Repowering the Indian Discoms
Repowering the Indian DiscomsRepowering the Indian Discoms
Repowering the Indian Discoms
 
SEC Final
SEC FinalSEC Final
SEC Final
 
SEC Final
SEC FinalSEC Final
SEC Final
 
Solar power - A developer prespective
Solar power - A developer prespectiveSolar power - A developer prespective
Solar power - A developer prespective
 
India - Renewables - eligible overseas capital markets candidate 2015
India - Renewables - eligible overseas capital markets candidate 2015India - Renewables - eligible overseas capital markets candidate 2015
India - Renewables - eligible overseas capital markets candidate 2015
 
XYZ solar power Global IPO
XYZ solar power   Global IPOXYZ solar power   Global IPO
XYZ solar power Global IPO
 
India Renewables-Eligible Overseas Capital Markets Candidate
India Renewables-Eligible Overseas Capital Markets CandidateIndia Renewables-Eligible Overseas Capital Markets Candidate
India Renewables-Eligible Overseas Capital Markets Candidate
 
NCI Report on Maryland Wind and Biomass Implementation 101211r1-clean
NCI Report on Maryland Wind and Biomass Implementation 101211r1-cleanNCI Report on Maryland Wind and Biomass Implementation 101211r1-clean
NCI Report on Maryland Wind and Biomass Implementation 101211r1-clean
 
Financial Comparative Analysis of SPV and SPT Power Plants for a Village in R...
Financial Comparative Analysis of SPV and SPT Power Plants for a Village in R...Financial Comparative Analysis of SPV and SPT Power Plants for a Village in R...
Financial Comparative Analysis of SPV and SPT Power Plants for a Village in R...
 
J&K Solar policy 2010
J&K Solar policy 2010J&K Solar policy 2010
J&K Solar policy 2010
 
WP_SiPV Manufacturing_0.pdf
WP_SiPV Manufacturing_0.pdfWP_SiPV Manufacturing_0.pdf
WP_SiPV Manufacturing_0.pdf
 
Solar Photovoltaic Module Industry, Solar PV Module Manufacturing Plant, Deta...
Solar Photovoltaic Module Industry, Solar PV Module Manufacturing Plant, Deta...Solar Photovoltaic Module Industry, Solar PV Module Manufacturing Plant, Deta...
Solar Photovoltaic Module Industry, Solar PV Module Manufacturing Plant, Deta...
 
Birendra Behuria ppt.pptx
Birendra Behuria ppt.pptxBirendra Behuria ppt.pptx
Birendra Behuria ppt.pptx
 
CERC Final Order order on Benchmark cost of Solar PV and Solar Thermal for F...
CERC Final Order  order on Benchmark cost of Solar PV and Solar Thermal for F...CERC Final Order  order on Benchmark cost of Solar PV and Solar Thermal for F...
CERC Final Order order on Benchmark cost of Solar PV and Solar Thermal for F...
 
Lobel proposal for 1 mw crystalline pv solar power plant
Lobel proposal for 1 mw crystalline pv solar power plantLobel proposal for 1 mw crystalline pv solar power plant
Lobel proposal for 1 mw crystalline pv solar power plant
 
Discussion paper 16.11.2015
Discussion paper 16.11.2015Discussion paper 16.11.2015
Discussion paper 16.11.2015
 
Small Power Generation Plant
Small Power Generation PlantSmall Power Generation Plant
Small Power Generation Plant
 

Más de Akash Jauhari

Engineering services outsourcing_unraveling myths
Engineering services outsourcing_unraveling mythsEngineering services outsourcing_unraveling myths
Engineering services outsourcing_unraveling mythsAkash Jauhari
 
State of Indian Economy & Budget Proposals 2012
State of Indian Economy & Budget Proposals 2012 State of Indian Economy & Budget Proposals 2012
State of Indian Economy & Budget Proposals 2012 Akash Jauhari
 
Tata Motors Acquisition of Jaguar&amp;Land Rover
Tata Motors Acquisition of Jaguar&amp;Land RoverTata Motors Acquisition of Jaguar&amp;Land Rover
Tata Motors Acquisition of Jaguar&amp;Land RoverAkash Jauhari
 
Wal mart Entering India
Wal mart Entering IndiaWal mart Entering India
Wal mart Entering IndiaAkash Jauhari
 
How culture can make or break a company
How culture can make or break a companyHow culture can make or break a company
How culture can make or break a companyAkash Jauhari
 
Resources & rivalry in Central asia
Resources & rivalry in Central asiaResources & rivalry in Central asia
Resources & rivalry in Central asiaAkash Jauhari
 
Behavior of Indian Investor: A Market Research
Behavior of Indian Investor: A Market ResearchBehavior of Indian Investor: A Market Research
Behavior of Indian Investor: A Market ResearchAkash Jauhari
 
Econometric Forecasting of Short term Interest Rates in India
Econometric Forecasting of Short term Interest Rates in IndiaEconometric Forecasting of Short term Interest Rates in India
Econometric Forecasting of Short term Interest Rates in IndiaAkash Jauhari
 
Corporate & Business Strategy: GE
Corporate & Business Strategy: GECorporate & Business Strategy: GE
Corporate & Business Strategy: GEAkash Jauhari
 
C-Si Module Manufacturers in India
C-Si Module Manufacturers in IndiaC-Si Module Manufacturers in India
C-Si Module Manufacturers in IndiaAkash Jauhari
 
Management Information System & Technology
Management Information System & TechnologyManagement Information System & Technology
Management Information System & TechnologyAkash Jauhari
 
The Dubai Logistics Industry
The Dubai Logistics IndustryThe Dubai Logistics Industry
The Dubai Logistics IndustryAkash Jauhari
 
Case Study on Air Deccan - The Marketing Mantra
Case Study on Air Deccan - The Marketing MantraCase Study on Air Deccan - The Marketing Mantra
Case Study on Air Deccan - The Marketing MantraAkash Jauhari
 
India's First Low Cost Airline
India's First Low Cost AirlineIndia's First Low Cost Airline
India's First Low Cost AirlineAkash Jauhari
 
Product Differentiation as Marketing Strategy
Product Differentiation as Marketing StrategyProduct Differentiation as Marketing Strategy
Product Differentiation as Marketing StrategyAkash Jauhari
 
Branding as Marketing Tool
Branding as Marketing ToolBranding as Marketing Tool
Branding as Marketing ToolAkash Jauhari
 
The PC Industry Wars
The PC Industry WarsThe PC Industry Wars
The PC Industry WarsAkash Jauhari
 
Are indian stock market driven more by sentiments than fundamentals- A Resear...
Are indian stock market driven more by sentiments than fundamentals- A Resear...Are indian stock market driven more by sentiments than fundamentals- A Resear...
Are indian stock market driven more by sentiments than fundamentals- A Resear...Akash Jauhari
 
The Company Act of India : Articles and Memorandums
The Company Act of India : Articles and MemorandumsThe Company Act of India : Articles and Memorandums
The Company Act of India : Articles and MemorandumsAkash Jauhari
 
Zara Fashion : Marketing Strategy and M.I.S.
Zara Fashion : Marketing Strategy and M.I.S.Zara Fashion : Marketing Strategy and M.I.S.
Zara Fashion : Marketing Strategy and M.I.S.Akash Jauhari
 

Más de Akash Jauhari (20)

Engineering services outsourcing_unraveling myths
Engineering services outsourcing_unraveling mythsEngineering services outsourcing_unraveling myths
Engineering services outsourcing_unraveling myths
 
State of Indian Economy & Budget Proposals 2012
State of Indian Economy & Budget Proposals 2012 State of Indian Economy & Budget Proposals 2012
State of Indian Economy & Budget Proposals 2012
 
Tata Motors Acquisition of Jaguar&amp;Land Rover
Tata Motors Acquisition of Jaguar&amp;Land RoverTata Motors Acquisition of Jaguar&amp;Land Rover
Tata Motors Acquisition of Jaguar&amp;Land Rover
 
Wal mart Entering India
Wal mart Entering IndiaWal mart Entering India
Wal mart Entering India
 
How culture can make or break a company
How culture can make or break a companyHow culture can make or break a company
How culture can make or break a company
 
Resources & rivalry in Central asia
Resources & rivalry in Central asiaResources & rivalry in Central asia
Resources & rivalry in Central asia
 
Behavior of Indian Investor: A Market Research
Behavior of Indian Investor: A Market ResearchBehavior of Indian Investor: A Market Research
Behavior of Indian Investor: A Market Research
 
Econometric Forecasting of Short term Interest Rates in India
Econometric Forecasting of Short term Interest Rates in IndiaEconometric Forecasting of Short term Interest Rates in India
Econometric Forecasting of Short term Interest Rates in India
 
Corporate & Business Strategy: GE
Corporate & Business Strategy: GECorporate & Business Strategy: GE
Corporate & Business Strategy: GE
 
C-Si Module Manufacturers in India
C-Si Module Manufacturers in IndiaC-Si Module Manufacturers in India
C-Si Module Manufacturers in India
 
Management Information System & Technology
Management Information System & TechnologyManagement Information System & Technology
Management Information System & Technology
 
The Dubai Logistics Industry
The Dubai Logistics IndustryThe Dubai Logistics Industry
The Dubai Logistics Industry
 
Case Study on Air Deccan - The Marketing Mantra
Case Study on Air Deccan - The Marketing MantraCase Study on Air Deccan - The Marketing Mantra
Case Study on Air Deccan - The Marketing Mantra
 
India's First Low Cost Airline
India's First Low Cost AirlineIndia's First Low Cost Airline
India's First Low Cost Airline
 
Product Differentiation as Marketing Strategy
Product Differentiation as Marketing StrategyProduct Differentiation as Marketing Strategy
Product Differentiation as Marketing Strategy
 
Branding as Marketing Tool
Branding as Marketing ToolBranding as Marketing Tool
Branding as Marketing Tool
 
The PC Industry Wars
The PC Industry WarsThe PC Industry Wars
The PC Industry Wars
 
Are indian stock market driven more by sentiments than fundamentals- A Resear...
Are indian stock market driven more by sentiments than fundamentals- A Resear...Are indian stock market driven more by sentiments than fundamentals- A Resear...
Are indian stock market driven more by sentiments than fundamentals- A Resear...
 
The Company Act of India : Articles and Memorandums
The Company Act of India : Articles and MemorandumsThe Company Act of India : Articles and Memorandums
The Company Act of India : Articles and Memorandums
 
Zara Fashion : Marketing Strategy and M.I.S.
Zara Fashion : Marketing Strategy and M.I.S.Zara Fashion : Marketing Strategy and M.I.S.
Zara Fashion : Marketing Strategy and M.I.S.
 

Último

Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdftbatkhuu1
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseribangash
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 

Último (20)

Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdf
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 

Financial Feasibility of Solar Power Plant in India

  • 1.
  • 2. Tax holidays for first 10 years of operation for power producing firms.
  • 3. Exemptions on custom and excise for goods imported required in power plants.
  • 4. Levy of VAT at a discounted rate of 5%
  • 5.
  • 6. Life of the project is expected to be 12 years, since the technology will become obsolete after that time period
  • 7. The cost of equity is assumed to be 15% with 50% weight age. The cost of debt is taken to be 11.5% (as per IREDA norms) with 50% weight age. Hence, the cost of capital is calculated to be 13.25%.
  • 8. For discounting purpose, hurdle rate is taken to be 14%.
  • 9. Power Purchase Agreement of Rs. 15.3/KWh is taken to be constant for the period of 12 years.
  • 10.
  • 11. The NPV value is $64.36
  • 12. NPV as a percentage of initial outlay is 0.05%.
  • 13. Return on Equity is 0.11.
  • 14.
  • 17.
  • 18. The Sector is highly driven by Government support, hence any Scenario where Government reduces or minimizes the incentives proves to be destructive to return & risk profile of the project. However, possibility of such a development is expected to be low.
  • 19. Reducing Poly-silicon prices, increasing efficiency and economies of scale are expected to drive down the Initial outlay of project and hence increase the return. Thus considering the supply-demand gap in India energy market and reducing cost of PV, Solar power plants are expected to be lucrative in long term. We thus recommend Global players to invest with some delay of about 3-4 years with improved technology and reduced cost.
  • 20. Further to reduce cost in India, players should focus on manufacturing poly-silicon wafers indigenously, developing technology tailored for Indian conditions, and joint venture with technology providers to improve efficiency. Backward and forward integration will also help to increase the margins for the firms.
  • 21. Going by example of Germany, world leader in PV technology, we expect PPA offered in India to decrease to about Rs 10.7 by 2015 and Rs. 7.8 by 2019, with reducing cost structure of PV power. As per data available we expect PV power to reach grid parity by 2020. Hence after 2020 we expect PV power to compete with other sources of energy without any Government support, and contribute about 7% of energy demand of the nation. Appendix 1<br />Appendix 2<br />