Commissioning and Sustainability:
Ensuring Your ROI



               Presented by:
               Adam Muggleton, Cobalt Engineering


The Fourth Annual Green Building Festival
September 10, 2008
Cobalt Engineering

                                            At Cobalt, we give life to buildings.
                                            Adopting a holistic perspective, we
                                            offer fully integrated mechanical
                                            and electrical services with a
                                            sustainable focus to deliver high
                                            performance building solution for
                                            every project.

IKEA, Calgary, AB




Presented by:
Adam Muggleton, MSc, LEED® AP   Commissioning & Sustainability: Ensuring your ROI
Managing Partner Toronto
September 10, 2008
Adding Value
    • Advanced Energy,
      Building Comfort Modeling
                                                        Metropolis at Metrotown Mall, Burnaby, BC
    • Passive Design
    • Microclimate Analysis/Modeling
    • Daylighting Analysis
    • Façade Design
    • Sustainable Master Planning                         IGA, Various locations across Canada



    • External Airflow Analysis
    • LEED Consulting
    • Commissioning
                                                       Boston Pizza, Various locations across Canada


Presented by:
Adam Muggleton, MSc, LEED® AP   Commissioning & Sustainability: Ensuring your ROI
Managing Partner Toronto
September 10, 2008
Today’s Global Issues




Presented by:
Adam Muggleton, MSc, LEED® AP   Commissioning & Sustainability: Ensuring your ROI
Managing Partner Toronto
September 10, 2008
Why Commission Buildings?
       A 2002 study of 60 buildings in USA found:
  •    50% had control problems
  •    40% of HVAC equipment did not function properly
  •    15% had missing equipment
  •    25% of energy management systems, economizers and variable speed
       drives did not function correctly
  •    60% of insurance claims are related to HVAC issues
  •    The number one source of complaints is HVAC
  •    The average cost of energy due to above $3 ft2
  LBNL. (2002). Lawrence Berkeley National Laboratory Survey of 60 Buildings in USA. http://buildings.lbl.gov/hpcbs/Year_01/Element_5)/
  01_E5.html




Presented by:
Adam Muggleton, MSc, LEED® AP                            Commissioning & Sustainability: Ensuring your ROI
Managing Partner Toronto
September 10, 2008
Why Commission Buildings?




Presented by:
Adam Muggleton, MSc, LEED® AP   Commissioning & Sustainability: Ensuring your ROI
Managing Partner Toronto
September 10, 2008
Why Commission Buildings?




Presented by:
Adam Muggleton, MSc, LEED® AP   Commissioning & Sustainability: Ensuring your ROI
Managing Partner Toronto
September 10, 2008
Why Commission Buildings?




Presented by:
Adam Muggleton, MSc, LEED® AP   Commissioning & Sustainability: Ensuring your ROI
Managing Partner Toronto
September 10, 2008
No Commissioning?




                                                         Image courtesy of Zurich U.S.



Presented by:
Adam Muggleton, MSc, LEED® AP   Commissioning & Sustainability: Ensuring your ROI
Managing Partner Toronto
September 10, 2008
Commissioning Definition
                                  The American Society of Heating,
                                  Refrigeration and Air-Conditioning
                                  Engineers (ASHRAE) Guideline 0-2005:
                                  The Commissioning Process, defines
                                  commissioning as a “Quality oriented
                                  process for achieving, verifying and
                                  documenting that the performance of
                                  facilities, systems and assemblies meets
                                  defined objectives and criteria”.

                                  Commissioning is multi discipline and can
                                  be considered a bridge between the design
                                  and delivery of a project. The more
                                  complex and interconnect the systems or
                                  building the greater the need for
                                  commissioning.


Presented by:
Adam Muggleton, MSc, LEED® AP   Commissioning & Sustainability: Ensuring your ROI
Managing Partner Toronto
September 10, 2008
Commissioning and Quality
The commissioning process is based on larger global quality process
movement.
The key tenants of a quality process are:
          The end goal must be defined
          Work to be done right the first time
          Each individual worker is responsible for quality
          Verification of work, not inspection
          Focus on long term whole life of product i.e. building
          Improve quality and lower costs - lean construction



Presented by:
Adam Muggleton, MSc, LEED® AP         Commissioning & Sustainability: Ensuring your ROI
Managing Partner Toronto
September 10, 2008
What is Commissioning?

• A planned, collaborative and
  systematic process


• Takes place and adds value
  throughout the entire project


• Confirms that systems and the
  building function as an
  integrated whole



Presented by:
Adam Muggleton, MSc, LEED® AP   Commissioning & Sustainability: Ensuring your ROI
Managing Partner Toronto
September 10, 2008
What is Commissioning?




Presented by:
Adam Muggleton, MSc, LEED® AP   Commissioning & Sustainability: Ensuring your ROI
Managing Partner Toronto
September 10, 2008
Commissioning Sustainable Buildings
• Commissioning, maybe counter intuitively, is very important for
  highly sustainable “green” buildings or “Net Zero” buildings

• Buildings are systems in their own right

• Commissioning commences at the component level and extends to
  the building level




Presented by:
Adam Muggleton, MSc, LEED® AP   Commissioning & Sustainability: Ensuring your ROI
Managing Partner Toronto
September 10, 2008
Risks to Project Completion




Presented by:
Adam Muggleton, MSc, LEED® AP   Commissioning & Sustainability: Ensuring your ROI
Managing Partner Toronto
September 10, 2008
Commissioning Adds Value




Presented by:
Adam Muggleton, MSc, LEED® AP   Commissioning & Sustainability: Ensuring your ROI
Managing Partner Toronto
September 10, 2008
Commissioning KPI’s
             “You cannot manage what you do not measure”




Presented by:
Adam Muggleton, MSc, LEED® AP   Commissioning & Sustainability: Ensuring your ROI
Managing Partner Toronto
September 10, 2008
Commissioning Process
Pre Design Phase = Quality Management




   Pre Design
                                                          Deliverables
    Owner hires design team
    Owner hires commissioning authority                  ✓ Team appointed
    Develop expectations & budgets                       ✓ Draft scope & budget
    Determine scope & budget                             ✓ Draft owners intent document
    Develop owners intent




Presented by:
Adam Muggleton, MSc, LEED® AP          Commissioning & Sustainability: Ensuring your ROI
Managing Partner Toronto
September 10, 2008
Commissioning Process
Design Phase = Quality Management

   Design
    Design for commissioning review                       Deliverables
    Develop basis of design document
    Commissioning Charrette                               ✓ Owners intent document
    Develop commissioning plan                            ✓ Basis of design document - design team
    Review LEED check list                                ✓ Issues log and Risk register
    Develop commissioning contract                        ✓ Robust design
   document clauses                                        ✓ Integrated commissioning logic network
    Develop test sheet suite                              ✓ Commissioning plan
    Develop draft functional test
   protocols(FTP’S)

                                                              Commissioning Plan includes:
                                                              ✓ Scope
                                                              ✓ Responsibility matrix
                                                              ✓ Documentation matrix
                                                              ✓ Systems logic networks
                                                              ✓ Book of systems interfaces
                                                              ✓ Pre-functional test documentation
Presented by:
Adam Muggleton, MSc, LEED® AP           Commissioning & Sustainability: Ensuring your ROI
Managing Partner Toronto
September 10, 2008
Commissioning Process
Construction Phase = Quality Control




Construction Phase
 Contractors commissioning workshop                        Deliverables
 Review submittals & O&M’s                                 ✓ Ownership of the commissioning plan
 Assistance in problem resolution                          ✓ Low levels of installation defects
 Installation inspections                                  ✓ Agreed commissioning plan
 Sample witness of static systems testing                  ✓ Right first time commissioning
 Observe equipment & systems start up                      ✓ Quality control
 Finalize functional test protocols(FTP’S)                 ✓ Deficiency reports
 Refine basis of design document                           ✓ On time systems commissioning
 Refine commissioning plan
 Finalize commissioning program




Presented by:
Adam Muggleton, MSc, LEED® AP            Commissioning & Sustainability: Ensuring your ROI
Managing Partner Toronto
September 10, 2008
Contractors’ First Reaction to Commissioning!




Presented by:
Adam Muggleton, MSc, LEED® AP   Commissioning & Sustainability: Ensuring your ROI
Managing Partner Toronto
September 10, 2008
Commissioning Process
 Acceptance Phase = Quality Control



Acceptance
                                                            Deliverables
 Sample witness vendor commissioning
 Sample witness systems commissioning                      ✓ Tested and validated building and systems
 Sample witness TAB                                        ✓ Documented building performance
 Witness 100% all life safety systems                      ✓ Fully operational & optimized building
 Use FTP’s to verify systems performance                   ✓ Timely completion of commissioning
 Global integration testing                                ✓ High quality environmental conditions
 Black building test                                       ✓ Low levels of deficiencies
 Assist in problem resolution                              ✓ Low levels of call backs
 Collate & document all systems test results               ✓Set trend logs to monitor building
 Produce the commissioning report                          performance
 Review and coordinate O&M team training




  Presented by:
  Adam Muggleton, MSc, LEED® AP            Commissioning & Sustainability: Ensuring your ROI
  Managing Partner Toronto
  September 10, 2008
Commissioning Process
Acceptance Phase - Post Occupancy = Quality Control & Fine tuning




 Occupancy
  Deferred FTP testing                             Deliverables
  Deferred seasonal testing
  Systems optimization                             ✓Up-dated commissioning report
  Post occupancy adjustments                       ✓Lessons learned report / workshop
  Review of outstanding defects
  Lessons learned workshop




Presented by:
Adam Muggleton, MSc, LEED® AP      Commissioning & Sustainability: Ensuring your ROI
Managing Partner Toronto
September 10, 2008
Cost of NOT Commissioning

Commissioning exposes deficiencies in design and installation
                                             Cause of Defects in Construction
                                       Product/
                                      Equipment
                                     Failures, 10%




                                                                                                     Design
                                                                                                  Problems, 50%
                         Construction
                        Problems, 40%




M Billington. (2001). Defects in Buildings: Symptoms, Investigation, Diagnosis and Cure. www.BRE.co.uk


Presented by:
Adam Muggleton, MSc, LEED® AP                             Commissioning & Sustainability: Ensuring your ROI
Managing Partner Toronto
September 10, 2008
Cost of NOT Commissioning

Cost of rectifying quality failures increases as the project progresses:


                                                  Cost
      Rectified at design stage                 1.00 (Zero)

      Rectified during construction             3 times design stage

      Rectified at completion                   8 times design stage

      Rectified in use                          unlimited!




Presented by:
Adam Muggleton, MSc, LEED® AP    Commissioning & Sustainability: Ensuring your ROI
Managing Partner Toronto
September 10, 2008
Cost of NOT Commissioning
                                  Energy Costs at Differing RTU Minimum Outside Air Settings

                       $120,000

                                                                                                $99,315
                       $100,000

                                                                            $80,820
                        $80,000
     Annual Cost ($)




                                                         $61,349
                        $60,000
                                       $46,488

                        $40,000


                        $20,000


                            $0
                                     21% (Design)         30%                 40%                50%
                                                         % OA During Occupied Hours


Presented by:
Adam Muggleton, MSc, LEED® AP                            Commissioning & Sustainability: Ensuring your ROI
Managing Partner Toronto
September 10, 2008
Costs of Commissioning
                Estimates of Construction Phase Commissioning Costs
                     (Costs from the commission authority in new construction, per square foot)




   PECI. (2002). New Construction Commissioning Costs. www.PECI.org
Presented by:
Adam Muggleton, MSc, LEED® AP                        Commissioning & Sustainability: Ensuring your ROI
Managing Partner Toronto
September 10, 2008
Benefits of Commissioning


                                • Increased occupant thermal comfort
                                  with improved environmental control
                                • Improved indoor air quality
                                • Smoother turnover from contractor to
                                  owner
                                • Optimized Energy Performance




Presented by:
Adam Muggleton, MSc, LEED® AP        Commissioning & Sustainability: Ensuring your ROI
Managing Partner Toronto
September 10, 2008
Benefits of Commissioning


                                • Reduced construction, operating and
                                  maintenance costs
                                • Reduced energy consumption
                                • Reduced RFI’s and change orders
                                • Reduced contractor and vender call
                                  backs



Presented by:
Adam Muggleton, MSc, LEED® AP      Commissioning & Sustainability: Ensuring your ROI
Managing Partner Toronto
September 10, 2008
Presented by:
Adam Muggleton, MSc, LEED® AP
                                Thank You
                                  Commissioning & Sustainability: Ensuring your ROI
Managing Partner Toronto
September 10, 2008

More Related Content

Viewers also liked

2010 07 BSidesLV Mobilizing The PCI Resistance 1c
2010 07 BSidesLV Mobilizing The PCI Resistance 1c 2010 07 BSidesLV Mobilizing The PCI Resistance 1c
2010 07 BSidesLV Mobilizing The PCI Resistance 1c
Security B-Sides
 
حقيبة تدريبية في تشغيل الاجهزة وصيانتها
حقيبة تدريبية في تشغيل الاجهزة وصيانتهاحقيبة تدريبية في تشغيل الاجهزة وصيانتها
حقيبة تدريبية في تشغيل الاجهزة وصيانتها
saradosoky
 
06 procedure of start up boiler ok
06 procedure of start up boiler ok06 procedure of start up boiler ok
06 procedure of start up boiler ok
Bunk Bonk
 

Viewers also liked (6)

2010 07 BSidesLV Mobilizing The PCI Resistance 1c
2010 07 BSidesLV Mobilizing The PCI Resistance 1c 2010 07 BSidesLV Mobilizing The PCI Resistance 1c
2010 07 BSidesLV Mobilizing The PCI Resistance 1c
 
Risk management during start up and commissioning of super critical once thro...
Risk management during start up and commissioning of super critical once thro...Risk management during start up and commissioning of super critical once thro...
Risk management during start up and commissioning of super critical once thro...
 
حقيبة تدريبية في تشغيل الاجهزة وصيانتها
حقيبة تدريبية في تشغيل الاجهزة وصيانتهاحقيبة تدريبية في تشغيل الاجهزة وصيانتها
حقيبة تدريبية في تشغيل الاجهزة وصيانتها
 
Risk Management - Time to blow it up and start over? - Alex Hutton
Risk Management - Time to blow it up and start over? - Alex HuttonRisk Management - Time to blow it up and start over? - Alex Hutton
Risk Management - Time to blow it up and start over? - Alex Hutton
 
Mineral processing plant design and optimisation
Mineral processing plant design and optimisation Mineral processing plant design and optimisation
Mineral processing plant design and optimisation
 
06 procedure of start up boiler ok
06 procedure of start up boiler ok06 procedure of start up boiler ok
06 procedure of start up boiler ok
 

Similar to Gbf08 muggleton commissioning

Lex resume 2011 latest version
Lex resume 2011 latest versionLex resume 2011 latest version
Lex resume 2011 latest version
lexmaclaine
 
Prem_Papabathini_Resume_2016
Prem_Papabathini_Resume_2016Prem_Papabathini_Resume_2016
Prem_Papabathini_Resume_2016
Prem Papabathini
 
BEE Company Presentation 中英文
BEE Company Presentation 中英文BEE Company Presentation 中英文
BEE Company Presentation 中英文
Lucas Wang
 

Similar to Gbf08 muggleton commissioning (20)

BDC Leed Commissioning Presentation
BDC Leed Commissioning PresentationBDC Leed Commissioning Presentation
BDC Leed Commissioning Presentation
 
BDC LEED Cx Preso
BDC LEED Cx PresoBDC LEED Cx Preso
BDC LEED Cx Preso
 
Sbai value of commissioning
Sbai value of commissioningSbai value of commissioning
Sbai value of commissioning
 
The Value of Building Commissioning
The Value of Building CommissioningThe Value of Building Commissioning
The Value of Building Commissioning
 
Leaflet Green Building
Leaflet Green BuildingLeaflet Green Building
Leaflet Green Building
 
Integrative Design Working With Your Mep
Integrative Design Working With Your MepIntegrative Design Working With Your Mep
Integrative Design Working With Your Mep
 
Phil Welker Commissioning
Phil Welker CommissioningPhil Welker Commissioning
Phil Welker Commissioning
 
Lex resume 2011 latest version
Lex resume 2011 latest versionLex resume 2011 latest version
Lex resume 2011 latest version
 
2.6 sustainability
2.6 sustainability2.6 sustainability
2.6 sustainability
 
2.6 sustainability (1)
2.6 sustainability (1)2.6 sustainability (1)
2.6 sustainability (1)
 
Total construction quality management by leading ICT technology
Total construction quality management by leading ICT technologyTotal construction quality management by leading ICT technology
Total construction quality management by leading ICT technology
 
01 Corporate Profile Green Intl_PM Services,Training and Oil & Gas
01 Corporate Profile Green Intl_PM Services,Training and Oil & Gas01 Corporate Profile Green Intl_PM Services,Training and Oil & Gas
01 Corporate Profile Green Intl_PM Services,Training and Oil & Gas
 
Agile Load Testing in the Real World
Agile Load Testing in the Real WorldAgile Load Testing in the Real World
Agile Load Testing in the Real World
 
Prem_Papabathini_Resume_2016
Prem_Papabathini_Resume_2016Prem_Papabathini_Resume_2016
Prem_Papabathini_Resume_2016
 
Obelisk Profile
Obelisk ProfileObelisk Profile
Obelisk Profile
 
Building Simulations | Understanding Your Energy Profile
Building Simulations | Understanding Your Energy ProfileBuilding Simulations | Understanding Your Energy Profile
Building Simulations | Understanding Your Energy Profile
 
Building Simulations | Understanding Your Building's Energy Profile
Building Simulations | Understanding Your Building's Energy ProfileBuilding Simulations | Understanding Your Building's Energy Profile
Building Simulations | Understanding Your Building's Energy Profile
 
Opportunities and role of the quantity surveyor in green building project dev...
Opportunities and role of the quantity surveyor in green building project dev...Opportunities and role of the quantity surveyor in green building project dev...
Opportunities and role of the quantity surveyor in green building project dev...
 
LEED EBOM Session 1
LEED EBOM Session 1LEED EBOM Session 1
LEED EBOM Session 1
 
BEE Company Presentation 中英文
BEE Company Presentation 中英文BEE Company Presentation 中英文
BEE Company Presentation 中英文
 

More from Toronto 2030 District

What is "Model" Sustainability? UniverCity's Journey Toward Sustainability T...
What is "Model" Sustainability?  UniverCity's Journey Toward Sustainability T...What is "Model" Sustainability?  UniverCity's Journey Toward Sustainability T...
What is "Model" Sustainability? UniverCity's Journey Toward Sustainability T...
Toronto 2030 District
 

More from Toronto 2030 District (20)

GBF2014 - Rob Thornton - Flexible, Local, Resilient Energy Generation
GBF2014 - Rob Thornton - Flexible, Local, Resilient Energy GenerationGBF2014 - Rob Thornton - Flexible, Local, Resilient Energy Generation
GBF2014 - Rob Thornton - Flexible, Local, Resilient Energy Generation
 
GBF2014 - James Voogt - Climate Change & Cities
GBF2014 - James Voogt - Climate Change & CitiesGBF2014 - James Voogt - Climate Change & Cities
GBF2014 - James Voogt - Climate Change & Cities
 
GBF2014 - Glenn McGillivray - Cities in the Crosshairs
GBF2014 - Glenn McGillivray - Cities in the CrosshairsGBF2014 - Glenn McGillivray - Cities in the Crosshairs
GBF2014 - Glenn McGillivray - Cities in the Crosshairs
 
GBF2014 - Paul Dowsett - Resilient Design
GBF2014 - Paul Dowsett - Resilient DesignGBF2014 - Paul Dowsett - Resilient Design
GBF2014 - Paul Dowsett - Resilient Design
 
GBF2014 - Alec Hay - Planning Climate Resilient Cities
GBF2014 - Alec Hay - Planning Climate Resilient CitiesGBF2014 - Alec Hay - Planning Climate Resilient Cities
GBF2014 - Alec Hay - Planning Climate Resilient Cities
 
Closing The Loops in Malmö, Sweden - Daniel Skog
Closing The Loops in Malmö, Sweden - Daniel SkogClosing The Loops in Malmö, Sweden - Daniel Skog
Closing The Loops in Malmö, Sweden - Daniel Skog
 
Re-Energizing Our Cities: From District to Specific - Integral Group
Re-Energizing Our Cities:  From District to Specific - Integral GroupRe-Energizing Our Cities:  From District to Specific - Integral Group
Re-Energizing Our Cities: From District to Specific - Integral Group
 
Sustainable Cities through an Integrated Approach - Agneta Persson
Sustainable Cities through an Integrated Approach - Agneta PerssonSustainable Cities through an Integrated Approach - Agneta Persson
Sustainable Cities through an Integrated Approach - Agneta Persson
 
Ampersand: A Sustainable Community - Robert Smith
Ampersand:  A Sustainable Community - Robert SmithAmpersand:  A Sustainable Community - Robert Smith
Ampersand: A Sustainable Community - Robert Smith
 
An Emerging Water Management Paradigm - Dr. Khosrow Farabakhsh
An Emerging Water Management Paradigm - Dr. Khosrow FarabakhshAn Emerging Water Management Paradigm - Dr. Khosrow Farabakhsh
An Emerging Water Management Paradigm - Dr. Khosrow Farabakhsh
 
What is "Model" Sustainability? UniverCity's Journey Toward Sustainability T...
What is "Model" Sustainability?  UniverCity's Journey Toward Sustainability T...What is "Model" Sustainability?  UniverCity's Journey Toward Sustainability T...
What is "Model" Sustainability? UniverCity's Journey Toward Sustainability T...
 
B bach energy efficiency in obc2012
B bach energy efficiency in obc2012B bach energy efficiency in obc2012
B bach energy efficiency in obc2012
 
Update on the Enbridge Savings By Design Program
Update on the Enbridge Savings By Design ProgramUpdate on the Enbridge Savings By Design Program
Update on the Enbridge Savings By Design Program
 
Toronto Green Standard & Energy Efficiency
Toronto Green Standard & Energy EfficiencyToronto Green Standard & Energy Efficiency
Toronto Green Standard & Energy Efficiency
 
The Ins & Outs of Energy Efficiency in the Building Code
The Ins & Outs of Energy Efficiency in the Building CodeThe Ins & Outs of Energy Efficiency in the Building Code
The Ins & Outs of Energy Efficiency in the Building Code
 
Stormwater Compliance
Stormwater ComplianceStormwater Compliance
Stormwater Compliance
 
SB-10: The Envelope Ultimatum
SB-10: The Envelope UltimatumSB-10: The Envelope Ultimatum
SB-10: The Envelope Ultimatum
 
National Energy Code for Buildings
National Energy Code for BuildingsNational Energy Code for Buildings
National Energy Code for Buildings
 
Low-Impact Development from the Developer Perspective
Low-Impact Development from the Developer PerspectiveLow-Impact Development from the Developer Perspective
Low-Impact Development from the Developer Perspective
 
Low-Impact Development Case Study Examples
Low-Impact Development Case Study ExamplesLow-Impact Development Case Study Examples
Low-Impact Development Case Study Examples
 

Recently uploaded

Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
CristineGraceAcuyan
 
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
eeanqy
 
Minimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptxMinimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptx
balqisyamutia
 
ab-initio-training basics and architecture
ab-initio-training basics and architectureab-initio-training basics and architecture
ab-initio-training basics and architecture
saipriyacoool
 
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
gajnagarg
 
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
ehyxf
 
Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...
gajnagarg
 
Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...
Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...
Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...
nirzagarg
 
poliovirus-190801072449. pptx
poliovirus-190801072449.            pptxpoliovirus-190801072449.            pptx
poliovirus-190801072449. pptx
ssuser0ad194
 
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
yhavx
 
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
gajnagarg
 
怎样办理伯明翰城市大学毕业证(BCU毕业证书)成绩单留信认证
怎样办理伯明翰城市大学毕业证(BCU毕业证书)成绩单留信认证怎样办理伯明翰城市大学毕业证(BCU毕业证书)成绩单留信认证
怎样办理伯明翰城市大学毕业证(BCU毕业证书)成绩单留信认证
eeanqy
 

Recently uploaded (20)

The hottest UI and UX Design Trends 2024
The hottest UI and UX Design Trends 2024The hottest UI and UX Design Trends 2024
The hottest UI and UX Design Trends 2024
 
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
 
Jordan_Amanda_DMBS202404_PB1_2024-04.pdf
Jordan_Amanda_DMBS202404_PB1_2024-04.pdfJordan_Amanda_DMBS202404_PB1_2024-04.pdf
Jordan_Amanda_DMBS202404_PB1_2024-04.pdf
 
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
 
Minimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptxMinimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptx
 
ab-initio-training basics and architecture
ab-initio-training basics and architectureab-initio-training basics and architecture
ab-initio-training basics and architecture
 
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
 
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
 
Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...
 
Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...
Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...
Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...
 
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEKLANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
 
UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...
UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...
UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...
 
Pondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime Pondicherry
Pondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime PondicherryPondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime Pondicherry
Pondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime Pondicherry
 
BLOCK CHAIN PROJECT block chain project
BLOCK CHAIN  PROJECT block chain projectBLOCK CHAIN  PROJECT block chain project
BLOCK CHAIN PROJECT block chain project
 
poliovirus-190801072449. pptx
poliovirus-190801072449.            pptxpoliovirus-190801072449.            pptx
poliovirus-190801072449. pptx
 
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
 
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
 
怎样办理伯明翰城市大学毕业证(BCU毕业证书)成绩单留信认证
怎样办理伯明翰城市大学毕业证(BCU毕业证书)成绩单留信认证怎样办理伯明翰城市大学毕业证(BCU毕业证书)成绩单留信认证
怎样办理伯明翰城市大学毕业证(BCU毕业证书)成绩单留信认证
 
Abortion pills in Riyadh +966572737505 <> buy cytotec <> unwanted kit Saudi A...
Abortion pills in Riyadh +966572737505 <> buy cytotec <> unwanted kit Saudi A...Abortion pills in Riyadh +966572737505 <> buy cytotec <> unwanted kit Saudi A...
Abortion pills in Riyadh +966572737505 <> buy cytotec <> unwanted kit Saudi A...
 
High Profile Escorts Nerul WhatsApp +91-9930687706, Best Service
High Profile Escorts Nerul WhatsApp +91-9930687706, Best ServiceHigh Profile Escorts Nerul WhatsApp +91-9930687706, Best Service
High Profile Escorts Nerul WhatsApp +91-9930687706, Best Service
 

Gbf08 muggleton commissioning

  • 1. Commissioning and Sustainability: Ensuring Your ROI Presented by: Adam Muggleton, Cobalt Engineering The Fourth Annual Green Building Festival September 10, 2008
  • 2. Cobalt Engineering At Cobalt, we give life to buildings. Adopting a holistic perspective, we offer fully integrated mechanical and electrical services with a sustainable focus to deliver high performance building solution for every project. IKEA, Calgary, AB Presented by: Adam Muggleton, MSc, LEED® AP Commissioning & Sustainability: Ensuring your ROI Managing Partner Toronto September 10, 2008
  • 3. Adding Value • Advanced Energy, Building Comfort Modeling Metropolis at Metrotown Mall, Burnaby, BC • Passive Design • Microclimate Analysis/Modeling • Daylighting Analysis • Façade Design • Sustainable Master Planning IGA, Various locations across Canada • External Airflow Analysis • LEED Consulting • Commissioning Boston Pizza, Various locations across Canada Presented by: Adam Muggleton, MSc, LEED® AP Commissioning & Sustainability: Ensuring your ROI Managing Partner Toronto September 10, 2008
  • 4. Today’s Global Issues Presented by: Adam Muggleton, MSc, LEED® AP Commissioning & Sustainability: Ensuring your ROI Managing Partner Toronto September 10, 2008
  • 5. Why Commission Buildings? A 2002 study of 60 buildings in USA found: • 50% had control problems • 40% of HVAC equipment did not function properly • 15% had missing equipment • 25% of energy management systems, economizers and variable speed drives did not function correctly • 60% of insurance claims are related to HVAC issues • The number one source of complaints is HVAC • The average cost of energy due to above $3 ft2 LBNL. (2002). Lawrence Berkeley National Laboratory Survey of 60 Buildings in USA. http://buildings.lbl.gov/hpcbs/Year_01/Element_5)/ 01_E5.html Presented by: Adam Muggleton, MSc, LEED® AP Commissioning & Sustainability: Ensuring your ROI Managing Partner Toronto September 10, 2008
  • 6. Why Commission Buildings? Presented by: Adam Muggleton, MSc, LEED® AP Commissioning & Sustainability: Ensuring your ROI Managing Partner Toronto September 10, 2008
  • 7. Why Commission Buildings? Presented by: Adam Muggleton, MSc, LEED® AP Commissioning & Sustainability: Ensuring your ROI Managing Partner Toronto September 10, 2008
  • 8. Why Commission Buildings? Presented by: Adam Muggleton, MSc, LEED® AP Commissioning & Sustainability: Ensuring your ROI Managing Partner Toronto September 10, 2008
  • 9. No Commissioning? Image courtesy of Zurich U.S. Presented by: Adam Muggleton, MSc, LEED® AP Commissioning & Sustainability: Ensuring your ROI Managing Partner Toronto September 10, 2008
  • 10. Commissioning Definition The American Society of Heating, Refrigeration and Air-Conditioning Engineers (ASHRAE) Guideline 0-2005: The Commissioning Process, defines commissioning as a “Quality oriented process for achieving, verifying and documenting that the performance of facilities, systems and assemblies meets defined objectives and criteria”. Commissioning is multi discipline and can be considered a bridge between the design and delivery of a project. The more complex and interconnect the systems or building the greater the need for commissioning. Presented by: Adam Muggleton, MSc, LEED® AP Commissioning & Sustainability: Ensuring your ROI Managing Partner Toronto September 10, 2008
  • 11. Commissioning and Quality The commissioning process is based on larger global quality process movement. The key tenants of a quality process are:  The end goal must be defined  Work to be done right the first time  Each individual worker is responsible for quality  Verification of work, not inspection  Focus on long term whole life of product i.e. building  Improve quality and lower costs - lean construction Presented by: Adam Muggleton, MSc, LEED® AP Commissioning & Sustainability: Ensuring your ROI Managing Partner Toronto September 10, 2008
  • 12. What is Commissioning? • A planned, collaborative and systematic process • Takes place and adds value throughout the entire project • Confirms that systems and the building function as an integrated whole Presented by: Adam Muggleton, MSc, LEED® AP Commissioning & Sustainability: Ensuring your ROI Managing Partner Toronto September 10, 2008
  • 13. What is Commissioning? Presented by: Adam Muggleton, MSc, LEED® AP Commissioning & Sustainability: Ensuring your ROI Managing Partner Toronto September 10, 2008
  • 14. Commissioning Sustainable Buildings • Commissioning, maybe counter intuitively, is very important for highly sustainable “green” buildings or “Net Zero” buildings • Buildings are systems in their own right • Commissioning commences at the component level and extends to the building level Presented by: Adam Muggleton, MSc, LEED® AP Commissioning & Sustainability: Ensuring your ROI Managing Partner Toronto September 10, 2008
  • 15. Risks to Project Completion Presented by: Adam Muggleton, MSc, LEED® AP Commissioning & Sustainability: Ensuring your ROI Managing Partner Toronto September 10, 2008
  • 16. Commissioning Adds Value Presented by: Adam Muggleton, MSc, LEED® AP Commissioning & Sustainability: Ensuring your ROI Managing Partner Toronto September 10, 2008
  • 17. Commissioning KPI’s “You cannot manage what you do not measure” Presented by: Adam Muggleton, MSc, LEED® AP Commissioning & Sustainability: Ensuring your ROI Managing Partner Toronto September 10, 2008
  • 18. Commissioning Process Pre Design Phase = Quality Management Pre Design Deliverables  Owner hires design team  Owner hires commissioning authority ✓ Team appointed  Develop expectations & budgets ✓ Draft scope & budget  Determine scope & budget ✓ Draft owners intent document  Develop owners intent Presented by: Adam Muggleton, MSc, LEED® AP Commissioning & Sustainability: Ensuring your ROI Managing Partner Toronto September 10, 2008
  • 19. Commissioning Process Design Phase = Quality Management Design  Design for commissioning review Deliverables  Develop basis of design document  Commissioning Charrette ✓ Owners intent document  Develop commissioning plan ✓ Basis of design document - design team  Review LEED check list ✓ Issues log and Risk register  Develop commissioning contract ✓ Robust design document clauses ✓ Integrated commissioning logic network  Develop test sheet suite ✓ Commissioning plan  Develop draft functional test protocols(FTP’S) Commissioning Plan includes: ✓ Scope ✓ Responsibility matrix ✓ Documentation matrix ✓ Systems logic networks ✓ Book of systems interfaces ✓ Pre-functional test documentation Presented by: Adam Muggleton, MSc, LEED® AP Commissioning & Sustainability: Ensuring your ROI Managing Partner Toronto September 10, 2008
  • 20. Commissioning Process Construction Phase = Quality Control Construction Phase  Contractors commissioning workshop Deliverables  Review submittals & O&M’s ✓ Ownership of the commissioning plan  Assistance in problem resolution ✓ Low levels of installation defects  Installation inspections ✓ Agreed commissioning plan  Sample witness of static systems testing ✓ Right first time commissioning  Observe equipment & systems start up ✓ Quality control  Finalize functional test protocols(FTP’S) ✓ Deficiency reports  Refine basis of design document ✓ On time systems commissioning  Refine commissioning plan  Finalize commissioning program Presented by: Adam Muggleton, MSc, LEED® AP Commissioning & Sustainability: Ensuring your ROI Managing Partner Toronto September 10, 2008
  • 21. Contractors’ First Reaction to Commissioning! Presented by: Adam Muggleton, MSc, LEED® AP Commissioning & Sustainability: Ensuring your ROI Managing Partner Toronto September 10, 2008
  • 22. Commissioning Process Acceptance Phase = Quality Control Acceptance Deliverables  Sample witness vendor commissioning  Sample witness systems commissioning ✓ Tested and validated building and systems  Sample witness TAB ✓ Documented building performance  Witness 100% all life safety systems ✓ Fully operational & optimized building  Use FTP’s to verify systems performance ✓ Timely completion of commissioning  Global integration testing ✓ High quality environmental conditions  Black building test ✓ Low levels of deficiencies  Assist in problem resolution ✓ Low levels of call backs  Collate & document all systems test results ✓Set trend logs to monitor building  Produce the commissioning report performance  Review and coordinate O&M team training Presented by: Adam Muggleton, MSc, LEED® AP Commissioning & Sustainability: Ensuring your ROI Managing Partner Toronto September 10, 2008
  • 23. Commissioning Process Acceptance Phase - Post Occupancy = Quality Control & Fine tuning Occupancy  Deferred FTP testing Deliverables  Deferred seasonal testing  Systems optimization ✓Up-dated commissioning report  Post occupancy adjustments ✓Lessons learned report / workshop  Review of outstanding defects  Lessons learned workshop Presented by: Adam Muggleton, MSc, LEED® AP Commissioning & Sustainability: Ensuring your ROI Managing Partner Toronto September 10, 2008
  • 24. Cost of NOT Commissioning Commissioning exposes deficiencies in design and installation Cause of Defects in Construction Product/ Equipment Failures, 10% Design Problems, 50% Construction Problems, 40% M Billington. (2001). Defects in Buildings: Symptoms, Investigation, Diagnosis and Cure. www.BRE.co.uk Presented by: Adam Muggleton, MSc, LEED® AP Commissioning & Sustainability: Ensuring your ROI Managing Partner Toronto September 10, 2008
  • 25. Cost of NOT Commissioning Cost of rectifying quality failures increases as the project progresses: Cost  Rectified at design stage 1.00 (Zero)  Rectified during construction 3 times design stage  Rectified at completion 8 times design stage  Rectified in use unlimited! Presented by: Adam Muggleton, MSc, LEED® AP Commissioning & Sustainability: Ensuring your ROI Managing Partner Toronto September 10, 2008
  • 26. Cost of NOT Commissioning Energy Costs at Differing RTU Minimum Outside Air Settings $120,000 $99,315 $100,000 $80,820 $80,000 Annual Cost ($) $61,349 $60,000 $46,488 $40,000 $20,000 $0 21% (Design) 30% 40% 50% % OA During Occupied Hours Presented by: Adam Muggleton, MSc, LEED® AP Commissioning & Sustainability: Ensuring your ROI Managing Partner Toronto September 10, 2008
  • 27. Costs of Commissioning Estimates of Construction Phase Commissioning Costs (Costs from the commission authority in new construction, per square foot) PECI. (2002). New Construction Commissioning Costs. www.PECI.org Presented by: Adam Muggleton, MSc, LEED® AP Commissioning & Sustainability: Ensuring your ROI Managing Partner Toronto September 10, 2008
  • 28. Benefits of Commissioning • Increased occupant thermal comfort with improved environmental control • Improved indoor air quality • Smoother turnover from contractor to owner • Optimized Energy Performance Presented by: Adam Muggleton, MSc, LEED® AP Commissioning & Sustainability: Ensuring your ROI Managing Partner Toronto September 10, 2008
  • 29. Benefits of Commissioning • Reduced construction, operating and maintenance costs • Reduced energy consumption • Reduced RFI’s and change orders • Reduced contractor and vender call backs Presented by: Adam Muggleton, MSc, LEED® AP Commissioning & Sustainability: Ensuring your ROI Managing Partner Toronto September 10, 2008
  • 30. Presented by: Adam Muggleton, MSc, LEED® AP Thank You Commissioning & Sustainability: Ensuring your ROI Managing Partner Toronto September 10, 2008