SlideShare una empresa de Scribd logo
1 de 14
Vendor Selection Michael Shullich, CISSP, PMP
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
1 3 5 7 9 12 14 16
4 = Must Have Without this requirement the system will not be considered for evaluation. 3 = Very Important  It would be extremely difficult to function without this feature. 2 = Important  This feature should be included. Can function without this feature but it will have a negative affect on performance. 1 = Desirable  Although this feature is beneficial, its absence will not significantly degrade the system but its presence will improve efficiency.
Evaluation Score Description Exceptional 1.00 Exceeds basic needs and provides significant additional useful value and potential Meets Requirements Well 0.75 The system compares well with competitors, meets all essential needs and gives all that’s needed Meets Minimal Requirements Only 0.50 System does not compare well to best performers in this category, but still does enough to be useful Meets Partial Requirements 0.25 The system does not meet all necessary requirements in this area, but does contribute some partial value Does Not Meet Requirements 0.00 The system does not meet any of the basic requirements at all
Company Vendor A <logo> Vendor B <logo> Vendor C <logo> Product Product-A Product-B Product-C Employees 1,025 6,000 960 Location UK Los Angeles, Ca  San Jose, CA Technology Window Servers Windows, Unix Cloud Experience Founded 1980  Revenue $300M Founded 1981 Revenue $400 M Founded 1998 Revenue $200M Potential 3 – Medium 4 – High 4 – High Customers 1,000 Customers  2,000 Customers 8,000 customers  Pros Mature product Comprehensive solution Mature product  Low initial Cost  Good fit out of the box Cons Overly Microsoft centric Implementation High initial cost  Implementation Company Not Profitable
Max Vendor-A Vendor-B Vendor-C Vendor Profile  23.00 16.50 20.75 15.25 Core Functionality 29.00 15.75 17.25 18.75 Extended Functionality 6.00 3.00 3.75 3.75 Regulatory 6.00 4.50 4.50 4.50 Technical  15.00 9.00 11.25 12.00 Usability 21.00 12.75 14.25 14.25 Overall Score 61.50 71.75 68.50 ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Vendor-A Vendor-B Vendor-C One Time  ,[object Object],$50 $50 $35 ,[object Object],$50 $50 $35 Reoccurring  ,[object Object],$25 $15 $17 First Year Total $125 $115 $70 Five Year Total $245 $235 $140 Five Year Avg. / yr $49 $47 $28 ,[object Object],[object Object],[object Object],[object Object],[object Object]
Cost vs. Functionality  (sample) Estimated 1 st  Year Cost  Percentage of Requirements Met 40  70  100 $150k $0k $50k $100 A C B $200K Vendor C C B Vendor B A Vendor A

Más contenido relacionado

La actualidad más candente

Purchasing and vendor management
Purchasing and vendor managementPurchasing and vendor management
Purchasing and vendor managementNarendra Chaudhary
 
Purchasing policy and procedures
Purchasing policy and proceduresPurchasing policy and procedures
Purchasing policy and proceduresKris Marie Laserna
 
Strategic Sourcing
Strategic Sourcing Strategic Sourcing
Strategic Sourcing mubarak2009
 
The Beer Game - Supply Chain Analysis
The Beer Game - Supply Chain AnalysisThe Beer Game - Supply Chain Analysis
The Beer Game - Supply Chain AnalysisMohammad Faraz Ansari
 
Supply Chain Management chap 6
Supply Chain Management chap 6Supply Chain Management chap 6
Supply Chain Management chap 6Umair Arain
 
introduction to operation management
introduction to operation managementintroduction to operation management
introduction to operation managementSanjay Thakur
 
Supply chain management & case study
Supply chain management & case studySupply chain management & case study
Supply chain management & case studyDhruv Patel
 
Procurement Strategy by Derek Hendrikz
Procurement Strategy by Derek HendrikzProcurement Strategy by Derek Hendrikz
Procurement Strategy by Derek HendrikzDerek Hendrikz
 
VENDOR PROCESS DEVELOPMENT
VENDOR PROCESS DEVELOPMENTVENDOR PROCESS DEVELOPMENT
VENDOR PROCESS DEVELOPMENTSWAPAN KUMAR ROY
 
international sourcing
international sourcinginternational sourcing
international sourcingAnkit
 
Supply chain mngt
Supply chain mngtSupply chain mngt
Supply chain mngthas10nas
 
Supply Chain Management and Logistics in Construction
Supply Chain Management and Logistics in ConstructionSupply Chain Management and Logistics in Construction
Supply Chain Management and Logistics in ConstructionKogan Page
 
Supplier evaluation criteria
Supplier evaluation criteriaSupplier evaluation criteria
Supplier evaluation criteriaArt Acosta
 
Consumer Behaviour: Supplier Evaluation Selection
Consumer Behaviour:   Supplier Evaluation Selection Consumer Behaviour:   Supplier Evaluation Selection
Consumer Behaviour: Supplier Evaluation Selection Snqobile Ndebele
 
Vendor development
Vendor developmentVendor development
Vendor developmentPadmadhar PD
 

La actualidad más candente (20)

Purchasing and vendor management
Purchasing and vendor managementPurchasing and vendor management
Purchasing and vendor management
 
Purchasing ~Sourcing
Purchasing ~SourcingPurchasing ~Sourcing
Purchasing ~Sourcing
 
Purchasing policy and procedures
Purchasing policy and proceduresPurchasing policy and procedures
Purchasing policy and procedures
 
Strategic Sourcing
Strategic Sourcing Strategic Sourcing
Strategic Sourcing
 
The Beer Game - Supply Chain Analysis
The Beer Game - Supply Chain AnalysisThe Beer Game - Supply Chain Analysis
The Beer Game - Supply Chain Analysis
 
Supply Chain Management chap 6
Supply Chain Management chap 6Supply Chain Management chap 6
Supply Chain Management chap 6
 
GREEN LOGISTICS
GREEN LOGISTICSGREEN LOGISTICS
GREEN LOGISTICS
 
introduction to operation management
introduction to operation managementintroduction to operation management
introduction to operation management
 
Supply chain management & case study
Supply chain management & case studySupply chain management & case study
Supply chain management & case study
 
Procurement Strategy by Derek Hendrikz
Procurement Strategy by Derek HendrikzProcurement Strategy by Derek Hendrikz
Procurement Strategy by Derek Hendrikz
 
VENDOR PROCESS DEVELOPMENT
VENDOR PROCESS DEVELOPMENTVENDOR PROCESS DEVELOPMENT
VENDOR PROCESS DEVELOPMENT
 
international sourcing
international sourcinginternational sourcing
international sourcing
 
Supply chain mngt
Supply chain mngtSupply chain mngt
Supply chain mngt
 
Supply Chain Management and Logistics in Construction
Supply Chain Management and Logistics in ConstructionSupply Chain Management and Logistics in Construction
Supply Chain Management and Logistics in Construction
 
Purchase management
Purchase managementPurchase management
Purchase management
 
Supplier evaluation criteria
Supplier evaluation criteriaSupplier evaluation criteria
Supplier evaluation criteria
 
Vendor Management
Vendor ManagementVendor Management
Vendor Management
 
Consumer Behaviour: Supplier Evaluation Selection
Consumer Behaviour:   Supplier Evaluation Selection Consumer Behaviour:   Supplier Evaluation Selection
Consumer Behaviour: Supplier Evaluation Selection
 
Vendor development
Vendor developmentVendor development
Vendor development
 
Supply chain management
Supply chain managementSupply chain management
Supply chain management
 

Similar a Vendor Selection

Vendor Evaluation PowerPoint Presentation Slides
Vendor Evaluation PowerPoint Presentation SlidesVendor Evaluation PowerPoint Presentation Slides
Vendor Evaluation PowerPoint Presentation SlidesSlideTeam
 
Vendor Assessment PowerPoint Presentation Slides
Vendor Assessment PowerPoint Presentation SlidesVendor Assessment PowerPoint Presentation Slides
Vendor Assessment PowerPoint Presentation SlidesSlideTeam
 
9 Borland Solo Pruebas 2009
9 Borland Solo Pruebas 20099 Borland Solo Pruebas 2009
9 Borland Solo Pruebas 2009Pepe
 
JF608: Quality Control - Unit 2
JF608: Quality Control - Unit 2JF608: Quality Control - Unit 2
JF608: Quality Control - Unit 2Asraf Malik
 
Leading the way in six sigma
Leading the way in six sigmaLeading the way in six sigma
Leading the way in six sigmaInvensis Learning
 
OM2_Lecture 11vvvhhbbjjbjdjjeebjrhvhuuhh
OM2_Lecture 11vvvhhbbjjbjdjjeebjrhvhuuhhOM2_Lecture 11vvvhhbbjjbjdjjeebjrhvhuuhh
OM2_Lecture 11vvvhhbbjjbjdjjeebjrhvhuuhhrammanoharjharupnaga
 
Vendor Management Powerpoint Presentation Slides
Vendor Management Powerpoint Presentation SlidesVendor Management Powerpoint Presentation Slides
Vendor Management Powerpoint Presentation SlidesSlideTeam
 
3D – CHOOSING YOUR ACCOUNTING SOFTWARE PROVIDER
3D – CHOOSING YOUR ACCOUNTING SOFTWARE PROVIDER3D – CHOOSING YOUR ACCOUNTING SOFTWARE PROVIDER
3D – CHOOSING YOUR ACCOUNTING SOFTWARE PROVIDERCFG
 
Costof quality
Costof qualityCostof quality
Costof qualityOmnex Inc.
 
Chapter 7_OM
Chapter 7_OMChapter 7_OM
Chapter 7_OMthangv
 
Vendor Management PowerPoint Presentation Slides
Vendor Management PowerPoint Presentation SlidesVendor Management PowerPoint Presentation Slides
Vendor Management PowerPoint Presentation SlidesSlideTeam
 
411705005-IATF-16949-PPT-TRAINING-AWARENESS.pptx
411705005-IATF-16949-PPT-TRAINING-AWARENESS.pptx411705005-IATF-16949-PPT-TRAINING-AWARENESS.pptx
411705005-IATF-16949-PPT-TRAINING-AWARENESS.pptx401apecgkvelu
 
Isabel Evans - Working Ourselves out of a Job: A Passion For Improvement - Eu...
Isabel Evans - Working Ourselves out of a Job: A Passion For Improvement - Eu...Isabel Evans - Working Ourselves out of a Job: A Passion For Improvement - Eu...
Isabel Evans - Working Ourselves out of a Job: A Passion For Improvement - Eu...TEST Huddle
 
Session 7_OM
Session 7_OMSession 7_OM
Session 7_OMthangv
 

Similar a Vendor Selection (20)

Vendor Evaluation PowerPoint Presentation Slides
Vendor Evaluation PowerPoint Presentation SlidesVendor Evaluation PowerPoint Presentation Slides
Vendor Evaluation PowerPoint Presentation Slides
 
Vendor Assessment PowerPoint Presentation Slides
Vendor Assessment PowerPoint Presentation SlidesVendor Assessment PowerPoint Presentation Slides
Vendor Assessment PowerPoint Presentation Slides
 
cost of quality
cost of qualitycost of quality
cost of quality
 
9 Borland Solo Pruebas 2009
9 Borland Solo Pruebas 20099 Borland Solo Pruebas 2009
9 Borland Solo Pruebas 2009
 
Six sigma
Six sigma Six sigma
Six sigma
 
JF608: Quality Control - Unit 2
JF608: Quality Control - Unit 2JF608: Quality Control - Unit 2
JF608: Quality Control - Unit 2
 
Benchmarking
BenchmarkingBenchmarking
Benchmarking
 
Leading the way in six sigma
Leading the way in six sigmaLeading the way in six sigma
Leading the way in six sigma
 
Tqm notes
Tqm notesTqm notes
Tqm notes
 
OM2_Lecture 11vvvhhbbjjbjdjjeebjrhvhuuhh
OM2_Lecture 11vvvhhbbjjbjdjjeebjrhvhuuhhOM2_Lecture 11vvvhhbbjjbjdjjeebjrhvhuuhh
OM2_Lecture 11vvvhhbbjjbjdjjeebjrhvhuuhh
 
Vendor Management Powerpoint Presentation Slides
Vendor Management Powerpoint Presentation SlidesVendor Management Powerpoint Presentation Slides
Vendor Management Powerpoint Presentation Slides
 
3D – CHOOSING YOUR ACCOUNTING SOFTWARE PROVIDER
3D – CHOOSING YOUR ACCOUNTING SOFTWARE PROVIDER3D – CHOOSING YOUR ACCOUNTING SOFTWARE PROVIDER
3D – CHOOSING YOUR ACCOUNTING SOFTWARE PROVIDER
 
Project initiation
Project initiationProject initiation
Project initiation
 
Costof quality
Costof qualityCostof quality
Costof quality
 
Chapter 7_OM
Chapter 7_OMChapter 7_OM
Chapter 7_OM
 
Chapter 7_OM
Chapter 7_OMChapter 7_OM
Chapter 7_OM
 
Vendor Management PowerPoint Presentation Slides
Vendor Management PowerPoint Presentation SlidesVendor Management PowerPoint Presentation Slides
Vendor Management PowerPoint Presentation Slides
 
411705005-IATF-16949-PPT-TRAINING-AWARENESS.pptx
411705005-IATF-16949-PPT-TRAINING-AWARENESS.pptx411705005-IATF-16949-PPT-TRAINING-AWARENESS.pptx
411705005-IATF-16949-PPT-TRAINING-AWARENESS.pptx
 
Isabel Evans - Working Ourselves out of a Job: A Passion For Improvement - Eu...
Isabel Evans - Working Ourselves out of a Job: A Passion For Improvement - Eu...Isabel Evans - Working Ourselves out of a Job: A Passion For Improvement - Eu...
Isabel Evans - Working Ourselves out of a Job: A Passion For Improvement - Eu...
 
Session 7_OM
Session 7_OMSession 7_OM
Session 7_OM
 

Vendor Selection

  • 1. Vendor Selection Michael Shullich, CISSP, PMP
  • 2.
  • 3.
  • 4.
  • 5. 1 3 5 7 9 12 14 16
  • 6. 4 = Must Have Without this requirement the system will not be considered for evaluation. 3 = Very Important It would be extremely difficult to function without this feature. 2 = Important This feature should be included. Can function without this feature but it will have a negative affect on performance. 1 = Desirable Although this feature is beneficial, its absence will not significantly degrade the system but its presence will improve efficiency.
  • 7.
  • 8.
  • 9. Evaluation Score Description Exceptional 1.00 Exceeds basic needs and provides significant additional useful value and potential Meets Requirements Well 0.75 The system compares well with competitors, meets all essential needs and gives all that’s needed Meets Minimal Requirements Only 0.50 System does not compare well to best performers in this category, but still does enough to be useful Meets Partial Requirements 0.25 The system does not meet all necessary requirements in this area, but does contribute some partial value Does Not Meet Requirements 0.00 The system does not meet any of the basic requirements at all
  • 10.
  • 11. Company Vendor A <logo> Vendor B <logo> Vendor C <logo> Product Product-A Product-B Product-C Employees 1,025 6,000 960 Location UK Los Angeles, Ca San Jose, CA Technology Window Servers Windows, Unix Cloud Experience Founded 1980 Revenue $300M Founded 1981 Revenue $400 M Founded 1998 Revenue $200M Potential 3 – Medium 4 – High 4 – High Customers 1,000 Customers 2,000 Customers 8,000 customers Pros Mature product Comprehensive solution Mature product Low initial Cost Good fit out of the box Cons Overly Microsoft centric Implementation High initial cost Implementation Company Not Profitable
  • 12.
  • 13.
  • 14. Cost vs. Functionality (sample) Estimated 1 st Year Cost Percentage of Requirements Met 40 70 100 $150k $0k $50k $100 A C B $200K Vendor C C B Vendor B A Vendor A