How Much? A study into accounting for Carbon and power in the Data Centre
What? & When?

•

Business Drivers

•

The CARBS Project

•

Challenges

•

Learning

•

Outcomes

•

Summing Up
How Much? A study into accounting for Carbon and power in the Data Centre
Business Drivers
•

The project supports the following UH initiatives:

– The Carbon Management Plan
– KPIs for Sustainability
•

•
•
•
•
•
•
•
•

Green ICT Strategy

HEFCE encouragement to reduce Carbon footprint
Need to minimise IT operational costs
Making best use of existing scarce resources
Assessments of cloud computing versus running services in-house are required for all new
service acquisitions/replacements
Lack of a framework to refer to
Understanding what is driving power usage within the university’s data centres
Can service users help to reduce our Carbon Footprint?
Providing capacity planning data for future data centre requirements
How Much? A study into accounting for Carbon and power in the Data Centre
The Carbon Accounting & Reporting of Baselines for Services Project
(CARBS)
•
•
•
•
•
•

12 month project funded by JISC 2012-2013
Working with Concurrent Thinking
Employs inexpensive hardware
Makes use of internal server system metrics (where available)
Accurate measurement of power usage within systems and across hardware domains
Create a real-time environmental dashboard for individual services and the data centre(s)
as a whole
How Much? A study into accounting for Carbon and power in the Data Centre
The CARBS Project
•

Aims & Objectives:
– Hardware and software model for providing real-time financial & carbon costing of two or
more internally delivered IT services
– Comparisons of output from JISC baselining resources and actual results as calculated by the
project
– A report on the experiences of power & carbon cost accounting for services and its
comparability to the costs of external service provision through the cloud
– Public blog tracking the path through the project and learning along the way
– Presentation(s) to the JISC community
– To work with the JISC community and wider sector to share the experiences and approaches
to assist other organisations to benchmark, further develop carbon cost accounting
approaches for IT services
How Much? A study into accounting for Carbon and power in the Data Centre
Challenges
•
•
•
•
•
•

No such thing as a “simple” service anymore
Not all systems follow the rules
Different communications protocols (MODBUS, SNMP)
DCIM products are immature and constantly evolving
False economies: you get what you pay for!
Operational processes can be an obstacle to implementing service monitoring
How Much? A study into accounting for Carbon and power in the Data Centre
Apportioning the Cost of the SAN
•

The total operational cost is a function of the ratio of disk storage in use by the service
against that allocated elsewhere + the ratio of unallocated storage to that allocated to the
service
1.
2.
3.
4.

Meter the PDUs in the cabs that house the SAN
Get the disk allocation for the Service
Get the total allocated capacity of SAN
Meter the actual Service used storage of its full
allocation
5. Get the unallocated storage of the SAN
6. Calculation will be: (1*4/3)+(1/(2/3*5))
•

In English:

– We know how much storage is in the SAN, but we are only interested in what is being
used for the service we are trying to meter. We have storage that is in use by the
service and can be costed and we have spare capacity on the SAN that is powered up
but not in use by any service
How Much? A study into accounting for Carbon and power in the Data Centre
Learning
•

Pre-Project

–
–
–
–
–

More difficult than it looks!
Prototype
Scope project out carefully
Is everything SNMP-enabled/compatible?
MIBS
• Do you have them?
• Check dependencies
• Research OIDS
– Take a full audit of your data centre
– Make any changes beforehand
How Much? A study into accounting for Carbon and power in the Data Centre
Learning
•

During the Project

– Keep Stakeholders informed
– Manage changes
– Work closely with your DCIM vendor
How Much? A study into accounting for Carbon and power in the Data Centre
Learning
•

Post-Project

–
–
–
–
–
–

Manage changes to the data centre
Check validity of reported values regularly
Keep Stakeholders informed
Build SNMP compatility and functionality into future procurement requirements
Don’t have a DCIM?
SusteIT’s Carbon Footprinting Tool can be made even better:
• Use PUE to provide facility overhead
• Add in Carbon cost to get a true picture
• Don't trust the server estimators, test one of each type of server and use this
base data to provide your wattage figures
How Much? A study into accounting for Carbon and power in the Data Centre
Outcomes
•

Achievements

–
–
–
–
–
–
–
–

Complete carbon and power cost accounting for the Voyager book-lending system
Better awareness of the value of virtualising or replacing servers
Better informed as to cost comparison between cloud and in-house
Successful implementation of the infrastructure required to provide carbon and cost
accounting for most services within the university’s data centres
Increased awareness of sustainability efforts at the university
Increased focus on carbon costing during project initiation process
A specific assessment of SusteIT’s carbon footprinting benchmarking tool against
real-world data
Learning documented throughout the project in our blog
(http://blogs.herts.ac.uk/carbs/)
How Much? A study into accounting for Carbon and power in the Data Centre
Voyager Dashboard
How Much? A study into accounting for Carbon and power in the Data Centre
Outcomes
•

Achievements

√
√
√
√
√
√
√
√

Complete carbon and power cost accounting for the Voyager book-lending system
Better awareness of the value of virtualising or replacing servers
Better informed as to cost comparison between cloud and in-house
Successful implementation of the infrastructure required to provide carbon and cost
accounting for most services within the university’s data centres
Increased awareness of sustainability efforts at the university
Increased focus on carbon costing during project initiation process
A specific assessment of SusteIT’s carbon footprinting benchmarking tool against
real-world data
Learning documented throughout the project in our blog
(http://blogs.herts.ac.uk/carbs/)
How Much? A study into accounting for Carbon and power in the Data Centre
Outcomes
•

Drawbacks

– Large number of assumptions in model
– Reliance on rack PDU data creates problems if they are not fully functional
– A specific assessment of SusteIT’s carbon footprinting benchmarking tool against
real-world data
– Increased awareness of sustainability efforts at the university
– Increased focus on carbon costing during project initiation process
– Learning documented throughout the project in our blog
(http://blogs.herts.ac.uk/carbs/)
How Much? A study into accounting for Carbon and power in the Data Centre
Summing Up
•

The Voyager service cost is composed of the following elements:

1.
2.
3.
4.
•

Power from the PDUs in the rack where Voyager is located
A proportion of the power taken from the PDUs where the SAN storage is located
A proportion of the facility power, based on the PUE and the share of power
required for 1 & 2 above
Carbon cost for the power consumed

Specifically excluded:

– The network
•

Interesting Note:

– Server at very low loading but consuming almost twice Oracle’s estimated power
draw
How Much? A study into accounting for Carbon and power in
the Data Centre
Blogs: http://blogs.herts.ac.uk/carbs/
http://blogs.herts.ac.uk/rare-idc/

SusteIT’s ICT Energy & Carbon Footprinting Tool
http://www.susteit.org.uk/files/category.php?catID=4
Thank You
Any Questions?

Más contenido relacionado

La actualidad más candente

Advancing the Last Frontier: Reduction of commercial plug loads
Advancing the Last Frontier: Reduction of commercial plug loadsAdvancing the Last Frontier: Reduction of commercial plug loads
Advancing the Last Frontier: Reduction of commercial plug loadsCenter for Energy and Environment
 
Environmental Modeling of NextGen (2010)
Environmental Modeling of NextGen (2010)Environmental Modeling of NextGen (2010)
Environmental Modeling of NextGen (2010)Jawad Rachami
 
Webinar: Post-combusion carbon capture - Thermodynamic modelling
Webinar: Post-combusion carbon capture - Thermodynamic modellingWebinar: Post-combusion carbon capture - Thermodynamic modelling
Webinar: Post-combusion carbon capture - Thermodynamic modellingGlobal CCS Institute
 
Catchment Data & Evidence Forum 28/09/18 - RibbleRivers Trust
Catchment Data & Evidence Forum 28/09/18 - RibbleRivers TrustCatchment Data & Evidence Forum 28/09/18 - RibbleRivers Trust
Catchment Data & Evidence Forum 28/09/18 - RibbleRivers TrustCaBASupport
 
Ispe the energy saving in the pharmaceutical industry
Ispe   the energy saving in the pharmaceutical industryIspe   the energy saving in the pharmaceutical industry
Ispe the energy saving in the pharmaceutical industryMarcello Pasquazzo
 
ACEEE EE as a Grid Resource
ACEEE EE as a Grid ResourceACEEE EE as a Grid Resource
ACEEE EE as a Grid ResourcePatty Cook
 
Renewable Energy & power system support
Renewable Energy & power system supportRenewable Energy & power system support
Renewable Energy & power system supportPower System Operation
 
Cert Ambient Generation And Transmission
Cert Ambient Generation And TransmissionCert Ambient Generation And Transmission
Cert Ambient Generation And Transmissionevansdevelopment
 
Mitigation Pathways to well below 2C in ETSAP-TIAM
Mitigation Pathways to well below 2C in ETSAP-TIAMMitigation Pathways to well below 2C in ETSAP-TIAM
Mitigation Pathways to well below 2C in ETSAP-TIAMIEA-ETSAP
 
Webinar: The cost effectiveness of natural gas combined cycle power plants wi...
Webinar: The cost effectiveness of natural gas combined cycle power plants wi...Webinar: The cost effectiveness of natural gas combined cycle power plants wi...
Webinar: The cost effectiveness of natural gas combined cycle power plants wi...Global CCS Institute
 
Low Carbon Data Centres without Compromise
Low Carbon Data Centres without CompromiseLow Carbon Data Centres without Compromise
Low Carbon Data Centres without CompromiseArk Continuity Limited
 
Webinar: The cost effectiveness of natural gas combined cycle power plants wi...
Webinar: The cost effectiveness of natural gas combined cycle power plants wi...Webinar: The cost effectiveness of natural gas combined cycle power plants wi...
Webinar: The cost effectiveness of natural gas combined cycle power plants wi...Global CCS Institute
 

La actualidad más candente (14)

Advancing the Last Frontier: Reduction of commercial plug loads
Advancing the Last Frontier: Reduction of commercial plug loadsAdvancing the Last Frontier: Reduction of commercial plug loads
Advancing the Last Frontier: Reduction of commercial plug loads
 
Environmental Modeling of NextGen (2010)
Environmental Modeling of NextGen (2010)Environmental Modeling of NextGen (2010)
Environmental Modeling of NextGen (2010)
 
Hawaii Utility Integration Efforts
Hawaii Utility Integration EffortsHawaii Utility Integration Efforts
Hawaii Utility Integration Efforts
 
Webinar: Post-combusion carbon capture - Thermodynamic modelling
Webinar: Post-combusion carbon capture - Thermodynamic modellingWebinar: Post-combusion carbon capture - Thermodynamic modelling
Webinar: Post-combusion carbon capture - Thermodynamic modelling
 
Catchment Data & Evidence Forum 28/09/18 - RibbleRivers Trust
Catchment Data & Evidence Forum 28/09/18 - RibbleRivers TrustCatchment Data & Evidence Forum 28/09/18 - RibbleRivers Trust
Catchment Data & Evidence Forum 28/09/18 - RibbleRivers Trust
 
Ispe the energy saving in the pharmaceutical industry
Ispe   the energy saving in the pharmaceutical industryIspe   the energy saving in the pharmaceutical industry
Ispe the energy saving in the pharmaceutical industry
 
ACEEE EE as a Grid Resource
ACEEE EE as a Grid ResourceACEEE EE as a Grid Resource
ACEEE EE as a Grid Resource
 
Renewable Energy & power system support
Renewable Energy & power system supportRenewable Energy & power system support
Renewable Energy & power system support
 
Cert Ambient Generation And Transmission
Cert Ambient Generation And TransmissionCert Ambient Generation And Transmission
Cert Ambient Generation And Transmission
 
Mitigation Pathways to well below 2C in ETSAP-TIAM
Mitigation Pathways to well below 2C in ETSAP-TIAMMitigation Pathways to well below 2C in ETSAP-TIAM
Mitigation Pathways to well below 2C in ETSAP-TIAM
 
Webinar: The cost effectiveness of natural gas combined cycle power plants wi...
Webinar: The cost effectiveness of natural gas combined cycle power plants wi...Webinar: The cost effectiveness of natural gas combined cycle power plants wi...
Webinar: The cost effectiveness of natural gas combined cycle power plants wi...
 
Low Carbon Data Centres without Compromise
Low Carbon Data Centres without CompromiseLow Carbon Data Centres without Compromise
Low Carbon Data Centres without Compromise
 
Alabama e3 Overview
Alabama e3 OverviewAlabama e3 Overview
Alabama e3 Overview
 
Webinar: The cost effectiveness of natural gas combined cycle power plants wi...
Webinar: The cost effectiveness of natural gas combined cycle power plants wi...Webinar: The cost effectiveness of natural gas combined cycle power plants wi...
Webinar: The cost effectiveness of natural gas combined cycle power plants wi...
 

Destacado

Video-Conferencing in the UK HE & FE Sectors - Research Findings
Video-Conferencing in the UK HE & FE Sectors - Research FindingsVideo-Conferencing in the UK HE & FE Sectors - Research Findings
Video-Conferencing in the UK HE & FE Sectors - Research FindingsJISC's Green ICT Programme
 
University of Warwick Video Conferencing Service
University of Warwick Video Conferencing ServiceUniversity of Warwick Video Conferencing Service
University of Warwick Video Conferencing ServiceJISC's Green ICT Programme
 
Understanding IT Costs - Part of Jisc's Costing IT Services Project
Understanding IT Costs - Part of Jisc's Costing IT Services ProjectUnderstanding IT Costs - Part of Jisc's Costing IT Services Project
Understanding IT Costs - Part of Jisc's Costing IT Services ProjectJISC's Green ICT Programme
 
Better Decision Making by Understanding IT Spend
Better Decision Making by Understanding IT SpendBetter Decision Making by Understanding IT Spend
Better Decision Making by Understanding IT SpendJISC's Green ICT Programme
 
Data Centre Compute and Overhead Costs - Delivering End-to-end KPIs
Data Centre Compute and Overhead Costs - Delivering End-to-end KPIsData Centre Compute and Overhead Costs - Delivering End-to-end KPIs
Data Centre Compute and Overhead Costs - Delivering End-to-end KPIsJISC's Green ICT Programme
 
What does central IT really cost? - An attempt to find out
What does central IT really cost? - An attempt to find outWhat does central IT really cost? - An attempt to find out
What does central IT really cost? - An attempt to find outJISC's Green ICT Programme
 

Destacado (6)

Video-Conferencing in the UK HE & FE Sectors - Research Findings
Video-Conferencing in the UK HE & FE Sectors - Research FindingsVideo-Conferencing in the UK HE & FE Sectors - Research Findings
Video-Conferencing in the UK HE & FE Sectors - Research Findings
 
University of Warwick Video Conferencing Service
University of Warwick Video Conferencing ServiceUniversity of Warwick Video Conferencing Service
University of Warwick Video Conferencing Service
 
Understanding IT Costs - Part of Jisc's Costing IT Services Project
Understanding IT Costs - Part of Jisc's Costing IT Services ProjectUnderstanding IT Costs - Part of Jisc's Costing IT Services Project
Understanding IT Costs - Part of Jisc's Costing IT Services Project
 
Better Decision Making by Understanding IT Spend
Better Decision Making by Understanding IT SpendBetter Decision Making by Understanding IT Spend
Better Decision Making by Understanding IT Spend
 
Data Centre Compute and Overhead Costs - Delivering End-to-end KPIs
Data Centre Compute and Overhead Costs - Delivering End-to-end KPIsData Centre Compute and Overhead Costs - Delivering End-to-end KPIs
Data Centre Compute and Overhead Costs - Delivering End-to-end KPIs
 
What does central IT really cost? - An attempt to find out
What does central IT really cost? - An attempt to find outWhat does central IT really cost? - An attempt to find out
What does central IT really cost? - An attempt to find out
 

Similar a CARBS Project Presentation - Jisc Cost of IT Services 10-02-14

IWSM2014 MEGSUS14 - GQM on energy for SaaS - CETIC
IWSM2014   MEGSUS14 - GQM on energy for SaaS - CETICIWSM2014   MEGSUS14 - GQM on energy for SaaS - CETIC
IWSM2014 MEGSUS14 - GQM on energy for SaaS - CETICNesma
 
APN Partner Webinar - Having Effective and Critical TCO Conversations
APN Partner Webinar - Having Effective and Critical TCO ConversationsAPN Partner Webinar - Having Effective and Critical TCO Conversations
APN Partner Webinar - Having Effective and Critical TCO ConversationsAmazon Web Services
 
e-Research & the art of linking Astrophysics to Deforestation
e-Research & the art of linking Astrophysics to Deforestatione-Research & the art of linking Astrophysics to Deforestation
e-Research & the art of linking Astrophysics to DeforestationDavid Wallom
 
apidays London 2023 - API Green Score, Yannick Tremblais & Julien Brun, Green...
apidays London 2023 - API Green Score, Yannick Tremblais & Julien Brun, Green...apidays London 2023 - API Green Score, Yannick Tremblais & Julien Brun, Green...
apidays London 2023 - API Green Score, Yannick Tremblais & Julien Brun, Green...apidays
 
SC17 Panel: Energy Efficiency Gains From HPC Software
SC17 Panel: Energy Efficiency Gains From HPC SoftwareSC17 Panel: Energy Efficiency Gains From HPC Software
SC17 Panel: Energy Efficiency Gains From HPC Softwareinside-BigData.com
 
jguijarro_Dc4cities_DCDC_Abril15
jguijarro_Dc4cities_DCDC_Abril15jguijarro_Dc4cities_DCDC_Abril15
jguijarro_Dc4cities_DCDC_Abril15Jordi Guijarro
 
Overview of Hydrogen TCP, Task 41. Introduce discussion points from the hydro...
Overview of Hydrogen TCP, Task 41. Introduce discussion points from the hydro...Overview of Hydrogen TCP, Task 41. Introduce discussion points from the hydro...
Overview of Hydrogen TCP, Task 41. Introduce discussion points from the hydro...IEA-ETSAP
 
2009 Going Green Data Center Presentation
2009 Going Green Data Center Presentation2009 Going Green Data Center Presentation
2009 Going Green Data Center Presentationenternet
 
Achieving more with less - Infrastructure
Achieving more with less - InfrastructureAchieving more with less - Infrastructure
Achieving more with less - InfrastructureGethNichols
 
PG&E_Distribution_Resource_Plan_Summary
PG&E_Distribution_Resource_Plan_SummaryPG&E_Distribution_Resource_Plan_Summary
PG&E_Distribution_Resource_Plan_SummaryThomas Russell, PE
 
Using human-centred design to improve energy efficiency programs
Using human-centred design to improve energy efficiency programsUsing human-centred design to improve energy efficiency programs
Using human-centred design to improve energy efficiency programsLeonardo ENERGY
 
The RECAP Project: Large Scale Simulation Framework
The RECAP Project: Large Scale Simulation FrameworkThe RECAP Project: Large Scale Simulation Framework
The RECAP Project: Large Scale Simulation FrameworkRECAP Project
 
Energy-Efficient Task Scheduling in Cloud Environment
Energy-Efficient Task Scheduling in Cloud EnvironmentEnergy-Efficient Task Scheduling in Cloud Environment
Energy-Efficient Task Scheduling in Cloud EnvironmentIRJET Journal
 
Aged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptxAged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptxSchneider Electric
 
Equota Pitch Deck EN 2015
Equota Pitch Deck EN 2015Equota Pitch Deck EN 2015
Equota Pitch Deck EN 2015Lucia Shen
 
Energy efficient computing & computational services
Energy efficient computing & computational services Energy efficient computing & computational services
Energy efficient computing & computational services David Wallom
 

Similar a CARBS Project Presentation - Jisc Cost of IT Services 10-02-14 (20)

IWSM2014 MEGSUS14 - GQM on energy for SaaS - CETIC
IWSM2014   MEGSUS14 - GQM on energy for SaaS - CETICIWSM2014   MEGSUS14 - GQM on energy for SaaS - CETIC
IWSM2014 MEGSUS14 - GQM on energy for SaaS - CETIC
 
APN Partner Webinar - Having Effective and Critical TCO Conversations
APN Partner Webinar - Having Effective and Critical TCO ConversationsAPN Partner Webinar - Having Effective and Critical TCO Conversations
APN Partner Webinar - Having Effective and Critical TCO Conversations
 
e-Research & the art of linking Astrophysics to Deforestation
e-Research & the art of linking Astrophysics to Deforestatione-Research & the art of linking Astrophysics to Deforestation
e-Research & the art of linking Astrophysics to Deforestation
 
apidays London 2023 - API Green Score, Yannick Tremblais & Julien Brun, Green...
apidays London 2023 - API Green Score, Yannick Tremblais & Julien Brun, Green...apidays London 2023 - API Green Score, Yannick Tremblais & Julien Brun, Green...
apidays London 2023 - API Green Score, Yannick Tremblais & Julien Brun, Green...
 
SC17 Panel: Energy Efficiency Gains From HPC Software
SC17 Panel: Energy Efficiency Gains From HPC SoftwareSC17 Panel: Energy Efficiency Gains From HPC Software
SC17 Panel: Energy Efficiency Gains From HPC Software
 
An Environmentally Sustainable Data Centre for Smart Cities
An Environmentally Sustainable Data Centre for Smart CitiesAn Environmentally Sustainable Data Centre for Smart Cities
An Environmentally Sustainable Data Centre for Smart Cities
 
jguijarro_Dc4cities_DCDC_Abril15
jguijarro_Dc4cities_DCDC_Abril15jguijarro_Dc4cities_DCDC_Abril15
jguijarro_Dc4cities_DCDC_Abril15
 
Overview of Hydrogen TCP, Task 41. Introduce discussion points from the hydro...
Overview of Hydrogen TCP, Task 41. Introduce discussion points from the hydro...Overview of Hydrogen TCP, Task 41. Introduce discussion points from the hydro...
Overview of Hydrogen TCP, Task 41. Introduce discussion points from the hydro...
 
2009 Going Green Data Center Presentation
2009 Going Green Data Center Presentation2009 Going Green Data Center Presentation
2009 Going Green Data Center Presentation
 
Achieving more with less - Infrastructure
Achieving more with less - InfrastructureAchieving more with less - Infrastructure
Achieving more with less - Infrastructure
 
PG&E_Distribution_Resource_Plan_Summary
PG&E_Distribution_Resource_Plan_SummaryPG&E_Distribution_Resource_Plan_Summary
PG&E_Distribution_Resource_Plan_Summary
 
Chap013.pptx
Chap013.pptxChap013.pptx
Chap013.pptx
 
Using human-centred design to improve energy efficiency programs
Using human-centred design to improve energy efficiency programsUsing human-centred design to improve energy efficiency programs
Using human-centred design to improve energy efficiency programs
 
The RECAP Project: Large Scale Simulation Framework
The RECAP Project: Large Scale Simulation FrameworkThe RECAP Project: Large Scale Simulation Framework
The RECAP Project: Large Scale Simulation Framework
 
What Makes Software Green?
What Makes Software Green?What Makes Software Green?
What Makes Software Green?
 
Energy-Efficient Task Scheduling in Cloud Environment
Energy-Efficient Task Scheduling in Cloud EnvironmentEnergy-Efficient Task Scheduling in Cloud Environment
Energy-Efficient Task Scheduling in Cloud Environment
 
Aged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptxAged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptx
 
Equota Pitch Deck EN 2015
Equota Pitch Deck EN 2015Equota Pitch Deck EN 2015
Equota Pitch Deck EN 2015
 
Energy efficient computing & computational services
Energy efficient computing & computational services Energy efficient computing & computational services
Energy efficient computing & computational services
 
Green cloud
Green cloudGreen cloud
Green cloud
 

Más de JISC's Green ICT Programme

Circling the Square! - Understanding and Minimising the Costs of Providing Di...
Circling the Square! - Understanding and Minimising the Costs of Providing Di...Circling the Square! - Understanding and Minimising the Costs of Providing Di...
Circling the Square! - Understanding and Minimising the Costs of Providing Di...JISC's Green ICT Programme
 
US Trends in Data Centre Design with NREL Examples of Large Energy Savings
US Trends in Data Centre Design with NREL Examples of Large Energy Savings US Trends in Data Centre Design with NREL Examples of Large Energy Savings
US Trends in Data Centre Design with NREL Examples of Large Energy Savings JISC's Green ICT Programme
 
Migrating from a physical to a hosted Data Centre - Experiences of a small Un...
Migrating from a physical to a hosted Data Centre - Experiences of a small Un...Migrating from a physical to a hosted Data Centre - Experiences of a small Un...
Migrating from a physical to a hosted Data Centre - Experiences of a small Un...JISC's Green ICT Programme
 
The “Financial X-ray” of IT Services costs -
The “Financial X-ray” of IT Services costs - The “Financial X-ray” of IT Services costs -
The “Financial X-ray” of IT Services costs - JISC's Green ICT Programme
 
Energy Efficient Server Rooms at the University of Cambridge
Energy Efficient Server Rooms at the University of CambridgeEnergy Efficient Server Rooms at the University of Cambridge
Energy Efficient Server Rooms at the University of CambridgeJISC's Green ICT Programme
 
What does central IT really cost? An attempt to find out! - Heidi Fraser-Krau...
What does central IT really cost? An attempt to find out! - Heidi Fraser-Krau...What does central IT really cost? An attempt to find out! - Heidi Fraser-Krau...
What does central IT really cost? An attempt to find out! - Heidi Fraser-Krau...JISC's Green ICT Programme
 
Understanding Data Centre Costs: Lessons from e-InfraNet and JISC activities
Understanding Data Centre Costs: Lessons from e-InfraNet and JISC activitiesUnderstanding Data Centre Costs: Lessons from e-InfraNet and JISC activities
Understanding Data Centre Costs: Lessons from e-InfraNet and JISC activitiesJISC's Green ICT Programme
 
Ppt 1 le leeds - welcome alan real ( university of leeds )
Ppt 1 le   leeds - welcome alan real ( university of leeds )Ppt 1 le   leeds - welcome alan real ( university of leeds )
Ppt 1 le leeds - welcome alan real ( university of leeds )JISC's Green ICT Programme
 
Ppt6 london - james harbridge ( intellect uk ) crc policy update
Ppt6   london - james harbridge ( intellect uk ) crc policy updatePpt6   london - james harbridge ( intellect uk ) crc policy update
Ppt6 london - james harbridge ( intellect uk ) crc policy updateJISC's Green ICT Programme
 
Ppt5 exp lonodn - kevin cope & alex yakimov ( imperial college ) data cent...
Ppt5   exp lonodn - kevin cope & alex yakimov ( imperial college )  data cent...Ppt5   exp lonodn - kevin cope & alex yakimov ( imperial college )  data cent...
Ppt5 exp lonodn - kevin cope & alex yakimov ( imperial college ) data cent...JISC's Green ICT Programme
 
Ppt4 london - michael rudgyard ( concurrent thinking ) driving efficiencie...
Ppt4   london -  michael rudgyard ( concurrent thinking ) driving efficiencie...Ppt4   london -  michael rudgyard ( concurrent thinking ) driving efficiencie...
Ppt4 london - michael rudgyard ( concurrent thinking ) driving efficiencie...JISC's Green ICT Programme
 
Ppt4 exp leeds - alan real and jon summers ( university of leeds ) experien...
Ppt4   exp leeds - alan real and jon summers ( university of leeds ) experien...Ppt4   exp leeds - alan real and jon summers ( university of leeds ) experien...
Ppt4 exp leeds - alan real and jon summers ( university of leeds ) experien...JISC's Green ICT Programme
 
Ppt4 exp birmingham - steve bowes phipps ( university of hertfordshire ) - ...
Ppt4   exp birmingham - steve bowes phipps ( university of hertfordshire ) - ...Ppt4   exp birmingham - steve bowes phipps ( university of hertfordshire ) - ...
Ppt4 exp birmingham - steve bowes phipps ( university of hertfordshire ) - ...JISC's Green ICT Programme
 
Ppt3 london - sophia ( operation intelligence ) what is the eu code of conduct
Ppt3   london - sophia ( operation intelligence ) what is the eu code of conductPpt3   london - sophia ( operation intelligence ) what is the eu code of conduct
Ppt3 london - sophia ( operation intelligence ) what is the eu code of conductJISC's Green ICT Programme
 
Ppt2 london - mike walker ( defra ) background to the eu code of conduct j...
Ppt2   london - mike walker ( defra )  background to the eu code of conduct j...Ppt2   london - mike walker ( defra )  background to the eu code of conduct j...
Ppt2 london - mike walker ( defra ) background to the eu code of conduct j...JISC's Green ICT Programme
 
Ppt1 london -simon allen ( concurrent thinking ) welcome
Ppt1   london -simon allen ( concurrent thinking ) welcomePpt1   london -simon allen ( concurrent thinking ) welcome
Ppt1 london -simon allen ( concurrent thinking ) welcomeJISC's Green ICT Programme
 
The Welsh Video Network: Supporting Video Conferencing in Welsh Education: Us...
The Welsh Video Network: Supporting Video Conferencing in Welsh Education: Us...The Welsh Video Network: Supporting Video Conferencing in Welsh Education: Us...
The Welsh Video Network: Supporting Video Conferencing in Welsh Education: Us...JISC's Green ICT Programme
 

Más de JISC's Green ICT Programme (20)

Circling the Square! - Understanding and Minimising the Costs of Providing Di...
Circling the Square! - Understanding and Minimising the Costs of Providing Di...Circling the Square! - Understanding and Minimising the Costs of Providing Di...
Circling the Square! - Understanding and Minimising the Costs of Providing Di...
 
US Trends in Data Centre Design with NREL Examples of Large Energy Savings
US Trends in Data Centre Design with NREL Examples of Large Energy Savings US Trends in Data Centre Design with NREL Examples of Large Energy Savings
US Trends in Data Centre Design with NREL Examples of Large Energy Savings
 
Migrating from a physical to a hosted Data Centre - Experiences of a small Un...
Migrating from a physical to a hosted Data Centre - Experiences of a small Un...Migrating from a physical to a hosted Data Centre - Experiences of a small Un...
Migrating from a physical to a hosted Data Centre - Experiences of a small Un...
 
The “Financial X-ray” of IT Services costs -
The “Financial X-ray” of IT Services costs - The “Financial X-ray” of IT Services costs -
The “Financial X-ray” of IT Services costs -
 
Energy Efficient Server Rooms at the University of Cambridge
Energy Efficient Server Rooms at the University of CambridgeEnergy Efficient Server Rooms at the University of Cambridge
Energy Efficient Server Rooms at the University of Cambridge
 
What does central IT really cost? An attempt to find out! - Heidi Fraser-Krau...
What does central IT really cost? An attempt to find out! - Heidi Fraser-Krau...What does central IT really cost? An attempt to find out! - Heidi Fraser-Krau...
What does central IT really cost? An attempt to find out! - Heidi Fraser-Krau...
 
Understanding Data Centre Costs: Lessons from e-InfraNet and JISC activities
Understanding Data Centre Costs: Lessons from e-InfraNet and JISC activitiesUnderstanding Data Centre Costs: Lessons from e-InfraNet and JISC activities
Understanding Data Centre Costs: Lessons from e-InfraNet and JISC activities
 
Ppt 1 le leeds - welcome alan real ( university of leeds )
Ppt 1 le   leeds - welcome alan real ( university of leeds )Ppt 1 le   leeds - welcome alan real ( university of leeds )
Ppt 1 le leeds - welcome alan real ( university of leeds )
 
Ppt6 london - james harbridge ( intellect uk ) crc policy update
Ppt6   london - james harbridge ( intellect uk ) crc policy updatePpt6   london - james harbridge ( intellect uk ) crc policy update
Ppt6 london - james harbridge ( intellect uk ) crc policy update
 
Ppt5 exp lonodn - kevin cope & alex yakimov ( imperial college ) data cent...
Ppt5   exp lonodn - kevin cope & alex yakimov ( imperial college )  data cent...Ppt5   exp lonodn - kevin cope & alex yakimov ( imperial college )  data cent...
Ppt5 exp lonodn - kevin cope & alex yakimov ( imperial college ) data cent...
 
Ppt4 london - michael rudgyard ( concurrent thinking ) driving efficiencie...
Ppt4   london -  michael rudgyard ( concurrent thinking ) driving efficiencie...Ppt4   london -  michael rudgyard ( concurrent thinking ) driving efficiencie...
Ppt4 london - michael rudgyard ( concurrent thinking ) driving efficiencie...
 
Ppt4 exp leeds - alan real and jon summers ( university of leeds ) experien...
Ppt4   exp leeds - alan real and jon summers ( university of leeds ) experien...Ppt4   exp leeds - alan real and jon summers ( university of leeds ) experien...
Ppt4 exp leeds - alan real and jon summers ( university of leeds ) experien...
 
Ppt4 exp birmingham - steve bowes phipps ( university of hertfordshire ) - ...
Ppt4   exp birmingham - steve bowes phipps ( university of hertfordshire ) - ...Ppt4   exp birmingham - steve bowes phipps ( university of hertfordshire ) - ...
Ppt4 exp birmingham - steve bowes phipps ( university of hertfordshire ) - ...
 
Ppt3 london - sophia ( operation intelligence ) what is the eu code of conduct
Ppt3   london - sophia ( operation intelligence ) what is the eu code of conductPpt3   london - sophia ( operation intelligence ) what is the eu code of conduct
Ppt3 london - sophia ( operation intelligence ) what is the eu code of conduct
 
Ppt2 london - mike walker ( defra ) background to the eu code of conduct j...
Ppt2   london - mike walker ( defra )  background to the eu code of conduct j...Ppt2   london - mike walker ( defra )  background to the eu code of conduct j...
Ppt2 london - mike walker ( defra ) background to the eu code of conduct j...
 
Ppt1 london -simon allen ( concurrent thinking ) welcome
Ppt1   london -simon allen ( concurrent thinking ) welcomePpt1   london -simon allen ( concurrent thinking ) welcome
Ppt1 london -simon allen ( concurrent thinking ) welcome
 
The Welsh Video Network: Supporting Video Conferencing in Welsh Education: Us...
The Welsh Video Network: Supporting Video Conferencing in Welsh Education: Us...The Welsh Video Network: Supporting Video Conferencing in Welsh Education: Us...
The Welsh Video Network: Supporting Video Conferencing in Welsh Education: Us...
 
Videoconferencing in Dutch Higher Education
Videoconferencing in Dutch Higher EducationVideoconferencing in Dutch Higher Education
Videoconferencing in Dutch Higher Education
 
Greening Events II
Greening Events IIGreening Events II
Greening Events II
 
Into the clouds with surf
Into the clouds with surfInto the clouds with surf
Into the clouds with surf
 

Último

Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxVishalSingh1417
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxVishalSingh1417
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterMateoGardella
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfChris Hunter
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docxPoojaSen20
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfSanaAli374401
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.MateoGardella
 

Último (20)

Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
 

CARBS Project Presentation - Jisc Cost of IT Services 10-02-14

  • 1. How Much? A study into accounting for Carbon and power in the Data Centre Steve Bowes-Phipps Data Centre Manager University of Hertfordshire http://rare-idc.herts.ac.uk
  • 2. How Much? A study into accounting for Carbon and power in the Data Centre What? & When? • Business Drivers • The CARBS Project • Challenges • Learning • Outcomes • Summing Up
  • 3. How Much? A study into accounting for Carbon and power in the Data Centre Business Drivers • The project supports the following UH initiatives: – The Carbon Management Plan – KPIs for Sustainability • • • • • • • • • Green ICT Strategy HEFCE encouragement to reduce Carbon footprint Need to minimise IT operational costs Making best use of existing scarce resources Assessments of cloud computing versus running services in-house are required for all new service acquisitions/replacements Lack of a framework to refer to Understanding what is driving power usage within the university’s data centres Can service users help to reduce our Carbon Footprint? Providing capacity planning data for future data centre requirements
  • 4. How Much? A study into accounting for Carbon and power in the Data Centre The Carbon Accounting & Reporting of Baselines for Services Project (CARBS) • • • • • • 12 month project funded by JISC 2012-2013 Working with Concurrent Thinking Employs inexpensive hardware Makes use of internal server system metrics (where available) Accurate measurement of power usage within systems and across hardware domains Create a real-time environmental dashboard for individual services and the data centre(s) as a whole
  • 5. How Much? A study into accounting for Carbon and power in the Data Centre The CARBS Project • Aims & Objectives: – Hardware and software model for providing real-time financial & carbon costing of two or more internally delivered IT services – Comparisons of output from JISC baselining resources and actual results as calculated by the project – A report on the experiences of power & carbon cost accounting for services and its comparability to the costs of external service provision through the cloud – Public blog tracking the path through the project and learning along the way – Presentation(s) to the JISC community – To work with the JISC community and wider sector to share the experiences and approaches to assist other organisations to benchmark, further develop carbon cost accounting approaches for IT services
  • 6. How Much? A study into accounting for Carbon and power in the Data Centre Challenges • • • • • • No such thing as a “simple” service anymore Not all systems follow the rules Different communications protocols (MODBUS, SNMP) DCIM products are immature and constantly evolving False economies: you get what you pay for! Operational processes can be an obstacle to implementing service monitoring
  • 7. How Much? A study into accounting for Carbon and power in the Data Centre Apportioning the Cost of the SAN • The total operational cost is a function of the ratio of disk storage in use by the service against that allocated elsewhere + the ratio of unallocated storage to that allocated to the service 1. 2. 3. 4. Meter the PDUs in the cabs that house the SAN Get the disk allocation for the Service Get the total allocated capacity of SAN Meter the actual Service used storage of its full allocation 5. Get the unallocated storage of the SAN 6. Calculation will be: (1*4/3)+(1/(2/3*5)) • In English: – We know how much storage is in the SAN, but we are only interested in what is being used for the service we are trying to meter. We have storage that is in use by the service and can be costed and we have spare capacity on the SAN that is powered up but not in use by any service
  • 8. How Much? A study into accounting for Carbon and power in the Data Centre Learning • Pre-Project – – – – – More difficult than it looks! Prototype Scope project out carefully Is everything SNMP-enabled/compatible? MIBS • Do you have them? • Check dependencies • Research OIDS – Take a full audit of your data centre – Make any changes beforehand
  • 9. How Much? A study into accounting for Carbon and power in the Data Centre Learning • During the Project – Keep Stakeholders informed – Manage changes – Work closely with your DCIM vendor
  • 10. How Much? A study into accounting for Carbon and power in the Data Centre Learning • Post-Project – – – – – – Manage changes to the data centre Check validity of reported values regularly Keep Stakeholders informed Build SNMP compatility and functionality into future procurement requirements Don’t have a DCIM? SusteIT’s Carbon Footprinting Tool can be made even better: • Use PUE to provide facility overhead • Add in Carbon cost to get a true picture • Don't trust the server estimators, test one of each type of server and use this base data to provide your wattage figures
  • 11. How Much? A study into accounting for Carbon and power in the Data Centre Outcomes • Achievements – – – – – – – – Complete carbon and power cost accounting for the Voyager book-lending system Better awareness of the value of virtualising or replacing servers Better informed as to cost comparison between cloud and in-house Successful implementation of the infrastructure required to provide carbon and cost accounting for most services within the university’s data centres Increased awareness of sustainability efforts at the university Increased focus on carbon costing during project initiation process A specific assessment of SusteIT’s carbon footprinting benchmarking tool against real-world data Learning documented throughout the project in our blog (http://blogs.herts.ac.uk/carbs/)
  • 12. How Much? A study into accounting for Carbon and power in the Data Centre Voyager Dashboard
  • 13. How Much? A study into accounting for Carbon and power in the Data Centre Outcomes • Achievements √ √ √ √ √ √ √ √ Complete carbon and power cost accounting for the Voyager book-lending system Better awareness of the value of virtualising or replacing servers Better informed as to cost comparison between cloud and in-house Successful implementation of the infrastructure required to provide carbon and cost accounting for most services within the university’s data centres Increased awareness of sustainability efforts at the university Increased focus on carbon costing during project initiation process A specific assessment of SusteIT’s carbon footprinting benchmarking tool against real-world data Learning documented throughout the project in our blog (http://blogs.herts.ac.uk/carbs/)
  • 14. How Much? A study into accounting for Carbon and power in the Data Centre Outcomes • Drawbacks – Large number of assumptions in model – Reliance on rack PDU data creates problems if they are not fully functional – A specific assessment of SusteIT’s carbon footprinting benchmarking tool against real-world data – Increased awareness of sustainability efforts at the university – Increased focus on carbon costing during project initiation process – Learning documented throughout the project in our blog (http://blogs.herts.ac.uk/carbs/)
  • 15. How Much? A study into accounting for Carbon and power in the Data Centre Summing Up • The Voyager service cost is composed of the following elements: 1. 2. 3. 4. • Power from the PDUs in the rack where Voyager is located A proportion of the power taken from the PDUs where the SAN storage is located A proportion of the facility power, based on the PUE and the share of power required for 1 & 2 above Carbon cost for the power consumed Specifically excluded: – The network • Interesting Note: – Server at very low loading but consuming almost twice Oracle’s estimated power draw
  • 16. How Much? A study into accounting for Carbon and power in the Data Centre Blogs: http://blogs.herts.ac.uk/carbs/ http://blogs.herts.ac.uk/rare-idc/ SusteIT’s ICT Energy & Carbon Footprinting Tool http://www.susteit.org.uk/files/category.php?catID=4 Thank You Any Questions?

Notas del editor

  1. No such thing as a “simple” service anymoreAll of our systems used shared resources to some degree (SAN & network)Not all systems follow the rulesSNMP implementationsMIB definitions, dependencies and bugsRounding errorsCommunications protocolsMODBUS vs SNMPDCIM products are immature and constantly evolvingFeatures and functions differ considerably between products and how data is usedNewer versions of software often resolved unknown issuesFalse economies: you get what you pay for!ePDUs are limited unless you are prepared to pay extra for better monitoring functionality and more fine-grained meteringOperational processes can be an obstacle to implementing service monitoring Initial power arrangements, and cablingVLAN configurationsChange Management
  2. Pre-Project Don’t assume this is going to be easy!Divide the project up into small bite-size chunks, where you can prototype the dashboard creation a service at a time.It is important to scope out the complete list of devices and software components (i.e. databases, applications, etc.) you want to monitor. This ensures you are prepared to grab data from whatever sources you need to but also highlights areas where data capture may be either very difficult or impossible without carrying out significant changes beforehand.Resolve any issues with devices not having SNMP-capability prior to install. We had power meters that said they were SNMP-capable but actually were not! They were compatible with MODBUS though, so we purchased a converter appliance.Have all necessary MIB files collated and ready to be installed. Check dependencies within MIBs and do a little research on them to ensure that they install correctly. You may need to contact the vendors to check that the values you want to extract are actually available in the MIB.Check through the MIBs and make a note of the OIDs you need to select. This is extremely useful when you come to program the DCIMHave a complete audit of your data centre to hand, including positioning of racks, equipment within them and number and positioning of power supplies. Very useful if you wan a visual output as well as a dashboard-style display. Most DCIMs allow you to do this.Move power supplies for servers on to distinct circuits or sockets depending on to what level of detail your ePDUs are capable of monitoring down to. Otherwise you will not be able to extract specific power data for individual devices.
  3. During the Project Keep stakeholders informed so that they understand the value they get from the project and provide information, or changes that support your project. The server we wanted to monitor required a patch upgrade before we could get the specific, and only currently available, MIB to work with it.Manage changes to the data centre carefully or what you thought you were monitoring may change. This means ensuring that your data centre users are aware that if they make specific changes to the environment, your monitoring will fail or give off spurious results. This could invalidate your testing.This is an immature industry and DCIM products are still being developed to their full potential. Work closely with your DCIM vendor and report back issues and chase for prompt resolution.
  4. Post-Project Manage changes to the data centre strictly or what you thought you were monitoring may change. This means ensuring that your data centre users are aware that if they make specific changes to the environment, your monitoring will fail or give off spurious results. This may invalidate your dashboards.Check validity of reported values on a regular basis – note any significant changes and investigate whether the service has changedLet stakeholders knowMake sure all future data centre procurement takes into account SNMP-compatibility and functionality that makes separating service-related data out simply and easily.SusteIT's Carbon Footprinting Tool can be made even better by applying a few lessons from our real-life assessment exercise:Use PUE to provide facility overheadAdd in Carbon cost to get a true pictureDon't trust the server estimators, test one of each type of server and use this base data to provide your wattage figures
  5. With the framework now in place, this method can be applied to other similarly-architected services in order to provide carbon cost accounting with an estimated error margin of +/-5% In any organisation, financial decisions concerning the ICT estate are made all the time based on data that are either incomplete or missing concerning the true costs associated with owning and delivering those services. For the first time, we have been able to picture what the cost to the university might be of running a particular service in-house. Future decisions around the sustainability and viability of continuing to operate in this way rather than make more use of cloud services can be taken in the presence of greater information. As we continue to monitor and measure the costs, more complete profiling of data centre service costs will be built up. Dramatic changes can be investigated and with the tools to provide a greater degree of detailed data, better efficiency can be architected in.  The assessment exercise for the benchmarking tool would be valuable to those who feel using the default values provided within it would result in a blunt instrument for guesstimating overall power and carbon usage within the data centre. In particular, the simple use of PUE, which is commonly calculated in most data centres, to cost out the impact of a server on its environment is a valuable one. Server costing can be used as a justification for replacement or sharing of hardware resources in a virtualised environment. 
  6. With the framework now in place, this method can be applied to other similarly-architected services in order to provide carbon cost accounting with an estimated error margin of +/-5% In any organisation, financial decisions concerning the ICT estate are made all the time based on data that are either incomplete or missing concerning the true costs associated with owning and delivering those services. For the first time, we have been able to picture what the cost to the university might be of running a particular service in-house. Future decisions around the sustainability and viability of continuing to operate in this way rather than make more use of cloud services can be taken in the presence of greater information. As we continue to monitor and measure the costs, more complete profiling of data centre service costs will be built up. Dramatic changes can be investigated and with the tools to provide a greater degree of detailed data, better efficiency can be architected in.  The assessment exercise for the benchmarking tool would be valuable to those who feel using the default values provided within it would result in a blunt instrument for guesstimating overall power and carbon usage within the data centre. In particular, the simple use of PUE, which is commonly calculated in most data centres, to cost out the impact of a server on its environment is a valuable one. Server costing can be used as a justification for replacement or sharing of hardware resources in a virtualised environment. 
  7. Drawbacks Many assumptions need to be made when apportioning costs from various hardware and software platforms for any particular service. Even the simplest service may require a certain amount of assumptive reasoning that could be open to debate as to how accurate a picture it gives. Data from PDUs that only provide amperage output, and minimal separate distinct circuits, can cause problems when trying to assess what power is being used at the service level. Some systems, such as storage, cannot be interrogated for power usage data and therefore reliance on the PDUs is complete. Apportioning costs of the network is complex and fraught with danger. Networks can ‘self-heal’, causing the traffic patterns to change and result in an inaccurate picture of what network systems are in use and to what extent.  Technology moves on, changes occur frequently, software develops with functions being both added and removed, sometimes changing the architecture of a service in ways that the original setup may not have envisaged. For this reason, carbon accounting for services may be liable to disruption, raising the possibility of inaccurate or incomplete values being reported on the dashboard. For these reasons, this is not an exercise that can be set up and left running with no further work. Regular analysis of both the service and the data emanating from the service should be undertaken to ensure that the reported values are still valid.
  8. Network: This is because it is highly complex to work out, so that will be done in a later phase of the project. The values we do have give a good approximation of what it actually costs to run the service on an hourly basis (c£0.17, $0.26, €0.20).It will be interesting to see how this power profile changes as the students return to the University in September and begin to use the service in anger once again.