SlideShare una empresa de Scribd logo
1 de 12
Descargar para leer sin conexión
Professional services
February 2011
2011_v01
Index

                                 Site Acquisition
                                        2_1_1 Acquisition.
                                        2_1_2 Permits. Management of permits and
                                        authorizations.
 1 About us                             2_1_3 Renegotiation of rents.
                                        2_1_4 Access permits for private properties.
 2 Products & Services
                                  Site Engineering
      2_1 Site Acquisition               2_2_1 Electrical & Telco Projects.
      2_2 Site Engineering                                    .
                                         2_2_2 Site Management.
                                         2_2_3 Site Supervision.
      2_3 Strategic Consulting           2_2_4 Health & Safety coordination.
      2_4 EMR Measurements
      2_5 Site Implementation    Strategic Consulting
                                        2_3_1 Radio planning.
 3 Business insight                     2_3_2 Radio optimization.
                                        2_3_3 Transmission Network engineering.
     3_1 Results                        2_3_4 Drive Test.
     3_2 Costumers
 4 Flowchart                       EMR Measurement
                                          2_4_1 EMR Certification.
                                          2_4_2 Noise projects and certifications.
                                          2_4_3 Product audits.
                                          2_4_4 Process audits.


                                  Site Implementation
                                         2_5_1 Radiant systems.
                                         2_5_2 Radio Transmission Equipments.
                                         2_5_3 Power lines. Low and Medium Voltage.
About us

 Acquisition               Engineering                   Consulting            EMR                   Implementation

  About us                                                             OFG figures
  Founded in 1998. Spanish company with international vocation
  located in Andalucía.
  OFG Consultores Holding:
                              OFG Adquisiciones e Ingeniería
                              Fuertes Gimeno Comunicaciones
  Overall picture
  • Highly qualified staff. 70% University graduates.
  • Well known QUALITY services.
  • Own Financial & Human resources.
  • Focus on flexibility, and cost & time compromises.                Human Resources
  • Ability to integrate products and services.                       Young staff, highly qualified and motivated. Mostly
  • We care about Technology.                                         integrated by:
                                                                         Engineers: Telecommunication, Industrial, Agronomist,
                                                                         Surveyor, Mining, etc.
                                                                         Degrees in Business and Laws.
                    Company presence                                     Social Graduates.
                                                                         Computer and Electrical Engineers.
                                                  •   Córdoba            Occupational risks graduates.
                                                                         Quality and Environment graduates.
                                                  •   Madrid
                                                                         Draftsmen.
 ISO 9001                                         •   Barcelona          Real State Agents.
                                                  •   Cáceres            Property administrators.
                                                  •   Valladolid
                                                  •   Las Palmas
 ISO 14001
Products & Services. Acquisition

 Acquisition                Engineering                   Consulting                  EMR                      Implementation

   Description:                                                                 Solutions:
                                                                             • Acquired more than 3500 locations throughout the
  Acquisition                                                                  country. Tracking until signature and legalization.
         • Consulting concerned City Councils.
         • Constructive and administrative viability studies.                • Regular meeting with municipalities and councils, at
         • Contact and negotiation with different properties.                  regional and national levels.
         • Validation of candidates and signing of contracts.
  Legalization Management of permits and authorizations.                     • Multidisciplinary staff: technical, legal, administrative,
        • Audit dossiers.                                                      commercial and economic.
        • Relations with Public Administrations, Industry and environment
           delegations and other agencies.                                   • Average rent reduction between 20% and 30%.
        • Obtaining documentation and resources.
        • Monitoring of administrative procedures to obtain necessary        • OPEX reduction on generator sets sites. Investment
           permits and authorizations.                                         amortized from the first year.
        • Analysis of specific administrative procedures for each project.
  Renegotiation of Rents
         • Cost reduction and extension of deadlines.
         • Site property loyalty.                                                Work references:
         • OPEX site reduction (macros and micro).                            • Cost - Reduction of 400 sites in 3 months.
  Expropriation                                                                 Analysis, auditing, inventory, removal,
         • Affected. Check, verification and contact search.                    cancellation of contracts and systems upgrading.
         • Processing. Negotiation and publication of affected dossiers.      • Legalization of more than 2890 sites for all
         • Achievement. Dossier or sentence closure.                            operators and services.
  Access permits for private properties                                       • Collaboration with the European Space Agency
         • Road crossing permits.                                               (ESA).
         • Crossing permits for power lines.
Products & Services. Engineering

 Acquisition            Engineering                  Consulting            EMR                    Implementation



     Description:                                                 Solutions:
     Telecommunication and Electrical Projects
                                                                  • More than 20 engineers and draftsmen in staff.
           •   Constructive projects.
           •   License acquisition projects.                      • Structures calculation projects.
           •   Photomontages.                                     • Facilities calculation projects.
           •   Environmental impact studies.                      • Own sound level meters and calibrator.
           •   Termination of Works certification.                • Surveying projects.
           •   Site reengineering.                                • Multidisciplinary team.
           •   Studies of structure robustness.                   • Coverage throughout the country.
           •   Implementations plans.                             • All specialities in Health & Safety coordinators.
     Site Management
           • Site management.
           • Time, Quality and Costs control.
           • Legal Requirements.
     Supervision
           • Survey and visual. Documentation elaboration.            Work References:
           • Site monitoring «in situ».                            • More than 3200 site projects over the past 5
     Health and Safety coordination                                  years.
                                                                   • More than 1500 data digitalizations.
           •     Initial requirements.
           •     Coordination.                                     • More than 200 Km of Optic Fiber projects in GEA
           •     H&S studies elaboration.                            Network.
           •     Project Integration.                              • Projects and Facultative Direction for the Junta
                                                                     de Castilla y León.
Products & Services. Strategic consulting

 Acquisition                 Engineering                    Consulting               EMR                     Implementation

    Description:                                                              Solutions:
  Radio Engineering
        •      Design – Planning.
        •      Radio Optimization.                                           • More than 70 outsourcing consultants.
        •      Transmission design and optimization.                         • More than 25 objective based project managers.
                                                                             • More than 40 consultants RND, RNP or RNO
  Supervision and Technical assistance
                                                                             experts.
        •      Civil Works supervision and implementation.
                                                                             •National level presence.
        •      Operation and Maintenance.
        •      Remote integrations support.
        •      Digitalization and data processing.
        •      Inventory and Network catalogue.                              Technologies:
        •      Administrative support to projects.                           GSM, DCS, UMTS, HSDPA+, HSUPA, TETRA, WIFI,
        •      Logistics, suppliers, purchases.                              WIMAX, TDT, SDH, PDH, FTTH (GPON, GEPON)
  Drive Test
        •      Data acquisition, processing and analysis.
        •      Network first tuning.
  Monitoring
        • Operating network supervision.                                      Work references:
                                                                              • Construction of more than 7.000 sites in turnkey
        • Dispatching: Control and management of alarms and
                                                                              projects.
          incidents.
                                                                              • Swapping of more than 4.000 sites.
  Project Management                                                          • More than 40.000 Work Orders.
        •   Bidding Development and Management. RFIs, RFQs.                   • More than 5000 network solutions.
        •   Integral Management of multidisciplinary projects.                • Integral optimization of complete site zones.
        •   Administration and negotiation of customers and suppliers.        • Involved in the network outsourcing and
        •   Outsourcing of middle management positions.                       development of all the leading operators and vendor's
        •   Study of conditions or qualifications for obtaining contracts,    during the last 7 years.
            governmental grants, biddings, etc.
Products & Services. Certification

 Acquisition            Engineering                  Consulting                  Certification             Implementation

   Description:                                                                   Solutions:
  Electromagnetic measures                                               •        22 PMM strength field meters 8053, and EP330
                                                                                  and EP408 probes.
       •   Radio Electrical certification RD 1066/2001 y CTE 23/2002
                                                                         •        1 PMM EHP50B.
           Radio Electrical certification . European Parliament policy
                                                                         •        2 spectrum analyzer for Phase II studies.
           2004/40/CE and European Council policy, of 29th of April of
                                                                         •        SLM A class, model Cesva SC310 and CB006
           2004 and autonomic regulations. Phase II studies.
                                                                                  calibrator.
       •   Low frequency site emitter certifications.
                                                                         •        22 full equipped field test technician.
       •   Inventory and catalogue of radio electrical emitters.
                                                                         •        12 technician in Technical Office.
  Noise studies                                                          •        7 mobile units equipped with Promax Explorer
       •   NAE y NEE certification according to autonomic regulations.            II+ TV digital meters.
       •    Verification and monitoring of noise emissions.              •        1 low frequency EMR measurements
       •   Internal and external audits. Audit process.                           equipment.
  Integral Project Office
       •   Outsourced document management and administrative
           processes.
       •   Mediation with the Ministry of Industry and public                     Work references:
           administrations.                                                  •     More than 40.000 EMR certifications since
  Audit processes                                                                  2001.
       •   Product.                                                          •     Phase II measures.
       •   Process. «in situ» audit                                          •     Internal and regulatory noise campaigns for
       •   Services.                                                               operators.
                                                                             •     RED.es , SANDETEL and COITT.
                                                                             •     Junta de Castilla y León.
Products & Services. Implementation

 Acquisition            Engineering                 Consulting               EMR                   Implementation

   Description:                                                           Solutions:
  Telecommunications
                                                                  •       50 SWAP per week.
       Radio systems
                                                                  •       30 complete Macro sites per week.
       •    BTS equipments from all suppliers and technologies:   •       Multi-technology facilities.
            GSM, DCS, UMTS, WCDMA, HSDPA, WiMax, WiFi…            •       20 maintenance teams (2). Corrective and
       •    Radiant systems.                                              preventive.
       Terrestrial and satellite transmission systems             •       60 experienced installers and auxiliary
       •    PDH, SDH, IP.                                                 technicians.
       •    ADM´s.                                                •       Full site construction.
       Structured cabling networks                                •       Approved and accredited by all operators.
       •    Ethernet, coaxial …                                   •       Own human and material resources.
       •    CCTv.                                                 •       Elevation elements, cranes.
       Optic fiber Networks
       •    GPON.
       •    GEPON.
       •    Active Ethernet.                                              Work references:
  Base station construction. Civil works.                             •    Integration of more than 1800 BTS´s.
                                                                      •    Integration of more than 4000 radio links
  Electricity                                                              during the last 2 years.
       Low voltage                                                    •    More than 250 equipments migrated in 8
       •   Cabling and electrical panel installation.                      weeks.
       Medium/ High voltage                                           •    More than 15 Km of MV power lines.
       •    15Kv lines.                                               •    More than 250 transformers.
       •   Transformers.                                              •    More than 200 km of O.F. in Southern Spain.
References. Figures
                                                                        INGENIERIA RED RADIO TX
                   670.000
            1.443.000
                                   646.040   560.000 2005-2010          SUPERVISION
                     724.297                               425.000      ADQUISICION
                                                                        REFORMA INSTALACION Y COMISIONING
           1.665.000
                                                                        PROJECT MANAGMENT INTE
                 1.800.000                                 15.285.465
                                                                        INGENIERIA OBRA CIVIL
                                                                        GESTIÓN LOGÍSTICA
              3.351.806                                                 CONSULTORÍA ESTRATÉGICA
                                                                        LICENCIAS
              3.432.200                                                 ENERGIA Y AHORRO
                                                                        SOPORTE TÉCNICO
                                                                        AUDITORIA
               3.806.040                                                GESTION DE COMPRAS
                                                                        MANTENIMIENTO
                       4.330.000                                        OBRA CIVIL + INSTALACION
                                                            8.387.335
                                      4.767.674

                               ORANGE
                               TELEFÓNICA                                           2005-2010
                               VODAFONE
                               IBERBANDA
                               YOIGO
                               JUNTA DE CASTILLA
                               CLEARWIRE ESPAÑA, S.A.
                               AXION
                               YOIGO-VODAFONE-TELEF-ORANGE
                               RAILWAIS
                               MUNICIPIOS TAJO-ALB.
                               ABERTIS/TRADIA
                               RED.ES (MINISTERIO)
                               AYUNTO DE BURGOS Y MADRID
                               ONO-VDF-VENTAS
                               COMUNIDAD AUTONOMA MADRID
                               TME
                               SANDETEL (JUNTA DE ANDALUCIA)
                               SILIKEN
References. Our main costumers




   Orange                   •   Unión FENOSA          •   Medialatina              • Junta de Castilla y León
   Vodafone                 •   France Telecom        •   Iberbanda                • AXION
   Telefónica               •   BT                    •   Intelia Comunicaciones   • Aptica
   Yoigo                    •   Banda 26              •   Ecointegral              • Tradia. Difusión Digital -
   Nokia                    •   Lucent Technologies   •   Eurocontrol                Societat de
   Siemens                  •   Nortel Networks       •   Insyte                     Telecomunicaciones, SA
   Nokia Siemens Networks   •   Setelcom              •   Cobra                    • Solution
 • Ericsson                 •   Semi                                               • Uni2
 • Motorola                 •   ClearWire                                          • LGAI Technological Center
Flowchart

OFG Adquisiciones e Ingeniería
Fuertes Gimeno Comunicaciones




                                                                                                                                CEO
                                                                                                                            Rafael Fuertes


                                                                                                                                              Assistant Manager
                                                                                                                                             José J. Vidal de Torres

                                                               Human
                                                                                    ECO-FIN              General Services
                                                              Resources
                                                                              Antonio García         Miguel A. Márquez
                                                            José L. Dueñas


                                                                                                Implementation
                              Services Management                                                                                             Commercial Management
                                                                                                 Management
                              José J. Vidal de Torres                                                                                           José J. Vidal de Torres
                                                                                                 Rafael Fuertes

         Consultants        EMR               Acquisition          Engineering           Operation          Administration
                                                                                                                                                        TBA
        Rafael Algarra   Antonio Lora       Antonio Vállez        José A. Álvarez      Rafael Guillena       José L. Dueñas




                                                                                                                                                         Flowchart V01 02/13/2011
ofg@ofg.es
Management            Rafael Fuertes Gimeno              rfuertes@ofg.es    +34658831360
Services Management   José Juan Vidal de Torres Romero   jjvitoro@ofg.es    +34658831391
Acquisition           Antonio Valle Troyano              tvallez@ofg.es     +34658831321
Consultants           Rafael Algarra Álvarez             ralgarra@ofg.es    +34658831374
Engineering           José Antonio Álvarez               jalvarez@ofg.es    +34658831378
EMR                   Antonio López Lora                 alopez@ofg.es      +34658831356
Implementation        Rafael Guillena                    rguillena@ofg.es   +34658831379

Más contenido relacionado

La actualidad más candente

DD-Corporate-Brochure- V5
DD-Corporate-Brochure- V5DD-Corporate-Brochure- V5
DD-Corporate-Brochure- V5
Vibin Vasudevan
 
Hands on Data-Communication, Networking and TCP/IP Troubleshooting
Hands on Data-Communication, Networking and TCP/IP TroubleshootingHands on Data-Communication, Networking and TCP/IP Troubleshooting
Hands on Data-Communication, Networking and TCP/IP Troubleshooting
Living Online
 
3a offshore profile new
3a offshore profile new3a offshore profile new
3a offshore profile new
ashokanp
 
01.brindavan profile
01.brindavan profile01.brindavan profile
01.brindavan profile
Vivek Prakash
 
Gps China Company Presentation
Gps China Company PresentationGps China Company Presentation
Gps China Company Presentation
cashe
 
EE 460 Project Plan V1
EE 460 Project Plan V1EE 460 Project Plan V1
EE 460 Project Plan V1
Large Kellider
 

La actualidad más candente (18)

DD-Corporate-Brochure- V5
DD-Corporate-Brochure- V5DD-Corporate-Brochure- V5
DD-Corporate-Brochure- V5
 
Hands on Data-Communication, Networking and TCP/IP Troubleshooting
Hands on Data-Communication, Networking and TCP/IP TroubleshootingHands on Data-Communication, Networking and TCP/IP Troubleshooting
Hands on Data-Communication, Networking and TCP/IP Troubleshooting
 
New product presentation
New product presentationNew product presentation
New product presentation
 
3a offshore profile new
3a offshore profile new3a offshore profile new
3a offshore profile new
 
Practical Process Control
Practical Process ControlPractical Process Control
Practical Process Control
 
DMX-512A FOR LED CONTROL: Getting Reacquainted With an Old/New Friend by Shos...
DMX-512A FOR LED CONTROL: Getting Reacquainted With an Old/New Friend by Shos...DMX-512A FOR LED CONTROL: Getting Reacquainted With an Old/New Friend by Shos...
DMX-512A FOR LED CONTROL: Getting Reacquainted With an Old/New Friend by Shos...
 
Derar CM
Derar CMDerar CM
Derar CM
 
Reconstructing the Business of Light by Deborah Gottesman
Reconstructing the Business of Light by Deborah GottesmanReconstructing the Business of Light by Deborah Gottesman
Reconstructing the Business of Light by Deborah Gottesman
 
Practical Process Control
Practical Process ControlPractical Process Control
Practical Process Control
 
TAI Gas & Utility Industries
TAI Gas & Utility IndustriesTAI Gas & Utility Industries
TAI Gas & Utility Industries
 
Lighting the Classroom of the Future: a D.O.E Project by Tom Ward
Lighting the Classroom of the Future: a D.O.E Project by Tom WardLighting the Classroom of the Future: a D.O.E Project by Tom Ward
Lighting the Classroom of the Future: a D.O.E Project by Tom Ward
 
01.brindavan profile
01.brindavan profile01.brindavan profile
01.brindavan profile
 
Gps China Company Presentation
Gps China Company PresentationGps China Company Presentation
Gps China Company Presentation
 
Brindavan profile
Brindavan profileBrindavan profile
Brindavan profile
 
EE 460 Project Plan V1
EE 460 Project Plan V1EE 460 Project Plan V1
EE 460 Project Plan V1
 
Tunable White Lighting Control with LEDs by Tom Shearer and Craig Casey
Tunable White Lighting Control with LEDs by Tom Shearer and Craig CaseyTunable White Lighting Control with LEDs by Tom Shearer and Craig Casey
Tunable White Lighting Control with LEDs by Tom Shearer and Craig Casey
 
Quest global overview
Quest global overviewQuest global overview
Quest global overview
 
Enginuity
EnginuityEnginuity
Enginuity
 

Destacado

Teatro de la comedia
Teatro de la comediaTeatro de la comedia
Teatro de la comedia
pablangaz
 
Un moli fariner del segle xv, juneda senyoriu dels cardona
Un moli fariner del segle xv, juneda senyoriu dels cardonaUn moli fariner del segle xv, juneda senyoriu dels cardona
Un moli fariner del segle xv, juneda senyoriu dels cardona
Antoni Aixalà
 
Marta , 5 hijos ,5 panes
Marta , 5 hijos ,5 panesMarta , 5 hijos ,5 panes
Marta , 5 hijos ,5 panes
ghivan
 
DICCIONARIO INFORMATICO
DICCIONARIO INFORMATICODICCIONARIO INFORMATICO
DICCIONARIO INFORMATICO
MarCela Pineda
 

Destacado (20)

Nr – 05
Nr – 05Nr – 05
Nr – 05
 
PNES-2009-2-Discriminacion social
PNES-2009-2-Discriminacion socialPNES-2009-2-Discriminacion social
PNES-2009-2-Discriminacion social
 
Y Academy «Automatisierte Kampagnen mit Google»
Y Academy «Automatisierte Kampagnen mit Google»Y Academy «Automatisierte Kampagnen mit Google»
Y Academy «Automatisierte Kampagnen mit Google»
 
Come si fa a promuovere con Google - Indice
Come si fa a promuovere con Google - IndiceCome si fa a promuovere con Google - Indice
Come si fa a promuovere con Google - Indice
 
Electric Supplies and Contractor - Powergrid Electrical Corp
Electric Supplies and Contractor - Powergrid Electrical CorpElectric Supplies and Contractor - Powergrid Electrical Corp
Electric Supplies and Contractor - Powergrid Electrical Corp
 
Presentación: Marco Garcia - eCommerce Day Lima 2013
Presentación: Marco Garcia - eCommerce Day Lima 2013Presentación: Marco Garcia - eCommerce Day Lima 2013
Presentación: Marco Garcia - eCommerce Day Lima 2013
 
The success story of the Swiss Museum Pass
The success story of the Swiss Museum PassThe success story of the Swiss Museum Pass
The success story of the Swiss Museum Pass
 
37 09 huerto urbano info@horturba.com www.gftaognosticaespiritual.org
37 09 huerto urbano    info@horturba.com  www.gftaognosticaespiritual.org37 09 huerto urbano    info@horturba.com  www.gftaognosticaespiritual.org
37 09 huerto urbano info@horturba.com www.gftaognosticaespiritual.org
 
Teatro de la comedia
Teatro de la comediaTeatro de la comedia
Teatro de la comedia
 
Un moli fariner del segle xv, juneda senyoriu dels cardona
Un moli fariner del segle xv, juneda senyoriu dels cardonaUn moli fariner del segle xv, juneda senyoriu dels cardona
Un moli fariner del segle xv, juneda senyoriu dels cardona
 
Marta , 5 hijos ,5 panes
Marta , 5 hijos ,5 panesMarta , 5 hijos ,5 panes
Marta , 5 hijos ,5 panes
 
DICCIONARIO INFORMATICO
DICCIONARIO INFORMATICODICCIONARIO INFORMATICO
DICCIONARIO INFORMATICO
 
Sercotec Genero
Sercotec GeneroSercotec Genero
Sercotec Genero
 
La golondrina
La golondrinaLa golondrina
La golondrina
 
Capgemini - Take your organization to Cloud 9
Capgemini - Take your organization to Cloud 9Capgemini - Take your organization to Cloud 9
Capgemini - Take your organization to Cloud 9
 
Bases de Trabajos de Investigacion...CORNECCOF Tumbes
Bases de Trabajos de Investigacion...CORNECCOF TumbesBases de Trabajos de Investigacion...CORNECCOF Tumbes
Bases de Trabajos de Investigacion...CORNECCOF Tumbes
 
Presentación Evento SAP GRC Barcelona Dell Software y Omega Peripherals
Presentación Evento SAP GRC Barcelona Dell Software y Omega PeripheralsPresentación Evento SAP GRC Barcelona Dell Software y Omega Peripherals
Presentación Evento SAP GRC Barcelona Dell Software y Omega Peripherals
 
ARIDO Ergonomics & Design By OPC
ARIDO Ergonomics & Design By OPCARIDO Ergonomics & Design By OPC
ARIDO Ergonomics & Design By OPC
 
Muebles y decoración en el 2013 en Colombia
Muebles y decoración en el 2013 en ColombiaMuebles y decoración en el 2013 en Colombia
Muebles y decoración en el 2013 en Colombia
 
Forandringsprocesser på et universitet
Forandringsprocesser på et universitetForandringsprocesser på et universitet
Forandringsprocesser på et universitet
 

Similar a Ofg Consultores English

Improving safety, efficiency and regulatory compliance via asset documentatio...
Improving safety, efficiency and regulatory compliance via asset documentatio...Improving safety, efficiency and regulatory compliance via asset documentatio...
Improving safety, efficiency and regulatory compliance via asset documentatio...
IBM Danmark
 
Electrical Engineer (1)
Electrical Engineer (1)Electrical Engineer (1)
Electrical Engineer (1)
msh_shaban
 
Electrical engineer
Electrical engineerElectrical engineer
Electrical engineer
msh_shaban
 
Presentation Enviro Management 2012
Presentation Enviro Management 2012Presentation Enviro Management 2012
Presentation Enviro Management 2012
Cristian Agapie
 
Putting technology to_work_reviving_new_yorks_200_year_old_city_hall
Putting technology to_work_reviving_new_yorks_200_year_old_city_hallPutting technology to_work_reviving_new_yorks_200_year_old_city_hall
Putting technology to_work_reviving_new_yorks_200_year_old_city_hall
QuestexConf
 
Allied consultants (final)
Allied consultants (final)Allied consultants (final)
Allied consultants (final)
jemshy
 
AdKore Engineering
AdKore EngineeringAdKore Engineering
AdKore Engineering
rfavreau
 
Ebs eqs overview qad
Ebs eqs overview qadEbs eqs overview qad
Ebs eqs overview qad
Laura DeLea
 
Fal Telecom Qatar Profile
Fal Telecom Qatar ProfileFal Telecom Qatar Profile
Fal Telecom Qatar Profile
Venkata Reddy
 

Similar a Ofg Consultores English (20)

EPC Services Capability Tra International limited
EPC Services Capability  Tra International limitedEPC Services Capability  Tra International limited
EPC Services Capability Tra International limited
 
B.I.G. Line Card
B.I.G. Line CardB.I.G. Line Card
B.I.G. Line Card
 
Ateeq cv
Ateeq cv Ateeq cv
Ateeq cv
 
Solar Brochure
Solar BrochureSolar Brochure
Solar Brochure
 
Roevin
RoevinRoevin
Roevin
 
Improving safety, efficiency and regulatory compliance via asset documentatio...
Improving safety, efficiency and regulatory compliance via asset documentatio...Improving safety, efficiency and regulatory compliance via asset documentatio...
Improving safety, efficiency and regulatory compliance via asset documentatio...
 
Ateeq cv d
Ateeq cv dAteeq cv d
Ateeq cv d
 
Electrical Engineer (1)
Electrical Engineer (1)Electrical Engineer (1)
Electrical Engineer (1)
 
Electrical engineer
Electrical engineerElectrical engineer
Electrical engineer
 
Presentation Enviro Management 2012
Presentation Enviro Management 2012Presentation Enviro Management 2012
Presentation Enviro Management 2012
 
Jawad Ali Khan ARE-2
Jawad Ali Khan  ARE-2 Jawad Ali Khan  ARE-2
Jawad Ali Khan ARE-2
 
2009 Soq
2009 Soq2009 Soq
2009 Soq
 
Putting technology to_work_reviving_new_yorks_200_year_old_city_hall
Putting technology to_work_reviving_new_yorks_200_year_old_city_hallPutting technology to_work_reviving_new_yorks_200_year_old_city_hall
Putting technology to_work_reviving_new_yorks_200_year_old_city_hall
 
Allied consultants (final)
Allied consultants (final)Allied consultants (final)
Allied consultants (final)
 
AdKore Engineering
AdKore EngineeringAdKore Engineering
AdKore Engineering
 
OFG Corporate Presentation 2014
OFG Corporate Presentation 2014OFG Corporate Presentation 2014
OFG Corporate Presentation 2014
 
IRY-PC Water_Design
IRY-PC Water_DesignIRY-PC Water_Design
IRY-PC Water_Design
 
Ebs eqs overview qad
Ebs eqs overview qadEbs eqs overview qad
Ebs eqs overview qad
 
Fal Telecom Qatar Profile
Fal Telecom Qatar ProfileFal Telecom Qatar Profile
Fal Telecom Qatar Profile
 
2.annexure mep
2.annexure mep2.annexure mep
2.annexure mep
 

Ofg Consultores English

  • 2. Index Site Acquisition 2_1_1 Acquisition. 2_1_2 Permits. Management of permits and authorizations. 1 About us 2_1_3 Renegotiation of rents. 2_1_4 Access permits for private properties. 2 Products & Services Site Engineering 2_1 Site Acquisition 2_2_1 Electrical & Telco Projects. 2_2 Site Engineering . 2_2_2 Site Management. 2_2_3 Site Supervision. 2_3 Strategic Consulting 2_2_4 Health & Safety coordination. 2_4 EMR Measurements 2_5 Site Implementation Strategic Consulting 2_3_1 Radio planning. 3 Business insight 2_3_2 Radio optimization. 2_3_3 Transmission Network engineering. 3_1 Results 2_3_4 Drive Test. 3_2 Costumers 4 Flowchart EMR Measurement 2_4_1 EMR Certification. 2_4_2 Noise projects and certifications. 2_4_3 Product audits. 2_4_4 Process audits. Site Implementation 2_5_1 Radiant systems. 2_5_2 Radio Transmission Equipments. 2_5_3 Power lines. Low and Medium Voltage.
  • 3. About us Acquisition Engineering Consulting EMR Implementation About us OFG figures Founded in 1998. Spanish company with international vocation located in Andalucía. OFG Consultores Holding: OFG Adquisiciones e Ingeniería Fuertes Gimeno Comunicaciones Overall picture • Highly qualified staff. 70% University graduates. • Well known QUALITY services. • Own Financial & Human resources. • Focus on flexibility, and cost & time compromises. Human Resources • Ability to integrate products and services. Young staff, highly qualified and motivated. Mostly • We care about Technology. integrated by: Engineers: Telecommunication, Industrial, Agronomist, Surveyor, Mining, etc. Degrees in Business and Laws. Company presence Social Graduates. Computer and Electrical Engineers. • Córdoba Occupational risks graduates. Quality and Environment graduates. • Madrid Draftsmen. ISO 9001 • Barcelona Real State Agents. • Cáceres Property administrators. • Valladolid • Las Palmas ISO 14001
  • 4. Products & Services. Acquisition Acquisition Engineering Consulting EMR Implementation Description: Solutions: • Acquired more than 3500 locations throughout the Acquisition country. Tracking until signature and legalization. • Consulting concerned City Councils. • Constructive and administrative viability studies. • Regular meeting with municipalities and councils, at • Contact and negotiation with different properties. regional and national levels. • Validation of candidates and signing of contracts. Legalization Management of permits and authorizations. • Multidisciplinary staff: technical, legal, administrative, • Audit dossiers. commercial and economic. • Relations with Public Administrations, Industry and environment delegations and other agencies. • Average rent reduction between 20% and 30%. • Obtaining documentation and resources. • Monitoring of administrative procedures to obtain necessary • OPEX reduction on generator sets sites. Investment permits and authorizations. amortized from the first year. • Analysis of specific administrative procedures for each project. Renegotiation of Rents • Cost reduction and extension of deadlines. • Site property loyalty. Work references: • OPEX site reduction (macros and micro). • Cost - Reduction of 400 sites in 3 months. Expropriation Analysis, auditing, inventory, removal, • Affected. Check, verification and contact search. cancellation of contracts and systems upgrading. • Processing. Negotiation and publication of affected dossiers. • Legalization of more than 2890 sites for all • Achievement. Dossier or sentence closure. operators and services. Access permits for private properties • Collaboration with the European Space Agency • Road crossing permits. (ESA). • Crossing permits for power lines.
  • 5. Products & Services. Engineering Acquisition Engineering Consulting EMR Implementation Description: Solutions: Telecommunication and Electrical Projects • More than 20 engineers and draftsmen in staff. • Constructive projects. • License acquisition projects. • Structures calculation projects. • Photomontages. • Facilities calculation projects. • Environmental impact studies. • Own sound level meters and calibrator. • Termination of Works certification. • Surveying projects. • Site reengineering. • Multidisciplinary team. • Studies of structure robustness. • Coverage throughout the country. • Implementations plans. • All specialities in Health & Safety coordinators. Site Management • Site management. • Time, Quality and Costs control. • Legal Requirements. Supervision • Survey and visual. Documentation elaboration. Work References: • Site monitoring «in situ». • More than 3200 site projects over the past 5 Health and Safety coordination years. • More than 1500 data digitalizations. • Initial requirements. • Coordination. • More than 200 Km of Optic Fiber projects in GEA • H&S studies elaboration. Network. • Project Integration. • Projects and Facultative Direction for the Junta de Castilla y León.
  • 6. Products & Services. Strategic consulting Acquisition Engineering Consulting EMR Implementation Description: Solutions: Radio Engineering • Design – Planning. • Radio Optimization. • More than 70 outsourcing consultants. • Transmission design and optimization. • More than 25 objective based project managers. • More than 40 consultants RND, RNP or RNO Supervision and Technical assistance experts. • Civil Works supervision and implementation. •National level presence. • Operation and Maintenance. • Remote integrations support. • Digitalization and data processing. • Inventory and Network catalogue. Technologies: • Administrative support to projects. GSM, DCS, UMTS, HSDPA+, HSUPA, TETRA, WIFI, • Logistics, suppliers, purchases. WIMAX, TDT, SDH, PDH, FTTH (GPON, GEPON) Drive Test • Data acquisition, processing and analysis. • Network first tuning. Monitoring • Operating network supervision. Work references: • Construction of more than 7.000 sites in turnkey • Dispatching: Control and management of alarms and projects. incidents. • Swapping of more than 4.000 sites. Project Management • More than 40.000 Work Orders. • Bidding Development and Management. RFIs, RFQs. • More than 5000 network solutions. • Integral Management of multidisciplinary projects. • Integral optimization of complete site zones. • Administration and negotiation of customers and suppliers. • Involved in the network outsourcing and • Outsourcing of middle management positions. development of all the leading operators and vendor's • Study of conditions or qualifications for obtaining contracts, during the last 7 years. governmental grants, biddings, etc.
  • 7. Products & Services. Certification Acquisition Engineering Consulting Certification Implementation Description: Solutions: Electromagnetic measures • 22 PMM strength field meters 8053, and EP330 and EP408 probes. • Radio Electrical certification RD 1066/2001 y CTE 23/2002 • 1 PMM EHP50B. Radio Electrical certification . European Parliament policy • 2 spectrum analyzer for Phase II studies. 2004/40/CE and European Council policy, of 29th of April of • SLM A class, model Cesva SC310 and CB006 2004 and autonomic regulations. Phase II studies. calibrator. • Low frequency site emitter certifications. • 22 full equipped field test technician. • Inventory and catalogue of radio electrical emitters. • 12 technician in Technical Office. Noise studies • 7 mobile units equipped with Promax Explorer • NAE y NEE certification according to autonomic regulations. II+ TV digital meters. • Verification and monitoring of noise emissions. • 1 low frequency EMR measurements • Internal and external audits. Audit process. equipment. Integral Project Office • Outsourced document management and administrative processes. • Mediation with the Ministry of Industry and public Work references: administrations. • More than 40.000 EMR certifications since Audit processes 2001. • Product. • Phase II measures. • Process. «in situ» audit • Internal and regulatory noise campaigns for • Services. operators. • RED.es , SANDETEL and COITT. • Junta de Castilla y León.
  • 8. Products & Services. Implementation Acquisition Engineering Consulting EMR Implementation Description: Solutions: Telecommunications • 50 SWAP per week. Radio systems • 30 complete Macro sites per week. • BTS equipments from all suppliers and technologies: • Multi-technology facilities. GSM, DCS, UMTS, WCDMA, HSDPA, WiMax, WiFi… • 20 maintenance teams (2). Corrective and • Radiant systems. preventive. Terrestrial and satellite transmission systems • 60 experienced installers and auxiliary • PDH, SDH, IP. technicians. • ADM´s. • Full site construction. Structured cabling networks • Approved and accredited by all operators. • Ethernet, coaxial … • Own human and material resources. • CCTv. • Elevation elements, cranes. Optic fiber Networks • GPON. • GEPON. • Active Ethernet. Work references: Base station construction. Civil works. • Integration of more than 1800 BTS´s. • Integration of more than 4000 radio links Electricity during the last 2 years. Low voltage • More than 250 equipments migrated in 8 • Cabling and electrical panel installation. weeks. Medium/ High voltage • More than 15 Km of MV power lines. • 15Kv lines. • More than 250 transformers. • Transformers. • More than 200 km of O.F. in Southern Spain.
  • 9. References. Figures INGENIERIA RED RADIO TX 670.000 1.443.000 646.040 560.000 2005-2010 SUPERVISION 724.297 425.000 ADQUISICION REFORMA INSTALACION Y COMISIONING 1.665.000 PROJECT MANAGMENT INTE 1.800.000 15.285.465 INGENIERIA OBRA CIVIL GESTIÓN LOGÍSTICA 3.351.806 CONSULTORÍA ESTRATÉGICA LICENCIAS 3.432.200 ENERGIA Y AHORRO SOPORTE TÉCNICO AUDITORIA 3.806.040 GESTION DE COMPRAS MANTENIMIENTO 4.330.000 OBRA CIVIL + INSTALACION 8.387.335 4.767.674 ORANGE TELEFÓNICA 2005-2010 VODAFONE IBERBANDA YOIGO JUNTA DE CASTILLA CLEARWIRE ESPAÑA, S.A. AXION YOIGO-VODAFONE-TELEF-ORANGE RAILWAIS MUNICIPIOS TAJO-ALB. ABERTIS/TRADIA RED.ES (MINISTERIO) AYUNTO DE BURGOS Y MADRID ONO-VDF-VENTAS COMUNIDAD AUTONOMA MADRID TME SANDETEL (JUNTA DE ANDALUCIA) SILIKEN
  • 10. References. Our main costumers Orange • Unión FENOSA • Medialatina • Junta de Castilla y León Vodafone • France Telecom • Iberbanda • AXION Telefónica • BT • Intelia Comunicaciones • Aptica Yoigo • Banda 26 • Ecointegral • Tradia. Difusión Digital - Nokia • Lucent Technologies • Eurocontrol Societat de Siemens • Nortel Networks • Insyte Telecomunicaciones, SA Nokia Siemens Networks • Setelcom • Cobra • Solution • Ericsson • Semi • Uni2 • Motorola • ClearWire • LGAI Technological Center
  • 11. Flowchart OFG Adquisiciones e Ingeniería Fuertes Gimeno Comunicaciones CEO Rafael Fuertes Assistant Manager José J. Vidal de Torres Human ECO-FIN General Services Resources Antonio García Miguel A. Márquez José L. Dueñas Implementation Services Management Commercial Management Management José J. Vidal de Torres José J. Vidal de Torres Rafael Fuertes Consultants EMR Acquisition Engineering Operation Administration TBA Rafael Algarra Antonio Lora Antonio Vállez José A. Álvarez Rafael Guillena José L. Dueñas Flowchart V01 02/13/2011
  • 12. ofg@ofg.es Management Rafael Fuertes Gimeno rfuertes@ofg.es +34658831360 Services Management José Juan Vidal de Torres Romero jjvitoro@ofg.es +34658831391 Acquisition Antonio Valle Troyano tvallez@ofg.es +34658831321 Consultants Rafael Algarra Álvarez ralgarra@ofg.es +34658831374 Engineering José Antonio Álvarez jalvarez@ofg.es +34658831378 EMR Antonio López Lora alopez@ofg.es +34658831356 Implementation Rafael Guillena rguillena@ofg.es +34658831379