BA Activities & Techniques:
       Solution Validation & Assessment
BA Activities & Techniques: Solution Validation & Assessment




                              Julen C Mohanty
                        Citicorp Services India Ltd
DISCLAIMERS

   Any views or opinions showcased in this presentation
        are solely those of the author and may not
       necessarily represent those of the Citigroup.


This document is meant for use of Business Analyst World or
it’s members. Has to be used within Business Analyst World
 or it’s members and not to be forwarded to anyone outside
           Business Analyst World or it’s members.
INDEX
   Solution Assessment & Validation - Fundamentals
   Importance of Solution Assessment & Validation in CMMI
   Tasks by BA in Solution Assessment & Validation
   Activities Done By BA in Assessment & validation
   BA in Post production deployment



                  BABoK Fundamentals
                  Actual tasks to be done
                  Industry best Practices activities
Learning Objectives:

Deciding on a Solution that best fits the business
Validating the Solution to add value to the business
Testing, Implementing & Communicating Solution to the respective stakeholders
Knowledge Areas - BABoK
                                  Business Analysis Planning
                                        & Monitoring




                                                            Solution
                           Enterprise                                         Requirements
                                                         Assessment &
       Elicitation          Analysis                                          Management &
                                                           Validation
                                                                              Communication

                                          Requirement
                                            Analysis




                                  Underlying Competencies


  Start-    Initi-   Concept    Func     Tech
                     Design                                    Build / Test            Deploy
   up       ation              Design   Design
Solution Assessment & Validation - BABoK


  Stakeholder          Solution                                                                   Identified    Mitigating
   Concerns             Scope                                                                      Defects       Actions
                                                Assess Proposed     Allocate
                                                    Solution      Requirements
                                                                                               Organization    Assessment of
 Requirements           Assumptions &                                                           Readiness        proposed
                         Constraints                                                           Assessment         Solution
                                                    Assess           Define
                                                 Organization      Transitions                                 Requirements
                                                                                                Transitions
                                                  Readiness       Requirements                 Requirements     [Allocated]
   Solution            Solution Options

                                                                    Evaluate
                                                     Validate                                Solution            Solution
                                                                    Solution
Solution Performance        Enterprise               Solution                              Performance          Validation
       Metrics             Architecture                           Performance
                                                                                           Assessment          Assessment




      Start-       Initi-         Concept    Func       Tech
                                  Design                                        Build / Test                    Deploy
       up          ation                    Design     Design
Solution Assessment & Validation
  Software                      "Are we building the product right”.
 Assessment               The software should conform to its specification.

  Software                         "Are we building the right product”.
  Validation              The software should do what the user really requires.

 Business Analyst is most Knowledgeable Team Member about Business Requirements,
 the Environment, can best Assess the impact of the Proposed Solution to the
 Environment

 BA Can best assess impact of change on workers, since BA Observed/ Analyzed
 Current Work Environment.


  BA Assists with Implementation Plan when Project Includes
            (a) Business Worker Training,
            (b) Conversion of Existing Info,
            (c) Creation of New Employee Procedure Manuals,
            (d) User Acceptance Testing of Software/Hardware Component of Solution.
Importance of Solution Assessment & Validation in CMMI

                     Requirements
                     Development




                       Alternative
                       Solutions                       Product
      Requirements                      Technical    Components     Product     Product
      Development
                                                                                          Customer
                                        Solution                  Integration
                       Requirements



                      Product Components,     Work Products
                              Assessment &    Validation Report




                                      Assessment                   Validation


        Customer Needs
Tasks by BA in Solution Assessment & Validation

         (1)   Develop Alternate Solutions;
         (2)   Evaluate Technology Options;
         (3)   Facilitate the Selection of Solution;
         (4)   Ensure Usability of Solution;
         (5)   Support QA Process;
         (6)   Support Implementation of Solution;
         (7)   Communicate Solution Impacts;
         (8)   Post Implementation Review / Assessment
Solution Assessment - BABoK

           Assumptions &       Requirements
                                 [Prioritized &       Solution Options
            Constraints           Approved]




                           Assess Proposed Solution




                                                                             Solution Selection
                                Assessment of
                              proposed Solution
                                                                              Solution Design



  Start-   Initi-   Concept    Func          Tech
                    Design                                          Build / Test                  Deploy
   up      ation              Design        Design
Solution Assessment

     1.   Ranking the Solution Options - Should use a set of evaluation criteria to rank the
          solution options

     2.   Identifying Additional Solution Capabilities - If the option offers more capabilities
          than required, you should decide if they provide value now or in the future



    Major work Should be done by business analysts
           Splitting a Large Project into Phases,
           Reviewing Technical Design Deliverables,
           Help Build Usability into Application Software.
Solution Assessment
  (1) BA Highly Involved in Design Strategy;
  (2) Tasks include                     What is actually done to Develop Alternate Solutions?
            (a) Mapping Design Plan;
            (b) Help Resolve Automated Processes;
            (c) Determine how System Interacts with End Users;
  (3) Technical Team Designer Constructs Software & are Key Drivers of Implementation Process;
  (4) BA Ensures Requirements are Fulfilled by Technical Design Solution.

               BA Responsible for in Developing Alternate Solutions
  (1) Communicating Proposed Design Solution to Stakeholders;
  (2) Guide Decisions Regarding Tradeoffs that Impact Requirements;
  (3) Mediate Discuss/ Negotiate Alternative Solutions AFTER Impact to Requirements is Known
  (4) Help Stakeholders and Technicians Scope Design Phases of Project;

 BA Works with Tech Team to Evaluate Options Available to Solve Business Problem/ Opportunity.
              BA is Able to Assess Each Option for its Applicability to Business Area.
Solution Assessment


         Business
                                                               Recommendations
      Requirements
                                                                  [Aligned with
        [Approved,                                                Requirements]
       Prioritized]


                                                                    Assured
                                     Evaluate
        Technical                                               Compliance with
                                    Technology                    Organization
       Constraints
                                      Options                      Standards

       High Level
                                                               Evaluated Feedback
     Understanding
                                                                 [Problems/ issues/
     of Technology
                                                                     Concerns]
      Capabilities




    BA Helps Evaluate Options/ Assess Applicability of each option for Business.
Solution Assessment


         Business
      Requirements
        [Approved,
       Prioritized]
                                                                 RFP/RFQ

       High Level                Facilitate the
     Understanding
                                 Selection of a
     of Technology
      Capabilities                 Solution

                                                            Ensure the Usability
      Organizations                                           of the Solution
        RFP/RFQ
       Standards




      Solution must be as Usable as possible. BA Assists Technology Team in
                       Designing Usability into the Solution
Solution Assessment
         Business
      Requirements
        [Approved,
       Prioritized]


        Usability
      Requirements
                                 Facilitate the
                                                              Assessment of
                                   Solution                  Solution Usability
                                   Usability
        Test Plan




        Test Plan




      Solution must be as Usable as possible. BA Assists Technology Team in
                       Designing Usability into the Solution
Solution Assessment
• Doesn’t only mean jazzy UI, but must                        • Does the solution address the
  have usability, flexibility and accessibility                 existing risks of the business
• Internalization must be considered for                      • Does the solution create any
  global applications                                           potential     Risk     for   the
• Creating early code, prototyping, or other                    company
  various techniques, the graphical user                      • Address/ create risk for other
  interface can be utilized for early                           applications
  assessment                   Rich                    RISK   • Address/ create risk for other
                         Customer                               functions        within      the
                        Experience                              applications (if enhanced)


                                                  4R
                        Regulation
                                                       ROI
                            &
                        Compliance                       • Maximize ROI by using
 • Need to make sure their software data is                    Automation
   protected.                                                  Environment optimization
 • No negotiation on regulatory compliance                     Reducing dependencies
   & must be compliant                                   • Depending on the business,
 • Integration must be done with overall                   some manual work may be
   compliance perspective                                  necessary, should be kept.
 • Different entities within the organization              Automating as much as possible
   will be responsible for regulation and                  in all phases of the lifecycle
   compliance but should have independent                  would reduce operational errors
   assessment and verification services.
Solution Assessment
• Doesn’t only mean jazzy UI, but must                        • Does the solution address the
  have usability, flexibility and accessibility                 existing risks of the business
• Internalization must be considered for                      • Does the solution create any
  global applications                                           potential     Risk     for   the
• Creating early code, prototyping, or other                    company
  various techniques, the graphical user                      • Address/ create risk for other
  interface can be utilized for early                           applications
  assessment                   Rich                    RISK   • Address/ create risk for other
                         Customer                               functions        within      the
                        Experience                              applications (if enhanced)


                                                  4R
                        Regulation
                                                       ROI
                            &
                        Compliance                       • Maximize ROI by using
 • Need to make sure their software data is                    Automation
   protected.                                                  Environment optimization
 • No negotiation on regulatory compliance                     Reducing dependencies
   & must be compliant                                   • Depending on the business,
 • Integration must be done with overall                   some manual work may be
   compliance perspective                                  necessary, should be kept.
 • Different entities within the organization              Automating as much as possible
   will be responsible for regulation and                  in all phases of the lifecycle
   compliance but should have independent                  would reduce operational errors
   assessment and verification services.
Allocate Requirements - BABoK

            Requirements
             [Prioritized &         Solution Designed      Solution Scope
              Approved]




                                   Allocate Requirements
                                                                                   Requirements
                                                                                  Management &
                                                                                  Communication


                                                                                 Solution Selection
                                       Requirements
                                         [Allocated]

                                                                                  Solution Design


   Start-   Initi-       Concept      Func       Tech
                         Design                                         Build / Test                  Deploy
    up      ation                    Design     Design
Allocate Requirements
   •     The requirements are allocated to product functions and product components
         including objects, people, and processes.
   •     The traceability of requirements to functions, objects, tests, issues, or other entities is
         documented.
   •     The allocated requirements and functions are the basis for the synthesis of the
         technical solution.
   •     As internal components are developed, additional interfaces are defined and
         interface requirements established.

Tasks to be done are:
    Allocate requirements to functions
        Allocate requirements to product components
        Allocate design constraints to product components
        Document relationships among allocated requirements
        Allocate customer requirements to functional partitions, objects, people, or
         support elements to support the synthesis of solutions
        Allocate functional and performance requirements to functions and sub-functions
Allocate Requirements
    * Allocation of User Requirements

   In this activity, the total User Requirements and Marginal Conditions for the System have
   to be allocated to the elements of the technical architecture.

   This allocation of requirements is the basis for the requirements analyses and design steps
   taking place on the lower levels.

   It is necessary to observe that the allocation of requirements and Marginal Conditions to
   the elements of the technical architecture must fulfil the following criteria:
                Every requirement must be allocated to at least one element of the technical
           architecture, ideally exactly to one architecture element.
                Each requirement is allocated to the lowest element in the refinement levels
           which makes it possible to meet the requirement completely. Normally, the total of
           the requirements have to be allocated to various refinement levels.


   Technical and organizational specifications that have to be considered within the scope of system generation. Marginal conditions
   may anticipate or limit design decisions.
Allocate Requirements
             Provided that a requirement is of general importance to elements, it
        must be considered within the scope of the allocation which individual
        architecture elements this requirement really has to fulfil.
             The allocation must be realized in such a manner that it will be possible
        to prove the fulfilment of the requirement by checking the corresponding
        architecture element.

* Allocation of IT Security Requirements to the IT Security Measures
   With the allocation of the IT security requirements to the IT security measures it must be
   proven that each IT security requirement is covered by at least one IT security measure &
   if the specified IT security objective can be reached with the selected security measures.


            Requirements to functions and sub-functions

         Ensure that satisfaction of the set of requirements at the lower level will
                 guarantee satisfaction of the higher level requirement.
Allocate Requirements

 Determine how many Construction Phases a Project will Undergo


           (1) Review User Classes;
           (2) Review Functions and Features List;
           (3) Map the Requirements to Design -
                    (a) Functional Requirements;
                    (b) Quality of Service Requirements;
           (4) Propose Design Phases;
           (5) Determine Number of Design Phases;
           (6) Map Requirements to Design Phases;
           (7) Update Requirements Traceability Matrix:
                    (a) Examples of Traceability Mapping Tools,
                    (b) Tracing Features to Use Cases;
           (8) Recommend Improvements for Non-Automated Processes
Assess Organization Readiness

    Enterprise                                                Stakeholder
                       Solution Designed     Solution Scope
   Architecture                                                Concerns




                               Assess Organization
                                   Readiness




                             Organizational Readiness                       Define Transitions
                                   Assessment                                Requirements




    Start-    Initi-     Concept    Func      Tech
                         Design                                    Build / Test                  Deploy
     up       ation                Design    Design
Assess Organization Readiness
Experts estimate that 50% of all change efforts fail because leaders do not sufficiently
                    assess organizational readiness for change.

  To assess whether the organization is ready to make effective use of the solution.


          The internal ability and willingness to move in a new direction.

   Ability - accessing new skill sets necessary to successfully implement a change.
   Willingness - desire of the organization and its employees to change.


  Assessing organizational readiness will identify any major challenges that could
  delay or prevent your new program’s successful start-up.

  Organizational strengths can be leveraged to assist in program development and
  acceptance.
Assess Organization Readiness

     Key concepts to consider when assessing the organizational readiness are:
         1.   Cultural Assessment
         2.   Operational or Technical Assessment
         3.   Stakeholder Impact Analysis


  To identify impacts the business analyst should understand the Solution [Designed]
  in order to communicate the effect a new solution will have on an organization


  The output of an Organizational Readiness Assessment document describes
  whether stakeholders & the organization are prepared to accept the change
  associated with a solution and are able to use it effectively
Assess Organization Readiness                      Identify the Anticipated or Desired Change
  -  Clearly reiterate the desired change
  -  Develop a short paragraph that specifically describes the action or program that the
     organization is considering.
  This may seem rather basic, it will assure that the stakeholders see the same vision.

      Determine Current State of the Organization in Relation to the Desired Change
                                                                           Significant   Minimal
                                                   Major     Substantial                             Full
                                                                            Changes      Changes
                                                   Barrier     Barrier                             Support
                                                                            Needed       Needed
  Alignment With Organizational Vision & Mission
  Alignment With Strategic plan
  Alignment with organizational value & culture
  Resource Availability
  Decision Maker Interest
  Support for the Initiative
  Stakeholder Program Perception
  Stakeholder Program Education
  Internal Factors (Skills, Strength, Weakness)
  External Factor (Opportunity, Challenges)
Assess Organization Readiness - Force Field Analysis

                               Current                               Desired
                                State                                 State

 Pushing/ Driving Forces                       Pulling/ Restraining Forces



            Driving Force 1                   Restraining Force 1



            Driving Force 2                   Restraining Force 2



            Driving Force 3                    Restraining Force 3
Assess Organization Readiness - Force Field Analysis
                                                                                    Managers Unhappy with
                           1    Eliminates Operational Error
                                                                                        clerical work
                                                                                                                  1




                                                                                                                      Relative Forces Strength
                                                               Implementing
Relative Forces Strength




                                 Faster Execution of Admin                         Requires Training of More
                           1               Works                a HR system                 people
                                                                                                                  2

                                                               Enables employees
                                  Online Documentation           to self manage    Some activity costs shift to
                           3      Eliminates Paper work           their personal        high paid staff
                                                                                                                  1
                                                                information such
                                                                    as Payroll
                                                                   Deductions,
                                 Reduces Need of Clerical                          Cost of eliminating clerical
                           2              Staff
                                                                     Benefit
                                                                                               staff
                                                                                                                  3
                                                                   participation

                                Increases Control / auditing
                           3            Capabilities
                                                                                         Start-up costs           1
                   TOTAL = 10                                                                              TOTAL = 8
                           force field analysis helps you:
                                     Decide if you have the right support for the change initiative
                                     Identify what obstacles are standing in your way
                                     Find ways to reduce or marginalize those obstacles
Define Transitions Requirements

  Organizational
                       Requirements             Solution   Solution
    Readiness
                         [ Stated ]             Deployed   Designed
   Assessment




                                 Define Transitions
                                  Requirements

                                                                           Prioritize
                                                                         Requirements

                                                                            Verify
                                    Transitions                          Requirements
                                   Requirements
                                                                         Requirements
                                                                        Management &
                                                                        Communication


    Start-    Initi-   Concept         Func     Tech
                       Design                                 Build / Test              Deploy
     up       ation                   Design   Design
Define Transitions Requirements
     To define requirements for capabilities needed to transition from the existing to
                                   the new solution.
      Transition Requirements define characteristics that a solution must have in
          order to transition from the current state to the desired future state


    - A solution is implemented within an enterprise in order to enhance
    - Replace an existing solution.

   During the transition period (the time when both the old and new solutions are operational)
        -   The enterprise may need to operate both solutions in parallel,
        -   Move information between the new and old solution,
        -   Conduct training to enable stakeholders to effectively operate the new solution
        -   Retain All data in old system in new system
Define Transitions Requirements
   Activities done by in this phase are:
          Identify project activities to be completed before transition can start
                Conduct skill gap analysis against all IS staff
                Determine actual training needed, based on gap analysis
                Develop training plans
                               •         Identify necessary training courses
                               •         Schedule classes
                               •         Identify necessary knowledge to transfer activities
                               •
                          Determine measurable tasks to validate that knowledge transfer is
                          acceptable
                  Stakeholder Analysis for all Transition Requirements




Reference : http://www.batimes.com/images/stories/nov15ewan1.jpg
Solution Validation - BABOK
                               Requirements                  Solution
                                    [Prioritized &
                                      Validated]
                                                            Constructed




                                              Validate Solution




                                                                     Solution Validation
               Identified Defects             Mitigating Actions
                                                                        Assessment



                Evaluate Solution                              Solution
                  Performance                               Implementation


  Start-   Initi-   Concept    Func             Tech
                    Design                                                Build / Test     Deploy
   up      ation              Design           Design
Solution Validation

     Validate that a solution meets the business need and determine the most
                      appropriate response to identified defects

   Solution validation is required to ensure that a delivered solution meets the
   business needs on an ongoing basis.

   Problems that are identified through solution validation will be reported and
   prioritized for resolution. BA will be able to help the team determine the
   most appropriate action

     The documented act of proving that any procedure, process, equipment,
        material, activity or system actually leads to the expected results.

   Action of proving, that any procedure, process, equipment, material, activity,
   or system actually leads to the expected results.
Solution Validation - Accuracy VS Precision


                      What you would like to see!




Poor accuracy                                                   Poor precision
Good precision                                                  Good accuracy




confirmation by examination and provision of objective evidence that software
specifications conform to user needs and intended uses, and that the particular
requirements implemented through software can be consistently fulfilled.
Solution Validation - Purpose of Validation

                                  Fewer
                                  Rejects
       Customer                                Reduced
      Satisfaction                               Cost




Effective handling             Reduction of        Maximize
 of Requirements               Quality Costs        Yield




       Fewer Retest                               Fewer
                                                 Rework
                              Fewer Wastage
                                 & Scrap
Solution Validation
  General Task to be considered are
        Audits, Reviews, and Inspection
           Analytic Techniques
           Dynamic Techniques

 Techniques to verify the software during its development process
       Peer Reviews
       Documentation inspections (User sign off on specification)
       Traceability of Requirements
       Requirements/design/code reading (Prototypes too)
       Test witnessing (Unit Test, SIT, UAT, Test Cases Too)
       Installation audits

 Sufficient replication of the testing and challenging of each defined critical Stage of a
 system, process, etc. that has to be performed to give valid levels of assurance

 An adequate System of referenced documentation is essential.
 Flow diagrams and schematics should define the system, process, etc. The critical
 areas must be highlighted, and the written experimental design defined by a protocol.
Solution Validation - QA process V-MODEL


                                    Quality Product Delivery                   Finished
       New Idea                     Conform to all Requirements
                                                                              Product for
                                                                             business Use



                                          Test Against
      Feasibility Study                                                          Review


                                          Test Against
          User Requirements                                          User Acceptance


                                          Test Against
                 System Design                                     System Test


                                           Test Against
                          Development                      Program (UNIT) Test


                                             Coding
Solution Validation

BA task Quality Assurance Activities

  (1) Understand Tasks Performed by QA;
  (2) Be Available to Answer Questions about the Testing of the Solution;
  (3) Review QA Deliverables (test plans, test cases) to Assure Business risks are mitigated
      by Thorough Testing;
  (4) Help Business Stakeholders with User Acceptance Testing, Defect Reporting, and
      Resolution.
Solution Validation                                      Business SME to do Testing
                                                             SIT & UAT
                                             People &        Maintains standard process & related docs
 Can foresee business timelines, helps in    Process        Have E2E knowledge of solution for testing
  getting preparedness
 Can help in better time to market with
  domain knowledge
 Can optimize staffing by maintaining
  knowledge management


                                             Strategic
                                                                        Tools &
                    Business                    BA                    Automations
                                             Activities


                                                           Helps in automating Test cycles
                                                           Can maintain Testing data management
                                                           Maintains Standard for testing across project


   BA can maintain reporting standards for Governance
    testing cycles
   Maintain Governance across Business &
    testers
Evaluate Solution Performance

   Business         Identified             Business     Identified
 Requirements        Defects             Requirements    Defects




                             Evaluate Solution
                               Performance




                        Solution performance                    Assess Capability
                             Assessment                              Gaps




 Start-   Initi-   Concept      Func       Tech
                   Design                                   Build / Test            Deploy
  up      ation                Design     Design
Evaluate Solution Performance
  To evaluate functioning solutions to
           1) understand the value they deliver
           2) identify opportunities for improvement.

  Solution evaluation involves investigating how a solution is actually used after
  it is deployed, and assessing the effect it has had

  It may also be referred to as post-implementation assessment when performed
  immediately following the completion of a project.

 Key concepts to consider when evaluating a solution performance can include:
     –    Understand Value Delivered by Solution
     –    Validate Solution Metrics
     –    Solution Replacement or Elimination
          •   Ongoing Cost versus Initial Investment
          •   Opportunity Cost
          •   Necessity
          •   Sunk Cost
Evaluate Solution Performance - Risk Based Testing
 The Risk Based Testing (RBT) approach addresses the size & complexity parameters of
 a regression testing in a methodical manner by:

 This technique prioritizes the functions to be tested based on their risk
     Risk = Impact * Probability

 Prioritize test cases by clearly defining importance
  of a functionality or feature

 Impact assessment to identify likelihood of failure.
  Thus addressing the testability of a requirement
 Improving testing effectiveness by ensuring testing
  of all critical functionalities, which are used most
  often

 Increasing test case effectiveness by eliminating
  non-productive test cases

 Identifying test data need during the planning or
  requirement gathering phase itself.

                                                         Pareto Principle (80-20 Rule)
Evaluate Solution Performance - 360o Testing Assessment


                             Requirement
                             Prioritization



      Post Live Analysis
                                                          Test Plan
                                                          Coverage




            Defect Metrics
               Analysis
                                              Test Execution
                                                Coverage
ASSESSMENT & VALIDATION CYCLE
                START



Is Goal                 Stakeholder Analysis
Attained


                                                                                           END PROCESS
           Validation

                        Validation
                                                                    Set Requirements =
                                          Attainable               METRIC + Target Value
                                                                                                        Complete?
                                                                                     Functional
  Delivered Solution                                       Assessment
                                                                                     Deployment

                                             Delivered Goals =
                                                                                                  Intended
                                          METRIC + Delivered Value      ASSESSMENT                Function
                        Model

                                                                 Model                  Concept

                                                                          Design
                                           Consistent ?`                  Solution                     Solvable?
BA should be Involved with Solution Rollout
 (1) Make Sure Production Rollout Changes are Completed as Smoothly as Possible;

 (2) Help Training of Business Area Workers on
          (a) New procedures and Software,
          (b) Creation of Employee Procedure Manuals,
          (c) Communication of Change Impacts to Employees/ Customers;
          (d) Development of Conversion Plans;
          (e) Assist IT Team in Rollout Strategies to Lessen Negative Impact to Business Area.
BA should be Involved Production Implementation
       (1) Problem Resolution;
       (2) Adjustments to New Procedures;
       (3) Managing Change Requests Including
               (a) New Requirements,
               (b) Next Phase Issues,
               (c) Any Other Post Implementation Support Analysis.
Thank You

            julenmohanty@gmail.com

            www.twitter.com/julenmohanty

            www.linkedin.com/julenmohanty

            julenmohanty

Más contenido relacionado

La actualidad más candente

Requirements Analysis And Design Ddefinition
Requirements Analysis And Design DdefinitionRequirements Analysis And Design Ddefinition
Requirements Analysis And Design DdefinitionOD Ali
 
Enterprise Architecture using TOGAF 's ADM - Architecture Delivery Method (...
Enterprise Architecture using TOGAF 's ADM - Architecture Delivery Method (...Enterprise Architecture using TOGAF 's ADM - Architecture Delivery Method (...
Enterprise Architecture using TOGAF 's ADM - Architecture Delivery Method (...Chandrashekhar More
 
PMI Project Management Principles
PMI Project Management PrinciplesPMI Project Management Principles
PMI Project Management Principlestltiede
 
Agile Coaching Workshop
Agile Coaching WorkshopAgile Coaching Workshop
Agile Coaching WorkshopCraig Smith
 
The Agile BA (Business Analyst)
The Agile BA (Business Analyst)The Agile BA (Business Analyst)
The Agile BA (Business Analyst)Bill Gaiennie
 
BABOK V3.0 Business Analysis Models
BABOK V3.0 Business Analysis ModelsBABOK V3.0 Business Analysis Models
BABOK V3.0 Business Analysis Modelsamorshed
 
Introduction to Project Management (workshop) - v.1
Introduction to Project Management (workshop) - v.1Introduction to Project Management (workshop) - v.1
Introduction to Project Management (workshop) - v.1Mena M. Eissa
 
Business Analysis in IT
Business Analysis in ITBusiness Analysis in IT
Business Analysis in IT*instinctools
 
Business Analyst Job Course.pptx
Business Analyst Job Course.pptxBusiness Analyst Job Course.pptx
Business Analyst Job Course.pptxRohit Dubey
 
Product owner
Product ownerProduct owner
Product ownerMrSnow76
 
Introduction to scaled agile framework
Introduction to scaled agile frameworkIntroduction to scaled agile framework
Introduction to scaled agile frameworkITEM
 
Product Backlog - Refinement and Prioritization Techniques
Product Backlog - Refinement and Prioritization TechniquesProduct Backlog - Refinement and Prioritization Techniques
Product Backlog - Refinement and Prioritization TechniquesVikash Karuna
 
Identifying and Recovering Troubled Projects
Identifying and Recovering Troubled ProjectsIdentifying and Recovering Troubled Projects
Identifying and Recovering Troubled ProjectsRicardo Viana Vargas
 
An Introduction into the design of business using business architecture
An Introduction into the design of business using business architectureAn Introduction into the design of business using business architecture
An Introduction into the design of business using business architectureCraig Martin
 

La actualidad más candente (20)

Requirements Analysis And Design Ddefinition
Requirements Analysis And Design DdefinitionRequirements Analysis And Design Ddefinition
Requirements Analysis And Design Ddefinition
 
PMP
PMPPMP
PMP
 
Enterprise Architecture using TOGAF 's ADM - Architecture Delivery Method (...
Enterprise Architecture using TOGAF 's ADM - Architecture Delivery Method (...Enterprise Architecture using TOGAF 's ADM - Architecture Delivery Method (...
Enterprise Architecture using TOGAF 's ADM - Architecture Delivery Method (...
 
PMI Project Management Principles
PMI Project Management PrinciplesPMI Project Management Principles
PMI Project Management Principles
 
Agile governance
Agile governanceAgile governance
Agile governance
 
Agile Coaching Workshop
Agile Coaching WorkshopAgile Coaching Workshop
Agile Coaching Workshop
 
The Agile BA (Business Analyst)
The Agile BA (Business Analyst)The Agile BA (Business Analyst)
The Agile BA (Business Analyst)
 
BABOK V3.0 Business Analysis Models
BABOK V3.0 Business Analysis ModelsBABOK V3.0 Business Analysis Models
BABOK V3.0 Business Analysis Models
 
Introduction to Project Management (workshop) - v.1
Introduction to Project Management (workshop) - v.1Introduction to Project Management (workshop) - v.1
Introduction to Project Management (workshop) - v.1
 
Business Analysis in IT
Business Analysis in ITBusiness Analysis in IT
Business Analysis in IT
 
AXELOS - MoP® - Management of Portfolios - Foundation
AXELOS - MoP® - Management of Portfolios - FoundationAXELOS - MoP® - Management of Portfolios - Foundation
AXELOS - MoP® - Management of Portfolios - Foundation
 
Business Analyst Job Course.pptx
Business Analyst Job Course.pptxBusiness Analyst Job Course.pptx
Business Analyst Job Course.pptx
 
Product Backlog Management
Product Backlog ManagementProduct Backlog Management
Product Backlog Management
 
Product owner
Product ownerProduct owner
Product owner
 
Introduction to scaled agile framework
Introduction to scaled agile frameworkIntroduction to scaled agile framework
Introduction to scaled agile framework
 
day 1 PMP.pptx
day 1 PMP.pptxday 1 PMP.pptx
day 1 PMP.pptx
 
Guide to Project Portfolio Management
Guide to Project Portfolio ManagementGuide to Project Portfolio Management
Guide to Project Portfolio Management
 
Product Backlog - Refinement and Prioritization Techniques
Product Backlog - Refinement and Prioritization TechniquesProduct Backlog - Refinement and Prioritization Techniques
Product Backlog - Refinement and Prioritization Techniques
 
Identifying and Recovering Troubled Projects
Identifying and Recovering Troubled ProjectsIdentifying and Recovering Troubled Projects
Identifying and Recovering Troubled Projects
 
An Introduction into the design of business using business architecture
An Introduction into the design of business using business architectureAn Introduction into the design of business using business architecture
An Introduction into the design of business using business architecture
 

Destacado

BABOK Chapter 2 - Business Analysis Planning and Monitoring
BABOK Chapter 2 - Business Analysis Planning and MonitoringBABOK Chapter 2 - Business Analysis Planning and Monitoring
BABOK Chapter 2 - Business Analysis Planning and MonitoringKathy Vezina
 
Validation and moderation_-_guide_for_developing_assessment_tools
Validation and moderation_-_guide_for_developing_assessment_toolsValidation and moderation_-_guide_for_developing_assessment_tools
Validation and moderation_-_guide_for_developing_assessment_toolsKaztiania Andig
 
BABOK - Tasks, Input and Outputs
BABOK - Tasks, Input and OutputsBABOK - Tasks, Input and Outputs
BABOK - Tasks, Input and OutputsCBAP Master
 
448.4 Solution Assessment and Validation, Underlying Competencies
448.4 Solution Assessment and Validation, Underlying Competencies448.4 Solution Assessment and Validation, Underlying Competencies
448.4 Solution Assessment and Validation, Underlying CompetenciesRohan Stanny Lopes
 
Power point quality_assessment_and_validation
Power point quality_assessment_and_validationPower point quality_assessment_and_validation
Power point quality_assessment_and_validationjmhunt40
 
Social Media Assessment - How to Get Started
Social Media Assessment - How to Get StartedSocial Media Assessment - How to Get Started
Social Media Assessment - How to Get StartedWalter Adamson
 
Integrating agile into sdlc presentation pmi v2
Integrating agile into sdlc presentation   pmi v2Integrating agile into sdlc presentation   pmi v2
Integrating agile into sdlc presentation pmi v2pmimkecomm
 
BABoK V2 Requirements Elicitation (RE)
BABoK V2 Requirements Elicitation (RE)BABoK V2 Requirements Elicitation (RE)
BABoK V2 Requirements Elicitation (RE)AMJAD SHAIKH
 
BABoK V2 Requirements Analysis (RA)
BABoK V2 Requirements Analysis (RA)BABoK V2 Requirements Analysis (RA)
BABoK V2 Requirements Analysis (RA)AMJAD SHAIKH
 
Assessment Validation IT Conference 08
Assessment Validation IT Conference 08Assessment Validation IT Conference 08
Assessment Validation IT Conference 08hapy
 
CBAP Business analysis planning and monitoring
CBAP   Business analysis planning and monitoringCBAP   Business analysis planning and monitoring
CBAP Business analysis planning and monitoringLN Mishra CBAP
 
Sprint backlog specified by example
Sprint backlog specified by exampleSprint backlog specified by example
Sprint backlog specified by exampleAgora Group
 
Free CBAP V3 study guide
Free CBAP V3 study guideFree CBAP V3 study guide
Free CBAP V3 study guideLN Mishra CBAP
 
Meta tags1
Meta tags1Meta tags1
Meta tags1hapy
 
Agile Terms Series - Daily Stand-up Meeting
Agile Terms Series - Daily Stand-up MeetingAgile Terms Series - Daily Stand-up Meeting
Agile Terms Series - Daily Stand-up MeetingDisha Srivastava
 
Assessment Validation
Assessment ValidationAssessment Validation
Assessment Validationalicanc
 
Elicitation techniques
Elicitation techniquesElicitation techniques
Elicitation techniquesdaisy92081
 
Putting the Ready in Business Readiness
Putting the Ready in Business ReadinessPutting the Ready in Business Readiness
Putting the Ready in Business ReadinessDarren Nerland
 
Agile & Secure SDLC
Agile & Secure SDLCAgile & Secure SDLC
Agile & Secure SDLCPaul Yang
 

Destacado (20)

BABOK Chapter 2 - Business Analysis Planning and Monitoring
BABOK Chapter 2 - Business Analysis Planning and MonitoringBABOK Chapter 2 - Business Analysis Planning and Monitoring
BABOK Chapter 2 - Business Analysis Planning and Monitoring
 
Validation and moderation_-_guide_for_developing_assessment_tools
Validation and moderation_-_guide_for_developing_assessment_toolsValidation and moderation_-_guide_for_developing_assessment_tools
Validation and moderation_-_guide_for_developing_assessment_tools
 
BABOK - Tasks, Input and Outputs
BABOK - Tasks, Input and OutputsBABOK - Tasks, Input and Outputs
BABOK - Tasks, Input and Outputs
 
448.4 Solution Assessment and Validation, Underlying Competencies
448.4 Solution Assessment and Validation, Underlying Competencies448.4 Solution Assessment and Validation, Underlying Competencies
448.4 Solution Assessment and Validation, Underlying Competencies
 
Power point quality_assessment_and_validation
Power point quality_assessment_and_validationPower point quality_assessment_and_validation
Power point quality_assessment_and_validation
 
Social Media Assessment - How to Get Started
Social Media Assessment - How to Get StartedSocial Media Assessment - How to Get Started
Social Media Assessment - How to Get Started
 
Integrating agile into sdlc presentation pmi v2
Integrating agile into sdlc presentation   pmi v2Integrating agile into sdlc presentation   pmi v2
Integrating agile into sdlc presentation pmi v2
 
BABoK V2 Requirements Elicitation (RE)
BABoK V2 Requirements Elicitation (RE)BABoK V2 Requirements Elicitation (RE)
BABoK V2 Requirements Elicitation (RE)
 
BABoK V2 Requirements Analysis (RA)
BABoK V2 Requirements Analysis (RA)BABoK V2 Requirements Analysis (RA)
BABoK V2 Requirements Analysis (RA)
 
Assessment Validation IT Conference 08
Assessment Validation IT Conference 08Assessment Validation IT Conference 08
Assessment Validation IT Conference 08
 
CBAP Business analysis planning and monitoring
CBAP   Business analysis planning and monitoringCBAP   Business analysis planning and monitoring
CBAP Business analysis planning and monitoring
 
Sprint backlog specified by example
Sprint backlog specified by exampleSprint backlog specified by example
Sprint backlog specified by example
 
AgileCeremonies
AgileCeremoniesAgileCeremonies
AgileCeremonies
 
Free CBAP V3 study guide
Free CBAP V3 study guideFree CBAP V3 study guide
Free CBAP V3 study guide
 
Meta tags1
Meta tags1Meta tags1
Meta tags1
 
Agile Terms Series - Daily Stand-up Meeting
Agile Terms Series - Daily Stand-up MeetingAgile Terms Series - Daily Stand-up Meeting
Agile Terms Series - Daily Stand-up Meeting
 
Assessment Validation
Assessment ValidationAssessment Validation
Assessment Validation
 
Elicitation techniques
Elicitation techniquesElicitation techniques
Elicitation techniques
 
Putting the Ready in Business Readiness
Putting the Ready in Business ReadinessPutting the Ready in Business Readiness
Putting the Ready in Business Readiness
 
Agile & Secure SDLC
Agile & Secure SDLCAgile & Secure SDLC
Agile & Secure SDLC
 

Similar a Solution Validation & Assessments - A practical Approach

Business analysis and project changes
Business analysis and project changesBusiness analysis and project changes
Business analysis and project changesIIBA Romania Chapter
 
Product design and development
Product design and developmentProduct design and development
Product design and developmentVishal Kachhdiya
 
Process performance models case study
Process performance models case studyProcess performance models case study
Process performance models case studyKobi Vider
 
Requirements Manager Center of Excellence: “Achieving Goals Without Formaliz...
Requirements Manager Center of Excellence:  “Achieving Goals Without Formaliz...Requirements Manager Center of Excellence:  “Achieving Goals Without Formaliz...
Requirements Manager Center of Excellence: “Achieving Goals Without Formaliz...IIBA Rochester NY
 
Assessing IT Situation
Assessing IT SituationAssessing IT Situation
Assessing IT SituationMike Batton
 
Six sigma as foundation to cmmi
Six sigma as foundation to cmmiSix sigma as foundation to cmmi
Six sigma as foundation to cmmiKobi Vider
 
BABOK 2 Tasks & Techniques
BABOK 2 Tasks & TechniquesBABOK 2 Tasks & Techniques
BABOK 2 Tasks & TechniquesCBAP Master
 
Linkroad Corporate Snapshot
Linkroad Corporate SnapshotLinkroad Corporate Snapshot
Linkroad Corporate Snapshotmelvinyou
 
Integrated methodology for testing and quality management.
Integrated methodology for testing and quality management.Integrated methodology for testing and quality management.
Integrated methodology for testing and quality management.Mindtree Ltd.
 
Check Point Brochure 5 Governance Sprints 2012[1]
Check Point Brochure   5 Governance Sprints 2012[1]Check Point Brochure   5 Governance Sprints 2012[1]
Check Point Brochure 5 Governance Sprints 2012[1]Project Adventure Inc
 
Project Management Case Studies by Terry Hall
Project Management Case Studies by Terry HallProject Management Case Studies by Terry Hall
Project Management Case Studies by Terry HallTerry Hall, PMP
 
Project Management Case Studies Terry Hall, Project Manager
Project Management Case Studies Terry Hall, Project ManagerProject Management Case Studies Terry Hall, Project Manager
Project Management Case Studies Terry Hall, Project ManagerTerry Hall, PMP
 
Project management case studies terry hall, project manager
Project management case studies terry hall, project managerProject management case studies terry hall, project manager
Project management case studies terry hall, project managerTerry Hall, PMP
 
TLMC Corporate Presentation-v 1.2
TLMC Corporate Presentation-v 1.2TLMC Corporate Presentation-v 1.2
TLMC Corporate Presentation-v 1.2Anil Balan
 
Value Reference Model - Development
Value Reference Model - DevelopmentValue Reference Model - Development
Value Reference Model - DevelopmentArnaldo Colombo
 
IBM Rational Software Conference 2009 Day 1 Keynote: Jamie Thomas
IBM Rational Software Conference 2009 Day 1 Keynote: Jamie ThomasIBM Rational Software Conference 2009 Day 1 Keynote: Jamie Thomas
IBM Rational Software Conference 2009 Day 1 Keynote: Jamie ThomasKathy (Kat) Mandelstein
 
The Product Management Value Chain
The Product Management Value ChainThe Product Management Value Chain
The Product Management Value Chainktrexler
 
CAES Selection Services
CAES Selection Services CAES Selection Services
CAES Selection Services Jim Gilchrist
 
Agile & Business Analysis: A Successful Combination
Agile & Business Analysis: A Successful CombinationAgile & Business Analysis: A Successful Combination
Agile & Business Analysis: A Successful CombinationLuiz C. Parzianello
 

Similar a Solution Validation & Assessments - A practical Approach (20)

Business analysis and project changes
Business analysis and project changesBusiness analysis and project changes
Business analysis and project changes
 
Product design and development
Product design and developmentProduct design and development
Product design and development
 
Process performance models case study
Process performance models case studyProcess performance models case study
Process performance models case study
 
Requirements Manager Center of Excellence: “Achieving Goals Without Formaliz...
Requirements Manager Center of Excellence:  “Achieving Goals Without Formaliz...Requirements Manager Center of Excellence:  “Achieving Goals Without Formaliz...
Requirements Manager Center of Excellence: “Achieving Goals Without Formaliz...
 
Assessing IT Situation
Assessing IT SituationAssessing IT Situation
Assessing IT Situation
 
Six sigma as foundation to cmmi
Six sigma as foundation to cmmiSix sigma as foundation to cmmi
Six sigma as foundation to cmmi
 
BABOK 2 Tasks & Techniques
BABOK 2 Tasks & TechniquesBABOK 2 Tasks & Techniques
BABOK 2 Tasks & Techniques
 
Linkroad Corporate Snapshot
Linkroad Corporate SnapshotLinkroad Corporate Snapshot
Linkroad Corporate Snapshot
 
Integrated methodology for testing and quality management.
Integrated methodology for testing and quality management.Integrated methodology for testing and quality management.
Integrated methodology for testing and quality management.
 
Killing the Myth: Agile & CMMI
Killing the Myth: Agile & CMMIKilling the Myth: Agile & CMMI
Killing the Myth: Agile & CMMI
 
Check Point Brochure 5 Governance Sprints 2012[1]
Check Point Brochure   5 Governance Sprints 2012[1]Check Point Brochure   5 Governance Sprints 2012[1]
Check Point Brochure 5 Governance Sprints 2012[1]
 
Project Management Case Studies by Terry Hall
Project Management Case Studies by Terry HallProject Management Case Studies by Terry Hall
Project Management Case Studies by Terry Hall
 
Project Management Case Studies Terry Hall, Project Manager
Project Management Case Studies Terry Hall, Project ManagerProject Management Case Studies Terry Hall, Project Manager
Project Management Case Studies Terry Hall, Project Manager
 
Project management case studies terry hall, project manager
Project management case studies terry hall, project managerProject management case studies terry hall, project manager
Project management case studies terry hall, project manager
 
TLMC Corporate Presentation-v 1.2
TLMC Corporate Presentation-v 1.2TLMC Corporate Presentation-v 1.2
TLMC Corporate Presentation-v 1.2
 
Value Reference Model - Development
Value Reference Model - DevelopmentValue Reference Model - Development
Value Reference Model - Development
 
IBM Rational Software Conference 2009 Day 1 Keynote: Jamie Thomas
IBM Rational Software Conference 2009 Day 1 Keynote: Jamie ThomasIBM Rational Software Conference 2009 Day 1 Keynote: Jamie Thomas
IBM Rational Software Conference 2009 Day 1 Keynote: Jamie Thomas
 
The Product Management Value Chain
The Product Management Value ChainThe Product Management Value Chain
The Product Management Value Chain
 
CAES Selection Services
CAES Selection Services CAES Selection Services
CAES Selection Services
 
Agile & Business Analysis: A Successful Combination
Agile & Business Analysis: A Successful CombinationAgile & Business Analysis: A Successful Combination
Agile & Business Analysis: A Successful Combination
 

Más de Julen Mohanty

Robotics Process Automation (RPA) - Hands on knowledge
Robotics Process Automation (RPA) - Hands on knowledgeRobotics Process Automation (RPA) - Hands on knowledge
Robotics Process Automation (RPA) - Hands on knowledgeJulen Mohanty
 
Program management scope management
Program management   scope managementProgram management   scope management
Program management scope managementJulen Mohanty
 
Requirementless testing
Requirementless testingRequirementless testing
Requirementless testingJulen Mohanty
 
Program management - Fundamentals
Program management   - FundamentalsProgram management   - Fundamentals
Program management - FundamentalsJulen Mohanty
 
Strategic Business IT alignment
Strategic Business IT alignmentStrategic Business IT alignment
Strategic Business IT alignmentJulen Mohanty
 
BA conf presentation 2010
BA conf presentation 2010BA conf presentation 2010
BA conf presentation 2010Julen Mohanty
 
Info sec 2011 julen c mohanty
Info sec 2011   julen c mohantyInfo sec 2011   julen c mohanty
Info sec 2011 julen c mohantyJulen Mohanty
 
Info sec 2011 julen c mohanty
Info sec 2011   julen c mohantyInfo sec 2011   julen c mohanty
Info sec 2011 julen c mohantyJulen Mohanty
 
Agile adoption julen c. mohanty
Agile adoption   julen c. mohantyAgile adoption   julen c. mohanty
Agile adoption julen c. mohantyJulen Mohanty
 

Más de Julen Mohanty (10)

Robotics Process Automation (RPA) - Hands on knowledge
Robotics Process Automation (RPA) - Hands on knowledgeRobotics Process Automation (RPA) - Hands on knowledge
Robotics Process Automation (RPA) - Hands on knowledge
 
Program management scope management
Program management   scope managementProgram management   scope management
Program management scope management
 
Requirementless testing
Requirementless testingRequirementless testing
Requirementless testing
 
Program management - Fundamentals
Program management   - FundamentalsProgram management   - Fundamentals
Program management - Fundamentals
 
Strategic Business IT alignment
Strategic Business IT alignmentStrategic Business IT alignment
Strategic Business IT alignment
 
Business case
Business case  Business case
Business case
 
BA conf presentation 2010
BA conf presentation 2010BA conf presentation 2010
BA conf presentation 2010
 
Info sec 2011 julen c mohanty
Info sec 2011   julen c mohantyInfo sec 2011   julen c mohanty
Info sec 2011 julen c mohanty
 
Info sec 2011 julen c mohanty
Info sec 2011   julen c mohantyInfo sec 2011   julen c mohanty
Info sec 2011 julen c mohanty
 
Agile adoption julen c. mohanty
Agile adoption   julen c. mohantyAgile adoption   julen c. mohanty
Agile adoption julen c. mohanty
 

Último

Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...HostedbyConfluent
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...gurkirankumar98700
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhisoniya singh
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 

Último (20)

Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 

Solution Validation & Assessments - A practical Approach

  • 1. BA Activities & Techniques: Solution Validation & Assessment
  • 2. BA Activities & Techniques: Solution Validation & Assessment Julen C Mohanty Citicorp Services India Ltd
  • 3. DISCLAIMERS Any views or opinions showcased in this presentation are solely those of the author and may not necessarily represent those of the Citigroup. This document is meant for use of Business Analyst World or it’s members. Has to be used within Business Analyst World or it’s members and not to be forwarded to anyone outside Business Analyst World or it’s members.
  • 4. INDEX  Solution Assessment & Validation - Fundamentals  Importance of Solution Assessment & Validation in CMMI  Tasks by BA in Solution Assessment & Validation  Activities Done By BA in Assessment & validation  BA in Post production deployment  BABoK Fundamentals  Actual tasks to be done  Industry best Practices activities
  • 5. Learning Objectives: Deciding on a Solution that best fits the business Validating the Solution to add value to the business Testing, Implementing & Communicating Solution to the respective stakeholders
  • 6. Knowledge Areas - BABoK Business Analysis Planning & Monitoring Solution Enterprise Requirements Assessment & Elicitation Analysis Management & Validation Communication Requirement Analysis Underlying Competencies Start- Initi- Concept Func Tech Design Build / Test Deploy up ation Design Design
  • 7. Solution Assessment & Validation - BABoK Stakeholder Solution Identified Mitigating Concerns Scope Defects Actions Assess Proposed Allocate Solution Requirements Organization Assessment of Requirements Assumptions & Readiness proposed Constraints Assessment Solution Assess Define Organization Transitions Requirements Transitions Readiness Requirements Requirements [Allocated] Solution Solution Options Evaluate Validate Solution Solution Solution Solution Performance Enterprise Solution Performance Validation Metrics Architecture Performance Assessment Assessment Start- Initi- Concept Func Tech Design Build / Test Deploy up ation Design Design
  • 8. Solution Assessment & Validation Software "Are we building the product right”. Assessment The software should conform to its specification. Software "Are we building the right product”. Validation The software should do what the user really requires. Business Analyst is most Knowledgeable Team Member about Business Requirements, the Environment, can best Assess the impact of the Proposed Solution to the Environment BA Can best assess impact of change on workers, since BA Observed/ Analyzed Current Work Environment. BA Assists with Implementation Plan when Project Includes (a) Business Worker Training, (b) Conversion of Existing Info, (c) Creation of New Employee Procedure Manuals, (d) User Acceptance Testing of Software/Hardware Component of Solution.
  • 9. Importance of Solution Assessment & Validation in CMMI Requirements Development Alternative Solutions Product Requirements Technical Components Product Product Development Customer Solution Integration Requirements Product Components, Work Products Assessment & Validation Report Assessment Validation Customer Needs
  • 10. Tasks by BA in Solution Assessment & Validation (1) Develop Alternate Solutions; (2) Evaluate Technology Options; (3) Facilitate the Selection of Solution; (4) Ensure Usability of Solution; (5) Support QA Process; (6) Support Implementation of Solution; (7) Communicate Solution Impacts; (8) Post Implementation Review / Assessment
  • 11. Solution Assessment - BABoK Assumptions & Requirements [Prioritized & Solution Options Constraints Approved] Assess Proposed Solution Solution Selection Assessment of proposed Solution Solution Design Start- Initi- Concept Func Tech Design Build / Test Deploy up ation Design Design
  • 12. Solution Assessment 1. Ranking the Solution Options - Should use a set of evaluation criteria to rank the solution options 2. Identifying Additional Solution Capabilities - If the option offers more capabilities than required, you should decide if they provide value now or in the future Major work Should be done by business analysts  Splitting a Large Project into Phases,  Reviewing Technical Design Deliverables,  Help Build Usability into Application Software.
  • 13. Solution Assessment (1) BA Highly Involved in Design Strategy; (2) Tasks include What is actually done to Develop Alternate Solutions? (a) Mapping Design Plan; (b) Help Resolve Automated Processes; (c) Determine how System Interacts with End Users; (3) Technical Team Designer Constructs Software & are Key Drivers of Implementation Process; (4) BA Ensures Requirements are Fulfilled by Technical Design Solution. BA Responsible for in Developing Alternate Solutions (1) Communicating Proposed Design Solution to Stakeholders; (2) Guide Decisions Regarding Tradeoffs that Impact Requirements; (3) Mediate Discuss/ Negotiate Alternative Solutions AFTER Impact to Requirements is Known (4) Help Stakeholders and Technicians Scope Design Phases of Project; BA Works with Tech Team to Evaluate Options Available to Solve Business Problem/ Opportunity. BA is Able to Assess Each Option for its Applicability to Business Area.
  • 14. Solution Assessment Business Recommendations Requirements [Aligned with [Approved, Requirements] Prioritized] Assured Evaluate Technical Compliance with Technology Organization Constraints Options Standards High Level Evaluated Feedback Understanding [Problems/ issues/ of Technology Concerns] Capabilities BA Helps Evaluate Options/ Assess Applicability of each option for Business.
  • 15. Solution Assessment Business Requirements [Approved, Prioritized] RFP/RFQ High Level Facilitate the Understanding Selection of a of Technology Capabilities Solution Ensure the Usability Organizations of the Solution RFP/RFQ Standards Solution must be as Usable as possible. BA Assists Technology Team in Designing Usability into the Solution
  • 16. Solution Assessment Business Requirements [Approved, Prioritized] Usability Requirements Facilitate the Assessment of Solution Solution Usability Usability Test Plan Test Plan Solution must be as Usable as possible. BA Assists Technology Team in Designing Usability into the Solution
  • 17. Solution Assessment • Doesn’t only mean jazzy UI, but must • Does the solution address the have usability, flexibility and accessibility existing risks of the business • Internalization must be considered for • Does the solution create any global applications potential Risk for the • Creating early code, prototyping, or other company various techniques, the graphical user • Address/ create risk for other interface can be utilized for early applications assessment Rich RISK • Address/ create risk for other Customer functions within the Experience applications (if enhanced) 4R Regulation ROI & Compliance • Maximize ROI by using • Need to make sure their software data is  Automation protected.  Environment optimization • No negotiation on regulatory compliance  Reducing dependencies & must be compliant • Depending on the business, • Integration must be done with overall some manual work may be compliance perspective necessary, should be kept. • Different entities within the organization Automating as much as possible will be responsible for regulation and in all phases of the lifecycle compliance but should have independent would reduce operational errors assessment and verification services.
  • 18. Solution Assessment • Doesn’t only mean jazzy UI, but must • Does the solution address the have usability, flexibility and accessibility existing risks of the business • Internalization must be considered for • Does the solution create any global applications potential Risk for the • Creating early code, prototyping, or other company various techniques, the graphical user • Address/ create risk for other interface can be utilized for early applications assessment Rich RISK • Address/ create risk for other Customer functions within the Experience applications (if enhanced) 4R Regulation ROI & Compliance • Maximize ROI by using • Need to make sure their software data is  Automation protected.  Environment optimization • No negotiation on regulatory compliance  Reducing dependencies & must be compliant • Depending on the business, • Integration must be done with overall some manual work may be compliance perspective necessary, should be kept. • Different entities within the organization Automating as much as possible will be responsible for regulation and in all phases of the lifecycle compliance but should have independent would reduce operational errors assessment and verification services.
  • 19. Allocate Requirements - BABoK Requirements [Prioritized & Solution Designed Solution Scope Approved] Allocate Requirements Requirements Management & Communication Solution Selection Requirements [Allocated] Solution Design Start- Initi- Concept Func Tech Design Build / Test Deploy up ation Design Design
  • 20. Allocate Requirements • The requirements are allocated to product functions and product components including objects, people, and processes. • The traceability of requirements to functions, objects, tests, issues, or other entities is documented. • The allocated requirements and functions are the basis for the synthesis of the technical solution. • As internal components are developed, additional interfaces are defined and interface requirements established. Tasks to be done are:  Allocate requirements to functions  Allocate requirements to product components  Allocate design constraints to product components  Document relationships among allocated requirements  Allocate customer requirements to functional partitions, objects, people, or support elements to support the synthesis of solutions  Allocate functional and performance requirements to functions and sub-functions
  • 21. Allocate Requirements * Allocation of User Requirements In this activity, the total User Requirements and Marginal Conditions for the System have to be allocated to the elements of the technical architecture. This allocation of requirements is the basis for the requirements analyses and design steps taking place on the lower levels. It is necessary to observe that the allocation of requirements and Marginal Conditions to the elements of the technical architecture must fulfil the following criteria:  Every requirement must be allocated to at least one element of the technical architecture, ideally exactly to one architecture element.  Each requirement is allocated to the lowest element in the refinement levels which makes it possible to meet the requirement completely. Normally, the total of the requirements have to be allocated to various refinement levels. Technical and organizational specifications that have to be considered within the scope of system generation. Marginal conditions may anticipate or limit design decisions.
  • 22. Allocate Requirements  Provided that a requirement is of general importance to elements, it must be considered within the scope of the allocation which individual architecture elements this requirement really has to fulfil.  The allocation must be realized in such a manner that it will be possible to prove the fulfilment of the requirement by checking the corresponding architecture element. * Allocation of IT Security Requirements to the IT Security Measures With the allocation of the IT security requirements to the IT security measures it must be proven that each IT security requirement is covered by at least one IT security measure & if the specified IT security objective can be reached with the selected security measures. Requirements to functions and sub-functions Ensure that satisfaction of the set of requirements at the lower level will guarantee satisfaction of the higher level requirement.
  • 23. Allocate Requirements Determine how many Construction Phases a Project will Undergo (1) Review User Classes; (2) Review Functions and Features List; (3) Map the Requirements to Design - (a) Functional Requirements; (b) Quality of Service Requirements; (4) Propose Design Phases; (5) Determine Number of Design Phases; (6) Map Requirements to Design Phases; (7) Update Requirements Traceability Matrix: (a) Examples of Traceability Mapping Tools, (b) Tracing Features to Use Cases; (8) Recommend Improvements for Non-Automated Processes
  • 24. Assess Organization Readiness Enterprise Stakeholder Solution Designed Solution Scope Architecture Concerns Assess Organization Readiness Organizational Readiness Define Transitions Assessment Requirements Start- Initi- Concept Func Tech Design Build / Test Deploy up ation Design Design
  • 25. Assess Organization Readiness Experts estimate that 50% of all change efforts fail because leaders do not sufficiently assess organizational readiness for change. To assess whether the organization is ready to make effective use of the solution. The internal ability and willingness to move in a new direction.  Ability - accessing new skill sets necessary to successfully implement a change.  Willingness - desire of the organization and its employees to change. Assessing organizational readiness will identify any major challenges that could delay or prevent your new program’s successful start-up. Organizational strengths can be leveraged to assist in program development and acceptance.
  • 26. Assess Organization Readiness Key concepts to consider when assessing the organizational readiness are: 1. Cultural Assessment 2. Operational or Technical Assessment 3. Stakeholder Impact Analysis To identify impacts the business analyst should understand the Solution [Designed] in order to communicate the effect a new solution will have on an organization The output of an Organizational Readiness Assessment document describes whether stakeholders & the organization are prepared to accept the change associated with a solution and are able to use it effectively
  • 27. Assess Organization Readiness Identify the Anticipated or Desired Change - Clearly reiterate the desired change - Develop a short paragraph that specifically describes the action or program that the organization is considering. This may seem rather basic, it will assure that the stakeholders see the same vision. Determine Current State of the Organization in Relation to the Desired Change Significant Minimal Major Substantial Full Changes Changes Barrier Barrier Support Needed Needed Alignment With Organizational Vision & Mission Alignment With Strategic plan Alignment with organizational value & culture Resource Availability Decision Maker Interest Support for the Initiative Stakeholder Program Perception Stakeholder Program Education Internal Factors (Skills, Strength, Weakness) External Factor (Opportunity, Challenges)
  • 28. Assess Organization Readiness - Force Field Analysis Current Desired State State Pushing/ Driving Forces Pulling/ Restraining Forces Driving Force 1 Restraining Force 1 Driving Force 2 Restraining Force 2 Driving Force 3 Restraining Force 3
  • 29. Assess Organization Readiness - Force Field Analysis Managers Unhappy with 1 Eliminates Operational Error clerical work 1 Relative Forces Strength Implementing Relative Forces Strength Faster Execution of Admin Requires Training of More 1 Works a HR system people 2 Enables employees Online Documentation to self manage Some activity costs shift to 3 Eliminates Paper work their personal high paid staff 1 information such as Payroll Deductions, Reduces Need of Clerical Cost of eliminating clerical 2 Staff Benefit staff 3 participation Increases Control / auditing 3 Capabilities Start-up costs 1 TOTAL = 10 TOTAL = 8 force field analysis helps you: Decide if you have the right support for the change initiative Identify what obstacles are standing in your way Find ways to reduce or marginalize those obstacles
  • 30. Define Transitions Requirements Organizational Requirements Solution Solution Readiness [ Stated ] Deployed Designed Assessment Define Transitions Requirements Prioritize Requirements Verify Transitions Requirements Requirements Requirements Management & Communication Start- Initi- Concept Func Tech Design Build / Test Deploy up ation Design Design
  • 31. Define Transitions Requirements To define requirements for capabilities needed to transition from the existing to the new solution. Transition Requirements define characteristics that a solution must have in order to transition from the current state to the desired future state - A solution is implemented within an enterprise in order to enhance - Replace an existing solution. During the transition period (the time when both the old and new solutions are operational) - The enterprise may need to operate both solutions in parallel, - Move information between the new and old solution, - Conduct training to enable stakeholders to effectively operate the new solution - Retain All data in old system in new system
  • 32. Define Transitions Requirements Activities done by in this phase are: Identify project activities to be completed before transition can start Conduct skill gap analysis against all IS staff Determine actual training needed, based on gap analysis Develop training plans • Identify necessary training courses • Schedule classes • Identify necessary knowledge to transfer activities • Determine measurable tasks to validate that knowledge transfer is acceptable Stakeholder Analysis for all Transition Requirements Reference : http://www.batimes.com/images/stories/nov15ewan1.jpg
  • 33. Solution Validation - BABOK Requirements Solution [Prioritized & Validated] Constructed Validate Solution Solution Validation Identified Defects Mitigating Actions Assessment Evaluate Solution Solution Performance Implementation Start- Initi- Concept Func Tech Design Build / Test Deploy up ation Design Design
  • 34. Solution Validation Validate that a solution meets the business need and determine the most appropriate response to identified defects Solution validation is required to ensure that a delivered solution meets the business needs on an ongoing basis. Problems that are identified through solution validation will be reported and prioritized for resolution. BA will be able to help the team determine the most appropriate action The documented act of proving that any procedure, process, equipment, material, activity or system actually leads to the expected results. Action of proving, that any procedure, process, equipment, material, activity, or system actually leads to the expected results.
  • 35. Solution Validation - Accuracy VS Precision What you would like to see! Poor accuracy Poor precision Good precision Good accuracy confirmation by examination and provision of objective evidence that software specifications conform to user needs and intended uses, and that the particular requirements implemented through software can be consistently fulfilled.
  • 36. Solution Validation - Purpose of Validation Fewer Rejects Customer Reduced Satisfaction Cost Effective handling Reduction of Maximize of Requirements Quality Costs Yield Fewer Retest Fewer Rework Fewer Wastage & Scrap
  • 37. Solution Validation General Task to be considered are  Audits, Reviews, and Inspection  Analytic Techniques  Dynamic Techniques Techniques to verify the software during its development process  Peer Reviews  Documentation inspections (User sign off on specification)  Traceability of Requirements  Requirements/design/code reading (Prototypes too)  Test witnessing (Unit Test, SIT, UAT, Test Cases Too)  Installation audits Sufficient replication of the testing and challenging of each defined critical Stage of a system, process, etc. that has to be performed to give valid levels of assurance An adequate System of referenced documentation is essential. Flow diagrams and schematics should define the system, process, etc. The critical areas must be highlighted, and the written experimental design defined by a protocol.
  • 38. Solution Validation - QA process V-MODEL Quality Product Delivery Finished New Idea Conform to all Requirements Product for business Use Test Against Feasibility Study Review Test Against User Requirements User Acceptance Test Against System Design System Test Test Against Development Program (UNIT) Test Coding
  • 39. Solution Validation BA task Quality Assurance Activities (1) Understand Tasks Performed by QA; (2) Be Available to Answer Questions about the Testing of the Solution; (3) Review QA Deliverables (test plans, test cases) to Assure Business risks are mitigated by Thorough Testing; (4) Help Business Stakeholders with User Acceptance Testing, Defect Reporting, and Resolution.
  • 40. Solution Validation  Business SME to do Testing  SIT & UAT People &  Maintains standard process & related docs  Can foresee business timelines, helps in Process  Have E2E knowledge of solution for testing getting preparedness  Can help in better time to market with domain knowledge  Can optimize staffing by maintaining knowledge management Strategic Tools & Business BA Automations Activities  Helps in automating Test cycles  Can maintain Testing data management  Maintains Standard for testing across project  BA can maintain reporting standards for Governance testing cycles  Maintain Governance across Business & testers
  • 41. Evaluate Solution Performance Business Identified Business Identified Requirements Defects Requirements Defects Evaluate Solution Performance Solution performance Assess Capability Assessment Gaps Start- Initi- Concept Func Tech Design Build / Test Deploy up ation Design Design
  • 42. Evaluate Solution Performance To evaluate functioning solutions to 1) understand the value they deliver 2) identify opportunities for improvement. Solution evaluation involves investigating how a solution is actually used after it is deployed, and assessing the effect it has had It may also be referred to as post-implementation assessment when performed immediately following the completion of a project. Key concepts to consider when evaluating a solution performance can include: – Understand Value Delivered by Solution – Validate Solution Metrics – Solution Replacement or Elimination • Ongoing Cost versus Initial Investment • Opportunity Cost • Necessity • Sunk Cost
  • 43. Evaluate Solution Performance - Risk Based Testing The Risk Based Testing (RBT) approach addresses the size & complexity parameters of a regression testing in a methodical manner by: This technique prioritizes the functions to be tested based on their risk Risk = Impact * Probability  Prioritize test cases by clearly defining importance of a functionality or feature  Impact assessment to identify likelihood of failure. Thus addressing the testability of a requirement  Improving testing effectiveness by ensuring testing of all critical functionalities, which are used most often  Increasing test case effectiveness by eliminating non-productive test cases  Identifying test data need during the planning or requirement gathering phase itself. Pareto Principle (80-20 Rule)
  • 44. Evaluate Solution Performance - 360o Testing Assessment Requirement Prioritization Post Live Analysis Test Plan Coverage Defect Metrics Analysis Test Execution Coverage
  • 45. ASSESSMENT & VALIDATION CYCLE START Is Goal Stakeholder Analysis Attained END PROCESS Validation Validation Set Requirements = Attainable METRIC + Target Value Complete? Functional Delivered Solution Assessment Deployment Delivered Goals = Intended METRIC + Delivered Value ASSESSMENT Function Model Model Concept Design Consistent ?` Solution Solvable?
  • 46. BA should be Involved with Solution Rollout (1) Make Sure Production Rollout Changes are Completed as Smoothly as Possible; (2) Help Training of Business Area Workers on (a) New procedures and Software, (b) Creation of Employee Procedure Manuals, (c) Communication of Change Impacts to Employees/ Customers; (d) Development of Conversion Plans; (e) Assist IT Team in Rollout Strategies to Lessen Negative Impact to Business Area.
  • 47. BA should be Involved Production Implementation (1) Problem Resolution; (2) Adjustments to New Procedures; (3) Managing Change Requests Including (a) New Requirements, (b) Next Phase Issues, (c) Any Other Post Implementation Support Analysis.
  • 48. Thank You julenmohanty@gmail.com www.twitter.com/julenmohanty www.linkedin.com/julenmohanty julenmohanty