SlideShare una empresa de Scribd logo
1 de 40
JIT and Lean Operations
When you complete this chapter you should be able to:



    1. Define just-in-time, TPS, and lean
       operations
    2. Define the seven wastes and the
       5 Ss
    3. Explain JIT partnerships
    4. Determine optimal setup time

                                                        16 - 1
Learning Objectives
When you complete this chapter you should be able to:




  1. Define kanban
  2. Compute the required number of
     kanbans
  3. Explain the principles of the Toyota
     Production System


                                                        16 - 2
JIT/Lean Operations
 Good production systems require that managers
   address three issues that are pervasive and
fundamental to operations management: eliminate
waste, remove variability, and improve throughput




                                                    16 - 3
Just-In-Time, TPS, and
     Lean Operations
 JIT is a philosophy of continuous and
  forced problem solving via a focus on
  throughput and reduced inventory
 TPS emphasizes continuous
  improvement, respect for people, and
  standard work practices
 Lean production supplies the
  customer with their exact wants when
  the customer wants it without waste

                                          16 - 4
Just-In-Time, TPS, and
     Lean Operations
 JIT emphasizes forced problem
  solving
 TPS emphasizes employee
  learning and empowerment in an
  assembly-line environment
 Lean operations emphasize
  understanding the customer

                                   16 - 5
Eliminate Waste
 Waste is anything that does not
  add value from the customer point
  of view
 Storage, inspection, delay, waiting
  in queues, and defective products
  do not add value and are 100%
  waste


                                        16 - 6
Ohno’s Seven Wastes
  Overproduction
  Queues
  Transportation
  Inventory
  Motion
  Overprocessing
  Defective products
                        16 - 7
The 5 Ss
 Sort/segregate – when in doubt, throw it out
 Simplify/straighten – methods analysis tools
 Shine/sweep – clean daily
 Standardize – remove variations from processes
 Sustain/self-discipline – review work and recognize
  progress




                                                        16 - 8
The 5 Ss
 Sort/segregate – when in doubt, throw it out
 Simplify/straighten – methods analysis tools
 Shine/sweep – clean daily
      Two remove variations
 Standardize –additional Ss from processes
     Safety – build in work and recognize
 Sustain/self-discipline – review good practices
  progress
      Support/maintenance – reduce
       variability and unplanned
       downtime

                                                    16 - 9
Remove Variability
 JIT systems require managers to
  reduce variability caused by both
  internal and external factors
 Variability is any deviation from
  the optimum process
 Inventory hides variability
 Less variability results in less
  waste
                                      16 - 10
Sources of Variability
1. Incomplete or inaccurate drawings
   or specifications
2. Poor production processes
   resulting in incorrect quantities,
   late, or non-conforming units
3. Unknown customer demands



                                        16 - 11
Improve Throughput
 By pulling material in small lots,
  inventory cushions are removed,
  exposing problems and
  emphasizing continual improvement
 Manufacturing cycle time is reduced
 Push systems dump orders on the
  downstream stations regardless of
  the need

                                      16 - 12
Just-In-Time (JIT)
 Powerful strategy for improving operations
 Materials arrive where they
  are needed when they are
  needed
 Identifying problems and
  driving out waste reduces
  costs and variability and
  improves throughput
 Requires a meaningful
  buyer-supplier relationship
                                               16 - 13
JIT and Competitive
     Advantage




                      16 - 14
JIT Partnerships
 JIT partnerships exist when a
  supplier and purchaser work
  together to remove waste and drive
  down costs
 Four goals of JIT partnerships are:
    Removal of unnecessary activities
    Removal of in-plant inventory
    Removal of in-transit inventory
    Improved quality and reliability
                                         16 - 15
JIT Partnerships




                   16 - 16
JIT Layout
Reduce waste due to movement
JIT Layout Tactics
Build work cells for families of products
Include a large number operations in a small area
Minimize distance
Design little space for inventory
Improve employee communication
Use poka-yoke devices
Build flexible or movable equipment
Cross-train workers to add flexibility

                                                    16 - 17
Distance Reduction
 Large lots and long production
  lines with single-purpose
  machinery are being replaced by
  smaller flexible cells
 Often U-shaped for shorter paths
  and improved communication
 Often using group technology
  concepts

                                     16 - 18
Impact on Employees
 Employees may be cross trained
  for flexibility and efficiency
 Improved communications
  facilitate the passing on of
  important information about the
  process
 With little or no inventory buffer,
  getting it right the first time is
  critical
                                        16 - 19
JIT Inventory
Inventory is at the minimum level
necessary to keep operations running
JIT Inventory Tactics
Use a pull system to move inventory
Reduce lot sizes
Develop just-in-time delivery systems with suppliers
Deliver directly to point of use
Perform to schedule
Reduce setup time
Use group technology

                                                   16 - 20
Reduce Variability

             Inventory level




                          Process
    Scrap                downtime

       Setup        Quality
        time       problems

            Late deliveries

                                    16 - 21
Reduce Inventory
 Reducing inventory uncovers the “rocks”
 Problems are exposed
 Ultimately there will
  be virtually no
  inventory and no
  problems
 Shingo says “Inventory is evil”




                                            16 - 22
Reduce Lot Sizes
                            Q1 When average order size = 200
                               average inventory is 100
            200 –
Inventory




                                  Q2 When average order size = 100
            100 –
                                     average inventory is 50




                           Time




                                                             16 - 23
Reduce Lot Sizes
 Ideal situation is to have lot sizes
  of one pulled from one process to
  the next
 Often not feasible
 Can use EOQ analysis to calculate
  desired setup time
 Two key changes necessary
    Improve material handling
    Reduce setup time
                                         16 - 24
Lot Size Example
D=   Annual demand = 400,000 units
d=   Daily demand = 400,000/250 = 1,600 per day
p=   Daily production rate = 4,000 units
Q=   EOQ desired = 400
H=   Holding cost = $20 per unit
S=   Setup cost (to be determined)

             2DS                   2DS
     Q=                      Q =
                              2
           H(1 - d/p)            H(1 - d/p)

      (Q2)(H)(1 - d/p)   (3,200,000)(0.6)
   S=       2D         =     800,000      = $2.40

Setup time = $2.40/($30/hour) = 0.08 hr = 4.8 minutes
                                                    16 - 25
Reduce Setup Costs
 High setup costs encourage large
  lot sizes
 Reducing setup costs reduces lot
  size and reduces average
  inventory
 Setup time can be reduced
  through preparation prior to
  shutdown and changeover

                                     16 - 26
Reduce Setup Times
                            Initial Setup Time                                    90 min —

             Separate setup into preparation and actual
             setup, doing as much as possible while the
Step 1             machine/process is operating
                          (save 30 minutes)

                                                                                  60 min —
                        Move material closer and
         Step 2        improve material handling
                           (save 20 minutes)
                                                                                  45 min —
                             Standardize and
              Step 3         improve tooling
                            (save 15 minutes)
                                                                                  25 min —
                                              Use one-touch system to eliminate
                   Step 4
                                              adjustments (save 10 minutes)
                                                                                  15 min —
                                          Training operators and standardizing    13 min —
                        Step 5            work procedures (save 2 minutes)
                            Step 6     Repeat cycle until subminute                          —
                                       setup is achieved
                                                                                   16 - 27
JIT Scheduling
Better scheduling improves performance
 JIT Scheduling Tactics
 Communicate schedules to suppliers
 Make level schedules
 Freeze part of the schedule
 Perform to schedule
 Seek one-piece-make and one-piece move
 Eliminate waste
 Produce in small lots
 Use kanbans
 Make each operation produce a perfect part
                                              16 - 28
Scheduling Small Lots
 JIT Level Material-Use Approach
    A A   B   B   B   C        A A       B       B   B   C



Large-Lot Approach
A A A A A A B     B   B    B     B   B       B   B   B   C C C



                          Time
                                                             16 - 29
Kanban
 Kanban is the Japanese word for card
 The card is an authorization for the next
  container of material to be produced
 A sequence of kanbans
  pulls material through
  the process
 Many different sorts of
  signals are used, but
  the system is still called
  a kanban

                                              16 - 30
Kanban

Material/Parts                           Final      Finished   Customer
  Supplier                             assembly      goods       order

                      Work
                      cell



                                                  Kanban
             Kanban           Kanban




                                                                     16 - 31
More Kanban
 When the producer and user are not in
  visual contact, a card can be used
 When the producer and user are in
  visual contact, a light or flag or empty
  spot on the floor may be adequate
 Since several components may
  be required, several different
  kanban techniques may be employed


                                             16 - 32
The Number of Kanban Cards
      or Containers
 Need to know the lead time needed to
  produce a container of parts
 Need to know the amount of safety
  stock needed

                    Demand during     Safety
Number of kanbans      lead time   + stock
   (containers)   =
                       Size of container



                                               16 - 33
Number of Kanbans Example
      Daily demand               = 500 cakes
      Production lead time       = 2 days
      (Wait time +
      Material handling time +
      Processing time)
      Safety stock               = 1/2 day
      Container size             = 250 cakes

Demand during lead time = 2 days x 500 cakes = 1,000

                           1,000 + 250
       Number of kanbans =     250     =5

                                                  16 - 34
Advantages of Kanban
 Allow only limited amount of faulty or
  delayed material
 Problems are immediately evident
 Puts downward pressure on bad
  aspects of inventory
 Standardized containers reduce
  weight, disposal costs, wasted space,
  and labor


                                           16 - 35
JIT Quality
 Strong relationship
    JIT cuts the cost of obtaining good
     quality because JIT exposes poor
     quality
    Because lead times are shorter,
     quality problems are exposed sooner
    Better quality means fewer buffers
     and allows simpler JIT systems to be
     used

                                            16 - 36
Toyota Production System
 Continuous improvement
    Build an organizational culture and value
     system that stresses improvement of all
     processes, kaizen
    Part of everyone’s job
 Respect for people
    People are treated as
     knowledge workers
    Engage mental and
     physical capabilities
    Empower employees
                                                 16 - 37
Toyota Production System
 Standard work practice
    Work shall be completely specified as to
     content, sequence, timing, and outcome
    Internal and external customer-supplier
     connection are direct
    Product and service flows must be simple
     and direct
    Any improvement must be made in
     accordance with the scientific method at the
     lowest possible level of the organization


                                                16 - 38
Building a Lean Organization
 Transitioning to a lean system can
  be difficult
 Lean systems tend to have the
  following attributes
    Use JIT techniques
    Build systems that help employees
     produce perfect parts
    Reduce space requirements

                                         16 - 39
Building a Lean Organization
 Develop partnerships with suppliers
 Educate suppliers
 Eliminate all but value-added
  activities
 Develop employees
 Make jobs challenging
 Build worker flexibility


                                        16 - 40

Más contenido relacionado

La actualidad más candente (20)

MRP-II
MRP-IIMRP-II
MRP-II
 
Operation scheduling
Operation schedulingOperation scheduling
Operation scheduling
 
Jit
JitJit
Jit
 
CAPACITY PLANNING
CAPACITY PLANNINGCAPACITY PLANNING
CAPACITY PLANNING
 
2. scope of operations management
2.  scope of operations management2.  scope of operations management
2. scope of operations management
 
Just In Time (JIT)
Just In Time (JIT)Just In Time (JIT)
Just In Time (JIT)
 
Sales & Operations Planning
Sales & Operations PlanningSales & Operations Planning
Sales & Operations Planning
 
Demand Management
Demand ManagementDemand Management
Demand Management
 
Role of information Technology in Supply Chain Manageent
Role of information Technology in Supply Chain ManageentRole of information Technology in Supply Chain Manageent
Role of information Technology in Supply Chain Manageent
 
Presentation on Just in Time
Presentation on Just in TimePresentation on Just in Time
Presentation on Just in Time
 
Aggregate Planning
Aggregate PlanningAggregate Planning
Aggregate Planning
 
Material requirement planning, MRP.
Material requirement planning, MRP. Material requirement planning, MRP.
Material requirement planning, MRP.
 
Lean production
Lean production Lean production
Lean production
 
Drivers of supply chain performance group 2
Drivers of supply chain performance group 2Drivers of supply chain performance group 2
Drivers of supply chain performance group 2
 
JIT inventory
JIT inventoryJIT inventory
JIT inventory
 
Just In Time
Just In TimeJust In Time
Just In Time
 
Materials requirement planning
Materials requirement planningMaterials requirement planning
Materials requirement planning
 
Just In Time (JIT) Systems
Just In Time (JIT) SystemsJust In Time (JIT) Systems
Just In Time (JIT) Systems
 
INTEGRATED LOGISTICS
INTEGRATED LOGISTICSINTEGRATED LOGISTICS
INTEGRATED LOGISTICS
 
Jit principles
Jit principlesJit principles
Jit principles
 

Destacado

just in time and lean manufacturing
just in time and lean manufacturingjust in time and lean manufacturing
just in time and lean manufacturingAkhil Bhatia
 
Just in time (jit), lean, and toyota production system (tps)
Just in time (jit), lean, and toyota production system (tps)Just in time (jit), lean, and toyota production system (tps)
Just in time (jit), lean, and toyota production system (tps)Dr. Mahmoud Al-Naimi
 
PRODUCTION & OPERATIONS MANAGEMENT- QUALITY
PRODUCTION & OPERATIONS MANAGEMENT- QUALITYPRODUCTION & OPERATIONS MANAGEMENT- QUALITY
PRODUCTION & OPERATIONS MANAGEMENT- QUALITYTrinity Dwarka
 
Material Requirement Planning
Material Requirement PlanningMaterial Requirement Planning
Material Requirement PlanningPritesh Mogane
 
Material Requisite Planning
Material Requisite PlanningMaterial Requisite Planning
Material Requisite Planningajithsrc
 
Just In Time - Operations Management
Just In Time - Operations ManagementJust In Time - Operations Management
Just In Time - Operations ManagementGargi Kapadia
 
MIS - IT Infrastructure (Part I)
MIS  - IT Infrastructure (Part I)MIS  - IT Infrastructure (Part I)
MIS - IT Infrastructure (Part I)Soetam Rizky
 
Reward systems & legal issues
Reward systems & legal issuesReward systems & legal issues
Reward systems & legal issueskahogan62
 
Warehouse Operations and Inventory Management
Warehouse Operations and Inventory Management Warehouse Operations and Inventory Management
Warehouse Operations and Inventory Management Thomas Tanel
 
Lean presentation ppt
Lean presentation pptLean presentation ppt
Lean presentation pptbwu.nl
 
The Project Management Process - Week 1
The Project Management Process -  Week 1The Project Management Process -  Week 1
The Project Management Process - Week 1Craig Brown
 
Operations management forecasting
Operations management   forecastingOperations management   forecasting
Operations management forecastingTwinkle Constantino
 
Introduction to Business Process Management
Introduction to Business Process ManagementIntroduction to Business Process Management
Introduction to Business Process ManagementAlan McSweeney
 

Destacado (18)

Jit And Lean
Jit And LeanJit And Lean
Jit And Lean
 
just in time and lean manufacturing
just in time and lean manufacturingjust in time and lean manufacturing
just in time and lean manufacturing
 
Just in time (jit), lean, and toyota production system (tps)
Just in time (jit), lean, and toyota production system (tps)Just in time (jit), lean, and toyota production system (tps)
Just in time (jit), lean, and toyota production system (tps)
 
Jit
JitJit
Jit
 
PRODUCTION & OPERATIONS MANAGEMENT- QUALITY
PRODUCTION & OPERATIONS MANAGEMENT- QUALITYPRODUCTION & OPERATIONS MANAGEMENT- QUALITY
PRODUCTION & OPERATIONS MANAGEMENT- QUALITY
 
Material Requirement Planning
Material Requirement PlanningMaterial Requirement Planning
Material Requirement Planning
 
Material Requisite Planning
Material Requisite PlanningMaterial Requisite Planning
Material Requisite Planning
 
JIT
JITJIT
JIT
 
Just In Time - Operations Management
Just In Time - Operations ManagementJust In Time - Operations Management
Just In Time - Operations Management
 
MIS - IT Infrastructure (Part I)
MIS  - IT Infrastructure (Part I)MIS  - IT Infrastructure (Part I)
MIS - IT Infrastructure (Part I)
 
Reward systems & legal issues
Reward systems & legal issuesReward systems & legal issues
Reward systems & legal issues
 
Warehouse Operations and Inventory Management
Warehouse Operations and Inventory Management Warehouse Operations and Inventory Management
Warehouse Operations and Inventory Management
 
Information System Plan
Information System PlanInformation System Plan
Information System Plan
 
Lean presentation ppt
Lean presentation pptLean presentation ppt
Lean presentation ppt
 
Risk management
Risk managementRisk management
Risk management
 
The Project Management Process - Week 1
The Project Management Process -  Week 1The Project Management Process -  Week 1
The Project Management Process - Week 1
 
Operations management forecasting
Operations management   forecastingOperations management   forecasting
Operations management forecasting
 
Introduction to Business Process Management
Introduction to Business Process ManagementIntroduction to Business Process Management
Introduction to Business Process Management
 

Similar a Jit & Lean Operations

Similar a Jit & Lean Operations (20)

Session 8
Session 8Session 8
Session 8
 
Session 8_OM
Session 8_OMSession 8_OM
Session 8_OM
 
Lean_Manufacturing___Just-in-Time.ppt
Lean_Manufacturing___Just-in-Time.pptLean_Manufacturing___Just-in-Time.ppt
Lean_Manufacturing___Just-in-Time.ppt
 
just in time manufacturing
just in time manufacturingjust in time manufacturing
just in time manufacturing
 
Jit In Toyota
Jit In ToyotaJit In Toyota
Jit In Toyota
 
37022309 lean-simple-solutions
37022309 lean-simple-solutions37022309 lean-simple-solutions
37022309 lean-simple-solutions
 
lean-simple-solutions
 lean-simple-solutions lean-simple-solutions
lean-simple-solutions
 
Operation management II
Operation management IIOperation management II
Operation management II
 
LEAN
LEANLEAN
LEAN
 
Ch12 jit+&+lean+systems
Ch12 jit+&+lean+systemsCh12 jit+&+lean+systems
Ch12 jit+&+lean+systems
 
Slide Show Week #9 Chapter 11 Jit
Slide Show Week #9 Chapter 11 JitSlide Show Week #9 Chapter 11 Jit
Slide Show Week #9 Chapter 11 Jit
 
13. lean production system pgp
13. lean production system pgp13. lean production system pgp
13. lean production system pgp
 
JUST IN TIME PRODUCTION SYSTEM
JUST IN TIME PRODUCTION SYSTEMJUST IN TIME PRODUCTION SYSTEM
JUST IN TIME PRODUCTION SYSTEM
 
Generic Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S DesrocherGeneric Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S Desrocher
 
Lean production System - TPS
Lean production System - TPSLean production System - TPS
Lean production System - TPS
 
Just In Time
Just In TimeJust In Time
Just In Time
 
Make green go green by going lean
Make green go green by going leanMake green go green by going lean
Make green go green by going lean
 
Lean Tools
Lean ToolsLean Tools
Lean Tools
 
Supply Chain Mgmt Jit
Supply Chain Mgmt JitSupply Chain Mgmt Jit
Supply Chain Mgmt Jit
 
MANT 265 S01.ppt
MANT 265 S01.pptMANT 265 S01.ppt
MANT 265 S01.ppt
 

Más de kahogan62

Define performance & choosing a measurement approach
Define performance & choosing a measurement approachDefine performance & choosing a measurement approach
Define performance & choosing a measurement approachkahogan62
 
Supply chain risk mgmt
Supply chain risk mgmtSupply chain risk mgmt
Supply chain risk mgmtkahogan62
 
Value chain SCM
Value chain SCMValue chain SCM
Value chain SCMkahogan62
 
Contractor Relationship OPS405
Contractor Relationship OPS405Contractor Relationship OPS405
Contractor Relationship OPS405kahogan62
 
Chap016 suppply management ops405
Chap016 suppply management ops405Chap016 suppply management ops405
Chap016 suppply management ops405kahogan62
 
Cost of ownership gsa
Cost of ownership gsaCost of ownership gsa
Cost of ownership gsakahogan62
 
Business Process Outsourcing OPS405
Business Process Outsourcing OPS405Business Process Outsourcing OPS405
Business Process Outsourcing OPS405kahogan62
 
Procurement ops450
Procurement ops450Procurement ops450
Procurement ops450kahogan62
 
Supply chain management ops 405
Supply chain management ops 405Supply chain management ops 405
Supply chain management ops 405kahogan62
 
Developing Performance Based Work Statements
Developing Performance Based Work StatementsDeveloping Performance Based Work Statements
Developing Performance Based Work Statementskahogan62
 
Krause corporation ops4505
Krause corporation ops4505Krause corporation ops4505
Krause corporation ops4505kahogan62
 
Value chain thru general electric
Value chain thru general electricValue chain thru general electric
Value chain thru general electrickahogan62
 
Inventory & Inflation
Inventory & InflationInventory & Inflation
Inventory & Inflationkahogan62
 
Price vs quality
Price vs qualityPrice vs quality
Price vs qualitykahogan62
 
Best practices in_leading_change
Best practices in_leading_changeBest practices in_leading_change
Best practices in_leading_changekahogan62
 
Cost, diff, responce
Cost, diff, responceCost, diff, responce
Cost, diff, responcekahogan62
 
Vertical integration
Vertical integrationVertical integration
Vertical integrationkahogan62
 
Inventory management
Inventory managementInventory management
Inventory managementkahogan62
 
Operational efficiencies
Operational efficienciesOperational efficiencies
Operational efficiencieskahogan62
 

Más de kahogan62 (20)

Define performance & choosing a measurement approach
Define performance & choosing a measurement approachDefine performance & choosing a measurement approach
Define performance & choosing a measurement approach
 
Eoq model
Eoq modelEoq model
Eoq model
 
Supply chain risk mgmt
Supply chain risk mgmtSupply chain risk mgmt
Supply chain risk mgmt
 
Value chain SCM
Value chain SCMValue chain SCM
Value chain SCM
 
Contractor Relationship OPS405
Contractor Relationship OPS405Contractor Relationship OPS405
Contractor Relationship OPS405
 
Chap016 suppply management ops405
Chap016 suppply management ops405Chap016 suppply management ops405
Chap016 suppply management ops405
 
Cost of ownership gsa
Cost of ownership gsaCost of ownership gsa
Cost of ownership gsa
 
Business Process Outsourcing OPS405
Business Process Outsourcing OPS405Business Process Outsourcing OPS405
Business Process Outsourcing OPS405
 
Procurement ops450
Procurement ops450Procurement ops450
Procurement ops450
 
Supply chain management ops 405
Supply chain management ops 405Supply chain management ops 405
Supply chain management ops 405
 
Developing Performance Based Work Statements
Developing Performance Based Work StatementsDeveloping Performance Based Work Statements
Developing Performance Based Work Statements
 
Krause corporation ops4505
Krause corporation ops4505Krause corporation ops4505
Krause corporation ops4505
 
Value chain thru general electric
Value chain thru general electricValue chain thru general electric
Value chain thru general electric
 
Inventory & Inflation
Inventory & InflationInventory & Inflation
Inventory & Inflation
 
Price vs quality
Price vs qualityPrice vs quality
Price vs quality
 
Best practices in_leading_change
Best practices in_leading_changeBest practices in_leading_change
Best practices in_leading_change
 
Cost, diff, responce
Cost, diff, responceCost, diff, responce
Cost, diff, responce
 
Vertical integration
Vertical integrationVertical integration
Vertical integration
 
Inventory management
Inventory managementInventory management
Inventory management
 
Operational efficiencies
Operational efficienciesOperational efficiencies
Operational efficiencies
 

Último

Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadAyesha Khan
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 

Último (20)

Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 

Jit & Lean Operations

  • 1. JIT and Lean Operations When you complete this chapter you should be able to: 1. Define just-in-time, TPS, and lean operations 2. Define the seven wastes and the 5 Ss 3. Explain JIT partnerships 4. Determine optimal setup time 16 - 1
  • 2. Learning Objectives When you complete this chapter you should be able to: 1. Define kanban 2. Compute the required number of kanbans 3. Explain the principles of the Toyota Production System 16 - 2
  • 3. JIT/Lean Operations Good production systems require that managers address three issues that are pervasive and fundamental to operations management: eliminate waste, remove variability, and improve throughput 16 - 3
  • 4. Just-In-Time, TPS, and Lean Operations  JIT is a philosophy of continuous and forced problem solving via a focus on throughput and reduced inventory  TPS emphasizes continuous improvement, respect for people, and standard work practices  Lean production supplies the customer with their exact wants when the customer wants it without waste 16 - 4
  • 5. Just-In-Time, TPS, and Lean Operations  JIT emphasizes forced problem solving  TPS emphasizes employee learning and empowerment in an assembly-line environment  Lean operations emphasize understanding the customer 16 - 5
  • 6. Eliminate Waste  Waste is anything that does not add value from the customer point of view  Storage, inspection, delay, waiting in queues, and defective products do not add value and are 100% waste 16 - 6
  • 7. Ohno’s Seven Wastes  Overproduction  Queues  Transportation  Inventory  Motion  Overprocessing  Defective products 16 - 7
  • 8. The 5 Ss  Sort/segregate – when in doubt, throw it out  Simplify/straighten – methods analysis tools  Shine/sweep – clean daily  Standardize – remove variations from processes  Sustain/self-discipline – review work and recognize progress 16 - 8
  • 9. The 5 Ss  Sort/segregate – when in doubt, throw it out  Simplify/straighten – methods analysis tools  Shine/sweep – clean daily  Two remove variations  Standardize –additional Ss from processes  Safety – build in work and recognize  Sustain/self-discipline – review good practices progress  Support/maintenance – reduce variability and unplanned downtime 16 - 9
  • 10. Remove Variability  JIT systems require managers to reduce variability caused by both internal and external factors  Variability is any deviation from the optimum process  Inventory hides variability  Less variability results in less waste 16 - 10
  • 11. Sources of Variability 1. Incomplete or inaccurate drawings or specifications 2. Poor production processes resulting in incorrect quantities, late, or non-conforming units 3. Unknown customer demands 16 - 11
  • 12. Improve Throughput  By pulling material in small lots, inventory cushions are removed, exposing problems and emphasizing continual improvement  Manufacturing cycle time is reduced  Push systems dump orders on the downstream stations regardless of the need 16 - 12
  • 13. Just-In-Time (JIT)  Powerful strategy for improving operations  Materials arrive where they are needed when they are needed  Identifying problems and driving out waste reduces costs and variability and improves throughput  Requires a meaningful buyer-supplier relationship 16 - 13
  • 14. JIT and Competitive Advantage 16 - 14
  • 15. JIT Partnerships  JIT partnerships exist when a supplier and purchaser work together to remove waste and drive down costs  Four goals of JIT partnerships are:  Removal of unnecessary activities  Removal of in-plant inventory  Removal of in-transit inventory  Improved quality and reliability 16 - 15
  • 16. JIT Partnerships 16 - 16
  • 17. JIT Layout Reduce waste due to movement JIT Layout Tactics Build work cells for families of products Include a large number operations in a small area Minimize distance Design little space for inventory Improve employee communication Use poka-yoke devices Build flexible or movable equipment Cross-train workers to add flexibility 16 - 17
  • 18. Distance Reduction  Large lots and long production lines with single-purpose machinery are being replaced by smaller flexible cells  Often U-shaped for shorter paths and improved communication  Often using group technology concepts 16 - 18
  • 19. Impact on Employees  Employees may be cross trained for flexibility and efficiency  Improved communications facilitate the passing on of important information about the process  With little or no inventory buffer, getting it right the first time is critical 16 - 19
  • 20. JIT Inventory Inventory is at the minimum level necessary to keep operations running JIT Inventory Tactics Use a pull system to move inventory Reduce lot sizes Develop just-in-time delivery systems with suppliers Deliver directly to point of use Perform to schedule Reduce setup time Use group technology 16 - 20
  • 21. Reduce Variability Inventory level Process Scrap downtime Setup Quality time problems Late deliveries 16 - 21
  • 22. Reduce Inventory  Reducing inventory uncovers the “rocks”  Problems are exposed  Ultimately there will be virtually no inventory and no problems  Shingo says “Inventory is evil” 16 - 22
  • 23. Reduce Lot Sizes Q1 When average order size = 200 average inventory is 100 200 – Inventory Q2 When average order size = 100 100 – average inventory is 50 Time 16 - 23
  • 24. Reduce Lot Sizes  Ideal situation is to have lot sizes of one pulled from one process to the next  Often not feasible  Can use EOQ analysis to calculate desired setup time  Two key changes necessary  Improve material handling  Reduce setup time 16 - 24
  • 25. Lot Size Example D= Annual demand = 400,000 units d= Daily demand = 400,000/250 = 1,600 per day p= Daily production rate = 4,000 units Q= EOQ desired = 400 H= Holding cost = $20 per unit S= Setup cost (to be determined) 2DS 2DS Q= Q = 2 H(1 - d/p) H(1 - d/p) (Q2)(H)(1 - d/p) (3,200,000)(0.6) S= 2D = 800,000 = $2.40 Setup time = $2.40/($30/hour) = 0.08 hr = 4.8 minutes 16 - 25
  • 26. Reduce Setup Costs  High setup costs encourage large lot sizes  Reducing setup costs reduces lot size and reduces average inventory  Setup time can be reduced through preparation prior to shutdown and changeover 16 - 26
  • 27. Reduce Setup Times Initial Setup Time 90 min — Separate setup into preparation and actual setup, doing as much as possible while the Step 1 machine/process is operating (save 30 minutes) 60 min — Move material closer and Step 2 improve material handling (save 20 minutes) 45 min — Standardize and Step 3 improve tooling (save 15 minutes) 25 min — Use one-touch system to eliminate Step 4 adjustments (save 10 minutes) 15 min — Training operators and standardizing 13 min — Step 5 work procedures (save 2 minutes) Step 6 Repeat cycle until subminute — setup is achieved 16 - 27
  • 28. JIT Scheduling Better scheduling improves performance JIT Scheduling Tactics Communicate schedules to suppliers Make level schedules Freeze part of the schedule Perform to schedule Seek one-piece-make and one-piece move Eliminate waste Produce in small lots Use kanbans Make each operation produce a perfect part 16 - 28
  • 29. Scheduling Small Lots JIT Level Material-Use Approach A A B B B C A A B B B C Large-Lot Approach A A A A A A B B B B B B B B B C C C Time 16 - 29
  • 30. Kanban  Kanban is the Japanese word for card  The card is an authorization for the next container of material to be produced  A sequence of kanbans pulls material through the process  Many different sorts of signals are used, but the system is still called a kanban 16 - 30
  • 31. Kanban Material/Parts Final Finished Customer Supplier assembly goods order Work cell Kanban Kanban Kanban 16 - 31
  • 32. More Kanban  When the producer and user are not in visual contact, a card can be used  When the producer and user are in visual contact, a light or flag or empty spot on the floor may be adequate  Since several components may be required, several different kanban techniques may be employed 16 - 32
  • 33. The Number of Kanban Cards or Containers  Need to know the lead time needed to produce a container of parts  Need to know the amount of safety stock needed Demand during Safety Number of kanbans lead time + stock (containers) = Size of container 16 - 33
  • 34. Number of Kanbans Example Daily demand = 500 cakes Production lead time = 2 days (Wait time + Material handling time + Processing time) Safety stock = 1/2 day Container size = 250 cakes Demand during lead time = 2 days x 500 cakes = 1,000 1,000 + 250 Number of kanbans = 250 =5 16 - 34
  • 35. Advantages of Kanban  Allow only limited amount of faulty or delayed material  Problems are immediately evident  Puts downward pressure on bad aspects of inventory  Standardized containers reduce weight, disposal costs, wasted space, and labor 16 - 35
  • 36. JIT Quality  Strong relationship  JIT cuts the cost of obtaining good quality because JIT exposes poor quality  Because lead times are shorter, quality problems are exposed sooner  Better quality means fewer buffers and allows simpler JIT systems to be used 16 - 36
  • 37. Toyota Production System  Continuous improvement  Build an organizational culture and value system that stresses improvement of all processes, kaizen  Part of everyone’s job  Respect for people  People are treated as knowledge workers  Engage mental and physical capabilities  Empower employees 16 - 37
  • 38. Toyota Production System  Standard work practice  Work shall be completely specified as to content, sequence, timing, and outcome  Internal and external customer-supplier connection are direct  Product and service flows must be simple and direct  Any improvement must be made in accordance with the scientific method at the lowest possible level of the organization 16 - 38
  • 39. Building a Lean Organization  Transitioning to a lean system can be difficult  Lean systems tend to have the following attributes  Use JIT techniques  Build systems that help employees produce perfect parts  Reduce space requirements 16 - 39
  • 40. Building a Lean Organization  Develop partnerships with suppliers  Educate suppliers  Eliminate all but value-added activities  Develop employees  Make jobs challenging  Build worker flexibility 16 - 40