SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN 
BACHELOR OF QUANTITY SURVEYING (HONOURS) 
 
 
INTEGRATED ASSIGNMENT: 
MEASUREMENT I (QSB 60104) 
CONSTRUCTION TECHNOLOGY I (BLD 60104) 
BUILDING MATERIALS (BLD 62003) 
 
 
SITE VISIT REPORT 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
STUDENT NAME :  YEO KAI WEN 
 
STUDENT ID NO.  :` 0319844 
 
DATE OF SUBMISSION  : 27.11.2015 
TABLE OF CONTENT 
 
 
No.   Title  Pages 
1  Introduction  1 
2  Objective  2 
3  Content of the site visit / Technical Observation   3 
4  Photo and Description  7 
5  Learning Outcome and Conclusion  14 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Introduction 
 
 
In this assignment, we are required to write a site visit report. This assignment is 
integrated with three modules, which are Measurement I, Building Materials and 
Construction Technology I. This site visit was held on last Thursday, which was on 19th 
of November. This site is located at Section 2A, Antara Gapi, Mukim Serendah, Hulu 
Selangor.  
 
Before we go to the site, we were told that we have to wear a proper attire such 
as wearing long pants, and sport shoes also bring a safety helmet to ensure our safety 
at the site. During that day, we gathered at Taylor’s University to take the bus and get to 
the construction site. It took us around an hour to reach the destination. 
 
After we had arrived our destination, we were briefed by the project manager 
who is Encik Mohd Sobri Bin Hj Abd Majid. The project manager gave us about 8 
minutes briefing of the safety precaution in the site as we had to walk around to observe 
the site. We had to be aware on our safety and not to fall down which can lead to injury. 
 
During that time, Encik Hafizi was in charged for explaining more details about 
the construction site. According to his information, this project consists of total 96 units 
double storeys of semi­detached houses (40’ x 60’) . It cost RM44 Million. It needs 3 
years to complete the project. The construction site had started from 8th of July 2014 
and hopefully to be complete at 4th of July 2016.  It has 4 different types of houses at 
the site which are Type 1, Type 2A, Type 2B and Type 3. There are 3 kinds of houses 
which are split up house, spilt down down and flat house. Each type of house use 
different foundation such as piling and pad footing. The reinforced concrete grade used 
for the construction site is Grade 30.  
 
 
 
 
 
  
 
 
 
 
  1 
Objectives 
 
 
The objectives of the this technical site visit : 
 
1. To understand the basics of the construction process. 
 
2. To witness the usage the of the construction equipment on site including the 
mechanical part. 
 
3. To explore and identify the various types of building materials and technology on 
site. 
 
4. To understand the construction of buildings and the scientific principles  that 
underpin the design and construction. 
 
5. To be aware the importance of personal safety in the construction site and 
understanding site conditions. 
 
6. To gain personal knowledge about the safety precautions by listening the 
professional’s briefing. 
 
7. To gain personal knowledge about the construction process by listening the 
person in­ charge’s briefing. 
 
8. To have an up­close view of the building structure as opposed to see in the 
drawings. 
 
9. To learn how to communicate and work together in a construction site with the 
professions. 
 
10.To have an experience of exposure of the actual working environment on site. 
 
 
 
 
 
 
2 
Content  / Technical Observation 
 
We arrived the construction site at around 10am. Before we enter the site,  
I noticed that there was a notice board which is project signboard placed outside of the 
site. The project signboard states that this project consists of total 96 units of double 
storeys of semi­detached house (40’ x 60’). 
The companies cooperating are : 
­ Perbadanan Kemajuan Negeri Selangor (PKNS) ​ (Developer) 
­ Zain Hamzah Architect  ​(Architect) 
­ Wawasan Bersatu Sdn Bhd  ​(Civil and Structural Engineer) 
­ ZNVA & Associated  ​(Mechanical and Electrical Engineer) 
­ MCM Associates Sdn Bhd  ​(Quantity Surveyor) 
­ AJ­Corp Sdn Bhd  ​(Contractor) 
  
The construction site is located beside the residential area which is located at 
Section 2A, Antara Gapi at Hulu Selangor. It is fenced up with vertical hoarding around 
the construction site to avoid unauthorized person to entry the site.  
 
Besides that, I can saw there are few temporary accommodation for the workers 
including a meeting room at the site. I also saw some familiar machine at the site 
construction. For example, mobile crane, excavator, concrete mixer and etc. I also can 
saw many different of materials that placed on the site which are reinforcement bars, 
part of scaffolding, formwork, cement bags, roof tiles, bricks, metal roof truss and 
others. 
 
There are 2 type of foundation for this project which are piling and pad footing. A 
foundation is a lower portion of the building that transfers the gravity load to the earth. 
There are 4 types of houses which need to build at the site which are Type 1, Type 2A, 
Type 2B and Type 3. Each type of house used different type of foundations.   
 
Type  Type of foundation  Type of house 
Type 1  Piling  Flat house 
Type 2A  Piling  Split down house 
Type 2B  Piling and Pad Footing  Split up house 
Type 3  Piling  Spilt down house 
3 
I was required to study how is the pad footing is constructed and what are the 
materials are involved in constructing a pad footing. I had gain my personal knowledge 
about the construction process by listening the person in­charge who is Encik Mohd 
Hafizi.  He had explained to us that how’s the foundations are constructed and the 
concrete grade used in this construction for pad footing. 
 
Process of the pad footing is constructed : 
­ Setting out 
­ Excavation 
­ Formwork 
­ Lean Concrete 
­ Reinforcement 
­ Concreting 
 
Material involved in constructing a  pad footing : 
­ Concrete Grade 30 
­ Reinforcement bars size in T12 and T16 
­ Lean Concrete Grade 30 
­ Formwork in plywood 
 
First and foremost, it have to do with site clearance to clear the site of the 
vegetation, brush wood, stumps of trees so that the site is clear enough to build a 
building at the site with the used of the machinery such as excavator, bulldozer and etc. 
After the site had clearance, the position of the pad footing is set up by the land 
surveyor according to the drawing plan dimension. Then, the cement powder is used to 
mark the size of the pad footing. 
 
Then, it excavate the soil for 1200mm depth by using an excavator. A formwork 
is build according to the drawing plan of the dimensions with the materials of plywood. 
This is due to plywood formwork is the most common in using the facing panel. It is 
reusable and easy to be cut into shapes at the site. The size for the wood is 2 x 3. 
 
After the formwork had built, it needs to recheck the plan for adjustment to make 
sure that the size of the pad footing is correct. Adding the studs to prevent the formwork 
falling when the concrete is being poured. 
 
 
4 
A lean concrete is poured on top of the surface of the excavated earth. The lean 
concrete should be at a layer at least 50mm thick. The concrete grade for the lean 
concrete is Grade 30. The purpose of putting the lean concrete is to provide a smooth 
surface to the foundation of the concrete. It is also to prevent direct contact of 
foundation concrete to the soil. place some spacer blocks into the formwork before the 
reinforcement bar. The spacers are used to maintain the reinforcement in their proper 
position and prevent the rebars from corrosion. 
 
Arrange the reinforcement bar like RC cage according to the drawing plan 
provided. Placed the RC cage into the formwork. The size for the reinforcement bars 
used in pad footings are T12 and T16. Erect the reinforcement for the stump, and add 
more ties to the formwork so that it able to pour the concrete with Grade 30. When the 
concrete is hard, then the formwork can be dismantle.  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
5 
 
For the materials are involving in constructing a pad footing are concrete, 
reinforcement bar, lean concrete and formwork. 
  
Formwork is a mould or a box into which wet concrete can be poured and 
compacted so that it will flow and finally set to the inner profile of the box or mould.It is a 
classic temporary structure at the construction site. For the material used for formwork 
is plywood. The advantages to use plywood formwork because it’s the most common on 
using the facing panel. It can be easily to be cut the shape on site. It is reusable. The 
wood size for plywood is 2 x 3. 
 
Concrete is the one of the very important and widely used in the construction. 
Communities around the world rely on the concrete as a safe, simple and strong 
building material. The grade of the concrete use for the pad footing is Grade 30.  
 
Lean concrete is a mix where the amount of the cement is lower than the amount 
of the liquid present in the strata. Lean concrete used to provide a level surface for the 
foundation. The purpose of putting the lean concrete is to provide a protection for the 
foundation from below the soil. The grade for the lean concrete is Grade 30. 
 
Reinforcement bar is used for concrete reinforcement in project such as 
foundation. The type of the pad footing used is T16 and T12.  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
6 
 
 
Photo and Description 
 
 
 
 
 
  Figure 1 :  
 
The project signboard had 
shown  
in front of the construction site. 
The companies cooperating in  
this project are ​Perbadanan  
Kemajuan Negeri Selangor  
(PKNS)​ (Developer)​, 
​Zain Hamzah Architect  
  (Architect)​,  
Wawasan Bersatu Sdn Bhd 
​(Civil and Structural Engineer)​, 
ZNVA & Associated 
​(Mechanical and Electrical  
Engineer)​, 
MCM Associates Sdn Bhd  
​(Quantity Surveyor)​, 
AJ­Corp Sdn Bhd ​(Contractor)​. 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
7 
Figure 2 : ​This is the​ layout map​ of the site plan. 
Figure 3 : ​Temporary accommodation : office  ​Figure 4 :  ​Vertical hoarding            ​8 
Figure 5 : ​Piling Foundation ​Figure 6 :​ Pad Footing foundation 
Figure 7 : ​Formwork in ground beam  Figure 8 : ​Cement bags 
 
 
 
 
 
 
 
9 
 
Figure 9​ : Concrete Mixer ​Figure 10 : ​Lorry 
 
Figure 11 : Mobile Crane ​Figure 12 :​Compactors 
 
 
 
10 
 
Figure 13 : Split up house Figure 14 : Flat house 
 
Figure 15 : Split down house ​Figure 16 : ​The worker tie the stirrup  
           with the wire equally. 
 
 
 
11 
 
 
 
 
Figure 17 :​ Independent scaffolding installed  ​Figure 18 : ​Metal Roof truss on the ground 
          on site. 
Figure 19 :​BRC on the ground ​Figure 20 :​ Metal scaffolding  
          scattering around without  
          properly 
 
12 
Figure 21 :​ Had a photo with the project manager, Encik Mohd Sobri Bin Hj Abd. Majid. 
 
Figure 22 : ​Had a photo with Encik Hafizi  ​Figure 23 :​ Had a group photo with my  
          coursemates  
13 
Learning Outcome and Conclusion 
 
 
Throughout this site visit, it was a great experience for me for being the first time 
to visit this kind of construction site. It was great opportunity for me to experience it, it 
gains me extra information of the knowledge about how is the foundation of pad footing 
and piling constructed, material used for the pad footing, types of the houses such as 
split up house, split down house and identify the machinery and so on. I found out that 
safety is important in the construction site. I learnt that we have to be patient , aware 
and careful due to the weather condition also the risk will be happen on the site. 
 
I able to identify various types of the building materials and technology on the 
construction site such as concrete, clay, reinforcement bars, bricks, roof, machineries 
and so on. Besides that, I had understand the basics of the construction process.  
I understand the scientific principles and the construction of the buildings that had 
underpin the design and construction.   
 
I think that this experience is good for me because it an unique experience to 
have an exposure to the actual working environment on the construction site.  
This helped me to have a better understanding what am I going to face in the future as 
a Quantity Surveyor.  This site visit was benefits to me and I hope that I could have 
more practical knowledge to prepare for my working in future. 
 
 
 
 
 
 
 
 
 
14 

Más contenido relacionado

La actualidad más candente

Site visit report
Site visit reportSite visit report
Site visit reportJıa Yıı
 
Site Visit Report CT BM M1
Site Visit Report CT BM M1Site Visit Report CT BM M1
Site Visit Report CT BM M1Zi Shan
 
Construction Materials site visit report
Construction Materials site visit report Construction Materials site visit report
Construction Materials site visit report Batoul Alshamali
 
Building construction
Building constructionBuilding construction
Building constructionnhmurad
 
BUILDING FAILURE- FOUNDATION FAILURE
BUILDING FAILURE- FOUNDATION FAILURE BUILDING FAILURE- FOUNDATION FAILURE
BUILDING FAILURE- FOUNDATION FAILURE VISHNU VIJAYAN
 
SITE VISIT REPORT
SITE VISIT REPORTSITE VISIT REPORT
SITE VISIT REPORTWan Nee
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit ReportZIyeeTan
 
Site report for Measurement 1
Site report for Measurement 1Site report for Measurement 1
Site report for Measurement 1Yap Xin
 
Residential building construction ppt
Residential building construction pptResidential building construction ppt
Residential building construction pptBeing Deepak
 
Site visit report 2017
Site visit report 2017Site visit report 2017
Site visit report 2017bee_by
 
Industrial Training Report of Construction Site in Civil Engineering
Industrial Training Report of Construction Site in Civil EngineeringIndustrial Training Report of Construction Site in Civil Engineering
Industrial Training Report of Construction Site in Civil EngineeringRAVI KUMAR
 
FOOTING CONSTRUCTION
FOOTING CONSTRUCTIONFOOTING CONSTRUCTION
FOOTING CONSTRUCTIONMd Shadab
 
Visit to a construction site
Visit to a construction siteVisit to a construction site
Visit to a construction siteUmair Ali
 
Construction work of a multi storied residential building
Construction work of a multi storied residential buildingConstruction work of a multi storied residential building
Construction work of a multi storied residential buildingShariful Haque Robin
 
PRESENTATION ON SUMMER INTERNSHIP ON MULTISTOREY BUILDING CONSTRUCTION
PRESENTATION ON SUMMER INTERNSHIP ON MULTISTOREY BUILDING CONSTRUCTION PRESENTATION ON SUMMER INTERNSHIP ON MULTISTOREY BUILDING CONSTRUCTION
PRESENTATION ON SUMMER INTERNSHIP ON MULTISTOREY BUILDING CONSTRUCTION Ved Jangid
 
Summer training report in civil engineering
Summer training report in civil engineeringSummer training report in civil engineering
Summer training report in civil engineeringalok0025
 
Building Construction 1 : Experience construction; a building construction re...
Building Construction 1 : Experience construction; a building construction re...Building Construction 1 : Experience construction; a building construction re...
Building Construction 1 : Experience construction; a building construction re...aarenneoone
 
site visit report (final)
site visit report (final)site visit report (final)
site visit report (final)Jia Hong Mui
 

La actualidad más candente (20)

Site visit report
Site visit reportSite visit report
Site visit report
 
Site Visit Report CT BM M1
Site Visit Report CT BM M1Site Visit Report CT BM M1
Site Visit Report CT BM M1
 
Construction Materials site visit report
Construction Materials site visit report Construction Materials site visit report
Construction Materials site visit report
 
Building construction
Building constructionBuilding construction
Building construction
 
BUILDING FAILURE- FOUNDATION FAILURE
BUILDING FAILURE- FOUNDATION FAILURE BUILDING FAILURE- FOUNDATION FAILURE
BUILDING FAILURE- FOUNDATION FAILURE
 
Bcon
BconBcon
Bcon
 
SITE VISIT REPORT
SITE VISIT REPORTSITE VISIT REPORT
SITE VISIT REPORT
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit Report
 
Site report for Measurement 1
Site report for Measurement 1Site report for Measurement 1
Site report for Measurement 1
 
Residential building construction ppt
Residential building construction pptResidential building construction ppt
Residential building construction ppt
 
Site visit report 2017
Site visit report 2017Site visit report 2017
Site visit report 2017
 
Industrial Training Report of Construction Site in Civil Engineering
Industrial Training Report of Construction Site in Civil EngineeringIndustrial Training Report of Construction Site in Civil Engineering
Industrial Training Report of Construction Site in Civil Engineering
 
Site visit report
Site visit reportSite visit report
Site visit report
 
FOOTING CONSTRUCTION
FOOTING CONSTRUCTIONFOOTING CONSTRUCTION
FOOTING CONSTRUCTION
 
Visit to a construction site
Visit to a construction siteVisit to a construction site
Visit to a construction site
 
Construction work of a multi storied residential building
Construction work of a multi storied residential buildingConstruction work of a multi storied residential building
Construction work of a multi storied residential building
 
PRESENTATION ON SUMMER INTERNSHIP ON MULTISTOREY BUILDING CONSTRUCTION
PRESENTATION ON SUMMER INTERNSHIP ON MULTISTOREY BUILDING CONSTRUCTION PRESENTATION ON SUMMER INTERNSHIP ON MULTISTOREY BUILDING CONSTRUCTION
PRESENTATION ON SUMMER INTERNSHIP ON MULTISTOREY BUILDING CONSTRUCTION
 
Summer training report in civil engineering
Summer training report in civil engineeringSummer training report in civil engineering
Summer training report in civil engineering
 
Building Construction 1 : Experience construction; a building construction re...
Building Construction 1 : Experience construction; a building construction re...Building Construction 1 : Experience construction; a building construction re...
Building Construction 1 : Experience construction; a building construction re...
 
site visit report (final)
site visit report (final)site visit report (final)
site visit report (final)
 

Destacado

Technical site visit report
Technical site visit reportTechnical site visit report
Technical site visit reportMomo Poyi
 
Building Construction Project 1 Shelter Report
Building Construction Project 1 Shelter ReportBuilding Construction Project 1 Shelter Report
Building Construction Project 1 Shelter ReportJoyeeLee0131
 
Site visit report
Site visit reportSite visit report
Site visit reportJordon Wong
 
Building construction 2 project 1 report
Building construction 2 project 1 reportBuilding construction 2 project 1 report
Building construction 2 project 1 reportOng Seng Peng Jeff
 
building construction project 1 report
building construction project 1 reportbuilding construction project 1 report
building construction project 1 reportYq Chong
 
Site visit report
Site visit report Site visit report
Site visit report Liming Hiew
 
Assignment 2 - Jaya Shopping Centre
Assignment 2 - Jaya Shopping CentreAssignment 2 - Jaya Shopping Centre
Assignment 2 - Jaya Shopping CentreKai Yun Pang
 
Building construction report
Building construction reportBuilding construction report
Building construction reportSoh Shing
 
Assignment 1 - Site Visit Report
Assignment 1 - Site Visit ReportAssignment 1 - Site Visit Report
Assignment 1 - Site Visit ReportKai Yun Pang
 
Fifth year report bc
Fifth year report bcFifth year report bc
Fifth year report bcRohit Digra
 
Site visit report.
Site visit report.Site visit report.
Site visit report.Man Yee
 
Building Construction 2 Project 1 Report
Building Construction 2 Project 1 ReportBuilding Construction 2 Project 1 Report
Building Construction 2 Project 1 Reporthiewyennee
 
Building Construction Analysis Report
Building Construction Analysis ReportBuilding Construction Analysis Report
Building Construction Analysis ReportDaniel Yap
 
Building construction I project 1 report
Building construction I project 1 reportBuilding construction I project 1 report
Building construction I project 1 reportAmos Tan
 
Building Construction Report
Building Construction ReportBuilding Construction Report
Building Construction ReportSheau Hui Tan
 
Multi story building construction training report anshul
Multi story building construction training report anshulMulti story building construction training report anshul
Multi story building construction training report anshulAnshul Shakya
 
Building construction ii report (1)
Building construction ii report  (1)Building construction ii report  (1)
Building construction ii report (1)Chong jiayi
 
Building Construction Project 01 Final Report
Building Construction Project 01 Final ReportBuilding Construction Project 01 Final Report
Building Construction Project 01 Final ReportjolynnTJL
 
BUILDING CONSTRUCTION 2 ; PROJECT 1 REPORT
BUILDING CONSTRUCTION 2 ; PROJECT 1 REPORTBUILDING CONSTRUCTION 2 ; PROJECT 1 REPORT
BUILDING CONSTRUCTION 2 ; PROJECT 1 REPORTDarshiini Vig
 

Destacado (20)

Technical site visit report
Technical site visit reportTechnical site visit report
Technical site visit report
 
Building Construction Project 1 Shelter Report
Building Construction Project 1 Shelter ReportBuilding Construction Project 1 Shelter Report
Building Construction Project 1 Shelter Report
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Building construction 2 project 1 report
Building construction 2 project 1 reportBuilding construction 2 project 1 report
Building construction 2 project 1 report
 
building construction project 1 report
building construction project 1 reportbuilding construction project 1 report
building construction project 1 report
 
Site visit report
Site visit report Site visit report
Site visit report
 
Assignment 2 - Jaya Shopping Centre
Assignment 2 - Jaya Shopping CentreAssignment 2 - Jaya Shopping Centre
Assignment 2 - Jaya Shopping Centre
 
Building construction report
Building construction reportBuilding construction report
Building construction report
 
Assignment 1 - Site Visit Report
Assignment 1 - Site Visit ReportAssignment 1 - Site Visit Report
Assignment 1 - Site Visit Report
 
Fifth year report bc
Fifth year report bcFifth year report bc
Fifth year report bc
 
Site visit report.
Site visit report.Site visit report.
Site visit report.
 
Building Construction 2 Project 1 Report
Building Construction 2 Project 1 ReportBuilding Construction 2 Project 1 Report
Building Construction 2 Project 1 Report
 
Building Construction Analysis Report
Building Construction Analysis ReportBuilding Construction Analysis Report
Building Construction Analysis Report
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Building construction I project 1 report
Building construction I project 1 reportBuilding construction I project 1 report
Building construction I project 1 report
 
Building Construction Report
Building Construction ReportBuilding Construction Report
Building Construction Report
 
Multi story building construction training report anshul
Multi story building construction training report anshulMulti story building construction training report anshul
Multi story building construction training report anshul
 
Building construction ii report (1)
Building construction ii report  (1)Building construction ii report  (1)
Building construction ii report (1)
 
Building Construction Project 01 Final Report
Building Construction Project 01 Final ReportBuilding Construction Project 01 Final Report
Building Construction Project 01 Final Report
 
BUILDING CONSTRUCTION 2 ; PROJECT 1 REPORT
BUILDING CONSTRUCTION 2 ; PROJECT 1 REPORTBUILDING CONSTRUCTION 2 ; PROJECT 1 REPORT
BUILDING CONSTRUCTION 2 ; PROJECT 1 REPORT
 

Similar a Site Visit report- Measurement I, Building materials, Construction Technology I

Integrated assignment m1 ct1 and bm aug2015
Integrated assignment m1 ct1 and bm aug2015Integrated assignment m1 ct1 and bm aug2015
Integrated assignment m1 ct1 and bm aug2015jordanlim96
 
Integrated assignment m1 ct1 and bm aug2015
Integrated assignment m1 ct1 and bm aug2015Integrated assignment m1 ct1 and bm aug2015
Integrated assignment m1 ct1 and bm aug2015KhangWei Chin
 
Integrated assignment m1 ct1 and bm aug2015
Integrated assignment m1 ct1 and bm aug2015Integrated assignment m1 ct1 and bm aug2015
Integrated assignment m1 ct1 and bm aug2015Est
 
Integrated assignment m1 ct1 and bm aug2015
Integrated assignment m1 ct1 and bm aug2015Integrated assignment m1 ct1 and bm aug2015
Integrated assignment m1 ct1 and bm aug2015Lam Wee
 
CT, BM & MEASUREMENT Report
CT, BM & MEASUREMENT ReportCT, BM & MEASUREMENT Report
CT, BM & MEASUREMENT Reporttianji96
 
Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016Darrentqn
 
Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016Louise Foong
 
Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016Areeb Amirullah
 
Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016Nicole Thain
 
(BRICK WALL) Integrated assignment m1 ct1 and bm mac 2016
(BRICK WALL) Integrated assignment m1 ct1 and bm mac 2016(BRICK WALL) Integrated assignment m1 ct1 and bm mac 2016
(BRICK WALL) Integrated assignment m1 ct1 and bm mac 2016Sheng Zhe
 
Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016Lam Wee
 
Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016Lin Hui
 
Site visit report
Site visit reportSite visit report
Site visit reportwleying
 
Site Visit Report - Chin Kian Hon & Chong Gia Xao
Site Visit Report - Chin Kian Hon & Chong Gia XaoSite Visit Report - Chin Kian Hon & Chong Gia Xao
Site Visit Report - Chin Kian Hon & Chong Gia XaoChin Kian Hon
 
Site visit report
Site visit reportSite visit report
Site visit reportEyelynLee
 
Integrated site vite report
Integrated site vite reportIntegrated site vite report
Integrated site vite reportxennechau
 
INTEGRATED ASSIGNMENT - CT BM M
INTEGRATED ASSIGNMENT - CT BM MINTEGRATED ASSIGNMENT - CT BM M
INTEGRATED ASSIGNMENT - CT BM MWan Nee
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit ReportXinYee Khoo
 

Similar a Site Visit report- Measurement I, Building materials, Construction Technology I (20)

Integrated assignment m1 ct1 and bm aug2015
Integrated assignment m1 ct1 and bm aug2015Integrated assignment m1 ct1 and bm aug2015
Integrated assignment m1 ct1 and bm aug2015
 
Integrated assignment m1 ct1 and bm aug2015
Integrated assignment m1 ct1 and bm aug2015Integrated assignment m1 ct1 and bm aug2015
Integrated assignment m1 ct1 and bm aug2015
 
Integrated assignment m1 ct1 and bm aug2015
Integrated assignment m1 ct1 and bm aug2015Integrated assignment m1 ct1 and bm aug2015
Integrated assignment m1 ct1 and bm aug2015
 
Integrated assignment m1 ct1 and bm aug2015
Integrated assignment m1 ct1 and bm aug2015Integrated assignment m1 ct1 and bm aug2015
Integrated assignment m1 ct1 and bm aug2015
 
CT, BM & MEASUREMENT Report
CT, BM & MEASUREMENT ReportCT, BM & MEASUREMENT Report
CT, BM & MEASUREMENT Report
 
Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016
 
Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016
 
Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016
 
Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016
 
(BRICK WALL) Integrated assignment m1 ct1 and bm mac 2016
(BRICK WALL) Integrated assignment m1 ct1 and bm mac 2016(BRICK WALL) Integrated assignment m1 ct1 and bm mac 2016
(BRICK WALL) Integrated assignment m1 ct1 and bm mac 2016
 
Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016
 
Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Site Visit Report - Chin Kian Hon & Chong Gia Xao
Site Visit Report - Chin Kian Hon & Chong Gia XaoSite Visit Report - Chin Kian Hon & Chong Gia Xao
Site Visit Report - Chin Kian Hon & Chong Gia Xao
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Integrated site vite report
Integrated site vite reportIntegrated site vite report
Integrated site vite report
 
Site report
Site reportSite report
Site report
 
Site Report
Site ReportSite Report
Site Report
 
INTEGRATED ASSIGNMENT - CT BM M
INTEGRATED ASSIGNMENT - CT BM MINTEGRATED ASSIGNMENT - CT BM M
INTEGRATED ASSIGNMENT - CT BM M
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit Report
 

Más de kaiwenyeo

FNBE 0814- ITD -1A
FNBE 0814- ITD -1AFNBE 0814- ITD -1A
FNBE 0814- ITD -1Akaiwenyeo
 
FNBE 0814 - INTRODUCTION TO DESIGN -DPJ 04
FNBE 0814 - INTRODUCTION TO DESIGN -DPJ 04FNBE 0814 - INTRODUCTION TO DESIGN -DPJ 04
FNBE 0814 - INTRODUCTION TO DESIGN -DPJ 04kaiwenyeo
 
FNBE 0814 - ITD -Class tutorial 2
FNBE 0814 - ITD -Class tutorial 2FNBE 0814 - ITD -Class tutorial 2
FNBE 0814 - ITD -Class tutorial 2kaiwenyeo
 
FNBE 0814 -ITD Class tutorial 1
FNBE 0814 -ITD Class tutorial 1FNBE 0814 -ITD Class tutorial 1
FNBE 0814 -ITD Class tutorial 1kaiwenyeo
 
FNBE 0814- INTRODUCTION TO DESIGN- DPJ3
FNBE 0814- INTRODUCTION TO DESIGN- DPJ3FNBE 0814- INTRODUCTION TO DESIGN- DPJ3
FNBE 0814- INTRODUCTION TO DESIGN- DPJ3kaiwenyeo
 
BUSINESS CLASS ACTIVITY 1
BUSINESS CLASS ACTIVITY 1BUSINESS CLASS ACTIVITY 1
BUSINESS CLASS ACTIVITY 1kaiwenyeo
 
FNBE 0814-ECONOMICS-REPORT
FNBE 0814-ECONOMICS-REPORTFNBE 0814-ECONOMICS-REPORT
FNBE 0814-ECONOMICS-REPORTkaiwenyeo
 
FNBE 0814- ECONOMICS- ASSIGNMENT 1
FNBE 0814- ECONOMICS- ASSIGNMENT 1FNBE 0814- ECONOMICS- ASSIGNMENT 1
FNBE 0814- ECONOMICS- ASSIGNMENT 1kaiwenyeo
 
FNBE 0814- SOCIAL PSYCHOLOGY- PROJECT BRIEF
FNBE 0814- SOCIAL PSYCHOLOGY- PROJECT BRIEFFNBE 0814- SOCIAL PSYCHOLOGY- PROJECT BRIEF
FNBE 0814- SOCIAL PSYCHOLOGY- PROJECT BRIEFkaiwenyeo
 
FNBE 0814- SOCIAL PSYCHOLOGY- ASSESMENT
FNBE 0814- SOCIAL PSYCHOLOGY- ASSESMENTFNBE 0814- SOCIAL PSYCHOLOGY- ASSESMENT
FNBE 0814- SOCIAL PSYCHOLOGY- ASSESMENTkaiwenyeo
 
FNBE 0814- INTRODUCTION TO BUSINESS- BUSINESS REPORT
FNBE 0814- INTRODUCTION TO BUSINESS- BUSINESS REPORTFNBE 0814- INTRODUCTION TO BUSINESS- BUSINESS REPORT
FNBE 0814- INTRODUCTION TO BUSINESS- BUSINESS REPORTkaiwenyeo
 
FNBE 0814- INTRODUCTION TO BUSINESS- FINAL ASSIGNMENT
FNBE 0814- INTRODUCTION TO BUSINESS- FINAL ASSIGNMENTFNBE 0814- INTRODUCTION TO BUSINESS- FINAL ASSIGNMENT
FNBE 0814- INTRODUCTION TO BUSINESS- FINAL ASSIGNMENTkaiwenyeo
 
FNBE 0814- EFFECTIVE PUBLIC COMMUNICATION - PROJECT 3-
FNBE 0814- EFFECTIVE PUBLIC COMMUNICATION - PROJECT 3- FNBE 0814- EFFECTIVE PUBLIC COMMUNICATION - PROJECT 3-
FNBE 0814- EFFECTIVE PUBLIC COMMUNICATION - PROJECT 3- kaiwenyeo
 
FNBE 0814- EFFECTIVE PUBLIC COMMUNICATION - PROJECT 2- MURAL ART
FNBE 0814- EFFECTIVE PUBLIC COMMUNICATION - PROJECT 2- MURAL ARTFNBE 0814- EFFECTIVE PUBLIC COMMUNICATION - PROJECT 2- MURAL ART
FNBE 0814- EFFECTIVE PUBLIC COMMUNICATION - PROJECT 2- MURAL ARTkaiwenyeo
 
FNBE 0814- EFFECTIVE PUBLIC COMMUNICATION- PROJECT 1-PHOTO BLOG
FNBE 0814- EFFECTIVE PUBLIC COMMUNICATION- PROJECT 1-PHOTO BLOGFNBE 0814- EFFECTIVE PUBLIC COMMUNICATION- PROJECT 1-PHOTO BLOG
FNBE 0814- EFFECTIVE PUBLIC COMMUNICATION- PROJECT 1-PHOTO BLOGkaiwenyeo
 
FNBE 0814- ENGLISH II- ASSIGNMENT 2-REPORT
FNBE 0814- ENGLISH II- ASSIGNMENT 2-REPORTFNBE 0814- ENGLISH II- ASSIGNMENT 2-REPORT
FNBE 0814- ENGLISH II- ASSIGNMENT 2-REPORTkaiwenyeo
 
FNBE0814- SOCIAL PSYCHOLOGY- ASSIGNMENT 1
FNBE0814- SOCIAL PSYCHOLOGY- ASSIGNMENT 1FNBE0814- SOCIAL PSYCHOLOGY- ASSIGNMENT 1
FNBE0814- SOCIAL PSYCHOLOGY- ASSIGNMENT 1kaiwenyeo
 
FNBE 0814- Social Psychology - Assignment 3- Report
FNBE 0814- Social Psychology - Assignment 3- ReportFNBE 0814- Social Psychology - Assignment 3- Report
FNBE 0814- Social Psychology - Assignment 3- Reportkaiwenyeo
 
FNBE 0814- Social Psychology- Assignment 2
FNBE 0814- Social Psychology- Assignment 2FNBE 0814- Social Psychology- Assignment 2
FNBE 0814- Social Psychology- Assignment 2kaiwenyeo
 

Más de kaiwenyeo (20)

Itd final
Itd finalItd final
Itd final
 
FNBE 0814- ITD -1A
FNBE 0814- ITD -1AFNBE 0814- ITD -1A
FNBE 0814- ITD -1A
 
FNBE 0814 - INTRODUCTION TO DESIGN -DPJ 04
FNBE 0814 - INTRODUCTION TO DESIGN -DPJ 04FNBE 0814 - INTRODUCTION TO DESIGN -DPJ 04
FNBE 0814 - INTRODUCTION TO DESIGN -DPJ 04
 
FNBE 0814 - ITD -Class tutorial 2
FNBE 0814 - ITD -Class tutorial 2FNBE 0814 - ITD -Class tutorial 2
FNBE 0814 - ITD -Class tutorial 2
 
FNBE 0814 -ITD Class tutorial 1
FNBE 0814 -ITD Class tutorial 1FNBE 0814 -ITD Class tutorial 1
FNBE 0814 -ITD Class tutorial 1
 
FNBE 0814- INTRODUCTION TO DESIGN- DPJ3
FNBE 0814- INTRODUCTION TO DESIGN- DPJ3FNBE 0814- INTRODUCTION TO DESIGN- DPJ3
FNBE 0814- INTRODUCTION TO DESIGN- DPJ3
 
BUSINESS CLASS ACTIVITY 1
BUSINESS CLASS ACTIVITY 1BUSINESS CLASS ACTIVITY 1
BUSINESS CLASS ACTIVITY 1
 
FNBE 0814-ECONOMICS-REPORT
FNBE 0814-ECONOMICS-REPORTFNBE 0814-ECONOMICS-REPORT
FNBE 0814-ECONOMICS-REPORT
 
FNBE 0814- ECONOMICS- ASSIGNMENT 1
FNBE 0814- ECONOMICS- ASSIGNMENT 1FNBE 0814- ECONOMICS- ASSIGNMENT 1
FNBE 0814- ECONOMICS- ASSIGNMENT 1
 
FNBE 0814- SOCIAL PSYCHOLOGY- PROJECT BRIEF
FNBE 0814- SOCIAL PSYCHOLOGY- PROJECT BRIEFFNBE 0814- SOCIAL PSYCHOLOGY- PROJECT BRIEF
FNBE 0814- SOCIAL PSYCHOLOGY- PROJECT BRIEF
 
FNBE 0814- SOCIAL PSYCHOLOGY- ASSESMENT
FNBE 0814- SOCIAL PSYCHOLOGY- ASSESMENTFNBE 0814- SOCIAL PSYCHOLOGY- ASSESMENT
FNBE 0814- SOCIAL PSYCHOLOGY- ASSESMENT
 
FNBE 0814- INTRODUCTION TO BUSINESS- BUSINESS REPORT
FNBE 0814- INTRODUCTION TO BUSINESS- BUSINESS REPORTFNBE 0814- INTRODUCTION TO BUSINESS- BUSINESS REPORT
FNBE 0814- INTRODUCTION TO BUSINESS- BUSINESS REPORT
 
FNBE 0814- INTRODUCTION TO BUSINESS- FINAL ASSIGNMENT
FNBE 0814- INTRODUCTION TO BUSINESS- FINAL ASSIGNMENTFNBE 0814- INTRODUCTION TO BUSINESS- FINAL ASSIGNMENT
FNBE 0814- INTRODUCTION TO BUSINESS- FINAL ASSIGNMENT
 
FNBE 0814- EFFECTIVE PUBLIC COMMUNICATION - PROJECT 3-
FNBE 0814- EFFECTIVE PUBLIC COMMUNICATION - PROJECT 3- FNBE 0814- EFFECTIVE PUBLIC COMMUNICATION - PROJECT 3-
FNBE 0814- EFFECTIVE PUBLIC COMMUNICATION - PROJECT 3-
 
FNBE 0814- EFFECTIVE PUBLIC COMMUNICATION - PROJECT 2- MURAL ART
FNBE 0814- EFFECTIVE PUBLIC COMMUNICATION - PROJECT 2- MURAL ARTFNBE 0814- EFFECTIVE PUBLIC COMMUNICATION - PROJECT 2- MURAL ART
FNBE 0814- EFFECTIVE PUBLIC COMMUNICATION - PROJECT 2- MURAL ART
 
FNBE 0814- EFFECTIVE PUBLIC COMMUNICATION- PROJECT 1-PHOTO BLOG
FNBE 0814- EFFECTIVE PUBLIC COMMUNICATION- PROJECT 1-PHOTO BLOGFNBE 0814- EFFECTIVE PUBLIC COMMUNICATION- PROJECT 1-PHOTO BLOG
FNBE 0814- EFFECTIVE PUBLIC COMMUNICATION- PROJECT 1-PHOTO BLOG
 
FNBE 0814- ENGLISH II- ASSIGNMENT 2-REPORT
FNBE 0814- ENGLISH II- ASSIGNMENT 2-REPORTFNBE 0814- ENGLISH II- ASSIGNMENT 2-REPORT
FNBE 0814- ENGLISH II- ASSIGNMENT 2-REPORT
 
FNBE0814- SOCIAL PSYCHOLOGY- ASSIGNMENT 1
FNBE0814- SOCIAL PSYCHOLOGY- ASSIGNMENT 1FNBE0814- SOCIAL PSYCHOLOGY- ASSIGNMENT 1
FNBE0814- SOCIAL PSYCHOLOGY- ASSIGNMENT 1
 
FNBE 0814- Social Psychology - Assignment 3- Report
FNBE 0814- Social Psychology - Assignment 3- ReportFNBE 0814- Social Psychology - Assignment 3- Report
FNBE 0814- Social Psychology - Assignment 3- Report
 
FNBE 0814- Social Psychology- Assignment 2
FNBE 0814- Social Psychology- Assignment 2FNBE 0814- Social Psychology- Assignment 2
FNBE 0814- Social Psychology- Assignment 2
 

Último

办昆士兰大学UQ毕业证书/成绩单GPA修改 - 留学买假毕业证
办昆士兰大学UQ毕业证书/成绩单GPA修改 - 留学买假毕业证办昆士兰大学UQ毕业证书/成绩单GPA修改 - 留学买假毕业证
办昆士兰大学UQ毕业证书/成绩单GPA修改 - 留学买假毕业证0622mpom
 
Viet Nam Inclusive Business Accreditation System
Viet Nam Inclusive Business Accreditation SystemViet Nam Inclusive Business Accreditation System
Viet Nam Inclusive Business Accreditation SystemTri Dung, Tran
 
Entrepreneur street first Edition is now out
Entrepreneur street first Edition is now outEntrepreneur street first Edition is now out
Entrepreneur street first Edition is now outentrepreneur street
 
NEON LIGHT CITY pitch deck for AR PC GAME
NEON LIGHT CITY pitch deck for AR PC GAMENEON LIGHT CITY pitch deck for AR PC GAME
NEON LIGHT CITY pitch deck for AR PC GAMEtess51
 
Authentic No 1 Amil Baba In Pakistan Amil Baba In Faisalabad Amil Baba In Kar...
Authentic No 1 Amil Baba In Pakistan Amil Baba In Faisalabad Amil Baba In Kar...Authentic No 1 Amil Baba In Pakistan Amil Baba In Faisalabad Amil Baba In Kar...
Authentic No 1 Amil Baba In Pakistan Amil Baba In Faisalabad Amil Baba In Kar...Authentic No 1 Amil Baba In Pakistan
 
Role of social media marketing in digital marketing.pdf
Role of social media marketing in digital marketing.pdfRole of social media marketing in digital marketing.pdf
Role of social media marketing in digital marketing.pdftopsearchexperts
 
Driving Bangladesh's Growth: Demand Soars for Quality Supply Chain Managers.pptx
Driving Bangladesh's Growth: Demand Soars for Quality Supply Chain Managers.pptxDriving Bangladesh's Growth: Demand Soars for Quality Supply Chain Managers.pptx
Driving Bangladesh's Growth: Demand Soars for Quality Supply Chain Managers.pptxPraloy Chowdhury
 
blank inception deck powerpoint template
blank inception deck powerpoint templateblank inception deck powerpoint template
blank inception deck powerpoint templatericardojunco4
 

Último (11)

办昆士兰大学UQ毕业证书/成绩单GPA修改 - 留学买假毕业证
办昆士兰大学UQ毕业证书/成绩单GPA修改 - 留学买假毕业证办昆士兰大学UQ毕业证书/成绩单GPA修改 - 留学买假毕业证
办昆士兰大学UQ毕业证书/成绩单GPA修改 - 留学买假毕业证
 
Viet Nam Inclusive Business Accreditation System
Viet Nam Inclusive Business Accreditation SystemViet Nam Inclusive Business Accreditation System
Viet Nam Inclusive Business Accreditation System
 
Entrepreneur street first Edition is now out
Entrepreneur street first Edition is now outEntrepreneur street first Edition is now out
Entrepreneur street first Edition is now out
 
Why Powderless DTF Printer is T-shirt Printing Game Changer.pptx
Why Powderless DTF Printer is T-shirt Printing Game Changer.pptxWhy Powderless DTF Printer is T-shirt Printing Game Changer.pptx
Why Powderless DTF Printer is T-shirt Printing Game Changer.pptx
 
young call girls in kailash Nagar, 🔝 9953056974 🔝 escort Service
young call girls in kailash Nagar, 🔝 9953056974 🔝 escort Serviceyoung call girls in kailash Nagar, 🔝 9953056974 🔝 escort Service
young call girls in kailash Nagar, 🔝 9953056974 🔝 escort Service
 
NEON LIGHT CITY pitch deck for AR PC GAME
NEON LIGHT CITY pitch deck for AR PC GAMENEON LIGHT CITY pitch deck for AR PC GAME
NEON LIGHT CITY pitch deck for AR PC GAME
 
Authentic No 1 Amil Baba In Pakistan Amil Baba In Faisalabad Amil Baba In Kar...
Authentic No 1 Amil Baba In Pakistan Amil Baba In Faisalabad Amil Baba In Kar...Authentic No 1 Amil Baba In Pakistan Amil Baba In Faisalabad Amil Baba In Kar...
Authentic No 1 Amil Baba In Pakistan Amil Baba In Faisalabad Amil Baba In Kar...
 
Role of social media marketing in digital marketing.pdf
Role of social media marketing in digital marketing.pdfRole of social media marketing in digital marketing.pdf
Role of social media marketing in digital marketing.pdf
 
Hot Sexy call girls in Rajouri Garden🔝 9953056974 🔝 Delhi escort Service
Hot Sexy call girls in  Rajouri Garden🔝 9953056974 🔝 Delhi escort ServiceHot Sexy call girls in  Rajouri Garden🔝 9953056974 🔝 Delhi escort Service
Hot Sexy call girls in Rajouri Garden🔝 9953056974 🔝 Delhi escort Service
 
Driving Bangladesh's Growth: Demand Soars for Quality Supply Chain Managers.pptx
Driving Bangladesh's Growth: Demand Soars for Quality Supply Chain Managers.pptxDriving Bangladesh's Growth: Demand Soars for Quality Supply Chain Managers.pptx
Driving Bangladesh's Growth: Demand Soars for Quality Supply Chain Managers.pptx
 
blank inception deck powerpoint template
blank inception deck powerpoint templateblank inception deck powerpoint template
blank inception deck powerpoint template
 

Site Visit report- Measurement I, Building materials, Construction Technology I