Six Sigma DMAIC Project




                                                   Gillette



                                  Project Leader/Green Belt: Ilya Rubinshteyn
                                Project Leader Title: Desk Side Support Engineer
                                       Project Start Date: July 24th, 2003

Master Black Belt: Steven Bonacorsi
Six Sigma in Action
                                                           IMAC – General Workstation-PC Setup

 Customer Profile – 1700 Gillette Employees at Prudential and Copley in                                                      Before
 Boston, MA, 2200 users In SBMC, 170 users in Woburn, 300 users at AMC,                                  UCL

 500 Users in Bethel, CT, and about 500 in the field.                                   150
 Business Problem & Impact
 Gillette employees submitting cases through Help Desk have to wait                                                               Z_ST = 0.78




                                                                            Frequency
                                                                                        100
 about 12 hours before they are contacted by Desk side Support, resulting
 in a tremendous amount of down time.
                                                                                        50
 Measure & Analyze
 Data Collection: Time it took to complete a PC setup for the user after
 case was opened in Clarify. The existing process sigma was 0.11.                          0

 Root Causes: Lack of technician training was identified as the root                                     0                 5000
                                                                                                                     opentime(mins)
                                                                                                                                            10000

 cause.
 Improve & Control                                                                                                          After
 • IMAC case creation and completion process was completely                                                                                         USL
 overhauled, process maps were created and distributed to technicians
 • IMAC teams were created to enhance specialization and performance
 • Appropriate training for faster PC setup process completed, and                              20                           Z_ST = 4.69
 methods for handling were implemented. Clarify metrics are reviewed




                                                                                         Frequency
 weekly.
Results/Benefits                                                                                10
 ITS Productivity Savings = $21,000 Annually
 Customer Productivity Savings = $2,730,000 Annually
• Improving process from 4122 to 222 minutes, to meet customer CTQ                                   0

<= 1800 minutes!                                                                                             0   200 400 600 800 100012001400160018002000
                                                                                                                          Rtime (Minutes)




                         PC Setup time is Critical to Clients!! $2.7M

Más contenido relacionado

Similar a Gillette Six Sigma Case Study

Cisco Connect 2018 Thailand - Introducing cisco dna assurance the future of n...
Cisco Connect 2018 Thailand - Introducing cisco dna assurance the future of n...Cisco Connect 2018 Thailand - Introducing cisco dna assurance the future of n...
Cisco Connect 2018 Thailand - Introducing cisco dna assurance the future of n...NetworkCollaborators
 
Hitesh Summan _CV_New
Hitesh Summan _CV_NewHitesh Summan _CV_New
Hitesh Summan _CV_NewHitesh Summan
 
Kaseya Connect 2012 - Migration
Kaseya Connect 2012 - MigrationKaseya Connect 2012 - Migration
Kaseya Connect 2012 - MigrationKaseya
 
Why You Should Be Selling Business Continuity Services (5 MSP Tips to Get Sta...
Why You Should Be Selling Business Continuity Services (5 MSP Tips to Get Sta...Why You Should Be Selling Business Continuity Services (5 MSP Tips to Get Sta...
Why You Should Be Selling Business Continuity Services (5 MSP Tips to Get Sta...David Castro
 
Service Desk Now! Product Outline 2010 07 01
Service Desk Now! Product Outline 2010 07 01Service Desk Now! Product Outline 2010 07 01
Service Desk Now! Product Outline 2010 07 01mckeeg
 
Database performance improvement, a six sigma project (4 block) by nirav shah
Database performance improvement, a six sigma project (4 block) by nirav shah Database performance improvement, a six sigma project (4 block) by nirav shah
Database performance improvement, a six sigma project (4 block) by nirav shah Nirav Shah
 
Cisco on Cisco. Defining the NG Cloud & Data Center Services
Cisco on Cisco. Defining the NG Cloud & Data Center ServicesCisco on Cisco. Defining the NG Cloud & Data Center Services
Cisco on Cisco. Defining the NG Cloud & Data Center ServicesCisco Russia
 
Smart Case Study 001
Smart Case Study 001Smart Case Study 001
Smart Case Study 001agbagb
 
VMworld 2013: The Transformative Power and Business Case for Cloud Automation
VMworld 2013: The Transformative Power and Business Case for Cloud Automation VMworld 2013: The Transformative Power and Business Case for Cloud Automation
VMworld 2013: The Transformative Power and Business Case for Cloud Automation VMworld
 
Maximize Citrix Performance Complementing Citrix Director and Edgesight
Maximize Citrix Performance Complementing Citrix Director and EdgesightMaximize Citrix Performance Complementing Citrix Director and Edgesight
Maximize Citrix Performance Complementing Citrix Director and EdgesighteG Innovations
 
Beakbane safeguards future with ERP - ready infrastructure upgrade.
Beakbane safeguards future with ERP - ready infrastructure upgrade.Beakbane safeguards future with ERP - ready infrastructure upgrade.
Beakbane safeguards future with ERP - ready infrastructure upgrade.Icomm Technologies
 
Barrick simulation with mimic presentation
Barrick simulation with mimic presentationBarrick simulation with mimic presentation
Barrick simulation with mimic presentationMYNAH Technologies
 
Customer Satisfaction and Quality Induction_PPM .pptx
Customer Satisfaction and Quality Induction_PPM .pptxCustomer Satisfaction and Quality Induction_PPM .pptx
Customer Satisfaction and Quality Induction_PPM .pptxMunirahAyub1
 
CA Infrastructure Management 2.0 vs. Solarwinds Orion: Speed and ease of mana...
CA Infrastructure Management 2.0 vs. Solarwinds Orion: Speed and ease of mana...CA Infrastructure Management 2.0 vs. Solarwinds Orion: Speed and ease of mana...
CA Infrastructure Management 2.0 vs. Solarwinds Orion: Speed and ease of mana...Principled Technologies
 

Similar a Gillette Six Sigma Case Study (20)

Cisco Connect 2018 Thailand - Introducing cisco dna assurance the future of n...
Cisco Connect 2018 Thailand - Introducing cisco dna assurance the future of n...Cisco Connect 2018 Thailand - Introducing cisco dna assurance the future of n...
Cisco Connect 2018 Thailand - Introducing cisco dna assurance the future of n...
 
Hitesh Summan _CV_New
Hitesh Summan _CV_NewHitesh Summan _CV_New
Hitesh Summan _CV_New
 
Why Managed Services
Why Managed ServicesWhy Managed Services
Why Managed Services
 
Kaseya Connect 2012 - Migration
Kaseya Connect 2012 - MigrationKaseya Connect 2012 - Migration
Kaseya Connect 2012 - Migration
 
Why You Should Be Selling Business Continuity Services (5 MSP Tips to Get Sta...
Why You Should Be Selling Business Continuity Services (5 MSP Tips to Get Sta...Why You Should Be Selling Business Continuity Services (5 MSP Tips to Get Sta...
Why You Should Be Selling Business Continuity Services (5 MSP Tips to Get Sta...
 
Cck company profile
Cck company profileCck company profile
Cck company profile
 
Cck Company Profile
Cck Company ProfileCck Company Profile
Cck Company Profile
 
Service Desk Now! Product Outline 2010 07 01
Service Desk Now! Product Outline 2010 07 01Service Desk Now! Product Outline 2010 07 01
Service Desk Now! Product Outline 2010 07 01
 
Database performance improvement, a six sigma project (4 block) by nirav shah
Database performance improvement, a six sigma project (4 block) by nirav shah Database performance improvement, a six sigma project (4 block) by nirav shah
Database performance improvement, a six sigma project (4 block) by nirav shah
 
Cisco on Cisco. Defining the NG Cloud & Data Center Services
Cisco on Cisco. Defining the NG Cloud & Data Center ServicesCisco on Cisco. Defining the NG Cloud & Data Center Services
Cisco on Cisco. Defining the NG Cloud & Data Center Services
 
Smart Case Study 001
Smart Case Study 001Smart Case Study 001
Smart Case Study 001
 
Ankita_Garg_CV
Ankita_Garg_CVAnkita_Garg_CV
Ankita_Garg_CV
 
VMworld 2013: The Transformative Power and Business Case for Cloud Automation
VMworld 2013: The Transformative Power and Business Case for Cloud Automation VMworld 2013: The Transformative Power and Business Case for Cloud Automation
VMworld 2013: The Transformative Power and Business Case for Cloud Automation
 
Maximize Citrix Performance Complementing Citrix Director and Edgesight
Maximize Citrix Performance Complementing Citrix Director and EdgesightMaximize Citrix Performance Complementing Citrix Director and Edgesight
Maximize Citrix Performance Complementing Citrix Director and Edgesight
 
Beakbane safeguards future with ERP - ready infrastructure upgrade.
Beakbane safeguards future with ERP - ready infrastructure upgrade.Beakbane safeguards future with ERP - ready infrastructure upgrade.
Beakbane safeguards future with ERP - ready infrastructure upgrade.
 
Barrick simulation with mimic presentation
Barrick simulation with mimic presentationBarrick simulation with mimic presentation
Barrick simulation with mimic presentation
 
Resume
ResumeResume
Resume
 
Customer Satisfaction and Quality Induction_PPM .pptx
Customer Satisfaction and Quality Induction_PPM .pptxCustomer Satisfaction and Quality Induction_PPM .pptx
Customer Satisfaction and Quality Induction_PPM .pptx
 
KBC Proven Application of Digital Twin
KBC Proven Application of Digital TwinKBC Proven Application of Digital Twin
KBC Proven Application of Digital Twin
 
CA Infrastructure Management 2.0 vs. Solarwinds Orion: Speed and ease of mana...
CA Infrastructure Management 2.0 vs. Solarwinds Orion: Speed and ease of mana...CA Infrastructure Management 2.0 vs. Solarwinds Orion: Speed and ease of mana...
CA Infrastructure Management 2.0 vs. Solarwinds Orion: Speed and ease of mana...
 

Más de Kevin Egan

E Zsigma 2012 Fall Brochure
E Zsigma 2012 Fall BrochureE Zsigma 2012 Fall Brochure
E Zsigma 2012 Fall BrochureKevin Egan
 
Data Collection Six Sigma Case Study
Data Collection Six Sigma Case StudyData Collection Six Sigma Case Study
Data Collection Six Sigma Case StudyKevin Egan
 
Image Update Six Sigma Case Study
Image Update Six Sigma Case StudyImage Update Six Sigma Case Study
Image Update Six Sigma Case StudyKevin Egan
 
Operating System Six Sigma Case Study
Operating System Six Sigma Case StudyOperating System Six Sigma Case Study
Operating System Six Sigma Case StudyKevin Egan
 
Pc Shipping Improvement Six Sigma Case Study
Pc Shipping Improvement Six Sigma Case StudyPc Shipping Improvement Six Sigma Case Study
Pc Shipping Improvement Six Sigma Case StudyKevin Egan
 
Serrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case StudySerrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case StudyKevin Egan
 
Sms Integration Six Sigma Case Study
Sms Integration Six Sigma Case StudySms Integration Six Sigma Case Study
Sms Integration Six Sigma Case StudyKevin Egan
 
Ticket Accuracy Six Sigma Case Study
Ticket Accuracy   Six Sigma Case StudyTicket Accuracy   Six Sigma Case Study
Ticket Accuracy Six Sigma Case StudyKevin Egan
 
Qaa paul nelson
Qaa   paul nelsonQaa   paul nelson
Qaa paul nelsonKevin Egan
 
Pharma iq mediakit1
Pharma iq mediakit1Pharma iq mediakit1
Pharma iq mediakit1Kevin Egan
 
Jack Welch Speak - PEXN
Jack Welch Speak - PEXNJack Welch Speak - PEXN
Jack Welch Speak - PEXNKevin Egan
 
ISLSS Offerings
ISLSS OfferingsISLSS Offerings
ISLSS OfferingsKevin Egan
 

Más de Kevin Egan (12)

E Zsigma 2012 Fall Brochure
E Zsigma 2012 Fall BrochureE Zsigma 2012 Fall Brochure
E Zsigma 2012 Fall Brochure
 
Data Collection Six Sigma Case Study
Data Collection Six Sigma Case StudyData Collection Six Sigma Case Study
Data Collection Six Sigma Case Study
 
Image Update Six Sigma Case Study
Image Update Six Sigma Case StudyImage Update Six Sigma Case Study
Image Update Six Sigma Case Study
 
Operating System Six Sigma Case Study
Operating System Six Sigma Case StudyOperating System Six Sigma Case Study
Operating System Six Sigma Case Study
 
Pc Shipping Improvement Six Sigma Case Study
Pc Shipping Improvement Six Sigma Case StudyPc Shipping Improvement Six Sigma Case Study
Pc Shipping Improvement Six Sigma Case Study
 
Serrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case StudySerrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case Study
 
Sms Integration Six Sigma Case Study
Sms Integration Six Sigma Case StudySms Integration Six Sigma Case Study
Sms Integration Six Sigma Case Study
 
Ticket Accuracy Six Sigma Case Study
Ticket Accuracy   Six Sigma Case StudyTicket Accuracy   Six Sigma Case Study
Ticket Accuracy Six Sigma Case Study
 
Qaa paul nelson
Qaa   paul nelsonQaa   paul nelson
Qaa paul nelson
 
Pharma iq mediakit1
Pharma iq mediakit1Pharma iq mediakit1
Pharma iq mediakit1
 
Jack Welch Speak - PEXN
Jack Welch Speak - PEXNJack Welch Speak - PEXN
Jack Welch Speak - PEXN
 
ISLSS Offerings
ISLSS OfferingsISLSS Offerings
ISLSS Offerings
 

Gillette Six Sigma Case Study

  • 1. Six Sigma DMAIC Project Gillette Project Leader/Green Belt: Ilya Rubinshteyn Project Leader Title: Desk Side Support Engineer Project Start Date: July 24th, 2003 Master Black Belt: Steven Bonacorsi
  • 2. Six Sigma in Action IMAC – General Workstation-PC Setup Customer Profile – 1700 Gillette Employees at Prudential and Copley in Before Boston, MA, 2200 users In SBMC, 170 users in Woburn, 300 users at AMC, UCL 500 Users in Bethel, CT, and about 500 in the field. 150 Business Problem & Impact Gillette employees submitting cases through Help Desk have to wait Z_ST = 0.78 Frequency 100 about 12 hours before they are contacted by Desk side Support, resulting in a tremendous amount of down time. 50 Measure & Analyze Data Collection: Time it took to complete a PC setup for the user after case was opened in Clarify. The existing process sigma was 0.11. 0 Root Causes: Lack of technician training was identified as the root 0 5000 opentime(mins) 10000 cause. Improve & Control After • IMAC case creation and completion process was completely USL overhauled, process maps were created and distributed to technicians • IMAC teams were created to enhance specialization and performance • Appropriate training for faster PC setup process completed, and 20 Z_ST = 4.69 methods for handling were implemented. Clarify metrics are reviewed Frequency weekly. Results/Benefits 10  ITS Productivity Savings = $21,000 Annually  Customer Productivity Savings = $2,730,000 Annually • Improving process from 4122 to 222 minutes, to meet customer CTQ 0 <= 1800 minutes! 0 200 400 600 800 100012001400160018002000 Rtime (Minutes) PC Setup time is Critical to Clients!! $2.7M