Six Sigma DMAIC Project




                    Kaiser Permanente – Asset Management




                                      Project Leader/Green Belt: Troy Baldwin
                           Project Leader Title: Enterprise Planning & Strategy Analyst
                                         Project Start Date: July 25, 2003
Master Black Belt: Steven Bonacorsi
Six Sigma in Action
                                                               Serial Number - Location
                                                                   Process Capability – Before
                                                                       Z_ST = 2.3 Sigma
Customer Profile – 130,000 Seat Health Care Provider
                                                               Defects 43%              Success 57%
Business Problem & Impact
                                                                   (83)                    (111)
Asset Location Values do not accurately match an existing SN
within the current Asset Management Databases impacting
contract payment dollars and intensive labor.


Measure & Analyze
Data Collection: Focused on Corona Data Center
                                                                    Process Capability – After
Root Causes: Database Input procedures have not been                    Z_ST = 2.6 Sigma
clearly defined, Inconsistent data entry method between the               Still Improving
Databases, All Databases have not been accurately maintained
                                                                    Defects
Improve & Control                                                   26% (31)
                                                                                  Success
Multiple databases have been collapsed into one database,
AssetCenter                                                                       74% (90)

Results/Benefits
Process Improvement from Z_ST = 2.3 Sigma to Z_ST = 2.6
Sigma. Physical Inventory Data continuing to be added to
AssetCenter showing constant Z_ST improvement.


                   Increased Successes and Increased Sigma!

Más contenido relacionado

Más de Kevin Egan

E Zsigma 2012 Fall Brochure
E Zsigma 2012 Fall BrochureE Zsigma 2012 Fall Brochure
E Zsigma 2012 Fall BrochureKevin Egan
 
Data Collection Six Sigma Case Study
Data Collection Six Sigma Case StudyData Collection Six Sigma Case Study
Data Collection Six Sigma Case StudyKevin Egan
 
Gillette Six Sigma Case Study
Gillette Six Sigma Case StudyGillette Six Sigma Case Study
Gillette Six Sigma Case StudyKevin Egan
 
Image Update Six Sigma Case Study
Image Update Six Sigma Case StudyImage Update Six Sigma Case Study
Image Update Six Sigma Case StudyKevin Egan
 
Operating System Six Sigma Case Study
Operating System Six Sigma Case StudyOperating System Six Sigma Case Study
Operating System Six Sigma Case StudyKevin Egan
 
Pc Shipping Improvement Six Sigma Case Study
Pc Shipping Improvement Six Sigma Case StudyPc Shipping Improvement Six Sigma Case Study
Pc Shipping Improvement Six Sigma Case StudyKevin Egan
 
Serrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case StudySerrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case StudyKevin Egan
 
Sms Integration Six Sigma Case Study
Sms Integration Six Sigma Case StudySms Integration Six Sigma Case Study
Sms Integration Six Sigma Case StudyKevin Egan
 
Ticket Accuracy Six Sigma Case Study
Ticket Accuracy   Six Sigma Case StudyTicket Accuracy   Six Sigma Case Study
Ticket Accuracy Six Sigma Case StudyKevin Egan
 
Qaa paul nelson
Qaa   paul nelsonQaa   paul nelson
Qaa paul nelsonKevin Egan
 
Pharma iq mediakit1
Pharma iq mediakit1Pharma iq mediakit1
Pharma iq mediakit1Kevin Egan
 
Jack Welch Speak - PEXN
Jack Welch Speak - PEXNJack Welch Speak - PEXN
Jack Welch Speak - PEXNKevin Egan
 
ISLSS Offerings
ISLSS OfferingsISLSS Offerings
ISLSS OfferingsKevin Egan
 

Más de Kevin Egan (13)

E Zsigma 2012 Fall Brochure
E Zsigma 2012 Fall BrochureE Zsigma 2012 Fall Brochure
E Zsigma 2012 Fall Brochure
 
Data Collection Six Sigma Case Study
Data Collection Six Sigma Case StudyData Collection Six Sigma Case Study
Data Collection Six Sigma Case Study
 
Gillette Six Sigma Case Study
Gillette Six Sigma Case StudyGillette Six Sigma Case Study
Gillette Six Sigma Case Study
 
Image Update Six Sigma Case Study
Image Update Six Sigma Case StudyImage Update Six Sigma Case Study
Image Update Six Sigma Case Study
 
Operating System Six Sigma Case Study
Operating System Six Sigma Case StudyOperating System Six Sigma Case Study
Operating System Six Sigma Case Study
 
Pc Shipping Improvement Six Sigma Case Study
Pc Shipping Improvement Six Sigma Case StudyPc Shipping Improvement Six Sigma Case Study
Pc Shipping Improvement Six Sigma Case Study
 
Serrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case StudySerrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case Study
 
Sms Integration Six Sigma Case Study
Sms Integration Six Sigma Case StudySms Integration Six Sigma Case Study
Sms Integration Six Sigma Case Study
 
Ticket Accuracy Six Sigma Case Study
Ticket Accuracy   Six Sigma Case StudyTicket Accuracy   Six Sigma Case Study
Ticket Accuracy Six Sigma Case Study
 
Qaa paul nelson
Qaa   paul nelsonQaa   paul nelson
Qaa paul nelson
 
Pharma iq mediakit1
Pharma iq mediakit1Pharma iq mediakit1
Pharma iq mediakit1
 
Jack Welch Speak - PEXN
Jack Welch Speak - PEXNJack Welch Speak - PEXN
Jack Welch Speak - PEXN
 
ISLSS Offerings
ISLSS OfferingsISLSS Offerings
ISLSS Offerings
 

Location Accuracy Six Sigma Case Study

  • 1. Six Sigma DMAIC Project Kaiser Permanente – Asset Management Project Leader/Green Belt: Troy Baldwin Project Leader Title: Enterprise Planning & Strategy Analyst Project Start Date: July 25, 2003 Master Black Belt: Steven Bonacorsi
  • 2. Six Sigma in Action Serial Number - Location Process Capability – Before Z_ST = 2.3 Sigma Customer Profile – 130,000 Seat Health Care Provider Defects 43% Success 57% Business Problem & Impact (83) (111) Asset Location Values do not accurately match an existing SN within the current Asset Management Databases impacting contract payment dollars and intensive labor. Measure & Analyze Data Collection: Focused on Corona Data Center Process Capability – After Root Causes: Database Input procedures have not been Z_ST = 2.6 Sigma clearly defined, Inconsistent data entry method between the Still Improving Databases, All Databases have not been accurately maintained Defects Improve & Control 26% (31) Success Multiple databases have been collapsed into one database, AssetCenter 74% (90) Results/Benefits Process Improvement from Z_ST = 2.3 Sigma to Z_ST = 2.6 Sigma. Physical Inventory Data continuing to be added to AssetCenter showing constant Z_ST improvement. Increased Successes and Increased Sigma!