CITY OF HOBOKEN CAPITAL EQUIPMENT / PROJECT REQUEST (5 year Plan)
For discussion with your Department's Sub Committee if Applicable
Please list items in priority order

No.           Equipment/Project                 Cost




Attach additional information as necessary




Department Head:                                         Sub Committee:
/ PROJECT REQUEST (5 year Plan)
ttee if Applicable



                          Justification




         Sub Committee:
CITY OF HOBOKEN CAPITAL EQUIPMENT / PROJECT REQUEST (5 Year Plan)

BUDGET YEAR: 2010                 DEPARTMENT: Central Purchasing

YEAR REQUESTED:
                                                      Check                                    Check
           Type of item                                One                   Priority           One
           1. Additional Acquisition                                         1. Essential        x
           2. Replacement                                 x                  2. Badly Needed
           3. New Item                                                       3. Desirable
           4. Improvement                                                    4. Nice to Have
           5. Renovation or Reconstruction

Item / Project Name:              Replacement Printer - EPSON DFX-5000+


Quantity:              One (1)

Description:           The current Purchase Order printer in Purchasing is approximately
                       Fifteen + years (15+) old and while still functioning should have
                       a contingency of replacement cost.


Estimated Cost :                      $2,750.00
(per item and total - attached detailed cost estimate)
(Note any additional costs to operating budget as well. (ex. maintenance cost etc.) )


Justification / Benefit:          Contingency to maintain the purchase order operation.




Attach additional information as necessary
CITY OF HOBOKEN CAPITAL EQUIPMENT / PROJECT REQUEST (5 Year Plan)

BUDGET YEAR: 2010                 DEPARTMENT:

YEAR REQUESTED:
                                                      Check                                    Check
           Type of item                                One                   Priority           One
           1. Additional Acquisition                                         1. Essential
           2. Replacement                                 x                  2. Badly Needed
           3. New Item                                                       3. Desirable        x
           4. Improvement                                                    4. Nice to Have
           5. Renovation or Reconstruction

Item / Project Name:           Personal Computer with system interface
                       A four year program to continually upgrade the systems in the Div.

Quantity:              Two (2)

Description:           2 PC's to upgrade the buyers machines in Purchasing
                       The newest of the four in the Division is going to be 4 years old
                       and the oldest is the Purchasing Agent which will be 7 years old


Estimated Cost :                      $2,000.00
(per item and total - attached detailed cost estimate)
(Note any additional costs to operating budget as well. (ex. maintenance cost etc.) )


Justification / Benefit:   As technology improves in the system approach to our
           business functions, it is imperative that the workforce is provided with
           the equipment which allows it to perform to its' potential




Attach additional information as necessary
CITY OF HOBOKEN CAPITAL EQUIPMENT / PROJECT REQUEST (5 Year Plan)

BUDGET YEAR: 2010                 DEPARTMENT:

YEAR REQUESTED:
                                                      Check                                    Check
           Type of item                                One                   Priority           One
           1. Additional Acquisition                                         1. Essential
           2. Replacement                                                    2. Badly Needed     x
           3. New Item                                                       3. Desirable
           4. Improvement                                                    4. Nice to Have
           5. Renovation or Reconstruction                x

Item / Project Name:              Replacement of flooring in the outer office of Purchasing


Quantity:              Approximately 150 sq. ft. of floating wooden flooring

Description:           The removal of the existing carpeting which is approximately
                       ten (10) years old and replacing it with a wooden floor.



Estimated Cost :                      $2,000.00
(per item and total - attached detailed cost estimate)
(Note any additional costs to operating budget as well. (ex. maintenance cost etc.) )


Justification / Benefit:   The existing flooring is becoming a potential health
           hazard for the employees of Purchasing.




Attach additional information as necessary
CITY OF HOBOKEN CAPITAL EQUIPMENT / PROJECT REQUEST (5 Year Plan)

BUDGET YEAR: 2010                 DEPARTMENT:

YEAR REQUESTED:
                                                      Check                                    Check
           Type of item                                One                   Priority           One
           1. Additional Acquisition                                         1. Essential
           2. Replacement                                                    2. Badly Needed
           3. New Item                                                       3. Desirable
           4. Improvement                                                    4. Nice to Have
           5. Renovation or Reconstruction

Item / Project Name:



Quantity:

Description:




Estimated Cost :
(per item and total - attached detailed cost estimate)
(Note any additional costs to operating budget as well. (ex. maintenance cost etc.) )


Justification / Benefit:




Attach additional information as necessary
CITY OF HOBOKEN CAPITAL EQUIPMENT / PROJECT REQUEST (5 Year Plan)

BUDGET YEAR: 2010                 DEPARTMENT:

YEAR REQUESTED:
                                                      Check                                    Check
           Type of item                                One                   Priority           One
           1. Additional Acquisition                                         1. Essential
           2. Replacement                                                    2. Badly Needed
           3. New Item                                                       3. Desirable
           4. Improvement                                                    4. Nice to Have
           5. Renovation or Reconstruction

Item / Project Name:



Quantity:

Description:




Estimated Cost :
(per item and total - attached detailed cost estimate)
(Note any additional costs to operating budget as well. (ex. maintenance cost etc.) )


Justification / Benefit:




Attach additional information as necessary
CITY OF HOBOKEN CAPITAL EQUIPMENT / PROJECT REQUEST (5 Year Plan)

BUDGET YEAR: 2010                 DEPARTMENT:

YEAR REQUESTED:
                                                      Check                                    Check
           Type of item                                One                   Priority           One
           1. Additional Acquisition                                         1. Essential
           2. Replacement                                                    2. Badly Needed
           3. New Item                                                       3. Desirable
           4. Improvement                                                    4. Nice to Have
           5. Renovation or Reconstruction

Item / Project Name:



Quantity:

Description:




Estimated Cost :
(per item and total - attached detailed cost estimate)
(Note any additional costs to operating budget as well. (ex. maintenance cost etc.) )


Justification / Benefit:




Attach additional information as necessary
CITY OF HOBOKEN CAPITAL EQUIPMENT / PROJECT REQUEST (5 Year Plan)

BUDGET YEAR: 2010                 DEPARTMENT:

YEAR REQUESTED:
                                                      Check                                    Check
           Type of item                                One                   Priority           One
           1. Additional Acquisition                                         1. Essential
           2. Replacement                                                    2. Badly Needed
           3. New Item                                                       3. Desirable
           4. Improvement                                                    4. Nice to Have
           5. Renovation or Reconstruction

Item / Project Name:



Quantity:

Description:




Estimated Cost :
(per item and total - attached detailed cost estimate)
(Note any additional costs to operating budget as well. (ex. maintenance cost etc.) )


Justification / Benefit:




Attach additional information as necessary
CITY OF HOBOKEN CAPITAL EQUIPMENT / PROJECT REQUEST (5 Year Plan)

BUDGET YEAR: 2010                 DEPARTMENT:

YEAR REQUESTED:
                                                      Check                                    Check
           Type of item                                One                   Priority           One
           1. Additional Acquisition                                         1. Essential
           2. Replacement                                                    2. Badly Needed
           3. New Item                                                       3. Desirable
           4. Improvement                                                    4. Nice to Have
           5. Renovation or Reconstruction

Item / Project Name:



Quantity:

Description:




Estimated Cost :
(per item and total - attached detailed cost estimate)
(Note any additional costs to operating budget as well. (ex. maintenance cost etc.) )


Justification / Benefit:
Attach additional information as necessary
CITY OF HOBOKEN CAPITAL EQUIPMENT / PROJECT REQUEST (5 Year Plan)

BUDGET YEAR: 2010                 DEPARTMENT:

YEAR REQUESTED:
                                                      Check                                    Check
           Type of item                                One                   Priority           One
           1. Additional Acquisition                                         1. Essential
           2. Replacement                                                    2. Badly Needed
           3. New Item                                                       3. Desirable
           4. Improvement                                                    4. Nice to Have
           5. Renovation or Reconstruction

Item / Project Name:



Quantity:

Description:




Estimated Cost :
(per item and total - attached detailed cost estimate)
(Note any additional costs to operating budget as well. (ex. maintenance cost etc.) )


Justification / Benefit:
Attach additional information as necessary
CITY OF HOBOKEN CAPITAL EQUIPMENT / PROJECT REQUEST (5 Year Plan)

BUDGET YEAR: 2010                 DEPARTMENT:

YEAR REQUESTED:
                                                      Check                                    Check
           Type of item                                One                   Priority           One
           1. Additional Acquisition                                         1. Essential
           2. Replacement                                                    2. Badly Needed
           3. New Item                                                       3. Desirable
           4. Improvement                                                    4. Nice to Have
           5. Renovation or Reconstruction

Item / Project Name:



Quantity:

Description:




Estimated Cost :
(per item and total - attached detailed cost estimate)
(Note any additional costs to operating budget as well. (ex. maintenance cost etc.) )


Justification / Benefit:
Attach additional information as necessary
CITY OF HOBOKEN CAPITAL EQUIPMENT / PROJECT REQUEST (5 Year Plan)

BUDGET YEAR: 2010                 DEPARTMENT:

YEAR REQUESTED:
                                                      Check                                    Check
           Type of item                                One                   Priority           One
           1. Additional Acquisition                                         1. Essential
           2. Replacement                                                    2. Badly Needed
           3. New Item                                                       3. Desirable
           4. Improvement                                                    4. Nice to Have
           5. Renovation or Reconstruction

Item / Project Name:



Quantity:

Description:




Estimated Cost :
(per item and total - attached detailed cost estimate)
(Note any additional costs to operating budget as well. (ex. maintenance cost etc.) )


Justification / Benefit:
Attach additional information as necessary
5 (E)
                                                                                                                                                                         5(C)       5 (D)
                                                                                          FIVE YEAR
                                                                                     CAPITAL BUDGET PLAN

                       2                                                                                                                                                                                2014
                                                                                                                                                      LOCAL UNIT:        2012       2013
                                      3                                      4 (B)            4 (C)                5 (A-E)         5 (A)              5 (B)
                                                           4 (A)
                                                           PLANNED FUNDING SERVICES FOR CURRENT YEAR- 2010                         FUNDING AMOUNTS PER BUDGET YEAR
1

                                                                                        GRANTS
                            PROJECT       ESTIMATED             CAPITAL        IN AID AND OTHER      DEBT              ESTIMATED
       PROJECT TITLE       NUMBER         TOTAL COST       IMPROVEMENT FUND          FUNDS        AUTHORIZED         TOTAL COST            2010               2011




                                                       -                                                                       -
                                                       -                                                                       -
                                                       -                                                                       -
                                                       -                                                                       -
                                                       -                                                                       -
                                                       -                                                                       -
                                                       -                                                                       -
                                                       -                                                                       -
                                                       -                                                                       -
                                                       -                                                                       -
                                                       -                                                                       -
                                                       -                                                                       -
                                                       -                                                                       -
                                                       -                                                                       -
                                                       -                                                                       -
                                                       -                                                                       -
                                                       -                                                                       -
                                                       -                                                                       -
                                                       -                                                                       -
                                                       -                                                                       -
                                                       -                                                                       -
                                                       -                                                                       -
TOTAL ALL PROJECTS                                     -                   -                 -                 -               -                  -                  -          -           -              -

More Related Content

Similar to Purchasing Capital Request

Similar to Purchasing Capital Request (6)

It Capital Request
It Capital RequestIt Capital Request
It Capital Request
 
Hs Cultural Affairs Capital Request
Hs Cultural Affairs Capital RequestHs Cultural Affairs Capital Request
Hs Cultural Affairs Capital Request
 
Fire Capital Request
Fire Capital RequestFire Capital Request
Fire Capital Request
 
Police Capital Request
Police Capital RequestPolice Capital Request
Police Capital Request
 
ppt_chapter 10_kieso_accounting principles
ppt_chapter 10_kieso_accounting principlesppt_chapter 10_kieso_accounting principles
ppt_chapter 10_kieso_accounting principles
 
ch10-Acquisition and disposition of PPE.ppt
ch10-Acquisition and disposition of PPE.pptch10-Acquisition and disposition of PPE.ppt
ch10-Acquisition and disposition of PPE.ppt
 

More from Hoboken Resistance

Taxi And Limo New Request Personnel
Taxi And Limo New Request PersonnelTaxi And Limo New Request Personnel
Taxi And Limo New Request Personnel
Hoboken Resistance
 
Taxi And Limo Appropriation Request
Taxi And Limo Appropriation RequestTaxi And Limo Appropriation Request
Taxi And Limo Appropriation Request
Hoboken Resistance
 
Purchasing Copiers & Printers Appropriation
Purchasing Copiers & Printers AppropriationPurchasing Copiers & Printers Appropriation
Purchasing Copiers & Printers Appropriation
Hoboken Resistance
 

More from Hoboken Resistance (20)

Beth Mason NJ political contribution history
Beth Mason NJ political contribution historyBeth Mason NJ political contribution history
Beth Mason NJ political contribution history
 
Ravi Bhalla November ELEC 2017
Ravi Bhalla November ELEC 2017 Ravi Bhalla November ELEC 2017
Ravi Bhalla November ELEC 2017
 
Jen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry Dock
Jen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry DockJen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry Dock
Jen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry Dock
 
Tim Occhipinti Elec report 11-23-2010
Tim Occhipinti Elec report 11-23-2010Tim Occhipinti Elec report 11-23-2010
Tim Occhipinti Elec report 11-23-2010
 
Mike Lenz ELEC report 11-30-2010
Mike Lenz ELEC report 11-30-2010Mike Lenz ELEC report 11-30-2010
Mike Lenz ELEC report 11-30-2010
 
Roh wine tasting invite form
Roh wine tasting invite formRoh wine tasting invite form
Roh wine tasting invite form
 
Mayor cammarano-schaffer
Mayor cammarano-schafferMayor cammarano-schaffer
Mayor cammarano-schaffer
 
City council terminates agreement with Hekenian
City council terminates agreement with HekenianCity council terminates agreement with Hekenian
City council terminates agreement with Hekenian
 
Memorandum 6-16-10 hoboken
Memorandum 6-16-10 hobokenMemorandum 6-16-10 hoboken
Memorandum 6-16-10 hoboken
 
Port Authority Budget 2010
Port Authority Budget 2010Port Authority Budget 2010
Port Authority Budget 2010
 
3 Capital Master List
3 Capital Master List3 Capital Master List
3 Capital Master List
 
2 Sfy 10 Detail Budget
2 Sfy 10 Detail Budget2 Sfy 10 Detail Budget
2 Sfy 10 Detail Budget
 
1 Introduced Budget
1 Introduced Budget1 Introduced Budget
1 Introduced Budget
 
Taxi And Limo Revenue 2010
Taxi And Limo Revenue 2010Taxi And Limo Revenue 2010
Taxi And Limo Revenue 2010
 
Taxi And Limo Recommendations
Taxi And Limo RecommendationsTaxi And Limo Recommendations
Taxi And Limo Recommendations
 
Taxi And Limo Narrative
Taxi And Limo NarrativeTaxi And Limo Narrative
Taxi And Limo Narrative
 
Taxi And Limo New Request Personnel
Taxi And Limo New Request PersonnelTaxi And Limo New Request Personnel
Taxi And Limo New Request Personnel
 
Taxi And Limo Appropriation Request
Taxi And Limo Appropriation RequestTaxi And Limo Appropriation Request
Taxi And Limo Appropriation Request
 
Purchasing Narrative
Purchasing NarrativePurchasing Narrative
Purchasing Narrative
 
Purchasing Copiers & Printers Appropriation
Purchasing Copiers & Printers AppropriationPurchasing Copiers & Printers Appropriation
Purchasing Copiers & Printers Appropriation
 

Recently uploaded

Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
amitlee9823
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
allensay1
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
amitlee9823
 
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
lizamodels9
 
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂EscortCall Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
dlhescort
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
amitlee9823
 

Recently uploaded (20)

Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Whitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
Whitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLWhitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
Whitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
 
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂EscortCall Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 

Purchasing Capital Request

  • 1. CITY OF HOBOKEN CAPITAL EQUIPMENT / PROJECT REQUEST (5 year Plan) For discussion with your Department's Sub Committee if Applicable Please list items in priority order No. Equipment/Project Cost Attach additional information as necessary Department Head: Sub Committee:
  • 2. / PROJECT REQUEST (5 year Plan) ttee if Applicable Justification Sub Committee:
  • 3. CITY OF HOBOKEN CAPITAL EQUIPMENT / PROJECT REQUEST (5 Year Plan) BUDGET YEAR: 2010 DEPARTMENT: Central Purchasing YEAR REQUESTED: Check Check Type of item One Priority One 1. Additional Acquisition 1. Essential x 2. Replacement x 2. Badly Needed 3. New Item 3. Desirable 4. Improvement 4. Nice to Have 5. Renovation or Reconstruction Item / Project Name: Replacement Printer - EPSON DFX-5000+ Quantity: One (1) Description: The current Purchase Order printer in Purchasing is approximately Fifteen + years (15+) old and while still functioning should have a contingency of replacement cost. Estimated Cost : $2,750.00 (per item and total - attached detailed cost estimate) (Note any additional costs to operating budget as well. (ex. maintenance cost etc.) ) Justification / Benefit: Contingency to maintain the purchase order operation. Attach additional information as necessary
  • 4. CITY OF HOBOKEN CAPITAL EQUIPMENT / PROJECT REQUEST (5 Year Plan) BUDGET YEAR: 2010 DEPARTMENT: YEAR REQUESTED: Check Check Type of item One Priority One 1. Additional Acquisition 1. Essential 2. Replacement x 2. Badly Needed 3. New Item 3. Desirable x 4. Improvement 4. Nice to Have 5. Renovation or Reconstruction Item / Project Name: Personal Computer with system interface A four year program to continually upgrade the systems in the Div. Quantity: Two (2) Description: 2 PC's to upgrade the buyers machines in Purchasing The newest of the four in the Division is going to be 4 years old and the oldest is the Purchasing Agent which will be 7 years old Estimated Cost : $2,000.00 (per item and total - attached detailed cost estimate) (Note any additional costs to operating budget as well. (ex. maintenance cost etc.) ) Justification / Benefit: As technology improves in the system approach to our business functions, it is imperative that the workforce is provided with the equipment which allows it to perform to its' potential Attach additional information as necessary
  • 5. CITY OF HOBOKEN CAPITAL EQUIPMENT / PROJECT REQUEST (5 Year Plan) BUDGET YEAR: 2010 DEPARTMENT: YEAR REQUESTED: Check Check Type of item One Priority One 1. Additional Acquisition 1. Essential 2. Replacement 2. Badly Needed x 3. New Item 3. Desirable 4. Improvement 4. Nice to Have 5. Renovation or Reconstruction x Item / Project Name: Replacement of flooring in the outer office of Purchasing Quantity: Approximately 150 sq. ft. of floating wooden flooring Description: The removal of the existing carpeting which is approximately ten (10) years old and replacing it with a wooden floor. Estimated Cost : $2,000.00 (per item and total - attached detailed cost estimate) (Note any additional costs to operating budget as well. (ex. maintenance cost etc.) ) Justification / Benefit: The existing flooring is becoming a potential health hazard for the employees of Purchasing. Attach additional information as necessary
  • 6. CITY OF HOBOKEN CAPITAL EQUIPMENT / PROJECT REQUEST (5 Year Plan) BUDGET YEAR: 2010 DEPARTMENT: YEAR REQUESTED: Check Check Type of item One Priority One 1. Additional Acquisition 1. Essential 2. Replacement 2. Badly Needed 3. New Item 3. Desirable 4. Improvement 4. Nice to Have 5. Renovation or Reconstruction Item / Project Name: Quantity: Description: Estimated Cost : (per item and total - attached detailed cost estimate) (Note any additional costs to operating budget as well. (ex. maintenance cost etc.) ) Justification / Benefit: Attach additional information as necessary
  • 7. CITY OF HOBOKEN CAPITAL EQUIPMENT / PROJECT REQUEST (5 Year Plan) BUDGET YEAR: 2010 DEPARTMENT: YEAR REQUESTED: Check Check Type of item One Priority One 1. Additional Acquisition 1. Essential 2. Replacement 2. Badly Needed 3. New Item 3. Desirable 4. Improvement 4. Nice to Have 5. Renovation or Reconstruction Item / Project Name: Quantity: Description: Estimated Cost : (per item and total - attached detailed cost estimate) (Note any additional costs to operating budget as well. (ex. maintenance cost etc.) ) Justification / Benefit: Attach additional information as necessary
  • 8. CITY OF HOBOKEN CAPITAL EQUIPMENT / PROJECT REQUEST (5 Year Plan) BUDGET YEAR: 2010 DEPARTMENT: YEAR REQUESTED: Check Check Type of item One Priority One 1. Additional Acquisition 1. Essential 2. Replacement 2. Badly Needed 3. New Item 3. Desirable 4. Improvement 4. Nice to Have 5. Renovation or Reconstruction Item / Project Name: Quantity: Description: Estimated Cost : (per item and total - attached detailed cost estimate) (Note any additional costs to operating budget as well. (ex. maintenance cost etc.) ) Justification / Benefit: Attach additional information as necessary
  • 9. CITY OF HOBOKEN CAPITAL EQUIPMENT / PROJECT REQUEST (5 Year Plan) BUDGET YEAR: 2010 DEPARTMENT: YEAR REQUESTED: Check Check Type of item One Priority One 1. Additional Acquisition 1. Essential 2. Replacement 2. Badly Needed 3. New Item 3. Desirable 4. Improvement 4. Nice to Have 5. Renovation or Reconstruction Item / Project Name: Quantity: Description: Estimated Cost : (per item and total - attached detailed cost estimate) (Note any additional costs to operating budget as well. (ex. maintenance cost etc.) ) Justification / Benefit: Attach additional information as necessary
  • 10. CITY OF HOBOKEN CAPITAL EQUIPMENT / PROJECT REQUEST (5 Year Plan) BUDGET YEAR: 2010 DEPARTMENT: YEAR REQUESTED: Check Check Type of item One Priority One 1. Additional Acquisition 1. Essential 2. Replacement 2. Badly Needed 3. New Item 3. Desirable 4. Improvement 4. Nice to Have 5. Renovation or Reconstruction Item / Project Name: Quantity: Description: Estimated Cost : (per item and total - attached detailed cost estimate) (Note any additional costs to operating budget as well. (ex. maintenance cost etc.) ) Justification / Benefit:
  • 12.
  • 13.
  • 14. CITY OF HOBOKEN CAPITAL EQUIPMENT / PROJECT REQUEST (5 Year Plan) BUDGET YEAR: 2010 DEPARTMENT: YEAR REQUESTED: Check Check Type of item One Priority One 1. Additional Acquisition 1. Essential 2. Replacement 2. Badly Needed 3. New Item 3. Desirable 4. Improvement 4. Nice to Have 5. Renovation or Reconstruction Item / Project Name: Quantity: Description: Estimated Cost : (per item and total - attached detailed cost estimate) (Note any additional costs to operating budget as well. (ex. maintenance cost etc.) ) Justification / Benefit:
  • 16.
  • 17.
  • 18. CITY OF HOBOKEN CAPITAL EQUIPMENT / PROJECT REQUEST (5 Year Plan) BUDGET YEAR: 2010 DEPARTMENT: YEAR REQUESTED: Check Check Type of item One Priority One 1. Additional Acquisition 1. Essential 2. Replacement 2. Badly Needed 3. New Item 3. Desirable 4. Improvement 4. Nice to Have 5. Renovation or Reconstruction Item / Project Name: Quantity: Description: Estimated Cost : (per item and total - attached detailed cost estimate) (Note any additional costs to operating budget as well. (ex. maintenance cost etc.) ) Justification / Benefit:
  • 20.
  • 21.
  • 22. CITY OF HOBOKEN CAPITAL EQUIPMENT / PROJECT REQUEST (5 Year Plan) BUDGET YEAR: 2010 DEPARTMENT: YEAR REQUESTED: Check Check Type of item One Priority One 1. Additional Acquisition 1. Essential 2. Replacement 2. Badly Needed 3. New Item 3. Desirable 4. Improvement 4. Nice to Have 5. Renovation or Reconstruction Item / Project Name: Quantity: Description: Estimated Cost : (per item and total - attached detailed cost estimate) (Note any additional costs to operating budget as well. (ex. maintenance cost etc.) ) Justification / Benefit:
  • 24.
  • 25.
  • 26. 5 (E) 5(C) 5 (D) FIVE YEAR CAPITAL BUDGET PLAN 2 2014 LOCAL UNIT: 2012 2013 3 4 (B) 4 (C) 5 (A-E) 5 (A) 5 (B) 4 (A) PLANNED FUNDING SERVICES FOR CURRENT YEAR- 2010 FUNDING AMOUNTS PER BUDGET YEAR 1 GRANTS PROJECT ESTIMATED CAPITAL IN AID AND OTHER DEBT ESTIMATED PROJECT TITLE NUMBER TOTAL COST IMPROVEMENT FUND FUNDS AUTHORIZED TOTAL COST 2010 2011 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - TOTAL ALL PROJECTS - - - - - - - - - -