VALUE RE-ENGINEERING


Introduction

       Value engineering began at General Electric Co. during World War II. Because of
the war, there were shortages of skilled labor, raw materials, and component parts.
Lawrence Miles, Jerry Leftow, and Harry Erlicher at G.E. looked for acceptable
substitutes. They noticed that these substitutions often reduced costs, improved product,
or both. What started out as an accident of necessity was turned into a systematic
process. They called their technique ―value analysis‖.

Definition

        Value Engineering (VE) is a methodology that focuses on the function of a product
or service to improve value without sacrificing quality or reliability. VE involves
assembling a cross section of multi-disciplined professionals and enabling them to work
together, each bringing a unique perspective and expertise to the assignment. VE relies
heavily on team-building principles, and focuses on effective communicating, careful
listening and understanding, the generation of creative solutions, and efficient decision
making.




Value Job Analysis Plan

        Value engineering is often done by systematically following a multi-stage job
plan. Others have varied the job plan to fit their constraints. Depending on the
application, there may be four, five, six, or more stages. One modern version has the
following eight steps:

   1. Preparation
   2. Information
3.   Analysis
   4.   Creation
   5.   Evaluation
   6.   Development
   7.   Presentation
   8.   Follow-up

Four basic steps in the job plan are:

        Information gathering - This asks what the requirements are for the object.
        Function analysis, an important technique in value engineering, is usually done
        in this initial stage. It tries to determine what functions or performance
        characteristics are important. It asks questions like; What does the object do?
        What must it do? What should it do? What could it do? What must it not do?

        Alternative generation (creation) - In this stage value engineers ask; What are the
        various alternative ways of meeting requirements? What else will perform the
        desired function?

        Evaluation - In this stage all the alternatives are assessed by evaluating how well
        they meet the required functions and how great will the cost savings be.

        Presentation - In the final stage, the best alternative will be chosen and
        presented to the client for final decision

Benefits

       Lowering Overhead & Material costs
       Improving quality management
       Improving resource efficiency
       Simplifying procedures
       Minimizing paperwork
       Lowering staff costs
       Increasing procedural efficiency
       Optimizing construction expenditures
       Developing value attitudes in staff
       Competing more successfully in marketplace
TOTAL QUALITY MANAGEMENT


Introduction

        After World War II, the U.S. was the only major power with an intact economy.
Deming and Juran found their quality improvement theories irrelevant to U.S. business
leaders. They were interested in quantity, not quality. Deming found a more
appreciative audience in Japan, where he was conducting postwar census work. He was
invited to speak about his views during a now-famous dinner in the early 1950's.

       Shortly after, Dr. Deming predicted in the early 1950's that the Japanese
industry would become a world-class force equal to any other country. Everyone around
the world laughed. The Japanese didn't laugh . They worked hard to apply the lessons
learned. Henry Ford's book on manufacturing (written decades earlier) became a
Japanese best seller.

       There was a weekly radio program that trained workers,               lead hands,
supervisors, and managers on statistics and Dr. Deming's methods.           It became a
national hit in most Japanese homes. Drs. Deming and Juran because          celebrities in
constant         demand         as        speakers       and                 consultants.

      Decades later, the Emperor of Japan awarded Dr. Deming with the highest
Japanese award for a civilian in recognition for his decades of hard work and leadership
he    gave     to      the      Japanese       people     and      their    government.

       The Japanese business leaders listened, the rest is history.

Definition

       A holistic approach to long-term success that views continuous improvement in all
aspects of an organization as a process and not as a short-term goal. It aims to radically
transform the organization through progressive changes in the attitudes, practices,
structures, and systems.

       Total quality management transcends the product quality approach, involves
everyone in the organization, and encompasses its every function: administration,
communications, distribution, manufacturing, marketing, planning, training, etc.

        The continuous process of reducing or eliminating errors in manufacturing,
streamlining supply chain management, improving the customer experience and
ensuring that employees are up-to-speed with their training. Total quality management
aims to hold all parties involved in the production process as accountable for the overall
quality of the final product or service.
Elements

     Customer-focused. The customer ultimately determines the level of quality. No
      matter what an organization does to foster quality improvement—training
      employees, integrating quality into the design process, upgrading computers or
      software, or buying new measuring tools—the customer determines whether the
      efforts were worthwhile.

     Total employee involvement. All employees participate in working toward
      common goals. Total employee commitment can only be obtained after fear has
      been driven from the workplace, when empowerment has occurred, and
      management has provided the proper environment. High-performance work
      systems integrate continuous improvement efforts with normal business
      operations. Self-managed work teams are one form of empowerment.

     Process-centered. A fundamental part of TQM is a focus on process thinking. A
      process is a series of steps that take inputs from suppliers (internal or external)
      and transforms them into outputs that are delivered to customers (again, either
      internal or external). The steps required to carry out the process are defined,
      and performance measures are continuously monitored in order to detect
      unexpected variation.

     Integrated system. Although an organization may consist of many different
      functional specialties often organized into vertically structured departments, it is
      the horizontal processes interconnecting these functions that are the focus of
      TQM.
               Micro-processes add up to larger processes, and all processes
                 aggregate into the business processes required for defining and
                 implementing strategy. Everyone must understand the vision,
                 mission, and guiding principles as well as the quality policies,
                 objectives, and critical processes of the organization. Business
                 performance must be monitored and communicated continuously.

                Every organization has a unique work culture, and it is virtually
                 impossible to achieve excellence in its products and services unless a
                 good quality culture has been fostered. Thus, an integrated system
                 connects business improvement elements in an attempt to continually
                 improve and exceed the expectations of customers, employees, and
                 other stakeholders.


     Strategic and systematic approach. A critical part of the management of quality
      is the strategic and systematic approach to achieving an organization’s vision,
      mission, and goals. This process, called strategic planning or strategic
      management, includes the formulation of a strategic plan that integrates quality
      as a core component.

     Continual improvement. A major thrust of TQM is continual process
      improvement. Continual improvement drives an organization to be both
      analytical and creative in finding ways to become more competitive and more
      effective at meeting stakeholder expectations.
   Fact-based decision making. In order to know how well an organization is
       performing, data on performance measures are necessary. TQM requires that an
       organization continually collect and analyze data in order to improve decision
       making accuracy, achieve consensus, and allow prediction based on past
       history.

      Communications. During times of organizational change, as well as part of day-
       to-day operation, effective communications plays a large part in maintaining
       morale and in motivating employees at all levels. Communications involve
       strategies, method, and timeliness.


Objectives

             Process improvement
             Defect prevention
             Priority of effort
             Developing cause-effect relationships
             Measuring system capacity
             Developing improvement checklist and check forms
             Helping teams make better decisions
             Developing operational definitions
             Separating trivial from significant needs
             Observing behaviour changes over a period of time
THEORY OF CONSTRAINTS


Introduction

        Theory Of Constraints (TOC) adopts the common idiom "a chain is no stronger
than its weakest link". This means that processes, organizations, etc., are vulnerable
because the weakest person or part can always damage or break them or at least
adversely affect the outcome.

       It was created by Dr. Eli Goldratt and was published in his 1984 book "The
Goal." According to Goldratt, organizational performance is dictated by constraints.
These are where bottlenecks occur that prevent an organization from maximizing its
performance and reaching its goals. Constraints can involve people, supplies,
information, equipment, or even policies, and they can be internal or external to an
organization.

Definition

        The theory says that every system, no matter how well it performs, has at least
one constraint that limits its performance – this is the system's "weakest link." The
theory also says that a system can have only one constraint at a time, and that other
areas of weakness are "non-constraints" until they become the weakest link. The theory
was originally used successfully in manufacturing, but it can be used in a variety of
situations. It's most useful with important or frequently-used processes within your
organization.

STEPS IN APPLYING THE THEORY




      Exploit the Constraint

              The first step is to identify your weakest link – this is the factor that's
holding you back the most. Start by looking at the processes that you use regularly. It
can help to use tools like Flow Charts, Swim Lane Diagrams, Storyboarding, and
Failure Modes and Effects Analysis to map out processes and identify what's causing
issues.

        Remember that constraints may not just be physical. They can also include
intangible factors such as ineffective communication, restrictive company policies, or
even poor team morale. Also bear in mind that, according to the theory, a system can
only have one constraint at a time. So, you need to decide which factor is your weakest
link, and focus on that.

      Subordinate and Synchronize to the Constraint

               ―Subordinate everything to the constraint." This means that all other
organizational processes should also focus on eliminating the constraint. Solutions will
vary depending on the team, your goals, and the constraint you're trying to overcome.

      Evaluate Performance of the Constraint

              Review how the system is performing with the simple fixes you've put
into place.

      Repeat the Process

               Once you've eliminated the constraint, you can move back to step 1 and
identify another constraint.
LIFE-CYCLE COSTING

Introduction

         Life-cycle cost analysis (LCCA) is a method for assessing the total cost of facility
ownership. It takes into account all costs of acquiring, owning, and disposing of a
building or building system. LCCA is especially useful when project alternatives that
fulfil the same performance requirements, but differ with respect to initial costs and
operating costs, have to be compared in order to select the one that maximizes net
savings. Lowest life-cycle cost (LCC) is the most straightforward and easy-to-interpret
measure of economic evaluation.

Definition

       Procurement and production costing technique that considers all life cycle costs.
In procurement, it aims to determine the lowest cost of ownership of a fixed asset during
the asset's economic life. In manufacturing, it aims to estimate not only the production
costs but also how much revenue a product will generate and what expenses will be
incurred at each stage of the value chain during the product's estimated life cycle
duration.

       The purpose of an LCCA is to estimate the overall costs of project alternatives and
to select the design that ensures the facility will provide the lowest overall cost of
ownership consistent with its quality and function. The LCCA should be performed early
in the design process while there is still a chance to refine the design to ensure a
reduction in life-cycle costs (LCC).

       The first and most challenging task of an LCCA, or any economic evaluation
method, is to determine the economic effects of alternative designs of buildings and
building systems and to quantify these effects and express them in dollar amounts.




There are numerous costs associated with acquiring, operating, maintaining, and
disposing of a building or building system. Building-related costs usually fall into the
following categories:

      Initial Costs; Purchase, Acquisition, Construction Costs
      Fuel Costs
      Operation, Maintenance, and Repair Costs
      Replacement Costs
   Residual Values; Resale or Salvage Values or Disposal Costs
      Finance Charges; Loan Interest Payments
      Non-Monetary Benefits or Costs

        Only those costs within each category that are relevant to the decision and
significant in amount are needed to make a valid investment decision. Costs are relevant
when they are different for one alternative compared with another; costs are significant
when they are large enough to make a credible difference in the LCC of a project
alternative.


Life-Cycle Cost Calculation

       LCC = I + Repl — Res + E + W + OM&R + O

LCC     =     Total LCC in present-value (PV) dollars of a given alternative
I      =      PV investment costs
Repl   =      PV capital replacement costs
Res    =      PV residual value (resale value, salvage value) less disposal costs
E      =      PV of energy costs
W      =      PV of water costs
OM&R    =     PV of non-fuel operating, maintenance and repair costs
O       =      PV of other costs
In Partial Completion of the Requirements for




COST MANAGEMENT (Acc10a)


           ―FOCUS NOTES‖



                  Submitted to:
          Mr. Ricardo Marcellones, CPA



                  Submitted by:
              Kristine Joyce Tinga



                  March 21, 2013
REFERENCES


      Value re-engineering

http://www.ncs.com.sg/html/Brochures/Services/Business_Application_Services/Proc
ess_Re-engineering_for_Value.pdf

www.invest-in.org/invest/ve/index.php


      Total Quality Management

http://asq.org/learn-about-quality/total-quality-management/overview/overview.html

www.economist.com/node/14301657

www.wiley.com/college/sc/reid/chap5.pdf


      Life-Cycle Costing

www.businessdictionary.com/definition/life-cycle-costing.html

www.barringer1.com/pdf/LifeCycleCostSummary.pdf


      Theory of Constraints

www.scholarpedia.org/article/Theory_of_Constraints

www.mindtools.com › Strategy Tools

www.focusedperformance.com/toc01.html

Más contenido relacionado

La actualidad más candente

La actualidad más candente (20)

Tqm ch 01
Tqm ch 01Tqm ch 01
Tqm ch 01
 
The deming philosophy
The deming philosophyThe deming philosophy
The deming philosophy
 
Bpr vs TQM
Bpr vs TQMBpr vs TQM
Bpr vs TQM
 
Quality Management
Quality ManagementQuality Management
Quality Management
 
Process Change PPt
Process Change PPtProcess Change PPt
Process Change PPt
 
Building and sustaining total quality organizations
Building and sustaining total quality organizationsBuilding and sustaining total quality organizations
Building and sustaining total quality organizations
 
Tqm
TqmTqm
Tqm
 
Change mgt assignment
Change mgt assignmentChange mgt assignment
Change mgt assignment
 
Total quality management
Total quality managementTotal quality management
Total quality management
 
Quality circle 2
Quality circle 2Quality circle 2
Quality circle 2
 
Quality Management
Quality ManagementQuality Management
Quality Management
 
Total Quality Management
Total Quality Management Total Quality Management
Total Quality Management
 
Quality gurus osama 1 3-2010
Quality gurus osama 1 3-2010Quality gurus osama 1 3-2010
Quality gurus osama 1 3-2010
 
HR in TQM
HR in TQMHR in TQM
HR in TQM
 
Tqm vs bpr
Tqm vs bprTqm vs bpr
Tqm vs bpr
 
TOTAL QUALITY MANAGEMENT (TQM)
TOTAL QUALITY MANAGEMENT (TQM)TOTAL QUALITY MANAGEMENT (TQM)
TOTAL QUALITY MANAGEMENT (TQM)
 
Productivity and quality_mgmt_v2
Productivity and quality_mgmt_v2Productivity and quality_mgmt_v2
Productivity and quality_mgmt_v2
 
LDR 531 Final Exam Analysis | LDR 531 Final Exam Answers | LDR 531 Final Exam...
LDR 531 Final Exam Analysis | LDR 531 Final Exam Answers | LDR 531 Final Exam...LDR 531 Final Exam Analysis | LDR 531 Final Exam Answers | LDR 531 Final Exam...
LDR 531 Final Exam Analysis | LDR 531 Final Exam Answers | LDR 531 Final Exam...
 
Total quality management vs quality circles, tools
Total quality management vs quality circles, toolsTotal quality management vs quality circles, tools
Total quality management vs quality circles, tools
 
TQM & JIT
TQM & JITTQM & JIT
TQM & JIT
 

Similar a 10a_req

Trends In Mgmt Nw
Trends In Mgmt NwTrends In Mgmt Nw
Trends In Mgmt Nwjim
 
Feedback from the frontlines
Feedback from the frontlinesFeedback from the frontlines
Feedback from the frontlinesChelse Benham
 
Introduction to Total Quality Management
Introduction to Total Quality ManagementIntroduction to Total Quality Management
Introduction to Total Quality ManagementDrJayantaKumarMahato1
 
Introduction to Total Quality Management
Introduction to Total Quality ManagementIntroduction to Total Quality Management
Introduction to Total Quality ManagementDrJayantaKumarMahato1
 
Total quality management english socioeducational project
Total quality management  english socioeducational projectTotal quality management  english socioeducational project
Total quality management english socioeducational projectLorena Tapia
 
total quality management
total quality management total quality management
total quality management biruktigistu1
 
BS 99001 Quality Management in the Built Environment sector.pdf
BS 99001 Quality Management in the Built Environment sector.pdfBS 99001 Quality Management in the Built Environment sector.pdf
BS 99001 Quality Management in the Built Environment sector.pdfdemingcertificationa
 
Unit 6_ Qulaity Assurance_Lecture 7 (6) (2).pptx
Unit 6_ Qulaity Assurance_Lecture 7 (6) (2).pptxUnit 6_ Qulaity Assurance_Lecture 7 (6) (2).pptx
Unit 6_ Qulaity Assurance_Lecture 7 (6) (2).pptxSriSusilawatiIslam
 
tqm midterm reviewer.docx
tqm midterm reviewer.docxtqm midterm reviewer.docx
tqm midterm reviewer.docxSephTorres1
 
Change Management
Change Management Change Management
Change Management Swagat Rath
 
Quality management gurus research by Behzaad Bahreyni
Quality management gurus research by Behzaad BahreyniQuality management gurus research by Behzaad Bahreyni
Quality management gurus research by Behzaad BahreyniBehzaad Bahreyni
 
Philosophies and Frameworks daniel pirzada
Philosophies and Frameworks daniel pirzadaPhilosophies and Frameworks daniel pirzada
Philosophies and Frameworks daniel pirzadaAbdullahTariq648768
 
1. Change in Organizations2. Planned Change Strategies3. Res.docx
1. Change in Organizations2. Planned Change Strategies3. Res.docx1. Change in Organizations2. Planned Change Strategies3. Res.docx
1. Change in Organizations2. Planned Change Strategies3. Res.docxblondellchancy
 
Undersstanding of lean mananagement & processes course content sign
Undersstanding of lean mananagement & processes course content signUndersstanding of lean mananagement & processes course content sign
Undersstanding of lean mananagement & processes course content signTeh Chin Weng
 
International Journal of Business and Management Invention (IJBMI)
International Journal of Business and Management Invention (IJBMI)International Journal of Business and Management Invention (IJBMI)
International Journal of Business and Management Invention (IJBMI)inventionjournals
 

Similar a 10a_req (20)

Trends In Mgmt Nw
Trends In Mgmt NwTrends In Mgmt Nw
Trends In Mgmt Nw
 
Feedback from the frontlines
Feedback from the frontlinesFeedback from the frontlines
Feedback from the frontlines
 
Introduction to Total Quality Management
Introduction to Total Quality ManagementIntroduction to Total Quality Management
Introduction to Total Quality Management
 
Introduction to Total Quality Management
Introduction to Total Quality ManagementIntroduction to Total Quality Management
Introduction to Total Quality Management
 
Total quality management english socioeducational project
Total quality management  english socioeducational projectTotal quality management  english socioeducational project
Total quality management english socioeducational project
 
total quality management
total quality management total quality management
total quality management
 
Doe
DoeDoe
Doe
 
BS 99001 Quality Management in the Built Environment sector.pdf
BS 99001 Quality Management in the Built Environment sector.pdfBS 99001 Quality Management in the Built Environment sector.pdf
BS 99001 Quality Management in the Built Environment sector.pdf
 
Unit 6_ Qulaity Assurance_Lecture 7 (6) (2).pptx
Unit 6_ Qulaity Assurance_Lecture 7 (6) (2).pptxUnit 6_ Qulaity Assurance_Lecture 7 (6) (2).pptx
Unit 6_ Qulaity Assurance_Lecture 7 (6) (2).pptx
 
tqm midterm reviewer.docx
tqm midterm reviewer.docxtqm midterm reviewer.docx
tqm midterm reviewer.docx
 
Change Management
Change Management Change Management
Change Management
 
Quality management gurus research by Behzaad Bahreyni
Quality management gurus research by Behzaad BahreyniQuality management gurus research by Behzaad Bahreyni
Quality management gurus research by Behzaad Bahreyni
 
Philosophies and Frameworks daniel pirzada
Philosophies and Frameworks daniel pirzadaPhilosophies and Frameworks daniel pirzada
Philosophies and Frameworks daniel pirzada
 
Quality management
Quality managementQuality management
Quality management
 
Tqm r esearch ppt final
Tqm r esearch ppt finalTqm r esearch ppt final
Tqm r esearch ppt final
 
1. Change in Organizations2. Planned Change Strategies3. Res.docx
1. Change in Organizations2. Planned Change Strategies3. Res.docx1. Change in Organizations2. Planned Change Strategies3. Res.docx
1. Change in Organizations2. Planned Change Strategies3. Res.docx
 
Undersstanding of lean mananagement & processes course content sign
Undersstanding of lean mananagement & processes course content signUndersstanding of lean mananagement & processes course content sign
Undersstanding of lean mananagement & processes course content sign
 
International Journal of Business and Management Invention (IJBMI)
International Journal of Business and Management Invention (IJBMI)International Journal of Business and Management Invention (IJBMI)
International Journal of Business and Management Invention (IJBMI)
 
Lesson6
Lesson6Lesson6
Lesson6
 
Tqm
TqmTqm
Tqm
 

Último

Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting DataJhengPantaleon
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsKarinaGenton
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 

Último (20)

Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its Characteristics
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 

10a_req

  • 1. VALUE RE-ENGINEERING Introduction Value engineering began at General Electric Co. during World War II. Because of the war, there were shortages of skilled labor, raw materials, and component parts. Lawrence Miles, Jerry Leftow, and Harry Erlicher at G.E. looked for acceptable substitutes. They noticed that these substitutions often reduced costs, improved product, or both. What started out as an accident of necessity was turned into a systematic process. They called their technique ―value analysis‖. Definition Value Engineering (VE) is a methodology that focuses on the function of a product or service to improve value without sacrificing quality or reliability. VE involves assembling a cross section of multi-disciplined professionals and enabling them to work together, each bringing a unique perspective and expertise to the assignment. VE relies heavily on team-building principles, and focuses on effective communicating, careful listening and understanding, the generation of creative solutions, and efficient decision making. Value Job Analysis Plan Value engineering is often done by systematically following a multi-stage job plan. Others have varied the job plan to fit their constraints. Depending on the application, there may be four, five, six, or more stages. One modern version has the following eight steps: 1. Preparation 2. Information
  • 2. 3. Analysis 4. Creation 5. Evaluation 6. Development 7. Presentation 8. Follow-up Four basic steps in the job plan are: Information gathering - This asks what the requirements are for the object. Function analysis, an important technique in value engineering, is usually done in this initial stage. It tries to determine what functions or performance characteristics are important. It asks questions like; What does the object do? What must it do? What should it do? What could it do? What must it not do? Alternative generation (creation) - In this stage value engineers ask; What are the various alternative ways of meeting requirements? What else will perform the desired function? Evaluation - In this stage all the alternatives are assessed by evaluating how well they meet the required functions and how great will the cost savings be. Presentation - In the final stage, the best alternative will be chosen and presented to the client for final decision Benefits  Lowering Overhead & Material costs  Improving quality management  Improving resource efficiency  Simplifying procedures  Minimizing paperwork  Lowering staff costs  Increasing procedural efficiency  Optimizing construction expenditures  Developing value attitudes in staff  Competing more successfully in marketplace
  • 3. TOTAL QUALITY MANAGEMENT Introduction After World War II, the U.S. was the only major power with an intact economy. Deming and Juran found their quality improvement theories irrelevant to U.S. business leaders. They were interested in quantity, not quality. Deming found a more appreciative audience in Japan, where he was conducting postwar census work. He was invited to speak about his views during a now-famous dinner in the early 1950's. Shortly after, Dr. Deming predicted in the early 1950's that the Japanese industry would become a world-class force equal to any other country. Everyone around the world laughed. The Japanese didn't laugh . They worked hard to apply the lessons learned. Henry Ford's book on manufacturing (written decades earlier) became a Japanese best seller. There was a weekly radio program that trained workers, lead hands, supervisors, and managers on statistics and Dr. Deming's methods. It became a national hit in most Japanese homes. Drs. Deming and Juran because celebrities in constant demand as speakers and consultants. Decades later, the Emperor of Japan awarded Dr. Deming with the highest Japanese award for a civilian in recognition for his decades of hard work and leadership he gave to the Japanese people and their government. The Japanese business leaders listened, the rest is history. Definition A holistic approach to long-term success that views continuous improvement in all aspects of an organization as a process and not as a short-term goal. It aims to radically transform the organization through progressive changes in the attitudes, practices, structures, and systems. Total quality management transcends the product quality approach, involves everyone in the organization, and encompasses its every function: administration, communications, distribution, manufacturing, marketing, planning, training, etc. The continuous process of reducing or eliminating errors in manufacturing, streamlining supply chain management, improving the customer experience and ensuring that employees are up-to-speed with their training. Total quality management aims to hold all parties involved in the production process as accountable for the overall quality of the final product or service.
  • 4. Elements  Customer-focused. The customer ultimately determines the level of quality. No matter what an organization does to foster quality improvement—training employees, integrating quality into the design process, upgrading computers or software, or buying new measuring tools—the customer determines whether the efforts were worthwhile.  Total employee involvement. All employees participate in working toward common goals. Total employee commitment can only be obtained after fear has been driven from the workplace, when empowerment has occurred, and management has provided the proper environment. High-performance work systems integrate continuous improvement efforts with normal business operations. Self-managed work teams are one form of empowerment.  Process-centered. A fundamental part of TQM is a focus on process thinking. A process is a series of steps that take inputs from suppliers (internal or external) and transforms them into outputs that are delivered to customers (again, either internal or external). The steps required to carry out the process are defined, and performance measures are continuously monitored in order to detect unexpected variation.  Integrated system. Although an organization may consist of many different functional specialties often organized into vertically structured departments, it is the horizontal processes interconnecting these functions that are the focus of TQM.  Micro-processes add up to larger processes, and all processes aggregate into the business processes required for defining and implementing strategy. Everyone must understand the vision, mission, and guiding principles as well as the quality policies, objectives, and critical processes of the organization. Business performance must be monitored and communicated continuously.  Every organization has a unique work culture, and it is virtually impossible to achieve excellence in its products and services unless a good quality culture has been fostered. Thus, an integrated system connects business improvement elements in an attempt to continually improve and exceed the expectations of customers, employees, and other stakeholders.  Strategic and systematic approach. A critical part of the management of quality is the strategic and systematic approach to achieving an organization’s vision, mission, and goals. This process, called strategic planning or strategic management, includes the formulation of a strategic plan that integrates quality as a core component.  Continual improvement. A major thrust of TQM is continual process improvement. Continual improvement drives an organization to be both analytical and creative in finding ways to become more competitive and more effective at meeting stakeholder expectations.
  • 5. Fact-based decision making. In order to know how well an organization is performing, data on performance measures are necessary. TQM requires that an organization continually collect and analyze data in order to improve decision making accuracy, achieve consensus, and allow prediction based on past history.  Communications. During times of organizational change, as well as part of day- to-day operation, effective communications plays a large part in maintaining morale and in motivating employees at all levels. Communications involve strategies, method, and timeliness. Objectives  Process improvement  Defect prevention  Priority of effort  Developing cause-effect relationships  Measuring system capacity  Developing improvement checklist and check forms  Helping teams make better decisions  Developing operational definitions  Separating trivial from significant needs  Observing behaviour changes over a period of time
  • 6. THEORY OF CONSTRAINTS Introduction Theory Of Constraints (TOC) adopts the common idiom "a chain is no stronger than its weakest link". This means that processes, organizations, etc., are vulnerable because the weakest person or part can always damage or break them or at least adversely affect the outcome. It was created by Dr. Eli Goldratt and was published in his 1984 book "The Goal." According to Goldratt, organizational performance is dictated by constraints. These are where bottlenecks occur that prevent an organization from maximizing its performance and reaching its goals. Constraints can involve people, supplies, information, equipment, or even policies, and they can be internal or external to an organization. Definition The theory says that every system, no matter how well it performs, has at least one constraint that limits its performance – this is the system's "weakest link." The theory also says that a system can have only one constraint at a time, and that other areas of weakness are "non-constraints" until they become the weakest link. The theory was originally used successfully in manufacturing, but it can be used in a variety of situations. It's most useful with important or frequently-used processes within your organization. STEPS IN APPLYING THE THEORY  Exploit the Constraint The first step is to identify your weakest link – this is the factor that's holding you back the most. Start by looking at the processes that you use regularly. It can help to use tools like Flow Charts, Swim Lane Diagrams, Storyboarding, and
  • 7. Failure Modes and Effects Analysis to map out processes and identify what's causing issues. Remember that constraints may not just be physical. They can also include intangible factors such as ineffective communication, restrictive company policies, or even poor team morale. Also bear in mind that, according to the theory, a system can only have one constraint at a time. So, you need to decide which factor is your weakest link, and focus on that.  Subordinate and Synchronize to the Constraint ―Subordinate everything to the constraint." This means that all other organizational processes should also focus on eliminating the constraint. Solutions will vary depending on the team, your goals, and the constraint you're trying to overcome.  Evaluate Performance of the Constraint Review how the system is performing with the simple fixes you've put into place.  Repeat the Process Once you've eliminated the constraint, you can move back to step 1 and identify another constraint.
  • 8. LIFE-CYCLE COSTING Introduction Life-cycle cost analysis (LCCA) is a method for assessing the total cost of facility ownership. It takes into account all costs of acquiring, owning, and disposing of a building or building system. LCCA is especially useful when project alternatives that fulfil the same performance requirements, but differ with respect to initial costs and operating costs, have to be compared in order to select the one that maximizes net savings. Lowest life-cycle cost (LCC) is the most straightforward and easy-to-interpret measure of economic evaluation. Definition Procurement and production costing technique that considers all life cycle costs. In procurement, it aims to determine the lowest cost of ownership of a fixed asset during the asset's economic life. In manufacturing, it aims to estimate not only the production costs but also how much revenue a product will generate and what expenses will be incurred at each stage of the value chain during the product's estimated life cycle duration. The purpose of an LCCA is to estimate the overall costs of project alternatives and to select the design that ensures the facility will provide the lowest overall cost of ownership consistent with its quality and function. The LCCA should be performed early in the design process while there is still a chance to refine the design to ensure a reduction in life-cycle costs (LCC). The first and most challenging task of an LCCA, or any economic evaluation method, is to determine the economic effects of alternative designs of buildings and building systems and to quantify these effects and express them in dollar amounts. There are numerous costs associated with acquiring, operating, maintaining, and disposing of a building or building system. Building-related costs usually fall into the following categories:  Initial Costs; Purchase, Acquisition, Construction Costs  Fuel Costs  Operation, Maintenance, and Repair Costs  Replacement Costs
  • 9. Residual Values; Resale or Salvage Values or Disposal Costs  Finance Charges; Loan Interest Payments  Non-Monetary Benefits or Costs Only those costs within each category that are relevant to the decision and significant in amount are needed to make a valid investment decision. Costs are relevant when they are different for one alternative compared with another; costs are significant when they are large enough to make a credible difference in the LCC of a project alternative. Life-Cycle Cost Calculation LCC = I + Repl — Res + E + W + OM&R + O LCC = Total LCC in present-value (PV) dollars of a given alternative I = PV investment costs Repl = PV capital replacement costs Res = PV residual value (resale value, salvage value) less disposal costs E = PV of energy costs W = PV of water costs OM&R = PV of non-fuel operating, maintenance and repair costs O = PV of other costs
  • 10. In Partial Completion of the Requirements for COST MANAGEMENT (Acc10a) ―FOCUS NOTES‖ Submitted to: Mr. Ricardo Marcellones, CPA Submitted by: Kristine Joyce Tinga March 21, 2013
  • 11.
  • 12. REFERENCES  Value re-engineering http://www.ncs.com.sg/html/Brochures/Services/Business_Application_Services/Proc ess_Re-engineering_for_Value.pdf www.invest-in.org/invest/ve/index.php  Total Quality Management http://asq.org/learn-about-quality/total-quality-management/overview/overview.html www.economist.com/node/14301657 www.wiley.com/college/sc/reid/chap5.pdf  Life-Cycle Costing www.businessdictionary.com/definition/life-cycle-costing.html www.barringer1.com/pdf/LifeCycleCostSummary.pdf  Theory of Constraints www.scholarpedia.org/article/Theory_of_Constraints www.mindtools.com › Strategy Tools www.focusedperformance.com/toc01.html