Computer Validation Training Series




 Computer Validation
Fundamentals Training
      Manual
Why do you need to be here?

●   As you use or support regulated computer systems, you may impact their
    validated state
●   This subject has been identified as a key concern by the highest levels of our
    company
●   We are expected to validate and control our important computer systems in
    accordance with GSK expectations
●   If important computer systems at your site operate poorly, it may reflect badly
    on all of GSK and cause a loss of customer confidence worldwide
After this training you should be able to….

●   Describe the background behind computer validation as it applies to GSK
●   Understand why GSK views this topic as a key business, safety, and
    regulatory benefit
●   Recognise the GSK Computer Validation Life Cycle and its major activities
    and deliverables
●   Explain the items included in the Computer System Validation Checklist
●   Know where to learn more about the GSK expectations for computer
    validation
Introduction

●   Computerisation is now dominating almost every aspect of our jobs at GSK
●   Computer validation has rapidly become a critical issue in GSK and
    throughout the rest of our industry
●   Many of our employees may not be aware that they routinely impact the
    validated state of computer systems
●   Computer validation is mostly important for business and safety reasons
●   However, many people first noticed computer validation because of
    regulatory scrutiny
Process Validation Roots

●   Process Validation began before Computer Validation
●   Regulators and the drug companies have both been focused on Process
    Validation for a long time
●   Process Validation terminology (e.g. IQ,OQ,PQ) and mindset carried over to
    Computer Validation
Is Computer Validation new?
●   No, it has been required for over 20 years
●   For many years, it was usually overlooked during regulatory inspections
●   During the last 5 years, it has quickly increased in importance to the
    regulators and drug companies
●   Many drug companies now see that there is high risk of severe punishment
    from regulators for not doing it properly
●   Everyone that uses, supports, buys, or develops regulated GSK computer
    systems must understand how their actions impact the validated state of those
    systems
What is a Computer System?
   In general, a combination of hardware, software, people, documents, inputs,
processing, and outputs working together




                           Inputs              outputs




      Software     Hardware                     Equipment

                                           Operating Procedures &
       Controlling System                     Documentation


      Controlled process                   People and Training
What Computer Systems do you use?
●   MRP/ERP system?
●   LIMS system?
●   Laboratory Instruments (e.g. Chromatography)?
●   Automated manufacturing or packaging equipment?
●   IT systems, including those supporting network and infrastructure?
●   Spreadsheets or databases?
Applicability?
●   Do you know how to identify whether a system you use requires validation?
●   Global Quality Guideline 1401A is our tool to sort these out
●   Do you know if the systems you sue have not been validated or were already
    validated?
●   Ask your local Computer Inspection Readiness representative or validation group.
    Your systems should be listed on a local system register that includes the
    validation status
Who plays a validation role?
●   Users play a key validation role in:
       ─starting the process for new or existing systems
       ─performing some major steps (e.g. Requirements)
       ─writing and following operating procedure
       ─maintaining the validated state while in use

●   Developers play a key role in many steps including:
       ─design, coding, testing, changes, support

●   Support groups (IT, IR, SCS, Infrastructure):
       ─maintain proper network environment
       ─troubleshooting and maintenance
       ─desktop and infrastructure control
Who plays a validation role?
●   QA and Validation
      ─author some major documents
      ─approve major documents that others write
      ─provide advice, training, auditing

●   Senior management for each group decides:
      ─which systems to buy or build
      ─how much resource to make available
      ─what risks are acceptable
How can computers systems be better than
          people doing the same tasks?
●   Computer systems that work properly...
●   are faster than people
●   make less mistakes than people
●   do not need sleep (24 hour operation is possible)
●   are less expensive than people (no salary)
How can computers systems be worse than
          people doing the same tasks?
●   Computer systems that work improperly...
●   cause people to lose time while they fix the errors
●   make much more serous mistakes than people
●   can stop all production or release or product
●   are far more expensive than people
Why can defects in computer systems be
      worse than other equipment problems?
●   When equipment breaks, there are typically obvious and immediate symptoms.
    Catastrophic results can often be avoided
●   Computer system defects can typically be very difficult to recognise and severe
    problems may result without being detected until well after the problem started
●   Drug companies, the airline industry, public utilities, nuclear power plants and
    other industries where quality is critical have seen very expensive consequences
    from improper computer system operation
●   Many of these consequences cost far more than the cost of Computer Vlidation
What is Computer Validation?
●   The ongoing process of establishing documented evidence which provides a
    high degree of assurance that a system will consistently perform according to
    its predetermined specifications and quality attributes
●   ongoing...- starts at initial concept, does not stop until retired
●   documented...- written testing
●   predetermined...- must document what we want at the start
Is it difficult?
●   It depends!
●   If you begin the process at the start, when the computer system is first considered
    for possible purchase or development, then it should be much easier
●   Lack of understanding of computer validation will make it more difficult, take more
    time, and result in more errors
Is it expensive?
●   It depends! Where do you draw the line between good business practice and
    required computer validation steps?
●   Many of these required computer validation steps are considered good business
    practice that many of us are taught during computer programming classes
●   If you compare it to the price of not validating, then the price is typically very low
Why Validation?


●   Business reasons
●   Safety reasons
●   Regulatory reasons
Cost to Fix
          When
      Problem found         Cost to correct




requirements
   design

     code
      test

  implement
How can defects in your computer systems
                      hurt the entire company?

●   The world is now much smaller with the use of the internet and mass media
    communications
●   Defects in your computer systems that cause harm to public may be rapidly
    communicated globally to all customers
●   Customers may then assume that they could be harmed by using our products
    made at any of our sites
●   This can reflect poorly on global product sales and stock values
Would you allow this surgical
computer system to be used on you?
The Regulatory Benefit?
●   Regulatory agencies around the world are rapidly increasing their scrutiny of
    computer systems
       ─In the first 5 months of 2001, there were 50% more computer validation findings than in
       all of 2000 (2nd highest category for From 483 observations)
●   GSK has come very close to severe penalties by the FDA for poor computer
    validation
●   Regulators have made it clear to us that they consider that problems at one site
    are an indication of conditions for the entire company
The GMP “Hook” to Computer Systems
                                 FDA:21 CFR 211.68
●   “ … equipment, including computers… that will perform a function satisfactorily…
    can be used in manufacturing, processing, packaging an holding of a a drug
    product.”
●   Requires “ … written program designed to assure proper performance.”
●   Requires “ appropriate controls shall be exercised over computer or related
    systems…” input/output accuracy check, backup file of data that is exact and
    complete
●   Requires written record of the program to be along with “ appropriate” validation
    data
The GMP “Hook” to Computer Systems
                                   MCA: Annex 11
●   “ Where a computerised system replaces a manual operation, there should be no
    resultant decrease in product quality or quality assurance”
●   “Where critical data are being entered manually … there should be additional
    check of accuracy of the record… This check may be done by a second operator
    or by validated electronic means”
●   “Before a system using a computer is brought into use, it should be thoroughly
    tested and confirmed as being capable of achieving the desired results”
There are also other regulatory agencies increasing attention on
            computer systems. These are just a few…
Regulatory Focus
●   We receive regular input on regulatory trends and expectations through many
    sources including…
●   Direct communication with the regulators
●   Representation in industry groups (e.g. GAMP, ISPE, PDA)
●   The FDA posts recent Warning Letters on their web site at http://www.fda.gov/foi/
    warning.htm
●   “GMP Trends” publishes excerpts from Form 483 observations semi-monthly
    (http://www.gmptrends.com)
●   Other magazines, web sites, industry conferences, and more
Summary of Benefits
●   Computer systems now serve in critical roles in every aspect or our business
●   Because of the unique nature of computer systems, problems can be hard to
    detect in advance, but catastrophic
●   Poorly built systems can easily
       ─   halt production and product release
       ─   harm the public before we know of a defect
       ─   result in severe regulatory penalty
●   We cannot afford to ignore the need for ensuring that quality is built into our
    computer systems
Planning

                                   Planning
               Decommissioning
                                                 Supplier Assessment

                                 Phases of
                Use
                             Computer System         Requirements
                                Lifecycle


               Deployment
                            Developmen         Design and Code
                                 t
Cross-Phase                   Testing
  Activities
  (always)
Phases of the Lifecycle
Reference Global Quality Guideline 1205


   ●Planning
   ●Supplier Assessment

   ●Requirements

   ●Design and Code

   ●Development Testing

   ●Deployment

   ●Use

   ●Decommissioning

   ●Cross Phase-Activities
Planning Phase
●   Business Requirements
       ─high level, not product-specific
       ─can be used to make business case and select product
       ─required functions and constraints,
       ─enough detail to make compliance assessment
●   Compliance Assessment - is system GxP-related?
●   ERES Assessment - if GxP, assess based on GQG 1401A
●   Validation Planning
       ─defines standards to maintain quality during life of system
       ─key roles and responsibilities
       ─deliverables, rationale for approach
Supplier Assessment Phase

●   Compare supplier’s validation activities/deliverables with ours

●   Information used to determine activities needed by GSK where supplier is deficient

●   Validation Plan should state whether supplier audit is needed and when it will be

    done
User-Supplier Relationship
 Primary Responsibility                                                                                       Primary Responsibility
    for Specification                                                                                              for Testing

                                                                  Testing of the URS
User                               User Requirements                                                    Performance
                                     Specification                                                      Qualification                                             User




                                                                                                                           More Supplier involvement for custom
       More User involvement for custom




                                            Functional                 Testing of the               Operation
          systems, less for packaged




                                                                                                                                systems, less for packaged
                                           Specification          Functional Specification         Qualification


                                                                       Testing of the
                                                    Design                                    Installation
                                                  Specification                               Qualification
                                                                       Design Specification




                                                                    Build System



                                             Design                                            Unit Testing
                                           Specification                                                                                            Supplier
Supplier


                      Requirement Specification                                                      System Testing
Requirements Phase

●   Business Requirements are further developed to make the User Requirements

    Specifications (URS)

●   URS details what the system should do, but not how

●   Categorise level of importance- must, should, could
Computer System require more detailed specifications...
User Requirements Specification
                                  Requirements Phase

●   Requirements traceable to Functional Specifications and testing
●   Unambiguous, clear, concise
●   Testable and measurable
●   Typically written and approved by end-user
●   Basis for system acceptance testing
●   Should be approved before the design review
Functional Specification
                                    Design and Code Phase

●   The highest level design document responding directly to the User Requirements
    Specification
●   All system inputs, outputs, and interfaces
●   All functions and performance requirements
●   Error definition and handling
●   Ranges, limits, defaults
●   Safety considerations
Design Specification
                                  Design and Code Phase

●   Defines how the system should meet the requirements, including…
●   Architecture AND interfaces
●   All functions
●   Data processing and integrity
●   Security
●   Backup, archive, and restoration
●   disaster recovery
●   Data definition
Design Review
                                  Design and Code Phase

●   Activity performed to verify that all deliverables from Requirements and Design
    Phases are produced and…
●   are clear and concise
●   are complete, current, and traceable
●   electronic record and signatures addressed
●   are testable
●   show system fit for purpose
Coding and Configuration
                                  Design and Code Phase

●   Design Review should be complete before starting
●   Should be performed in accordance with written Programming Standards
●   Programming Standards should define appropriate rules for writing source code
    (e.g. dead code, structure, naming)
●   Example of Dead Code:
            Line 5: GOTO Line7;
            Line 6: Add 5 to all input variables;
            Line 7: Add 3 to all input variables;
    For this example, it should not possible for Line 6 t execute during actual system
    operation
Code and Configuration Review
                                Design and Code Phase


●   Should be completed before formal testing

●   Verify code complies with Programming Standards

●   Check to ensure all pre-defined system specifications are addressed

●   Check for coding errors
Development Testing Phase
Testing at Multiple Levels
                                     Development Testing Phase


    ‘White Box’ *
●   Unit Testing/Structural Testing
                                                                                                out
●   Low level                                                    in
    ‘Black Box’ *
●   System & Acceptance testing
●   Functional Testing
●   Higher level
                                                                      in                        out




                                                                           Manual Calculation
            * -Unofficial term used for explanation of concept
Test Plan
                                  Development Testing Phase


●   Define and justify the how the system will be tested and how much

●   Address how tests are traceable to specifications

●   Testing approach should address
       —normal operation
       —entire design range, boundaries, stress
       —failure modes, including power failure

●   Should be approved before testing starts
Test Case
                             Development Testing Phase


●Lists the test objective

●Traceable to specifications

●Lists test pre-requisites

●Reproducible test steps

●Clear acceptance criteria
Test Results
                                  Development Testing Phase


●   Record all raw data and derived results

●   Ticks, ‘ok’, ‘yes/no’, ‘Pass/Fail’ or similar are not valid results

●   Record a ‘Pass/Fail’ conclusion of whether results met acceptance criteria

●   Signature and date of test performer

●   Signature and date of test result approver

●   References to incident log for failures
Test Report
                                  Development Testing Phase


●   Used to…
       ═collate test result documentation

       ═conclude each phase of testing

       ═authorise subsequent testing phases

●   Summarises the testing outcome, addresses test failures
Deployment Phase

●   Data Load

●   Operational and Support Plans (e.g. SOP, training, service contracts, security,

    support processes)

●   Installation Qualification (IQ) - verifies installed in accordance with specifications

    and diagnostics checks performed
Deployment Phase

●   Operational Qualification (OQ) -user acceptance testing of base functionality
    under normal and stress conditions
●   System Release - can use in live environment before PQ
●   Performance Qualification (PQ) - verify OK while in actual use
●   Validation Report - summarise all activities, address deviations, provide
    conclusion
Use Phase

●   Implementation of Operational and Support Plans

●   Dial-in Support Services - be very careful if you allow this

●   Upgrades and fixes - manage through change control

●   Periodic Reviews - verify still in a validated state

●   Revalidation as required
Archive and Decommission Phase

●   Occurs at end of system life

●   Store records to ensure compliance with rules for electronic records and record

    retention
Cross Phase Activities

●Requirements Traceability

●Change Control

●Configuration Management

●Incident Management

●Documentation Management

●Training
Validation Planning

●   “ A documented plan exists for validation this system”
●   Sample Regulatory Observation
            No original planning documents included in the validation materials
    for the programs
●   “ This plan includes the deliverables and activities that were to result from the
    validation effort”
●   Sample Regulatory Observation
           ‘The procedure calls for the same individual who writes/revises the
    program to validate the program’
●   “The supplier of this system has been audited (report available)”
●   “ A system description or overview is available”
Functional Requirements
                    (document in the User Requirements Specification)

●   “ Functional Requirements (or equivalent named document) exist for this system”
●   “The Functional Requirements identifies all functions that the system must
    perform”
●   “The Functional Requirements are approved using a signature”
●   “The Functional Requirements are updated for each system functional change”
●   “The Functional Requirements include enough detail to allow objective test
    measurement”
●   Sample Regulatory Observation
    ‘The procedure discusses discrepancies in decimal places between the
    computer and manual results and …” significant values”. There is no
    definition of “significant values”’
Functional Requirements
                   (document in the User Requirements Specification)


●   “ Either the Functional Requirements or Design Specifications provide a system

    overview”

●   “Function Requirement are traceable to corresponding design elements”

●   “ Function Requirement are traceable to corresponding test elements”
Summary/Release Documentation
●   “ The system was not released prior to completion of the activities defined in the
    validation plan”
●   “ Version numbers are used to identify each component of the computer system
    installed for use and it’s current supportive documentation”
●   Sample Regulatory Observation
    ‘Inadequate software version control’
●   “ All required approval signatures were obtained prior to release of the system”
●   Sample Regulatory Observation
    ‘Inconsistencies in the review of the validation documents’
●   “A summary of the validation documents and activities for this computer system is
    available”
●   “ The system was released into production in accordance with a SOP”
●   Sample Regulatory Observation
    ‘There were no written requirements/specifiactions and validation protocol
    SOP at the time of validation’
System Maintenance and Operation

●   “ Change were tested prior to placing the change into production use”
●   “ Enhancements and modifications to computerised systems and associated
    documentation re implemented under change control and configuration
    management that maintains version history of computer components”
●   “ Changes were approved prior to placing the change into production use”
●   Sample Regulatory Observation
    ‘Inconsistencies in the review of the validation documents’
●   “ The site’s change control documentation fully describes proposed or actual
    changes”
●   “There is a SOP defining how users are to interact with the system to perform their
    jobs”
System Maintenance and Operation
●   “ All system users have been trained on the system operation SOP”
●   “The need for possible regression testing was addressed in the change control
    documentation”
●   “ There is a written Disaster Recovery Plan that will restore operation of this
    system”
●   “ Documented testing of the Disaster Recovery Plan has been performed”
●   “ Changes have a documented evaluation of whether a complete system re-
    validation is warranted”
●   “ The site can provide a list of authorised users and their security access profile”
●   “ There is evidence that access is terminated for transferred or terminated
    employees”
●   “ There is a documented process and criteria to revoke system access”
Electronic Records/Electronic Signatures
                                       (ERES)
●   “A written ER/ES compliance assessment, suitable for presentation to an
    investigator, is available for this system”
●   “ The application has an automatic, electronic audit trail to record changes to
    electronic records”
●   “ Authorised deletions of electronic records are only performed with an appropriate
    audit trail”
●   This completes the Computer System Validation Self Inspection Checklist, but
    there are many other critical computer validation points on the other Self
    Inspection Checklists that are not specific to individual systems
What about Legacy System?

●   Your site may have systems that are not validated or that don’t meet today’s
    regulatory expectations
●   These systems must be validated to comply with GSK policy on computer
    validation (Global Quality Policy 1205)
●   GQP 1205 does not allow retrospective validation as an acceptable substitute for
    prospective validation
●   For systems that are in use without validation, retrospective validation should be
    done as a prospective
Scalability

●   Many deliverables in the computer validation life cycle may be combined into the
    same document or made smaller
●   This scalability is dependent on the size, complexity, intended use, and risks
    associated with the computer system
●   However, some deliverables cannot be combined because of their intended role
    and timing in the life cycle
●   For example, Business Requirements can often be combined with the User
    Requirements Specification, but Requirements and Testing cannot be combined
Can this be done more than one way?

●   Yes!
●   GQG 1205 describes how several key areas of intended use for computer
    systems may be validated differently
      ═Laboratory systems
      ═Control systems
      ═Desktop applications
      ═IT systems
      ═IT infrastructure
      ═Software tools
Should this always be done the same way?


●   No!
●   You probably don’t have the resource to use a “one-size-fits-all” approach to
    computer validation
●   Regulatory agencies have made it clear that they do not insist on a “one-size -fits-
    all” approach
●   Attempting to validate spreadsheets using the same method as for a MRP system
    may be wasting resource that could be better applied to fixing compliance gaps
Is this a one-time effort?


●   Validation does not end when a system is put into use
●   When systems are changed, the validation deliverables may need to be updated
●   As your site’s priorities and resources change, more work may be required to
    improve the compliance of system
●   As regulatory expectations for computer validation change, more validation
    activities are required
●   Significant resource is always needed on permanent basis to maintain the
    validated state of systems already in use
Popular Misconceptions?


●   “ We bought it from a vendor…” so we can get by with very little for validation
●   The vendor supplies a validation package - that’s all we need
●   “ Validation can be done at the end - just be fore turnover
●   The Validation Department approved it - there shouldn’t be any bugs
●   Computer Validation is slowing down this project
●   We can’t afford to perform Computer Validation
●   The Regulatory Agencies will not look at our Computer Validation
●   Testing is Validation
What does success look like?


●   Many of our manufacturing sites have not yet experienced a computer system
    inspection, but will soon
●   Without having first-hand knowledge of what it takes to succeed during a computer
    system inspection, many sites need help
●   Global Computer Validation can help by providing training, coaching, consultation,
    and examples
Challenges


●   Staff that are not trained or experienced in performing computer validation and
    don’t know what they don’t know
●   Lack of resource-people, time, money
●   Resources are not always allocated based on a complete understanding of the
    challenges faced in achieving compliance in computer validation
●   Specific regulatory expectations can be hard to define, since much of them are not
    written directly into regulations
What should we target first?


●   We must comply with commitments made by GSK to the regulators
●   We must avoid deficiencies that have repeatedly been the source of citations to
    GSK and other pharmaceutical companies
●   These are all defined in the Computer Inspection Readiness Self Inspection
    Checklists
●   We must also follow all of Gsk policy, but start with these checklists
Priorities
●   Computer validation is only one of many high priorities that your site or group
    faces
●   Your site or group is responsible for determining the proper balance of resource
    and risk for each of these challenges
●   The Computer Inspection Readiness (CIR) Training outlines the prioritisation
    strategies that you should use for addressing your computer systems
●   The CIR Self Inspection Checklists indicate numerical weighting of many relevant
    topics
Risk Management


●   Management staff for your site or group will decide their tolerance level for risk in
    each major category of issues
●   Poor computer validation can be very expensive. These risks are business, safety,
    and regulatory related
●   This guideline is called “ Computerised Systems - Management of Risk to Product
    Quality and the Application of Interim Measures”
Quick Wins
●   Improving the “perception of control” of your computer systems can reduce your
    regulatory risk somewhat without adding resource
●   Strategies for increasing this perception of control are described in the Computer
    Inspection Readiness Training, offered by Global Computer Validation
●   Interim measures can be applied for short-term mitigation of risk (e.g. procedural,
    administrative workarounds)
●   Incremental improvement starting with the most critical computer systems (MRP,
    LIMS,CDS, Process Control) is recommended
Quick Review of the Big Picture

                                    Planning
                Decommissioning
                                                   Supplier Assessment

                                  Phases of
                  Use
                               Computer System
                                  Lifecycle            Requirements


                 Deployment
                              Developmen         Design and Code
                                   t
Cross-Phase                     Testing
  Activities
  (always)
Summary

●   Computer validation has become very high visibility in our industry and at GSK
●   There is very real business and safety benefit, in addition to concerns with
    regulatory agencies
●   GSK has a guideline that clearly describes the entire computer validation life cycle
    and GSK expectations
●   The Computer System Self Inspection Checklists, published on the web, give
    excellent focus to the most critical issues



                                                          Finale

More Related Content

What's hot

Computerized System Validation Business Intelligence Solutions
Computerized System Validation Business Intelligence SolutionsComputerized System Validation Business Intelligence Solutions
Computerized System Validation Business Intelligence SolutionsDigital-360
 
Gamp Riskbased Approch To Validation
Gamp Riskbased Approch To ValidationGamp Riskbased Approch To Validation
Gamp Riskbased Approch To ValidationRajendra Sadare
 
Computerized system validation_final
Computerized system validation_finalComputerized system validation_final
Computerized system validation_finalDuy Tan Geek
 
General Principals Of Software Validation
General Principals Of Software ValidationGeneral Principals Of Software Validation
General Principals Of Software Validationstaciemarotta
 
ISPE-CCPIE China Conference 2010 (Stokes-GAMP Legacy Systems - English)
ISPE-CCPIE China Conference 2010 (Stokes-GAMP Legacy Systems - English)ISPE-CCPIE China Conference 2010 (Stokes-GAMP Legacy Systems - English)
ISPE-CCPIE China Conference 2010 (Stokes-GAMP Legacy Systems - English)David Stokes
 
Computer System Validation
Computer System ValidationComputer System Validation
Computer System ValidationEric Silva
 
CSV - Computer System Validation
CSV - Computer System Validation CSV - Computer System Validation
CSV - Computer System Validation JayaKrishna161
 
Myths of validation
Myths of validationMyths of validation
Myths of validationJeff Thomas
 
Overview of computer system validation
Overview of computer system validationOverview of computer system validation
Overview of computer system validationNilesh Damale
 
Overview on “Computer System Validation” CSV
Overview on  “Computer System Validation” CSVOverview on  “Computer System Validation” CSV
Overview on “Computer System Validation” CSVAnil Sharma
 
Computerized System Validation : Understanding basics
Computerized System Validation : Understanding basics Computerized System Validation : Understanding basics
Computerized System Validation : Understanding basics Anand Pandya
 
Computer system validation
Computer system validationComputer system validation
Computer system validationGaurav Kr
 
Computer System Validation - The Validation Master Plan
Computer System Validation - The Validation Master PlanComputer System Validation - The Validation Master Plan
Computer System Validation - The Validation Master PlanWolfgang Kuchinke
 
Regulatory Considerations for use of Cloud Computing and SaaS Environments
Regulatory Considerations for use of Cloud Computing and SaaS EnvironmentsRegulatory Considerations for use of Cloud Computing and SaaS Environments
Regulatory Considerations for use of Cloud Computing and SaaS EnvironmentsInstitute of Validation Technology
 
Computer System Validation Training
Computer System Validation TrainingComputer System Validation Training
Computer System Validation TrainingNetZealous LLC
 
Good Automated Manufacturing Practices
Good Automated Manufacturing PracticesGood Automated Manufacturing Practices
Good Automated Manufacturing PracticesPrashant Tomar
 
Overview of Computerized Systems Compliance Using the GAMP® 5 Guide
Overview of Computerized Systems Compliance Using the GAMP® 5 GuideOverview of Computerized Systems Compliance Using the GAMP® 5 Guide
Overview of Computerized Systems Compliance Using the GAMP® 5 GuideProPharma Group
 
Management of e-SOP in GxP environment .
Management of e-SOP in GxP environment .Management of e-SOP in GxP environment .
Management of e-SOP in GxP environment .Anand Pandya
 

What's hot (20)

Computerized System Validation Business Intelligence Solutions
Computerized System Validation Business Intelligence SolutionsComputerized System Validation Business Intelligence Solutions
Computerized System Validation Business Intelligence Solutions
 
Gamp Riskbased Approch To Validation
Gamp Riskbased Approch To ValidationGamp Riskbased Approch To Validation
Gamp Riskbased Approch To Validation
 
Computerized system validation_final
Computerized system validation_finalComputerized system validation_final
Computerized system validation_final
 
General Principals Of Software Validation
General Principals Of Software ValidationGeneral Principals Of Software Validation
General Principals Of Software Validation
 
ISPE-CCPIE China Conference 2010 (Stokes-GAMP Legacy Systems - English)
ISPE-CCPIE China Conference 2010 (Stokes-GAMP Legacy Systems - English)ISPE-CCPIE China Conference 2010 (Stokes-GAMP Legacy Systems - English)
ISPE-CCPIE China Conference 2010 (Stokes-GAMP Legacy Systems - English)
 
Computer System Validation
Computer System ValidationComputer System Validation
Computer System Validation
 
CSV - Computer System Validation
CSV - Computer System Validation CSV - Computer System Validation
CSV - Computer System Validation
 
Myths of validation
Myths of validationMyths of validation
Myths of validation
 
Overview of computer system validation
Overview of computer system validationOverview of computer system validation
Overview of computer system validation
 
Overview on “Computer System Validation” CSV
Overview on  “Computer System Validation” CSVOverview on  “Computer System Validation” CSV
Overview on “Computer System Validation” CSV
 
Computerized System Validation : Understanding basics
Computerized System Validation : Understanding basics Computerized System Validation : Understanding basics
Computerized System Validation : Understanding basics
 
Computer system validation
Computer system validationComputer system validation
Computer system validation
 
Computer System Validation - The Validation Master Plan
Computer System Validation - The Validation Master PlanComputer System Validation - The Validation Master Plan
Computer System Validation - The Validation Master Plan
 
Regulatory Considerations for use of Cloud Computing and SaaS Environments
Regulatory Considerations for use of Cloud Computing and SaaS EnvironmentsRegulatory Considerations for use of Cloud Computing and SaaS Environments
Regulatory Considerations for use of Cloud Computing and SaaS Environments
 
Computer system validation
Computer system validationComputer system validation
Computer system validation
 
Computer System Validation Training
Computer System Validation TrainingComputer System Validation Training
Computer System Validation Training
 
Good Automated Manufacturing Practices
Good Automated Manufacturing PracticesGood Automated Manufacturing Practices
Good Automated Manufacturing Practices
 
Csv concepts
Csv conceptsCsv concepts
Csv concepts
 
Overview of Computerized Systems Compliance Using the GAMP® 5 Guide
Overview of Computerized Systems Compliance Using the GAMP® 5 GuideOverview of Computerized Systems Compliance Using the GAMP® 5 Guide
Overview of Computerized Systems Compliance Using the GAMP® 5 Guide
 
Management of e-SOP in GxP environment .
Management of e-SOP in GxP environment .Management of e-SOP in GxP environment .
Management of e-SOP in GxP environment .
 

Viewers also liked

FDA's top data integrity issues during the inspections
FDA's top data integrity issues during the inspectionsFDA's top data integrity issues during the inspections
FDA's top data integrity issues during the inspectionsKiran Kota
 
Computer Operation Management
Computer Operation ManagementComputer Operation Management
Computer Operation ManagementSeto Elkahfi
 
"GAMP 5 & 21 CFR Part 11 Compliance with Computer System Validation”
"GAMP 5 & 21 CFR Part 11 Compliance with Computer System Validation”"GAMP 5 & 21 CFR Part 11 Compliance with Computer System Validation”
"GAMP 5 & 21 CFR Part 11 Compliance with Computer System Validation”Marcep Inc.
 
Introduction to information technology lecture 1
Introduction to information technology   lecture 1Introduction to information technology   lecture 1
Introduction to information technology lecture 1CBAKhan
 

Viewers also liked (9)

FDA's top data integrity issues during the inspections
FDA's top data integrity issues during the inspectionsFDA's top data integrity issues during the inspections
FDA's top data integrity issues during the inspections
 
Computer Operation Management
Computer Operation ManagementComputer Operation Management
Computer Operation Management
 
Application of Operations Management
Application of Operations ManagementApplication of Operations Management
Application of Operations Management
 
Software Engineering
Software EngineeringSoftware Engineering
Software Engineering
 
"GAMP 5 & 21 CFR Part 11 Compliance with Computer System Validation”
"GAMP 5 & 21 CFR Part 11 Compliance with Computer System Validation”"GAMP 5 & 21 CFR Part 11 Compliance with Computer System Validation”
"GAMP 5 & 21 CFR Part 11 Compliance with Computer System Validation”
 
Correlation of FDA-EU-PICS-WHO Requirement for Computer System Validation
Correlation  of  FDA-EU-PICS-WHO Requirement for Computer System Validation Correlation  of  FDA-EU-PICS-WHO Requirement for Computer System Validation
Correlation of FDA-EU-PICS-WHO Requirement for Computer System Validation
 
Gamp5 new
Gamp5 newGamp5 new
Gamp5 new
 
Computer System Validation
Computer System ValidationComputer System Validation
Computer System Validation
 
Introduction to information technology lecture 1
Introduction to information technology   lecture 1Introduction to information technology   lecture 1
Introduction to information technology lecture 1
 

Similar to Computer Validation Fundamentals Training Manual

Software validation do's and dont's may 2013
Software validation do's and dont's may 2013Software validation do's and dont's may 2013
Software validation do's and dont's may 2013John Cachat
 
Auditing In Computer Environment Presentation
Auditing In Computer Environment PresentationAuditing In Computer Environment Presentation
Auditing In Computer Environment PresentationEMAC Consulting Group
 
The Importance of Security within the Computer Environment
The Importance of Security within the Computer EnvironmentThe Importance of Security within the Computer Environment
The Importance of Security within the Computer EnvironmentAdetula Bunmi
 
Software testing
Software testingSoftware testing
Software testingdavidsantro
 
When Medical Device Software Fails Due to Improper Verification & Validation ...
When Medical Device Software Fails Due to Improper Verification & Validation ...When Medical Device Software Fails Due to Improper Verification & Validation ...
When Medical Device Software Fails Due to Improper Verification & Validation ...Sterling Medical Devices
 
Guidelines for Choosing and Implementing a Machine Vision System
Guidelines for Choosing and Implementing a Machine Vision SystemGuidelines for Choosing and Implementing a Machine Vision System
Guidelines for Choosing and Implementing a Machine Vision SystemTST - Technological Solutions
 
10 Warning Signs of Weak Requirements Management
10 Warning Signs of Weak Requirements Management10 Warning Signs of Weak Requirements Management
10 Warning Signs of Weak Requirements ManagementPerforce
 
Building a QMS for Your SaMD Part II
Building a QMS for Your SaMD Part IIBuilding a QMS for Your SaMD Part II
Building a QMS for Your SaMD Part IIEMMAIntl
 
Online Crime Management System.ppt.pptx
Online Crime Management System.ppt.pptxOnline Crime Management System.ppt.pptx
Online Crime Management System.ppt.pptxAshutoshmahale3
 
3Audit Software & Tools.pptx
3Audit Software & Tools.pptx3Audit Software & Tools.pptx
3Audit Software & Tools.pptxjack952975
 
HIS 2017 Paul Sherwood- towards trustable software
HIS 2017 Paul Sherwood- towards trustable software HIS 2017 Paul Sherwood- towards trustable software
HIS 2017 Paul Sherwood- towards trustable software jamieayre
 

Similar to Computer Validation Fundamentals Training Manual (20)

Epitome Corporate PPT
Epitome Corporate PPTEpitome Corporate PPT
Epitome Corporate PPT
 
Software validation do's and dont's may 2013
Software validation do's and dont's may 2013Software validation do's and dont's may 2013
Software validation do's and dont's may 2013
 
Auditing In Computer Environment Presentation
Auditing In Computer Environment PresentationAuditing In Computer Environment Presentation
Auditing In Computer Environment Presentation
 
The Importance of Security within the Computer Environment
The Importance of Security within the Computer EnvironmentThe Importance of Security within the Computer Environment
The Importance of Security within the Computer Environment
 
RSPL Brochure
RSPL BrochureRSPL Brochure
RSPL Brochure
 
Software testing
Software testingSoftware testing
Software testing
 
When Medical Device Software Fails Due to Improper Verification & Validation ...
When Medical Device Software Fails Due to Improper Verification & Validation ...When Medical Device Software Fails Due to Improper Verification & Validation ...
When Medical Device Software Fails Due to Improper Verification & Validation ...
 
Guidelines for Choosing and Implementing a Machine Vision System
Guidelines for Choosing and Implementing a Machine Vision SystemGuidelines for Choosing and Implementing a Machine Vision System
Guidelines for Choosing and Implementing a Machine Vision System
 
10 Warning Signs of Weak Requirements Management
10 Warning Signs of Weak Requirements Management10 Warning Signs of Weak Requirements Management
10 Warning Signs of Weak Requirements Management
 
Building a QMS for Your SaMD Part II
Building a QMS for Your SaMD Part IIBuilding a QMS for Your SaMD Part II
Building a QMS for Your SaMD Part II
 
Ingenico Technologies _ppt
Ingenico Technologies _pptIngenico Technologies _ppt
Ingenico Technologies _ppt
 
Bankauditin it env
Bankauditin it envBankauditin it env
Bankauditin it env
 
bankauditinITEnv
bankauditinITEnvbankauditinITEnv
bankauditinITEnv
 
bankauditinITEnv
bankauditinITEnvbankauditinITEnv
bankauditinITEnv
 
Online Crime Management System.ppt.pptx
Online Crime Management System.ppt.pptxOnline Crime Management System.ppt.pptx
Online Crime Management System.ppt.pptx
 
3Audit Software & Tools.pptx
3Audit Software & Tools.pptx3Audit Software & Tools.pptx
3Audit Software & Tools.pptx
 
Bankauditin it env
Bankauditin it envBankauditin it env
Bankauditin it env
 
HIS 2017 Paul Sherwood- towards trustable software
HIS 2017 Paul Sherwood- towards trustable software HIS 2017 Paul Sherwood- towards trustable software
HIS 2017 Paul Sherwood- towards trustable software
 
Text-DISA_Review_Questions.docx
Text-DISA_Review_Questions.docxText-DISA_Review_Questions.docx
Text-DISA_Review_Questions.docx
 
Text-DISA_Review_Questions.docx
Text-DISA_Review_Questions.docxText-DISA_Review_Questions.docx
Text-DISA_Review_Questions.docx
 

Recently uploaded

Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCRashishs7044
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadAyesha Khan
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 

Recently uploaded (20)

Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 

Computer Validation Fundamentals Training Manual

  • 1. Computer Validation Training Series Computer Validation Fundamentals Training Manual
  • 2. Why do you need to be here? ● As you use or support regulated computer systems, you may impact their validated state ● This subject has been identified as a key concern by the highest levels of our company ● We are expected to validate and control our important computer systems in accordance with GSK expectations ● If important computer systems at your site operate poorly, it may reflect badly on all of GSK and cause a loss of customer confidence worldwide
  • 3. After this training you should be able to…. ● Describe the background behind computer validation as it applies to GSK ● Understand why GSK views this topic as a key business, safety, and regulatory benefit ● Recognise the GSK Computer Validation Life Cycle and its major activities and deliverables ● Explain the items included in the Computer System Validation Checklist ● Know where to learn more about the GSK expectations for computer validation
  • 4. Introduction ● Computerisation is now dominating almost every aspect of our jobs at GSK ● Computer validation has rapidly become a critical issue in GSK and throughout the rest of our industry ● Many of our employees may not be aware that they routinely impact the validated state of computer systems ● Computer validation is mostly important for business and safety reasons ● However, many people first noticed computer validation because of regulatory scrutiny
  • 5. Process Validation Roots ● Process Validation began before Computer Validation ● Regulators and the drug companies have both been focused on Process Validation for a long time ● Process Validation terminology (e.g. IQ,OQ,PQ) and mindset carried over to Computer Validation
  • 6. Is Computer Validation new? ● No, it has been required for over 20 years ● For many years, it was usually overlooked during regulatory inspections ● During the last 5 years, it has quickly increased in importance to the regulators and drug companies ● Many drug companies now see that there is high risk of severe punishment from regulators for not doing it properly ● Everyone that uses, supports, buys, or develops regulated GSK computer systems must understand how their actions impact the validated state of those systems
  • 7. What is a Computer System? In general, a combination of hardware, software, people, documents, inputs, processing, and outputs working together Inputs outputs Software Hardware Equipment Operating Procedures & Controlling System Documentation Controlled process People and Training
  • 8. What Computer Systems do you use? ● MRP/ERP system? ● LIMS system? ● Laboratory Instruments (e.g. Chromatography)? ● Automated manufacturing or packaging equipment? ● IT systems, including those supporting network and infrastructure? ● Spreadsheets or databases?
  • 9. Applicability? ● Do you know how to identify whether a system you use requires validation? ● Global Quality Guideline 1401A is our tool to sort these out ● Do you know if the systems you sue have not been validated or were already validated? ● Ask your local Computer Inspection Readiness representative or validation group. Your systems should be listed on a local system register that includes the validation status
  • 10. Who plays a validation role? ● Users play a key validation role in: ─starting the process for new or existing systems ─performing some major steps (e.g. Requirements) ─writing and following operating procedure ─maintaining the validated state while in use ● Developers play a key role in many steps including: ─design, coding, testing, changes, support ● Support groups (IT, IR, SCS, Infrastructure): ─maintain proper network environment ─troubleshooting and maintenance ─desktop and infrastructure control
  • 11. Who plays a validation role? ● QA and Validation ─author some major documents ─approve major documents that others write ─provide advice, training, auditing ● Senior management for each group decides: ─which systems to buy or build ─how much resource to make available ─what risks are acceptable
  • 12. How can computers systems be better than people doing the same tasks? ● Computer systems that work properly... ● are faster than people ● make less mistakes than people ● do not need sleep (24 hour operation is possible) ● are less expensive than people (no salary)
  • 13. How can computers systems be worse than people doing the same tasks? ● Computer systems that work improperly... ● cause people to lose time while they fix the errors ● make much more serous mistakes than people ● can stop all production or release or product ● are far more expensive than people
  • 14. Why can defects in computer systems be worse than other equipment problems? ● When equipment breaks, there are typically obvious and immediate symptoms. Catastrophic results can often be avoided ● Computer system defects can typically be very difficult to recognise and severe problems may result without being detected until well after the problem started ● Drug companies, the airline industry, public utilities, nuclear power plants and other industries where quality is critical have seen very expensive consequences from improper computer system operation ● Many of these consequences cost far more than the cost of Computer Vlidation
  • 15. What is Computer Validation? ● The ongoing process of establishing documented evidence which provides a high degree of assurance that a system will consistently perform according to its predetermined specifications and quality attributes ● ongoing...- starts at initial concept, does not stop until retired ● documented...- written testing ● predetermined...- must document what we want at the start
  • 16. Is it difficult? ● It depends! ● If you begin the process at the start, when the computer system is first considered for possible purchase or development, then it should be much easier ● Lack of understanding of computer validation will make it more difficult, take more time, and result in more errors
  • 17. Is it expensive? ● It depends! Where do you draw the line between good business practice and required computer validation steps? ● Many of these required computer validation steps are considered good business practice that many of us are taught during computer programming classes ● If you compare it to the price of not validating, then the price is typically very low
  • 18. Why Validation? ● Business reasons ● Safety reasons ● Regulatory reasons
  • 19. Cost to Fix When Problem found Cost to correct requirements design code test implement
  • 20. How can defects in your computer systems hurt the entire company? ● The world is now much smaller with the use of the internet and mass media communications ● Defects in your computer systems that cause harm to public may be rapidly communicated globally to all customers ● Customers may then assume that they could be harmed by using our products made at any of our sites ● This can reflect poorly on global product sales and stock values
  • 21. Would you allow this surgical computer system to be used on you?
  • 22. The Regulatory Benefit? ● Regulatory agencies around the world are rapidly increasing their scrutiny of computer systems ─In the first 5 months of 2001, there were 50% more computer validation findings than in all of 2000 (2nd highest category for From 483 observations) ● GSK has come very close to severe penalties by the FDA for poor computer validation ● Regulators have made it clear to us that they consider that problems at one site are an indication of conditions for the entire company
  • 23. The GMP “Hook” to Computer Systems FDA:21 CFR 211.68 ● “ … equipment, including computers… that will perform a function satisfactorily… can be used in manufacturing, processing, packaging an holding of a a drug product.” ● Requires “ … written program designed to assure proper performance.” ● Requires “ appropriate controls shall be exercised over computer or related systems…” input/output accuracy check, backup file of data that is exact and complete ● Requires written record of the program to be along with “ appropriate” validation data
  • 24. The GMP “Hook” to Computer Systems MCA: Annex 11 ● “ Where a computerised system replaces a manual operation, there should be no resultant decrease in product quality or quality assurance” ● “Where critical data are being entered manually … there should be additional check of accuracy of the record… This check may be done by a second operator or by validated electronic means” ● “Before a system using a computer is brought into use, it should be thoroughly tested and confirmed as being capable of achieving the desired results”
  • 25. There are also other regulatory agencies increasing attention on computer systems. These are just a few…
  • 26. Regulatory Focus ● We receive regular input on regulatory trends and expectations through many sources including… ● Direct communication with the regulators ● Representation in industry groups (e.g. GAMP, ISPE, PDA) ● The FDA posts recent Warning Letters on their web site at http://www.fda.gov/foi/ warning.htm ● “GMP Trends” publishes excerpts from Form 483 observations semi-monthly (http://www.gmptrends.com) ● Other magazines, web sites, industry conferences, and more
  • 27. Summary of Benefits ● Computer systems now serve in critical roles in every aspect or our business ● Because of the unique nature of computer systems, problems can be hard to detect in advance, but catastrophic ● Poorly built systems can easily ─ halt production and product release ─ harm the public before we know of a defect ─ result in severe regulatory penalty ● We cannot afford to ignore the need for ensuring that quality is built into our computer systems
  • 28. Planning Planning Decommissioning Supplier Assessment Phases of Use Computer System Requirements Lifecycle Deployment Developmen Design and Code t Cross-Phase Testing Activities (always)
  • 29. Phases of the Lifecycle Reference Global Quality Guideline 1205 ●Planning ●Supplier Assessment ●Requirements ●Design and Code ●Development Testing ●Deployment ●Use ●Decommissioning ●Cross Phase-Activities
  • 30. Planning Phase ● Business Requirements ─high level, not product-specific ─can be used to make business case and select product ─required functions and constraints, ─enough detail to make compliance assessment ● Compliance Assessment - is system GxP-related? ● ERES Assessment - if GxP, assess based on GQG 1401A ● Validation Planning ─defines standards to maintain quality during life of system ─key roles and responsibilities ─deliverables, rationale for approach
  • 31. Supplier Assessment Phase ● Compare supplier’s validation activities/deliverables with ours ● Information used to determine activities needed by GSK where supplier is deficient ● Validation Plan should state whether supplier audit is needed and when it will be done
  • 32. User-Supplier Relationship Primary Responsibility Primary Responsibility for Specification for Testing Testing of the URS User User Requirements Performance Specification Qualification User More Supplier involvement for custom More User involvement for custom Functional Testing of the Operation systems, less for packaged systems, less for packaged Specification Functional Specification Qualification Testing of the Design Installation Specification Qualification Design Specification Build System Design Unit Testing Specification Supplier Supplier Requirement Specification System Testing
  • 33. Requirements Phase ● Business Requirements are further developed to make the User Requirements Specifications (URS) ● URS details what the system should do, but not how ● Categorise level of importance- must, should, could
  • 34. Computer System require more detailed specifications...
  • 35. User Requirements Specification Requirements Phase ● Requirements traceable to Functional Specifications and testing ● Unambiguous, clear, concise ● Testable and measurable ● Typically written and approved by end-user ● Basis for system acceptance testing ● Should be approved before the design review
  • 36. Functional Specification Design and Code Phase ● The highest level design document responding directly to the User Requirements Specification ● All system inputs, outputs, and interfaces ● All functions and performance requirements ● Error definition and handling ● Ranges, limits, defaults ● Safety considerations
  • 37. Design Specification Design and Code Phase ● Defines how the system should meet the requirements, including… ● Architecture AND interfaces ● All functions ● Data processing and integrity ● Security ● Backup, archive, and restoration ● disaster recovery ● Data definition
  • 38. Design Review Design and Code Phase ● Activity performed to verify that all deliverables from Requirements and Design Phases are produced and… ● are clear and concise ● are complete, current, and traceable ● electronic record and signatures addressed ● are testable ● show system fit for purpose
  • 39. Coding and Configuration Design and Code Phase ● Design Review should be complete before starting ● Should be performed in accordance with written Programming Standards ● Programming Standards should define appropriate rules for writing source code (e.g. dead code, structure, naming) ● Example of Dead Code: Line 5: GOTO Line7; Line 6: Add 5 to all input variables; Line 7: Add 3 to all input variables; For this example, it should not possible for Line 6 t execute during actual system operation
  • 40. Code and Configuration Review Design and Code Phase ● Should be completed before formal testing ● Verify code complies with Programming Standards ● Check to ensure all pre-defined system specifications are addressed ● Check for coding errors
  • 42. Testing at Multiple Levels Development Testing Phase ‘White Box’ * ● Unit Testing/Structural Testing out ● Low level in ‘Black Box’ * ● System & Acceptance testing ● Functional Testing ● Higher level in out Manual Calculation * -Unofficial term used for explanation of concept
  • 43. Test Plan Development Testing Phase ● Define and justify the how the system will be tested and how much ● Address how tests are traceable to specifications ● Testing approach should address —normal operation —entire design range, boundaries, stress —failure modes, including power failure ● Should be approved before testing starts
  • 44. Test Case Development Testing Phase ●Lists the test objective ●Traceable to specifications ●Lists test pre-requisites ●Reproducible test steps ●Clear acceptance criteria
  • 45. Test Results Development Testing Phase ● Record all raw data and derived results ● Ticks, ‘ok’, ‘yes/no’, ‘Pass/Fail’ or similar are not valid results ● Record a ‘Pass/Fail’ conclusion of whether results met acceptance criteria ● Signature and date of test performer ● Signature and date of test result approver ● References to incident log for failures
  • 46. Test Report Development Testing Phase ● Used to… ═collate test result documentation ═conclude each phase of testing ═authorise subsequent testing phases ● Summarises the testing outcome, addresses test failures
  • 47. Deployment Phase ● Data Load ● Operational and Support Plans (e.g. SOP, training, service contracts, security, support processes) ● Installation Qualification (IQ) - verifies installed in accordance with specifications and diagnostics checks performed
  • 48. Deployment Phase ● Operational Qualification (OQ) -user acceptance testing of base functionality under normal and stress conditions ● System Release - can use in live environment before PQ ● Performance Qualification (PQ) - verify OK while in actual use ● Validation Report - summarise all activities, address deviations, provide conclusion
  • 49. Use Phase ● Implementation of Operational and Support Plans ● Dial-in Support Services - be very careful if you allow this ● Upgrades and fixes - manage through change control ● Periodic Reviews - verify still in a validated state ● Revalidation as required
  • 50. Archive and Decommission Phase ● Occurs at end of system life ● Store records to ensure compliance with rules for electronic records and record retention
  • 51. Cross Phase Activities ●Requirements Traceability ●Change Control ●Configuration Management ●Incident Management ●Documentation Management ●Training
  • 52. Validation Planning ● “ A documented plan exists for validation this system” ● Sample Regulatory Observation No original planning documents included in the validation materials for the programs ● “ This plan includes the deliverables and activities that were to result from the validation effort” ● Sample Regulatory Observation ‘The procedure calls for the same individual who writes/revises the program to validate the program’ ● “The supplier of this system has been audited (report available)” ● “ A system description or overview is available”
  • 53. Functional Requirements (document in the User Requirements Specification) ● “ Functional Requirements (or equivalent named document) exist for this system” ● “The Functional Requirements identifies all functions that the system must perform” ● “The Functional Requirements are approved using a signature” ● “The Functional Requirements are updated for each system functional change” ● “The Functional Requirements include enough detail to allow objective test measurement” ● Sample Regulatory Observation ‘The procedure discusses discrepancies in decimal places between the computer and manual results and …” significant values”. There is no definition of “significant values”’
  • 54. Functional Requirements (document in the User Requirements Specification) ● “ Either the Functional Requirements or Design Specifications provide a system overview” ● “Function Requirement are traceable to corresponding design elements” ● “ Function Requirement are traceable to corresponding test elements”
  • 55. Summary/Release Documentation ● “ The system was not released prior to completion of the activities defined in the validation plan” ● “ Version numbers are used to identify each component of the computer system installed for use and it’s current supportive documentation” ● Sample Regulatory Observation ‘Inadequate software version control’ ● “ All required approval signatures were obtained prior to release of the system” ● Sample Regulatory Observation ‘Inconsistencies in the review of the validation documents’ ● “A summary of the validation documents and activities for this computer system is available” ● “ The system was released into production in accordance with a SOP” ● Sample Regulatory Observation ‘There were no written requirements/specifiactions and validation protocol SOP at the time of validation’
  • 56. System Maintenance and Operation ● “ Change were tested prior to placing the change into production use” ● “ Enhancements and modifications to computerised systems and associated documentation re implemented under change control and configuration management that maintains version history of computer components” ● “ Changes were approved prior to placing the change into production use” ● Sample Regulatory Observation ‘Inconsistencies in the review of the validation documents’ ● “ The site’s change control documentation fully describes proposed or actual changes” ● “There is a SOP defining how users are to interact with the system to perform their jobs”
  • 57. System Maintenance and Operation ● “ All system users have been trained on the system operation SOP” ● “The need for possible regression testing was addressed in the change control documentation” ● “ There is a written Disaster Recovery Plan that will restore operation of this system” ● “ Documented testing of the Disaster Recovery Plan has been performed” ● “ Changes have a documented evaluation of whether a complete system re- validation is warranted” ● “ The site can provide a list of authorised users and their security access profile” ● “ There is evidence that access is terminated for transferred or terminated employees” ● “ There is a documented process and criteria to revoke system access”
  • 58. Electronic Records/Electronic Signatures (ERES) ● “A written ER/ES compliance assessment, suitable for presentation to an investigator, is available for this system” ● “ The application has an automatic, electronic audit trail to record changes to electronic records” ● “ Authorised deletions of electronic records are only performed with an appropriate audit trail” ● This completes the Computer System Validation Self Inspection Checklist, but there are many other critical computer validation points on the other Self Inspection Checklists that are not specific to individual systems
  • 59. What about Legacy System? ● Your site may have systems that are not validated or that don’t meet today’s regulatory expectations ● These systems must be validated to comply with GSK policy on computer validation (Global Quality Policy 1205) ● GQP 1205 does not allow retrospective validation as an acceptable substitute for prospective validation ● For systems that are in use without validation, retrospective validation should be done as a prospective
  • 60. Scalability ● Many deliverables in the computer validation life cycle may be combined into the same document or made smaller ● This scalability is dependent on the size, complexity, intended use, and risks associated with the computer system ● However, some deliverables cannot be combined because of their intended role and timing in the life cycle ● For example, Business Requirements can often be combined with the User Requirements Specification, but Requirements and Testing cannot be combined
  • 61. Can this be done more than one way? ● Yes! ● GQG 1205 describes how several key areas of intended use for computer systems may be validated differently ═Laboratory systems ═Control systems ═Desktop applications ═IT systems ═IT infrastructure ═Software tools
  • 62. Should this always be done the same way? ● No! ● You probably don’t have the resource to use a “one-size-fits-all” approach to computer validation ● Regulatory agencies have made it clear that they do not insist on a “one-size -fits- all” approach ● Attempting to validate spreadsheets using the same method as for a MRP system may be wasting resource that could be better applied to fixing compliance gaps
  • 63. Is this a one-time effort? ● Validation does not end when a system is put into use ● When systems are changed, the validation deliverables may need to be updated ● As your site’s priorities and resources change, more work may be required to improve the compliance of system ● As regulatory expectations for computer validation change, more validation activities are required ● Significant resource is always needed on permanent basis to maintain the validated state of systems already in use
  • 64. Popular Misconceptions? ● “ We bought it from a vendor…” so we can get by with very little for validation ● The vendor supplies a validation package - that’s all we need ● “ Validation can be done at the end - just be fore turnover ● The Validation Department approved it - there shouldn’t be any bugs ● Computer Validation is slowing down this project ● We can’t afford to perform Computer Validation ● The Regulatory Agencies will not look at our Computer Validation ● Testing is Validation
  • 65. What does success look like? ● Many of our manufacturing sites have not yet experienced a computer system inspection, but will soon ● Without having first-hand knowledge of what it takes to succeed during a computer system inspection, many sites need help ● Global Computer Validation can help by providing training, coaching, consultation, and examples
  • 66. Challenges ● Staff that are not trained or experienced in performing computer validation and don’t know what they don’t know ● Lack of resource-people, time, money ● Resources are not always allocated based on a complete understanding of the challenges faced in achieving compliance in computer validation ● Specific regulatory expectations can be hard to define, since much of them are not written directly into regulations
  • 67. What should we target first? ● We must comply with commitments made by GSK to the regulators ● We must avoid deficiencies that have repeatedly been the source of citations to GSK and other pharmaceutical companies ● These are all defined in the Computer Inspection Readiness Self Inspection Checklists ● We must also follow all of Gsk policy, but start with these checklists
  • 68. Priorities ● Computer validation is only one of many high priorities that your site or group faces ● Your site or group is responsible for determining the proper balance of resource and risk for each of these challenges ● The Computer Inspection Readiness (CIR) Training outlines the prioritisation strategies that you should use for addressing your computer systems ● The CIR Self Inspection Checklists indicate numerical weighting of many relevant topics
  • 69. Risk Management ● Management staff for your site or group will decide their tolerance level for risk in each major category of issues ● Poor computer validation can be very expensive. These risks are business, safety, and regulatory related ● This guideline is called “ Computerised Systems - Management of Risk to Product Quality and the Application of Interim Measures”
  • 70. Quick Wins ● Improving the “perception of control” of your computer systems can reduce your regulatory risk somewhat without adding resource ● Strategies for increasing this perception of control are described in the Computer Inspection Readiness Training, offered by Global Computer Validation ● Interim measures can be applied for short-term mitigation of risk (e.g. procedural, administrative workarounds) ● Incremental improvement starting with the most critical computer systems (MRP, LIMS,CDS, Process Control) is recommended
  • 71. Quick Review of the Big Picture Planning Decommissioning Supplier Assessment Phases of Use Computer System Lifecycle Requirements Deployment Developmen Design and Code t Cross-Phase Testing Activities (always)
  • 72. Summary ● Computer validation has become very high visibility in our industry and at GSK ● There is very real business and safety benefit, in addition to concerns with regulatory agencies ● GSK has a guideline that clearly describes the entire computer validation life cycle and GSK expectations ● The Computer System Self Inspection Checklists, published on the web, give excellent focus to the most critical issues Finale