The State Corparation of Atomic Energy RОSАТОМ
ROSATOM NEW PROJECTS of NPS
THEME: Contract strategies of project realization of new NPS in ROSATOM.
Vladimir Malakhov Ph.D. DBA
Adviser of Director on Capital Investments SC RОSАТОМ
07.04.2014
Malakhov Vladimir Ph.D.DBA Conference MAGATE-2014 Obninsk, ROSATOM CICET. 07.04.2014г. Page 2
INVEST-BUILDING PROCESS (IBP)
ИНВЕСТИЦИОННЫЙ ЗАМЫСЕЛ
(INVESTMENT PLANNING)
ФИНАНСОВОЕ ПЛАНИРОВАНИЕ
(FINANCING)
БИЗНЕС-ПЛАНИРОВАНИЕ
(BUSINESS-PLANNING)
УПРАВЛЕНИЕ РЕАЛИЗАЦИЕЙ ПРОЕКТА
(PROCESS MANAGEMENT)
ПРОЕКТИРОВАНИЕ И ДИЗАЙН
(ENGINEERING)
КОМПЛЕКТАЦИЯ
(PROCURIMENT)
СТРОИТЕЛЬСТВО
(CONSTRUCTION)
ВВОД В ЭКСПЛУАТАЦИЮ
(OBJECT COMISSIONING)
ЭКСПЛУАТАЦИЯ / РЕАЛИЗАЦИЯ
(OPERATION / TRANSFER)
ВЫВОД ИЗ ЭКСПЛУАТАЦИИ
(DECOMISSIONING)
I
F
BP
PM
E
P
C
OC
O/T
DC
КОНЦЕПТУАЛЬНЫЙ ИНЖИНИРИНГ (CONCEPT OF
DEVELOPMENT & CONCEPTUAL ENGINEERING )
ФИНАНСОВЫЙ ИНЖИНИРИНГ
(FINANCIAL ENGINEERING)
ТЕХНИКО-ЭКОНОМИЧЕСКИЙ ИНЖИНИРИНГ
(TECHNICAL & ECONOMIC ENGINEERING)
ОРГАНИЗАЦИОННЫЙ ИНЖИНИРИНГ
(MANAGERIAL & SYSTEM ENGINEERING)
БАЗОВОЕ И РАБОЧЕЕ ПРОЕКТИРОВАНИЕ
(BASIC & DETAILED ENGINEERING & DESIGN)
ЛОГИСТИЧЕСКИЙ ИНЖИНИРИНГ
(LOGISTICS ENGINEERING)
ПРОИЗВОДСТВЕННЫЙ ИНЖИНИРИНГ
(CONSTRUCTION ENGINEERING)
ИСПЫТАТЕЛЬНЫЙ И ПУСКОВОЙ ИНЖИНИРИНГ
(COMISSIONING DESIGN)
ЭКСПЛУАТАЦИОННЫЙ ИНЖИНИРИНГ
(OPERATION / CLOSEOUT PROCESSING)
ЛИКВИДАЦИОННЫЙ ИНЖИНИРИНГ
(DECOMISSIONING DESIGN)
Basic Invest-Building Process (IBP) Engineering of each stage of IBP Variant circular IBP
THE INVESTMENT-BUILDING PROJECT
- any time-limited investment enterprise
directed to create new unique object of the
real estate is impossible without
achievement of the purposes of investment.
THE INVESTMENT-BUILDING PROCESS
- consecutive set of stages for realization
of any step of the investment building
project, directed at achievemenst of the
purposes of investments by creation or
changes of objects of real estate.
Malakhov Vladimir Ph.D.DBA Conference MAGATE-2014 Obninsk, ROSATOM CICET. 07.04.2014г. Page 3
INVEST-BUILDING PROCESS
VARIANTS IBP DEPEND on PARAMETERS of the PROJECT.
Consultancy
•Master-Plan
•Pre-Feasibility Study
•Feasibility Study
Design and
Planning
•Preliminary Planning
•Conceptual Design
•Permit Application Design
•Construction Design
Procurement
•Tendering Procedures
•Suppliers Contracts
•Material Procurement
•Logistics
Construction
•Quality Supervision and Surveying
•As-built Documentation
•Construction cost tracking
•Acceptance
Start-up
•Staff Training
•Operation Manuals
•Maintainance Manuals
•Commissioning
Conceptual
Engineering and
Design
•Feasibility Studies
•Basic Engineering
•Front-End Engineering and Design (FEED)
•Process Simulation
•Process Flow Diagram and Equipment Data Sheet
Detailed Engineering
and Design
•Technology Process
•Mechanical Engineering
•Civil Engineering
•Process Desing and Piping
•Electrical and Instrimentation Control
Procurement
Construction
Management (PCM)
•Expediting and Logistics
•Site management
•Health and Safety Management
•Quality Supervision and Surveying
Commissioning
Handover
Rand Up
•As-built Documantation
•Consructioning cost tracking
•Comissioning and Plant
•Acceptance and Start up
Maintainance and
Operation
•Plant Operation Management
•Plant Safety and Reliability
•Plant Revamp
•Decommissioning
Variant IBP for not industrial development Variant IBP for industrial development
Malakhov Vladimir Ph.D.DBA Conference MAGATE-2014 Obninsk, ROSATOM CICET. 07.04.2014г. Page 4
INVEST-BUILDING PROCESS
INVEST - BUILDING PROCESS BASE CLASSIFICATION INVEST - BUILDING CONTRACTS.
By way of choice of
the executor
Competitive
negotiations
The Public
tender
Возмещение
затрат (Cost+Fee)
Метод целевых
затрат (Target Price)
Mixed by kinds of works
and services
Technological
project, Basic
Logistical
engineering
Architectural or
Design - project
General
contract
Contract by kinds of
works
Starting-up and
adjustment
ccontrat
The adviser of the
Customer
The engineer
of the project
The Site
manager
The manager
of project
The responsibility for the
professional competence
The responsibility for
management and the control
Expanded general contract
EPC (Engineering,
Procurement, Construction)
EPCM (Man. for Engineering,
Procurement, Construction)
PMC, EPCI, EPCC, EPCS
contracts
Fee and Concession
Development
Contracts-turnkey
Фиксированная
цена (Lump Sum)
Единичные цены
(Measure&Value)
The announcement of
the price
FEED, BP,
exlusive project
Conceptual
engineering
Изменяющаяся
(MV to LSTK)
Basis of classification
By way of volume of the responsibility
In invest - building process
Method of definition
of the price
Complex Contracts
Engineering
Complete set and
deliveries
Construction
Indentification of
expenses
Base classification of contracts
Malakhov Vladimir Ph.D.DBA Conference MAGATE-2014 Obninsk, ROSATOM CICET. 07.04.2014г. Page 5
FACTORS OF CONTRACT STRATEGY: CLASSIFICATION OF CUSTOMERS
THE MAIN CLASSIFICATION OF CUSTOMERS
The Passive Nonprofessional
Customer (PN)
It is the most passive Customer which
doesn't understand specificity of designing,
construction and operations with objects,
moreover it basically doesn't intend to
concentrate any attention at those objects
in the future. Its purpose is to resolve the
assigned task. They are various state
organizations or special funds which are
meant for charity.
The Passive Professional customer
(PP)
The professional Customer invests in
objects of the real estate with a view to
resale them separately in the future or for
other purposes. Those objects must be
used neither for exploitation nor for
obtaining benefit by production or by rent
activity.
The Active Nonprofessional
Customer (АN)
The nonprofessional Customer of the
object which is not included in the field of
the most important competences, but it
needs for performance of nonspecialized
service functions, but the Customer is
compelled to maintain such objects and
therefore has the competence of
management, therefore it demands ofthe
strict accounting in the project of
operational expenses for exploitation
The Active Professional Client
(АP)
The professional Customer in the field of
construction of objects which must be built.
It understands the technology or
production better than any of engineering
companies and contractors and can
adequately estimate expenses for
construction, commissioning and
withdrawal on the basis of own
competence and experience.Thecustomer
Profile Project
Thethirdparty
3 4
Non-profile Project
Compliance to competences of Client
Thefutureoperatoroftheobject
21
The main classification of Customers
Malakhov Vladimir Ph.D.DBA Conference MAGATE-2014 Obninsk, ROSATOM CICET. 07.04.2014г. Page 6
FACTORS OF CONTRACT STRATEDY: CLASSIFICATION OF CUSTOMERS
THE MAIN CLASSIFICATION OF CUSTOMERS.
The Customer carries out great
volume of works by own
department of capital construction.
More often designing, as
conceptual as well as fundamental
and working designing is carried
out by own affiliated structures
which are specializing in such
objects.There is no needs in
complex (ЕРС/ЕРСМ) of
contractors because management,
construction and the organization
of works is conducted by own
inspectors. In the best cases
contracts are concluded for special
sections of design engineering,
creative technological or
architectural decisions, exclusive
design, subturnkey contract - i.e.
turnkey contract which has a level
of title object, specialized and
linear subturnkey contract.Works
connected with startup and
adjustment often are carried out
by own structures
.
The customer is compelled to have
such object for the objective
reasons more often.Either its own
service or the expert, employed for
that aim, prepares the technical
project for designing (ТЗ) and
employs the company on FEASTS. In
this case corporative demands must
be fulfilled. At first in case of need
one should address to advisers who
are specializing on construction of
similar objects. For performance of
works at design engineering the
specializing designers are invited to
take part in tender. Functions of
the technical adviser (ТЗ) are
carriedout either by own qualified
operational service or by the
employed independent expert, but
other construction and installation
is done by small contractors under
their own control, but over typical
works, in case of any atypical
project EPCM -contract is optimum
model.
The customer is the professional in
this area, but object is stranger for
it. Its specialists are commercial
developers more often, but there
can be situations when construction
of the similar enterprises are built
under control of experts of the
Customer for related structure. In
this situation the Customer assumes
functions of the Technical expert
and takes charge of professional
competences, namely: the
technology, structure of the
equipment, etc. The future operator
connects a technological (or
architectural) project with its own
requirements and coordinates
executors for realization of stages
ИСП. Optimum model is a global
general contractor with functions of
design engineering, building
прокъюримента (designs, building
materials and auxiliaries) and a site-
manager, PCM - contractor it is
optimum.
The customer is either casual, or a
rare moderator of the invest-building
project by virtue of the received
powers or concrete assignments.
This customer is compelled to
address to experts for realization of
all stages of инвестиционно-building
process more often, but by virtue of
the professional incapacity seeks also
help from experts for an estimation
of offered services, their volume,
quality, terms and cost. For such
companies the open public
competition is a unique opportunity
to receive object for fair cost. The
most acceptable form of contract
model is the EPC-contract for small
and average projects and the EMC-
contract for complex projects, which
have many titles, with possibility to
attract EPC -subcontractors and
mini-EPC contractors and specialized
general subcontractors also.
Classification by the type of the Customer
Model 1 - AP. Model 2 - AN. Model 3 – PP. Model 4 - PN.
The expanded description of 4 types of Customers
Malakhov Vladimir Ph.D.DBA Conference MAGATE-2014 Obninsk, ROSATOM CICET. 07.04.2014г. Page 7
FACTORS OF CONTRACT STRATEGIES: CLASSIFICATION OF CUSTOMERS
TRANSITION FROM THE TYPE OF THE CUSTOMER TO THE CONTRACT MODEL.
The Passive Nonprofessional
Customer (PN)
It is the most passive Customer which
doesn't understand specificity of designing,
construction and operations with objects,
moreover it basically doesn't intend to
concentrate any attention at those objects
in the future. Its purpose is to resolve the
assigned task. They are various state
organizations or special funds which are
meant for charity.
The Passive Professional customer
(PP)
The professional Customer invests in
objects of the real estate with a view to
resale them separately in the future or for
other purposes. Those objects must be
used neither for exploitation nor for
obtaining benefit by production or by rent
activity.
The Active Nonprofessional
Customer (АN)
The nonprofessional Customer of the
object which is not included in the field of
the most important competences, but it
needs for performance of nonspecialized
service functions, but the Customer is
compelled to maintain such objects and
therefore has the competence of
management, therefore it demands ofthe
strict accounting in the project of
operational expenses for exploitation
The Active Professional Client
(АP)
The professional Customer in the field of
construction of objects which must be built.
It understands the technology or
production better than any of engineering
companies and contractors and can
adequately estimate expenses for
construction, commissioning and
withdrawal on the basis of own
competence and experience.
Competitivenegotiations
Compensation of expenses
Thetenderselection
3 4
The announcement of the price
Method of estimation of the cost of the contract
Methodofachoiceofthecontractor
21
1-st Process step of formation of contract strategy
Malakhov Vladimir Ph.D.DBA Conference MAGATE-2014 Obninsk, ROSATOM CICET. 07.04.2014г. Page 8
FACTORS OF CONTRACT STRATEGY: ENGINEERING
ENGINEERING And TYPE of the CUSTOMER: AP and AN.
I
F
BP
PM
E
P
C
OC
O/T
DC
CONCEPTUAL ENGINEERING: the Customer does itself, can give
for outsourcing special sections
FINANCIAL ENGINEERING: the Customer finds financing and
credits
TECHNICAL And ECONOMIC SUBSTANTIATION: the Customer
himself defines necessity of investments
ORGANIZATIONAL ENGINEERING: the Customer has in its
structures the services of capital construction and the Technical
contractor
MANAGERIAL ENGINEERING: the Customer has in its structures
the services of capital construction and the Technical contractor
PROCUREMENT and LOGISTICS: the Customer delivers the capital
equipment, the rest - Executors
CONSTRUCTION ENGINEERING: Construction is carried out by
General contractor
PUTTING INTO OPERATION: the Customer starts up object
entirely, separate units and aggregates - can be started by
Executors
OPERATION: the Customer prepares the personnel and conducts
management of object by itself
LIQUIDATING ENGINEERING: the Customer projects by itself,
outsourcing of special sections
I
F
BP
PM
E
P
C
OC
O/T
DC
I
F
BP
PM
E
P
C
OC
O/T
DC
The CONCEPT: the Customer can make the technical
project, more often by means of the expert, the Executor
does all the rest.
FINANCIAL ENGINEERING: the Customer finds financing
and credits
TECHNICAL And ECONOMIC SUBSTANTIATION: the
Customer himself defines necessity of investments, but
the data can be given by Expert-
MANAGERIAL ENGINEERING: Management of the project
is carried out by the Executor, but the Customer creates
the service of its own, which works as Technical
customer in the structure
BASIC and DESIGN ENGINEERING: the Executor does
everything, considering wishes of the Customer, which is
in charge for maintenance
PROCUREMENT And LOGISTICS: the Executor delivers
everything, considering wishes of the Customer
CONSTRUCTION ENGINEERING: Construction is
conducted by the Contractors coordinated by the
Customer
PUTTING INTO OPERATION: the Customer starts up the
object by its own personnel under direction of Executors
with transfer for maintenance
OPERATION: the Executor trains the personnel of the
customer and transfers the management of the object to
customer
LIQUIDATING ENGINEERING: the Customer projects itself,
outsourcing of special sections
I
F
BP
PM
E
P
C
OC
O/T
DC
Contact structure of the Customer of 1-st type - the Active Professional
CLIENT CONTRACTOR
Contact structure of the Customer of 2-nd type - the Active Nonprofessional
CLIENT CONTRACTOR
Malakhov Vladimir Ph.D.DBA Conference MAGATE-2014 Obninsk, ROSATOM CICET. 07.04.2014г. Page 9
FACTORS OF CONTRACT STRATEGY: ENGINEERING
ENGINEERING And TYPE of the CUSTOMER: PP and PN.
I
F
BP
PM
E
P
C
OC
O/T
DC
CONCEPTUAL ENGINEERING: the Customer does itself, can give
for outsourcing special sections
FINANCIAL ENGINEERING: the Customer finds financing and
credits
TECHNICAL And ECONOMIC SUBSTANTIATION: the Customer
himself defines necessity of investments and risks
MANAGERIAL ENGINEERING: the Client employs the independent
expert for the control of work of Executors
BASIC and DESIGN ENGINEERING: the Customer carries out the
base project itself , Executors can do the working design
PROCUREMENT and LOGISTICS: the Executor offers the Suppliers,
and itself is responsible for logistics
CONSTRUCTION ENGINEERING: Construction is carried out by
General contractor
PUTTING INTO OPERATION: the Customer authorizes Executors
and experts for start-up
OPERATION: the Executor himself prepares the personnel for
management in the future and transfers management of object
LIQUIDATION ENGINEERING: the Owner invites experts,
outsourcing of special sections
I
F
BP
PM
E
P
C
OC
O/T
DC
I
F
BP
PM
E
P
C
OC
O/T
DC
CONCEPTUAL ENGINEERING: the Customer employs the qualified
Adviser and sets requirements
FINANCIAL ENGINEERING: the Customer finds financing, except
for cases of " Speculative and Concession Development
FEASIBILITY REPORT: the Executor carries out the project, the
Client if it is necessary, employs the Adviser
MANAGERIAL ENGINEERING: the Executor does. The customer
can involve the independent expert to report the work of
Executors
BASIC and DESIGN ENGINEERING: the Executor does the base
project, Coauthors can do the equipment design
PROCUREMENT and LOGISTICS: the Executor offers the Suppliers,
and itself is responsible for logistics
CONSTRUCTION ENGINEERING: Construction is carried out by
General contractor
PUTTING INTO OPERATION: the Executor oneself organizes start-
up and authorizes Coauthors
OPERATION: the Executor oneself prepares the personnel for
management in the future and transfers management of object
LIQUIDATING ENGINEERING: the Owner invites experts,
outsourcing of special sections
I
F
BP
PM
E
P
C
OC
O/T
DC
CLIENT CONTRACTOR CONTRACTORCLIENT
Contact structure of the Customer of 3-d type - the Passiv Professional Contact structure of the Customer of 4-th type - the Passiv Non-Professional
Malakhov Vladimir Ph.D.DBA Conference MAGATE-2014 Obninsk, ROSATOM CICET. 07.04.2014г. Page 10
FACTORS OF CONTRACT STRATEGY: ENGINEERING
TRANSITION FROM COMPLEX КОМПЕТЕНЦИЙ TO CONTRACT MODEL
The Passive Nonprofessional
Customer (PN): LS
The Passive Professional customer
(PP): TP
The Active Nonprofessional
Customer (АN): MV
The Active Professional Customer
(АP): CF
Competitivenegotiations
Compensation of expenses
Thetenderselection
3 4
The announcement of the price
Method of estimation of cost of the contract
MethodofachoiceoftheExecutor
21
ENGINEERING is a science
and art of extraction of
practical benefit from pure
scientific knowledge, such
as physics or chemistry for
the purpose of use of them
for creation of new
buildings, constructions, the
enterprises, factories,
machines and mechanisms
2-nd Stage-by-stage step of formation of contract strategy in view of engineering competencies
Malakhov Vladimir Ph.D.DBA Conference MAGATE-2014 Obninsk, ROSATOM CICET. 07.04.2014г. Page 11
FACTORS OF CONTRACT STRATEGY: ENGINEERING
STATIC AND DYNAMIC THE COMPETENCIES.
Classification of
Customers
Engineering
competencies
Static Dynamic
Factors of contract model
Engineering
competencies
Desire to have
competencies at the
end of the project
The concept of the
early start
The concept of the
partner contract
Presence of competencies
at the beginning of the
project
Dynamics of competencies
of the Customer in the
project
Concept
Open Book
Formulas of the
contract
Classification of
Contracts
INVEST-BUILDING ENGINEERING is a
professional enterprise activity on
granting to Customers of the
complex engineering services
including modelling of technological
processes, designing of buildings
and constructions, preparation,
maintenance and technical support
of process of construction,
supervision of erection, installation,
startup-adjustment and operation
of industrial and economic objects.
Duality of engineering as factor of contract strategy
THE ENGINEERING COMPETENCE is an ability to
create a new intellectual product on the basis of last
achievements of a science limited by established
norms of safety and legislative restrictions, suitable
for target of commercial use in invest-building
projects
THE COMPETENCE is a skill level of the company or the
expert, sufficient for creation of the product demanded
in the market and guaranteeing of conformity of quality
of the offered product to the market expectations.
Malakhov Vladimir Ph.D.DBA Conference MAGATE-2014 Obninsk, ROSATOM CICET. 07.04.2014г. Page 12
FACTORS OF CONTRACT STRATEGY: ENGINEERING
THE ACCOUNT OF TRANSFER OF THE ENGINEERING COMPETENCE IN THE CONTRACT MODEL.
The CUSTOMER employs the
EXECUTOR without engineering
competences and all works accepts
oneself
of
The CUSTOMER employs the
EXECUTOR with engineering
competences and the EXPERT for the
purpose of estimation of its
competences and taking-over of works
The CUSTOMER employs the
EXECUTOR with engineering
competences and the Adviser for the
purpose of estimation of its
competences, but the result accepts
oneself
The CUSTOMER employs also the
EXECUTOR without engineering
competences and the EXPERT with
engineering competences for
acceptance of works
Itisnotdemanded
Is available
Itisdemanded
3 4
Is not available
The engineering competence of the Customer
TheengineeringcompetenceoftheContractor
21
Formula-1:
Customerr-Builder
(engineering) ↔ Group
of executors without
engineering
Formula-2:
Builder ↔ ТЗ (ЕРСМ at
Risk) (engineering) +
Group of executors
without engineering
3-rd Integration Step of Contract strategy - the account of transfer of engineering
Formula-3:
Customerr-Builder +
Adviser (engineering)
↔ Group of executors
(engineering)
Formula-4:
Builder + ТЗ (ЕРСМ for
Fee) (engineerig) ↔
ЕРС or Group of
executors
(engineering)
Malakhov Vladimir Ph.D.DBA Conference MAGATE-2014 Obninsk, ROSATOM CICET. 07.04.2014г. Page 13
FACTORS OF CONTRACT STRATEGIES: THE CONCEPT OF THE OPEN BOOK.
THE MOST WIDESPREAD APPROACHES.
Case of realization of
the project when at a
starting phase there is
no time for gathering
information about
expenses when the
final budget of the
project is unknown
yet by virtue of
presence of the
factors which doesn't
allow to define
precisely profitable
base. In this case
designing and
construction is
conducted by a
principle of granting
to all participants of
all "fair" expenses
who are approved by
the Customer.
The uncertainty of
the price
The uncertainty of
the term
Case of realization of
the project when at a
starting phase it is
impossible to find the
technological decision
or this decision is not
approved and terms
are not confirmed
technically, when final
term of realization is
unknown by virtue of
presence of the factors
which are not allowing
precisely to define
terms of delivery of
decisions. In this case
the customer
coordinates risks of
contractors on the
basis of "fair" actual
expenses.
Projects, profitableness
of which scienter
exceeds any costs, for
example, beautification
of deposits with the
proved stocks exceeding
the investments ten
times.
The Projects of exclusive
development, a circle of
buyers and consumers
of which is precisely
certain and the price is
coordinated also.
Projects, profitableness of
which is caused by tax
efficiency from
development of
infrastructure: roads,
engineering constructions
of the general using, a
transport and logistical
infrastructure, etc.;
Projects, profitableness of
which is guaranteed by
virtue of the state
guarantees according to
venture investments and
socially responsible
investments.
Time factor is the primary
factor of the project which
define the term of its
implementation. For
example, it can be any
protective and other
constructions, startup of
which exert influence on
safety of cities and groups
of the population. Political
factors - construction of
object provides global and
local safety, its urgent and
early construction is in
itself the political project.
Infrastructural projects -
projects, terms of
realization of which do not
keep within frameworks
of the investment analysis
or typical business-
planning. They are long-
term projects with
attraction of
megainvestments in the
future over a period for
some years.
Classification of approaches of the Open Book
The concept of the early
start
The concept of
partnership
The guaranteed
profitableness
Secondariness of
profitableness
Force-majeur
objects
Strategic
objects
Profitableness from
indemnifications
Profitableness from
sales
The reasons of occurrence of attitudes in the concept the Open Book
Malakhov Vladimir Ph.D.DBA Conference MAGATE-2014 Obninsk, ROSATOM CICET. 07.04.2014г. Page 14
FACTORS OF CONTRACT STRATEGIES: THE CONCEPT OF THE OPEN BOOK.
THREE TYPES OF CONTRACTS IN PARADIGM OF THE OPEN BOOK.
The decision on start of the project before
reception of the information on expenses
- " Opening of the Book "
Contract modelling within
the limits of concept Open
Book: contracts before
closing the book and
transfer contracts
The moment of " Closing
of the Book " - a point of
gathering and the
statement of the final
budget of the project
Contract transmodeling of
the contracts for
transferring in connection
with approaching of the
event of "Closed Book"
Modelling of contracts after
situation Closed Book, i.e.
according to standard
procedure of the analysis of
stages IBP
OPEN BOOK
- The concept of realization of the invest-building projects, which is presumed the beginning of the works on realization of
the project before reception of final representation, as about its design as well as about the budget of investments, in
connection with objective impossibility to carry out the works in conformity with classical sequence of stages of invest-
building process
Stream of changes of the approach to the contract modelling in the concept of the Open Book
Prevailing risks of the Customer before «Closing of the Book» and after
The stage of the Open Book
The stage of the Closed Book
Malakhov Vladimir Ph.D.DBA Conference MAGATE-2014 Obninsk, ROSATOM CICET. 07.04.2014г. Page 15
FACTORS OF CONTRACT STRATEGIES: CONCEPT OF THE OPEN BOOK.
VARIANTS OF THE TRANSFER CONTRACTS.
Transformation of the risks
of the Customer in the
contract policy
Separate works in a
stage
The separate stage
ИСП
The set of stages ИСП
"
Association of stages
on a turn-key basis
Compensation of expenses
(cost + fee)
OB to Cost+fix
OB to
Cost+fee+reward
Редко применим
Can't be used
Individual quotations
(measure & value)
OB to Scope of Works
Price
OB to Complete Work
Price
OB to General
Contractor Price
It is seldom applied
Target expenses
(target price)
It is seldom applied
OB to General Price
OB to EPCM
OB to Partner contract
The lump-sum price
(lump sum)
Не применим
It is seldom applid
OB to EPC, PCM, CPM
OB to LSTK
Blue Dream
of Contractor
Blue Dream
of Client
Reduction of the risks of the Customer
ReductionoftherisksoftheCustomer
Step 4 in contract strategy - the account of transformation of the contracts after stage the Open Book
Malakhov Vladimir Ph.D.DBA Conference MAGATE-2014 Obninsk, ROSATOM CICET. 07.04.2014г. Page 16
THE FORMATION OF THE CONTRACT STRATEGY: INTEGRATION.
THE ACCOUNT OF ALL FACTORS OF THE FORMATION OF THE MODEL.
THE CONTRACT
MODEL
OF PROJECT
REALIZATION
STEP-1:
CLASSIFICATION OF CLIENTS
RESULT: the General approach to
pricing and a choice of the
executors
Engineering of the
Executor
Engineering is not
transferred
The concept of the
partnership
The future Operator
of the Object
STEP-4: OPEN BOOK
RESULT: Updating of
complex contracts in view
of the transferring
STEP-2: ENGINEERING
RESULT: Division of stages
ИСП of engineering and
updating of the step-1
STEP-3: THE DYNAMICS OF
COMPETANCIES
RESULT: Specification of model of
stages ИСП and their integration
into complex contracts
Development is
transferred
The concept of the
early start
Engineering of the
Customer
The specialization of
the object
Factors of the formation of the Contract model of the project
Malakhov Vladimir Ph.D.DBA Conference MAGATE-2014 Obninsk, ROSATOM CICET. 07.04.2014г. Page 17
COMPLEX CONTRACT MODELS OF REALIZATION IBP
I
F
BP
PM
E
P
C
OC
O
DC
CONCEPTUAL ENGINEERING: the Customer carries out the
project (ТЗ), but itself ТЗ is carried out by the professional
adviser.
FINANCING: the Customer finds financing and credits
The FEASIBILITY REPORT: the Customer himself defines
necessity of investments, but the decision is based on data of
the Executor
ORGANIZATIONAL ENGINEERING: the Customer employs the
professional controller to control the course of realization of
the project, but the part is carried out by the Executor
BASE And DESIGN ENGINEERING: It is transferred the
executor completely and is accepted by the agreement with
the expert
PROCUREMENT And LOGISTICS: the Contractor delivers the
equipment coordinated with the expert and ТМЦ
INDUSTRIAL ENGINEERING: Генподрядчик completely
operates construction on the object
PUTTING INTO OPERATION: ЕРС- подрядчик starts up object
entirely, but under the supervision of the trained personnel
of the Customer
OPERATION: the Customer starts work and conducts
management of the object
LIQUIDATING ENGINEERING: the Customer projects oneself,
outsourcing of special sections
I
F
BP
PM
E
P
C
OC
O/T
DC
I
F
BP
PM
E
P
C
OC
O
DC
КОНЦЕПТУАЛЬНЫЙ ИНЖИНИРИНГ: Заказчик делает
проект ТЗ, но само ТЗ делает профессиональный
консультант
FINANCING: the Customer finds financing by means of
advisers
The FEASIBILITY REPORT: the Customer himself defines
necessity of investments, but the decision is based on data
of the Executor
ORGANIZATIONAL ENGINEERING: the Customer involves the
EPCM contractor for controlling a course of realization of the
project
BASE And DESIGN ENGINEERING: It is transferred to the
executor completely, is accepted in coordination with the
Customer
PROCUREMENT And LOGISTICS: ЕРСМ-the contractor
delivers the equipment coordinated with the Client and
ТМЦ, by means of contractors also.
INDUSTRIAL ENGINEERING: the EPCM contractor completely
operates construction on the object
PUTTING INTO OPERATION: The ЕРСМ contractor starts up
object entirely, trains the personnel of the Customer and
involves it in start-up
OPERATION: the Customer starts work and conducts
management of object
LIQUIDATING ENGINEERING: the Customer projects oneself,
outsourcing of special sections
I
F
BP
PM
E
P
C
OC
T
DC
Model of realization of projects through complex the ЕРС-contract Model of realization of projects through complex the ЕРСM-contract
CLIENT CONTRACTOR CLIENT CONTRACTOR
Malakhov Vladimir Ph.D.DBA Conference MAGATE-2014 Obninsk, ROSATOM CICET. 07.04.2014г. Page 18
COMPLEX CONTRACT MODELS OF REALIZATION IBP
THE ACCOUNT OF FEATURES OF THE CHOICE OF THE EXECUTOR FOR COMPLEX THE ЕРС-CONTRACT.
Highly specialized or
exclusive objects of
various purpose:
sports complexes, ice
arenas, stables,
hippodromes,
autodromes, hotels,
residential areas and
nondomestic
buildings of complex
architecture.
The architect
(Designer)
The designer The technologist
Projects of the
companies having
exclusive right on
designing of such
objects, and also by
virtue of narrow
specialization of
design decisions:
military, confidential
and nuclear objects
of the state
infrastructure
Industrial objects
which demand to be
bound to initial data
for development of
technological
projects: the
Chemical industry,
даунстрим,
metallurgy, food,
building materials,
etc. manufactures
Can be used for
designing and СМР is
attached to the
concrete basic
equipment: turbines,
reactors, furnaces
and other exclusive
equipment from the
list of manufacturers.
They are production
units and power
stations.
Can be used, when
designing and СМР
takes less than 20 %
of cost of the project:
sectional-modular
objects, modular
mobile facilities and
temporary buildings
and constructions,
mobile technics,
complex
technological
complexes and units.
Can be used, when
the most part of the
contract consist of
civil and erection
works, delivery of
building units and
materials,
standardized design:
roads, жильё,
service, garages,
networks,
warehouses etc.
The capital
equipment
Complex
deliveries
Construction and
installation
ConstructionProcurementEngineering
The key competence
of the ЕРС-contractor
Key competence of the ЕРС-contractor as the factor of the selection of the Executor
Malakhov Vladimir Ph.D.DBA Conference MAGATE-2014 Obninsk, ROSATOM CICET. 07.04.2014г. Page 19
COMPLEX CONTRACT MODELS OF REALIZATION IBP
COMPARISON of the RUSSIAN TECHNICAL-CLIENT with the ЕРСМ-contractor
The contractor
Russian
The customer
Western
Representative
TheConceptualmodel
The customer - the Builder
The Group of
Executors
Builder The General customer
The Group of
Executors
Contractors
EPC-contractor
Technical
customer
custome
rBuilder
Technical
customer
Client+
Expert-
Consultant
EPCM for
FEE
Client-
ContractorsClient
EPCM at
RISK
Analogy of the Technical Customer with the ЕРСМ-contractor in contract relationships
Malakhov Vladimir Ph.D.DBA Conference MAGATE-2014 Obninsk, ROSATOM CICET. 07.04.2014г. Page 20
COMPLEX CONTRACT MODELS OF REALIZATION IBP
CONTRACT HIERARCHY AND ЕРС-SUBCONTRACT.
Technical
supervision
Subcontractors for
constuction
Suppliers
of the equipment
Suppliers of
materials
Suppliers of the
equipment
OHSAS
Subcontractors for
constuction
Suppliers
of the nonbasic
equipment
Subcontractors for
constuction
The designer
for the local
binding
Suppliers of
materials
Designers for typical
decisions
The Technical-Client
(ЕРСМ -Contractor)
THE BUILDER (THE CLIENT-BUILDER)
The block of a direct control of
construction, for example,
construction of a factory
The Block of ERS- subcontractors
(staff - engineer)
Gen. contractor
Субпроектировщик
и
The designer
subcostractors
subЕРС in
technology
subЕРС in
engineering
subЕРС for the
Construction
subЕРС for the
Equipment
Functions of the Russian the CLIENT- BUILDER or the CLIENT + the ENGINEER-MANAGER
Management of
start-up
The ЕРСМ - contractor
The investment
adviser
Technical supervision, quality
assurance and safety
The technical
adviser
The scheme of use ЕРСМ and ЕРС - contracts in the large project
Problems of terminological perception of the Russian Technical Customer and the ЕРСМ - contractor
Malakhov Vladimir Ph.D.DBA Conference MAGATE-2014 Obninsk, ROSATOM CICET. 07.04.2014г. Page 21
CONTRACT STRATEGIES of REALIZATION of NEW PROJECTS OF NPS
VERIFICATION OF PROJECTS ACCORDING TO TYPES OF CUSTOMERS
The CUSTOMER of type
AP
. The customer is guided
by local requirements
and standards and itself
prepares ТЗ on the
project. The complex
project with equipment
of Росатома and other
suppliers, with the
complex integration
The CUSTOMER of
type AP
The professional
Customer having not
only developed
structure of capital
construction, but it
constantly maintains
objects of nuclear
powers of various types
that is why it operates
the project in full.
The CUSTOMER of
type PP
. The professional
Customer is compelled
to adapt own
engineering for the
developed standards of
the country and
involves for this purpose
local executors,
including in
construction
The CUSTOMER of type
AP
Rosatom builds by using
own engineering with
adaptation to the
international standards
and local conditions.
Operation through
training of local
personnel, model
ВОО.
The CUSTOMER of type
AN
The nonprofessional
Customer interested in
business administration
of the production by
itself in the future.
Builds, most likely,
under the international
standards, purchases
the engineering and the
training.
The new design of the atomic power
station
The country with the developed
nuclear engineering
In Russia
The customer of all projects - Concern
"ROSENERGOATOM"
The country without own nuclear
engineering
Abroad
The commercial
local Customer
The customer is the enterprise
GK ROSATOM
The customer is the enterprise
GK ROSATOM
The commercial
local Customer
Classification of designs of the atomic power station according to the types of Customers
Accuyu
Khankh
ikivi BelarusChina
Russia
Malakhov Vladimir Ph.D.DBA Conference MAGATE-2014 Obninsk, ROSATOM CICET. 07.04.2014г. Page 22
COMPLEX CONTRACT MODELS OF REALIZATION IBP
REALIZATION NEW PROJECTS OF NPS FOR CLIENT TYPE AP IN RUSSIA.
COMPLEX CONTRACT MODELS OF REALIZATION ИСП
Russian
(The block of generation and delivery of capacity)
Russian
(Nonbasic constructions)
Russian - the basic pool
(Nuclear island, etc.)
Are possible Foreign
(in the absence thereof of the analogues)
commissioning
GC ROSATOM
Center of CM on a site with blocks
according to directions of
management
Russian
(The block of generation and delivery of capacity)
ROSENERGOATOM – CLIENT
(AP) and future operator
Expert engineering company GK
ROSATOM is on the contract for the
purpose of control of realization of
the project, the budget and norms.
Russian
PMC - contractor (one of AEP) as the enterprise of ROSATOM
Subgeneral
contractors and mini ЕРС-
contractorsThe Russian
Suppliers
Subgeneral
and mini ЕРС-contractors
ROSENERGOATOM filial
The customer on the
construction site
The scheme of realization of in-Russian designs of the atomic power station through the quasi-ЕРСМ-contract
Malakhov Vladimir Ph.D.DBA Conference MAGATE-2014 Obninsk, ROSATOM CICET. 07.04.2014г. Page 23
COMPLEX CONTRACT MODELS OF REALIZATION IBP
REALIZATION OF FOREIGN PROJECTS OF NPS TROUGH DEVELOPING SCHEMS.
•Build - Operate - Transfer
•Построй - Эксплуатируй - ПередайBOT
•Build - Own - Operate - Transfer
•Построй - Владей - Эксплуатируй - ПередайBOOT
•Build - Transfer - Operate
•Построй - Передай - эксплуатируйBTO
•Build - Own - Lease - Transfer
•Построй - Владей - Сдай в аренду - ПередайBOLT
•Build - Transfer - Lease - Operate
•Построй - Передай - Арендуй - ЭксплуатируйBTLO
•Lease - (Re)Build- Operate
•Арендуй - Перестрой - ЭксплуатируйLBO/LRO
•Build - Transfer - Maintenance
•Построй - Передай - ОбслуживайBTM
•Buy - (Re)Build - Operate - Transfer
•Выкупи - Перестрой - Эксплуатируй - ПередайBBOT/BROT
•Build - Own - Lease
•Построй - Владей - Сдай в арендуBOL
•Lease - (Re)Build - Operate - Buy
•Арендуй - Перестрой - Эксплуатируй - ВыкупайLBOB/LROB
•Build - Own- Operate
•Построй - Владей- ЭксплуатируйBOO
•Buy - (Re)Build - Operate
•Выкупи - Перестрой - ЭксплуатируйBBO/BRO
ВОО is the most suitable model of realization of designs of NPS abroad
Models of concession development for implementation of projects
Malakhov Vladimir Ph.D.DBA Conference MAGATE-2014 Obninsk, ROSATOM CICET. 07.04.2014г. Page 24
COMPLEX CONTRACT MODELS OF REALIZATION ИСП
PROJECTS REALIZATION OF NEW NPS ABROAD BY THE TYPE PP FOR ВОО.
Russian (Nuclear island)
Аsset - Holder
From GC «ROSATOM»
Foreign
(The block of generation and delivery of capacity)
Foreign
(Nonbasic constructions)
Russian
(Nuclear island)
Foreign (other)
Suppliers
Foreign (adaptation of the project under local
requirements)
Center of CM on a site with blocks
according to directions of
management
ROSENERGOATOM filial
The customer on the
construction site
The joint Engineer-adviser of the
project - the coordination of the
project in local bodies
Russian
ЕРСМ at the Risk-contractor (one of AEP)
The Chief-Operator - CONCERN
ROSENERGOATOM
Expert engineering company GK
ROSATOM on the contract for the
purpose of controlling of realization of
the project, the budgeand norms
The local expert in
local specifications
The LOCAL PROJECT BUILDER
Operator in the Future
Russian
Generaldesigner and
coauthors
Subgeneral contractors and
the mini ЕРС - contractors
The scheme of realization of foreign projects of new NPS according to the scheme ВОО
Malakhov Vladimir Ph.D.DBA Conference MAGATE-2014 Obninsk, ROSATOM CICET. 07.04.2014г. Page 25
COMPLEX CONTRACT MODELS OF REALIZATION IBP
PROJECTS REALIZATION OF NEW NPS ABROAD FOR THE TYPE AP.
Thanks for attention!
Contact: VIMalakhov@Rosatom.ru mobile: +7 (903) 799-08-98
Russian
(nuclear island)
The LOCAL CUSTOMER -
the Future Operator
Joint venture - the control of the
project, building nuclear audit
and supervision
Foreign
(The block of generation and delivery of capacity)
Foreign
(Service and other constructions)
Russian
(nuclear island)
Foreign
(The Others)
Аsset - Holder
from GC ROSATOM
The local expert certified by
the another state
Russian Adjuster and
foreign coauthors
Russian The ЕРС - countractor
(ASE, AEP or Leader ЕРС - the Consortium)
External
Shareholders
Subgeneralcontractors
and mini ЕРС - contractors
Suppliers
Staff of construction on a platform
with blocks according to directions
of management
Expert engineering company GK
ROSATOM on the contract for the
purpose of controlling of realization
of the project, the budget and norms
The chief-Operator - CONCERN
ROSENERGOATOM
Russian
Generaldesigner and
coauthors
Foreign subdesigners
(adaptation to the local system)
The scheme of realization of the foreign projects of new NPS for the Client of type AP with Partnership

More Related Content

More from BICCED - Business-schoole for Invesment-Construction Consalting, Engineering and Development

More from BICCED - Business-schoole for Invesment-Construction Consalting, Engineering and Development (20)

Student Guide - 3: Organization Management for Construction Companies
Student Guide - 3: Organization Management for Construction CompaniesStudent Guide - 3: Organization Management for Construction Companies
Student Guide - 3: Organization Management for Construction Companies
 
Student Guide - 2: Contract strategies for construction projects implementation
Student Guide - 2: Contract strategies for construction projects implementationStudent Guide - 2: Contract strategies for construction projects implementation
Student Guide - 2: Contract strategies for construction projects implementation
 
Student Guide - 1: Introduction in system construction engineering
Student Guide - 1: Introduction in system construction engineeringStudent Guide - 1: Introduction in system construction engineering
Student Guide - 1: Introduction in system construction engineering
 
Malakhov Vladimir. ICE-18 (Investment&Construction Engineering): The Manifest...
Malakhov Vladimir. ICE-18 (Investment&Construction Engineering): The Manifest...Malakhov Vladimir. ICE-18 (Investment&Construction Engineering): The Manifest...
Malakhov Vladimir. ICE-18 (Investment&Construction Engineering): The Manifest...
 
Malakhov Vladimir. Interview for Magazine "Construction Orbit": Consulting En...
Malakhov Vladimir. Interview for Magazine "Construction Orbit": Consulting En...Malakhov Vladimir. Interview for Magazine "Construction Orbit": Consulting En...
Malakhov Vladimir. Interview for Magazine "Construction Orbit": Consulting En...
 
Malakhov Vladimir. ICE-16 (Investment&Construction Engineering): NACEC - Rosa...
Malakhov Vladimir. ICE-16 (Investment&Construction Engineering): NACEC - Rosa...Malakhov Vladimir. ICE-16 (Investment&Construction Engineering): NACEC - Rosa...
Malakhov Vladimir. ICE-16 (Investment&Construction Engineering): NACEC - Rosa...
 
Malakhov Vladimir. BIM-7 - 5D-collision
Malakhov Vladimir. BIM-7 - 5D-collisionMalakhov Vladimir. BIM-7 - 5D-collision
Malakhov Vladimir. BIM-7 - 5D-collision
 
Malakhov Vladimir. Interview for Magazine "Bulletin of the Russian Union of B...
Malakhov Vladimir. Interview for Magazine "Bulletin of the Russian Union of B...Malakhov Vladimir. Interview for Magazine "Bulletin of the Russian Union of B...
Malakhov Vladimir. Interview for Magazine "Bulletin of the Russian Union of B...
 
Malakhov Vladimir. BIM-4 - BIM-security as basic factor for operatoin stage o...
Malakhov Vladimir. BIM-4 - BIM-security as basic factor for operatoin stage o...Malakhov Vladimir. BIM-4 - BIM-security as basic factor for operatoin stage o...
Malakhov Vladimir. BIM-4 - BIM-security as basic factor for operatoin stage o...
 
Malakhov Vladimir. Interview for Magazine "Construction Orbit": NACEC - plans...
Malakhov Vladimir. Interview for Magazine "Construction Orbit": NACEC - plans...Malakhov Vladimir. Interview for Magazine "Construction Orbit": NACEC - plans...
Malakhov Vladimir. Interview for Magazine "Construction Orbit": NACEC - plans...
 
Malakhov Vladimir. ICE-12 (Investment&Construction Engineering): Contracts of...
Malakhov Vladimir. ICE-12 (Investment&Construction Engineering): Contracts of...Malakhov Vladimir. ICE-12 (Investment&Construction Engineering): Contracts of...
Malakhov Vladimir. ICE-12 (Investment&Construction Engineering): Contracts of...
 
Malakhov Vladimir. ICE-11 (Investment&Construction Engineering): PEP - Projec...
Malakhov Vladimir. ICE-11 (Investment&Construction Engineering): PEP - Projec...Malakhov Vladimir. ICE-11 (Investment&Construction Engineering): PEP - Projec...
Malakhov Vladimir. ICE-11 (Investment&Construction Engineering): PEP - Projec...
 
Malakhov Vladimir. BIM-1 - BIM-project method of contract costing
Malakhov Vladimir. BIM-1 - BIM-project method of contract costingMalakhov Vladimir. BIM-1 - BIM-project method of contract costing
Malakhov Vladimir. BIM-1 - BIM-project method of contract costing
 
Malakhov Vladimir. ICE-10 (Investment&Construction Engineering): About Nation...
Malakhov Vladimir. ICE-10 (Investment&Construction Engineering): About Nation...Malakhov Vladimir. ICE-10 (Investment&Construction Engineering): About Nation...
Malakhov Vladimir. ICE-10 (Investment&Construction Engineering): About Nation...
 
Malakhov Vladimir. Presentation for RSPP, 11-2016.
Malakhov Vladimir.  Presentation for RSPP, 11-2016.Malakhov Vladimir.  Presentation for RSPP, 11-2016.
Malakhov Vladimir. Presentation for RSPP, 11-2016.
 
Malakhov Vladimir. Presentation for Roskapctroy, 11-2016.
Malakhov Vladimir.  Presentation for Roskapctroy, 11-2016.Malakhov Vladimir.  Presentation for Roskapctroy, 11-2016.
Malakhov Vladimir. Presentation for Roskapctroy, 11-2016.
 
Malakhov Vladimir. ICE-7a: Newspaper Economy&Life №40-2016, Project Termin - ...
Malakhov Vladimir. ICE-7a: Newspaper Economy&Life №40-2016, Project Termin - ...Malakhov Vladimir. ICE-7a: Newspaper Economy&Life №40-2016, Project Termin - ...
Malakhov Vladimir. ICE-7a: Newspaper Economy&Life №40-2016, Project Termin - ...
 
Malakhov Vladimir. Contract implementation strategy of investment-constructi...
Malakhov Vladimir.  Contract implementation strategy of investment-constructi...Malakhov Vladimir.  Contract implementation strategy of investment-constructi...
Malakhov Vladimir. Contract implementation strategy of investment-constructi...
 
Malakhov Vladimir. ICE-5 (Investment&Construction Engineering): Contract budg...
Malakhov Vladimir. ICE-5 (Investment&Construction Engineering): Contract budg...Malakhov Vladimir. ICE-5 (Investment&Construction Engineering): Contract budg...
Malakhov Vladimir. ICE-5 (Investment&Construction Engineering): Contract budg...
 
Malakhov Vladimir. ICE-4 (Investment&Construction Engineering): BIM vs PIM (P...
Malakhov Vladimir. ICE-4 (Investment&Construction Engineering): BIM vs PIM (P...Malakhov Vladimir. ICE-4 (Investment&Construction Engineering): BIM vs PIM (P...
Malakhov Vladimir. ICE-4 (Investment&Construction Engineering): BIM vs PIM (P...
 

Recently uploaded

Testing and Development Challenges for Complex Cyber-Physical Systems: Insigh...
Testing and Development Challenges for Complex Cyber-Physical Systems: Insigh...Testing and Development Challenges for Complex Cyber-Physical Systems: Insigh...
Testing and Development Challenges for Complex Cyber-Physical Systems: Insigh...Sebastiano Panichella
 
GESCO SE Press and Analyst Conference on Financial Results 2024
GESCO SE Press and Analyst Conference on Financial Results 2024GESCO SE Press and Analyst Conference on Financial Results 2024
GESCO SE Press and Analyst Conference on Financial Results 2024GESCO SE
 
Testing with Fewer Resources: Toward Adaptive Approaches for Cost-effective ...
Testing with Fewer Resources:  Toward Adaptive Approaches for Cost-effective ...Testing with Fewer Resources:  Toward Adaptive Approaches for Cost-effective ...
Testing with Fewer Resources: Toward Adaptive Approaches for Cost-effective ...Sebastiano Panichella
 
Internship Presentation | PPT | CSE | SE
Internship Presentation | PPT | CSE | SEInternship Presentation | PPT | CSE | SE
Internship Presentation | PPT | CSE | SESaleh Ibne Omar
 
Chizaram's Women Tech Makers Deck. .pptx
Chizaram's Women Tech Makers Deck.  .pptxChizaram's Women Tech Makers Deck.  .pptx
Chizaram's Women Tech Makers Deck. .pptxogubuikealex
 
05.02 MMC - Assignment 4 - Image Attribution Lovepreet.pptx
05.02 MMC - Assignment 4 - Image Attribution Lovepreet.pptx05.02 MMC - Assignment 4 - Image Attribution Lovepreet.pptx
05.02 MMC - Assignment 4 - Image Attribution Lovepreet.pptxerickamwana1
 
cse-csp batch4 review-1.1.pptx cyber security
cse-csp batch4 review-1.1.pptx cyber securitycse-csp batch4 review-1.1.pptx cyber security
cse-csp batch4 review-1.1.pptx cyber securitysandeepnani2260
 
Don't Miss Out: Strategies for Making the Most of the Ethena DigitalOpportunity
Don't Miss Out: Strategies for Making the Most of the Ethena DigitalOpportunityDon't Miss Out: Strategies for Making the Most of the Ethena DigitalOpportunity
Don't Miss Out: Strategies for Making the Most of the Ethena DigitalOpportunityApp Ethena
 
proposal kumeneger edited.docx A kumeeger
proposal kumeneger edited.docx A kumeegerproposal kumeneger edited.docx A kumeeger
proposal kumeneger edited.docx A kumeegerkumenegertelayegrama
 
Quality by design.. ppt for RA (1ST SEM
Quality by design.. ppt for  RA (1ST SEMQuality by design.. ppt for  RA (1ST SEM
Quality by design.. ppt for RA (1ST SEMCharmi13
 
General Elections Final Press Noteas per M
General Elections Final Press Noteas per MGeneral Elections Final Press Noteas per M
General Elections Final Press Noteas per MVidyaAdsule1
 
Engaging Eid Ul Fitr Presentation for Kindergartners.pptx
Engaging Eid Ul Fitr Presentation for Kindergartners.pptxEngaging Eid Ul Fitr Presentation for Kindergartners.pptx
Engaging Eid Ul Fitr Presentation for Kindergartners.pptxAsifArshad8
 
RACHEL-ANN M. TENIBRO PRODUCT RESEARCH PRESENTATION
RACHEL-ANN M. TENIBRO PRODUCT RESEARCH PRESENTATIONRACHEL-ANN M. TENIBRO PRODUCT RESEARCH PRESENTATION
RACHEL-ANN M. TENIBRO PRODUCT RESEARCH PRESENTATIONRachelAnnTenibroAmaz
 
A Guide to Choosing the Ideal Air Cooler
A Guide to Choosing the Ideal Air CoolerA Guide to Choosing the Ideal Air Cooler
A Guide to Choosing the Ideal Air Coolerenquirieskenstar
 
Application of GIS in Landslide Disaster Response.pptx
Application of GIS in Landslide Disaster Response.pptxApplication of GIS in Landslide Disaster Response.pptx
Application of GIS in Landslide Disaster Response.pptxRoquia Salam
 
THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...
THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...
THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...漢銘 謝
 
INDIAN GCP GUIDELINE. for Regulatory affair 1st sem CRR
INDIAN GCP GUIDELINE. for Regulatory  affair 1st sem CRRINDIAN GCP GUIDELINE. for Regulatory  affair 1st sem CRR
INDIAN GCP GUIDELINE. for Regulatory affair 1st sem CRRsarwankumar4524
 

Recently uploaded (17)

Testing and Development Challenges for Complex Cyber-Physical Systems: Insigh...
Testing and Development Challenges for Complex Cyber-Physical Systems: Insigh...Testing and Development Challenges for Complex Cyber-Physical Systems: Insigh...
Testing and Development Challenges for Complex Cyber-Physical Systems: Insigh...
 
GESCO SE Press and Analyst Conference on Financial Results 2024
GESCO SE Press and Analyst Conference on Financial Results 2024GESCO SE Press and Analyst Conference on Financial Results 2024
GESCO SE Press and Analyst Conference on Financial Results 2024
 
Testing with Fewer Resources: Toward Adaptive Approaches for Cost-effective ...
Testing with Fewer Resources:  Toward Adaptive Approaches for Cost-effective ...Testing with Fewer Resources:  Toward Adaptive Approaches for Cost-effective ...
Testing with Fewer Resources: Toward Adaptive Approaches for Cost-effective ...
 
Internship Presentation | PPT | CSE | SE
Internship Presentation | PPT | CSE | SEInternship Presentation | PPT | CSE | SE
Internship Presentation | PPT | CSE | SE
 
Chizaram's Women Tech Makers Deck. .pptx
Chizaram's Women Tech Makers Deck.  .pptxChizaram's Women Tech Makers Deck.  .pptx
Chizaram's Women Tech Makers Deck. .pptx
 
05.02 MMC - Assignment 4 - Image Attribution Lovepreet.pptx
05.02 MMC - Assignment 4 - Image Attribution Lovepreet.pptx05.02 MMC - Assignment 4 - Image Attribution Lovepreet.pptx
05.02 MMC - Assignment 4 - Image Attribution Lovepreet.pptx
 
cse-csp batch4 review-1.1.pptx cyber security
cse-csp batch4 review-1.1.pptx cyber securitycse-csp batch4 review-1.1.pptx cyber security
cse-csp batch4 review-1.1.pptx cyber security
 
Don't Miss Out: Strategies for Making the Most of the Ethena DigitalOpportunity
Don't Miss Out: Strategies for Making the Most of the Ethena DigitalOpportunityDon't Miss Out: Strategies for Making the Most of the Ethena DigitalOpportunity
Don't Miss Out: Strategies for Making the Most of the Ethena DigitalOpportunity
 
proposal kumeneger edited.docx A kumeeger
proposal kumeneger edited.docx A kumeegerproposal kumeneger edited.docx A kumeeger
proposal kumeneger edited.docx A kumeeger
 
Quality by design.. ppt for RA (1ST SEM
Quality by design.. ppt for  RA (1ST SEMQuality by design.. ppt for  RA (1ST SEM
Quality by design.. ppt for RA (1ST SEM
 
General Elections Final Press Noteas per M
General Elections Final Press Noteas per MGeneral Elections Final Press Noteas per M
General Elections Final Press Noteas per M
 
Engaging Eid Ul Fitr Presentation for Kindergartners.pptx
Engaging Eid Ul Fitr Presentation for Kindergartners.pptxEngaging Eid Ul Fitr Presentation for Kindergartners.pptx
Engaging Eid Ul Fitr Presentation for Kindergartners.pptx
 
RACHEL-ANN M. TENIBRO PRODUCT RESEARCH PRESENTATION
RACHEL-ANN M. TENIBRO PRODUCT RESEARCH PRESENTATIONRACHEL-ANN M. TENIBRO PRODUCT RESEARCH PRESENTATION
RACHEL-ANN M. TENIBRO PRODUCT RESEARCH PRESENTATION
 
A Guide to Choosing the Ideal Air Cooler
A Guide to Choosing the Ideal Air CoolerA Guide to Choosing the Ideal Air Cooler
A Guide to Choosing the Ideal Air Cooler
 
Application of GIS in Landslide Disaster Response.pptx
Application of GIS in Landslide Disaster Response.pptxApplication of GIS in Landslide Disaster Response.pptx
Application of GIS in Landslide Disaster Response.pptx
 
THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...
THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...
THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...
 
INDIAN GCP GUIDELINE. for Regulatory affair 1st sem CRR
INDIAN GCP GUIDELINE. for Regulatory  affair 1st sem CRRINDIAN GCP GUIDELINE. for Regulatory  affair 1st sem CRR
INDIAN GCP GUIDELINE. for Regulatory affair 1st sem CRR
 

Malakhov Vladimir. Presentation for IAEA Technical Meeting on Becoming a Knowledgeable Customer in Obninsk 07.04.2014

  • 1. The State Corparation of Atomic Energy RОSАТОМ ROSATOM NEW PROJECTS of NPS THEME: Contract strategies of project realization of new NPS in ROSATOM. Vladimir Malakhov Ph.D. DBA Adviser of Director on Capital Investments SC RОSАТОМ 07.04.2014
  • 2. Malakhov Vladimir Ph.D.DBA Conference MAGATE-2014 Obninsk, ROSATOM CICET. 07.04.2014г. Page 2 INVEST-BUILDING PROCESS (IBP) ИНВЕСТИЦИОННЫЙ ЗАМЫСЕЛ (INVESTMENT PLANNING) ФИНАНСОВОЕ ПЛАНИРОВАНИЕ (FINANCING) БИЗНЕС-ПЛАНИРОВАНИЕ (BUSINESS-PLANNING) УПРАВЛЕНИЕ РЕАЛИЗАЦИЕЙ ПРОЕКТА (PROCESS MANAGEMENT) ПРОЕКТИРОВАНИЕ И ДИЗАЙН (ENGINEERING) КОМПЛЕКТАЦИЯ (PROCURIMENT) СТРОИТЕЛЬСТВО (CONSTRUCTION) ВВОД В ЭКСПЛУАТАЦИЮ (OBJECT COMISSIONING) ЭКСПЛУАТАЦИЯ / РЕАЛИЗАЦИЯ (OPERATION / TRANSFER) ВЫВОД ИЗ ЭКСПЛУАТАЦИИ (DECOMISSIONING) I F BP PM E P C OC O/T DC КОНЦЕПТУАЛЬНЫЙ ИНЖИНИРИНГ (CONCEPT OF DEVELOPMENT & CONCEPTUAL ENGINEERING ) ФИНАНСОВЫЙ ИНЖИНИРИНГ (FINANCIAL ENGINEERING) ТЕХНИКО-ЭКОНОМИЧЕСКИЙ ИНЖИНИРИНГ (TECHNICAL & ECONOMIC ENGINEERING) ОРГАНИЗАЦИОННЫЙ ИНЖИНИРИНГ (MANAGERIAL & SYSTEM ENGINEERING) БАЗОВОЕ И РАБОЧЕЕ ПРОЕКТИРОВАНИЕ (BASIC & DETAILED ENGINEERING & DESIGN) ЛОГИСТИЧЕСКИЙ ИНЖИНИРИНГ (LOGISTICS ENGINEERING) ПРОИЗВОДСТВЕННЫЙ ИНЖИНИРИНГ (CONSTRUCTION ENGINEERING) ИСПЫТАТЕЛЬНЫЙ И ПУСКОВОЙ ИНЖИНИРИНГ (COMISSIONING DESIGN) ЭКСПЛУАТАЦИОННЫЙ ИНЖИНИРИНГ (OPERATION / CLOSEOUT PROCESSING) ЛИКВИДАЦИОННЫЙ ИНЖИНИРИНГ (DECOMISSIONING DESIGN) Basic Invest-Building Process (IBP) Engineering of each stage of IBP Variant circular IBP THE INVESTMENT-BUILDING PROJECT - any time-limited investment enterprise directed to create new unique object of the real estate is impossible without achievement of the purposes of investment. THE INVESTMENT-BUILDING PROCESS - consecutive set of stages for realization of any step of the investment building project, directed at achievemenst of the purposes of investments by creation or changes of objects of real estate.
  • 3. Malakhov Vladimir Ph.D.DBA Conference MAGATE-2014 Obninsk, ROSATOM CICET. 07.04.2014г. Page 3 INVEST-BUILDING PROCESS VARIANTS IBP DEPEND on PARAMETERS of the PROJECT. Consultancy •Master-Plan •Pre-Feasibility Study •Feasibility Study Design and Planning •Preliminary Planning •Conceptual Design •Permit Application Design •Construction Design Procurement •Tendering Procedures •Suppliers Contracts •Material Procurement •Logistics Construction •Quality Supervision and Surveying •As-built Documentation •Construction cost tracking •Acceptance Start-up •Staff Training •Operation Manuals •Maintainance Manuals •Commissioning Conceptual Engineering and Design •Feasibility Studies •Basic Engineering •Front-End Engineering and Design (FEED) •Process Simulation •Process Flow Diagram and Equipment Data Sheet Detailed Engineering and Design •Technology Process •Mechanical Engineering •Civil Engineering •Process Desing and Piping •Electrical and Instrimentation Control Procurement Construction Management (PCM) •Expediting and Logistics •Site management •Health and Safety Management •Quality Supervision and Surveying Commissioning Handover Rand Up •As-built Documantation •Consructioning cost tracking •Comissioning and Plant •Acceptance and Start up Maintainance and Operation •Plant Operation Management •Plant Safety and Reliability •Plant Revamp •Decommissioning Variant IBP for not industrial development Variant IBP for industrial development
  • 4. Malakhov Vladimir Ph.D.DBA Conference MAGATE-2014 Obninsk, ROSATOM CICET. 07.04.2014г. Page 4 INVEST-BUILDING PROCESS INVEST - BUILDING PROCESS BASE CLASSIFICATION INVEST - BUILDING CONTRACTS. By way of choice of the executor Competitive negotiations The Public tender Возмещение затрат (Cost+Fee) Метод целевых затрат (Target Price) Mixed by kinds of works and services Technological project, Basic Logistical engineering Architectural or Design - project General contract Contract by kinds of works Starting-up and adjustment ccontrat The adviser of the Customer The engineer of the project The Site manager The manager of project The responsibility for the professional competence The responsibility for management and the control Expanded general contract EPC (Engineering, Procurement, Construction) EPCM (Man. for Engineering, Procurement, Construction) PMC, EPCI, EPCC, EPCS contracts Fee and Concession Development Contracts-turnkey Фиксированная цена (Lump Sum) Единичные цены (Measure&Value) The announcement of the price FEED, BP, exlusive project Conceptual engineering Изменяющаяся (MV to LSTK) Basis of classification By way of volume of the responsibility In invest - building process Method of definition of the price Complex Contracts Engineering Complete set and deliveries Construction Indentification of expenses Base classification of contracts
  • 5. Malakhov Vladimir Ph.D.DBA Conference MAGATE-2014 Obninsk, ROSATOM CICET. 07.04.2014г. Page 5 FACTORS OF CONTRACT STRATEGY: CLASSIFICATION OF CUSTOMERS THE MAIN CLASSIFICATION OF CUSTOMERS The Passive Nonprofessional Customer (PN) It is the most passive Customer which doesn't understand specificity of designing, construction and operations with objects, moreover it basically doesn't intend to concentrate any attention at those objects in the future. Its purpose is to resolve the assigned task. They are various state organizations or special funds which are meant for charity. The Passive Professional customer (PP) The professional Customer invests in objects of the real estate with a view to resale them separately in the future or for other purposes. Those objects must be used neither for exploitation nor for obtaining benefit by production or by rent activity. The Active Nonprofessional Customer (АN) The nonprofessional Customer of the object which is not included in the field of the most important competences, but it needs for performance of nonspecialized service functions, but the Customer is compelled to maintain such objects and therefore has the competence of management, therefore it demands ofthe strict accounting in the project of operational expenses for exploitation The Active Professional Client (АP) The professional Customer in the field of construction of objects which must be built. It understands the technology or production better than any of engineering companies and contractors and can adequately estimate expenses for construction, commissioning and withdrawal on the basis of own competence and experience.Thecustomer Profile Project Thethirdparty 3 4 Non-profile Project Compliance to competences of Client Thefutureoperatoroftheobject 21 The main classification of Customers
  • 6. Malakhov Vladimir Ph.D.DBA Conference MAGATE-2014 Obninsk, ROSATOM CICET. 07.04.2014г. Page 6 FACTORS OF CONTRACT STRATEDY: CLASSIFICATION OF CUSTOMERS THE MAIN CLASSIFICATION OF CUSTOMERS. The Customer carries out great volume of works by own department of capital construction. More often designing, as conceptual as well as fundamental and working designing is carried out by own affiliated structures which are specializing in such objects.There is no needs in complex (ЕРС/ЕРСМ) of contractors because management, construction and the organization of works is conducted by own inspectors. In the best cases contracts are concluded for special sections of design engineering, creative technological or architectural decisions, exclusive design, subturnkey contract - i.e. turnkey contract which has a level of title object, specialized and linear subturnkey contract.Works connected with startup and adjustment often are carried out by own structures . The customer is compelled to have such object for the objective reasons more often.Either its own service or the expert, employed for that aim, prepares the technical project for designing (ТЗ) and employs the company on FEASTS. In this case corporative demands must be fulfilled. At first in case of need one should address to advisers who are specializing on construction of similar objects. For performance of works at design engineering the specializing designers are invited to take part in tender. Functions of the technical adviser (ТЗ) are carriedout either by own qualified operational service or by the employed independent expert, but other construction and installation is done by small contractors under their own control, but over typical works, in case of any atypical project EPCM -contract is optimum model. The customer is the professional in this area, but object is stranger for it. Its specialists are commercial developers more often, but there can be situations when construction of the similar enterprises are built under control of experts of the Customer for related structure. In this situation the Customer assumes functions of the Technical expert and takes charge of professional competences, namely: the technology, structure of the equipment, etc. The future operator connects a technological (or architectural) project with its own requirements and coordinates executors for realization of stages ИСП. Optimum model is a global general contractor with functions of design engineering, building прокъюримента (designs, building materials and auxiliaries) and a site- manager, PCM - contractor it is optimum. The customer is either casual, or a rare moderator of the invest-building project by virtue of the received powers or concrete assignments. This customer is compelled to address to experts for realization of all stages of инвестиционно-building process more often, but by virtue of the professional incapacity seeks also help from experts for an estimation of offered services, their volume, quality, terms and cost. For such companies the open public competition is a unique opportunity to receive object for fair cost. The most acceptable form of contract model is the EPC-contract for small and average projects and the EMC- contract for complex projects, which have many titles, with possibility to attract EPC -subcontractors and mini-EPC contractors and specialized general subcontractors also. Classification by the type of the Customer Model 1 - AP. Model 2 - AN. Model 3 – PP. Model 4 - PN. The expanded description of 4 types of Customers
  • 7. Malakhov Vladimir Ph.D.DBA Conference MAGATE-2014 Obninsk, ROSATOM CICET. 07.04.2014г. Page 7 FACTORS OF CONTRACT STRATEGIES: CLASSIFICATION OF CUSTOMERS TRANSITION FROM THE TYPE OF THE CUSTOMER TO THE CONTRACT MODEL. The Passive Nonprofessional Customer (PN) It is the most passive Customer which doesn't understand specificity of designing, construction and operations with objects, moreover it basically doesn't intend to concentrate any attention at those objects in the future. Its purpose is to resolve the assigned task. They are various state organizations or special funds which are meant for charity. The Passive Professional customer (PP) The professional Customer invests in objects of the real estate with a view to resale them separately in the future or for other purposes. Those objects must be used neither for exploitation nor for obtaining benefit by production or by rent activity. The Active Nonprofessional Customer (АN) The nonprofessional Customer of the object which is not included in the field of the most important competences, but it needs for performance of nonspecialized service functions, but the Customer is compelled to maintain such objects and therefore has the competence of management, therefore it demands ofthe strict accounting in the project of operational expenses for exploitation The Active Professional Client (АP) The professional Customer in the field of construction of objects which must be built. It understands the technology or production better than any of engineering companies and contractors and can adequately estimate expenses for construction, commissioning and withdrawal on the basis of own competence and experience. Competitivenegotiations Compensation of expenses Thetenderselection 3 4 The announcement of the price Method of estimation of the cost of the contract Methodofachoiceofthecontractor 21 1-st Process step of formation of contract strategy
  • 8. Malakhov Vladimir Ph.D.DBA Conference MAGATE-2014 Obninsk, ROSATOM CICET. 07.04.2014г. Page 8 FACTORS OF CONTRACT STRATEGY: ENGINEERING ENGINEERING And TYPE of the CUSTOMER: AP and AN. I F BP PM E P C OC O/T DC CONCEPTUAL ENGINEERING: the Customer does itself, can give for outsourcing special sections FINANCIAL ENGINEERING: the Customer finds financing and credits TECHNICAL And ECONOMIC SUBSTANTIATION: the Customer himself defines necessity of investments ORGANIZATIONAL ENGINEERING: the Customer has in its structures the services of capital construction and the Technical contractor MANAGERIAL ENGINEERING: the Customer has in its structures the services of capital construction and the Technical contractor PROCUREMENT and LOGISTICS: the Customer delivers the capital equipment, the rest - Executors CONSTRUCTION ENGINEERING: Construction is carried out by General contractor PUTTING INTO OPERATION: the Customer starts up object entirely, separate units and aggregates - can be started by Executors OPERATION: the Customer prepares the personnel and conducts management of object by itself LIQUIDATING ENGINEERING: the Customer projects by itself, outsourcing of special sections I F BP PM E P C OC O/T DC I F BP PM E P C OC O/T DC The CONCEPT: the Customer can make the technical project, more often by means of the expert, the Executor does all the rest. FINANCIAL ENGINEERING: the Customer finds financing and credits TECHNICAL And ECONOMIC SUBSTANTIATION: the Customer himself defines necessity of investments, but the data can be given by Expert- MANAGERIAL ENGINEERING: Management of the project is carried out by the Executor, but the Customer creates the service of its own, which works as Technical customer in the structure BASIC and DESIGN ENGINEERING: the Executor does everything, considering wishes of the Customer, which is in charge for maintenance PROCUREMENT And LOGISTICS: the Executor delivers everything, considering wishes of the Customer CONSTRUCTION ENGINEERING: Construction is conducted by the Contractors coordinated by the Customer PUTTING INTO OPERATION: the Customer starts up the object by its own personnel under direction of Executors with transfer for maintenance OPERATION: the Executor trains the personnel of the customer and transfers the management of the object to customer LIQUIDATING ENGINEERING: the Customer projects itself, outsourcing of special sections I F BP PM E P C OC O/T DC Contact structure of the Customer of 1-st type - the Active Professional CLIENT CONTRACTOR Contact structure of the Customer of 2-nd type - the Active Nonprofessional CLIENT CONTRACTOR
  • 9. Malakhov Vladimir Ph.D.DBA Conference MAGATE-2014 Obninsk, ROSATOM CICET. 07.04.2014г. Page 9 FACTORS OF CONTRACT STRATEGY: ENGINEERING ENGINEERING And TYPE of the CUSTOMER: PP and PN. I F BP PM E P C OC O/T DC CONCEPTUAL ENGINEERING: the Customer does itself, can give for outsourcing special sections FINANCIAL ENGINEERING: the Customer finds financing and credits TECHNICAL And ECONOMIC SUBSTANTIATION: the Customer himself defines necessity of investments and risks MANAGERIAL ENGINEERING: the Client employs the independent expert for the control of work of Executors BASIC and DESIGN ENGINEERING: the Customer carries out the base project itself , Executors can do the working design PROCUREMENT and LOGISTICS: the Executor offers the Suppliers, and itself is responsible for logistics CONSTRUCTION ENGINEERING: Construction is carried out by General contractor PUTTING INTO OPERATION: the Customer authorizes Executors and experts for start-up OPERATION: the Executor himself prepares the personnel for management in the future and transfers management of object LIQUIDATION ENGINEERING: the Owner invites experts, outsourcing of special sections I F BP PM E P C OC O/T DC I F BP PM E P C OC O/T DC CONCEPTUAL ENGINEERING: the Customer employs the qualified Adviser and sets requirements FINANCIAL ENGINEERING: the Customer finds financing, except for cases of " Speculative and Concession Development FEASIBILITY REPORT: the Executor carries out the project, the Client if it is necessary, employs the Adviser MANAGERIAL ENGINEERING: the Executor does. The customer can involve the independent expert to report the work of Executors BASIC and DESIGN ENGINEERING: the Executor does the base project, Coauthors can do the equipment design PROCUREMENT and LOGISTICS: the Executor offers the Suppliers, and itself is responsible for logistics CONSTRUCTION ENGINEERING: Construction is carried out by General contractor PUTTING INTO OPERATION: the Executor oneself organizes start- up and authorizes Coauthors OPERATION: the Executor oneself prepares the personnel for management in the future and transfers management of object LIQUIDATING ENGINEERING: the Owner invites experts, outsourcing of special sections I F BP PM E P C OC O/T DC CLIENT CONTRACTOR CONTRACTORCLIENT Contact structure of the Customer of 3-d type - the Passiv Professional Contact structure of the Customer of 4-th type - the Passiv Non-Professional
  • 10. Malakhov Vladimir Ph.D.DBA Conference MAGATE-2014 Obninsk, ROSATOM CICET. 07.04.2014г. Page 10 FACTORS OF CONTRACT STRATEGY: ENGINEERING TRANSITION FROM COMPLEX КОМПЕТЕНЦИЙ TO CONTRACT MODEL The Passive Nonprofessional Customer (PN): LS The Passive Professional customer (PP): TP The Active Nonprofessional Customer (АN): MV The Active Professional Customer (АP): CF Competitivenegotiations Compensation of expenses Thetenderselection 3 4 The announcement of the price Method of estimation of cost of the contract MethodofachoiceoftheExecutor 21 ENGINEERING is a science and art of extraction of practical benefit from pure scientific knowledge, such as physics or chemistry for the purpose of use of them for creation of new buildings, constructions, the enterprises, factories, machines and mechanisms 2-nd Stage-by-stage step of formation of contract strategy in view of engineering competencies
  • 11. Malakhov Vladimir Ph.D.DBA Conference MAGATE-2014 Obninsk, ROSATOM CICET. 07.04.2014г. Page 11 FACTORS OF CONTRACT STRATEGY: ENGINEERING STATIC AND DYNAMIC THE COMPETENCIES. Classification of Customers Engineering competencies Static Dynamic Factors of contract model Engineering competencies Desire to have competencies at the end of the project The concept of the early start The concept of the partner contract Presence of competencies at the beginning of the project Dynamics of competencies of the Customer in the project Concept Open Book Formulas of the contract Classification of Contracts INVEST-BUILDING ENGINEERING is a professional enterprise activity on granting to Customers of the complex engineering services including modelling of technological processes, designing of buildings and constructions, preparation, maintenance and technical support of process of construction, supervision of erection, installation, startup-adjustment and operation of industrial and economic objects. Duality of engineering as factor of contract strategy THE ENGINEERING COMPETENCE is an ability to create a new intellectual product on the basis of last achievements of a science limited by established norms of safety and legislative restrictions, suitable for target of commercial use in invest-building projects THE COMPETENCE is a skill level of the company or the expert, sufficient for creation of the product demanded in the market and guaranteeing of conformity of quality of the offered product to the market expectations.
  • 12. Malakhov Vladimir Ph.D.DBA Conference MAGATE-2014 Obninsk, ROSATOM CICET. 07.04.2014г. Page 12 FACTORS OF CONTRACT STRATEGY: ENGINEERING THE ACCOUNT OF TRANSFER OF THE ENGINEERING COMPETENCE IN THE CONTRACT MODEL. The CUSTOMER employs the EXECUTOR without engineering competences and all works accepts oneself of The CUSTOMER employs the EXECUTOR with engineering competences and the EXPERT for the purpose of estimation of its competences and taking-over of works The CUSTOMER employs the EXECUTOR with engineering competences and the Adviser for the purpose of estimation of its competences, but the result accepts oneself The CUSTOMER employs also the EXECUTOR without engineering competences and the EXPERT with engineering competences for acceptance of works Itisnotdemanded Is available Itisdemanded 3 4 Is not available The engineering competence of the Customer TheengineeringcompetenceoftheContractor 21 Formula-1: Customerr-Builder (engineering) ↔ Group of executors without engineering Formula-2: Builder ↔ ТЗ (ЕРСМ at Risk) (engineering) + Group of executors without engineering 3-rd Integration Step of Contract strategy - the account of transfer of engineering Formula-3: Customerr-Builder + Adviser (engineering) ↔ Group of executors (engineering) Formula-4: Builder + ТЗ (ЕРСМ for Fee) (engineerig) ↔ ЕРС or Group of executors (engineering)
  • 13. Malakhov Vladimir Ph.D.DBA Conference MAGATE-2014 Obninsk, ROSATOM CICET. 07.04.2014г. Page 13 FACTORS OF CONTRACT STRATEGIES: THE CONCEPT OF THE OPEN BOOK. THE MOST WIDESPREAD APPROACHES. Case of realization of the project when at a starting phase there is no time for gathering information about expenses when the final budget of the project is unknown yet by virtue of presence of the factors which doesn't allow to define precisely profitable base. In this case designing and construction is conducted by a principle of granting to all participants of all "fair" expenses who are approved by the Customer. The uncertainty of the price The uncertainty of the term Case of realization of the project when at a starting phase it is impossible to find the technological decision or this decision is not approved and terms are not confirmed technically, when final term of realization is unknown by virtue of presence of the factors which are not allowing precisely to define terms of delivery of decisions. In this case the customer coordinates risks of contractors on the basis of "fair" actual expenses. Projects, profitableness of which scienter exceeds any costs, for example, beautification of deposits with the proved stocks exceeding the investments ten times. The Projects of exclusive development, a circle of buyers and consumers of which is precisely certain and the price is coordinated also. Projects, profitableness of which is caused by tax efficiency from development of infrastructure: roads, engineering constructions of the general using, a transport and logistical infrastructure, etc.; Projects, profitableness of which is guaranteed by virtue of the state guarantees according to venture investments and socially responsible investments. Time factor is the primary factor of the project which define the term of its implementation. For example, it can be any protective and other constructions, startup of which exert influence on safety of cities and groups of the population. Political factors - construction of object provides global and local safety, its urgent and early construction is in itself the political project. Infrastructural projects - projects, terms of realization of which do not keep within frameworks of the investment analysis or typical business- planning. They are long- term projects with attraction of megainvestments in the future over a period for some years. Classification of approaches of the Open Book The concept of the early start The concept of partnership The guaranteed profitableness Secondariness of profitableness Force-majeur objects Strategic objects Profitableness from indemnifications Profitableness from sales The reasons of occurrence of attitudes in the concept the Open Book
  • 14. Malakhov Vladimir Ph.D.DBA Conference MAGATE-2014 Obninsk, ROSATOM CICET. 07.04.2014г. Page 14 FACTORS OF CONTRACT STRATEGIES: THE CONCEPT OF THE OPEN BOOK. THREE TYPES OF CONTRACTS IN PARADIGM OF THE OPEN BOOK. The decision on start of the project before reception of the information on expenses - " Opening of the Book " Contract modelling within the limits of concept Open Book: contracts before closing the book and transfer contracts The moment of " Closing of the Book " - a point of gathering and the statement of the final budget of the project Contract transmodeling of the contracts for transferring in connection with approaching of the event of "Closed Book" Modelling of contracts after situation Closed Book, i.e. according to standard procedure of the analysis of stages IBP OPEN BOOK - The concept of realization of the invest-building projects, which is presumed the beginning of the works on realization of the project before reception of final representation, as about its design as well as about the budget of investments, in connection with objective impossibility to carry out the works in conformity with classical sequence of stages of invest- building process Stream of changes of the approach to the contract modelling in the concept of the Open Book Prevailing risks of the Customer before «Closing of the Book» and after The stage of the Open Book The stage of the Closed Book
  • 15. Malakhov Vladimir Ph.D.DBA Conference MAGATE-2014 Obninsk, ROSATOM CICET. 07.04.2014г. Page 15 FACTORS OF CONTRACT STRATEGIES: CONCEPT OF THE OPEN BOOK. VARIANTS OF THE TRANSFER CONTRACTS. Transformation of the risks of the Customer in the contract policy Separate works in a stage The separate stage ИСП The set of stages ИСП " Association of stages on a turn-key basis Compensation of expenses (cost + fee) OB to Cost+fix OB to Cost+fee+reward Редко применим Can't be used Individual quotations (measure & value) OB to Scope of Works Price OB to Complete Work Price OB to General Contractor Price It is seldom applied Target expenses (target price) It is seldom applied OB to General Price OB to EPCM OB to Partner contract The lump-sum price (lump sum) Не применим It is seldom applid OB to EPC, PCM, CPM OB to LSTK Blue Dream of Contractor Blue Dream of Client Reduction of the risks of the Customer ReductionoftherisksoftheCustomer Step 4 in contract strategy - the account of transformation of the contracts after stage the Open Book
  • 16. Malakhov Vladimir Ph.D.DBA Conference MAGATE-2014 Obninsk, ROSATOM CICET. 07.04.2014г. Page 16 THE FORMATION OF THE CONTRACT STRATEGY: INTEGRATION. THE ACCOUNT OF ALL FACTORS OF THE FORMATION OF THE MODEL. THE CONTRACT MODEL OF PROJECT REALIZATION STEP-1: CLASSIFICATION OF CLIENTS RESULT: the General approach to pricing and a choice of the executors Engineering of the Executor Engineering is not transferred The concept of the partnership The future Operator of the Object STEP-4: OPEN BOOK RESULT: Updating of complex contracts in view of the transferring STEP-2: ENGINEERING RESULT: Division of stages ИСП of engineering and updating of the step-1 STEP-3: THE DYNAMICS OF COMPETANCIES RESULT: Specification of model of stages ИСП and their integration into complex contracts Development is transferred The concept of the early start Engineering of the Customer The specialization of the object Factors of the formation of the Contract model of the project
  • 17. Malakhov Vladimir Ph.D.DBA Conference MAGATE-2014 Obninsk, ROSATOM CICET. 07.04.2014г. Page 17 COMPLEX CONTRACT MODELS OF REALIZATION IBP I F BP PM E P C OC O DC CONCEPTUAL ENGINEERING: the Customer carries out the project (ТЗ), but itself ТЗ is carried out by the professional adviser. FINANCING: the Customer finds financing and credits The FEASIBILITY REPORT: the Customer himself defines necessity of investments, but the decision is based on data of the Executor ORGANIZATIONAL ENGINEERING: the Customer employs the professional controller to control the course of realization of the project, but the part is carried out by the Executor BASE And DESIGN ENGINEERING: It is transferred the executor completely and is accepted by the agreement with the expert PROCUREMENT And LOGISTICS: the Contractor delivers the equipment coordinated with the expert and ТМЦ INDUSTRIAL ENGINEERING: Генподрядчик completely operates construction on the object PUTTING INTO OPERATION: ЕРС- подрядчик starts up object entirely, but under the supervision of the trained personnel of the Customer OPERATION: the Customer starts work and conducts management of the object LIQUIDATING ENGINEERING: the Customer projects oneself, outsourcing of special sections I F BP PM E P C OC O/T DC I F BP PM E P C OC O DC КОНЦЕПТУАЛЬНЫЙ ИНЖИНИРИНГ: Заказчик делает проект ТЗ, но само ТЗ делает профессиональный консультант FINANCING: the Customer finds financing by means of advisers The FEASIBILITY REPORT: the Customer himself defines necessity of investments, but the decision is based on data of the Executor ORGANIZATIONAL ENGINEERING: the Customer involves the EPCM contractor for controlling a course of realization of the project BASE And DESIGN ENGINEERING: It is transferred to the executor completely, is accepted in coordination with the Customer PROCUREMENT And LOGISTICS: ЕРСМ-the contractor delivers the equipment coordinated with the Client and ТМЦ, by means of contractors also. INDUSTRIAL ENGINEERING: the EPCM contractor completely operates construction on the object PUTTING INTO OPERATION: The ЕРСМ contractor starts up object entirely, trains the personnel of the Customer and involves it in start-up OPERATION: the Customer starts work and conducts management of object LIQUIDATING ENGINEERING: the Customer projects oneself, outsourcing of special sections I F BP PM E P C OC T DC Model of realization of projects through complex the ЕРС-contract Model of realization of projects through complex the ЕРСM-contract CLIENT CONTRACTOR CLIENT CONTRACTOR
  • 18. Malakhov Vladimir Ph.D.DBA Conference MAGATE-2014 Obninsk, ROSATOM CICET. 07.04.2014г. Page 18 COMPLEX CONTRACT MODELS OF REALIZATION IBP THE ACCOUNT OF FEATURES OF THE CHOICE OF THE EXECUTOR FOR COMPLEX THE ЕРС-CONTRACT. Highly specialized or exclusive objects of various purpose: sports complexes, ice arenas, stables, hippodromes, autodromes, hotels, residential areas and nondomestic buildings of complex architecture. The architect (Designer) The designer The technologist Projects of the companies having exclusive right on designing of such objects, and also by virtue of narrow specialization of design decisions: military, confidential and nuclear objects of the state infrastructure Industrial objects which demand to be bound to initial data for development of technological projects: the Chemical industry, даунстрим, metallurgy, food, building materials, etc. manufactures Can be used for designing and СМР is attached to the concrete basic equipment: turbines, reactors, furnaces and other exclusive equipment from the list of manufacturers. They are production units and power stations. Can be used, when designing and СМР takes less than 20 % of cost of the project: sectional-modular objects, modular mobile facilities and temporary buildings and constructions, mobile technics, complex technological complexes and units. Can be used, when the most part of the contract consist of civil and erection works, delivery of building units and materials, standardized design: roads, жильё, service, garages, networks, warehouses etc. The capital equipment Complex deliveries Construction and installation ConstructionProcurementEngineering The key competence of the ЕРС-contractor Key competence of the ЕРС-contractor as the factor of the selection of the Executor
  • 19. Malakhov Vladimir Ph.D.DBA Conference MAGATE-2014 Obninsk, ROSATOM CICET. 07.04.2014г. Page 19 COMPLEX CONTRACT MODELS OF REALIZATION IBP COMPARISON of the RUSSIAN TECHNICAL-CLIENT with the ЕРСМ-contractor The contractor Russian The customer Western Representative TheConceptualmodel The customer - the Builder The Group of Executors Builder The General customer The Group of Executors Contractors EPC-contractor Technical customer custome rBuilder Technical customer Client+ Expert- Consultant EPCM for FEE Client- ContractorsClient EPCM at RISK Analogy of the Technical Customer with the ЕРСМ-contractor in contract relationships
  • 20. Malakhov Vladimir Ph.D.DBA Conference MAGATE-2014 Obninsk, ROSATOM CICET. 07.04.2014г. Page 20 COMPLEX CONTRACT MODELS OF REALIZATION IBP CONTRACT HIERARCHY AND ЕРС-SUBCONTRACT. Technical supervision Subcontractors for constuction Suppliers of the equipment Suppliers of materials Suppliers of the equipment OHSAS Subcontractors for constuction Suppliers of the nonbasic equipment Subcontractors for constuction The designer for the local binding Suppliers of materials Designers for typical decisions The Technical-Client (ЕРСМ -Contractor) THE BUILDER (THE CLIENT-BUILDER) The block of a direct control of construction, for example, construction of a factory The Block of ERS- subcontractors (staff - engineer) Gen. contractor Субпроектировщик и The designer subcostractors subЕРС in technology subЕРС in engineering subЕРС for the Construction subЕРС for the Equipment Functions of the Russian the CLIENT- BUILDER or the CLIENT + the ENGINEER-MANAGER Management of start-up The ЕРСМ - contractor The investment adviser Technical supervision, quality assurance and safety The technical adviser The scheme of use ЕРСМ and ЕРС - contracts in the large project Problems of terminological perception of the Russian Technical Customer and the ЕРСМ - contractor
  • 21. Malakhov Vladimir Ph.D.DBA Conference MAGATE-2014 Obninsk, ROSATOM CICET. 07.04.2014г. Page 21 CONTRACT STRATEGIES of REALIZATION of NEW PROJECTS OF NPS VERIFICATION OF PROJECTS ACCORDING TO TYPES OF CUSTOMERS The CUSTOMER of type AP . The customer is guided by local requirements and standards and itself prepares ТЗ on the project. The complex project with equipment of Росатома and other suppliers, with the complex integration The CUSTOMER of type AP The professional Customer having not only developed structure of capital construction, but it constantly maintains objects of nuclear powers of various types that is why it operates the project in full. The CUSTOMER of type PP . The professional Customer is compelled to adapt own engineering for the developed standards of the country and involves for this purpose local executors, including in construction The CUSTOMER of type AP Rosatom builds by using own engineering with adaptation to the international standards and local conditions. Operation through training of local personnel, model ВОО. The CUSTOMER of type AN The nonprofessional Customer interested in business administration of the production by itself in the future. Builds, most likely, under the international standards, purchases the engineering and the training. The new design of the atomic power station The country with the developed nuclear engineering In Russia The customer of all projects - Concern "ROSENERGOATOM" The country without own nuclear engineering Abroad The commercial local Customer The customer is the enterprise GK ROSATOM The customer is the enterprise GK ROSATOM The commercial local Customer Classification of designs of the atomic power station according to the types of Customers Accuyu Khankh ikivi BelarusChina Russia
  • 22. Malakhov Vladimir Ph.D.DBA Conference MAGATE-2014 Obninsk, ROSATOM CICET. 07.04.2014г. Page 22 COMPLEX CONTRACT MODELS OF REALIZATION IBP REALIZATION NEW PROJECTS OF NPS FOR CLIENT TYPE AP IN RUSSIA. COMPLEX CONTRACT MODELS OF REALIZATION ИСП Russian (The block of generation and delivery of capacity) Russian (Nonbasic constructions) Russian - the basic pool (Nuclear island, etc.) Are possible Foreign (in the absence thereof of the analogues) commissioning GC ROSATOM Center of CM on a site with blocks according to directions of management Russian (The block of generation and delivery of capacity) ROSENERGOATOM – CLIENT (AP) and future operator Expert engineering company GK ROSATOM is on the contract for the purpose of control of realization of the project, the budget and norms. Russian PMC - contractor (one of AEP) as the enterprise of ROSATOM Subgeneral contractors and mini ЕРС- contractorsThe Russian Suppliers Subgeneral and mini ЕРС-contractors ROSENERGOATOM filial The customer on the construction site The scheme of realization of in-Russian designs of the atomic power station through the quasi-ЕРСМ-contract
  • 23. Malakhov Vladimir Ph.D.DBA Conference MAGATE-2014 Obninsk, ROSATOM CICET. 07.04.2014г. Page 23 COMPLEX CONTRACT MODELS OF REALIZATION IBP REALIZATION OF FOREIGN PROJECTS OF NPS TROUGH DEVELOPING SCHEMS. •Build - Operate - Transfer •Построй - Эксплуатируй - ПередайBOT •Build - Own - Operate - Transfer •Построй - Владей - Эксплуатируй - ПередайBOOT •Build - Transfer - Operate •Построй - Передай - эксплуатируйBTO •Build - Own - Lease - Transfer •Построй - Владей - Сдай в аренду - ПередайBOLT •Build - Transfer - Lease - Operate •Построй - Передай - Арендуй - ЭксплуатируйBTLO •Lease - (Re)Build- Operate •Арендуй - Перестрой - ЭксплуатируйLBO/LRO •Build - Transfer - Maintenance •Построй - Передай - ОбслуживайBTM •Buy - (Re)Build - Operate - Transfer •Выкупи - Перестрой - Эксплуатируй - ПередайBBOT/BROT •Build - Own - Lease •Построй - Владей - Сдай в арендуBOL •Lease - (Re)Build - Operate - Buy •Арендуй - Перестрой - Эксплуатируй - ВыкупайLBOB/LROB •Build - Own- Operate •Построй - Владей- ЭксплуатируйBOO •Buy - (Re)Build - Operate •Выкупи - Перестрой - ЭксплуатируйBBO/BRO ВОО is the most suitable model of realization of designs of NPS abroad Models of concession development for implementation of projects
  • 24. Malakhov Vladimir Ph.D.DBA Conference MAGATE-2014 Obninsk, ROSATOM CICET. 07.04.2014г. Page 24 COMPLEX CONTRACT MODELS OF REALIZATION ИСП PROJECTS REALIZATION OF NEW NPS ABROAD BY THE TYPE PP FOR ВОО. Russian (Nuclear island) Аsset - Holder From GC «ROSATOM» Foreign (The block of generation and delivery of capacity) Foreign (Nonbasic constructions) Russian (Nuclear island) Foreign (other) Suppliers Foreign (adaptation of the project under local requirements) Center of CM on a site with blocks according to directions of management ROSENERGOATOM filial The customer on the construction site The joint Engineer-adviser of the project - the coordination of the project in local bodies Russian ЕРСМ at the Risk-contractor (one of AEP) The Chief-Operator - CONCERN ROSENERGOATOM Expert engineering company GK ROSATOM on the contract for the purpose of controlling of realization of the project, the budgeand norms The local expert in local specifications The LOCAL PROJECT BUILDER Operator in the Future Russian Generaldesigner and coauthors Subgeneral contractors and the mini ЕРС - contractors The scheme of realization of foreign projects of new NPS according to the scheme ВОО
  • 25. Malakhov Vladimir Ph.D.DBA Conference MAGATE-2014 Obninsk, ROSATOM CICET. 07.04.2014г. Page 25 COMPLEX CONTRACT MODELS OF REALIZATION IBP PROJECTS REALIZATION OF NEW NPS ABROAD FOR THE TYPE AP. Thanks for attention! Contact: VIMalakhov@Rosatom.ru mobile: +7 (903) 799-08-98 Russian (nuclear island) The LOCAL CUSTOMER - the Future Operator Joint venture - the control of the project, building nuclear audit and supervision Foreign (The block of generation and delivery of capacity) Foreign (Service and other constructions) Russian (nuclear island) Foreign (The Others) Аsset - Holder from GC ROSATOM The local expert certified by the another state Russian Adjuster and foreign coauthors Russian The ЕРС - countractor (ASE, AEP or Leader ЕРС - the Consortium) External Shareholders Subgeneralcontractors and mini ЕРС - contractors Suppliers Staff of construction on a platform with blocks according to directions of management Expert engineering company GK ROSATOM on the contract for the purpose of controlling of realization of the project, the budget and norms The chief-Operator - CONCERN ROSENERGOATOM Russian Generaldesigner and coauthors Foreign subdesigners (adaptation to the local system) The scheme of realization of the foreign projects of new NPS for the Client of type AP with Partnership