        ICT
      VISION
         &

    STRATEGY


    2010 – 2013
ICT Vision Statement

ABS aims:-

    • to become the leading school in the region for integrating
        technology in all aspects of education and to ensure that
        ICT is at the centre of Learning and Teaching at ABS


    • to prepare students for an increasingly technology-driven
        world and to ensure that students are able to use
        technology critically, creatively, safely, ethically and in a
        responsible manner




CWE: November 2009
ABS ICT STRATEGIC PLAN  2010 ‐ 2013



   OBJECTIVE                        MAIN ACTION                LEAD     TIME SCALE           HOW                      IMPACT                RESOURCES
                                                                                                                    INDICATORS
   What are we trying to do?        What main action(s) are               By when?   INSET, Working Groups etc     How will we measure    Training: costs, source
                                    required to do this?                                                                impact?
 1 To create a whole           1.1 Create an ICT Strategic  Prin, DoR     Sep 09         Director of        Group is created                  Staff time
   school vision and               Planning Group that                               Resources identifies  and meets regularly
   approach                        represents all four                               staff who will form 
                                   schools and                                        the ICT strategic 
                                   administration                                      Planning Group

                               1.2 Create a whole school       DoR        Oct 09        ICT Strategic             Approval by Mgt             Staff time
                                   vision statement for                                Planning Group            Team, BoT, used in 
                                   ICT at ABS                                                                    school publications

                               1.3 Create an ICT Strategic     DoR        Nov 09        ICT Strategic             Approval by Mgt             Staff time
                                   Plan for ABS that                                   Planning Group            Team, BoT, used in 
                                   reflects the school's                                                         school publications
                                   Aims and Mission

                               1.4 Develop detailed ICT      HoS          Mar 10       School working               Published, clear    Management and 
                                   plans for each school                                   groups                action plans for each     staff time
                                   and the                                                                       school that relate to 
                                   administration to link                                                          the whole school 
                                   with the whole school                                                                  plan
                                   plan
                               1.5 Develop strategies to  Prin, DoR,      Jan 10     Finance Mtgs, BEF,  Funds are available  Management, BEF 
                                   fund the ICT plan       Finance                   Board Finance Sub‐     for proposed       members and 
                                                             Mgr                         Committee        ICTdevelopments       Finance Sub‐
                                                                                                                              Committee time




CWE: Revised 9 December 2009
ABS ICT STRATEGIC PLAN  2010 ‐ 2013



  OBJECTIVE                        MAIN ACTION                   LEAD          TIME SCALE                 HOW                     IMPACT                RESOURCES
                                                                                                                                INDICATORS
  What are we trying to do?        What main action(s) are                        By when?        INSET, Working Groups etc    How will we measure    Training: costs, source
                                   required to do this?                                                                             impact?
2 To ensure that ICT is at  2.1 Periodic evaluation       VPs' E‐    Annual Apr‐May                    VPs, Heads of          Publication of         Staff time
  the centre of Learning        and revision of ICT in  Learning Co‐                                Schools, Heads of  evaluation findings 
  and Teaching at ABS           the KG‐12 curriculum     ord, HoS                                    Departments, e‐       and revised KG‐12 
                                                                                                        learning co‐             ICT in the 
                                                                                                    ordinator, IT staff      Curriculum plan
                              2.2 Phased introduction         DoR, HoS, IT    Aug 10 for first    Phased introduction         Reduced total       Cost of laptops, 
                                  of laptops for               Manager         deployment          of laptops for staff.  number of PCs, staff  carts, completion of 
                                  students and staff                                                 Increased use of  'ownership' of own  wireless. Training 
                                                                                                  laptops by students.  laptop producing  for staff. Additional 
                                                                                                  Phased introduction  fewer IT technical  IT Technician. Some 
                                                                                                    of laptops on carts  issues compared to  improvements to 
                                                                                                   for younger grades. using multiple PCs.  power infrastructure 
                                                                                                                          Higher levels of staff    and storage 
                                                                                                                            ICT competence.           facilities.
                                                                                                                          Greater use of ICT in 
                                                                                                                               learning and 
                                                                                                                                 teaching.


                              2.3 Develop a staffing           Prin, VPs,         Dec 09                Meetings                   Improved             Recruitment, 
                                  structure of ICT             DoR, HoS                                                       management and          training of staff, 
                                  expertise to ensure                                                                         strategic direction     time allowances
                                  that the vision can be 
                                  met
ABS ICT STRATEGIC PLAN  2010 ‐ 2013



  OBJECTIVE                        MAIN ACTION                   LEAD         TIME SCALE                 HOW                      IMPACT                RESOURCES
                                                                                                                                INDICATORS
  What are we trying to do?        What main action(s) are                      By when?         INSET, Working Groups etc     How will we measure    Training: costs, source
                                   required to do this?                                                                             impact?
                              2.4 Provide a structured        VPs, HoS, E‐ Ongoing, plan for       Meetings,          Improved staff                  Cost of providing 
                                  and evaluated               Learning Co‐   the following        identifying         competencies,                   INSET,  staff time
                                  programme of staff              ord      academic year in  appropriate training  improved use of ICT 
                                  training and                                    May           and areas that       in classroom for 
                                  development to                                              needto be targetted      learning and 
                                  ensure that the vision                                                                 teaching
                                  can be met
                              2.5 Evaluate and develop          Prin, E‐   Jun 10 with annual     Review available            Improved student  Cost of additional 
                                  integration strategies      Learning Co‐       review           software and/or            achievements, more  software, training, 
                                  in Learning Support           ord, CLS                           software and              integration in class,   staff time
                                  for challenged               Counsellor                          peripherals to                less need for 
                                  students                                                        support student              teacher support
                                                                                                       needs
ABS ICT STRATEGIC PLAN  2010 ‐ 2013



  OBJECTIVE                        MAIN ACTION                  LEAD          TIME SCALE               HOW                    IMPACT                 RESOURCES
                                                                                                                            INDICATORS
  What are we trying to do?        What main action(s) are                      By when?       INSET, Working Groups etc   How will we measure     Training: costs, source
                                   required to do this?                                                                         impact?
3 To develop                  3.1 Appoint Data Officer           DoR            Nov 09              Internal and     Appointment made              Additional salary
  electronic                                                                                     external adverts, 
  administration                                                                                     Interviews
  throughout all four         3.2 Develop and            DoR, DoS,          Jan 10 ‐ Aug 11    Dir of Resources and  Successful staff use            Basic modules 
  schools by ensuring             implement modules of     DO                                   Data Officer work        of discipline,           already purchased, 
  that the electronic             the student                                                        with Offtec        scheduling and            annual updates and 
  administration                  administration system                                         technical support  reporting modules              maintenance costs
  systems are being               for Discipline,                                              and key school staff  that replace existing 
  effectively utilised            Scheduling and                                                      to devise      systems. Easier data 
                                  Reporting                                                    appropriate systems entry, more efficient 
                                                                                                                           processes

                              3.3 Develop a virtual           E‐Learning     Phased         E‐Learning Co‐ord       Delivery of e‐      Staff time. Annual 
                                  learning platform             Co‐ord implementation Sep ‐ plans training and  learning to students.  support agreement 
                                                                              Jul 11         implementation         Clear plan for         for software
                                                                                                                 distance learning in 
                                                                                                                  case of school or 
                                                                                                                   section closure.

                              3.4 Establish a secure          DoR, DO,          Jun 10          Data Officer builds        Staff access to  Initial cost of 
                                  staff intranet               IT Mgr                           structure and adds         school current software already 
                                                                                                    documents                documents   budgetted in 2009‐
                                                                                                                                           10. Staff time.
                              3.5 Periodically evaluate          DoR      Review whole site at   DoR/HoS/HoD        Clear, informative,  Annual server space 
                                  and review ABS                               end of each      evaluate content  easy to use website  rental, staff time. 
                                  website                                  semester. New site  and provide updates  designed for target  Costs of major site 
                                                                             design Jan 2013      and ideas for          audience         maintenance and 
                                                                                                 improvements                                 new site.
ABS ICT STRATEGIC PLAN  2010 ‐ 2013



  OBJECTIVE                        MAIN ACTION                LEAD       TIME SCALE                HOW                    IMPACT                RESOURCES
                                                                                                                        INDICATORS
  What are we trying to do?        What main action(s) are                 By when?        INSET, Working Groups etc   How will we measure    Training: costs, source
                                   required to do this?                                                                     impact?
                              3.6 Investigate and         IT Mgr             Annual             ICT Strategic    Able to complete  Cost of software / 
                                  implement where                      recommendations        Planning group  tasks faster and with  hardware. Training.
                                  necessary tools to                  for inclusion in Dec  reviews suggestions less time. Possible 
                                  improve productivity                       budget                             reduction in staff.
                                  and efficiency in the 
                                  administration
                              3.7 Implement and          VPs, HoS          Dec 11               Meet with         Clear mapping of  Cost of Curriculum 
                                  evaluate a Curriculum                                   Curriculum Mapping        whole school     Mapping Software. 
                                  Mapping System                                           System provider to  curriculum KG‐12           Staff time.
                                                                                               discuss ABS 
                                                                                              requirements
                              3.8 Produce digital         Head of          Dec 11          Media Centre staff  Searchable database  Staff time. Archiving 
                                  archive of ABS history MC, IT Mgr                        collect documents,  of school history      system software. 
                                                                                          identify appropriate  since school opened       Hardware.
                                                                                              materials and 
                                                                                                catalogue
ABS ICT STRATEGIC PLAN  2010 ‐ 2013



  OBJECTIVE                     MAIN ACTION                         LEAD          TIME SCALE                HOW                  IMPACT INDICATORS               RESOURCES
  What are we trying to         What main action(s) are required                    By when?        INSET, Working Groups etc   How will we measure impact?    Training: costs, source
  do?                           to do this?
4 To ensure that           4.1 IT infrastructure to by              DoR, IT          Aug 10            External audit            Report, action plans         Cost of bringing in 
  the school has               audited by external                   Mgr                                                                                        external audit 
  the necessary                Educational Technology                                                                                                               person
  infrastructure to            consultant every 2 years
  support further 
  developments             4.2 Produce a 3‐year plan                DoR, IT       Dec 09  then            Meetings                Clear strategy for    Cost of identified 
                               for maintaining and                   Mgr         annual review                                  maintenance, upgrades  hardware / software
                               upgrading infrastructure                                                                         and replacements with 
                               to meet the                                                                                        cost implications
                               requirements from 
                               schools and 
                               administration
                           4.3 Progressively increase               IT Mgr      Aug 10 ‐ 8 Mb,      Consultation with  Faster access, ability to  Annual Internet 
                               Internet bandwidth in                            Aug 11 ‐ 16 Mb,    Internet providers:  use higher bandwidth         access fees, 
                               order to support the                             Aug 12 ‐ 32 Mb          upgrading          applications eg       additional hardware 
                               required needs                                                        microwave link,       videostreaming           at server side
                                                                                                       considering 
                                                                                                       alternatives
                           4.4 Ensure that robust                   IT Mgr     Aug 10 with annual  Consultation and      Successful restores         Cost of new 
                               methods of backup and                             review through  researching industry  both as an exercise and      software and 
                               security exist and are                           audit by external     best practice            for real               hardware
                               tested in order to                                     body
                               guarantee the safety of 
                               all data
                           4.5 Periodically review all IT           IT Mgr,       Mar 10 then            Meetings,                Clear procedures,                Staff time
                               related procedures,                    DoR          annually             reviewing,                   policies and 
                               policies and                                                             structuring             documentation that are 
                               documentation                                                          documentation              periodically updated
ICT STRATEGIC PLAN COSTS
                                                                        2010/11             2011/12             2012/13
                                                                    Capital Expense     Capital Expense     Capital Expense
 2.2   Phased intro of laptops for staff 60/40/20 @850              51,000              34,000              17,000
       Wireless                                                     17,300                    -                   -
       Laptop carts for JS Gr 6 / 5 - 4 carts                             -             51,400                    -
       Laptop carts for JS Gr 4 / 3 - 4 carts                             -                   -             51,400
       PCs (DT - specialist area)                                   12,100
       Additional Technician (Staffing Budget)                            -       -         -          -         -
       Improvements to power infrastructure                          1,100                200                  200
       Training for staff (PD Budget)                                     -                 -                    -
       Equivalent to one extra teaching staff (could be in time
 2.3
       allowances across many staff)                                          15,000              15,000               15,000
 2.4   Prof Dev (PD Budget)                                              -                   -                   -
 2.5   Learning Support (Hardware, Software)                         2,000               2,000               2,000
 3.1   Data Officer Salary (Staffing Budget)                             -                   -                   -
 3.2   Annual Support Agreement                                                8,500               8,500                8,500
       Edline Web Hosting                                                      2,900               2,900                2,900
       Additional Modules/Tools                                      5,407               2,500               2,500
 3.4   Intranet Dashboard                                            4,000                          400                  400
 3.5   Website                                                                  500                 500     10,000       500
       With laptops we should use MS Exchange to provide unified
 3.6
       communication system                                              -                   -               8,750
       AD Manager Plus - managing user accounts                        900                   -                   -
       Media Communication Centre Interface                              -               3,500                   -
       HelpDesk Software (also for Maintenance)                      5,950                           800                  800
 3.7   Curriculum Mapping Software                                                       2,000     4,100                4,100
 3.8   Digital archive of ABS history                                                    5,000
 4.1   Consultation fees                                             5,000                   -               5,000
 4.2   Printers (additional + replacement)                           6,800               5,800               5,800
       Theatre Data Projector                                                           12,000
       LCD screen info/news system for Reception & College           3,920
       Data Projectors 16/20/20                                     14,880              18,600              18,600
       Scanners 3/3/3                                                  600                 600                 600
       Server RAM                                                    3,200                   -                   -
       Multi-Function Printer for Admin                                                  3,500
       NetOp Software (100 computer licence)                         3,100
       Other expenses (detail in 2010/11 ICT Budget)                          64,583              64,583               64,583
       UPS power circuits                                            9,450
       Software - Curriculum                                        12,656               5,000               5,000
       SMART CE Response Systems                                     1,100               1,100               1,100
       Smartboards with cabling (JS)                                19,925                   -                   -
 4.3   8 / 16 / 32 Mb bandwidth annual cost (microwave)                       27,000              40,000               60,000
       Additional hardware                                               -               4,700               2,400
 4.4   Backup System                                                 7,800                         1,000                1,000

                                                    ANNUAL TOTAL   188,188   118,483   151,900   137,783   130,350   157,783

                                                 TOTAL CAPITAL     470,438
                                                 TOTAL EXPENSE     414,049

                           + NEW KG HARDWARE (2009/10)              45,692

                                                                                                   NOTE: All costs EXCLUDE TAX

CWE: 9 December 2009

Más contenido relacionado

La actualidad más candente

Larriba Chem Rxn Notes
Larriba  Chem Rxn NotesLarriba  Chem Rxn Notes
Larriba Chem Rxn Notesguestd72bc65
 
Taking education to the next level with IT infrastructure
Taking education to the next level with IT infrastructureTaking education to the next level with IT infrastructure
Taking education to the next level with IT infrastructureHP India
 
Iftf redesigning education 20120324 v1
Iftf redesigning education 20120324 v1Iftf redesigning education 20120324 v1
Iftf redesigning education 20120324 v1ISSIP
 
Sosiaalinen media korkeakouluympäristössä
Sosiaalinen media korkeakouluympäristössäSosiaalinen media korkeakouluympäristössä
Sosiaalinen media korkeakouluympäristössäTeemu Arina
 
Ict Mark Report Dec 09 V2
Ict Mark Report Dec 09 V2Ict Mark Report Dec 09 V2
Ict Mark Report Dec 09 V2guest594ea
 
CS USM TRIZ Slide-proposed
CS USM TRIZ Slide-proposedCS USM TRIZ Slide-proposed
CS USM TRIZ Slide-proposedabuluqman
 
Exp learng refl-assgn1-informational interplay1
Exp learng refl-assgn1-informational interplay1Exp learng refl-assgn1-informational interplay1
Exp learng refl-assgn1-informational interplay1Susmita Pruthi
 
EDLD 5352 Week 4 Assignment
EDLD 5352 Week 4 AssignmentEDLD 5352 Week 4 Assignment
EDLD 5352 Week 4 AssignmentIvonne Rodriguez
 
Johnson & Wales University Alumni Magazine Spring 2009
Johnson & Wales University Alumni Magazine Spring 2009Johnson & Wales University Alumni Magazine Spring 2009
Johnson & Wales University Alumni Magazine Spring 2009gonanc
 
What is good ICT practice?
What is good ICT practice?What is good ICT practice?
What is good ICT practice?Miles Berry
 
LRT talks 20121120 JISC E-Learning Conference 2012
LRT talks 20121120 JISC E-Learning Conference 2012LRT talks 20121120 JISC E-Learning Conference 2012
LRT talks 20121120 JISC E-Learning Conference 2012Mark Stubbs
 
WEBINAR: ROI: Enabling Your Learning Initiatives to Connect to the Bottom Line
WEBINAR: ROI: Enabling Your Learning Initiatives to Connect to the Bottom LineWEBINAR: ROI: Enabling Your Learning Initiatives to Connect to the Bottom Line
WEBINAR: ROI: Enabling Your Learning Initiatives to Connect to the Bottom LineOntuitive
 
117114+carencro internship+bro
117114+carencro internship+bro117114+carencro internship+bro
117114+carencro internship+broNAFCareerAcads
 
Intel CSR in Senegal 2012 & IESC Corporate Overview
Intel CSR in Senegal 2012 & IESC Corporate OverviewIntel CSR in Senegal 2012 & IESC Corporate Overview
Intel CSR in Senegal 2012 & IESC Corporate Overviewmdoukoure1
 

La actualidad más candente (17)

Larriba Chem Rxn Notes
Larriba  Chem Rxn NotesLarriba  Chem Rxn Notes
Larriba Chem Rxn Notes
 
Taking education to the next level with IT infrastructure
Taking education to the next level with IT infrastructureTaking education to the next level with IT infrastructure
Taking education to the next level with IT infrastructure
 
Iftf redesigning education 20120324 v1
Iftf redesigning education 20120324 v1Iftf redesigning education 20120324 v1
Iftf redesigning education 20120324 v1
 
Sosiaalinen media korkeakouluympäristössä
Sosiaalinen media korkeakouluympäristössäSosiaalinen media korkeakouluympäristössä
Sosiaalinen media korkeakouluympäristössä
 
Ict Mark Report Dec 09 V2
Ict Mark Report Dec 09 V2Ict Mark Report Dec 09 V2
Ict Mark Report Dec 09 V2
 
Technology Action Plan
Technology Action PlanTechnology Action Plan
Technology Action Plan
 
CS USM TRIZ Slide-proposed
CS USM TRIZ Slide-proposedCS USM TRIZ Slide-proposed
CS USM TRIZ Slide-proposed
 
E025intranets web
E025intranets webE025intranets web
E025intranets web
 
Exp learng refl-assgn1-informational interplay1
Exp learng refl-assgn1-informational interplay1Exp learng refl-assgn1-informational interplay1
Exp learng refl-assgn1-informational interplay1
 
SEI Overview Dr. Paul Nielsen
SEI Overview Dr. Paul NielsenSEI Overview Dr. Paul Nielsen
SEI Overview Dr. Paul Nielsen
 
EDLD 5352 Week 4 Assignment
EDLD 5352 Week 4 AssignmentEDLD 5352 Week 4 Assignment
EDLD 5352 Week 4 Assignment
 
Johnson & Wales University Alumni Magazine Spring 2009
Johnson & Wales University Alumni Magazine Spring 2009Johnson & Wales University Alumni Magazine Spring 2009
Johnson & Wales University Alumni Magazine Spring 2009
 
What is good ICT practice?
What is good ICT practice?What is good ICT practice?
What is good ICT practice?
 
LRT talks 20121120 JISC E-Learning Conference 2012
LRT talks 20121120 JISC E-Learning Conference 2012LRT talks 20121120 JISC E-Learning Conference 2012
LRT talks 20121120 JISC E-Learning Conference 2012
 
WEBINAR: ROI: Enabling Your Learning Initiatives to Connect to the Bottom Line
WEBINAR: ROI: Enabling Your Learning Initiatives to Connect to the Bottom LineWEBINAR: ROI: Enabling Your Learning Initiatives to Connect to the Bottom Line
WEBINAR: ROI: Enabling Your Learning Initiatives to Connect to the Bottom Line
 
117114+carencro internship+bro
117114+carencro internship+bro117114+carencro internship+bro
117114+carencro internship+bro
 
Intel CSR in Senegal 2012 & IESC Corporate Overview
Intel CSR in Senegal 2012 & IESC Corporate OverviewIntel CSR in Senegal 2012 & IESC Corporate Overview
Intel CSR in Senegal 2012 & IESC Corporate Overview
 

Destacado

Science, technology, and innovation (sti
Science, technology, and innovation (stiScience, technology, and innovation (sti
Science, technology, and innovation (stiLily Fadhilah
 
Vision statement for ict chad vale done
Vision statement for ict chad vale   doneVision statement for ict chad vale   done
Vision statement for ict chad vale donekgrosvenor
 
XUE Lan: Challenges to global governance of science, technology and innovation
XUE Lan: Challenges to global governance of science, technology and innovationXUE Lan: Challenges to global governance of science, technology and innovation
XUE Lan: Challenges to global governance of science, technology and innovationSTEPS Centre
 
Training program for secondary school science, technology and mathematics tea...
Training program for secondary school science, technology and mathematics tea...Training program for secondary school science, technology and mathematics tea...
Training program for secondary school science, technology and mathematics tea...CESIRE - Dept d'Educació - GENCAT
 
Lecture 1 Knowing for Development
Lecture 1 Knowing for DevelopmentLecture 1 Knowing for Development
Lecture 1 Knowing for DevelopmentUNU.MERIT
 
Lecture 9 - Evolving policy perspectives on innovation
Lecture 9 - Evolving policy perspectives on innovationLecture 9 - Evolving policy perspectives on innovation
Lecture 9 - Evolving policy perspectives on innovationUNU.MERIT
 

Destacado (7)

Science, technology, and innovation (sti
Science, technology, and innovation (stiScience, technology, and innovation (sti
Science, technology, and innovation (sti
 
Vision statement for ict chad vale done
Vision statement for ict chad vale   doneVision statement for ict chad vale   done
Vision statement for ict chad vale done
 
XUE Lan: Challenges to global governance of science, technology and innovation
XUE Lan: Challenges to global governance of science, technology and innovationXUE Lan: Challenges to global governance of science, technology and innovation
XUE Lan: Challenges to global governance of science, technology and innovation
 
Training program for secondary school science, technology and mathematics tea...
Training program for secondary school science, technology and mathematics tea...Training program for secondary school science, technology and mathematics tea...
Training program for secondary school science, technology and mathematics tea...
 
Lecture 1 Knowing for Development
Lecture 1 Knowing for DevelopmentLecture 1 Knowing for Development
Lecture 1 Knowing for Development
 
Lecture 9 - Evolving policy perspectives on innovation
Lecture 9 - Evolving policy perspectives on innovationLecture 9 - Evolving policy perspectives on innovation
Lecture 9 - Evolving policy perspectives on innovation
 
counselling
counsellingcounselling
counselling
 

Similar a Abs ict vision and strategy 2010 2013

Basic Computer Literacy - P1
Basic Computer Literacy - P1Basic Computer Literacy - P1
Basic Computer Literacy - P1Gul Rehman
 
Ict journey plan 2011
Ict journey plan 2011Ict journey plan 2011
Ict journey plan 2011Lee Yong
 
MISD Technology Professional Development Action Plan
MISD Technology Professional Development Action PlanMISD Technology Professional Development Action Plan
MISD Technology Professional Development Action Planashleycoffman
 
Information technology kra presentation - jan 2013 ver. 2
Information technology  kra presentation - jan 2013 ver. 2Information technology  kra presentation - jan 2013 ver. 2
Information technology kra presentation - jan 2013 ver. 2Ic Celesios
 
Ict mark 2013 action plan 2
Ict mark 2013 action plan   2Ict mark 2013 action plan   2
Ict mark 2013 action plan 2kgrosvenor
 
Mythica Proposal Gold Team Review
Mythica Proposal Gold Team ReviewMythica Proposal Gold Team Review
Mythica Proposal Gold Team ReviewLaura Quiroga
 
Week 4 Upload Assignments
Week 4 Upload AssignmentsWeek 4 Upload Assignments
Week 4 Upload AssignmentsTroup ISD
 
Action Plan For Blog
Action Plan For BlogAction Plan For Blog
Action Plan For BlogBeth Polk
 
ICT Mark Summary Action Plan Section 2 Curriculum
ICT Mark Summary Action Plan Section 2 CurriculumICT Mark Summary Action Plan Section 2 Curriculum
ICT Mark Summary Action Plan Section 2 Curriculumguest594ea
 
PROJECT BFF - QTR 4 - FIRST GRADING.pptx
PROJECT BFF - QTR 4 - FIRST GRADING.pptxPROJECT BFF - QTR 4 - FIRST GRADING.pptx
PROJECT BFF - QTR 4 - FIRST GRADING.pptxMARIACRISTINADELACRU11
 
Central Sacramento Regional Workshop
Central Sacramento Regional WorkshopCentral Sacramento Regional Workshop
Central Sacramento Regional Workshopncook
 
Technology action plan
Technology action planTechnology action plan
Technology action planjimmyheffernan
 
Tattape Dissertation defencing 20 September 2012
Tattape Dissertation defencing  20 September 2012Tattape Dissertation defencing  20 September 2012
Tattape Dissertation defencing 20 September 2012Tattape
 
Personnel development
Personnel developmentPersonnel development
Personnel developmentJohnWPD
 

Similar a Abs ict vision and strategy 2010 2013 (20)

2010 year end report
2010 year end report2010 year end report
2010 year end report
 
Basic Computer Literacy - P1
Basic Computer Literacy - P1Basic Computer Literacy - P1
Basic Computer Literacy - P1
 
Ict journey plan 2011
Ict journey plan 2011Ict journey plan 2011
Ict journey plan 2011
 
MISD Technology Professional Development Action Plan
MISD Technology Professional Development Action PlanMISD Technology Professional Development Action Plan
MISD Technology Professional Development Action Plan
 
Action plan
Action planAction plan
Action plan
 
Information technology kra presentation - jan 2013 ver. 2
Information technology  kra presentation - jan 2013 ver. 2Information technology  kra presentation - jan 2013 ver. 2
Information technology kra presentation - jan 2013 ver. 2
 
Ict mark 2013 action plan 2
Ict mark 2013 action plan   2Ict mark 2013 action plan   2
Ict mark 2013 action plan 2
 
Strategic target objective
Strategic target objectiveStrategic target objective
Strategic target objective
 
Mythica Proposal Gold Team Review
Mythica Proposal Gold Team ReviewMythica Proposal Gold Team Review
Mythica Proposal Gold Team Review
 
Week 4 Upload Assignments
Week 4 Upload AssignmentsWeek 4 Upload Assignments
Week 4 Upload Assignments
 
Action Plan For Blog
Action Plan For BlogAction Plan For Blog
Action Plan For Blog
 
ICT Mark Summary Action Plan Section 2 Curriculum
ICT Mark Summary Action Plan Section 2 CurriculumICT Mark Summary Action Plan Section 2 Curriculum
ICT Mark Summary Action Plan Section 2 Curriculum
 
Cbn
CbnCbn
Cbn
 
PROJECT BFF - QTR 4 - FIRST GRADING.pptx
PROJECT BFF - QTR 4 - FIRST GRADING.pptxPROJECT BFF - QTR 4 - FIRST GRADING.pptx
PROJECT BFF - QTR 4 - FIRST GRADING.pptx
 
Fayston techplanjune2009
Fayston techplanjune2009Fayston techplanjune2009
Fayston techplanjune2009
 
Strategic target objective
Strategic target objectiveStrategic target objective
Strategic target objective
 
Central Sacramento Regional Workshop
Central Sacramento Regional WorkshopCentral Sacramento Regional Workshop
Central Sacramento Regional Workshop
 
Technology action plan
Technology action planTechnology action plan
Technology action plan
 
Tattape Dissertation defencing 20 September 2012
Tattape Dissertation defencing  20 September 2012Tattape Dissertation defencing  20 September 2012
Tattape Dissertation defencing 20 September 2012
 
Personnel development
Personnel developmentPersonnel development
Personnel development
 

Último

Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 

Último (20)

Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 

Abs ict vision and strategy 2010 2013

  • 1.     ICT VISION & STRATEGY 2010 – 2013
  • 2. ICT Vision Statement ABS aims:- • to become the leading school in the region for integrating technology in all aspects of education and to ensure that ICT is at the centre of Learning and Teaching at ABS • to prepare students for an increasingly technology-driven world and to ensure that students are able to use technology critically, creatively, safely, ethically and in a responsible manner CWE: November 2009
  • 3. ABS ICT STRATEGIC PLAN  2010 ‐ 2013 OBJECTIVE MAIN ACTION LEAD TIME SCALE HOW IMPACT  RESOURCES INDICATORS What are we trying to do? What main action(s) are  By when? INSET, Working Groups etc How will we measure  Training: costs, source required to do this? impact? 1 To create a whole  1.1 Create an ICT Strategic  Prin, DoR Sep 09 Director of  Group is created  Staff time school vision and  Planning Group that  Resources identifies  and meets regularly approach represents all four  staff who will form  schools and  the ICT strategic  administration Planning Group 1.2 Create a whole school  DoR Oct 09 ICT Strategic  Approval by Mgt  Staff time vision statement for  Planning Group Team, BoT, used in  ICT at ABS school publications 1.3 Create an ICT Strategic  DoR Nov 09 ICT Strategic  Approval by Mgt  Staff time Plan for ABS that  Planning Group Team, BoT, used in  reflects the school's  school publications Aims and Mission 1.4 Develop detailed ICT  HoS Mar 10 School working  Published, clear  Management and  plans for each school  groups action plans for each  staff time and the  school that relate to  administration to link  the whole school  with the whole school  plan plan 1.5 Develop strategies to  Prin, DoR,  Jan 10 Finance Mtgs, BEF,  Funds are available  Management, BEF  fund the ICT plan Finance  Board Finance Sub‐ for proposed  members and  Mgr Committee ICTdevelopments Finance Sub‐ Committee time CWE: Revised 9 December 2009
  • 4. ABS ICT STRATEGIC PLAN  2010 ‐ 2013 OBJECTIVE MAIN ACTION LEAD TIME SCALE HOW IMPACT  RESOURCES INDICATORS What are we trying to do? What main action(s) are  By when? INSET, Working Groups etc How will we measure  Training: costs, source required to do this? impact? 2 To ensure that ICT is at  2.1 Periodic evaluation  VPs' E‐ Annual Apr‐May VPs, Heads of  Publication of  Staff time the centre of Learning  and revision of ICT in  Learning Co‐ Schools, Heads of  evaluation findings  and Teaching at ABS the KG‐12 curriculum ord, HoS Departments, e‐ and revised KG‐12  learning co‐ ICT in the  ordinator, IT staff Curriculum plan 2.2 Phased introduction  DoR, HoS, IT  Aug 10 for first  Phased introduction  Reduced total  Cost of laptops,  of laptops for  Manager deployment of laptops for staff.  number of PCs, staff  carts, completion of  students and staff Increased use of  'ownership' of own  wireless. Training  laptops by students.  laptop producing  for staff. Additional  Phased introduction  fewer IT technical  IT Technician. Some  of laptops on carts  issues compared to  improvements to  for younger grades. using multiple PCs.  power infrastructure  Higher levels of staff  and storage  ICT competence.  facilities. Greater use of ICT in  learning and  teaching. 2.3 Develop a staffing  Prin, VPs,  Dec 09 Meetings Improved  Recruitment,  structure of ICT  DoR, HoS management and  training of staff,  expertise to ensure  strategic direction time allowances that the vision can be  met
  • 5. ABS ICT STRATEGIC PLAN  2010 ‐ 2013 OBJECTIVE MAIN ACTION LEAD TIME SCALE HOW IMPACT  RESOURCES INDICATORS What are we trying to do? What main action(s) are  By when? INSET, Working Groups etc How will we measure  Training: costs, source required to do this? impact? 2.4 Provide a structured  VPs, HoS, E‐ Ongoing, plan for  Meetings,  Improved staff  Cost of providing  and evaluated  Learning Co‐ the following  identifying  competencies,  INSET,  staff time programme of staff  ord academic year in  appropriate training  improved use of ICT  training and  May and areas that  in classroom for  development to  needto be targetted learning and  ensure that the vision  teaching can be met 2.5 Evaluate and develop  Prin, E‐ Jun 10 with annual  Review available  Improved student  Cost of additional  integration strategies  Learning Co‐ review software and/or  achievements, more  software, training,  in Learning Support  ord, CLS  software and  integration in class,  staff time for challenged  Counsellor peripherals to  less need for  students support student  teacher support needs
  • 6. ABS ICT STRATEGIC PLAN  2010 ‐ 2013 OBJECTIVE MAIN ACTION LEAD TIME SCALE HOW IMPACT  RESOURCES INDICATORS What are we trying to do? What main action(s) are  By when? INSET, Working Groups etc How will we measure  Training: costs, source required to do this? impact? 3 To develop  3.1 Appoint Data Officer DoR Nov 09 Internal and  Appointment made Additional salary electronic  external adverts,  administration  Interviews throughout all four  3.2 Develop and  DoR, DoS,  Jan 10 ‐ Aug 11 Dir of Resources and  Successful staff use  Basic modules  schools by ensuring  implement modules of  DO Data Officer work  of discipline,  already purchased,  that the electronic  the student  with Offtec  scheduling and  annual updates and  administration  administration system  technical support  reporting modules  maintenance costs systems are being  for Discipline,  and key school staff  that replace existing  effectively utilised Scheduling and  to devise  systems. Easier data  Reporting appropriate systems entry, more efficient  processes 3.3 Develop a virtual  E‐Learning  Phased  E‐Learning Co‐ord  Delivery of e‐ Staff time. Annual  learning platform Co‐ord implementation Sep ‐ plans training and  learning to students.  support agreement  Jul 11 implementation Clear plan for  for software distance learning in  case of school or  section closure. 3.4 Establish a secure  DoR, DO,  Jun 10 Data Officer builds  Staff access to  Initial cost of  staff intranet IT Mgr structure and adds  school current software already  documents documents budgetted in 2009‐ 10. Staff time. 3.5 Periodically evaluate  DoR Review whole site at  DoR/HoS/HoD  Clear, informative,  Annual server space  and review ABS  end of each  evaluate content  easy to use website  rental, staff time.  website semester. New site  and provide updates  designed for target  Costs of major site  design Jan 2013 and ideas for  audience maintenance and  improvements new site.
  • 7. ABS ICT STRATEGIC PLAN  2010 ‐ 2013 OBJECTIVE MAIN ACTION LEAD TIME SCALE HOW IMPACT  RESOURCES INDICATORS What are we trying to do? What main action(s) are  By when? INSET, Working Groups etc How will we measure  Training: costs, source required to do this? impact? 3.6 Investigate and  IT Mgr Annual  ICT Strategic  Able to complete  Cost of software /  implement where  recommendations  Planning group  tasks faster and with  hardware. Training. necessary tools to  for inclusion in Dec  reviews suggestions less time. Possible  improve productivity  budget reduction in staff. and efficiency in the  administration 3.7 Implement and  VPs, HoS Dec 11 Meet with  Clear mapping of  Cost of Curriculum  evaluate a Curriculum  Curriculum Mapping  whole school  Mapping Software.  Mapping System System provider to  curriculum KG‐12 Staff time. discuss ABS  requirements 3.8 Produce digital  Head of  Dec 11 Media Centre staff  Searchable database  Staff time. Archiving  archive of ABS history MC, IT Mgr collect documents,  of school history  system software.  identify appropriate  since school opened Hardware. materials and  catalogue
  • 8. ABS ICT STRATEGIC PLAN  2010 ‐ 2013 OBJECTIVE MAIN ACTION LEAD TIME SCALE HOW IMPACT INDICATORS RESOURCES What are we trying to  What main action(s) are required  By when? INSET, Working Groups etc How will we measure impact? Training: costs, source do? to do this? 4 To ensure that  4.1 IT infrastructure to by  DoR, IT  Aug 10 External audit Report, action plans Cost of bringing in  the school has  audited by external  Mgr external audit  the necessary  Educational Technology  person infrastructure to  consultant every 2 years support further  developments 4.2 Produce a 3‐year plan  DoR, IT  Dec 09  then  Meetings Clear strategy for  Cost of identified  for maintaining and  Mgr annual review maintenance, upgrades  hardware / software upgrading infrastructure  and replacements with  to meet the  cost implications requirements from  schools and  administration 4.3 Progressively increase  IT Mgr Aug 10 ‐ 8 Mb,    Consultation with  Faster access, ability to  Annual Internet  Internet bandwidth in  Aug 11 ‐ 16 Mb,   Internet providers:  use higher bandwidth  access fees,  order to support the  Aug 12 ‐ 32 Mb upgrading  applications eg  additional hardware  required needs microwave link,  videostreaming at server side considering  alternatives 4.4 Ensure that robust  IT Mgr Aug 10 with annual  Consultation and  Successful restores  Cost of new  methods of backup and  review through  researching industry  both as an exercise and  software and  security exist and are  audit by external  best practice for real hardware tested in order to  body guarantee the safety of  all data 4.5 Periodically review all IT  IT Mgr,  Mar 10 then  Meetings,  Clear procedures,  Staff time related procedures,  DoR annually reviewing,  policies and  policies and  structuring  documentation that are  documentation documentation periodically updated
  • 9. ICT STRATEGIC PLAN COSTS 2010/11 2011/12 2012/13 Capital Expense Capital Expense Capital Expense 2.2 Phased intro of laptops for staff 60/40/20 @850 51,000 34,000 17,000 Wireless 17,300 - - Laptop carts for JS Gr 6 / 5 - 4 carts - 51,400 - Laptop carts for JS Gr 4 / 3 - 4 carts - - 51,400 PCs (DT - specialist area) 12,100 Additional Technician (Staffing Budget) - - - - - Improvements to power infrastructure 1,100 200 200 Training for staff (PD Budget) - - - Equivalent to one extra teaching staff (could be in time 2.3 allowances across many staff) 15,000 15,000 15,000 2.4 Prof Dev (PD Budget) - - - 2.5 Learning Support (Hardware, Software) 2,000 2,000 2,000 3.1 Data Officer Salary (Staffing Budget) - - - 3.2 Annual Support Agreement 8,500 8,500 8,500 Edline Web Hosting 2,900 2,900 2,900 Additional Modules/Tools 5,407 2,500 2,500 3.4 Intranet Dashboard 4,000 400 400 3.5 Website 500 500 10,000 500 With laptops we should use MS Exchange to provide unified 3.6 communication system - - 8,750 AD Manager Plus - managing user accounts 900 - - Media Communication Centre Interface - 3,500 - HelpDesk Software (also for Maintenance) 5,950 800 800 3.7 Curriculum Mapping Software 2,000 4,100 4,100 3.8 Digital archive of ABS history 5,000 4.1 Consultation fees 5,000 - 5,000 4.2 Printers (additional + replacement) 6,800 5,800 5,800 Theatre Data Projector 12,000 LCD screen info/news system for Reception & College 3,920 Data Projectors 16/20/20 14,880 18,600 18,600 Scanners 3/3/3 600 600 600 Server RAM 3,200 - - Multi-Function Printer for Admin 3,500 NetOp Software (100 computer licence) 3,100 Other expenses (detail in 2010/11 ICT Budget) 64,583 64,583 64,583 UPS power circuits 9,450 Software - Curriculum 12,656 5,000 5,000 SMART CE Response Systems 1,100 1,100 1,100 Smartboards with cabling (JS) 19,925 - - 4.3 8 / 16 / 32 Mb bandwidth annual cost (microwave) 27,000 40,000 60,000 Additional hardware - 4,700 2,400 4.4 Backup System 7,800 1,000 1,000 ANNUAL TOTAL 188,188 118,483 151,900 137,783 130,350 157,783 TOTAL CAPITAL 470,438 TOTAL EXPENSE 414,049 + NEW KG HARDWARE (2009/10) 45,692 NOTE: All costs EXCLUDE TAX CWE: 9 December 2009