Transfer Switch
A transfer switch is an electrical
switch that switches a load
between two sources.
Manual transfer switch
Automatic Transfer
Switch
Manual transfer switch
- an operator affects the
transfer by throwing a switch.
 Automatic Transfer Switch
- An ATS is a device designed to
Automatically switch (transfer)
between (2 or 3) sources of power to
improve the reliability of the
electrical supply to a connected
load.

- It automatically switches when
it senses one of the sources has
lost or gained power. Current
range up to 4000 Amperes.
Automatic Transfer Switch
Operation of an Automatic Transfer Switch

Not only does ATS transfer the
load to the backup generator but
also it commands the backup
generator to start, based on the
voltage monitored on the primary
supply.
Example: ATS installed in homes

In a home equipped with a backup
generator and an ATS, when an electric
utility outage occurs, the ATS will tell
the backup generator to start. Once the
ATS sees that the generator is ready to
provide electric power, the ATS breaks
the home's connection to the electric
utility and connects the generator to the
home's main electrical panel.
Example: ATS installed in homes
Example: ATS installed in homes

The generator supplies power to the
home's electric load, but is not
connected to the electric utility
lines. It is necessary to isolate the
generator from the distribution
system to protect the generator
from overload in powering loads
beyond the house and for safety, as
utility workers expect the lines to
be dead.
Example: ATS installed in homes

When utility power returns for a
minimum time, the ATS will
automatically transfer the house
back to utility power and
command the generator to turn
off, after another specified
amount of "cool down" time
with no load on the generator.
Typical Applications of ATS
 Utility and Engine Generator
- Single unit standby applications
are very common
For facilities with a standby power
system and a single utility feed. The
transfer switch senses when utility
power has been lost, sends a start
signal to the standby generator and
transfers the load.
Utility and Engine Generator
 Utility and Utility
- Dual utility applications are
becoming more common

For use in facilities with redundant
utility feeds but no standby
generator. If one utility feed fails,
the transfer switch automatically
connects the load to the second
utility feed.
Utility and Utility
 Generator and Generator
- Prime power / standby application
For facilities with a prime power
system
using
multiple
on-site
generators. If the primary generator
fails, the transfer switch sends a start
signal to the second generator and then
transfers the load.
Generator and Generator
 Three-source system
For facilities with a standby power
system and two utility feeds. The
utility transfer switch controls the
feeds from the two utilities based on a
pre-established priority. If both utility
feeds fail, the generator transfer
switch sends a start signal to the
standby generator and transfers the
load.
ONE STANDBY POWER SYSTEM AND TWO UTILITY FEEDS
Three-source system :

Another three source system uses a
standby generator in place of the
second utility (dual standby). If the
utility fails, the first transfer switch
sends a start signal to the primary
standby generator and transfers the
load. If the primary standby generator
fails, the transfer switch sends a start
signal to the second generator set and
transfers the load.
TWO STANDBY POWER SYSTEM AND ONE UTILITY FEEDS
Types of ATS Transition
Open transition TS
Closed transition TS
Soft loading TS
Static TS
Open transition TS
An open transition transfer
switch is also called a break
before make transfer switch.
A break before make transfer
switch breaks contact with one
source of power before it makes
contact with another.
It prevents backfeeding from an emergency
generator back into the utility line
Backfeeding occurs when electric power is
being induced into the power grid. Power
flows in an opposite direction.
It can cause utility lineman to be
electrocuted as they work in power lines.
Reverse- power relay opens if backfeeding
occurs in the power lines.
Applications: Emergency, coderequired and optional standby
systems; resistive loads; small
motor loads
Open transition TS:

o Knife Blade Switch





Typically Non-Load breaking
Usually Manually Operated
Sometimes motor operated - Is a method of
arc suppression
Low withstand ratings – no
that extinguishes
arc chutes or vents
arcs by
 Low endurance ratings
channeling them
limited life
into chambers
- arc flash happens when electric current
flows through an air gap between
conductors.

above the
contacts.
Closed transition TS
A closed transition transfer switch is
also called a make before break
transfer switch.

A make before break transfer
switch makes contact with another
source before it breaks contact with
the interrupted source.
There are some loads, however,
that are affected by even the
slightest loss of power. There
are also operational conditions
where it may be desirable to
transfer loads with zero
interruption of power when
conditions permit.
For
these
applications,
closed transition transfer
switches can be provided.
With
closed
transition
transfer, the on-site engine
generator set is momentarily
connected in parallel with
the utility source.
This
requires
getting
approval from the local
utility company. The switch
will operate in a makebefore-break mode provided
both sources are acceptable
and synchronized.
Typical parameters determining
synchronization are:
•voltage difference less than 5%
•frequency difference less than 0.2 Hz
- Frequency counter is used to measure frequency

•maximum phase angle between the
sources of 5 electrical degrees
- Is the difference between the phase of a
sinusoidally varying quantity and the phase
of a second quantity which varies
sinusoidally at the same quantity.
Analog Voltage & frequency meter

Digital Generator Frequency & Voltage meter
Closed
Transition
(Make-BeforeBreak Operation)
NOTE: “P” Position indicates
both sources paralleled for 5
cycles

Applications:
Critical power
requirements,
including
hospitals and
data centers
Delayed Transition (center off)
- The delayed transition (center off) switch is
especially suited to applications in which large
inductive loads result in large inrush currents.
The delayed transition allows magnetic fields to
completely collapse before reconnection.
- A time delay between the opening of the
closed contacts and the closing of the open
contacts allows large motor loads to
demagnetize before transfer. This prevents the
severe “bump” caused by switching a rotating
motor (which momentarily acts as a
generator) from one source to another source
that is not in synchronism.
Types of ATS
Construction &
Design
Knife
Blade
Type

Twin
Contactor
Type

Twin
MCCB
Type

Power
Contactor
Type

Static
Transfer
Type
Knife Blade
Closed transition TS

o Twin Contactor
- contactor type is simpler design that is electrically operated
and mechanically held. It operates faster than circuit breaker
transfer switches, which reduces transfer time.








Switching device having 1 position of rest
Returns to position of rest @ loss power (un-latched type) or
add’l latching arrangement to hold position on loss of power
Built using 1 of up to 12 types of contactors under, from
basic contactor to high-capacity motor starters.
Often very basic controller
Mechanical/safety interlock often not available or optional
Variety of operators, from motor to electromagnets
Not a True double throw device - possible to close into both
Sources
Twin Contactor
Closed transition TS
o Twin MCCB (Molded Case Circuit Breaker)
- circuit breaker type has two interlocked circuit breakers,
so only one breaker can be closed any anytime.







2 Position device, typically operated from add-on motors
Built using 1 of up to 2 types of breaker under, from basic
instantaneous-trip type to short-time rated devices.
Mechanical/safety interlock is an add-on, sometimes
optional
Motor operators usually slow, often unreliable for high duty.
Wide range of manf-assigned withstand ratings (low, med,
or high)
Not a True double throw device - possible to close into both
Sources
Twin MCCB (Molded Case Circuit Breaker)
o Power Contactor Type
 Std. Double Throw mechanism - Inherent
mechanical interlock against closing to
both sources
 No add-on interlocks required
 Fewer moving parts
 High Withstand Current ratings to allow
fault clearing coordination
 Integrated Arc quenching components
 Solenoid Operated (very fast)
Power Contactor Type
o Power Contactor ATS - Composition
•
•
•
•

•

•

Arc quenching grids & enclosed arc chutes
Movable contact assembly has 2 pieces, arcing contact
and main current carrying contact.
Arcing contacts make first, break last
Silver alloy contacts
 Resists welding
 Enhanced withstand ratings
“Over center” switching principal to achieve a
mechanically locked position in either Source 1 or 2
High speed solenoid actuated drive assures contact
transfer in 30-50 msec
Power Contactor ATS - Composition
Static/ Solid-State Transfer Type
The static/solid-state ATS lacks the traditional
mechanical transfer switch. Because this unit relies
on SCR or transistor technology, sub-cycle transfers
are possible. Although there is technically a "break"
in load current, the speed of these units prevents
adverse effects to sensitive equipment.
Static Transfer Type









Two live sources required. Solid-state
switching >> no moving parts
Extremely FAST operation, transfer in
less than ¼ cycle.
SCR technology
Typically used on critical loads where 2
reliable and independent power
supplies available, or switching 2 x UPS
Outputs.
Both sources must be in sync
Often cost prohibitive for Standby
applications

E

N
2

1

L
Static Transfer Type
Bypass Isolation Transfer
Allows maintenance to the main
ATS without disconnecting the
load. By having two transfer
switches connected in parallel, the
bypass transfer switch adds
redundancy to the system.
Applications: Critical power and maintenance
requirements, including healthcare and data
center
Bypass Isolation ATS
• Essentially (2) ATS in Parallel, (1)
Automatic Switch (ATS) & (1) Manual
Switch (MTS).
• ATS is withdrawable, similar to
withdrawable CB’s
• (2) redundant paths from each source
to load.
• ATS & MTS are mechanically and
electrically interlocked
– To prevents accidental closure of
both sources
• Bypassing power from Source to Load
permits testing or maintenance of ATS
without interruption to load.
• Available in Open, Delayed, and
Closed Transition
• If power fails while bypassed, Genset
is auto started to permit fast transfer
using MTS.

TWO PATHS FROM
SOURCE TO LOAD

WITHDRAWABLE
ATS

MECHANICAL
INTERLOCKS

FIXED MOUNT MTS
Thank You!
CREATIVE MAKER:

MARK ANTHONY B. ENOY
BS EE – 5
SPECIAL THANKS TO MY SPONSORS:

Más contenido relacionado

La actualidad más candente

Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentationKamal Mittal
 
ETAP - Coordination and protecion 2
ETAP -  Coordination and protecion 2ETAP -  Coordination and protecion 2
ETAP - Coordination and protecion 2Himmelstern
 
Protection & switchgear
Protection & switchgear   Protection & switchgear
Protection & switchgear johny renoald
 
Alternator protection
Alternator protectionAlternator protection
Alternator protectionjawaharramaya
 
Power system slide notes
Power system slide notesPower system slide notes
Power system slide notesmichaeljmack
 
**Lightning Arrester Presentation**
**Lightning Arrester Presentation****Lightning Arrester Presentation**
**Lightning Arrester Presentation**SKPAMB
 
Switchgear and protection 1
Switchgear and protection 1Switchgear and protection 1
Switchgear and protection 1Md Irshad Ahmad
 
ETAP - Coordination and protecion
ETAP -  Coordination and protecionETAP -  Coordination and protecion
ETAP - Coordination and protecionHimmelstern
 
DISTANCE PROTECTION RELAY
DISTANCE PROTECTION RELAYDISTANCE PROTECTION RELAY
DISTANCE PROTECTION RELAYRaviraj solanki
 
Training report-in-a-132-k-v-substation
Training report-in-a-132-k-v-substationTraining report-in-a-132-k-v-substation
Training report-in-a-132-k-v-substationankesh kumar
 
Substations
SubstationsSubstations
Substationsitfakash
 
220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training pptShubham Patel
 
Differential protection
Differential protectionDifferential protection
Differential protectionRishi Tandon
 

La actualidad más candente (20)

Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentation
 
ETAP - Coordination and protecion 2
ETAP -  Coordination and protecion 2ETAP -  Coordination and protecion 2
ETAP - Coordination and protecion 2
 
BUSBAR PROTECTION
BUSBAR PROTECTIONBUSBAR PROTECTION
BUSBAR PROTECTION
 
132 33kv substation
132 33kv substation132 33kv substation
132 33kv substation
 
Protection & switchgear
Protection & switchgear   Protection & switchgear
Protection & switchgear
 
Alternator protection
Alternator protectionAlternator protection
Alternator protection
 
Power system slide notes
Power system slide notesPower system slide notes
Power system slide notes
 
**Lightning Arrester Presentation**
**Lightning Arrester Presentation****Lightning Arrester Presentation**
**Lightning Arrester Presentation**
 
Substation
Substation Substation
Substation
 
Switchgear and protection 1
Switchgear and protection 1Switchgear and protection 1
Switchgear and protection 1
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
 
ETAP - Coordination and protecion
ETAP -  Coordination and protecionETAP -  Coordination and protecion
ETAP - Coordination and protecion
 
Electric power system
Electric power systemElectric power system
Electric power system
 
DISTANCE PROTECTION RELAY
DISTANCE PROTECTION RELAYDISTANCE PROTECTION RELAY
DISTANCE PROTECTION RELAY
 
Training report-in-a-132-k-v-substation
Training report-in-a-132-k-v-substationTraining report-in-a-132-k-v-substation
Training report-in-a-132-k-v-substation
 
UPQC ppt main
UPQC ppt mainUPQC ppt main
UPQC ppt main
 
Vacuum circuit breaker
Vacuum circuit breakerVacuum circuit breaker
Vacuum circuit breaker
 
Substations
SubstationsSubstations
Substations
 
220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt
 
Differential protection
Differential protectionDifferential protection
Differential protection
 

Similar a Automatic transfer switch (ats)

Uttar pradesh power corporation limited
Uttar pradesh power corporation limitedUttar pradesh power corporation limited
Uttar pradesh power corporation limitedVSRAGHU
 
Electrical Basics-VBR
Electrical Basics-VBRElectrical Basics-VBR
Electrical Basics-VBRVijay Raskar
 
ELECTRIC SUB-STATION IN BRIEF
ELECTRIC SUB-STATION IN BRIEFELECTRIC SUB-STATION IN BRIEF
ELECTRIC SUB-STATION IN BRIEFjang041
 
Ppt on 400 kv gss raiser Bikaner- Yatendra Parashar
Ppt on 400 kv gss raiser Bikaner- Yatendra ParasharPpt on 400 kv gss raiser Bikaner- Yatendra Parashar
Ppt on 400 kv gss raiser Bikaner- Yatendra ParasharYatendra Parashar
 
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptxRajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptxsohaib268827
 
Substation equipments & its functions
Substation equipments & its functionsSubstation equipments & its functions
Substation equipments & its functionsMonzer Abdallah Eisa
 
Overview of custom power devices
Overview of custom power devicesOverview of custom power devices
Overview of custom power devicesRaja Adapa
 
33/11 KV SUB-STATION, VIBHUTI KHAND, GOMTI NAGAR, LUCKNOW
33/11 KV SUB-STATION, VIBHUTI KHAND, GOMTI  NAGAR, LUCKNOW33/11 KV SUB-STATION, VIBHUTI KHAND, GOMTI  NAGAR, LUCKNOW
33/11 KV SUB-STATION, VIBHUTI KHAND, GOMTI NAGAR, LUCKNOWSatya Prakash Chaurasia
 
DISTRIBUTION SYSTEM OPERATION AND CONTROL
DISTRIBUTION SYSTEM OPERATION AND CONTROLDISTRIBUTION SYSTEM OPERATION AND CONTROL
DISTRIBUTION SYSTEM OPERATION AND CONTROLyohannes feleke
 
Basic Power Electronics Concepts_Ozipineci_ORNL.pdf
Basic Power Electronics Concepts_Ozipineci_ORNL.pdfBasic Power Electronics Concepts_Ozipineci_ORNL.pdf
Basic Power Electronics Concepts_Ozipineci_ORNL.pdfgulie
 
Distribu pQ.pptx
Distribu pQ.pptxDistribu pQ.pptx
Distribu pQ.pptxbhuvana71
 

Similar a Automatic transfer switch (ats) (20)

Uttar pradesh power corporation limited
Uttar pradesh power corporation limitedUttar pradesh power corporation limited
Uttar pradesh power corporation limited
 
Electrical Basics-VBR
Electrical Basics-VBRElectrical Basics-VBR
Electrical Basics-VBR
 
Electrical basics
Electrical basicsElectrical basics
Electrical basics
 
Ashwani kumar
Ashwani kumarAshwani kumar
Ashwani kumar
 
132kV GSS ppt
132kV GSS ppt132kV GSS ppt
132kV GSS ppt
 
ELECTRIC SUB-STATION IN BRIEF
ELECTRIC SUB-STATION IN BRIEFELECTRIC SUB-STATION IN BRIEF
ELECTRIC SUB-STATION IN BRIEF
 
Ppt on 400 kv gss raiser Bikaner- Yatendra Parashar
Ppt on 400 kv gss raiser Bikaner- Yatendra ParasharPpt on 400 kv gss raiser Bikaner- Yatendra Parashar
Ppt on 400 kv gss raiser Bikaner- Yatendra Parashar
 
Power quality 2
Power quality 2Power quality 2
Power quality 2
 
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptxRajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
 
Chic export company_catalogue
Chic export company_catalogueChic export company_catalogue
Chic export company_catalogue
 
1. Introduction.pdf
1. Introduction.pdf1. Introduction.pdf
1. Introduction.pdf
 
Substation
SubstationSubstation
Substation
 
Substation equipments & its functions
Substation equipments & its functionsSubstation equipments & its functions
Substation equipments & its functions
 
Overview of custom power devices
Overview of custom power devicesOverview of custom power devices
Overview of custom power devices
 
33/11 KV SUB-STATION, VIBHUTI KHAND, GOMTI NAGAR, LUCKNOW
33/11 KV SUB-STATION, VIBHUTI KHAND, GOMTI  NAGAR, LUCKNOW33/11 KV SUB-STATION, VIBHUTI KHAND, GOMTI  NAGAR, LUCKNOW
33/11 KV SUB-STATION, VIBHUTI KHAND, GOMTI NAGAR, LUCKNOW
 
DISTRIBUTION SYSTEM OPERATION AND CONTROL
DISTRIBUTION SYSTEM OPERATION AND CONTROLDISTRIBUTION SYSTEM OPERATION AND CONTROL
DISTRIBUTION SYSTEM OPERATION AND CONTROL
 
Basic Power Electronics Concepts_Ozipineci_ORNL.pdf
Basic Power Electronics Concepts_Ozipineci_ORNL.pdfBasic Power Electronics Concepts_Ozipineci_ORNL.pdf
Basic Power Electronics Concepts_Ozipineci_ORNL.pdf
 
Relays
RelaysRelays
Relays
 
Distribu pQ.pptx
Distribu pQ.pptxDistribu pQ.pptx
Distribu pQ.pptx
 
ntpc ppt
ntpc pptntpc ppt
ntpc ppt
 

Más de Mark Anthony Enoy

Power quality & demand side management
Power quality & demand side managementPower quality & demand side management
Power quality & demand side managementMark Anthony Enoy
 
The italian physicist alessandro volta 0
The italian physicist alessandro volta 0The italian physicist alessandro volta 0
The italian physicist alessandro volta 0Mark Anthony Enoy
 
Automatic Transfer Switch (ATS) using Two- Magnetic Contactors With Power- Delay
Automatic Transfer Switch (ATS) using Two- Magnetic Contactors With Power- DelayAutomatic Transfer Switch (ATS) using Two- Magnetic Contactors With Power- Delay
Automatic Transfer Switch (ATS) using Two- Magnetic Contactors With Power- DelayMark Anthony Enoy
 
Wireless electrical power transmission using atmospheric conduction method
Wireless electrical power transmission using atmospheric conduction methodWireless electrical power transmission using atmospheric conduction method
Wireless electrical power transmission using atmospheric conduction methodMark Anthony Enoy
 

Más de Mark Anthony Enoy (12)

Power quality & demand side management
Power quality & demand side managementPower quality & demand side management
Power quality & demand side management
 
Protective relaying
Protective relayingProtective relaying
Protective relaying
 
CHEMICAL HAZARDS
CHEMICAL HAZARDSCHEMICAL HAZARDS
CHEMICAL HAZARDS
 
The italian physicist alessandro volta 0
The italian physicist alessandro volta 0The italian physicist alessandro volta 0
The italian physicist alessandro volta 0
 
Zaneco presentation
Zaneco presentationZaneco presentation
Zaneco presentation
 
Automatic Transfer Switch (ATS) using Two- Magnetic Contactors With Power- Delay
Automatic Transfer Switch (ATS) using Two- Magnetic Contactors With Power- DelayAutomatic Transfer Switch (ATS) using Two- Magnetic Contactors With Power- Delay
Automatic Transfer Switch (ATS) using Two- Magnetic Contactors With Power- Delay
 
Sheet 2
Sheet 2Sheet 2
Sheet 2
 
Sheet 1
Sheet 1Sheet 1
Sheet 1
 
Transformer Design
Transformer DesignTransformer Design
Transformer Design
 
Apartment design
Apartment design Apartment design
Apartment design
 
Wireless electrical power transmission using atmospheric conduction method
Wireless electrical power transmission using atmospheric conduction methodWireless electrical power transmission using atmospheric conduction method
Wireless electrical power transmission using atmospheric conduction method
 
Magnetic materials final
Magnetic materials finalMagnetic materials final
Magnetic materials final
 

Último

How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...DianaGray10
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityWSO2
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Zilliz
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelDeepika Singh
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyKhushali Kathiriya
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Orbitshub
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProduct Anonymous
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...apidays
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...apidays
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Victor Rentea
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxRemote DBA Services
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native ApplicationsWSO2
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...apidays
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Angeliki Cooney
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodJuan lago vázquez
 

Último (20)

How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital Adaptability
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering Developers
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 
Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptx
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 

Automatic transfer switch (ats)

  • 1. Automatic Transfer Switch (ATS) EE 50 – ELECTRICAL EQUIPMENT AND DEVICE MARK ANTHONY B. ENOY BS EE - V ENGR. KARRLOU C. RODA INSTRUCTOR
  • 2. Transfer Switch A transfer switch is an electrical switch that switches a load between two sources.
  • 4. Manual transfer switch - an operator affects the transfer by throwing a switch.
  • 5.  Automatic Transfer Switch - An ATS is a device designed to Automatically switch (transfer) between (2 or 3) sources of power to improve the reliability of the electrical supply to a connected load. - It automatically switches when it senses one of the sources has lost or gained power. Current range up to 4000 Amperes.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17. Operation of an Automatic Transfer Switch Not only does ATS transfer the load to the backup generator but also it commands the backup generator to start, based on the voltage monitored on the primary supply.
  • 18. Example: ATS installed in homes In a home equipped with a backup generator and an ATS, when an electric utility outage occurs, the ATS will tell the backup generator to start. Once the ATS sees that the generator is ready to provide electric power, the ATS breaks the home's connection to the electric utility and connects the generator to the home's main electrical panel.
  • 20. Example: ATS installed in homes The generator supplies power to the home's electric load, but is not connected to the electric utility lines. It is necessary to isolate the generator from the distribution system to protect the generator from overload in powering loads beyond the house and for safety, as utility workers expect the lines to be dead.
  • 21. Example: ATS installed in homes When utility power returns for a minimum time, the ATS will automatically transfer the house back to utility power and command the generator to turn off, after another specified amount of "cool down" time with no load on the generator.
  • 23.  Utility and Engine Generator - Single unit standby applications are very common For facilities with a standby power system and a single utility feed. The transfer switch senses when utility power has been lost, sends a start signal to the standby generator and transfers the load.
  • 24. Utility and Engine Generator
  • 25.  Utility and Utility - Dual utility applications are becoming more common For use in facilities with redundant utility feeds but no standby generator. If one utility feed fails, the transfer switch automatically connects the load to the second utility feed.
  • 27.  Generator and Generator - Prime power / standby application For facilities with a prime power system using multiple on-site generators. If the primary generator fails, the transfer switch sends a start signal to the second generator and then transfers the load.
  • 29.  Three-source system For facilities with a standby power system and two utility feeds. The utility transfer switch controls the feeds from the two utilities based on a pre-established priority. If both utility feeds fail, the generator transfer switch sends a start signal to the standby generator and transfers the load.
  • 30. ONE STANDBY POWER SYSTEM AND TWO UTILITY FEEDS
  • 31. Three-source system : Another three source system uses a standby generator in place of the second utility (dual standby). If the utility fails, the first transfer switch sends a start signal to the primary standby generator and transfers the load. If the primary standby generator fails, the transfer switch sends a start signal to the second generator set and transfers the load.
  • 32. TWO STANDBY POWER SYSTEM AND ONE UTILITY FEEDS
  • 33. Types of ATS Transition Open transition TS Closed transition TS Soft loading TS Static TS
  • 34. Open transition TS An open transition transfer switch is also called a break before make transfer switch. A break before make transfer switch breaks contact with one source of power before it makes contact with another.
  • 35. It prevents backfeeding from an emergency generator back into the utility line Backfeeding occurs when electric power is being induced into the power grid. Power flows in an opposite direction. It can cause utility lineman to be electrocuted as they work in power lines. Reverse- power relay opens if backfeeding occurs in the power lines.
  • 36. Applications: Emergency, coderequired and optional standby systems; resistive loads; small motor loads
  • 37.
  • 38. Open transition TS: o Knife Blade Switch     Typically Non-Load breaking Usually Manually Operated Sometimes motor operated - Is a method of arc suppression Low withstand ratings – no that extinguishes arc chutes or vents arcs by  Low endurance ratings channeling them limited life into chambers - arc flash happens when electric current flows through an air gap between conductors. above the contacts.
  • 39. Closed transition TS A closed transition transfer switch is also called a make before break transfer switch. A make before break transfer switch makes contact with another source before it breaks contact with the interrupted source.
  • 40. There are some loads, however, that are affected by even the slightest loss of power. There are also operational conditions where it may be desirable to transfer loads with zero interruption of power when conditions permit.
  • 41. For these applications, closed transition transfer switches can be provided. With closed transition transfer, the on-site engine generator set is momentarily connected in parallel with the utility source.
  • 42. This requires getting approval from the local utility company. The switch will operate in a makebefore-break mode provided both sources are acceptable and synchronized.
  • 43. Typical parameters determining synchronization are: •voltage difference less than 5% •frequency difference less than 0.2 Hz - Frequency counter is used to measure frequency •maximum phase angle between the sources of 5 electrical degrees - Is the difference between the phase of a sinusoidally varying quantity and the phase of a second quantity which varies sinusoidally at the same quantity.
  • 44. Analog Voltage & frequency meter Digital Generator Frequency & Voltage meter
  • 45. Closed Transition (Make-BeforeBreak Operation) NOTE: “P” Position indicates both sources paralleled for 5 cycles Applications: Critical power requirements, including hospitals and data centers
  • 46. Delayed Transition (center off) - The delayed transition (center off) switch is especially suited to applications in which large inductive loads result in large inrush currents. The delayed transition allows magnetic fields to completely collapse before reconnection. - A time delay between the opening of the closed contacts and the closing of the open contacts allows large motor loads to demagnetize before transfer. This prevents the severe “bump” caused by switching a rotating motor (which momentarily acts as a generator) from one source to another source that is not in synchronism.
  • 50. Closed transition TS o Twin Contactor - contactor type is simpler design that is electrically operated and mechanically held. It operates faster than circuit breaker transfer switches, which reduces transfer time.        Switching device having 1 position of rest Returns to position of rest @ loss power (un-latched type) or add’l latching arrangement to hold position on loss of power Built using 1 of up to 12 types of contactors under, from basic contactor to high-capacity motor starters. Often very basic controller Mechanical/safety interlock often not available or optional Variety of operators, from motor to electromagnets Not a True double throw device - possible to close into both Sources
  • 52. Closed transition TS o Twin MCCB (Molded Case Circuit Breaker) - circuit breaker type has two interlocked circuit breakers, so only one breaker can be closed any anytime.       2 Position device, typically operated from add-on motors Built using 1 of up to 2 types of breaker under, from basic instantaneous-trip type to short-time rated devices. Mechanical/safety interlock is an add-on, sometimes optional Motor operators usually slow, often unreliable for high duty. Wide range of manf-assigned withstand ratings (low, med, or high) Not a True double throw device - possible to close into both Sources
  • 53. Twin MCCB (Molded Case Circuit Breaker)
  • 54. o Power Contactor Type  Std. Double Throw mechanism - Inherent mechanical interlock against closing to both sources  No add-on interlocks required  Fewer moving parts  High Withstand Current ratings to allow fault clearing coordination  Integrated Arc quenching components  Solenoid Operated (very fast)
  • 56. o Power Contactor ATS - Composition • • • • • • Arc quenching grids & enclosed arc chutes Movable contact assembly has 2 pieces, arcing contact and main current carrying contact. Arcing contacts make first, break last Silver alloy contacts  Resists welding  Enhanced withstand ratings “Over center” switching principal to achieve a mechanically locked position in either Source 1 or 2 High speed solenoid actuated drive assures contact transfer in 30-50 msec
  • 57. Power Contactor ATS - Composition
  • 58. Static/ Solid-State Transfer Type The static/solid-state ATS lacks the traditional mechanical transfer switch. Because this unit relies on SCR or transistor technology, sub-cycle transfers are possible. Although there is technically a "break" in load current, the speed of these units prevents adverse effects to sensitive equipment.
  • 59. Static Transfer Type       Two live sources required. Solid-state switching >> no moving parts Extremely FAST operation, transfer in less than ¼ cycle. SCR technology Typically used on critical loads where 2 reliable and independent power supplies available, or switching 2 x UPS Outputs. Both sources must be in sync Often cost prohibitive for Standby applications E N 2 1 L
  • 61. Bypass Isolation Transfer Allows maintenance to the main ATS without disconnecting the load. By having two transfer switches connected in parallel, the bypass transfer switch adds redundancy to the system. Applications: Critical power and maintenance requirements, including healthcare and data center
  • 62. Bypass Isolation ATS • Essentially (2) ATS in Parallel, (1) Automatic Switch (ATS) & (1) Manual Switch (MTS). • ATS is withdrawable, similar to withdrawable CB’s • (2) redundant paths from each source to load. • ATS & MTS are mechanically and electrically interlocked – To prevents accidental closure of both sources • Bypassing power from Source to Load permits testing or maintenance of ATS without interruption to load. • Available in Open, Delayed, and Closed Transition • If power fails while bypassed, Genset is auto started to permit fast transfer using MTS. TWO PATHS FROM SOURCE TO LOAD WITHDRAWABLE ATS MECHANICAL INTERLOCKS FIXED MOUNT MTS