SlideShare una empresa de Scribd logo
1 de 2
Descargar para leer sin conexión
Module 8
                                                                                   Decoding ISO 15189™



 Conducting a Management Review
A management review is a formal meeting of key members of senior management. The purpose is to
review the status and effectiveness of the quality management system. This meeting provides a venue for
management to evaluate and analyze laboratory practices for the purpose of improvement. During this
meeting, a comprehensive look back at the organization’s quality management system takes place. This
includes a review of documented policies and a review of records. Following the meeting, a list of action
plans for improvement should be produced.


The Agenda:
A detailed, timed agenda should be prepared by the quality manager. With advance preparation, most
organizations should be able to complete the meeting in a single day. However, it is critical that advance
planning is done to allow the meeting to run smoothly.
The management review agenda should include the following inputs for discussion:
    1. Review of the quality policy
    2. Progress towards goals and objectives
    3. Results of audits from the past year, this includes internal audits and audits by external bodies
    4. Customer feedback such as the results of satisfaction surveys and a summary of complaints
    5. A summary of quality indicator data such a turn-around times or specimen rejection rates.
    6. Review of proficiency testing performance
    7. A review of nonconformites including the status of corrective actions
    8. Status of the previous management review items
    9. A review of resources taking into consideration any changes in the volume of work and type of
       work undertaken
    10. An evaluation of suppliers
For your management review, all discussion inputs should be included on the agenda along with a target
timeframe for each discussion. A review of your quality policy and objectives from the past year should
occur at the onset of the meeting.


Preparing for the Meeting:
For each agenda item, consideration should be given to the desired outcomes. It would be advantageous
to use standard templates for the preparation of briefing notes to establish continuity. In order to facilitate
a smooth meeting, it is essential to be thorough in material preparation so that the volume of information
can be managed in the time allotted. The meeting will be greatly enhanced by preparing graphical
summaries of data such as the Pareto chart shown in Figure 1.
Pareto charts and other summary tools will provide focus and direction to help pinpoint issues, monitor
progress and enable management to recognize trends. The champion—usually the quality manager—
must determine which process records will support the identified areas of measurement (i.e., quality
indicators) and ensure that they effectively assess the status of the area to be reviewed. The
management team must analyze all information to determine if the target has been realized, the action
has been adequate or if further improvement can be achieved.




                               © Institute for Quality Management in Healthcare                    Page 1 of 2
Module 8
                                                                                    Decoding ISO 15189™


Figure 1: Sample Pareto Chart




During the Meeting:
We suggest that as the meeting unfolds, the quality manager ensures that the management team
commits to an action plan to address each input. Essentially, the outputs of the management review feed
directly back into the strategic planning for the next year. The action plan should adequately identify the
issue to be resolved, assign key responsibility for follow-up, indicate timelines for completion and define a
mechanism to evaluate effectiveness, i.e., mini audits. Timelines should be adequately assigned
according to the urgency of the issue. Someone must be assigned to record the minutes of the meeting.
This will provide a record of the management review. It is imperative that each action plan is completely
documented.




Page 2 of 2                           © Institute for Quality Management in Healthcare

Más contenido relacionado

La actualidad más candente

ISO 15189 Accreditation Guide - Improving Laboratory Performance Through Qual...
ISO 15189 Accreditation Guide - Improving Laboratory Performance Through Qual...ISO 15189 Accreditation Guide - Improving Laboratory Performance Through Qual...
ISO 15189 Accreditation Guide - Improving Laboratory Performance Through Qual...Randox
 
Quality assurance in blood banking
Quality assurance in blood bankingQuality assurance in blood banking
Quality assurance in blood bankingDr Shahida Baloch
 
Good Documentation Practice (GDocP).pdf
Good Documentation Practice (GDocP).pdfGood Documentation Practice (GDocP).pdf
Good Documentation Practice (GDocP).pdfMd. Zakaria Faruki
 
Quality Management System
Quality Management System Quality Management System
Quality Management System Prasenjit Mitra
 
Quality management review template
Quality management review templateQuality management review template
Quality management review templateselinasimpson2801
 
BRC manual documents free download
BRC manual documents free downloadBRC manual documents free download
BRC manual documents free downloadGlobal Manager Group
 
Good laboratory practice SOP
Good laboratory practice SOPGood laboratory practice SOP
Good laboratory practice SOPPostgradoMLCC
 
Presentation on ISO 15189 documentation
Presentation on ISO 15189 documentationPresentation on ISO 15189 documentation
Presentation on ISO 15189 documentationGlobal Manager Group
 
Clinical laboratory total quality management (TQM) system
Clinical laboratory total quality management (TQM) systemClinical laboratory total quality management (TQM) system
Clinical laboratory total quality management (TQM) systemTapeshwar Yadav
 
Laboratory quality management system
Laboratory quality management systemLaboratory quality management system
Laboratory quality management systemselinasimpson0801
 
ISO/IEC 17025:2017 Required documentation
ISO/IEC 17025:2017 Required documentationISO/IEC 17025:2017 Required documentation
ISO/IEC 17025:2017 Required documentationMohamed Salama Elimam
 
Quality Control In Clinical Laboratory
Quality Control In Clinical LaboratoryQuality Control In Clinical Laboratory
Quality Control In Clinical LaboratoryDr. Rajesh Bendre
 
77 1 nabl-112-laboretories
77 1 nabl-112-laboretories77 1 nabl-112-laboretories
77 1 nabl-112-laboretoriesmdt77777
 

La actualidad más candente (20)

Corrective Action & Preventive Action
Corrective Action & Preventive ActionCorrective Action & Preventive Action
Corrective Action & Preventive Action
 
Quality assurance
Quality assuranceQuality assurance
Quality assurance
 
ISO 15189 Accreditation Guide - Improving Laboratory Performance Through Qual...
ISO 15189 Accreditation Guide - Improving Laboratory Performance Through Qual...ISO 15189 Accreditation Guide - Improving Laboratory Performance Through Qual...
ISO 15189 Accreditation Guide - Improving Laboratory Performance Through Qual...
 
Quality assurance in blood banking
Quality assurance in blood bankingQuality assurance in blood banking
Quality assurance in blood banking
 
Good Documentation Practice (GDocP).pdf
Good Documentation Practice (GDocP).pdfGood Documentation Practice (GDocP).pdf
Good Documentation Practice (GDocP).pdf
 
Quality audit
Quality auditQuality audit
Quality audit
 
Medical Laboratory Quality Assurance
Medical Laboratory Quality AssuranceMedical Laboratory Quality Assurance
Medical Laboratory Quality Assurance
 
Quality Management System
Quality Management System Quality Management System
Quality Management System
 
Quality management review template
Quality management review templateQuality management review template
Quality management review template
 
BRC manual documents free download
BRC manual documents free downloadBRC manual documents free download
BRC manual documents free download
 
Good laboratory practice SOP
Good laboratory practice SOPGood laboratory practice SOP
Good laboratory practice SOP
 
Iso9001training slide
Iso9001training slideIso9001training slide
Iso9001training slide
 
Quality control
Quality controlQuality control
Quality control
 
Presentation on ISO 15189 documentation
Presentation on ISO 15189 documentationPresentation on ISO 15189 documentation
Presentation on ISO 15189 documentation
 
Qms
QmsQms
Qms
 
Clinical laboratory total quality management (TQM) system
Clinical laboratory total quality management (TQM) systemClinical laboratory total quality management (TQM) system
Clinical laboratory total quality management (TQM) system
 
Laboratory quality management system
Laboratory quality management systemLaboratory quality management system
Laboratory quality management system
 
ISO/IEC 17025:2017 Required documentation
ISO/IEC 17025:2017 Required documentationISO/IEC 17025:2017 Required documentation
ISO/IEC 17025:2017 Required documentation
 
Quality Control In Clinical Laboratory
Quality Control In Clinical LaboratoryQuality Control In Clinical Laboratory
Quality Control In Clinical Laboratory
 
77 1 nabl-112-laboretories
77 1 nabl-112-laboretories77 1 nabl-112-laboretories
77 1 nabl-112-laboretories
 

Similar a Conducting management review1

MEASURING INTERNAL AUDIT PERFORMANCE
MEASURING INTERNAL AUDIT PERFORMANCEMEASURING INTERNAL AUDIT PERFORMANCE
MEASURING INTERNAL AUDIT PERFORMANCEbbongio
 
Audit Department Excellence Model
Audit Department Excellence ModelAudit Department Excellence Model
Audit Department Excellence ModelManny Rosenfeld
 
control-and-its-process-icsi.pdf
control-and-its-process-icsi.pdfcontrol-and-its-process-icsi.pdf
control-and-its-process-icsi.pdfssuser1fdbd91
 
Quality Maturity Analysis
Quality Maturity AnalysisQuality Maturity Analysis
Quality Maturity Analysisahmad bassiouny
 
AUDIT - AUDITING STRATEGIES.pptx
AUDIT - AUDITING STRATEGIES.pptxAUDIT - AUDITING STRATEGIES.pptx
AUDIT - AUDITING STRATEGIES.pptxMohamed Fazil M
 
Unit 5 CSM: Strategic Evaluation and Comtrol
Unit 5 CSM: Strategic Evaluation and ComtrolUnit 5 CSM: Strategic Evaluation and Comtrol
Unit 5 CSM: Strategic Evaluation and ComtrolDayanand Huded
 
performance management Audit report
performance management Audit report performance management Audit report
performance management Audit report Preeti Bhaskar
 
SAI Global Webinar: Tips for Effective Internal Auditing
SAI Global Webinar: Tips for Effective Internal AuditingSAI Global Webinar: Tips for Effective Internal Auditing
SAI Global Webinar: Tips for Effective Internal AuditingSwitzerland09
 
pnadw107.pdf
pnadw107.pdfpnadw107.pdf
pnadw107.pdfHinSeene
 
Ch 7-strategy-evaluation-and-control
Ch 7-strategy-evaluation-and-controlCh 7-strategy-evaluation-and-control
Ch 7-strategy-evaluation-and-controlSandhya Sivaprasad
 
7Keeping Things in CheckControls and the Control Process.docx
7Keeping Things in CheckControls and the Control Process.docx7Keeping Things in CheckControls and the Control Process.docx
7Keeping Things in CheckControls and the Control Process.docxsleeperharwell
 
kpi for the malaysian government
kpi for the malaysian governmentkpi for the malaysian government
kpi for the malaysian governmentHj Arriffin Mansor
 
CHAPTER-1 Management Audit and Planning procedure.pdf
CHAPTER-1 Management Audit and Planning procedure.pdfCHAPTER-1 Management Audit and Planning procedure.pdf
CHAPTER-1 Management Audit and Planning procedure.pdfDr. Dinesh Mehta
 
Measurement-Process-Effectiveness_paper_updated210
Measurement-Process-Effectiveness_paper_updated210Measurement-Process-Effectiveness_paper_updated210
Measurement-Process-Effectiveness_paper_updated210pbaxter
 
Performance Management- Guest Lecture
Performance Management- Guest LecturePerformance Management- Guest Lecture
Performance Management- Guest Lecturekaushiknandi79
 
Chapter vi strategic control and evaluation
Chapter vi  strategic control and evaluationChapter vi  strategic control and evaluation
Chapter vi strategic control and evaluationSuzana Vaidya
 
Sample ISO 13485 Quality Manual & Procedures Package
Sample ISO 13485 Quality Manual & Procedures Package Sample ISO 13485 Quality Manual & Procedures Package
Sample ISO 13485 Quality Manual & Procedures Package ComplianceOnline
 

Similar a Conducting management review1 (20)

MEASURING INTERNAL AUDIT PERFORMANCE
MEASURING INTERNAL AUDIT PERFORMANCEMEASURING INTERNAL AUDIT PERFORMANCE
MEASURING INTERNAL AUDIT PERFORMANCE
 
Audit Department Excellence Model
Audit Department Excellence ModelAudit Department Excellence Model
Audit Department Excellence Model
 
control-and-its-process-icsi.pdf
control-and-its-process-icsi.pdfcontrol-and-its-process-icsi.pdf
control-and-its-process-icsi.pdf
 
Quality Maturity Analysis
Quality Maturity AnalysisQuality Maturity Analysis
Quality Maturity Analysis
 
AUDIT - AUDITING STRATEGIES.pptx
AUDIT - AUDITING STRATEGIES.pptxAUDIT - AUDITING STRATEGIES.pptx
AUDIT - AUDITING STRATEGIES.pptx
 
Unit 5 CSM: Strategic Evaluation and Comtrol
Unit 5 CSM: Strategic Evaluation and ComtrolUnit 5 CSM: Strategic Evaluation and Comtrol
Unit 5 CSM: Strategic Evaluation and Comtrol
 
performance management Audit report
performance management Audit report performance management Audit report
performance management Audit report
 
SAI Global Webinar: Tips for Effective Internal Auditing
SAI Global Webinar: Tips for Effective Internal AuditingSAI Global Webinar: Tips for Effective Internal Auditing
SAI Global Webinar: Tips for Effective Internal Auditing
 
pnadw107.pdf
pnadw107.pdfpnadw107.pdf
pnadw107.pdf
 
Ch 7-strategy-evaluation-and-control
Ch 7-strategy-evaluation-and-controlCh 7-strategy-evaluation-and-control
Ch 7-strategy-evaluation-and-control
 
7Keeping Things in CheckControls and the Control Process.docx
7Keeping Things in CheckControls and the Control Process.docx7Keeping Things in CheckControls and the Control Process.docx
7Keeping Things in CheckControls and the Control Process.docx
 
kpi for the malaysian government
kpi for the malaysian governmentkpi for the malaysian government
kpi for the malaysian government
 
CHAPTER-1 Management Audit and Planning procedure.pdf
CHAPTER-1 Management Audit and Planning procedure.pdfCHAPTER-1 Management Audit and Planning procedure.pdf
CHAPTER-1 Management Audit and Planning procedure.pdf
 
Measurement-Process-Effectiveness_paper_updated210
Measurement-Process-Effectiveness_paper_updated210Measurement-Process-Effectiveness_paper_updated210
Measurement-Process-Effectiveness_paper_updated210
 
Performance Management- Guest Lecture
Performance Management- Guest LecturePerformance Management- Guest Lecture
Performance Management- Guest Lecture
 
Management audit
Management auditManagement audit
Management audit
 
Chapter vi strategic control and evaluation
Chapter vi  strategic control and evaluationChapter vi  strategic control and evaluation
Chapter vi strategic control and evaluation
 
Sample ISO 13485 Quality Manual & Procedures Package
Sample ISO 13485 Quality Manual & Procedures Package Sample ISO 13485 Quality Manual & Procedures Package
Sample ISO 13485 Quality Manual & Procedures Package
 
Operational audit
Operational auditOperational audit
Operational audit
 
Iso9000
Iso9000Iso9000
Iso9000
 

Más de mdt77777

140v7 training
140v7   training140v7   training
140v7 trainingmdt77777
 
120v7 roles and responsibilities
120v7   roles and responsibilities120v7   roles and responsibilities
120v7 roles and responsibilitiesmdt77777
 
110v26 organization and facilities
110v26   organization and facilities110v26   organization and facilities
110v26 organization and facilitiesmdt77777
 
101v9 control of standard operating procedures and test methods
101v9   control of standard operating procedures and test methods101v9   control of standard operating procedures and test methods
101v9 control of standard operating procedures and test methodsmdt77777
 
2012 to 2014 cap accreditation certificate
2012 to 2014 cap accreditation certificate2012 to 2014 cap accreditation certificate
2012 to 2014 cap accreditation certificatemdt77777
 
Internal audit
Internal auditInternal audit
Internal auditmdt77777
 
Build molecular-testing-lab-toc
Build molecular-testing-lab-tocBuild molecular-testing-lab-toc
Build molecular-testing-lab-tocmdt77777
 

Más de mdt77777 (7)

140v7 training
140v7   training140v7   training
140v7 training
 
120v7 roles and responsibilities
120v7   roles and responsibilities120v7   roles and responsibilities
120v7 roles and responsibilities
 
110v26 organization and facilities
110v26   organization and facilities110v26   organization and facilities
110v26 organization and facilities
 
101v9 control of standard operating procedures and test methods
101v9   control of standard operating procedures and test methods101v9   control of standard operating procedures and test methods
101v9 control of standard operating procedures and test methods
 
2012 to 2014 cap accreditation certificate
2012 to 2014 cap accreditation certificate2012 to 2014 cap accreditation certificate
2012 to 2014 cap accreditation certificate
 
Internal audit
Internal auditInternal audit
Internal audit
 
Build molecular-testing-lab-toc
Build molecular-testing-lab-tocBuild molecular-testing-lab-toc
Build molecular-testing-lab-toc
 

Conducting management review1

  • 1. Module 8 Decoding ISO 15189™ Conducting a Management Review A management review is a formal meeting of key members of senior management. The purpose is to review the status and effectiveness of the quality management system. This meeting provides a venue for management to evaluate and analyze laboratory practices for the purpose of improvement. During this meeting, a comprehensive look back at the organization’s quality management system takes place. This includes a review of documented policies and a review of records. Following the meeting, a list of action plans for improvement should be produced. The Agenda: A detailed, timed agenda should be prepared by the quality manager. With advance preparation, most organizations should be able to complete the meeting in a single day. However, it is critical that advance planning is done to allow the meeting to run smoothly. The management review agenda should include the following inputs for discussion: 1. Review of the quality policy 2. Progress towards goals and objectives 3. Results of audits from the past year, this includes internal audits and audits by external bodies 4. Customer feedback such as the results of satisfaction surveys and a summary of complaints 5. A summary of quality indicator data such a turn-around times or specimen rejection rates. 6. Review of proficiency testing performance 7. A review of nonconformites including the status of corrective actions 8. Status of the previous management review items 9. A review of resources taking into consideration any changes in the volume of work and type of work undertaken 10. An evaluation of suppliers For your management review, all discussion inputs should be included on the agenda along with a target timeframe for each discussion. A review of your quality policy and objectives from the past year should occur at the onset of the meeting. Preparing for the Meeting: For each agenda item, consideration should be given to the desired outcomes. It would be advantageous to use standard templates for the preparation of briefing notes to establish continuity. In order to facilitate a smooth meeting, it is essential to be thorough in material preparation so that the volume of information can be managed in the time allotted. The meeting will be greatly enhanced by preparing graphical summaries of data such as the Pareto chart shown in Figure 1. Pareto charts and other summary tools will provide focus and direction to help pinpoint issues, monitor progress and enable management to recognize trends. The champion—usually the quality manager— must determine which process records will support the identified areas of measurement (i.e., quality indicators) and ensure that they effectively assess the status of the area to be reviewed. The management team must analyze all information to determine if the target has been realized, the action has been adequate or if further improvement can be achieved. © Institute for Quality Management in Healthcare Page 1 of 2
  • 2. Module 8 Decoding ISO 15189™ Figure 1: Sample Pareto Chart During the Meeting: We suggest that as the meeting unfolds, the quality manager ensures that the management team commits to an action plan to address each input. Essentially, the outputs of the management review feed directly back into the strategic planning for the next year. The action plan should adequately identify the issue to be resolved, assign key responsibility for follow-up, indicate timelines for completion and define a mechanism to evaluate effectiveness, i.e., mini audits. Timelines should be adequately assigned according to the urgency of the issue. Someone must be assigned to record the minutes of the meeting. This will provide a record of the management review. It is imperative that each action plan is completely documented. Page 2 of 2 © Institute for Quality Management in Healthcare