Course Outline
Introduction. Horizontal Control; traverse
observation, calculation and adjustment. Vertical
control: Levelling and contouring. Applications in
highway drainage and setting out works. Area and
volumes. Mass haul diagram. Practicals: field
surveying.
Exam Course
Work
CAT Pass
Mark
Total
70 20 10 50 100
Course Assessment
References
1. Awange, J.L., and Kiema, J.B.K. (2013). Environmental
Geoinformatics: Monitoring and Management. Springer Verlag.
2. Bannister, A., Raymond, S., and Baker, R. (1998). Surveying. Pitmans
ELBS. 7th Ed.
3. Irvine and Macclennan (2006). Surveying for Construction. McGraw, C.
5th Ed.,
4. Schofield, W. and Breach, M. (2007). Engineering Surveying.
Butterworth-Heinemann, UK. 6th Ed.
5. Uren and Price. (2010). Surveying for Engineers. Macmillan Press Ltd.
5th Ed.
6. Wolf, P, R., and Ghilani, C.D., (2006). Elementary Surveying: An
Introduction to Geomatics. Pearson Prentice Hall. New Jersey. 11 Ed.
Course Assignment/Term Paper
Using suitable examples discuss the role of
Geoinformatics in the monitoring and management of
environmental pollution.
Lecture Outline
Part 2: Traversing
 Overview of Control Surveys
 Concept of Traversing
 Traverse Computation
 Accuracy of Traversing
Part 1: Background
 Basic Principle of Surveying
 Datum Concept
 Tenets of Survey Practice
Part 3: Vertical Control
 Introduction and Definitions
 Principle of Levelling
 Sources of Errors
 Applications of Levelling
Part 4: Earthworks
 Computation of Areas and Volumes
 Mass Haul Diagrams
Part 1: Background
 Basic Principle of Surveying
 Datum Concept
 Tenets of Survey Practice
Basic Principle of Surveying
1) Working from the “whole to the part”. First
provide control using methods with higher
accuracy followed by detail mapping using
lower accuracy and cheaper methods.
2) Always perform independent checks. Make
more observations than the basic minimum
needed.
3) Specifications and accuracy required.
Datum Concept
Basic problem in Surveying is to determine the position
(measure) of features on Earth’s curved surface and
map (coordinate) them for diverse purposes often onto
a plane.
Datum refers to a plane or surface to which positions
and elevations of points are referenced.
Ellipsoid is reference surface in geodetic surveys.
Best fitting ellipsoid is selected.
For heighting the most commonly adopted datum is
the Mean Sea Level. This is taken with data from
coastal tide gauges over several years.
Datum Concept (2)
Relationship between the Earth’s Surface, Geoid, and Ellipsoid
Tenets of Survey Practice
Complete in shortest possible time.
Complete at the least possible cost.
Complete according to client instruction(s) and
survey manual specifications.
Complete using instrumentation of appropriate
accuracy.
Part 2: Traversing
 Horizontal Control Surveys
 Concept of Traversing
 Traverse Computation
 Accuracy of Traversing
In line with the Principle of Surveying a control
survey provides a framework of survey points,
whose relative positions are known to
prescribed degrees of accuracy.
The areas covered by these points may extend
over a whole country and form the basis for the
national maps of that country.
Alternatively the area may be relatively small,
encompassing a construction site for which a
large-scale plan is required. Although the areas
covered in construction are usually quite small,
the accuracy may be required to a very high
order.
Horizontal Control Surveys
Horizontal Control Surveys (2)
Hence control networks provide a reference
framework of points for:
(1) Topographic mapping and large-scale plan
production.
(2) Dimensional control of construction work.
(3) Deformation surveys for all manner of structures,
both new and old.
(4) The extension and densification of existing control
networks.
Horizontal Control Surveys (3)
Techniques used in the provision of horizontal control
surveys include:
(1) Traversing
(2) Triangulation Classical methods
(3) Trilateration
(4) Triangulateration Modern approaches
(5) Satellite position fixing (Global Navigation Satellite
Systems)
(6) Inertial position fixing
(7) Continuously Operating Reference Stations (CORS).
Whilst the above systems establish a network of
points, single points may be fixed by intersection
and/or resection.
Since the advent of EDM equipment, traversing
has emerged as the most popular method of
establishing control networks not only in
engineering surveying but also in geodetic work.
Traverse networks are, to a large extent, free
of the limitations imposed on the other systems
and have the following advantages:
(1) Much less reconnaissance and organization
required in establishing a single line of easily
accessible stations compared with the laying out
of well-conditioned geometric figures.
(2) The limitations imposed on the other systems by
topographic conditions do not apply to
traversing.
Concept of Traversing
Concept of Traversing (2)
(3) The extent of observations to only two stations
at a time is relatively small and flexible
compared with the extensive angular and/or
linear observations at stations in the other
systems. It is thus much easier to organize.
(4) Traverse networks are free of the strength of
figure considerations so characteristic of
triangular systems. Thus once again the
organizational requirements are reduced.
(5) Scale error does not accrue as in triangulation,
whilst the use of longer sides, easily measured
with EDM equipment, reduces azimuth swing
errors.
(6) Traverse stations can usually be chosen so as to
be easily accessible, as well as convenient for
the subsequent densification of lower order
control.
(7) Traversing permits the control to closely follow
the route of a highway, pipeline or tunnel, etc.,
with the minimum number of stations.
From the logistical point of view, traversing is
far superior to the other classical horizontal
control methods and offers at least equivalent
accuracy.
Concept of Traversing (3)
Definition of Traversing
Traversing is a surveying technique used to
determine the planimetric positions (Easting and
Northing: EB and NB below) of control points or
setting out points using measured angles and
distances (DAB and Q below).
EB=EA+ΔEAB= EA+ DABsin Q
NB=NA+ΔNAB= NA+ DABcosQ
In traversing, the relative position of control
points is fixed by measuring the horizontal angle
at each point, subtended by the adjacent
stations, and the horizontal distance between
consecutive pairs of stations.
The liability of a traverse to undetected error
makes it essential that there should be some
external check on its accuracy. Hence, the
traverse needs to commence from and connect
into known points of greater accuracy than the
traverse.
Types of Traverses
Types of Traverses (2)
In this way, the error vector of misclosure can
be quantified and distributed throughout the
network, to produce geometric correctness. Such
a traverse is called a ‘link’ traverse.
The link traverse has certain advantages over
the remaining types, in that systematic error in
distance measurement and orientation are clearly
revealed by the error vector.
Alternatively, the error vector can be obtained
by completing the traverse back to its starting
origin. Such a traverse is called a ‘polygonal’ or
‘loop’ traverse.
Types of Traverses (3)
a) Link traverse b) Loop traverse (oriented)
d) Open (free) traverse
c) Loop traverse (independent)
Both the ‘link’ and ‘polygonal’ traverses are
generally referred to as ‘closed’ traverses.
The third type of traverse is the ‘free’ or
‘open’ traverse, which does not close back onto
any known point and which therefore has no way
of detecting or quantifying the errors.
Open traverses are not recommended due to
the lack of checks. Nevertheless, it is
frequently utilized in mining and tunnelling work
because of the physical restriction on closure.
Types of Traverses (4)
Field Procedure
Reconnaissance is a vitally important part of any
survey project. Its purpose here is to decide
the best location for the traverse points.
In the first instance the points should be
intervisible from the point of view of traverse
observations.
If the purpose of the control network is the
location of topographic detail only, then they
should be positioned to afford the best view of
the terrain, thereby ensuring that the maximum
amount of detail can be surveyed from each
point.
Field Procedure (2)
If the traverse is to be used for setting out
e.g., the centre-line of a road, then the
stations should be sited to afford the best
positions for setting out the intersection points
(IPs) and tangent points (TPs), to provide
accurate location.
The distance between stations should be kept as
long as possible to minimize effect of centring
errors.
Finally, as cost is always important, the scheme
should be one that can be completed in the
minimum of time, with the minimum of
personnel.
Sources of Errors
The sources of error in traversing include:
(1) Errors in the observation of horizontal and vertical
angles (angular error).
(2) Errors in the measurement of distance (linear
error).
(3) Errors in the accurate centring of the instrument
and targets, directly over the survey point
(centring error).
Traverse Computation
Using the data given below, compute the
coordinates of various points in the following
traverse.
Apply Bowditch rule to distribute the
misclosure.
Station Observations Station Observations
At Tr29 At Tr37
Tr28 97 11 10 Tr36 179 02 59
Tr10 279 15 11 Tr42 2154 58
Tr36 52 15 03
At Tr42
At Tr36 Tr37 201 54 58
Tr29 232 15 03 Tr43 234 55 58
Tr37 359 02 59 Tr41 120 32 05
Traverse Computation (2)
Traverse Computation (3)
Traverse Distances: Datum Bearings:
Tr29 – Tr36: 78.959m Tr29 – Tr28: 97 11 10
Tr36 – Tr37: 68.589m Tr10 – Tr29: 99 15 25
Tr37 – Tr42: 62.019m Tr42 – Tr43: 234 56 07
Tr42 – Tr41: 120 31 34
Datum Coordinates:
Station N (Metres) E
Tr29 78 674.77 92 174.20
Tr42 78 849.21 92 258.63
Bearing Sheet
Station Observations Orientation
Correction
Provisional
Bearing
Misclosure Final
Bearing
At Tr29
Tr28
Tr10
Tr36
At Tr36
Tr29
Tr37
At Tr37
Tr36
Tr42
At Tr42
Tr37
Tr43
Tr41
97 11 10
279 15 11
52 15 03
232 15 03
359 02 59
179 02 59
21 54 58
201 54 58
234 55 58
120 32 05
00
+14
+07
+07
+07
+07
52 15 10
232 15 10
359 03 06
179 03 06
21 55 05
201 55 05
234 56 05
120 32 12
-05
-09
-14
-18
+02
-38
97 11 10
279 15 25
52 15 05
359 02 57
21 54 51
234 56 07
120 31 34
Computation of Coordinates
ΔN (m) ΔE N (metres) E
Tr29 – Tr36 Tr29:+78 674.77 +92 174.20
52 15 05 +48.339 +62.433
78.959m -0.01 -0.01
Tr36 – Tr37 Tr36:+78 723.10 +92 236.62
359 02 57 +68.580 -1.138
68.589m -0.01 0.00
Tr37 – Tr42 Tr37:+78 791.67 +92 235.48
21 54 51 +57.538 +23.147
62.019m 0.00 0.00
Tr42:+78 849.21 +92 258.63
ΔN (m) ΔE
By Datum: 174.440 84.430
By Traverse: 174.456 84.442
Misclosure: -0.016 -0.012
Length of Traverse = 209.567m
Accuracy = Sqrt{(-0.016)2+(-0.012)2}/209.567 = 1 in 13,000
(approx)
Computation of Coordinates (2)
Accuracy of Traversing
Traversing is generally more accurate than
classical triangulation and trilateration.
Due to the weak geometry of a traverse, it
generally has only three degrees of freedom (that
is three redundant observations), it is difficult to
arrive at an estimate of accuracy.
Although there have been many attempts to
produce equations defining the accuracy of a
traverse, at the present time the best approach is
a strength analysis using variance–covariance
matrices from a least squares adjustment.
Blunders in the observed data
Blunders or mistakes in the measurement of the
angles, results in gross angular misclosure.
Provided it is only a single blunder it can easily be
located.
In the case of an angle, the traverse can be computed
forward from X (Figure) and then backwards from Y.
The point which has the same co-ordinates in each
case, is where the blunder occurred and the angle must
be re-observed.
Figure: Detection of
angular traverse blunder
Blunders in the observed data (2)
In the case of a blunder in measuring distance,
the incorrect leg is the one whose bearing is
similar to the bearing of the error vector.
If there are several legs with similar bearings the
method fails.
Again the incorrect leg must be re-measured.
Part 3: Vertical Control
 Introduction and Definitions
 Principle of Levelling
 Sources of Errors
 Applications of Levelling
The process of determining elevations (heights)
of points of interest above or below a reference
datum or differences in elevations.
For most practical applications only the
difference in elevation between points of
interest and not absolute heights is often
required.
Used in all aspects of surveying, particularly for
engineering surveys, route surveys, construction,
etc.
Different methods may be used for estimating
heights or height differences including;
differential levelling, barometric heighting,
trigonometric heighting, gravimetry and
satellite positioning etc.
Overview of Levelling
a) Differential levelling: basic idea involves obtaining of height
difference between points by measuring their vertical distance
from a horizontal line of sight.
b) Trigonometric heighting: method is generally used in
determination of elevation differences of lower accuracy than
spirit levelling. It is useful where it is very difficult (or
impossible) for differential levelling to be undertaken (e.g.
towers, spires, mountain ranges etc).
c) Barometric heighting: method consists of reading air pressure
differences from which elevation differences are computed.
d) Gravimetry: by measuring the gravitational potential variation
between different points it is possible to correlate this to
differences in heights.
d) Satellite Positioning: method is poised for extensive use in the
future with its only drawback being the determination of the
separation between the geoid and ellipsoid in areas of interest.
Comparison of Various Heighting Methods
a) Differential Levelling b) Trigonometric heighting
c) Barometer d) Gravimeters
e) Satellite Heighting
A horizontal line is a line that
is tangential to the level line
at a particular point. Hence a
horizontal line is perpendicular
to the direction of gravity.
Levelling Line and Horizontal Line
A level line is a line that is
normal to the direction of
gravity as shown by a plumbline
at any point. A level line is
curved by virtue of the shape
of the Earth. Hence, a level
line is a line in which all points
are the same height.
Basic Concept
Datum: A level surface to which elevations of points may
be referenced. The most commonly adopted datum is the
Mean Sea Level (MSL).
Reduced level: The elevation (above or below) of a point
in relation to the Datum.
Benchmark (BM): A permanent monument or feature for
which elevation is known. BMs are built on stable rock.
Three (3) types of benchmarks can be distinguished:
1) Fundamental benchmarks (FBMs): Very stable concrete structures
most often built into rock forming part of the primary levelling
network.
2) Ordinary benchmarks: Concrete points or marks on rocks, culverts,
bridges etc constructed between FBMs.
3) Temporary benchmarks (TBMs): Stable points established in the course
of a survey between established benchmarks, which may be some
distance away.
Datums, Reduced Levels and Benchmarks
A (curved) surface orthogonal to the plumb line
everywhere.
More correctly an equipotential surface for which
gravitational potential is constant.
A still body of water unaffected by tides is a good
analogy.
They are not equidistant apart, but converge and diverge
due to changes in density.
Level Surface
Vertical Line
The direction of gravity
Therefore the direction indicated by a plumb
line
In general it deviates from a line emanating
from the geometric centre of the Earth
In reality it is curved, but this can be
neglected in small plane surveys
Horizontal Plane
A plane tangent to a level surface (orthogonal
to the plumb line).
The collimation axis (line of sight) of a levelling
instrument that is in correct adjustment, once
levelled, defines a horizontal plane as the
instrument is rotated.
Levelling Instruments
Level, Tripod, staff and tape
Change plate.
Level and reading of staff
Level and reading of staff
Staffs of a variety of lengths and
graduation styles made from a
variety of materials (wood,
aluminium, fibreglass) exist.
The alternate metre lengths are in
black and red on a white
background.
Majority of staffs are telescopic
or socketed in three sections for
easy carrying.
Graduations can take various forms
with E-pattern type popular. The
smallest graduation on the staff is
0.01 m, with readings estimated to
the nearest millimetre.
As the staff must be held vertical
during observation it should be
fitted with a circular bubble.
Types of Levels
Examples of Levels
Examples of Levels
NA2000 Digital level with
coded levelling staff
Two Peg Test
This test is often conducted before using a level for any
levelling exercise.
The purpose of the test is find out to if the line of
collimation is parallel to the bubbles tube axis.
Collimation error occurs if the line of sight is not truly
horizontal when the bubble is centred. The line of sight
may be inclined either upwards or downwards from
the horizontal.
Levelling Procedure
A horizontal line of sight is established using some
form of levelling mechanism:
Spirit level tube
Swinging pendulum
A graduated staff is read through the telescope of
the level.
The elevation of points can be established by first
reading the staff on a bench mark.
The staff is then moved to the desired point, the
level is turned and the staff is read again.
Levelling Procedure (2)
The reading at the benchmark is called the backsight
(BS)
The reading taken after turning the instrument and
moving the staff is the foresight (FS)
Levelling Procedure (3)
To continue levelling, the staff is kept on the point at
A and the instrument moved to the midpoint between
A and the next point, B.
A is called the change point (CP) or turning point (TP).
The staff at A is carefully turned toward the
instrument and a BS reading taken.
Then the staff is moved to B and a FS reading is
made.
The procedure is repeated as many times as needed.
The levelling should always end on a BM as a check!
Levelling Procedure (4)
Two note reduction methods for calculating elevations
from the BS and FS observations exist.
Each use only two equations for the computations.
Height of Collimation method HC = Elev + BS
Elev = HC – FS
Rise and Fall method Rise (or Fall) = BS – FS
Elev = Previous Elev + Rise (or Fall)
A Fall is simply a negative Rise
Rise and Fall
Check: ∑BS - ∑ FS = ∑ Rise - ∑ Fall = RLlast - RLFirst
Height of Collimation
Check: ∑BS - ∑ FS = RLlast - RLFirst
Applied when points of interest can be seen
Accuracy in Levelling
Many factors affect accuracy of ordinary levelling:
Reading of staff.
Bubble not being central.
Instrument (level) being out of adjustment. Ensuring
that backsights and foresights are equal in length
lessens effects of maladjustment.
Differential settlement of the tripod.
Tilting and settlement of the staff.
Sensitivity of the bubble or compensator.
Acceptable Misclosures
Maximum acceptable misclosure depends on class of
levelling and specifications for the particular survey.
As a guideline the following figures give an indication of
misclosures for various classes:
Precise levelling:  4K
2nd order levelling:  8K
3rd order levelling:  12K.
Ordinary levelling falls into this category. On rough
ground, allowance may be made for misclosures of up to
 30K (Where K is the total distance levelled in
kilometres).
Precise Levelling
This class of levelling requires further refinement to
field technique and instrumentation to that applied in
ordinary levelling.
The accuracy requirements for this class of levelling
are more stringent than for ordinary levelling.
Typical rules governing field technique for precise
levelling include:
1) Backsights and foresights are made equal in length,
two staffs being used.
2) Readings are made to one particular staff at each
setup, and there being an even number of set ups.
Readings are made to all three hairs of the reticule
at each set up and a special format for booking of
readings used.
Precise Levelling (2)
3) All lines of levels to be run twice in opposite
directions, the runs being made on different days
with different change points.
4) All change points made on special footplates.
5) Staff readings below 0.5m level to be avoided.
6) Special staffs with invar strip and a bubble to be
used.
7) Only levels designed for precise levelling (or
comparable accuracy) should be used (e.g. with
parallel plate micrometer).
8) If the standards in the regulations for allowable
error are not complied with, the work is repeated.
Sources of Errors
Equipment errors
(a) Collimation error
(b) Compensator not working
(c) Parallax
(d) Defective staff
(e) Defective Tripod
Sources of Errors (2)
Field or on-sight errors (Gross error sources)
(a) Staff reading error.
(b) Unstable change point.
(c) Non‐vertical staff.
(d) Booking error
(e) Instrument not level
(f) Handling the instrument and tripod
Effect of curvature and refraction
(a) Earth curvature.
(b) Vertical collimation error in the instrument.
(c) Temperature relation expansion in the staff.
How to Reduce Errors
Levelling should start and finish at known Bench Mark.
Where possible, all sight lengths should be below 50m.
The staff must be held vertically.
BS and FS must be kept equal for each instrument
position.
Rise and Fall method should be used when heighting
controls.
HCM should be used when setting out.
For Automatic levels, staff readings should be booked
immediately they are observed.
Establishing vertical control.
To establish heights of points during
constructions – setting out levels.
For contouring purposes.
For road cross‐section, longitudinal
sections/profiles or volumes of
Earthwork in civil engineering works.
For provision of levels of inclined surface
during construction.
Applications of levelling
Part 4: Earthworks
 Overview
 Computation of Areas and Volumes
 Mass Haul Diagrams
Estimation of areas and volumes is basic to
most engineering schemes such as route
alignment, reservoirs, tunnels, etc.
Excavation and hauling of material is the
most significant and costly aspect of the
work, on which profit or loss may depend.
Areas may be required in connection with
the purchase or sale of land, with the
subdivision of land or with the grading of
land.
Overview
Earthwork volumes are estimated to:
i) enable route alignment to be located at such
lines and levels that cut and fill are balanced
as far as practicable;
ii) to enable contract estimates of time and
cost to be made for proposed work;
iii) to form the basis of payment for work
carried out.
Overview (2)
Areas
a) Trapezoidal rule
Area (A) = w(h1 + h2
b) Simpson’s rule
Many volumes encountered in civil engineering appear, at
first glance, to be rather complex in shape.
Generally, estimation of volumes can be divided into
computation of volumes for prisms, wedges or pyramids.
(1) Prism
The two ends of the prism (Figure 9.17) are equal and
parallel, the resulting sides thus being parallelograms.
Volume = AL
Volumes
(2) Wedge
Volume of wedge (Figure 9.18)
= L/6 (sum of parallel edges × vertical height of base)
= L/6 [(a + b + c) × h] (9.7a)
when a = b = c: V = AL/2
Mass-haul diagrams (MHD) are used to compare
the economy of various methods of earthwork
distribution on road or railway construction
schemes.
By the combined use of the MHD plotted directly
below the longitudinal section of the survey centre-
line, one can find:
(1) The distances over which cut and fill will balance.
(2) Quantities of materials to be moved and the
direction of movement.
(3) Areas where earth may have to be borrowed or
wasted and the amounts involved.
(4) The best policy to adopt to obtain the most
economic use of plant.
Mass-Haul Diagrams

Más contenido relacionado

La actualidad más candente

Tacheometric surveying ppt
Tacheometric surveying pptTacheometric surveying ppt
Tacheometric surveying pptNaufil Sayyad
 
Electronic distance measurement (EDM)
Electronic distance measurement (EDM)Electronic distance measurement (EDM)
Electronic distance measurement (EDM)Bathla Tuition Centre
 
EDM ( Electronic distance meter)
EDM ( Electronic distance meter)EDM ( Electronic distance meter)
EDM ( Electronic distance meter)Umarfarook Momin
 
Levelling, terms related to levelling, methods of levelling
Levelling, terms related to levelling, methods of levellingLevelling, terms related to levelling, methods of levelling
Levelling, terms related to levelling, methods of levellingMir Zafarullah
 
Lecture 02 types of surveying
Lecture 02 types of surveyingLecture 02 types of surveying
Lecture 02 types of surveyingRehan Hanif
 
Traverse Survey Part 1/2
Traverse Survey Part 1/2Traverse Survey Part 1/2
Traverse Survey Part 1/2Muhammad Zubair
 
SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTS
SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTSSURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTS
SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTSVISHNU VIJAYAN
 
Lecture 1 introdcution to engineering surveying
Lecture 1 introdcution to engineering surveyingLecture 1 introdcution to engineering surveying
Lecture 1 introdcution to engineering surveyingSarhat Adam
 
Photogrammetry Survey- Surveying II , Civil Engineering Students
Photogrammetry Survey- Surveying II , Civil Engineering StudentsPhotogrammetry Survey- Surveying II , Civil Engineering Students
Photogrammetry Survey- Surveying II , Civil Engineering StudentsPramesh Hada
 
Introduction to surveying, ranging and chaining
Introduction to surveying, ranging and chainingIntroduction to surveying, ranging and chaining
Introduction to surveying, ranging and chainingShital Navghare
 
Curves and there application in Survey
Curves and there application in SurveyCurves and there application in Survey
Curves and there application in SurveyLord1911
 
Surveying presentation and its objectives in detail including principles,hist...
Surveying presentation and its objectives in detail including principles,hist...Surveying presentation and its objectives in detail including principles,hist...
Surveying presentation and its objectives in detail including principles,hist...amansingh2914
 
Topic 2 area & volume
Topic 2   area & volumeTopic 2   area & volume
Topic 2 area & volumekmasz kamal
 
Surveying - Module II - compass surveying
Surveying - Module  II - compass surveyingSurveying - Module  II - compass surveying
Surveying - Module II - compass surveyingSHAMJITH KM
 

La actualidad más candente (20)

Tacheometric surveying ppt
Tacheometric surveying pptTacheometric surveying ppt
Tacheometric surveying ppt
 
Levelling
LevellingLevelling
Levelling
 
Levelling
LevellingLevelling
Levelling
 
Electronic distance measurement (EDM)
Electronic distance measurement (EDM)Electronic distance measurement (EDM)
Electronic distance measurement (EDM)
 
EDM ( Electronic distance meter)
EDM ( Electronic distance meter)EDM ( Electronic distance meter)
EDM ( Electronic distance meter)
 
Levelling, terms related to levelling, methods of levelling
Levelling, terms related to levelling, methods of levellingLevelling, terms related to levelling, methods of levelling
Levelling, terms related to levelling, methods of levelling
 
Modern Surveying
Modern Surveying Modern Surveying
Modern Surveying
 
Tacheometry ppt
Tacheometry pptTacheometry ppt
Tacheometry ppt
 
Lecture 02 types of surveying
Lecture 02 types of surveyingLecture 02 types of surveying
Lecture 02 types of surveying
 
Traverse Survey Part 1/2
Traverse Survey Part 1/2Traverse Survey Part 1/2
Traverse Survey Part 1/2
 
SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTS
SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTSSURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTS
SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTS
 
Lecture 1 introdcution to engineering surveying
Lecture 1 introdcution to engineering surveyingLecture 1 introdcution to engineering surveying
Lecture 1 introdcution to engineering surveying
 
Photogrammetry Survey- Surveying II , Civil Engineering Students
Photogrammetry Survey- Surveying II , Civil Engineering StudentsPhotogrammetry Survey- Surveying II , Civil Engineering Students
Photogrammetry Survey- Surveying II , Civil Engineering Students
 
Introduction of Surveying
Introduction of Surveying Introduction of Surveying
Introduction of Surveying
 
Introduction to surveying, ranging and chaining
Introduction to surveying, ranging and chainingIntroduction to surveying, ranging and chaining
Introduction to surveying, ranging and chaining
 
Setting out 12042018
Setting out 12042018Setting out 12042018
Setting out 12042018
 
Curves and there application in Survey
Curves and there application in SurveyCurves and there application in Survey
Curves and there application in Survey
 
Surveying presentation and its objectives in detail including principles,hist...
Surveying presentation and its objectives in detail including principles,hist...Surveying presentation and its objectives in detail including principles,hist...
Surveying presentation and its objectives in detail including principles,hist...
 
Topic 2 area & volume
Topic 2   area & volumeTopic 2   area & volume
Topic 2 area & volume
 
Surveying - Module II - compass surveying
Surveying - Module  II - compass surveyingSurveying - Module  II - compass surveying
Surveying - Module II - compass surveying
 

Similar a Engineering surveying-ii

Site surveying 2 done
Site surveying 2   done Site surveying 2   done
Site surveying 2 done w ss
 
Site surveying-2-done-1
Site surveying-2-done-1Site surveying-2-done-1
Site surveying-2-done-1Lam Yu
 
TOTAL STATION: THEORY, USES AND APPLICATIONS.
TOTAL STATION: THEORY, USES AND APPLICATIONS. TOTAL STATION: THEORY, USES AND APPLICATIONS.
TOTAL STATION: THEORY, USES AND APPLICATIONS. Ahmed Nassar
 
Lecture note triangulation_and_trilatera2016
Lecture note triangulation_and_trilatera2016Lecture note triangulation_and_trilatera2016
Lecture note triangulation_and_trilatera2016Mitiku Chachu
 
DUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONS
DUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONSDUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONS
DUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONSjantjournal
 
DUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONS
DUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONSDUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONS
DUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONSjantjournal
 
DUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONS
DUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONSDUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONS
DUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONSjantjournal
 
DUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONS
DUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONSDUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONS
DUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONSjantjournal
 
DUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONS
DUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONSDUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONS
DUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONSjantjournal
 
DUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONS
DUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONSDUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONS
DUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONSjantjournal
 
DUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONS
DUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONSDUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONS
DUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONSjantjournal
 
Case studies of surveys involved in Railway Tunnel constructed under sea.
Case studies of surveys involved in Railway Tunnel constructed under sea.Case studies of surveys involved in Railway Tunnel constructed under sea.
Case studies of surveys involved in Railway Tunnel constructed under sea.Prudhvi Thota
 
Iaetsd concepts of surveying with totalstation-a latest
Iaetsd concepts of surveying with totalstation-a latestIaetsd concepts of surveying with totalstation-a latest
Iaetsd concepts of surveying with totalstation-a latestIaetsd Iaetsd
 
ENABLING RAY TRACING FOR 5G
ENABLING RAY TRACING FOR 5GENABLING RAY TRACING FOR 5G
ENABLING RAY TRACING FOR 5GIJCNCJournal
 
Enabling Ray Tracing for 5G
Enabling Ray Tracing for 5GEnabling Ray Tracing for 5G
Enabling Ray Tracing for 5GIJCNCJournal
 

Similar a Engineering surveying-ii (20)

ERROR ESTIMATION IN DEVELOPING GIS MAPS USING DIFFERENT INPUT METHODS OF LAND...
ERROR ESTIMATION IN DEVELOPING GIS MAPS USING DIFFERENT INPUT METHODS OF LAND...ERROR ESTIMATION IN DEVELOPING GIS MAPS USING DIFFERENT INPUT METHODS OF LAND...
ERROR ESTIMATION IN DEVELOPING GIS MAPS USING DIFFERENT INPUT METHODS OF LAND...
 
Fw2
Fw2Fw2
Fw2
 
Surveying 2
Surveying   2Surveying   2
Surveying 2
 
Site surveying 2 done
Site surveying 2   done Site surveying 2   done
Site surveying 2 done
 
Site surveying-2-done-1
Site surveying-2-done-1Site surveying-2-done-1
Site surveying-2-done-1
 
TOTAL STATION: THEORY, USES AND APPLICATIONS.
TOTAL STATION: THEORY, USES AND APPLICATIONS. TOTAL STATION: THEORY, USES AND APPLICATIONS.
TOTAL STATION: THEORY, USES AND APPLICATIONS.
 
Lecture note triangulation_and_trilatera2016
Lecture note triangulation_and_trilatera2016Lecture note triangulation_and_trilatera2016
Lecture note triangulation_and_trilatera2016
 
DUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONS
DUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONSDUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONS
DUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONS
 
DUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONS
DUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONSDUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONS
DUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONS
 
DUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONS
DUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONSDUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONS
DUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONS
 
DUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONS
DUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONSDUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONS
DUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONS
 
DUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONS
DUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONSDUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONS
DUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONS
 
DUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONS
DUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONSDUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONS
DUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONS
 
DUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONS
DUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONSDUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONS
DUAL BAND GNSS ANTENNA PHASE CENTER CHARACTERIZATION FOR AUTOMOTIVE APPLICATIONS
 
Case studies of surveys involved in Railway Tunnel constructed under sea.
Case studies of surveys involved in Railway Tunnel constructed under sea.Case studies of surveys involved in Railway Tunnel constructed under sea.
Case studies of surveys involved in Railway Tunnel constructed under sea.
 
Monitoring Open Pit
Monitoring Open PitMonitoring Open Pit
Monitoring Open Pit
 
Iaetsd concepts of surveying with totalstation-a latest
Iaetsd concepts of surveying with totalstation-a latestIaetsd concepts of surveying with totalstation-a latest
Iaetsd concepts of surveying with totalstation-a latest
 
ENABLING RAY TRACING FOR 5G
ENABLING RAY TRACING FOR 5GENABLING RAY TRACING FOR 5G
ENABLING RAY TRACING FOR 5G
 
Enabling Ray Tracing for 5G
Enabling Ray Tracing for 5GEnabling Ray Tracing for 5G
Enabling Ray Tracing for 5G
 
[IJET-V1I3P14] Authors :Kruthika R.
[IJET-V1I3P14] Authors :Kruthika R.[IJET-V1I3P14] Authors :Kruthika R.
[IJET-V1I3P14] Authors :Kruthika R.
 

Más de Marvin Ken

speaker design with Enterprise Dynamics (ED) software
speaker design with Enterprise Dynamics (ED) softwarespeaker design with Enterprise Dynamics (ED) software
speaker design with Enterprise Dynamics (ED) softwareMarvin Ken
 
9 soil compaction
9  soil compaction9  soil compaction
9 soil compactionMarvin Ken
 
8 soil description and classification
8  soil description and classification8  soil description and classification
8 soil description and classificationMarvin Ken
 
7 applications in geotechnical engineering
7 applications in geotechnical engineering7 applications in geotechnical engineering
7 applications in geotechnical engineeringMarvin Ken
 
7 b soil properties determination
7  b soil properties determination7  b soil properties determination
7 b soil properties determinationMarvin Ken
 
7 a soil properties determination
7  a soil properties determination7  a soil properties determination
7 a soil properties determinationMarvin Ken
 
6 plasticity and consistency
6 plasticity and consistency6 plasticity and consistency
6 plasticity and consistencyMarvin Ken
 
5 basic properties
5 basic properties5 basic properties
5 basic propertiesMarvin Ken
 
4 clay mineralogy
4 clay mineralogy4 clay mineralogy
4 clay mineralogyMarvin Ken
 
3 soil formation
3 soil formation3 soil formation
3 soil formationMarvin Ken
 
2 introduction to soil mechanics
2 introduction to soil mechanics2 introduction to soil mechanics
2 introduction to soil mechanicsMarvin Ken
 
geotech laboratory works
geotech laboratory worksgeotech laboratory works
geotech laboratory worksMarvin Ken
 
1 course outline1
1 course outline11 course outline1
1 course outline1Marvin Ken
 

Más de Marvin Ken (14)

speaker design with Enterprise Dynamics (ED) software
speaker design with Enterprise Dynamics (ED) softwarespeaker design with Enterprise Dynamics (ED) software
speaker design with Enterprise Dynamics (ED) software
 
9 soil compaction
9  soil compaction9  soil compaction
9 soil compaction
 
8 soil description and classification
8  soil description and classification8  soil description and classification
8 soil description and classification
 
7 applications in geotechnical engineering
7 applications in geotechnical engineering7 applications in geotechnical engineering
7 applications in geotechnical engineering
 
7 b soil properties determination
7  b soil properties determination7  b soil properties determination
7 b soil properties determination
 
7 a soil properties determination
7  a soil properties determination7  a soil properties determination
7 a soil properties determination
 
6 plasticity and consistency
6 plasticity and consistency6 plasticity and consistency
6 plasticity and consistency
 
5 basic properties
5 basic properties5 basic properties
5 basic properties
 
4 clay mineralogy
4 clay mineralogy4 clay mineralogy
4 clay mineralogy
 
3 soil formation
3 soil formation3 soil formation
3 soil formation
 
2 introduction to soil mechanics
2 introduction to soil mechanics2 introduction to soil mechanics
2 introduction to soil mechanics
 
1 overview
1 overview1 overview
1 overview
 
geotech laboratory works
geotech laboratory worksgeotech laboratory works
geotech laboratory works
 
1 course outline1
1 course outline11 course outline1
1 course outline1
 

Último

Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating SystemRashmi Bhat
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxVelmuruganTECE
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxsiddharthjain2303
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptJasonTagapanGulla
 
Industrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIESIndustrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIESNarmatha D
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - GuideGOPINATHS437943
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the weldingMuhammadUzairLiaqat
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadaditya806802
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 

Último (20)

Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating System
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptx
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.ppt
 
Industrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIESIndustrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIES
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - Guide
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the welding
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasad
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 

Engineering surveying-ii

  • 1. Prof. Dr.-Ing. John Bosco Kyalo Kiema University of Nairobi Email: jbkkiema@uonbi.ac.ke by Engineering Surveying II
  • 2. Course Outline Introduction. Horizontal Control; traverse observation, calculation and adjustment. Vertical control: Levelling and contouring. Applications in highway drainage and setting out works. Area and volumes. Mass haul diagram. Practicals: field surveying.
  • 3. Exam Course Work CAT Pass Mark Total 70 20 10 50 100 Course Assessment
  • 4. References 1. Awange, J.L., and Kiema, J.B.K. (2013). Environmental Geoinformatics: Monitoring and Management. Springer Verlag. 2. Bannister, A., Raymond, S., and Baker, R. (1998). Surveying. Pitmans ELBS. 7th Ed. 3. Irvine and Macclennan (2006). Surveying for Construction. McGraw, C. 5th Ed., 4. Schofield, W. and Breach, M. (2007). Engineering Surveying. Butterworth-Heinemann, UK. 6th Ed. 5. Uren and Price. (2010). Surveying for Engineers. Macmillan Press Ltd. 5th Ed. 6. Wolf, P, R., and Ghilani, C.D., (2006). Elementary Surveying: An Introduction to Geomatics. Pearson Prentice Hall. New Jersey. 11 Ed.
  • 5. Course Assignment/Term Paper Using suitable examples discuss the role of Geoinformatics in the monitoring and management of environmental pollution.
  • 6. Lecture Outline Part 2: Traversing  Overview of Control Surveys  Concept of Traversing  Traverse Computation  Accuracy of Traversing Part 1: Background  Basic Principle of Surveying  Datum Concept  Tenets of Survey Practice Part 3: Vertical Control  Introduction and Definitions  Principle of Levelling  Sources of Errors  Applications of Levelling Part 4: Earthworks  Computation of Areas and Volumes  Mass Haul Diagrams
  • 7. Part 1: Background  Basic Principle of Surveying  Datum Concept  Tenets of Survey Practice
  • 8. Basic Principle of Surveying 1) Working from the “whole to the part”. First provide control using methods with higher accuracy followed by detail mapping using lower accuracy and cheaper methods. 2) Always perform independent checks. Make more observations than the basic minimum needed. 3) Specifications and accuracy required.
  • 9. Datum Concept Basic problem in Surveying is to determine the position (measure) of features on Earth’s curved surface and map (coordinate) them for diverse purposes often onto a plane. Datum refers to a plane or surface to which positions and elevations of points are referenced. Ellipsoid is reference surface in geodetic surveys. Best fitting ellipsoid is selected. For heighting the most commonly adopted datum is the Mean Sea Level. This is taken with data from coastal tide gauges over several years.
  • 10. Datum Concept (2) Relationship between the Earth’s Surface, Geoid, and Ellipsoid
  • 11. Tenets of Survey Practice Complete in shortest possible time. Complete at the least possible cost. Complete according to client instruction(s) and survey manual specifications. Complete using instrumentation of appropriate accuracy.
  • 12. Part 2: Traversing  Horizontal Control Surveys  Concept of Traversing  Traverse Computation  Accuracy of Traversing
  • 13. In line with the Principle of Surveying a control survey provides a framework of survey points, whose relative positions are known to prescribed degrees of accuracy. The areas covered by these points may extend over a whole country and form the basis for the national maps of that country. Alternatively the area may be relatively small, encompassing a construction site for which a large-scale plan is required. Although the areas covered in construction are usually quite small, the accuracy may be required to a very high order. Horizontal Control Surveys
  • 14. Horizontal Control Surveys (2) Hence control networks provide a reference framework of points for: (1) Topographic mapping and large-scale plan production. (2) Dimensional control of construction work. (3) Deformation surveys for all manner of structures, both new and old. (4) The extension and densification of existing control networks.
  • 15. Horizontal Control Surveys (3) Techniques used in the provision of horizontal control surveys include: (1) Traversing (2) Triangulation Classical methods (3) Trilateration (4) Triangulateration Modern approaches (5) Satellite position fixing (Global Navigation Satellite Systems) (6) Inertial position fixing (7) Continuously Operating Reference Stations (CORS). Whilst the above systems establish a network of points, single points may be fixed by intersection and/or resection.
  • 16. Since the advent of EDM equipment, traversing has emerged as the most popular method of establishing control networks not only in engineering surveying but also in geodetic work. Traverse networks are, to a large extent, free of the limitations imposed on the other systems and have the following advantages: (1) Much less reconnaissance and organization required in establishing a single line of easily accessible stations compared with the laying out of well-conditioned geometric figures. (2) The limitations imposed on the other systems by topographic conditions do not apply to traversing. Concept of Traversing
  • 17. Concept of Traversing (2) (3) The extent of observations to only two stations at a time is relatively small and flexible compared with the extensive angular and/or linear observations at stations in the other systems. It is thus much easier to organize. (4) Traverse networks are free of the strength of figure considerations so characteristic of triangular systems. Thus once again the organizational requirements are reduced. (5) Scale error does not accrue as in triangulation, whilst the use of longer sides, easily measured with EDM equipment, reduces azimuth swing errors.
  • 18. (6) Traverse stations can usually be chosen so as to be easily accessible, as well as convenient for the subsequent densification of lower order control. (7) Traversing permits the control to closely follow the route of a highway, pipeline or tunnel, etc., with the minimum number of stations. From the logistical point of view, traversing is far superior to the other classical horizontal control methods and offers at least equivalent accuracy. Concept of Traversing (3)
  • 19. Definition of Traversing Traversing is a surveying technique used to determine the planimetric positions (Easting and Northing: EB and NB below) of control points or setting out points using measured angles and distances (DAB and Q below). EB=EA+ΔEAB= EA+ DABsin Q NB=NA+ΔNAB= NA+ DABcosQ
  • 20. In traversing, the relative position of control points is fixed by measuring the horizontal angle at each point, subtended by the adjacent stations, and the horizontal distance between consecutive pairs of stations. The liability of a traverse to undetected error makes it essential that there should be some external check on its accuracy. Hence, the traverse needs to commence from and connect into known points of greater accuracy than the traverse. Types of Traverses
  • 21. Types of Traverses (2) In this way, the error vector of misclosure can be quantified and distributed throughout the network, to produce geometric correctness. Such a traverse is called a ‘link’ traverse. The link traverse has certain advantages over the remaining types, in that systematic error in distance measurement and orientation are clearly revealed by the error vector. Alternatively, the error vector can be obtained by completing the traverse back to its starting origin. Such a traverse is called a ‘polygonal’ or ‘loop’ traverse.
  • 22. Types of Traverses (3) a) Link traverse b) Loop traverse (oriented) d) Open (free) traverse c) Loop traverse (independent)
  • 23. Both the ‘link’ and ‘polygonal’ traverses are generally referred to as ‘closed’ traverses. The third type of traverse is the ‘free’ or ‘open’ traverse, which does not close back onto any known point and which therefore has no way of detecting or quantifying the errors. Open traverses are not recommended due to the lack of checks. Nevertheless, it is frequently utilized in mining and tunnelling work because of the physical restriction on closure. Types of Traverses (4)
  • 24. Field Procedure Reconnaissance is a vitally important part of any survey project. Its purpose here is to decide the best location for the traverse points. In the first instance the points should be intervisible from the point of view of traverse observations. If the purpose of the control network is the location of topographic detail only, then they should be positioned to afford the best view of the terrain, thereby ensuring that the maximum amount of detail can be surveyed from each point.
  • 25. Field Procedure (2) If the traverse is to be used for setting out e.g., the centre-line of a road, then the stations should be sited to afford the best positions for setting out the intersection points (IPs) and tangent points (TPs), to provide accurate location. The distance between stations should be kept as long as possible to minimize effect of centring errors. Finally, as cost is always important, the scheme should be one that can be completed in the minimum of time, with the minimum of personnel.
  • 26. Sources of Errors The sources of error in traversing include: (1) Errors in the observation of horizontal and vertical angles (angular error). (2) Errors in the measurement of distance (linear error). (3) Errors in the accurate centring of the instrument and targets, directly over the survey point (centring error).
  • 27. Traverse Computation Using the data given below, compute the coordinates of various points in the following traverse. Apply Bowditch rule to distribute the misclosure.
  • 28. Station Observations Station Observations At Tr29 At Tr37 Tr28 97 11 10 Tr36 179 02 59 Tr10 279 15 11 Tr42 2154 58 Tr36 52 15 03 At Tr42 At Tr36 Tr37 201 54 58 Tr29 232 15 03 Tr43 234 55 58 Tr37 359 02 59 Tr41 120 32 05 Traverse Computation (2)
  • 29. Traverse Computation (3) Traverse Distances: Datum Bearings: Tr29 – Tr36: 78.959m Tr29 – Tr28: 97 11 10 Tr36 – Tr37: 68.589m Tr10 – Tr29: 99 15 25 Tr37 – Tr42: 62.019m Tr42 – Tr43: 234 56 07 Tr42 – Tr41: 120 31 34 Datum Coordinates: Station N (Metres) E Tr29 78 674.77 92 174.20 Tr42 78 849.21 92 258.63
  • 30. Bearing Sheet Station Observations Orientation Correction Provisional Bearing Misclosure Final Bearing At Tr29 Tr28 Tr10 Tr36 At Tr36 Tr29 Tr37 At Tr37 Tr36 Tr42 At Tr42 Tr37 Tr43 Tr41 97 11 10 279 15 11 52 15 03 232 15 03 359 02 59 179 02 59 21 54 58 201 54 58 234 55 58 120 32 05 00 +14 +07 +07 +07 +07 52 15 10 232 15 10 359 03 06 179 03 06 21 55 05 201 55 05 234 56 05 120 32 12 -05 -09 -14 -18 +02 -38 97 11 10 279 15 25 52 15 05 359 02 57 21 54 51 234 56 07 120 31 34
  • 31. Computation of Coordinates ΔN (m) ΔE N (metres) E Tr29 – Tr36 Tr29:+78 674.77 +92 174.20 52 15 05 +48.339 +62.433 78.959m -0.01 -0.01 Tr36 – Tr37 Tr36:+78 723.10 +92 236.62 359 02 57 +68.580 -1.138 68.589m -0.01 0.00 Tr37 – Tr42 Tr37:+78 791.67 +92 235.48 21 54 51 +57.538 +23.147 62.019m 0.00 0.00 Tr42:+78 849.21 +92 258.63
  • 32. ΔN (m) ΔE By Datum: 174.440 84.430 By Traverse: 174.456 84.442 Misclosure: -0.016 -0.012 Length of Traverse = 209.567m Accuracy = Sqrt{(-0.016)2+(-0.012)2}/209.567 = 1 in 13,000 (approx) Computation of Coordinates (2)
  • 33. Accuracy of Traversing Traversing is generally more accurate than classical triangulation and trilateration. Due to the weak geometry of a traverse, it generally has only three degrees of freedom (that is three redundant observations), it is difficult to arrive at an estimate of accuracy. Although there have been many attempts to produce equations defining the accuracy of a traverse, at the present time the best approach is a strength analysis using variance–covariance matrices from a least squares adjustment.
  • 34. Blunders in the observed data Blunders or mistakes in the measurement of the angles, results in gross angular misclosure. Provided it is only a single blunder it can easily be located. In the case of an angle, the traverse can be computed forward from X (Figure) and then backwards from Y. The point which has the same co-ordinates in each case, is where the blunder occurred and the angle must be re-observed. Figure: Detection of angular traverse blunder
  • 35. Blunders in the observed data (2) In the case of a blunder in measuring distance, the incorrect leg is the one whose bearing is similar to the bearing of the error vector. If there are several legs with similar bearings the method fails. Again the incorrect leg must be re-measured.
  • 36. Part 3: Vertical Control  Introduction and Definitions  Principle of Levelling  Sources of Errors  Applications of Levelling
  • 37. The process of determining elevations (heights) of points of interest above or below a reference datum or differences in elevations. For most practical applications only the difference in elevation between points of interest and not absolute heights is often required. Used in all aspects of surveying, particularly for engineering surveys, route surveys, construction, etc. Different methods may be used for estimating heights or height differences including; differential levelling, barometric heighting, trigonometric heighting, gravimetry and satellite positioning etc. Overview of Levelling
  • 38. a) Differential levelling: basic idea involves obtaining of height difference between points by measuring their vertical distance from a horizontal line of sight. b) Trigonometric heighting: method is generally used in determination of elevation differences of lower accuracy than spirit levelling. It is useful where it is very difficult (or impossible) for differential levelling to be undertaken (e.g. towers, spires, mountain ranges etc). c) Barometric heighting: method consists of reading air pressure differences from which elevation differences are computed. d) Gravimetry: by measuring the gravitational potential variation between different points it is possible to correlate this to differences in heights. d) Satellite Positioning: method is poised for extensive use in the future with its only drawback being the determination of the separation between the geoid and ellipsoid in areas of interest. Comparison of Various Heighting Methods
  • 39. a) Differential Levelling b) Trigonometric heighting c) Barometer d) Gravimeters
  • 41. A horizontal line is a line that is tangential to the level line at a particular point. Hence a horizontal line is perpendicular to the direction of gravity. Levelling Line and Horizontal Line A level line is a line that is normal to the direction of gravity as shown by a plumbline at any point. A level line is curved by virtue of the shape of the Earth. Hence, a level line is a line in which all points are the same height.
  • 43. Datum: A level surface to which elevations of points may be referenced. The most commonly adopted datum is the Mean Sea Level (MSL). Reduced level: The elevation (above or below) of a point in relation to the Datum. Benchmark (BM): A permanent monument or feature for which elevation is known. BMs are built on stable rock. Three (3) types of benchmarks can be distinguished: 1) Fundamental benchmarks (FBMs): Very stable concrete structures most often built into rock forming part of the primary levelling network. 2) Ordinary benchmarks: Concrete points or marks on rocks, culverts, bridges etc constructed between FBMs. 3) Temporary benchmarks (TBMs): Stable points established in the course of a survey between established benchmarks, which may be some distance away. Datums, Reduced Levels and Benchmarks
  • 44. A (curved) surface orthogonal to the plumb line everywhere. More correctly an equipotential surface for which gravitational potential is constant. A still body of water unaffected by tides is a good analogy. They are not equidistant apart, but converge and diverge due to changes in density. Level Surface
  • 45. Vertical Line The direction of gravity Therefore the direction indicated by a plumb line In general it deviates from a line emanating from the geometric centre of the Earth In reality it is curved, but this can be neglected in small plane surveys
  • 46. Horizontal Plane A plane tangent to a level surface (orthogonal to the plumb line). The collimation axis (line of sight) of a levelling instrument that is in correct adjustment, once levelled, defines a horizontal plane as the instrument is rotated.
  • 47. Levelling Instruments Level, Tripod, staff and tape Change plate.
  • 48. Level and reading of staff
  • 49. Level and reading of staff Staffs of a variety of lengths and graduation styles made from a variety of materials (wood, aluminium, fibreglass) exist. The alternate metre lengths are in black and red on a white background. Majority of staffs are telescopic or socketed in three sections for easy carrying. Graduations can take various forms with E-pattern type popular. The smallest graduation on the staff is 0.01 m, with readings estimated to the nearest millimetre. As the staff must be held vertical during observation it should be fitted with a circular bubble.
  • 52. Examples of Levels NA2000 Digital level with coded levelling staff
  • 53. Two Peg Test This test is often conducted before using a level for any levelling exercise. The purpose of the test is find out to if the line of collimation is parallel to the bubbles tube axis. Collimation error occurs if the line of sight is not truly horizontal when the bubble is centred. The line of sight may be inclined either upwards or downwards from the horizontal.
  • 54. Levelling Procedure A horizontal line of sight is established using some form of levelling mechanism: Spirit level tube Swinging pendulum A graduated staff is read through the telescope of the level. The elevation of points can be established by first reading the staff on a bench mark. The staff is then moved to the desired point, the level is turned and the staff is read again.
  • 55. Levelling Procedure (2) The reading at the benchmark is called the backsight (BS) The reading taken after turning the instrument and moving the staff is the foresight (FS)
  • 56. Levelling Procedure (3) To continue levelling, the staff is kept on the point at A and the instrument moved to the midpoint between A and the next point, B. A is called the change point (CP) or turning point (TP). The staff at A is carefully turned toward the instrument and a BS reading taken. Then the staff is moved to B and a FS reading is made. The procedure is repeated as many times as needed. The levelling should always end on a BM as a check!
  • 57. Levelling Procedure (4) Two note reduction methods for calculating elevations from the BS and FS observations exist. Each use only two equations for the computations. Height of Collimation method HC = Elev + BS Elev = HC – FS Rise and Fall method Rise (or Fall) = BS – FS Elev = Previous Elev + Rise (or Fall) A Fall is simply a negative Rise
  • 58. Rise and Fall Check: ∑BS - ∑ FS = ∑ Rise - ∑ Fall = RLlast - RLFirst
  • 59. Height of Collimation Check: ∑BS - ∑ FS = RLlast - RLFirst Applied when points of interest can be seen
  • 60. Accuracy in Levelling Many factors affect accuracy of ordinary levelling: Reading of staff. Bubble not being central. Instrument (level) being out of adjustment. Ensuring that backsights and foresights are equal in length lessens effects of maladjustment. Differential settlement of the tripod. Tilting and settlement of the staff. Sensitivity of the bubble or compensator.
  • 61. Acceptable Misclosures Maximum acceptable misclosure depends on class of levelling and specifications for the particular survey. As a guideline the following figures give an indication of misclosures for various classes: Precise levelling:  4K 2nd order levelling:  8K 3rd order levelling:  12K. Ordinary levelling falls into this category. On rough ground, allowance may be made for misclosures of up to  30K (Where K is the total distance levelled in kilometres).
  • 62. Precise Levelling This class of levelling requires further refinement to field technique and instrumentation to that applied in ordinary levelling. The accuracy requirements for this class of levelling are more stringent than for ordinary levelling. Typical rules governing field technique for precise levelling include: 1) Backsights and foresights are made equal in length, two staffs being used. 2) Readings are made to one particular staff at each setup, and there being an even number of set ups. Readings are made to all three hairs of the reticule at each set up and a special format for booking of readings used.
  • 63. Precise Levelling (2) 3) All lines of levels to be run twice in opposite directions, the runs being made on different days with different change points. 4) All change points made on special footplates. 5) Staff readings below 0.5m level to be avoided. 6) Special staffs with invar strip and a bubble to be used. 7) Only levels designed for precise levelling (or comparable accuracy) should be used (e.g. with parallel plate micrometer). 8) If the standards in the regulations for allowable error are not complied with, the work is repeated.
  • 64. Sources of Errors Equipment errors (a) Collimation error (b) Compensator not working (c) Parallax (d) Defective staff (e) Defective Tripod
  • 65. Sources of Errors (2) Field or on-sight errors (Gross error sources) (a) Staff reading error. (b) Unstable change point. (c) Non‐vertical staff. (d) Booking error (e) Instrument not level (f) Handling the instrument and tripod Effect of curvature and refraction (a) Earth curvature. (b) Vertical collimation error in the instrument. (c) Temperature relation expansion in the staff.
  • 66. How to Reduce Errors Levelling should start and finish at known Bench Mark. Where possible, all sight lengths should be below 50m. The staff must be held vertically. BS and FS must be kept equal for each instrument position. Rise and Fall method should be used when heighting controls. HCM should be used when setting out. For Automatic levels, staff readings should be booked immediately they are observed.
  • 67. Establishing vertical control. To establish heights of points during constructions – setting out levels. For contouring purposes. For road cross‐section, longitudinal sections/profiles or volumes of Earthwork in civil engineering works. For provision of levels of inclined surface during construction. Applications of levelling
  • 68. Part 4: Earthworks  Overview  Computation of Areas and Volumes  Mass Haul Diagrams
  • 69. Estimation of areas and volumes is basic to most engineering schemes such as route alignment, reservoirs, tunnels, etc. Excavation and hauling of material is the most significant and costly aspect of the work, on which profit or loss may depend. Areas may be required in connection with the purchase or sale of land, with the subdivision of land or with the grading of land. Overview
  • 70. Earthwork volumes are estimated to: i) enable route alignment to be located at such lines and levels that cut and fill are balanced as far as practicable; ii) to enable contract estimates of time and cost to be made for proposed work; iii) to form the basis of payment for work carried out. Overview (2)
  • 71. Areas a) Trapezoidal rule Area (A) = w(h1 + h2 b) Simpson’s rule
  • 72. Many volumes encountered in civil engineering appear, at first glance, to be rather complex in shape. Generally, estimation of volumes can be divided into computation of volumes for prisms, wedges or pyramids. (1) Prism The two ends of the prism (Figure 9.17) are equal and parallel, the resulting sides thus being parallelograms. Volume = AL Volumes (2) Wedge Volume of wedge (Figure 9.18) = L/6 (sum of parallel edges × vertical height of base) = L/6 [(a + b + c) × h] (9.7a) when a = b = c: V = AL/2
  • 73. Mass-haul diagrams (MHD) are used to compare the economy of various methods of earthwork distribution on road or railway construction schemes. By the combined use of the MHD plotted directly below the longitudinal section of the survey centre- line, one can find: (1) The distances over which cut and fill will balance. (2) Quantities of materials to be moved and the direction of movement. (3) Areas where earth may have to be borrowed or wasted and the amounts involved. (4) The best policy to adopt to obtain the most economic use of plant. Mass-Haul Diagrams