SlideShare una empresa de Scribd logo
1 de 33
How to Achieve Compliance
Within a Reasonable Budget


                        Presented by:
                        Marcy R. Knysz, AICP, LEED AP
May 26, 2010            Senior Environmental Consultant
   Permit Overview
   Basic Permit Requirements
   6 Minimum Control Measures
   BMP Examples
   What to Track
   Getting Organized
Issued:   2003/re-issued Feb 2009
          (effective April 1, 2009)

Permit:   Storm water discharge from Municipal
          Separate Storm Sewer System (MS4) to
          waters of the state

Goal:     To reduce pollutants in storm water
Part IV: Develop, implement and enforce a Storm
         Water Management Program (SWMP)
             Six minimum control measures


Part V:   Monitoring
          Recordkeeping
          Reporting
2003 – 2008   SWMP Development

2009 – 2014   SWMP Implementation
1. Public education / outreach
2. Public involvement / participation
3. Illicit discharge detection and elimination (IDDE)
4. Construction site storm water runoff control
5. Post-construction storm water management
6. Pollution prevention / good housekeeping




    Identify BMPs & Track Them
   Educational Material
   Website Links
   Newsletter Articles
   Public Access Channel
   Utility Bill Inserts
   Business Renewal License
   Advertise SWANCC/SWALCO Events
BMP                        Tracking Item

Educational Material       Amount placed on take away rack
Website Links              Number of Hits
Newsletter Articles        Number of newsletters mailed
Public Access Channel      Frequency of slide shown
Utility Bill Inserts       Quantity mailed
Business Renewal License   Quantity mailed
SWANCC/SWALCO Events       Event date and amounts
   Public Meeting
   Community Cleanup
   Watershed Organizations
   Stakeholder Meetings
   Arbor Day Events
   Community Event Day
   Online Comment Forms
   Workshops
BMP                       Tracking Item
Public Meeting            Number of residents
Community Cleanup         Linear feet of stream cleaned
Watershed Organizations   Number of meetings and attendees
Stakeholder Meetings      Number of meetings and attendees
Arbor Day Events          Number of trees planted & volunteers
Community Event Day       Event date and material distributed
Online Comment Forms      Comment forms received
Workshops                 Number of workshops and attendees
   “Develop, implement and enforce a program to detect and
    eliminate illicit discharges into your small MS4”

   Storm sewer map (outfalls and receiving waters)

   Prohibit via ordinance

   Adequately fund program

   “Conduct periodic (annual is recommended) inspections of
    the storm sewer outfalls”
   Storm sewer outfall map
   Visual dry weather screening
   Storm Sewer Televising
   Illicit discharge tracing
   Illicit source removal
   Enforcement
   Citizen Phone Calls
BMP                            Tracking Item
Outfall Map                    Track updates
Visual Dry Weather Screening   Results of dry weather screening
Storm Sewer Televising         Linear feet of sewer televised
Illicit discharge tracing      No. of illicit connections found
Illicit source removal         No. of connections removed
Enforcement                    No. of illegal dumping penalties issued
Citizen Phone Calls            Number of calls received
   Regulatory authority
   Erosion and sediment control requirements
   Site plan review procedures
   Site inspection procedures
   Security deposits/enforcement
   Contractor Certification Program
BMP                                Tracking Item
Regulatory authority               Amendments to Municipal Code
Erosion/sediment control req.      Construction site tracking/ inspections
Site plan review procedures        Permit tracking
Site inspection procedures         Construction site inspection records
Security deposits/enforcement      No. of deposits/enforcement actions
Contractor Certification Program   Number of certifications issued
   Long term O&M plan requirements
   Deed restrictions
   Post-construction basin inspections
   Green Infrastructure Programs
BMP                       Tracking Item
Long term O&M plan req.   Number of projects with plans
Deed restrictions         Acreage of land under restrictions
Basin inspections         Track maintenance activity
Green Infrastructure      Acreage of rain gardens/wetlands created
Village of Riverwoods
   Employee training program
   Municipal operations waste disposal
   Hazardous waste material storage
   Street cleaning
   Road salt application
   Spill response plan
   Storm drain cleaning
   Used oil recycling
BMP                         Tracking Item
Employee training program   Number of employees trained
Municipal waste disposal    Amount of waste generated
Hazardous waste material    Amount of material removed
Street cleaning             Amount of debris removed/LF of road
Road salt application       Quantity of salt/alternative products used
Spill response plan         Number of spills
Storm drain cleaning        Amount of sediment removed
Used oil recycling          Amount of material recycled
Notice of Intent Log
A
N   Complaints/Suggestions Log
N
U   Distribution of Printed Materials Log
A   Outreach Events Log
L
    Hazardous Waste Removal Log
M
S   Electronic Recycling Log
4
    Catch Basin Cleaning Log
T
    Storm Sewer Cleaning Log
R
A   Street Sweeping Log
C
K   Outfall Inspection Log
I
N   Detention/Retention Basin Inspection Log
G
    Vehicle, Fluid, Battery Removal Log
B   Spoil Stock Removal Log
I
N   Employee Training Log
D
E   Illicit Discharge Complaint Log
R
    Newsletters
   Create SWMP
   Create annual binder
   Set up tracking forms
   Update website
   Presentation to governing board
   Adopt ordinances and program
   Employee training
Marcy R. Knysz, AICP, LEED AP
Gewalt Hamilton Associates, Inc.
    Phone: (847) 478-9700
 mknysz@gha-engineers.com

Más contenido relacionado

Destacado (7)

How To Get Your First Job
How To Get Your First  JobHow To Get Your First  Job
How To Get Your First Job
 
Javafx Overview 90minutes
Javafx Overview 90minutesJavafx Overview 90minutes
Javafx Overview 90minutes
 
WIN A JOB = THROUGH COVER LETTER
WIN A JOB = THROUGH COVER LETTERWIN A JOB = THROUGH COVER LETTER
WIN A JOB = THROUGH COVER LETTER
 
Tb writing book(1)
Tb writing book(1)Tb writing book(1)
Tb writing book(1)
 
Internet Marketing 2
Internet Marketing 2Internet Marketing 2
Internet Marketing 2
 
Universidad alberto hurtado
Universidad alberto hurtadoUniversidad alberto hurtado
Universidad alberto hurtado
 
Cpbe resume wk05_cover_letters
Cpbe resume wk05_cover_lettersCpbe resume wk05_cover_letters
Cpbe resume wk05_cover_letters
 

Similar a NPDES Phase II:How to Achieve Compliance

Stormwater Regulation In Wa April 2010
Stormwater Regulation In Wa April 2010Stormwater Regulation In Wa April 2010
Stormwater Regulation In Wa April 2010abakalian
 
1 ksa%20conference%202010%20 %20 mary%20kuo[1]
1 ksa%20conference%202010%20 %20 mary%20kuo[1]1 ksa%20conference%202010%20 %20 mary%20kuo[1]
1 ksa%20conference%202010%20 %20 mary%20kuo[1]guest7dbf4
 
Urban Water Quality Issues - Assisting Municipalities in Implementing NPDES P...
Urban Water Quality Issues - Assisting Municipalities in Implementing NPDES P...Urban Water Quality Issues - Assisting Municipalities in Implementing NPDES P...
Urban Water Quality Issues - Assisting Municipalities in Implementing NPDES P...nacaa
 
Urban Runoff - Storm Water 101
Urban Runoff - Storm Water 101Urban Runoff - Storm Water 101
Urban Runoff - Storm Water 101Greg Gearheart
 
Mr. Bernado Mazzanti IEWP @ 1st Indo-European Water Forum, 23-24 novembre 2015
Mr. Bernado Mazzanti IEWP @ 1st Indo-European Water Forum, 23-24 novembre 2015Mr. Bernado Mazzanti IEWP @ 1st Indo-European Water Forum, 23-24 novembre 2015
Mr. Bernado Mazzanti IEWP @ 1st Indo-European Water Forum, 23-24 novembre 2015India-EU Water Partnership
 
Monitoring and Modeling of the CDOT Blue Island/Cermak Streetscape
Monitoring and Modeling of the CDOT Blue Island/Cermak StreetscapeMonitoring and Modeling of the CDOT Blue Island/Cermak Streetscape
Monitoring and Modeling of the CDOT Blue Island/Cermak StreetscapeCenter for Neighborhood Technology
 
David Bridge presentation, Communicating Environmental Geoscience workshop, ...
David Bridge presentation,  Communicating Environmental Geoscience workshop, ...David Bridge presentation,  Communicating Environmental Geoscience workshop, ...
David Bridge presentation, Communicating Environmental Geoscience workshop, ...dliverman
 
2-6-06 TPWA Short Course Presentation
2-6-06 TPWA Short Course Presentation2-6-06 TPWA Short Course Presentation
2-6-06 TPWA Short Course Presentationjnett
 
SPC Water Framework Directive_Final
SPC Water Framework Directive_FinalSPC Water Framework Directive_Final
SPC Water Framework Directive_FinalStephen Barry
 
Only new details of new phase ii permit
Only new details of new phase ii permitOnly new details of new phase ii permit
Only new details of new phase ii permitguest7dbf4
 
SSES Bennett Area 2-8-06
SSES Bennett Area 2-8-06SSES Bennett Area 2-8-06
SSES Bennett Area 2-8-06HartTWI
 
Case Study: The City of Fort Worth’s Application for SWIFT Funds: Process and...
Case Study: The City of Fort Worth’s Application for SWIFT Funds: Process and...Case Study: The City of Fort Worth’s Application for SWIFT Funds: Process and...
Case Study: The City of Fort Worth’s Application for SWIFT Funds: Process and...Texas Living Waters Project
 
Tceq overview
Tceq overviewTceq overview
Tceq overviewPBASSE
 

Similar a NPDES Phase II:How to Achieve Compliance (20)

MetroWest Stormwater Management
MetroWest Stormwater ManagementMetroWest Stormwater Management
MetroWest Stormwater Management
 
Municipal Stormwater Permit Compliance
Municipal Stormwater Permit ComplianceMunicipal Stormwater Permit Compliance
Municipal Stormwater Permit Compliance
 
Stormwater Regulation In Wa April 2010
Stormwater Regulation In Wa April 2010Stormwater Regulation In Wa April 2010
Stormwater Regulation In Wa April 2010
 
1 ksa%20conference%202010%20 %20 mary%20kuo[1]
1 ksa%20conference%202010%20 %20 mary%20kuo[1]1 ksa%20conference%202010%20 %20 mary%20kuo[1]
1 ksa%20conference%202010%20 %20 mary%20kuo[1]
 
Storm0310wkshopspk2
Storm0310wkshopspk2Storm0310wkshopspk2
Storm0310wkshopspk2
 
Fort Buchanan MS4 Annual Report 2017
Fort Buchanan MS4 Annual Report 2017Fort Buchanan MS4 Annual Report 2017
Fort Buchanan MS4 Annual Report 2017
 
Street Sweeping
Street SweepingStreet Sweeping
Street Sweeping
 
Urban Water Quality Issues - Assisting Municipalities in Implementing NPDES P...
Urban Water Quality Issues - Assisting Municipalities in Implementing NPDES P...Urban Water Quality Issues - Assisting Municipalities in Implementing NPDES P...
Urban Water Quality Issues - Assisting Municipalities in Implementing NPDES P...
 
Urban Runoff - Storm Water 101
Urban Runoff - Storm Water 101Urban Runoff - Storm Water 101
Urban Runoff - Storm Water 101
 
Storm Water Utility Good Housekeeping
Storm Water Utility Good HousekeepingStorm Water Utility Good Housekeeping
Storm Water Utility Good Housekeeping
 
Mr. Bernado Mazzanti IEWP @ 1st Indo-European Water Forum, 23-24 novembre 2015
Mr. Bernado Mazzanti IEWP @ 1st Indo-European Water Forum, 23-24 novembre 2015Mr. Bernado Mazzanti IEWP @ 1st Indo-European Water Forum, 23-24 novembre 2015
Mr. Bernado Mazzanti IEWP @ 1st Indo-European Water Forum, 23-24 novembre 2015
 
Monitoring and Modeling of the CDOT Blue Island/Cermak Streetscape
Monitoring and Modeling of the CDOT Blue Island/Cermak StreetscapeMonitoring and Modeling of the CDOT Blue Island/Cermak Streetscape
Monitoring and Modeling of the CDOT Blue Island/Cermak Streetscape
 
David Bridge presentation, Communicating Environmental Geoscience workshop, ...
David Bridge presentation,  Communicating Environmental Geoscience workshop, ...David Bridge presentation,  Communicating Environmental Geoscience workshop, ...
David Bridge presentation, Communicating Environmental Geoscience workshop, ...
 
Code Blue Implementation
Code Blue ImplementationCode Blue Implementation
Code Blue Implementation
 
2-6-06 TPWA Short Course Presentation
2-6-06 TPWA Short Course Presentation2-6-06 TPWA Short Course Presentation
2-6-06 TPWA Short Course Presentation
 
SPC Water Framework Directive_Final
SPC Water Framework Directive_FinalSPC Water Framework Directive_Final
SPC Water Framework Directive_Final
 
Only new details of new phase ii permit
Only new details of new phase ii permitOnly new details of new phase ii permit
Only new details of new phase ii permit
 
SSES Bennett Area 2-8-06
SSES Bennett Area 2-8-06SSES Bennett Area 2-8-06
SSES Bennett Area 2-8-06
 
Case Study: The City of Fort Worth’s Application for SWIFT Funds: Process and...
Case Study: The City of Fort Worth’s Application for SWIFT Funds: Process and...Case Study: The City of Fort Worth’s Application for SWIFT Funds: Process and...
Case Study: The City of Fort Worth’s Application for SWIFT Funds: Process and...
 
Tceq overview
Tceq overviewTceq overview
Tceq overview
 

NPDES Phase II:How to Achieve Compliance

  • 1. How to Achieve Compliance Within a Reasonable Budget Presented by: Marcy R. Knysz, AICP, LEED AP May 26, 2010 Senior Environmental Consultant
  • 2. Permit Overview  Basic Permit Requirements  6 Minimum Control Measures  BMP Examples  What to Track  Getting Organized
  • 3. Issued: 2003/re-issued Feb 2009 (effective April 1, 2009) Permit: Storm water discharge from Municipal Separate Storm Sewer System (MS4) to waters of the state Goal: To reduce pollutants in storm water
  • 4. Part IV: Develop, implement and enforce a Storm Water Management Program (SWMP)  Six minimum control measures Part V: Monitoring Recordkeeping Reporting
  • 5. 2003 – 2008 SWMP Development 2009 – 2014 SWMP Implementation
  • 6. 1. Public education / outreach 2. Public involvement / participation 3. Illicit discharge detection and elimination (IDDE) 4. Construction site storm water runoff control 5. Post-construction storm water management 6. Pollution prevention / good housekeeping Identify BMPs & Track Them
  • 7.
  • 8.
  • 9. Educational Material  Website Links  Newsletter Articles  Public Access Channel  Utility Bill Inserts  Business Renewal License  Advertise SWANCC/SWALCO Events
  • 10.
  • 11. BMP Tracking Item Educational Material Amount placed on take away rack Website Links Number of Hits Newsletter Articles Number of newsletters mailed Public Access Channel Frequency of slide shown Utility Bill Inserts Quantity mailed Business Renewal License Quantity mailed SWANCC/SWALCO Events Event date and amounts
  • 12.
  • 13. Public Meeting  Community Cleanup  Watershed Organizations  Stakeholder Meetings  Arbor Day Events  Community Event Day  Online Comment Forms  Workshops
  • 14. BMP Tracking Item Public Meeting Number of residents Community Cleanup Linear feet of stream cleaned Watershed Organizations Number of meetings and attendees Stakeholder Meetings Number of meetings and attendees Arbor Day Events Number of trees planted & volunteers Community Event Day Event date and material distributed Online Comment Forms Comment forms received Workshops Number of workshops and attendees
  • 15.
  • 16. “Develop, implement and enforce a program to detect and eliminate illicit discharges into your small MS4”  Storm sewer map (outfalls and receiving waters)  Prohibit via ordinance  Adequately fund program  “Conduct periodic (annual is recommended) inspections of the storm sewer outfalls”
  • 17. Storm sewer outfall map  Visual dry weather screening  Storm Sewer Televising  Illicit discharge tracing  Illicit source removal  Enforcement  Citizen Phone Calls
  • 18. BMP Tracking Item Outfall Map Track updates Visual Dry Weather Screening Results of dry weather screening Storm Sewer Televising Linear feet of sewer televised Illicit discharge tracing No. of illicit connections found Illicit source removal No. of connections removed Enforcement No. of illegal dumping penalties issued Citizen Phone Calls Number of calls received
  • 19.
  • 20.
  • 21. Regulatory authority  Erosion and sediment control requirements  Site plan review procedures  Site inspection procedures  Security deposits/enforcement  Contractor Certification Program
  • 22. BMP Tracking Item Regulatory authority Amendments to Municipal Code Erosion/sediment control req. Construction site tracking/ inspections Site plan review procedures Permit tracking Site inspection procedures Construction site inspection records Security deposits/enforcement No. of deposits/enforcement actions Contractor Certification Program Number of certifications issued
  • 23.
  • 24. Long term O&M plan requirements  Deed restrictions  Post-construction basin inspections  Green Infrastructure Programs
  • 25. BMP Tracking Item Long term O&M plan req. Number of projects with plans Deed restrictions Acreage of land under restrictions Basin inspections Track maintenance activity Green Infrastructure Acreage of rain gardens/wetlands created
  • 27.
  • 28. Employee training program  Municipal operations waste disposal  Hazardous waste material storage  Street cleaning  Road salt application  Spill response plan  Storm drain cleaning  Used oil recycling
  • 29. BMP Tracking Item Employee training program Number of employees trained Municipal waste disposal Amount of waste generated Hazardous waste material Amount of material removed Street cleaning Amount of debris removed/LF of road Road salt application Quantity of salt/alternative products used Spill response plan Number of spills Storm drain cleaning Amount of sediment removed Used oil recycling Amount of material recycled
  • 30. Notice of Intent Log A N Complaints/Suggestions Log N U Distribution of Printed Materials Log A Outreach Events Log L Hazardous Waste Removal Log M S Electronic Recycling Log 4 Catch Basin Cleaning Log T Storm Sewer Cleaning Log R A Street Sweeping Log C K Outfall Inspection Log I N Detention/Retention Basin Inspection Log G Vehicle, Fluid, Battery Removal Log B Spoil Stock Removal Log I N Employee Training Log D E Illicit Discharge Complaint Log R Newsletters
  • 31.
  • 32. Create SWMP  Create annual binder  Set up tracking forms  Update website  Presentation to governing board  Adopt ordinances and program  Employee training
  • 33. Marcy R. Knysz, AICP, LEED AP Gewalt Hamilton Associates, Inc. Phone: (847) 478-9700 mknysz@gha-engineers.com