Project Management in digital content production process Michelangelo Parente
Summary Digital Content Production Production Models Production Process Production Team Managing Digital Content Production as a Project What is a project? Project Manager’s Tools What is Project Management (and why do you need to know it)? 2
Production Models Cascade Model The 'cascade' model is widely known as ADDIE model and it is one of the most popular Instructional Systems Design (ISD) model. It is used as dynamic, flexible guideline for building effective training and performance support tools by instructional designers and training developers. It is built upon 5 phases: Analysis, Design, Development, Implementation, Evaluation. 3
Production Models Evolutive Model This method is designed in four main phases: feasibility study and work plan iteration of the analysis prototype iteration of the project prototype implementation 4
Production Models Cascade Model The ‘cascade’ production method is characterised by phases following one another in a linear pattern without returning to previous phases. Every phase generates an output that is the input of the next phase. The outputs of the first three phases, in general, are text documents, while only from the fourth phase onward a physical prototype will be produced.  Evolutive model The main feature of the ‘evolutive’ production method consists in proceeding according to subsequent approximations, with continuous controls and returning from a phase to the previous one to introduce corrections and changes. Another feature consists in the fact that the whole process of the ‘evolutive’ method, except for the initial phase, is based on a physical prototype. A physical prototype is developed, tested and corrected until it becomes the final product. 5
Production Models Alternative models As an alternative to the systematic approach, in some training programs a modified ADDIE model should be used. This modified model could be represented by a circularprocess with repeated small steps rather than perfectly executed giant steps. In this process the different phases are reviewed for "successive approximation". Rather than developing the instructions in only one sequence, the entire development process is revised on the basis of users' or customers' feedback. The steps are iterative and not linear, so the instructional designers move back and forth between analysis, design, formative evaluation and revision. This circular approach to development has many advantages because it fit well with users needs. Despite these advantages it is much more time consuming and it requires much more money. In most cases, training programs must be developed under a fixed - and often limited - budget and schedule. 6
Content Production Process 2010 © Giunti Labs 7
Content Production Process 8 SME
Content Production Process 9 During Startup phase, the raw materials are analyzed by an Instructional Designer (ID) that, together with a SME, defines the content architecture, in terms of macro-structure (roughly: an index), learning paths, methodological approach, multimedia quality.  A Creative Designer defines the Visual Design (usually realizing interface mockups), and functional specifications (including software and technical aspects) for the whole product are defined.
Content Production Process 10 During Production phase, each content unit, according to macro-structure defined in the Startup phase, is processed by an Instructional Designer. The result is a highly detailed script for the multimedia implementation: the Storyboard. The Storyboard is submitted to the customer for revision and validation. The SME is then asked to  suggest changes and corrections (revision) and formally approve the amended document once all the requested corrections have been made (validation). Following the Storyboard, Multimedia developers (Web / Flash / software developers) create the assets  needed to implement the course, according to the style guidelines defined in the Visual Design (Media Production). The assets are then collected and assembled into a container (usually called shell, or more generally Learning Object interface) . This phase is called Packaging, and its output is the final Learning Object, whose format follows product requirements set during startup phase (e.g. a SCORM package).
Content Production Process 11 Subject Matter Experts Subject Matter Experts Raw Materials Raw Materials INPUT OUTPUT Raw Materials Subject Matter Experts 4 5 3 2 1 Course Delivery  6 Requirements & Specifications definition  (Instructional designing, L&F designing, Templates designing) Course Implementation (Graphic develpment and Course packaging) Prototype Implementation (Graphic development and Course packaging) Prototype Storyboarding (Storyboarding) Course Storyboarding (Storyboarding) Review Review Review Review Review Draft version Draft version Draft version Final version Draft version Final version Final version Draft version Final version Final version   I.Q.C.   I.Q.C.   E.Q.C.   E.Q.C.   E.Q.C.   E.Q.C.   E.Q.C. Review cycles 7 Project Management and Quality Check & Product Validation
Content Production Team 12 Instructional Designer Art Director Multimedia Developer Project Manager CUSTOMER SME 2010 © Giunti Labs
Content Production Team Instructional Designer (ID) An ID typically has a background in liberal arts, frequently with a master's degree or doctorate in instructional design, psychology, education, or multimedia technology. This team member must be very analytical, have good communication skills, and be very organized. A successful instructional designer works quickly in a fast-changing environment.  It is ID’s responsibility to conduct high-level analysis of performance goals, audience, training needs, and technology limitations. In concert with the Customer ID and SME s/he creates the design document, specifies learning objectives, selects interactive exercises, and creates evaluation questions. In the early design phases, this person may have to create script and screen templates and often will be the lead scriptwriter. Additionally, the instructional designer supervises the formative and summative evaluations.  Borrowing an analogy from movies, the project manager is the producer; the instructional designer is the director. 13
Content Production Team Art Director The Art Director works with the instructional designer to create the visual design to be used throughout the course.  She/He oversees a team of junior designers, image developers and production artists and also creates the visual layout and the guidelines to produce all the specific graphic animations.  He/She chooses the graphic style that will be used in the product, creating also 3D or 2D contributions when immersive metaphors and simulations are requested. 14
Content Production Team Multimedia Developer S/he develops the rapid prototype, a programmed working model, upon which the final product is based. The developer is called upon to debug a program following alpha and beta tests, create databases, and construct reporting mechanisms used for student tracking.  Like graphic artists, many programmers may have specialized degrees or be self-taught.  Multimedia development is not usually accomplished using advanced languages but rather in Hypertext Markup Language (HTML) or with authoring systems (e.g., Authorware, Toolbook), programs that facilitate e-learning creation.  15
Content Production Team Subject Matter Expert (SME) A SME is a person who is an expert in a particular area. Whithin Giunti Labs, typically the term SME describes any individual with expertise in the subject matter but not technical (e-learning specific) knowledge. Instructional designers interview SMEs to extract information and convert it into a form suitable for the audience . SMEs are often required to sign off on the documents or training developed, checking it for accuracy. 16
Content Production Team Project Manager (PM) The Project Manager is the person who ultimately guarantees on-time, on-budget delivery of an e-learning solution. S/he is responsible to the sponsor/client for the quality of the finished product.  Project manager serves as single point of contact between team members and the client. The PM is in charge of guiding the approval process, including obtaining feedback from evaluations, implementing revisions, and drafting progress reports.  Skills required are: good organization, time management, the ability to juggle multiple tasks. 17
What is a project? 18
What is a project? The PMBOK (Project Management Body Of Knowledge) Guide, edited by the Project Management Institute defines a project as: “a temporary* endeavor undertaken to create a unique product or service which brings about beneficial change or added value.”  *i.e. having specific start and completion dates 19
What is a project? A standard way to define a project is by comparing it to routines, i.e.the permanent or semi-permanent functional work to repetitively produce the same product or service. ,[object Object]
Projects are exceptions: they take place beside the standard operations of your institution, but they have their own scope, budget, objectives and deadlines. Sometimes they overlap the routines, or may be even in conflict with them. A routine is ongoing and has no singular results, a project is well defined only if its specific result is known. While routines ensure the continuous flow of a process, a project is aimed to the production of a specific outcome.  20
What is Project Management ? In the "traditional approach", we can distinguish 5 components of a project (4 stages plus control) in the development of a project: Project initiation; Project planning or design stage; Project execution (or production); Project monitoring and controlling; Project completion 21
What is Project Management ? Project Initiation The initiation processes determine the nature and scope of the project and, more generally, everything that is needed to set-up the project before work can start. If this stage is not performed well, it is unlikely that the project will be successful in meeting the business’ needs.  22
What is Project Management ? Planning and design The main purpose is to plan time, cost and resources adequately to estimate the work needed and to effectively manage risk during project execution. As with the Initiation process group, a failure to adequately plan greatly reduces the project's chances of successfully accomplishing its goals. 23
What is Project Management ? Executing  Executing consists of the processes used to complete the work defined in the project management plan to accomplish the project's requirements. Execution process involves coordinating people and resources, as well as integrating and performing the activities of the project in accordance with the project management plan.  24
What is Project Management ? Monitoring and controlling Monitoring and controlling consists of those processes performed to observe project execution so that potential problems can be identified in a timely manner and corrective action can be taken, when necessary, to control the execution of the project. The key benefit is that project performance is observed and measured regularly to identify variances from the project management plan. 25
What is Project Management ? Closing Closing includes the formal acceptance of the project and the ending thereof. Administrative activities include the archiving of the files and documenting lessons learned. 26
What is Project Management ? Project management triangle (ca.1950-2009)Like any human undertaking, projects need to be performed and delivered under certain constraints. Traditionally, these constraints have been listed as "scope," "time," and "cost". These are also referred to as the "Project Management Triangle," where each side represents a constraint. One side of the triangle cannot be changed without affecting the others. 27
What is Project Management ? 28 Project management triangle (ca.1950-2009)
Project Management Tools Projects are successful if they are completed on time, within budget, and to performance requirements. In order to bring the many components of a large project into control there is a large toolkit of techniques, methodologies, and tools.  These techniques provide the tools for managing different components involved in a project: planning and scheduling, developing a product, managing financial and capital resources, and monitoring progress. However the success of a project will always rest on the abilities of a project manager and the team members. Some classical tools used by Project Manager to design and manage project are WBS, GANTT and PERT.  29
Project Management Tools Work Breakdown Structure (WBS)  WBS is a fundamental tool commonly used in project management and systems engineering. This tool is related to planning and scheduling a project. Basically it is a functional decomposition of the tasks of the project. WBS is a tree-like structure that allows summing of subordinate costs for tasks, materials, etc., into their successively higher level “parent” tasks, materials, etc. For each element of the WBS a description of the task to be performed is provided. In other words: the total work of the project is broken down into the major subtasks. It starts with the end objective required and successively subdividing it into manageable components in terms of size and complexity. 30
Project Management Tools Gantt Charts A Gantt chart is a popular type of bar chart that illustrates a project schedule. These chart was developed by the industrial engineer and management expert Henry Gantt in 1916 to control munitions production. Heunderstood then that a visual display of these phase could be crucial in communicating the plan to the others. Gantt charts are used for planning, scheduling and then recording progress against these schedules. In these charts, each activity is represented on a timeline, with a start and finish date. Gantt charts may also show dependencies between activities, e.g. if an activity is a prerequisite of an other, the two activities are connected with a finish-to-start relationship. 31
Project Management Tools This system was designed originally to track time in projects involving concurrent activity and to monitor and control expenditures of time. PERT may be used in Project Management to provide a visual representation of a project and its tasks.  PERT makes easier to calculate the maximum time needed to complete each task (under general deadlines), and the time needed to complete the total project. 32 Project Evaluation and Review Technique (PERT) PERT came into popular use between 1956 and 1958 (now is used seldom).
What is the tool loved by 90% of PMs? 2010 © Giunti Labs 33
PM in real context: ELSPM framework 34 Opportunity management CS Solution promotion PCA PEA Assessment PS Resource Allocation Initiation Roadmap strategy Project Execution CA S R V D Specification  &  Planning Design & Implementation Verification & Validation Delivery Preparation Roll-out PC PES Maintenance & Support
Project Execution – Project Execution Start  CA S R V D Specification  &  Planning Design & Implementation Verification & Validation Delivery Preparation Roll-out PC PES The Project Execution Start is the milestone that identifies the real start of the Project Execution with the commitment of Customer and the confirmation that resources to support the project upon PEA gate’s decision have been assigned Contract with internal / external suppliers are signed off A kick-off meeting with major stakeholders has been held 35
Project Execution – Specification & Planning CA S R V D Specification  &  Planning Design & Implementation Verification & Validation Delivery Preparation Roll-out PC PES Requirements are fully analyzed, investigated, detailed and base-lined. Additional documentation is produced such as Functional and Non-Functional Requirements Specifications. In case of Content development project, the Storyboard is developed. User Acceptance Test documentation is prepared when required A Project Management Plan (PMP) to integrate the output of the phase is developed 36
CA S R V D Specification  &  Planning Design & Implementation Verification & Validation Delivery Preparation Roll-out PC PES To confirm that the project deliverables are specified and all activities have been planned.  Input required:  	Functional and Non Functional Requirements Specs 	Project Charter & Project Management Plan 	Validated Storyboard 	User Acceptance Test when required 	Detailed project plan is available on project server 37 Project Execution – Project Execution Start
CA S R V D Specification  &  Planning Design & Implementation Verification & Validation Delivery Preparation Roll-out PC PES Design and implement  the project component parts Test Design and Test Case Design are developed The agreed deliverables and project components are implemented by the production lines (SW development or Content development)  Project Execution – Design & Implementation 38
CA S R V D Specification  &  Planning Design & Implementation Verification & Validation Delivery Preparation Roll-out PC PES The product or all of its components developed is ready to be internally released Inputs required:  	Product and/or its component(s) is/are available 	Release Note is available 	Design “components” documentation is available 	Test Design and Test Case Design are available 	Unit/Module  tests have been performed and passed 	All Test specifications are approved 39 Project Execution – R – Released
CA S R V D Specification  &  Planning Design & Implementation Verification & Validation Delivery Preparation Roll-out PC PES To verify product and validate it against requirements Test Departement will test the released product or its  components and validate it against the requirements according to the test specifications.  The customer might be involved in the validation process. For content production projects the prototype is validated by the customer.    40 Project Execution – Verification & Validation
CA S R V D Specification  &  Planning Design & Implementation Verification & Validation Delivery Preparation Roll-out PC PES The product or all of its components have been verified and validated against its specifications Inputs: Approved test and quality reports 	Approved PR/CR overview list 	Content production is validated by the customer 	Reviewed Release Note with known limitations 	Optionally reviewed project documentation 41 Project Execution – V – Validated
CA S R V D Specification  &  Planning Design & Implementation Verification & Validation Delivery Preparation Roll-out PC PES To prepare the delivery of the product to Customer To organize the internal transfer of responsibility to Support department Resources from maintenance and support are reserved Delivery Notes is compiled (from public contents of RN) Rework on the content production project has been completed 42 Project Execution – Delivery Preparation
CA S R V D Specification  &  Planning Design & Implementation Verification & Validation Delivery Preparation Roll-out PC PES The product or all of its components can be delivered to the Customer Inputs: 	A Delivery Note is available 	Marketing Support Material/Guidelines (for Product) 	User Manual 	List of PRs/CRs reviewed and checked 	Rework has been completed for content production 	Knowledge and documentation transferred to Support team 43 Project Execution – D – Delivered
CA S R V D Specification  &  Planning Design & Implementation Verification & Validation Delivery Preparation Roll-out PC PES Some project team resources will be maintained at GL to provide support for early reported Customer issues and for Customer Acceptance.  Knowledge transfer to the Support & Maintenance team will be completed. Project & process best practices and improvements are captured along with lessons learned and project information is archived. At the end of this phase, the project goes to project closure and responsibility over the product support passes to the Maintenance & Support team.  44 Project Execution – Roll-out
CA S R V D Specification  &  Planning Design & Implementation Verification & Validation Delivery Preparation Roll-out PC PES This milestone is tracked to formalize the Acceptance of the project deliverable(s) by the Customer The Delivery and Acceptance Note is signed off 45 Project Execution – CA – Customer Acceptance
CA S R V D Specification  &  Planning Design & Implementation Verification & Validation Delivery Preparation Roll-out PC PES To close the project and sets the start of Maintenance & Support activities when applicable Project Closure Report is available and lessons learned have been captured, project documentation is correctly archived  The project is formally closed Transfer of responsibility to Maintenance & Support team is completed Resources allocation for Maintenance & Support activities are approved Project Execution – Project Closure 46

Más contenido relacionado

La actualidad más candente

Project Management PowerPoint Presentation Slides
Project Management PowerPoint Presentation SlidesProject Management PowerPoint Presentation Slides
Project Management PowerPoint Presentation SlidesSlideTeam
 
Total Cost Management PowerPoint Presentation Slides
Total Cost Management PowerPoint Presentation SlidesTotal Cost Management PowerPoint Presentation Slides
Total Cost Management PowerPoint Presentation SlidesSlideTeam
 
Pc 2011 Epmo Plan
Pc 2011 Epmo PlanPc 2011 Epmo Plan
Pc 2011 Epmo Plantigcap
 
00 Introduction of project scheduling
00 Introduction of project scheduling00 Introduction of project scheduling
00 Introduction of project schedulingSoe Naing Win
 
Waterfall to agile transition
Waterfall to agile transitionWaterfall to agile transition
Waterfall to agile transitionPonniA1
 
A Practical Guide to Scaling Agile
A Practical Guide to Scaling AgileA Practical Guide to Scaling Agile
A Practical Guide to Scaling AgileMariya Breyter
 
Project Management Tools & Techniques | PMP® Training Videos | Project Manage...
Project Management Tools & Techniques | PMP® Training Videos | Project Manage...Project Management Tools & Techniques | PMP® Training Videos | Project Manage...
Project Management Tools & Techniques | PMP® Training Videos | Project Manage...Edureka!
 
Establishing an Effective PMO
Establishing an Effective PMOEstablishing an Effective PMO
Establishing an Effective PMOBusiness Beam
 
Making project proposal
Making project proposalMaking project proposal
Making project proposalRhon Rhonz
 
Project Portfolio Management Kpi And Dashboard PowerPoint Presentation Slides
Project Portfolio Management Kpi And Dashboard PowerPoint Presentation SlidesProject Portfolio Management Kpi And Dashboard PowerPoint Presentation Slides
Project Portfolio Management Kpi And Dashboard PowerPoint Presentation SlidesSlideTeam
 
Program governance Structure
Program governance StructureProgram governance Structure
Program governance StructureSaurabh Sardesai
 
Fundamentals of Project Management
Fundamentals of Project Management Fundamentals of Project Management
Fundamentals of Project Management Yesica Adicondro
 
Project Status Report
Project Status ReportProject Status Report
Project Status Reportwebtel125
 
Creating the project charter
Creating the project charterCreating the project charter
Creating the project charterbadrux
 
Project / Program / Portfolio Management and Processes Groups
Project / Program / Portfolio Management and Processes GroupsProject / Program / Portfolio Management and Processes Groups
Project / Program / Portfolio Management and Processes GroupsAhmed Alageed
 
Importance of Project Management Basics Training
Importance of Project Management Basics TrainingImportance of Project Management Basics Training
Importance of Project Management Basics TrainingJeremy Jay V. Lim, MBB, PMP
 

La actualidad más candente (20)

Project Management PowerPoint Presentation Slides
Project Management PowerPoint Presentation SlidesProject Management PowerPoint Presentation Slides
Project Management PowerPoint Presentation Slides
 
Total Cost Management PowerPoint Presentation Slides
Total Cost Management PowerPoint Presentation SlidesTotal Cost Management PowerPoint Presentation Slides
Total Cost Management PowerPoint Presentation Slides
 
Pc 2011 Epmo Plan
Pc 2011 Epmo PlanPc 2011 Epmo Plan
Pc 2011 Epmo Plan
 
00 Introduction of project scheduling
00 Introduction of project scheduling00 Introduction of project scheduling
00 Introduction of project scheduling
 
P3M - Project, Program, Portfolio Management Framework
P3M - Project, Program, Portfolio Management FrameworkP3M - Project, Program, Portfolio Management Framework
P3M - Project, Program, Portfolio Management Framework
 
Walking Through Your Project Proposal
Walking Through Your Project ProposalWalking Through Your Project Proposal
Walking Through Your Project Proposal
 
Project Planning
Project PlanningProject Planning
Project Planning
 
Waterfall to agile transition
Waterfall to agile transitionWaterfall to agile transition
Waterfall to agile transition
 
What are the Basic Principles of Project Management | AIMS, UK
What are the Basic Principles of Project Management | AIMS, UK What are the Basic Principles of Project Management | AIMS, UK
What are the Basic Principles of Project Management | AIMS, UK
 
A Practical Guide to Scaling Agile
A Practical Guide to Scaling AgileA Practical Guide to Scaling Agile
A Practical Guide to Scaling Agile
 
Project Management Tools & Techniques | PMP® Training Videos | Project Manage...
Project Management Tools & Techniques | PMP® Training Videos | Project Manage...Project Management Tools & Techniques | PMP® Training Videos | Project Manage...
Project Management Tools & Techniques | PMP® Training Videos | Project Manage...
 
Establishing an Effective PMO
Establishing an Effective PMOEstablishing an Effective PMO
Establishing an Effective PMO
 
Making project proposal
Making project proposalMaking project proposal
Making project proposal
 
Project Portfolio Management Kpi And Dashboard PowerPoint Presentation Slides
Project Portfolio Management Kpi And Dashboard PowerPoint Presentation SlidesProject Portfolio Management Kpi And Dashboard PowerPoint Presentation Slides
Project Portfolio Management Kpi And Dashboard PowerPoint Presentation Slides
 
Program governance Structure
Program governance StructureProgram governance Structure
Program governance Structure
 
Fundamentals of Project Management
Fundamentals of Project Management Fundamentals of Project Management
Fundamentals of Project Management
 
Project Status Report
Project Status ReportProject Status Report
Project Status Report
 
Creating the project charter
Creating the project charterCreating the project charter
Creating the project charter
 
Project / Program / Portfolio Management and Processes Groups
Project / Program / Portfolio Management and Processes GroupsProject / Program / Portfolio Management and Processes Groups
Project / Program / Portfolio Management and Processes Groups
 
Importance of Project Management Basics Training
Importance of Project Management Basics TrainingImportance of Project Management Basics Training
Importance of Project Management Basics Training
 

Destacado

The Content Creation Workflow: How to Bring Your Strategy to Life
The Content Creation Workflow: How to Bring Your Strategy to LifeThe Content Creation Workflow: How to Bring Your Strategy to Life
The Content Creation Workflow: How to Bring Your Strategy to LifeGrant Tilus
 
Content Production and Your Communications Program
Content Production and Your Communications ProgramContent Production and Your Communications Program
Content Production and Your Communications ProgramKnowledgewebb Training
 
Social Media + Content Production: How to effectively implement a content pro...
Social Media + Content Production: How to effectively implement a content pro...Social Media + Content Production: How to effectively implement a content pro...
Social Media + Content Production: How to effectively implement a content pro...Knowledgewebb Training
 
The Beginner's Guide to Digital Content Management
The Beginner's Guide to Digital Content ManagementThe Beginner's Guide to Digital Content Management
The Beginner's Guide to Digital Content ManagementLaserfiche
 
BrightEdge Share15 - CM203: Scaling Content: Production, Process & Culture - ...
BrightEdge Share15 - CM203: Scaling Content: Production, Process & Culture - ...BrightEdge Share15 - CM203: Scaling Content: Production, Process & Culture - ...
BrightEdge Share15 - CM203: Scaling Content: Production, Process & Culture - ...BrightEdge Technologies
 
Web content management
Web content managementWeb content management
Web content managementsmtcd
 
20 ways Rule-Based Processes
20 ways Rule-Based Processes20 ways Rule-Based Processes
20 ways Rule-Based ProcessesAaron McKeehan
 
Womensport Social Media Presentation
Womensport Social Media PresentationWomensport Social Media Presentation
Womensport Social Media PresentationLara Solomon
 
Design Production Delivery Of Social Media Content for EMS Instructors
Design Production Delivery Of Social Media Content for EMS InstructorsDesign Production Delivery Of Social Media Content for EMS Instructors
Design Production Delivery Of Social Media Content for EMS InstructorsGreg Friese
 
Content Lab: Content Marketing by Publicis
Content Lab: Content Marketing by PublicisContent Lab: Content Marketing by Publicis
Content Lab: Content Marketing by PublicisPublicis
 
Mike Hamilton: Centralized Content Development
Mike Hamilton: Centralized Content Development Mike Hamilton: Centralized Content Development
Mike Hamilton: Centralized Content Development Jack Molisani
 
Successful Single-Source Content Development
Successful Single-Source Content Development Successful Single-Source Content Development
Successful Single-Source Content Development Xyleme
 
Web 2.0 And Content Creation And Distribution
Web 2.0 And Content Creation And DistributionWeb 2.0 And Content Creation And Distribution
Web 2.0 And Content Creation And Distributionguest168710
 
Content Strategie: Von der Relevanz zur Exzellenz (Jochen Mai)
Content Strategie: Von der Relevanz zur Exzellenz (Jochen Mai)Content Strategie: Von der Relevanz zur Exzellenz (Jochen Mai)
Content Strategie: Von der Relevanz zur Exzellenz (Jochen Mai)karrierebibel
 
Contented - How content management systems create contented customers
Contented - How content management systems create contented customersContented - How content management systems create contented customers
Contented - How content management systems create contented customersglanton
 

Destacado (20)

The Content Creation Workflow: How to Bring Your Strategy to Life - Grant Tilus
The Content Creation Workflow: How to Bring Your Strategy to Life - Grant TilusThe Content Creation Workflow: How to Bring Your Strategy to Life - Grant Tilus
The Content Creation Workflow: How to Bring Your Strategy to Life - Grant Tilus
 
The Content Creation Workflow: How to Bring Your Strategy to Life
The Content Creation Workflow: How to Bring Your Strategy to LifeThe Content Creation Workflow: How to Bring Your Strategy to Life
The Content Creation Workflow: How to Bring Your Strategy to Life
 
Content Production and Your Communications Program
Content Production and Your Communications ProgramContent Production and Your Communications Program
Content Production and Your Communications Program
 
Social Media + Content Production: How to effectively implement a content pro...
Social Media + Content Production: How to effectively implement a content pro...Social Media + Content Production: How to effectively implement a content pro...
Social Media + Content Production: How to effectively implement a content pro...
 
Content Workflow
Content WorkflowContent Workflow
Content Workflow
 
The Beginner's Guide to Digital Content Management
The Beginner's Guide to Digital Content ManagementThe Beginner's Guide to Digital Content Management
The Beginner's Guide to Digital Content Management
 
BrightEdge Share15 - CM203: Scaling Content: Production, Process & Culture - ...
BrightEdge Share15 - CM203: Scaling Content: Production, Process & Culture - ...BrightEdge Share15 - CM203: Scaling Content: Production, Process & Culture - ...
BrightEdge Share15 - CM203: Scaling Content: Production, Process & Culture - ...
 
Web content management
Web content managementWeb content management
Web content management
 
20 ways Rule-Based Processes
20 ways Rule-Based Processes20 ways Rule-Based Processes
20 ways Rule-Based Processes
 
Sap mrp
Sap mrpSap mrp
Sap mrp
 
Womensport Social Media Presentation
Womensport Social Media PresentationWomensport Social Media Presentation
Womensport Social Media Presentation
 
Design Production Delivery Of Social Media Content for EMS Instructors
Design Production Delivery Of Social Media Content for EMS InstructorsDesign Production Delivery Of Social Media Content for EMS Instructors
Design Production Delivery Of Social Media Content for EMS Instructors
 
Content Lab: Content Marketing by Publicis
Content Lab: Content Marketing by PublicisContent Lab: Content Marketing by Publicis
Content Lab: Content Marketing by Publicis
 
Mike Hamilton: Centralized Content Development
Mike Hamilton: Centralized Content Development Mike Hamilton: Centralized Content Development
Mike Hamilton: Centralized Content Development
 
Content Management
Content ManagementContent Management
Content Management
 
Successful Single-Source Content Development
Successful Single-Source Content Development Successful Single-Source Content Development
Successful Single-Source Content Development
 
Web 2.0 And Content Creation And Distribution
Web 2.0 And Content Creation And DistributionWeb 2.0 And Content Creation And Distribution
Web 2.0 And Content Creation And Distribution
 
Content Strategie: Von der Relevanz zur Exzellenz (Jochen Mai)
Content Strategie: Von der Relevanz zur Exzellenz (Jochen Mai)Content Strategie: Von der Relevanz zur Exzellenz (Jochen Mai)
Content Strategie: Von der Relevanz zur Exzellenz (Jochen Mai)
 
Content Development In The Modern Age
Content Development In The Modern AgeContent Development In The Modern Age
Content Development In The Modern Age
 
Contented - How content management systems create contented customers
Contented - How content management systems create contented customersContented - How content management systems create contented customers
Contented - How content management systems create contented customers
 

Similar a Project Management in digital content production process

The Pact Processes - Overview
The Pact Processes - OverviewThe Pact Processes - Overview
The Pact Processes - OverviewEPPIC Inc.
 
Project Management Complete Concept
Project Management Complete Concept Project Management Complete Concept
Project Management Complete Concept MuhammadTalha436
 
PM-1 Overview.ppt
PM-1 Overview.pptPM-1 Overview.ppt
PM-1 Overview.pptnatisil1
 
Project Management Fundamentals Course Preview
Project Management Fundamentals Course PreviewProject Management Fundamentals Course Preview
Project Management Fundamentals Course PreviewInvensis Learning
 
Project management chapter_04 for MSBTE
Project management chapter_04 for MSBTEProject management chapter_04 for MSBTE
Project management chapter_04 for MSBTEKalyan Ingole
 
Software Life Cylce Model
Software Life Cylce ModelSoftware Life Cylce Model
Software Life Cylce ModelJegadeesh Sam
 
ADDIE- An Instructional Systems Design Model
ADDIE- An Instructional Systems Design ModelADDIE- An Instructional Systems Design Model
ADDIE- An Instructional Systems Design Modeleshikachattopadhyay
 
Designing A Brand Market Analysis
Designing A Brand Market AnalysisDesigning A Brand Market Analysis
Designing A Brand Market AnalysisOlga Bautista
 
best-practices-to-develop-software-applications-for-startups- cuneiform.pdf
best-practices-to-develop-software-applications-for-startups- cuneiform.pdfbest-practices-to-develop-software-applications-for-startups- cuneiform.pdf
best-practices-to-develop-software-applications-for-startups- cuneiform.pdfCuneiform Consulting Pvt Ltd.
 
1 2. project management
1 2. project management1 2. project management
1 2. project managementakashsaini8
 
Topic: Making Multimedia Course Multimedia system and Design.
Topic: Making Multimedia Course Multimedia system and Design.Topic: Making Multimedia Course Multimedia system and Design.
Topic: Making Multimedia Course Multimedia system and Design.HafizMImran1
 
Curriculum e commerce
Curriculum e commerceCurriculum e commerce
Curriculum e commerceNaima2018
 
Scrum in IT Industry Part1
Scrum in IT Industry Part1Scrum in IT Industry Part1
Scrum in IT Industry Part1JayeshPatil149
 

Similar a Project Management in digital content production process (20)

The Pact Processes - Overview
The Pact Processes - OverviewThe Pact Processes - Overview
The Pact Processes - Overview
 
Project Management Complete Concept
Project Management Complete Concept Project Management Complete Concept
Project Management Complete Concept
 
PM-1 Overview.ppt
PM-1 Overview.pptPM-1 Overview.ppt
PM-1 Overview.ppt
 
Project Management Fundamentals Course Preview
Project Management Fundamentals Course PreviewProject Management Fundamentals Course Preview
Project Management Fundamentals Course Preview
 
Agile Dev. II
Agile Dev. IIAgile Dev. II
Agile Dev. II
 
Project management chapter_04 for MSBTE
Project management chapter_04 for MSBTEProject management chapter_04 for MSBTE
Project management chapter_04 for MSBTE
 
Software Life Cylce Model
Software Life Cylce ModelSoftware Life Cylce Model
Software Life Cylce Model
 
ADDIE- An Instructional Systems Design Model
ADDIE- An Instructional Systems Design ModelADDIE- An Instructional Systems Design Model
ADDIE- An Instructional Systems Design Model
 
2
22
2
 
Systematic Innovation
Systematic InnovationSystematic Innovation
Systematic Innovation
 
Unit 1 spm
Unit 1  spmUnit 1  spm
Unit 1 spm
 
Unit 1 spm
Unit 1  spmUnit 1  spm
Unit 1 spm
 
Ben Mkt 347 Week 4
Ben Mkt 347 Week 4Ben Mkt 347 Week 4
Ben Mkt 347 Week 4
 
Designing A Brand Market Analysis
Designing A Brand Market AnalysisDesigning A Brand Market Analysis
Designing A Brand Market Analysis
 
best-practices-to-develop-software-applications-for-startups- cuneiform.pdf
best-practices-to-develop-software-applications-for-startups- cuneiform.pdfbest-practices-to-develop-software-applications-for-startups- cuneiform.pdf
best-practices-to-develop-software-applications-for-startups- cuneiform.pdf
 
1 2. project management
1 2. project management1 2. project management
1 2. project management
 
Topic: Making Multimedia Course Multimedia system and Design.
Topic: Making Multimedia Course Multimedia system and Design.Topic: Making Multimedia Course Multimedia system and Design.
Topic: Making Multimedia Course Multimedia system and Design.
 
Curriculum e commerce
Curriculum e commerceCurriculum e commerce
Curriculum e commerce
 
Scrum in IT Industry Part1
Scrum in IT Industry Part1Scrum in IT Industry Part1
Scrum in IT Industry Part1
 
AgileBIM, BIM mets Agile
AgileBIM, BIM mets AgileAgileBIM, BIM mets Agile
AgileBIM, BIM mets Agile
 

Project Management in digital content production process

  • 1. Project Management in digital content production process Michelangelo Parente
  • 2. Summary Digital Content Production Production Models Production Process Production Team Managing Digital Content Production as a Project What is a project? Project Manager’s Tools What is Project Management (and why do you need to know it)? 2
  • 3. Production Models Cascade Model The 'cascade' model is widely known as ADDIE model and it is one of the most popular Instructional Systems Design (ISD) model. It is used as dynamic, flexible guideline for building effective training and performance support tools by instructional designers and training developers. It is built upon 5 phases: Analysis, Design, Development, Implementation, Evaluation. 3
  • 4. Production Models Evolutive Model This method is designed in four main phases: feasibility study and work plan iteration of the analysis prototype iteration of the project prototype implementation 4
  • 5. Production Models Cascade Model The ‘cascade’ production method is characterised by phases following one another in a linear pattern without returning to previous phases. Every phase generates an output that is the input of the next phase. The outputs of the first three phases, in general, are text documents, while only from the fourth phase onward a physical prototype will be produced. Evolutive model The main feature of the ‘evolutive’ production method consists in proceeding according to subsequent approximations, with continuous controls and returning from a phase to the previous one to introduce corrections and changes. Another feature consists in the fact that the whole process of the ‘evolutive’ method, except for the initial phase, is based on a physical prototype. A physical prototype is developed, tested and corrected until it becomes the final product. 5
  • 6. Production Models Alternative models As an alternative to the systematic approach, in some training programs a modified ADDIE model should be used. This modified model could be represented by a circularprocess with repeated small steps rather than perfectly executed giant steps. In this process the different phases are reviewed for "successive approximation". Rather than developing the instructions in only one sequence, the entire development process is revised on the basis of users' or customers' feedback. The steps are iterative and not linear, so the instructional designers move back and forth between analysis, design, formative evaluation and revision. This circular approach to development has many advantages because it fit well with users needs. Despite these advantages it is much more time consuming and it requires much more money. In most cases, training programs must be developed under a fixed - and often limited - budget and schedule. 6
  • 7. Content Production Process 2010 © Giunti Labs 7
  • 9. Content Production Process 9 During Startup phase, the raw materials are analyzed by an Instructional Designer (ID) that, together with a SME, defines the content architecture, in terms of macro-structure (roughly: an index), learning paths, methodological approach, multimedia quality. A Creative Designer defines the Visual Design (usually realizing interface mockups), and functional specifications (including software and technical aspects) for the whole product are defined.
  • 10. Content Production Process 10 During Production phase, each content unit, according to macro-structure defined in the Startup phase, is processed by an Instructional Designer. The result is a highly detailed script for the multimedia implementation: the Storyboard. The Storyboard is submitted to the customer for revision and validation. The SME is then asked to suggest changes and corrections (revision) and formally approve the amended document once all the requested corrections have been made (validation). Following the Storyboard, Multimedia developers (Web / Flash / software developers) create the assets needed to implement the course, according to the style guidelines defined in the Visual Design (Media Production). The assets are then collected and assembled into a container (usually called shell, or more generally Learning Object interface) . This phase is called Packaging, and its output is the final Learning Object, whose format follows product requirements set during startup phase (e.g. a SCORM package).
  • 11. Content Production Process 11 Subject Matter Experts Subject Matter Experts Raw Materials Raw Materials INPUT OUTPUT Raw Materials Subject Matter Experts 4 5 3 2 1 Course Delivery 6 Requirements & Specifications definition (Instructional designing, L&F designing, Templates designing) Course Implementation (Graphic develpment and Course packaging) Prototype Implementation (Graphic development and Course packaging) Prototype Storyboarding (Storyboarding) Course Storyboarding (Storyboarding) Review Review Review Review Review Draft version Draft version Draft version Final version Draft version Final version Final version Draft version Final version Final version I.Q.C. I.Q.C. E.Q.C. E.Q.C. E.Q.C. E.Q.C. E.Q.C. Review cycles 7 Project Management and Quality Check & Product Validation
  • 12. Content Production Team 12 Instructional Designer Art Director Multimedia Developer Project Manager CUSTOMER SME 2010 © Giunti Labs
  • 13. Content Production Team Instructional Designer (ID) An ID typically has a background in liberal arts, frequently with a master's degree or doctorate in instructional design, psychology, education, or multimedia technology. This team member must be very analytical, have good communication skills, and be very organized. A successful instructional designer works quickly in a fast-changing environment. It is ID’s responsibility to conduct high-level analysis of performance goals, audience, training needs, and technology limitations. In concert with the Customer ID and SME s/he creates the design document, specifies learning objectives, selects interactive exercises, and creates evaluation questions. In the early design phases, this person may have to create script and screen templates and often will be the lead scriptwriter. Additionally, the instructional designer supervises the formative and summative evaluations. Borrowing an analogy from movies, the project manager is the producer; the instructional designer is the director. 13
  • 14. Content Production Team Art Director The Art Director works with the instructional designer to create the visual design to be used throughout the course. She/He oversees a team of junior designers, image developers and production artists and also creates the visual layout and the guidelines to produce all the specific graphic animations. He/She chooses the graphic style that will be used in the product, creating also 3D or 2D contributions when immersive metaphors and simulations are requested. 14
  • 15. Content Production Team Multimedia Developer S/he develops the rapid prototype, a programmed working model, upon which the final product is based. The developer is called upon to debug a program following alpha and beta tests, create databases, and construct reporting mechanisms used for student tracking. Like graphic artists, many programmers may have specialized degrees or be self-taught. Multimedia development is not usually accomplished using advanced languages but rather in Hypertext Markup Language (HTML) or with authoring systems (e.g., Authorware, Toolbook), programs that facilitate e-learning creation. 15
  • 16. Content Production Team Subject Matter Expert (SME) A SME is a person who is an expert in a particular area. Whithin Giunti Labs, typically the term SME describes any individual with expertise in the subject matter but not technical (e-learning specific) knowledge. Instructional designers interview SMEs to extract information and convert it into a form suitable for the audience . SMEs are often required to sign off on the documents or training developed, checking it for accuracy. 16
  • 17. Content Production Team Project Manager (PM) The Project Manager is the person who ultimately guarantees on-time, on-budget delivery of an e-learning solution. S/he is responsible to the sponsor/client for the quality of the finished product. Project manager serves as single point of contact between team members and the client. The PM is in charge of guiding the approval process, including obtaining feedback from evaluations, implementing revisions, and drafting progress reports. Skills required are: good organization, time management, the ability to juggle multiple tasks. 17
  • 18. What is a project? 18
  • 19. What is a project? The PMBOK (Project Management Body Of Knowledge) Guide, edited by the Project Management Institute defines a project as: “a temporary* endeavor undertaken to create a unique product or service which brings about beneficial change or added value.” *i.e. having specific start and completion dates 19
  • 20.
  • 21. Projects are exceptions: they take place beside the standard operations of your institution, but they have their own scope, budget, objectives and deadlines. Sometimes they overlap the routines, or may be even in conflict with them. A routine is ongoing and has no singular results, a project is well defined only if its specific result is known. While routines ensure the continuous flow of a process, a project is aimed to the production of a specific outcome. 20
  • 22. What is Project Management ? In the "traditional approach", we can distinguish 5 components of a project (4 stages plus control) in the development of a project: Project initiation; Project planning or design stage; Project execution (or production); Project monitoring and controlling; Project completion 21
  • 23. What is Project Management ? Project Initiation The initiation processes determine the nature and scope of the project and, more generally, everything that is needed to set-up the project before work can start. If this stage is not performed well, it is unlikely that the project will be successful in meeting the business’ needs. 22
  • 24. What is Project Management ? Planning and design The main purpose is to plan time, cost and resources adequately to estimate the work needed and to effectively manage risk during project execution. As with the Initiation process group, a failure to adequately plan greatly reduces the project's chances of successfully accomplishing its goals. 23
  • 25. What is Project Management ? Executing Executing consists of the processes used to complete the work defined in the project management plan to accomplish the project's requirements. Execution process involves coordinating people and resources, as well as integrating and performing the activities of the project in accordance with the project management plan. 24
  • 26. What is Project Management ? Monitoring and controlling Monitoring and controlling consists of those processes performed to observe project execution so that potential problems can be identified in a timely manner and corrective action can be taken, when necessary, to control the execution of the project. The key benefit is that project performance is observed and measured regularly to identify variances from the project management plan. 25
  • 27. What is Project Management ? Closing Closing includes the formal acceptance of the project and the ending thereof. Administrative activities include the archiving of the files and documenting lessons learned. 26
  • 28. What is Project Management ? Project management triangle (ca.1950-2009)Like any human undertaking, projects need to be performed and delivered under certain constraints. Traditionally, these constraints have been listed as "scope," "time," and "cost". These are also referred to as the "Project Management Triangle," where each side represents a constraint. One side of the triangle cannot be changed without affecting the others. 27
  • 29. What is Project Management ? 28 Project management triangle (ca.1950-2009)
  • 30. Project Management Tools Projects are successful if they are completed on time, within budget, and to performance requirements. In order to bring the many components of a large project into control there is a large toolkit of techniques, methodologies, and tools. These techniques provide the tools for managing different components involved in a project: planning and scheduling, developing a product, managing financial and capital resources, and monitoring progress. However the success of a project will always rest on the abilities of a project manager and the team members. Some classical tools used by Project Manager to design and manage project are WBS, GANTT and PERT. 29
  • 31. Project Management Tools Work Breakdown Structure (WBS) WBS is a fundamental tool commonly used in project management and systems engineering. This tool is related to planning and scheduling a project. Basically it is a functional decomposition of the tasks of the project. WBS is a tree-like structure that allows summing of subordinate costs for tasks, materials, etc., into their successively higher level “parent” tasks, materials, etc. For each element of the WBS a description of the task to be performed is provided. In other words: the total work of the project is broken down into the major subtasks. It starts with the end objective required and successively subdividing it into manageable components in terms of size and complexity. 30
  • 32. Project Management Tools Gantt Charts A Gantt chart is a popular type of bar chart that illustrates a project schedule. These chart was developed by the industrial engineer and management expert Henry Gantt in 1916 to control munitions production. Heunderstood then that a visual display of these phase could be crucial in communicating the plan to the others. Gantt charts are used for planning, scheduling and then recording progress against these schedules. In these charts, each activity is represented on a timeline, with a start and finish date. Gantt charts may also show dependencies between activities, e.g. if an activity is a prerequisite of an other, the two activities are connected with a finish-to-start relationship. 31
  • 33. Project Management Tools This system was designed originally to track time in projects involving concurrent activity and to monitor and control expenditures of time. PERT may be used in Project Management to provide a visual representation of a project and its tasks. PERT makes easier to calculate the maximum time needed to complete each task (under general deadlines), and the time needed to complete the total project. 32 Project Evaluation and Review Technique (PERT) PERT came into popular use between 1956 and 1958 (now is used seldom).
  • 34. What is the tool loved by 90% of PMs? 2010 © Giunti Labs 33
  • 35. PM in real context: ELSPM framework 34 Opportunity management CS Solution promotion PCA PEA Assessment PS Resource Allocation Initiation Roadmap strategy Project Execution CA S R V D Specification & Planning Design & Implementation Verification & Validation Delivery Preparation Roll-out PC PES Maintenance & Support
  • 36. Project Execution – Project Execution Start CA S R V D Specification & Planning Design & Implementation Verification & Validation Delivery Preparation Roll-out PC PES The Project Execution Start is the milestone that identifies the real start of the Project Execution with the commitment of Customer and the confirmation that resources to support the project upon PEA gate’s decision have been assigned Contract with internal / external suppliers are signed off A kick-off meeting with major stakeholders has been held 35
  • 37. Project Execution – Specification & Planning CA S R V D Specification & Planning Design & Implementation Verification & Validation Delivery Preparation Roll-out PC PES Requirements are fully analyzed, investigated, detailed and base-lined. Additional documentation is produced such as Functional and Non-Functional Requirements Specifications. In case of Content development project, the Storyboard is developed. User Acceptance Test documentation is prepared when required A Project Management Plan (PMP) to integrate the output of the phase is developed 36
  • 38. CA S R V D Specification & Planning Design & Implementation Verification & Validation Delivery Preparation Roll-out PC PES To confirm that the project deliverables are specified and all activities have been planned. Input required: Functional and Non Functional Requirements Specs Project Charter & Project Management Plan Validated Storyboard User Acceptance Test when required Detailed project plan is available on project server 37 Project Execution – Project Execution Start
  • 39. CA S R V D Specification & Planning Design & Implementation Verification & Validation Delivery Preparation Roll-out PC PES Design and implement the project component parts Test Design and Test Case Design are developed The agreed deliverables and project components are implemented by the production lines (SW development or Content development) Project Execution – Design & Implementation 38
  • 40. CA S R V D Specification & Planning Design & Implementation Verification & Validation Delivery Preparation Roll-out PC PES The product or all of its components developed is ready to be internally released Inputs required: Product and/or its component(s) is/are available Release Note is available Design “components” documentation is available Test Design and Test Case Design are available Unit/Module tests have been performed and passed All Test specifications are approved 39 Project Execution – R – Released
  • 41. CA S R V D Specification & Planning Design & Implementation Verification & Validation Delivery Preparation Roll-out PC PES To verify product and validate it against requirements Test Departement will test the released product or its components and validate it against the requirements according to the test specifications. The customer might be involved in the validation process. For content production projects the prototype is validated by the customer. 40 Project Execution – Verification & Validation
  • 42. CA S R V D Specification & Planning Design & Implementation Verification & Validation Delivery Preparation Roll-out PC PES The product or all of its components have been verified and validated against its specifications Inputs: Approved test and quality reports Approved PR/CR overview list Content production is validated by the customer Reviewed Release Note with known limitations Optionally reviewed project documentation 41 Project Execution – V – Validated
  • 43. CA S R V D Specification & Planning Design & Implementation Verification & Validation Delivery Preparation Roll-out PC PES To prepare the delivery of the product to Customer To organize the internal transfer of responsibility to Support department Resources from maintenance and support are reserved Delivery Notes is compiled (from public contents of RN) Rework on the content production project has been completed 42 Project Execution – Delivery Preparation
  • 44. CA S R V D Specification & Planning Design & Implementation Verification & Validation Delivery Preparation Roll-out PC PES The product or all of its components can be delivered to the Customer Inputs: A Delivery Note is available Marketing Support Material/Guidelines (for Product) User Manual List of PRs/CRs reviewed and checked Rework has been completed for content production Knowledge and documentation transferred to Support team 43 Project Execution – D – Delivered
  • 45. CA S R V D Specification & Planning Design & Implementation Verification & Validation Delivery Preparation Roll-out PC PES Some project team resources will be maintained at GL to provide support for early reported Customer issues and for Customer Acceptance. Knowledge transfer to the Support & Maintenance team will be completed. Project & process best practices and improvements are captured along with lessons learned and project information is archived. At the end of this phase, the project goes to project closure and responsibility over the product support passes to the Maintenance & Support team. 44 Project Execution – Roll-out
  • 46. CA S R V D Specification & Planning Design & Implementation Verification & Validation Delivery Preparation Roll-out PC PES This milestone is tracked to formalize the Acceptance of the project deliverable(s) by the Customer The Delivery and Acceptance Note is signed off 45 Project Execution – CA – Customer Acceptance
  • 47. CA S R V D Specification & Planning Design & Implementation Verification & Validation Delivery Preparation Roll-out PC PES To close the project and sets the start of Maintenance & Support activities when applicable Project Closure Report is available and lessons learned have been captured, project documentation is correctly archived The project is formally closed Transfer of responsibility to Maintenance & Support team is completed Resources allocation for Maintenance & Support activities are approved Project Execution – Project Closure 46

Notas del editor

  1. Over the course of any construction project, the work scope may change. Changes can be the result of necessary design modifications, differing site conditions, material availability, contractor-requested changes, value engineering and impacts from third parties, to name a few. When changes are introduced to the project, the viability of the project has to be re-assessed. It is important not to lose sight of the initial goals and targets of the projects. When the changes accumulate, the forecasted result may not justify the original proposed investment in the project.
  2. Over the course of any construction project, the work scope may change. Changes can be the result of necessary design modifications, differing site conditions, material availability, contractor-requested changes, value engineering and impacts from third parties, to name a few. When changes are introduced to the project, the viability of the project has to be re-assessed. It is important not to lose sight of the initial goals and targets of the projects. When the changes accumulate, the forecasted result may not justify the original proposed investment in the project.
  3. The time constraint refers to the amount of time available to complete a project. The cost constraint refers to the budgeted amount available for the project. The scope constraint refers to what must be done to produce the project's end result. These three constraints are often competing constraints: increased scope typically means increased time and increased cost, a tight time constraint could mean increased costs and reduced scope, and a tight budget could mean increased time and reduced scope.
  4. Gantt realized that breaking down a process into precise phases made control easier, and that some activities could be executed concurrently, thus saving time and resources.