SlideShare una empresa de Scribd logo
1 de 40
Descargar para leer sin conexión
MMX:

CREATING CHOICES IN SEABORNE IRON
ORE SUPPLY
Rio de Janeiro | November 2013
DISCLAIMER
This presentation relating to MMX Mineração e Metálicos S.A. (“MMX”) includes “forward-looking statements”, as that term is defined in the
Private Securities Litigation Reform Act of 1995, in Section 27A of the Securities Act of 1933 and Section 21E of the U.S. Securities
Exchange Act of 1934. All statements other than statements of historical facts are statements that could be deemed forward-looking
statements and are often characterized by the use of words such as “projects”, “expects”, “anticipates”, “intends”, “plans”, “believes”,
“estimates”, “may”, “will”, or “intends”, or by discussions or comments about our objectives, strategy, plans or intentions and results of
operations. Forward-looking statements include projections regarding our operating capacity, operating expenditures, capital expenditures
and start-up dates.
By their nature, these forward-looking statements involve numerous assumptions, uncertainties and opportunities, both general and
specific. The risk exists that these statements may not be fulfilled or, even if they are fulfilled, the results or developments described in
such statements may not be indicative of results or developments in future periods. We caution participants of this presentation not to
place undue reliance on these forward-looking statements as a number of factors could cause future results to differ materially from these
statements.
Forward-looking statements may be influenced in particular by factors such as the ability to obtain all required regulatory approvals on a
timely basis or at all, exploration for mineral resources and reserves, difficulty in converting geological resources into mineral reserves,
and changes in economic, political and regulatory conditions. We caution that the foregoing list is not exhaustive. When relying on
forward-looking statements to make decisions, investors should carefully consider these factors as well as other uncertainties and events.
MMX does not undertake to update our forward-looking statements unless required by law. This presentation is neither an offer to sell
(which can only be made pursuant to definitive offering documents) nor a solicitation of an offer to buy any securities in the United States,
or any other jurisdiction. The securities referred to herein have not been registered in any jurisdiction, and in particular, will not be
registered under the U.S. Securities Act of 1933, as amended, or any applicable state securities laws and may not be offered or sold in the
United States absent registration or an applicable exemption from such registration requirements.
This presentation and its contents are proprietary information and may not be reproduced or otherwise disseminated in whole or in part
without MMX’s prior written consent.
1

MMX INTRODUCTION
MMXM3: SOLID CONTROLLING SHAREHOLDERS
Wisco
10,5%
Controlling
Shareholders

SK Networks
8,8%

59,3%

Outros
21,4%

94,52%
MMX Corumbá
Mineração

100%

100%

MMX Sudeste

Superporto
Sudeste

5,48% EBX

Serra
Azul

Bom
Sucesso
4
HIGH QUALITY MINING ASSETS IN TRADITIONAL
MINING DISTRICTS
Two operating systems: Serra Azul and Corumbá;
Current Capacity: approximately 7 Mtpy;
Mining rights in traditional iron ore districts: Brazil
(Minas Gerais and Mato Grosso do Sul);
Production committed with strategic consumers –
China and South Korea – through long-term
contracts;

Sudeste System
Serra Azul Unit
Bom Sucesso Unit

Brownfield start up in Brazil;
Expanding up to around 40 Mtpy in Brazil, under
revision, through fully integrated systems: Private
port;
Strategic port location.

Corumbá System

Sudeste Superport

5
INGREDIENTS FOR A SUCCESSFUL IRON ORE
BUSINESS
Resource Base
Competitive
Production Cost
Structure

SRK and Coffey Mining certifications (Serra Azul, Pau de Vinho e Bom Sucesso):
3,6 billion tons of mineral resources. Reserves of 1 billion tons in Serra Azul.
Low stripping ratio
Competitive scale – New beneficiation plant
Energy supply contract with MPX
Infrastructure with integrated logistics

Guaranteed
Logistics

Sudeste Superport at 50 Mtpy, expandable to 100 Mtpy, provides gateway to
seaborne markets
Long Term Railway Contract with MRS

Secured Offtake

64% of future production already committed through long-term contracts

Operational
Track Record

Experience management team with implementation and operational expertise
Current Capacity of 8 Mtpy (Serra Azul and Corumbá sites)

6
A LOT HAS BEEN DELIVERED
November
2013

Definitive agreements executed by the Company with Trafigura and Mubadala;
Sale of all shares in Minera MMX de Chile S.A. to Inversiones Cooper Mining S.A.
Hiring of financial advisors to evaluate business opportunities;
New certification of mineral resources (SRK and Coffey Mining) totaling 3.6 billion tons
considering Serra Azul Unit, Mina Pau de Vinho and Bom Sucesso;
Conclusion of the contracting of supplementary long term funding for the Sudeste Superport
with BNDES, in the sum of R$ 935 million;
Renewal of the lease contracts for mineral rights with the CEFAR, extending the terms of
validity from 2021 to 2034;

Arrival of 2 Ship Loaders in the Sudeste Superport ;
Conclusion of the capital increase in the amount of R$ 1.4 billion;
BNDES approves eligibility for a long term financing for Serra Azul;

January
2012

Conclusion of the offshore civil works at the Sudeste Superport;

Issuance of debentures at the amount of R$ 600 million;
7
FINANCIAL HIGHLIGHTS
Gross Profit (R$ million)

Net Revenue (R$ million)
200

300
250

150

200
150
100

204

100

284

237

0
2Q12

113

50

50
1Q13

2Q12

Adjusted EBITDA (R$ million)
14.6%

40

41

3.6%

2Q13

16%

7

3

2Q12

1Q13

8%

Adjusted EBITDA
EBITDA Margin

4%

1.3%

10
0

1Q13

12%

30

20

186

0

2Q13

50

140

0%
2Q13
8
2

SUDESTE SYSTEM
2.1

SERRA AZUL UNIT
UNIQUE INTEGRATED LOGISTICS
Since Iron ore is a bulk commodity, an integrated logistic (mine 
railway  port) is the key factor for a successful operation
Offtakers (Shareholders)

Long-Term contract (20 years). Wisco
will off-take at least 50% of MMX
Sudeste production.

Mine

Railway

Superport

Long-Term contract (20 years) to trade
iron ore. SK will take-off part of the
Sudeste System yearly production
equivalent to its participation in MMX
Capital (14%).

SK and Wisco will together
offtake 64% of total production
Serra Azul unit is near to the
MRS railway - 10 km from the
mine,
a
distance
currently
traversed by trucks.

MMX has a long term contract
with MRS railway, which connects
the mine with the CSN’s port and
the Sudeste Superport, both
located in Itaguaí.

Sudeste Superport will have
50Mtpy
iron
ore
shipping
capacity. The Superport will have
a depth of 20 meters, enough to
handle Capesize vessels.

11
Iron ore Quadrangle

QUADRILÁTERO FERRÍFERO
RAILWAY
Railway access connecting MRS to the Sudeste Superport

13
MRS CONTRACT
MMX signed a long term contract for railway services

Contract signed on December 28th 2011;
Long term contract through 2026;

Provides for a volume of up to 36 million tons of iron ore per year.

14
SERRA AZUL
Expansion project with integrated logistic and pellet feed iron ore
Highlights
Production target: 29 Mtpy under revision;
64% of production already committed through long-term contracts;
997.4 million tons of reserves already secured by SRK.

Execution Update
Beginning of construction of Serra Azul Unit expansion;
Construction license issued in April, 2012;

Expected Quality – Ouro Preto pilot plant test work
Fe: 66,65%

P: 0,025%

AL2O3: 0,54%

SiO2: 3,23%

Mn: 0,018%

LOI: 0,75%

15
SERRA AZUL
Growth through consolidation while leveraging existing
infrastructure

16
SERRA AZUL
Serra Azul Unit Expansion Project

Cava

New Beneficiation Plant, transmission line and water
pipelines, Stockyard and Loading Terminal

17
Serra Azul Expansion
Beneficiation Plant
SERRA AZUL
Earthwork
1

Pump House, Sump and
Thickeners

5

Substation

2

Construction Site

6

Grinding

10 Tank

3

Beneficiation

7

Piles

11 and Warehouse

4

Grinding

8

Primary Crusher

12 Tank Inc.

9

1

3

2

13 Main Access

Water Storage

14 Administrative Buildings

Construction Site

15 Maintenance Workshop

Water Storage

5
1

Primary Crusher

6

11

4
7

9
8

10

13

14

12
15
2.2

SUDESTE SUPERPORT
Sudeste Superport
Location
Offshore

Nautical
Access

Stockyard 06
Stockyard
32

Sudeste Superport
Artistic View

Railway
Access
SUDESTE SUPERPORT
Overview
Licensed to 50 Mtpy, expandable to 100 Mtpy;
Licensing for 100 Mtpy underway, public;
Hearing held on May, 2012;
Navy Approval to 100 Mtpy;
Loading: 2 ship loaders of 25 Mtpy each;
Construction works for the tunnel and offshore
infrastructure completed;

Fully funded (BNDES).
Definitive agreements executed with Trafigura
and Mubadala to sell 65% of the Sudeste
Superport
Sudeste Superport - Itaguaí
23
USIMINAS AGREEMENT
Pau de Vinho Joint Mining
SRK resources audit : 805 million tons;
Significant synergies with current mining operations at Serra Azul;

13.5% of production at Pau de Vinho will be delivered to Usiminas;
MMX will be responsible for the licensing, CAPEX and operation for 30 years.

Sudeste Superport Handling
Volumes:
■ 12 Mpta

80% Take-or-Pay;
Usiminas can renew the contract in 2016 for 1 to 5 years.
24
Sudeste Superport
Sudeste Superport
Road&Railway Access
Road&Railway Access
Stockyard 32

Stacker Reclaimer
Infrastructure
Stacker Reclaimer
Rolling Way

Road
Access

Car Dumpers Control
Room

Stockyard 6
Car Dumpers

Sudeste Superport
Stockyard Elevation 6 m
Sudeste Superport
Stockyard Elevation 6 m
Control Room of
Car Dumpers

Train
Positioners

Sudeste Superport
Car Dumpers
Sudeste Superport
Car Dumpers
Sudeste Superport
Stockyard Elevation 32 m

30
Sudeste Superport
Tunnel entrance

Tunnel Entrance

Electric Substation
Infrastructure

Transfer House
Structure
Sudeste Superport
Tunnel

32
Sudeste Superport
Tunnel Exit
33
Sudeste Superport
Offshore Structure
34
Electric Substation
Building

Plataform

Sudeste Superport
Plataform and
Substation Structure
35
Bridge
430 m

Bridge
270 m

Pier
766 m

Superporto Sudeste
Sudeste Superport
Estrutura Offshore
Offshore Structure
Superporto Sudeste
Estrutura Offshore

Sudeste Superport
Ship Loaders
37
3

CORUMBÁ
CORUMBÁ
Highlights
Current Capacity: 2.1 Mtpy;
Long-term contracts signed with local and
international barge operators;
SRK audit resources report: 192 million
tons plus a potential of an additional 123
million tons.

39
Investor Relations | MMX
Carlos Gonzalez, CEO and IRO
Adriana Marques, Manager
Phone: + 55 21 2163-6197
+ 55 21 2163-6338
E-mail: ri@mmx.com.br

Más contenido relacionado

La actualidad más candente

Mmx abril 2013 - ingles - vfinal
Mmx   abril 2013 - ingles - vfinalMmx   abril 2013 - ingles - vfinal
Mmx abril 2013 - ingles - vfinalmmxriweb
 
Corporate Presentation - August 2014
Corporate Presentation - August 2014Corporate Presentation - August 2014
Corporate Presentation - August 2014mmxriweb
 
Investor Presentation Aug-Sept 2012
Investor Presentation Aug-Sept 2012Investor Presentation Aug-Sept 2012
Investor Presentation Aug-Sept 2012Sagegold
 
Iberian Investors Presentation August 2009
Iberian Investors Presentation August 2009Iberian Investors Presentation August 2009
Iberian Investors Presentation August 2009Iberian Minerals Corp.
 
SRW Presentation Fall 2013
SRW Presentation Fall 2013SRW Presentation Fall 2013
SRW Presentation Fall 2013raremetals
 
Mmx webcast ingles 2013 vfinal
Mmx webcast ingles 2013 vfinalMmx webcast ingles 2013 vfinal
Mmx webcast ingles 2013 vfinalmmxriweb
 
Sage May 2014 investor presentation
Sage May 2014 investor presentationSage May 2014 investor presentation
Sage May 2014 investor presentationSagegold
 
Consolidated investor presentation 2014 10 28
Consolidated investor presentation 2014 10 28Consolidated investor presentation 2014 10 28
Consolidated investor presentation 2014 10 28CobreDelMayo
 
Investor Presentation - September 2011 (English)
Investor Presentation - September 2011 (English)Investor Presentation - September 2011 (English)
Investor Presentation - September 2011 (English)PetroMagdalena
 
11 01-16 rdc investor-presentation_website_final
11 01-16 rdc investor-presentation_website_final11 01-16 rdc investor-presentation_website_final
11 01-16 rdc investor-presentation_website_finalRowanCompanies
 
Investor Presentation - October 2014
Investor Presentation - October 2014Investor Presentation - October 2014
Investor Presentation - October 2014CobreDelMayo
 
Investor Presentation 2012
Investor Presentation 2012Investor Presentation 2012
Investor Presentation 2012PetroMagdalena
 
Aberdeen International Corporate Presentation July 2016
Aberdeen International Corporate Presentation July 2016 Aberdeen International Corporate Presentation July 2016
Aberdeen International Corporate Presentation July 2016 Aberdeen_AAB
 
Corporate Presentation June 2013
Corporate Presentation June 2013Corporate Presentation June 2013
Corporate Presentation June 2013pacificcoal
 
Volkmar Guido Hable enters into Agreement to Acquire North OTU Gold Property
Volkmar Guido Hable enters into Agreement to Acquire North OTU Gold Property Volkmar Guido Hable enters into Agreement to Acquire North OTU Gold Property
Volkmar Guido Hable enters into Agreement to Acquire North OTU Gold Property volkmarguidohable
 
Pmd investor presentation may 2012.v7
Pmd   investor presentation may 2012.v7Pmd   investor presentation may 2012.v7
Pmd investor presentation may 2012.v7PetroMagdalena
 

La actualidad más candente (20)

Mmx abril 2013 - ingles - vfinal
Mmx   abril 2013 - ingles - vfinalMmx   abril 2013 - ingles - vfinal
Mmx abril 2013 - ingles - vfinal
 
Corporate Presentation - August 2014
Corporate Presentation - August 2014Corporate Presentation - August 2014
Corporate Presentation - August 2014
 
Investor Presentation Aug-Sept 2012
Investor Presentation Aug-Sept 2012Investor Presentation Aug-Sept 2012
Investor Presentation Aug-Sept 2012
 
Developing potash in the Horn of Africa
Developing potash in the Horn of AfricaDeveloping potash in the Horn of Africa
Developing potash in the Horn of Africa
 
Iberian Investors Presentation August 2009
Iberian Investors Presentation August 2009Iberian Investors Presentation August 2009
Iberian Investors Presentation August 2009
 
SRW Presentation Fall 2013
SRW Presentation Fall 2013SRW Presentation Fall 2013
SRW Presentation Fall 2013
 
NAP Investor Presentation August 2014
NAP Investor Presentation August 2014NAP Investor Presentation August 2014
NAP Investor Presentation August 2014
 
Mmx webcast ingles 2013 vfinal
Mmx webcast ingles 2013 vfinalMmx webcast ingles 2013 vfinal
Mmx webcast ingles 2013 vfinal
 
Sage May 2014 investor presentation
Sage May 2014 investor presentationSage May 2014 investor presentation
Sage May 2014 investor presentation
 
Consolidated investor presentation 2014 10 28
Consolidated investor presentation 2014 10 28Consolidated investor presentation 2014 10 28
Consolidated investor presentation 2014 10 28
 
Investor Presentation - September 2011 (English)
Investor Presentation - September 2011 (English)Investor Presentation - September 2011 (English)
Investor Presentation - September 2011 (English)
 
Expanding resources in South Korea
Expanding resources in South KoreaExpanding resources in South Korea
Expanding resources in South Korea
 
11 01-16 rdc investor-presentation_website_final
11 01-16 rdc investor-presentation_website_final11 01-16 rdc investor-presentation_website_final
11 01-16 rdc investor-presentation_website_final
 
Investor Presentation - October 2014
Investor Presentation - October 2014Investor Presentation - October 2014
Investor Presentation - October 2014
 
Investor Presentation 2012
Investor Presentation 2012Investor Presentation 2012
Investor Presentation 2012
 
Aberdeen International Corporate Presentation July 2016
Aberdeen International Corporate Presentation July 2016 Aberdeen International Corporate Presentation July 2016
Aberdeen International Corporate Presentation July 2016
 
PMD February
PMD FebruaryPMD February
PMD February
 
Corporate Presentation June 2013
Corporate Presentation June 2013Corporate Presentation June 2013
Corporate Presentation June 2013
 
Volkmar Guido Hable enters into Agreement to Acquire North OTU Gold Property
Volkmar Guido Hable enters into Agreement to Acquire North OTU Gold Property Volkmar Guido Hable enters into Agreement to Acquire North OTU Gold Property
Volkmar Guido Hable enters into Agreement to Acquire North OTU Gold Property
 
Pmd investor presentation may 2012.v7
Pmd   investor presentation may 2012.v7Pmd   investor presentation may 2012.v7
Pmd investor presentation may 2012.v7
 

Similar a MMX: Creating Choices in Seaborne Iron Ore Supply

Mmx agosto 2013 - ingles - vfinal
Mmx   agosto 2013 - ingles - vfinalMmx   agosto 2013 - ingles - vfinal
Mmx agosto 2013 - ingles - vfinalmmxriweb
 
Mmx abril 2013 - ingles - v2
Mmx   abril 2013 - ingles - v2Mmx   abril 2013 - ingles - v2
Mmx abril 2013 - ingles - v2mmxriweb
 
Mmx agosto 2013 - ingles - vfinal
Mmx   agosto 2013 - ingles - vfinalMmx   agosto 2013 - ingles - vfinal
Mmx agosto 2013 - ingles - vfinalmmxriweb
 
Mmx agosto 2013 - ingles - vfinal
Mmx   agosto 2013 - ingles - vfinalMmx   agosto 2013 - ingles - vfinal
Mmx agosto 2013 - ingles - vfinalmmxriweb
 
Mmx julho 2013 - ingles - vfinal
Mmx   julho 2013 - ingles - vfinalMmx   julho 2013 - ingles - vfinal
Mmx julho 2013 - ingles - vfinalmmxriweb
 
Mmx janeiro - en - vfinal
Mmx   janeiro - en - vfinalMmx   janeiro - en - vfinal
Mmx janeiro - en - vfinalmmxriweb
 
Mmx junho 2013 - ingles - vfinal
Mmx   junho 2013 - ingles - vfinalMmx   junho 2013 - ingles - vfinal
Mmx junho 2013 - ingles - vfinalmmxriweb
 
Mmx junho 2013 - ingles - vfinal
Mmx   junho 2013 - ingles - vfinalMmx   junho 2013 - ingles - vfinal
Mmx junho 2013 - ingles - vfinalmmxriweb
 
Mmx junho 2013 - ingles - vfinal
Mmx   junho 2013 - ingles - vfinalMmx   junho 2013 - ingles - vfinal
Mmx junho 2013 - ingles - vfinalmmxriweb
 
Mmx junho 2013 - ingles - vfinal
Mmx   junho 2013 - ingles - vfinalMmx   junho 2013 - ingles - vfinal
Mmx junho 2013 - ingles - vfinalmmxriweb
 
Mmx junho 2013 - ingles - vfinal
Mmx   junho 2013 - ingles - vfinalMmx   junho 2013 - ingles - vfinal
Mmx junho 2013 - ingles - vfinalmmxriweb
 
Mmx maio 2013 - ingles - vfinal
Mmx   maio 2013 - ingles - vfinalMmx   maio 2013 - ingles - vfinal
Mmx maio 2013 - ingles - vfinalmmxriweb
 
Mmx maio 2013 - ingles - vfinal
Mmx   maio 2013 - ingles - vfinalMmx   maio 2013 - ingles - vfinal
Mmx maio 2013 - ingles - vfinalmmxriweb
 
Mmx maio 2013 - ingles - vfinal
Mmx   maio 2013 - ingles - vfinalMmx   maio 2013 - ingles - vfinal
Mmx maio 2013 - ingles - vfinalmmxriweb
 
Mmx maio 2013 - ingles - v2
Mmx   maio 2013 - ingles - v2Mmx   maio 2013 - ingles - v2
Mmx maio 2013 - ingles - v2mmxriweb
 
Mmx maio 2013 - ingles - v2
Mmx   maio 2013 - ingles - v2Mmx   maio 2013 - ingles - v2
Mmx maio 2013 - ingles - v2mmxriweb
 
Mmx maio 2013 - ingles
Mmx   maio 2013 - inglesMmx   maio 2013 - ingles
Mmx maio 2013 - inglesmmxriweb
 
Mmx abril - en - vfinal nova
Mmx   abril - en - vfinal novaMmx   abril - en - vfinal nova
Mmx abril - en - vfinal novammxriweb
 
Mmx junho - en - vfinal nova
Mmx   junho - en - vfinal novaMmx   junho - en - vfinal nova
Mmx junho - en - vfinal novammxriweb
 
Mmx março - en - vfinal nova
Mmx   março - en - vfinal novaMmx   março - en - vfinal nova
Mmx março - en - vfinal novammxriweb
 

Similar a MMX: Creating Choices in Seaborne Iron Ore Supply (20)

Mmx agosto 2013 - ingles - vfinal
Mmx   agosto 2013 - ingles - vfinalMmx   agosto 2013 - ingles - vfinal
Mmx agosto 2013 - ingles - vfinal
 
Mmx abril 2013 - ingles - v2
Mmx   abril 2013 - ingles - v2Mmx   abril 2013 - ingles - v2
Mmx abril 2013 - ingles - v2
 
Mmx agosto 2013 - ingles - vfinal
Mmx   agosto 2013 - ingles - vfinalMmx   agosto 2013 - ingles - vfinal
Mmx agosto 2013 - ingles - vfinal
 
Mmx agosto 2013 - ingles - vfinal
Mmx   agosto 2013 - ingles - vfinalMmx   agosto 2013 - ingles - vfinal
Mmx agosto 2013 - ingles - vfinal
 
Mmx julho 2013 - ingles - vfinal
Mmx   julho 2013 - ingles - vfinalMmx   julho 2013 - ingles - vfinal
Mmx julho 2013 - ingles - vfinal
 
Mmx janeiro - en - vfinal
Mmx   janeiro - en - vfinalMmx   janeiro - en - vfinal
Mmx janeiro - en - vfinal
 
Mmx junho 2013 - ingles - vfinal
Mmx   junho 2013 - ingles - vfinalMmx   junho 2013 - ingles - vfinal
Mmx junho 2013 - ingles - vfinal
 
Mmx junho 2013 - ingles - vfinal
Mmx   junho 2013 - ingles - vfinalMmx   junho 2013 - ingles - vfinal
Mmx junho 2013 - ingles - vfinal
 
Mmx junho 2013 - ingles - vfinal
Mmx   junho 2013 - ingles - vfinalMmx   junho 2013 - ingles - vfinal
Mmx junho 2013 - ingles - vfinal
 
Mmx junho 2013 - ingles - vfinal
Mmx   junho 2013 - ingles - vfinalMmx   junho 2013 - ingles - vfinal
Mmx junho 2013 - ingles - vfinal
 
Mmx junho 2013 - ingles - vfinal
Mmx   junho 2013 - ingles - vfinalMmx   junho 2013 - ingles - vfinal
Mmx junho 2013 - ingles - vfinal
 
Mmx maio 2013 - ingles - vfinal
Mmx   maio 2013 - ingles - vfinalMmx   maio 2013 - ingles - vfinal
Mmx maio 2013 - ingles - vfinal
 
Mmx maio 2013 - ingles - vfinal
Mmx   maio 2013 - ingles - vfinalMmx   maio 2013 - ingles - vfinal
Mmx maio 2013 - ingles - vfinal
 
Mmx maio 2013 - ingles - vfinal
Mmx   maio 2013 - ingles - vfinalMmx   maio 2013 - ingles - vfinal
Mmx maio 2013 - ingles - vfinal
 
Mmx maio 2013 - ingles - v2
Mmx   maio 2013 - ingles - v2Mmx   maio 2013 - ingles - v2
Mmx maio 2013 - ingles - v2
 
Mmx maio 2013 - ingles - v2
Mmx   maio 2013 - ingles - v2Mmx   maio 2013 - ingles - v2
Mmx maio 2013 - ingles - v2
 
Mmx maio 2013 - ingles
Mmx   maio 2013 - inglesMmx   maio 2013 - ingles
Mmx maio 2013 - ingles
 
Mmx abril - en - vfinal nova
Mmx   abril - en - vfinal novaMmx   abril - en - vfinal nova
Mmx abril - en - vfinal nova
 
Mmx junho - en - vfinal nova
Mmx   junho - en - vfinal novaMmx   junho - en - vfinal nova
Mmx junho - en - vfinal nova
 
Mmx março - en - vfinal nova
Mmx   março - en - vfinal novaMmx   março - en - vfinal nova
Mmx março - en - vfinal nova
 

Más de mmxriweb

Apresentação Corporativa - Agosto 2014
Apresentação Corporativa - Agosto 2014Apresentação Corporativa - Agosto 2014
Apresentação Corporativa - Agosto 2014mmxriweb
 
Mmx julho - en - vfinal nova
Mmx   julho - en - vfinal novaMmx   julho - en - vfinal nova
Mmx julho - en - vfinal novammxriweb
 
Mmx julho - pt - vfinal nova
Mmx   julho - pt - vfinal novaMmx   julho - pt - vfinal nova
Mmx julho - pt - vfinal novammxriweb
 
Mmx webcast ingles 1 t14 v1
Mmx webcast ingles 1 t14   v1Mmx webcast ingles 1 t14   v1
Mmx webcast ingles 1 t14 v1mmxriweb
 
Mmx webcast portugues 1 t14 vf
Mmx webcast portugues 1 t14   vfMmx webcast portugues 1 t14   vf
Mmx webcast portugues 1 t14 vfmmxriweb
 
Mmx junho - pt - vfinal nova
Mmx   junho - pt - vfinal novaMmx   junho - pt - vfinal nova
Mmx junho - pt - vfinal novammxriweb
 
Mmx junho - pt - vfinal nova
Mmx   junho - pt - vfinal novaMmx   junho - pt - vfinal nova
Mmx junho - pt - vfinal novammxriweb
 
Mmx maio - pt - vfinal nova
Mmx   maio - pt - vfinal novaMmx   maio - pt - vfinal nova
Mmx maio - pt - vfinal novammxriweb
 
Mmx maio - en - vfinal nova
Mmx   maio - en - vfinal novaMmx   maio - en - vfinal nova
Mmx maio - en - vfinal novammxriweb
 
Mmx maio - pt - vfinal nova
Mmx   maio - pt - vfinal novaMmx   maio - pt - vfinal nova
Mmx maio - pt - vfinal novammxriweb
 
Mmx maio - pt - vfinal nova
Mmx   maio - pt - vfinal novaMmx   maio - pt - vfinal nova
Mmx maio - pt - vfinal novammxriweb
 
Mmx abril - pt - vfinal nova
Mmx   abril - pt - vfinal novaMmx   abril - pt - vfinal nova
Mmx abril - pt - vfinal novammxriweb
 
Mmx março - pt - vfinal nova
Mmx   março - pt - vfinal novaMmx   março - pt - vfinal nova
Mmx março - pt - vfinal novammxriweb
 
Mmx webcast portugues 2013 vfinal
Mmx webcast portugues 2013 vfinalMmx webcast portugues 2013 vfinal
Mmx webcast portugues 2013 vfinalmmxriweb
 
Mmx março - pt - vfinal nova
Mmx   março - pt - vfinal novaMmx   março - pt - vfinal nova
Mmx março - pt - vfinal novammxriweb
 
Mmx fevereiro - pt - vfinal nova
Mmx   fevereiro - pt - vfinal novaMmx   fevereiro - pt - vfinal nova
Mmx fevereiro - pt - vfinal novammxriweb
 
Mmx fevereiro - pt - vfinal
Mmx   fevereiro - pt - vfinalMmx   fevereiro - pt - vfinal
Mmx fevereiro - pt - vfinalmmxriweb
 
Mmx fevereiro - pt - vfinal2
Mmx   fevereiro - pt - vfinal2Mmx   fevereiro - pt - vfinal2
Mmx fevereiro - pt - vfinal2mmxriweb
 
Mmx janeiro - pt - vfinal
Mmx   janeiro - pt - vfinalMmx   janeiro - pt - vfinal
Mmx janeiro - pt - vfinalmmxriweb
 
Mmx janeiro - pt - vfinal
Mmx   janeiro - pt - vfinalMmx   janeiro - pt - vfinal
Mmx janeiro - pt - vfinalmmxriweb
 

Más de mmxriweb (20)

Apresentação Corporativa - Agosto 2014
Apresentação Corporativa - Agosto 2014Apresentação Corporativa - Agosto 2014
Apresentação Corporativa - Agosto 2014
 
Mmx julho - en - vfinal nova
Mmx   julho - en - vfinal novaMmx   julho - en - vfinal nova
Mmx julho - en - vfinal nova
 
Mmx julho - pt - vfinal nova
Mmx   julho - pt - vfinal novaMmx   julho - pt - vfinal nova
Mmx julho - pt - vfinal nova
 
Mmx webcast ingles 1 t14 v1
Mmx webcast ingles 1 t14   v1Mmx webcast ingles 1 t14   v1
Mmx webcast ingles 1 t14 v1
 
Mmx webcast portugues 1 t14 vf
Mmx webcast portugues 1 t14   vfMmx webcast portugues 1 t14   vf
Mmx webcast portugues 1 t14 vf
 
Mmx junho - pt - vfinal nova
Mmx   junho - pt - vfinal novaMmx   junho - pt - vfinal nova
Mmx junho - pt - vfinal nova
 
Mmx junho - pt - vfinal nova
Mmx   junho - pt - vfinal novaMmx   junho - pt - vfinal nova
Mmx junho - pt - vfinal nova
 
Mmx maio - pt - vfinal nova
Mmx   maio - pt - vfinal novaMmx   maio - pt - vfinal nova
Mmx maio - pt - vfinal nova
 
Mmx maio - en - vfinal nova
Mmx   maio - en - vfinal novaMmx   maio - en - vfinal nova
Mmx maio - en - vfinal nova
 
Mmx maio - pt - vfinal nova
Mmx   maio - pt - vfinal novaMmx   maio - pt - vfinal nova
Mmx maio - pt - vfinal nova
 
Mmx maio - pt - vfinal nova
Mmx   maio - pt - vfinal novaMmx   maio - pt - vfinal nova
Mmx maio - pt - vfinal nova
 
Mmx abril - pt - vfinal nova
Mmx   abril - pt - vfinal novaMmx   abril - pt - vfinal nova
Mmx abril - pt - vfinal nova
 
Mmx março - pt - vfinal nova
Mmx   março - pt - vfinal novaMmx   março - pt - vfinal nova
Mmx março - pt - vfinal nova
 
Mmx webcast portugues 2013 vfinal
Mmx webcast portugues 2013 vfinalMmx webcast portugues 2013 vfinal
Mmx webcast portugues 2013 vfinal
 
Mmx março - pt - vfinal nova
Mmx   março - pt - vfinal novaMmx   março - pt - vfinal nova
Mmx março - pt - vfinal nova
 
Mmx fevereiro - pt - vfinal nova
Mmx   fevereiro - pt - vfinal novaMmx   fevereiro - pt - vfinal nova
Mmx fevereiro - pt - vfinal nova
 
Mmx fevereiro - pt - vfinal
Mmx   fevereiro - pt - vfinalMmx   fevereiro - pt - vfinal
Mmx fevereiro - pt - vfinal
 
Mmx fevereiro - pt - vfinal2
Mmx   fevereiro - pt - vfinal2Mmx   fevereiro - pt - vfinal2
Mmx fevereiro - pt - vfinal2
 
Mmx janeiro - pt - vfinal
Mmx   janeiro - pt - vfinalMmx   janeiro - pt - vfinal
Mmx janeiro - pt - vfinal
 
Mmx janeiro - pt - vfinal
Mmx   janeiro - pt - vfinalMmx   janeiro - pt - vfinal
Mmx janeiro - pt - vfinal
 

Último

VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...Suhani Kapoor
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaShree Krishna Exports
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 DelhiCall Girls in Delhi
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseri bangash
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdftbatkhuu1
 

Último (20)

VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in India
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdf
 

MMX: Creating Choices in Seaborne Iron Ore Supply

  • 1. MMX: CREATING CHOICES IN SEABORNE IRON ORE SUPPLY Rio de Janeiro | November 2013
  • 2. DISCLAIMER This presentation relating to MMX Mineração e Metálicos S.A. (“MMX”) includes “forward-looking statements”, as that term is defined in the Private Securities Litigation Reform Act of 1995, in Section 27A of the Securities Act of 1933 and Section 21E of the U.S. Securities Exchange Act of 1934. All statements other than statements of historical facts are statements that could be deemed forward-looking statements and are often characterized by the use of words such as “projects”, “expects”, “anticipates”, “intends”, “plans”, “believes”, “estimates”, “may”, “will”, or “intends”, or by discussions or comments about our objectives, strategy, plans or intentions and results of operations. Forward-looking statements include projections regarding our operating capacity, operating expenditures, capital expenditures and start-up dates. By their nature, these forward-looking statements involve numerous assumptions, uncertainties and opportunities, both general and specific. The risk exists that these statements may not be fulfilled or, even if they are fulfilled, the results or developments described in such statements may not be indicative of results or developments in future periods. We caution participants of this presentation not to place undue reliance on these forward-looking statements as a number of factors could cause future results to differ materially from these statements. Forward-looking statements may be influenced in particular by factors such as the ability to obtain all required regulatory approvals on a timely basis or at all, exploration for mineral resources and reserves, difficulty in converting geological resources into mineral reserves, and changes in economic, political and regulatory conditions. We caution that the foregoing list is not exhaustive. When relying on forward-looking statements to make decisions, investors should carefully consider these factors as well as other uncertainties and events. MMX does not undertake to update our forward-looking statements unless required by law. This presentation is neither an offer to sell (which can only be made pursuant to definitive offering documents) nor a solicitation of an offer to buy any securities in the United States, or any other jurisdiction. The securities referred to herein have not been registered in any jurisdiction, and in particular, will not be registered under the U.S. Securities Act of 1933, as amended, or any applicable state securities laws and may not be offered or sold in the United States absent registration or an applicable exemption from such registration requirements. This presentation and its contents are proprietary information and may not be reproduced or otherwise disseminated in whole or in part without MMX’s prior written consent.
  • 4. MMXM3: SOLID CONTROLLING SHAREHOLDERS Wisco 10,5% Controlling Shareholders SK Networks 8,8% 59,3% Outros 21,4% 94,52% MMX Corumbá Mineração 100% 100% MMX Sudeste Superporto Sudeste 5,48% EBX Serra Azul Bom Sucesso 4
  • 5. HIGH QUALITY MINING ASSETS IN TRADITIONAL MINING DISTRICTS Two operating systems: Serra Azul and Corumbá; Current Capacity: approximately 7 Mtpy; Mining rights in traditional iron ore districts: Brazil (Minas Gerais and Mato Grosso do Sul); Production committed with strategic consumers – China and South Korea – through long-term contracts; Sudeste System Serra Azul Unit Bom Sucesso Unit Brownfield start up in Brazil; Expanding up to around 40 Mtpy in Brazil, under revision, through fully integrated systems: Private port; Strategic port location. Corumbá System Sudeste Superport 5
  • 6. INGREDIENTS FOR A SUCCESSFUL IRON ORE BUSINESS Resource Base Competitive Production Cost Structure SRK and Coffey Mining certifications (Serra Azul, Pau de Vinho e Bom Sucesso): 3,6 billion tons of mineral resources. Reserves of 1 billion tons in Serra Azul. Low stripping ratio Competitive scale – New beneficiation plant Energy supply contract with MPX Infrastructure with integrated logistics Guaranteed Logistics Sudeste Superport at 50 Mtpy, expandable to 100 Mtpy, provides gateway to seaborne markets Long Term Railway Contract with MRS Secured Offtake 64% of future production already committed through long-term contracts Operational Track Record Experience management team with implementation and operational expertise Current Capacity of 8 Mtpy (Serra Azul and Corumbá sites) 6
  • 7. A LOT HAS BEEN DELIVERED November 2013 Definitive agreements executed by the Company with Trafigura and Mubadala; Sale of all shares in Minera MMX de Chile S.A. to Inversiones Cooper Mining S.A. Hiring of financial advisors to evaluate business opportunities; New certification of mineral resources (SRK and Coffey Mining) totaling 3.6 billion tons considering Serra Azul Unit, Mina Pau de Vinho and Bom Sucesso; Conclusion of the contracting of supplementary long term funding for the Sudeste Superport with BNDES, in the sum of R$ 935 million; Renewal of the lease contracts for mineral rights with the CEFAR, extending the terms of validity from 2021 to 2034; Arrival of 2 Ship Loaders in the Sudeste Superport ; Conclusion of the capital increase in the amount of R$ 1.4 billion; BNDES approves eligibility for a long term financing for Serra Azul; January 2012 Conclusion of the offshore civil works at the Sudeste Superport; Issuance of debentures at the amount of R$ 600 million; 7
  • 8. FINANCIAL HIGHLIGHTS Gross Profit (R$ million) Net Revenue (R$ million) 200 300 250 150 200 150 100 204 100 284 237 0 2Q12 113 50 50 1Q13 2Q12 Adjusted EBITDA (R$ million) 14.6% 40 41 3.6% 2Q13 16% 7 3 2Q12 1Q13 8% Adjusted EBITDA EBITDA Margin 4% 1.3% 10 0 1Q13 12% 30 20 186 0 2Q13 50 140 0% 2Q13 8
  • 11. UNIQUE INTEGRATED LOGISTICS Since Iron ore is a bulk commodity, an integrated logistic (mine  railway  port) is the key factor for a successful operation Offtakers (Shareholders) Long-Term contract (20 years). Wisco will off-take at least 50% of MMX Sudeste production. Mine Railway Superport Long-Term contract (20 years) to trade iron ore. SK will take-off part of the Sudeste System yearly production equivalent to its participation in MMX Capital (14%). SK and Wisco will together offtake 64% of total production Serra Azul unit is near to the MRS railway - 10 km from the mine, a distance currently traversed by trucks. MMX has a long term contract with MRS railway, which connects the mine with the CSN’s port and the Sudeste Superport, both located in Itaguaí. Sudeste Superport will have 50Mtpy iron ore shipping capacity. The Superport will have a depth of 20 meters, enough to handle Capesize vessels. 11
  • 13. RAILWAY Railway access connecting MRS to the Sudeste Superport 13
  • 14. MRS CONTRACT MMX signed a long term contract for railway services Contract signed on December 28th 2011; Long term contract through 2026; Provides for a volume of up to 36 million tons of iron ore per year. 14
  • 15. SERRA AZUL Expansion project with integrated logistic and pellet feed iron ore Highlights Production target: 29 Mtpy under revision; 64% of production already committed through long-term contracts; 997.4 million tons of reserves already secured by SRK. Execution Update Beginning of construction of Serra Azul Unit expansion; Construction license issued in April, 2012; Expected Quality – Ouro Preto pilot plant test work Fe: 66,65% P: 0,025% AL2O3: 0,54% SiO2: 3,23% Mn: 0,018% LOI: 0,75% 15
  • 16. SERRA AZUL Growth through consolidation while leveraging existing infrastructure 16
  • 17. SERRA AZUL Serra Azul Unit Expansion Project Cava New Beneficiation Plant, transmission line and water pipelines, Stockyard and Loading Terminal 17
  • 19. SERRA AZUL Earthwork 1 Pump House, Sump and Thickeners 5 Substation 2 Construction Site 6 Grinding 10 Tank 3 Beneficiation 7 Piles 11 and Warehouse 4 Grinding 8 Primary Crusher 12 Tank Inc. 9 1 3 2 13 Main Access Water Storage 14 Administrative Buildings Construction Site 15 Maintenance Workshop Water Storage 5 1 Primary Crusher 6 11 4 7 9 8 10 13 14 12 15
  • 23. SUDESTE SUPERPORT Overview Licensed to 50 Mtpy, expandable to 100 Mtpy; Licensing for 100 Mtpy underway, public; Hearing held on May, 2012; Navy Approval to 100 Mtpy; Loading: 2 ship loaders of 25 Mtpy each; Construction works for the tunnel and offshore infrastructure completed; Fully funded (BNDES). Definitive agreements executed with Trafigura and Mubadala to sell 65% of the Sudeste Superport Sudeste Superport - Itaguaí 23
  • 24. USIMINAS AGREEMENT Pau de Vinho Joint Mining SRK resources audit : 805 million tons; Significant synergies with current mining operations at Serra Azul; 13.5% of production at Pau de Vinho will be delivered to Usiminas; MMX will be responsible for the licensing, CAPEX and operation for 30 years. Sudeste Superport Handling Volumes: ■ 12 Mpta 80% Take-or-Pay; Usiminas can renew the contract in 2016 for 1 to 5 years. 24
  • 26. Stockyard 32 Stacker Reclaimer Infrastructure Stacker Reclaimer Rolling Way Road Access Car Dumpers Control Room Stockyard 6 Car Dumpers Sudeste Superport Stockyard Elevation 6 m
  • 28. Control Room of Car Dumpers Train Positioners Sudeste Superport Car Dumpers
  • 31. Sudeste Superport Tunnel entrance Tunnel Entrance Electric Substation Infrastructure Transfer House Structure
  • 36. Bridge 430 m Bridge 270 m Pier 766 m Superporto Sudeste Sudeste Superport Estrutura Offshore Offshore Structure
  • 39. CORUMBÁ Highlights Current Capacity: 2.1 Mtpy; Long-term contracts signed with local and international barge operators; SRK audit resources report: 192 million tons plus a potential of an additional 123 million tons. 39
  • 40. Investor Relations | MMX Carlos Gonzalez, CEO and IRO Adriana Marques, Manager Phone: + 55 21 2163-6197 + 55 21 2163-6338 E-mail: ri@mmx.com.br