SlideShare una empresa de Scribd logo
1 de 4
Mohamed Anis Ahmed 626 St., Beside Al-mohands central,
El-Mandare, Alexandria, Egypt
Mobile: +201005131825
Mobile :+201277110154
MOHAMEDANIS87@HOTMAIL.COM
ANISSO54@YAHOO.COM
I submit hear my CV hopping it will meet your requirement
PERSONAL INFORAMTION:
Date of Birth 22/2/1981
Qualification I&C supervisor
Marital Status Married
Military status Final exempted.
Drive License Valid.
EDUCATION:
Institution Town Duration Graduation
DON
BOSCO
Alexandria 3 years
Date Degree Major Grade
1997
Tech.
Diploma
ELECTROMECHANIC V. Good
POSITION
- I & C SUPERVISOR.
WORK EXPERIENCE
- Instrument Laboratory and Safety valve Activities
-Installation, Calibration, Pre-commissioning, Commissioning, loop
cheek, Startup and Troubleshooting for All field instruments.
 supervising the pre‐commissioning, commissioning and start‐up of
measuring and controlling Loops.
 Testing, installation, calibration, configuration, maintenance,
troubleshooting for instruments
as: Foxboro, Masoneillan, Fisher‐Rosemount, Honeywell.
 Loop checking and maintenance for Systems as: PLC‐Allan Bradley,
Bentley ‐Nevada Monitoring System, Delta V‐DCS and HIMA‐ESD.
-Checking for as per drawings instruments installation, proper
connections to process and Wiring links between instruments, marshaling
cabinets and DCS cabinets or controlpanels according with loop
diagrams
 Checking and adjusting range limits according with data sheets,
verifying calibration, recalibrate
 working with equipment available on the platform: ROSEMOUNT,
ABB, KROHNE, YOKOGAWA, SIEMENS, HONEYWELL, DRUCK,
MOBREY, DCS System YOKOGAWA AND EMERSON.
 Specific tools used: HART Communicators 275 &
375,475YOKOGAWA
WORK WITH LIQUID AND GAS ANALYZER`S (
PH,CONDUCTIVITY,QXYMITTER 4000ROSEMOUNTAND IN
SIDE THE ANALYZER HOUSE).
 After start‐up: technical assistance, maintenance and troubleshooting
for all instrumentation& control equipment's
I WORK IN GE TURBINE PGT10,FRAME5, FRAME 7
Field experience:-
05/2015 up to now XERVON TO TKIS COMPANY (UDHE)
ENPC PETROCHAMICAL PLANT
FOR AMMONIA AND UREA (EGYPT)
GENERAL ELECTRIC STEAM GAS TURBINE
09/2014 up to 04/2015 EGYPTION MAINTANANCE COMPANY (EMC)
BASRA GAS COMPANY (BGC) & SHELL IRAQ.
IRAQ GAS FIELD PROJECT
05/2014 up to 09/2014 RASPITCO PETROLUM COMPANY.
MAINTANANCE FOR ALL RASHID PLANT`S
Two gas compressors station (Nouvo Pignone)
controlled by HIMA & MARK VI PLC.
09/2013 up to 03/2014 BARMAG (INDIAN COMPANY)
EGYPTION INDIAN COMPANY FOR POLESTER
( EIPT).
12/2011 up to 05/2013 TECHINT CIMIMONTUBI -NIGERIA LTD
ESCRAVOS GAS TO LIQUIDS PROJECT - EGTL.
ESCRAVOS, NIGERIA. -(SGC main contractor and Chevron the
client (CNL(
10/2010 up to 04/2011 ALEX. MAINTENANCE COMPANY (PETROMAINT).
E-methanex Methanol Plant Damietta 1 Project.
Project instrument consultant
12/2008 up to 08/2010 TECHINT CIMIMONTUBI
.E-methanex Methanol Plant Damietta 1 Project.
Project instrument consultant
MANTURBO COMPRESSOR
05/2008 up to12/2008 Kellogg Brown And Root International Inc. (KBR).
EBIC 2000 MTPD KAAP AMMONIA PLANT
SUEZ INDUSTRIAL ZONE, EGYPT.
MANTURBO COMPRESSOR
03/2008 up to 05/2008 Techint cimimontubi & General Electric El Kureimat 3
750MW Combined Cycle Project.
Upper Egypt Electricity Production Company.
01/2007 up to01/2008 Techint Cimimontubi
TSKJ . NLNG Project -Bonny Island-Nigeria.
MR AND PR COMPRESSORS ( NOUVA PIGNONE)
09/2005 up to 01/2006 Carlo Gavazzi &Bonatti&Snamprogetti
Lummus Gas LTD.
WLGP Mellitah Plant. (LIBYA).
07/2005 up to 09/2005 E.M.C. (San Mesr).
Liquefied Natural Gas In ADKO, Egypt.
MR AND PR COMPRESSORS ( NOUVA PIGNONE
02/2005 up to 06/2005 Burullus Gas Co.
(SIMIAN / SIENNA & SAPPHIRE Project).
01/2005 up to 02/2005 Burullus Development
(SCARAB De-bottle Necking project).
05/2004 up to 12/2004 DLC.
(Liquefied Natural Gas (LNG) in Damietta Egypt.
MR AND PR COMPRESSORS ( NOUVA PIGNONE)
09/2003 up to 05/2004 Raspitco Petroleum Co., (Rosetta Field Gas Compressor).
Two gas compressors station (Nouvo Pignone) controlled by HIMA &
MARK VI PLC.
10/2002 up to08/2003 ESC & EDF Egyptian Engineering Company (France)
Egypt Boot. Project East Port Said.
Gas–Fuel Fired Power Plant of 2x 340MW Unit.
04/2002 up to 10/2002 ECS & EDF EGYPTION, ENGINEERING COMPANY (France).
Egypt Boot Project, Suez Gulf.
Gas-Fuel Fired Power Plants Of 2 X 340MW Units.
01/2002 up to 04/2002 PPC & Technical Reunites (Tr).
Aspic Specialty Products Company.
07/2001up to 01/2002 Carlo Gavazzi ( Italian ) & Foster Wheeler ( France ).
Amoc Lube Oil Expansion Project Site.
10/2000up to 06/2001 Daelim industrial (Korean) & TTIL (Italian).
El Amera - Free Zoon - Egypt Midor (Middle East Oil Refinery).
05/2000 up to 10/2000 Techint Cimimontubi (Italian).
Suez project 120.000 MTA poly propylene plant.
01/1997up to 05/2000 Techint Cimimontubi (Italian).
sidi kerir project power station 2x 320 mw .
GENERAL KNOWELDGE:
Control Systems:
- DCS (Distributed Control Systems_
- PLC (Programmable Logic Control)
Instrumentation:
- Indicators Gauges, Transmitters (Level, Flow, Pressure and Temperature. Smart Tip
And Foundation Field Bus Tip) Control Valve, safety valve & Control systems.
- Foundation Field Bus Instrumentation & Control.
LANGUAGES:
Native Language : Arabic
Foreign Language: Italian & English
COMPUTER ABILITIES
Microsoft Windows, Office (Word, Excel, Power Point), Internet

Más contenido relacionado

Destacado

Destacado (8)

Teacher track
Teacher trackTeacher track
Teacher track
 
Dossier general(school programs)
Dossier general(school programs)Dossier general(school programs)
Dossier general(school programs)
 
School program
School programSchool program
School program
 
SAP Long Term PLANNING
SAP Long Term PLANNINGSAP Long Term PLANNING
SAP Long Term PLANNING
 
Recurring inspection in QM
Recurring inspection in QMRecurring inspection in QM
Recurring inspection in QM
 
sas aeroplan sample
sas aeroplan samplesas aeroplan sample
sas aeroplan sample
 
Palo alto networks pcnse6 study guide feb 2015
Palo alto networks pcnse6 study guide feb 2015Palo alto networks pcnse6 study guide feb 2015
Palo alto networks pcnse6 study guide feb 2015
 
Caleb 'Muyiwa Akande's CV
Caleb 'Muyiwa Akande's CVCaleb 'Muyiwa Akande's CV
Caleb 'Muyiwa Akande's CV
 

Similar a Mohamed Anis Ahmed 2

instrument supervisor
instrument supervisorinstrument supervisor
instrument supervisor
hosam issa
 
C.V- 2015 Last
C.V- 2015 LastC.V- 2015 Last
C.V- 2015 Last
Ali Saleh
 
Mohamed Mady C
Mohamed Mady CMohamed Mady C
Mohamed Mady C
ENGADAM
 
Mohammed Walid C.v-2
Mohammed Walid C.v-2Mohammed Walid C.v-2
Mohammed Walid C.v-2
walid agamy
 
CV OF AHMED AHMED ELSAED 27 OCT 2015
CV OF AHMED AHMED ELSAED 27 OCT 2015CV OF AHMED AHMED ELSAED 27 OCT 2015
CV OF AHMED AHMED ELSAED 27 OCT 2015
ahmed elsyed
 
Wael zahran CV 8- 2016
Wael zahran CV 8- 2016Wael zahran CV 8- 2016
Wael zahran CV 8- 2016
wael zahran
 
Rotating_Equipment_Maintenance_Engineer
Rotating_Equipment_Maintenance_EngineerRotating_Equipment_Maintenance_Engineer
Rotating_Equipment_Maintenance_Engineer
Amgad Ismail
 
mamdouh fawzy CV----
mamdouh fawzy CV----mamdouh fawzy CV----
mamdouh fawzy CV----
MAMDOUH FAWZY
 
Mohamed Abdallah Kamal-CV
Mohamed Abdallah Kamal-CVMohamed Abdallah Kamal-CV
Mohamed Abdallah Kamal-CV
Mohamed ?bdalla
 
OIL GAS Sr.INST, TEL TECHNICIAN CV
OIL GAS Sr.INST, TEL TECHNICIAN CVOIL GAS Sr.INST, TEL TECHNICIAN CV
OIL GAS Sr.INST, TEL TECHNICIAN CV
afsar Sayed
 

Similar a Mohamed Anis Ahmed 2 (20)

instrument supervisor
instrument supervisorinstrument supervisor
instrument supervisor
 
C.V- 2015 Last
C.V- 2015 LastC.V- 2015 Last
C.V- 2015 Last
 
Mohamed Mady C
Mohamed Mady CMohamed Mady C
Mohamed Mady C
 
Mohammed Walid C.v-2
Mohammed Walid C.v-2Mohammed Walid C.v-2
Mohammed Walid C.v-2
 
Zulfiqar - Cv
Zulfiqar - CvZulfiqar - Cv
Zulfiqar - Cv
 
CV OF AHMED AHMED ELSAED 27 OCT 2015
CV OF AHMED AHMED ELSAED 27 OCT 2015CV OF AHMED AHMED ELSAED 27 OCT 2015
CV OF AHMED AHMED ELSAED 27 OCT 2015
 
fire & gas specialsit
fire & gas specialsitfire & gas specialsit
fire & gas specialsit
 
Shibu Thomas-CV
Shibu Thomas-CVShibu Thomas-CV
Shibu Thomas-CV
 
Fekry NEW 2NEW 2015 qatargas=segas
Fekry NEW 2NEW 2015 qatargas=segasFekry NEW 2NEW 2015 qatargas=segas
Fekry NEW 2NEW 2015 qatargas=segas
 
Wael zahran CV 8- 2016
Wael zahran CV 8- 2016Wael zahran CV 8- 2016
Wael zahran CV 8- 2016
 
MEP Manager CV)
MEP Manager CV)MEP Manager CV)
MEP Manager CV)
 
Rotating_Equipment_Maintenance_Engineer
Rotating_Equipment_Maintenance_EngineerRotating_Equipment_Maintenance_Engineer
Rotating_Equipment_Maintenance_Engineer
 
Mohamed Abdallah CV
Mohamed Abdallah CVMohamed Abdallah CV
Mohamed Abdallah CV
 
Moh roshdy curriculum vitae docxaaa
Moh roshdy curriculum vitae docxaaaMoh roshdy curriculum vitae docxaaa
Moh roshdy curriculum vitae docxaaa
 
MOTAZ ALI C.V LAST UPDATE
MOTAZ ALI C.V LAST UPDATEMOTAZ ALI C.V LAST UPDATE
MOTAZ ALI C.V LAST UPDATE
 
mamdouh fawzy CV----
mamdouh fawzy CV----mamdouh fawzy CV----
mamdouh fawzy CV----
 
Mohamed Abdallah Kamal-CV
Mohamed Abdallah Kamal-CVMohamed Abdallah Kamal-CV
Mohamed Abdallah Kamal-CV
 
OIL GAS Sr.INST, TEL TECHNICIAN CV
OIL GAS Sr.INST, TEL TECHNICIAN CVOIL GAS Sr.INST, TEL TECHNICIAN CV
OIL GAS Sr.INST, TEL TECHNICIAN CV
 
Moh cv
Moh cvMoh cv
Moh cv
 
Engineer Mostafa Al Wakeel C.V.-2019
Engineer Mostafa Al Wakeel C.V.-2019Engineer Mostafa Al Wakeel C.V.-2019
Engineer Mostafa Al Wakeel C.V.-2019
 

Mohamed Anis Ahmed 2

  • 1. Mohamed Anis Ahmed 626 St., Beside Al-mohands central, El-Mandare, Alexandria, Egypt Mobile: +201005131825 Mobile :+201277110154 MOHAMEDANIS87@HOTMAIL.COM ANISSO54@YAHOO.COM I submit hear my CV hopping it will meet your requirement PERSONAL INFORAMTION: Date of Birth 22/2/1981 Qualification I&C supervisor Marital Status Married Military status Final exempted. Drive License Valid. EDUCATION: Institution Town Duration Graduation DON BOSCO Alexandria 3 years Date Degree Major Grade 1997 Tech. Diploma ELECTROMECHANIC V. Good POSITION - I & C SUPERVISOR. WORK EXPERIENCE - Instrument Laboratory and Safety valve Activities -Installation, Calibration, Pre-commissioning, Commissioning, loop cheek, Startup and Troubleshooting for All field instruments.  supervising the pre‐commissioning, commissioning and start‐up of measuring and controlling Loops.  Testing, installation, calibration, configuration, maintenance, troubleshooting for instruments as: Foxboro, Masoneillan, Fisher‐Rosemount, Honeywell.  Loop checking and maintenance for Systems as: PLC‐Allan Bradley, Bentley ‐Nevada Monitoring System, Delta V‐DCS and HIMA‐ESD. -Checking for as per drawings instruments installation, proper connections to process and Wiring links between instruments, marshaling cabinets and DCS cabinets or controlpanels according with loop diagrams  Checking and adjusting range limits according with data sheets, verifying calibration, recalibrate
  • 2.  working with equipment available on the platform: ROSEMOUNT, ABB, KROHNE, YOKOGAWA, SIEMENS, HONEYWELL, DRUCK, MOBREY, DCS System YOKOGAWA AND EMERSON.  Specific tools used: HART Communicators 275 & 375,475YOKOGAWA WORK WITH LIQUID AND GAS ANALYZER`S ( PH,CONDUCTIVITY,QXYMITTER 4000ROSEMOUNTAND IN SIDE THE ANALYZER HOUSE).  After start‐up: technical assistance, maintenance and troubleshooting for all instrumentation& control equipment's I WORK IN GE TURBINE PGT10,FRAME5, FRAME 7 Field experience:- 05/2015 up to now XERVON TO TKIS COMPANY (UDHE) ENPC PETROCHAMICAL PLANT FOR AMMONIA AND UREA (EGYPT) GENERAL ELECTRIC STEAM GAS TURBINE 09/2014 up to 04/2015 EGYPTION MAINTANANCE COMPANY (EMC) BASRA GAS COMPANY (BGC) & SHELL IRAQ. IRAQ GAS FIELD PROJECT 05/2014 up to 09/2014 RASPITCO PETROLUM COMPANY. MAINTANANCE FOR ALL RASHID PLANT`S Two gas compressors station (Nouvo Pignone) controlled by HIMA & MARK VI PLC. 09/2013 up to 03/2014 BARMAG (INDIAN COMPANY) EGYPTION INDIAN COMPANY FOR POLESTER ( EIPT). 12/2011 up to 05/2013 TECHINT CIMIMONTUBI -NIGERIA LTD ESCRAVOS GAS TO LIQUIDS PROJECT - EGTL. ESCRAVOS, NIGERIA. -(SGC main contractor and Chevron the client (CNL( 10/2010 up to 04/2011 ALEX. MAINTENANCE COMPANY (PETROMAINT). E-methanex Methanol Plant Damietta 1 Project. Project instrument consultant 12/2008 up to 08/2010 TECHINT CIMIMONTUBI .E-methanex Methanol Plant Damietta 1 Project. Project instrument consultant MANTURBO COMPRESSOR 05/2008 up to12/2008 Kellogg Brown And Root International Inc. (KBR). EBIC 2000 MTPD KAAP AMMONIA PLANT SUEZ INDUSTRIAL ZONE, EGYPT. MANTURBO COMPRESSOR
  • 3. 03/2008 up to 05/2008 Techint cimimontubi & General Electric El Kureimat 3 750MW Combined Cycle Project. Upper Egypt Electricity Production Company. 01/2007 up to01/2008 Techint Cimimontubi TSKJ . NLNG Project -Bonny Island-Nigeria. MR AND PR COMPRESSORS ( NOUVA PIGNONE) 09/2005 up to 01/2006 Carlo Gavazzi &Bonatti&Snamprogetti Lummus Gas LTD. WLGP Mellitah Plant. (LIBYA). 07/2005 up to 09/2005 E.M.C. (San Mesr). Liquefied Natural Gas In ADKO, Egypt. MR AND PR COMPRESSORS ( NOUVA PIGNONE 02/2005 up to 06/2005 Burullus Gas Co. (SIMIAN / SIENNA & SAPPHIRE Project). 01/2005 up to 02/2005 Burullus Development (SCARAB De-bottle Necking project). 05/2004 up to 12/2004 DLC. (Liquefied Natural Gas (LNG) in Damietta Egypt. MR AND PR COMPRESSORS ( NOUVA PIGNONE) 09/2003 up to 05/2004 Raspitco Petroleum Co., (Rosetta Field Gas Compressor). Two gas compressors station (Nouvo Pignone) controlled by HIMA & MARK VI PLC. 10/2002 up to08/2003 ESC & EDF Egyptian Engineering Company (France) Egypt Boot. Project East Port Said. Gas–Fuel Fired Power Plant of 2x 340MW Unit. 04/2002 up to 10/2002 ECS & EDF EGYPTION, ENGINEERING COMPANY (France). Egypt Boot Project, Suez Gulf. Gas-Fuel Fired Power Plants Of 2 X 340MW Units. 01/2002 up to 04/2002 PPC & Technical Reunites (Tr). Aspic Specialty Products Company. 07/2001up to 01/2002 Carlo Gavazzi ( Italian ) & Foster Wheeler ( France ). Amoc Lube Oil Expansion Project Site. 10/2000up to 06/2001 Daelim industrial (Korean) & TTIL (Italian). El Amera - Free Zoon - Egypt Midor (Middle East Oil Refinery). 05/2000 up to 10/2000 Techint Cimimontubi (Italian). Suez project 120.000 MTA poly propylene plant.
  • 4. 01/1997up to 05/2000 Techint Cimimontubi (Italian). sidi kerir project power station 2x 320 mw . GENERAL KNOWELDGE: Control Systems: - DCS (Distributed Control Systems_ - PLC (Programmable Logic Control) Instrumentation: - Indicators Gauges, Transmitters (Level, Flow, Pressure and Temperature. Smart Tip And Foundation Field Bus Tip) Control Valve, safety valve & Control systems. - Foundation Field Bus Instrumentation & Control. LANGUAGES: Native Language : Arabic Foreign Language: Italian & English COMPUTER ABILITIES Microsoft Windows, Office (Word, Excel, Power Point), Internet