SlideShare una empresa de Scribd logo
1 de 28
Descargar para leer sin conexión
PROGRESS
REPORT
As of 1st February 2013
www.vision2030.go.ke




     The Kenya Vision 2030 is the national
   long-term development blue-print that
     aims to transform Kenya into a newly
    industrializing, middle-income country                                                                 OVERVIEW OF
                                                                                                             THE VISION
    providing a high quality of life to all its
     citizens by 2030 in a clean and secure
   environment whilst making the country
                       globally competitive.
                                                                 realize an issue-based, people-centred, result-    Progress has been made in the achievement of
        The Vision comprises of three key pillars:               oriented and accountable democratic system.        projects outlined in the development blueprint
  Economic; Social; and Political. The Economic                                                                    through concerted efforts by the implementing
     Pillar aims to achieve an average economic                       The three pillars are anchored on the        Agencies, comprising of all Ministries and other
     growth rate of 10 per cent per annum and                      foundations of macroeconomic stability;                               Government Departments.
sustaining the same until 2030. The Social Pillar                     infrastructural development; Science,
 seeks to engender just, cohesive and equitable              Technology and Innovation (STI); Land Reforms;        The following chapters detail the progress made
        social development in a clean and secure               Human Resources Development; Security and                and the outlined plans for the next 5 years,
  environment, while the Political Pillar aims to                                     Public Sector Reforms.                                       running to 2017.
www.vision2030.go.ke




             ECONOMIC
                PILLAR
2                        PROGRESS REPORT     www.vision2030.go.ke




    Tourism                                                                                                     •	 Under the niche products development the
                                                                                                                   Chyulu Hills Leviathan Cave development
                                                                                                                   phase one is complete.
                                                                                                                •	 Launch of UdoBandas completed and
    Areas of Progress
                                                                                                                   renovations done in Oribi House in Ruma
    •	 The Health Spa at Hells Gate is now complete.                                                               National Park.The Via Ferrata climbing trail
                                                              •	 Kenya Wildlife service has encouraged
       This tourism product is being undertaken                                                                    on Mt. Kenya. Technical rock climbing area
                                                                 tourists to tour underutilized parks. The
       by The KenGen Company to utilize the hot                                                                    improved with the help of donors. The
                                                                 underutilized parks have also been branded
       springs and geothermal resources within                                                                     Narumoru route can now be used by more
                                                                 and themes developed for each.
       Hell’s Gate National park.                                                                                  people of differing abilities.
                                                              •	 Kenya Wildlife Service reviewed conservation
    •	 A  5000 capacity Mombasa Convention                                                                      •	 The County Council of Isiolo has donated the
                                                                 fees in January 2012 for the Premium parks
       Centre (MCC) is being constructed by the                                                                    land for the Isiolo Resort City and is in the
                                                                 (L. Nakuru and Amboseli) to USD 80 up from
       Kenya Tourism Development Corporation                                                                       process of finalizing the documentation.
                                                                 USD 60 in low season and USD 75 in high
       (KTDC) at the Mombasa Haller Park. The
                                                                 season for international visitors.             •	 Land identified for the Turkana Resort City at
       feasibility study has been done by the
                                                              •	 The newly refurbished Naishi guest house at       Elliye Springs. Land has also been identified
       International Finance Corporation(IFC) on the
                                                                 Nakuru Premium Park has been opened.              for the Lamu Resort City.
       MCC and is being evaluated.
www.vision2030.go.ke   PROGRESS REPORT                          3




                                                    Agriculture
                                                   •	 The feasibility study on local fertilizer
Areas of Progress                                     manufacturing has been analyzed and the
•	 The Kenya Vision 2030 identifies                   process of engaging a strategic private
   ‘Consolidated Agricultural Reform’ as one          investor is on-going though an international
   of the key flagship projects for the period        expression of interest. The technical                   •	 Feasibility studies and detailed designs for the
   2008–2012.                                         evaluations are at an advanced stage.                      expansion of the 10,000 ha Turkana Irrigation
•	 Agricultural efficiency is at the core of the                                                                 Project have been completed and the ground
                                                   •	 The establishment of disease free zones
   three agriculture acts published in January                                                                   breaking ceremony presided over by the
                                                      in Arid and Semi-Arid, the Designs for 13
   2013. These acts are: The Agriculture, Fish                                                                   Prime Minister in August, 2012.
                                                      offices and laboratories in the coastal region
   and Food Authority act, 2012; The Crops            are ready and contracting is on-going. This             •	 In the Tana Delta 4,654 ha  expanded for
   Development act 2012; and the Agricultural         programme will cover all the six counties in               irrigation i.e. Bura-3238 ha in 2012 from 809
   and livestock Research act, 2012.                  the region: Lamu, Taita Taveta, Tana River,                ha in 2008; Hola-1416 ha in 2012 from 0 ha
•	 On the fertilizer cost reduction initiative,       Kilifi, Kwale and Mombasa.                                 in 2008.
   the Government has been procuring and           •	 For the Arid and Semi- Arid Lands (ASALs),              •	 On national development, expansion and
   distributing fertilizer at a subsidized rate       irrigation projects have been undertaken to                rehabilitation of irrigation infrastructure, Area
   to farmers across the country in order to          support small scale farmers in Turkana and                 under irrigation increased from 119,200 ha in
   stabilize fertilizer prices.                       the Tana delta.                                            2008 to 153,800 ha in 2012.
4                      PROGRESS REPORT    www.vision2030.go.ke




                                                                         Wholesale and
                                                                           retail trade
    Areas of Progress
    ●	 The Mombasa SEZ is being implemented                ●	 2,000 square kms of land in the Greater          first reading in parliament.The 50 acre Tier
       simultaneously with the Dongo Kundu Free               Mombasa area and 700 square kms of land in       One market land in Athi River and the 20 acre
       Transshipment Port (Mombasa).                          Lamu have been identified for the SEZs.          Wholesale Hub land in Maragua have been
    ●	 The Dongo Kundu Free Transshipment Port             ●	 The SEZ Bill and Policy already approved by      fenced and preliminary designs done by the
       (Mombasa) will cover 3000 acres.                       the cabinet and the bill  has gone through the   Ministry of Public Works.
www.vision2030.go.ke     PROGRESS REPORT                        5




                                                    Manufacturing Sector
Areas of Progress
●	 The Vision Delivery Secretariat has endorsed,        plans for Eldoret, Juja and Taita Taveta 		                      	    allowance for engineers teaching in 	
   a new private sector driven flagship project;        is on course.                                                    	    public training institutions is on course.
   the Latex Manufacturing plant.                   ●	 On training of engineers and                                 ●	 On Transformation of KIRDI, KIRDI has
●	 The National Industrialization Policy and Bill      technicians, 	                                                  started building regional offices all over the
   2012 have been approved by cabinet .             	   1   Plans for Approval and financing of 		                     country beginning with Kisumu and Eldoret
●	 The Jomo Kenyatta University of Agriculture          	 the upgrading of twelve (3 Universities, 	                   and increasing the number of researchers
   and Technology have donated 32 acres of              	 3 National Polytechnics, 3 National 	                        from 115 to 170.
   land for the development of the Nairobi              	 Training Institutes and 3Youth 	           	              ●	 A Memorandum of Understanding has been
   Industrial and Technology Park in Juja.               	 Polytechnics) training institutions  	 	                    signed to develop a Mini & Integrated Iron
●	 A 20 acre piece of land has also been                    	 into centres of excellence in engineering      	         and Steel Mills in Kenya as a collaborative
   identified and secured in TaitaTaveta for the        	 training at Khs.12.0 Billion is on course.                   effort between the Numerical Machining
   SME Park.                                        	   2	 Review of terms and conditions 	 	                          Complex and POSCO, a private South Korean
                                                              of service of the engineering profession 	               Steel company and the third largest steel
●	 Project proposals for these parks have been
                                                        	 and the introduction of non-practicing 	                     maker in the world.
   developed and approved and the master
6                        PROGRESS REPORT      www.vision2030.go.ke




    Information Technology Enabled
    Services (ITES/BPO) Sector
    Areas of Progress
    ●	 The Konza Technology City master plan has                     and supplying water to the city.
       been developed and approved.                            ●	 A multipurpose dam has been designed
    ● The Technocity is planned on a 	                            for supply of water to the city and the
      5,000 acre land and fencing is complete.                    neighboring communities.
    ●	 The Ground breaking ceremony for the                    ●	 A 10 km buffer zone has been created
       Konza Technology City was presided on                      around the city.
       by His Excellency the President Hon. Mwai               ●	 The legal notice on the establishment of the
       Kibaki on the 23nd January 2013.                           Konza Technolopolis Development Authority
    ●	 Nine boreholes have been earmarked for                     (KOTDA) has already been gazetted and the
       drilling out of which four boreholes drilled               board appointed.
www.vision2030.go.ke   PROGRESS REPORT   7




Areas of Progress
●	 The NSE Growth Enterprise Market Segment
   (GEMS) was launched on the 22nd January
   2013. This market segment will cater for
   the public listing of Small and 	
   Medium Enterprises.
●	 A Concept Note on the Nairobi International
                                                 Financial Services Sector
   Financial Services Centre has been
   developed and reviewed.
●	 The NIFC steering committee has been
   appointed and gazetted.
●	 Real Estates Investment Trusts (REITS) have
   been gazetted.
●	 With reference to the deepening of the
   capital markets, bond trading has been
   automated and maturity lengthened to 	
   30 years.
●	 The Capital Markets Master Plan Steering
   Committee has been inaugurated to develop
   the Kenya’s securities markets for the next
   ten years.
SOCIAL
PILLAR
www.vision2030.go.ke   PROGRESS REPORT                    9




                                   Education and Training
Areas of Progress                                                   total of 46 constituencies in ASALs
● 	 The new education policy framework and                    ● 	 Rehabilitation of 560 schools during the
    related legislation in is place. This includes                current MTP has been achieved.
    eight (8) Acts of Parliament and Sessional                ● 	 Under the computer supply programme
    Papers on Education, TIVET and ST&I.                          total of 1, 021 secondary schools received
● 	 21,400 primary and 600 post primary                           computers against a target of 1,050
    teachers recruited against a target of                        secondary schools in the current MTP.
    28,000 in the current MTP.                                Major Challenges
● 	 5 public secondary schools from                           ●	 Existence of regional inequalities in terms
    each constituency are targeted for                           of access and quality
    comprehensive ICT infrastructure
                                                              ● 	 Increasing pupil teacher ratio
● 	 Rehabilitated, expanded and equipped 37
    boarding primary schools in 23 out of a
10                       PROGRESS REPORT       www.vision2030.go.ke




         Environment,
     Water & Sanitation
     Areas of Progress
     ●	 A twenty (20) year National Forestry Plan                     complex is complete.                       ●	 Mapping of Kitengela Wildlife and pastoral
        aimed at increasing the current forest                  ●	 Catchment areas around the Lake Victoria         zone is on-going.
        cover to 10% developed.                                    Basin and the lakes catchment were            ●	 National action Plan on climate change
     ●	 5,441 ha of industrial forest plantation                   rehabilitated.                                   is finalized.
        and 415,393ha of natural forest have                    ●	 The establishment of a 9 kilometer wildlife
        been rehabilitated.
                                                                                                                 Major Challenges
                                                                   corridor linking Mt. Kenya Forest Reserve
                                                                                                                 ●	 Kenya’s vulnerability to climate change.
     ●	 The proportion of land under forest cover                  and Lewa Wildlife Conservancy (LWC)
        increased marginally from 3.47% to 3.82%                   to the North East of Mt. Kenya has been       ●	 Politicization of resettlements after
                                                                   finalized and is now operational.                evictions from catchment areas.
     ●	 Digital map for all 22 forest blocks
        constituting the Mau Forest                                                                              ●	 Increasing incidences of wildlife poaching
www.vision2030.go.ke   PROGRESS REPORT   11




                                                                                                          Youth &
                                                                                                          Sports
Areas of Progress
● 	 The Sports Act 2013 is in place paving       ●	 Youth Enterprise Development Fund
    way the streamlining and management of          (YEDF) has increased from KShs 2.2 billion
    sports. Key is establishment of the Kenya       in 2009 to KShs 6.5 billion in 2012.
    Academy of Sports, the Sports Tribunal and   ●	 YEDF Fund has expanded through leverage
    the Sports Fund.                                agreements between the Ministry of Youth
●	 The National Youth Policy is developed.          and Sports and financial institutions
   It spells out strategic areas that must be    Major Challenges
   addressed in order for Kenya’s youth to
                                                 ●	 Acquisition of building sites for
   play their role in nation building
                                                    sports stadia
●	 Piloting of a new curriculum is on-going in
                                                 ●	 Bureaucracies especially in acquisition of
   47 youth polytechnics (YPs)
                                                    bills of quantities
●	 355 youth polytechnics have been
                                                 ●	 Low capacity in YPs
   equipped with basic and specialized tools
12                        PROGRESS REPORT     www.vision2030.go.ke




                                                                     Health
     Areas of Progress                                                        ●	 Under the community health strategy 2530
     ●	 Rehabilitation of health facilities:                                     community units are established. This is to
        Cumulatively, 70 per cent are completed,                                 empower households and communities to
        21 per cent are over half complete and all                               take charge of improving their own health.
        repairs are 93 per cent complete.                                     ●	 Under the output based approach (OBA)
     ●	 De-linking the Ministry of Health from                                   phase l and ll, a total of 154, 489 deliveries
        service delivery: A process of finalizing                                and increased numbers of anti-natal care
        the Health Policy to get it enacted as                                   visits were supported.
        envisaged in the Blue Print has began.                                ●	 A comprehensive human resource strategy
     ●	 Equitable health financing mechanism: the                                was developed and launched to address
        government rolled out a comprehensive                                    staff recruitment, deployment and training
        medical scheme for Civil Servants and                                 ●	 The Kenya Medical Supplies Authority
        the Police through the National Hospital                                 Act is in place. This effectively establishes
        Insurance Fund. This scheme is expected to                               KEMSA as a state corporation.
        be extended to teachers and other groups.
                                                                              Major Challenges
     ●	 The health sector services Fund (HSSP)
        and Hospital Management Services Fund                                 ●	 Increase in non communicable diseases
        (HMSF) were established through legal                                 ●	 Health sector financing is inadequate
        notice to facilitate pooling of resources                             ●	 PPPs are yet to be realized
        from GoK and Development partners
                                                                              ●	 Inequalities in access
        through a sector wide approach (SWAP)
www.vision2030.go.ke   PROGRESS REPORT                   13




          Housing & Urbanization
Areas of Progress
                                                       ●	 The Kenya Informal Settlements
●	 The draft Housing Bill, 2011 which seeks               Improvement Project (KISIP)
   to facilitate the provision of decent                  has commenced.
   and affordable housing to all Kenyans
   was completed.                                      ●	 Construction of markets in Nyeri
                                                          and Kisumu and installation of high
●	 991 civil servants housing units were                  mast floodlighting structures has
   completed in Nairobi while 222 units are               been completed.
   under construction.
●	 National Housing Survey is ongoing. This            Major Challenges
   will provide data for effective planning            ●	 High cost of building materials leading to
   amongst stakeholders                                   low levels of investment in housing
●	 900 units in Kibera were completed under            ●	 Resistance by slum dwellers illegally
   the Slum upgrading program.                            occupying land meant for physical and
●	 Eighty one (81) constituency                           social infrastructure development for
   Appropriate Building and Technologies                  relocation to new sites
   (ABTs) centres have been established                ●	 High cost for land
   and operationalized.                                ●	 Low levels of PPP engagement
14                       PROGRESS REPORT    www.vision2030.go.ke




         Gender, Children And
           Vulnerable Groups
     	   Areas of Progress                                         are benefitting from cash transfer        Major challenges
                                                                   programmes and the Social Protection
     ●	 National Gender and Equality Commission                                                              ● 	 Vulnerable groups in the society
                                                                   Policy is finalized.
        is established as an institution to ensure                                                               continue to be faced by a vicious cycle
        gender provisions in the Constitution are            ●	 Disability fund has been set up to support       of poverty due to stigmatization and
        adhered to.                                             persons with disabilities who have no            limited education.
                                                                source of income.
     ●	 Gender and disability mainstreaming are                                                              ●	 Gender divisions in Line ministries
        incorporated as targets in all MDAs annual           ●	 The Social Assistance Act 2013 is in            and Parastatals are ineffective or non-
        Performance Contracts with standard                     place to provide for establishment of an        functional due to lack of adequate capacity
        intervention indicators.                                institutional framework to implement            and resources
                                                                social assistance programmes.
     ●	 Over 200,000 poor vulnerable households
www.vision2030.go.ke   PROGRESS REPORT                      15




Labour &
Employment   Areas of Progress                                           industry attachees. Industrial Training and
                                                                         Attachment Portal (ITAP) was developed
             ●	 The national manpower survey is in
                                                                         and launched to provide a platform
                progress. This will enable a skill inventory
                                                                         for placements.
                for Kenya.
                                                                    ●	 National Occupational Safety and Health
             ●	 Draft productivity policy and
                                                                       Policy 2012 formulated and approved
                National Productivity Bill 2012 have
                                                                       by cabinet.
                been developed.
             ●	 Strengthening of links between industry,            Major Challenges
                education, training and research                    ●	 Current provident fund (NSSF) is offering
                institution is steadily being realized                 inadequate benefits which are unable to
                through increasing recruitment of                      sustain post retirement life for Kenyans.
www.vision2030.go.ke




                       POLITICAL PILLAR
www.vision2030.go.ke   PROGRESS REPORT                       17




Areas of Progress
Constitution Implementation:                       •	 Integrated public complaint 		
•	 Promulgation of the Constitution 2010 and          handling mechanism.                                    •	 Implemented the recommendations of the
   its implementation.                                                                                          CIPEV (Waki Report).
                                                   •	 Facilitated the formation and management
•	 Good progress in achieving electoral and           of witness protection agency.                          •	 Established and operationalised the National
   judiciary reforms.                                                                                           Cohesion and Integration Commission;

•	 Constitutional offices have been set up. All    Electoral Processes
                                                                                                             TJRC Process
   Acts in relation to the Fifth Schedule of the   •	 Established a new National Voter Register
   Constitution are in place.                         (within a period of 40 days) which currently           •	 TJRC process successfully completed.
•	 Transition Authority in place and providing        contains over 14.3 million registered voters;
   guidelines on devolution process.               •	 Successful infusion of technology in 	 	
                                                                                                             Legal and Counseling
                                                      voter registration.                                    •	 Addressed legal issues affecting post
Rule of law                                                                                                     election violence victims through providing
                                                   National Cohesion and Integration                            legal counselling.
•	 Provided specific amendments on
   police reform legislation (Police Service       •	 Facilitated operationalisation of laws,                •	 Identified key issues for public interest
   Commission Act, National Police Service Act,       policies and practices that counter ethnic,               litigation and developing IDP policy and bill.
   Independent Police Oversight Act and the           race and religious tensions
   Coroner’s bill).                                •	 Coordinated peace and reconciliation
                                                                                                             Democracy and Public Participation
•	 Facilitated effective investigation,               activities through development and                     •	 Enhanced democracy and public
   prosecution and adjudication of corruption         advocacy of relevant policies and                         participation through enactment of 	
   related cases.                                     reconciliation advocacy materials;                        various Acts.
ENABLERS AND MACRO
www.vision2030.go.ke   PROGRESS REPORT                      19

                                                 Airports/Airstrips                                          potential of 30Mw.
                                                 •	 New passenger terminal at Kisumu                      •	 Construction of Menengai 1000MW 	 	
AREAS OF PROGRESS
                                                    international airport completed 	        	               plant ongoing.
Infrastructure Sector                               and launched.                                         •	 Olkaria 4 280MW plant commissioned.
Roads                                            •	 Isiolo international airport runway                   •	 Kipevu III 120MW thermal plant in 	 	
•	 Thika  Highway completed and launched            completed and construction of terminal                   Mombasa commissioned.
•	 Athi- Namanga road completed 	        	          building commissioned.
                                                 •	 JKIA terminal 4 near completion.
                                                                                                          Public Sector Reforms
   and launched.                                                                                          •	 Kenya School of Government established
•	 Email- Oloitokitok road completed.            •	 Rehabilitation of runway at Lodwar 	 	
                                                                                                             with 5 satellite campuses.
•	 Isiolo- Merile road completed.                   Airstrip complete.
                                                 •	 Phase I Embu Airstrip(widening and                    Land Reforms
•	 Emali-Loitoktok and Mai Mahiu-Narok-
                                                    resurfacing of the existing runway and                •	 Rehabilitation of Kericho, Kwale, Nyeri,
   Bomet roads complete.
                                                    taxiway) complete.                                       Kajiado, Garissa, Mandera, Koibatek, Kisumu,
•	 Eastern and Northern by passes in 	   	
                                                 •	 Phase I Nyeri Airstrip (reconstruction and               Kisii, Naivasha, Migori, Kiambu, Nakuru,
   Nairobi completed.
                                                    extension of the runway to 1.3km and the                 Bomet and Ugenya land registries completed
•	 Construction of Turbi-Moyale 	        	
                                                    construction of a taxiway, apron and 	 	              •	 Ministry’s processes and procedures
   Road commissioned.
                                                    fence) complete.                                         reviewed and reengineered.
•	 Construction of Kitale-Lokichar-Lodwar-
                                                                                                          •	 National Spatial Plan ongoing.
   Lokichoggio road ongoing.                     Rail
•	 Construction of Kakamega-Webuye-Kitale        •	 Syokimau railway station completed 	 	                Police Reforms
   road on going.                                   and launched.                                         •	 National police service established.
•	 Construction of Mau Summit-Kericho 	 	        •	 The Makadara and Imara stations currently             •	 Inspector General appointed.
   road ongoing.                                    at 75% and 50% completion respectively.               ICT Sector
•	 Rehabilitation of Njambini-Olkalou-Dundori-   •	 Consultations ongoing with China Exim bank            •	 TEAMS, EASSY, SEACOM and LION have
   Nakuru road complete.                            for funding for Mombasa – Nairobi – Malaba               already landed.
Sea-Ports                                           – Kisumu Standard Gauge Rail.                         •	 Most of the 47 counties are already
•	 Dredging and deepening of Mombasa 	 	         Energy Sector                                               connected with terrestrial fibre optic
   port completed.                               •	 Over 832,000 of the MTP target of 1 million              infrastructure under the National Optic Fibre
•	 Construction of Berth 19 completed.              new customers connected.                                 Backbone Infrastructure (NOFBI) programme.
•	 Groundbreaking for 2nd Container 	    	       •	 17,000 public institutions and shopping
   Terminal conducted.                              centres connected to the grid out of  MTP             Challenges
•	 Groundbreaking for construction of 3 berths      target of 20,000.                                     •	   Funding.
   at Lamu port underway.                        •	 Olkaria II (35MW), Kiambere hydro (82MW)              •	   Lack of quality standards in roads.
                                                    and Ngong wind (5MW) projects completed.              •	   Bureaucratic   procurement procedures.
                                                 •	 Six (6) wells drilled in Menengai; 3 with a           •	   Land for various flagship projects.
20                        PROGRESS REPORT   www.vision2030.go.ke




     Challenges that need to be overcome;




             • Funding                      • Human Capacity/Bureaucracy            • Judicial system.




     • Land for various flagship            • Legislation, pace of legislative   • Negative value system
                                              reforms e.g. procurement law
www.vision2030.go.ke   www.vision2030.go.ke




SECOND MEDIUM TERM PLAN (MTP2)
22                        PROGRESS REPORT      www.vision2030.go.ke




     MTP2: Moving Vision 2030 to the                            10.	 Population, Urbanization and Housing 	
     Second Phase of Implementation                             	    Sector Working Group.                           New Sectors will also be included within the
     The five year implementation plan gives the                11.	 Labour Sector Working Group	           	        pillars, specifically within the Economic Pillar a
     Country an opportunity to reflect on the gains,            	    Cross Cutting Issues/Sectors .                  seventh sector on oil, gas and mineral resources
     challenges and opportunities’ of the national              12.	 Equity and Poverty Elimination Sector 		        will be included.
     development plan.                                          	    Working Group.                                  The discovery oil and gas in Kenya, holds
     The first Medium Term Plan (2008-2012)                     13.	 Science, Technology and Innovation Sector 	     tremendous opportunity for Kenya and will
     progress is expressed though the previous                  	    Working Group.                                  definitely become a driver of economic growth
     score card. The process of  developing the                 14.	 Security Sector Working Group.                  and social development. It will also spur job
     second medium term plan is under way  by                                                                        creation and infrastructure development. To this
                                                                15.	 Public Sector Reforms Sector 	         	        end, the Kenya Vision 2030 Delivery Secretariat
     the lead agency, the Ministry of Planning and              	    Working Group.
     National Development and Vision 2030. This is                                                                   (VDS) undertaking its mandate of providing
     being undertaken through the following sector              16.	 Governance, Judiciary, Security and Rule of 	   strategic leadership for Vision 2030 and has
     working groups:                                            	    Law Sector Working Group.                       resolved to start off the process of making
                                                                17.	 Decentralization Sector Working Group.          Kenya an Oil, Gas and Minerals manufacturing
     MEDIUM TERM PLAN SECTOR                                    18.	 Environment, Water and Sanitation Sector 	
                                                                                                                     and trading hub.
     WORKING GROUPS                                             	    Working Group.                                  The new MTP2 economic pillar flagship 	
     1.	 Tourism Sector Working Group.                                                                               projects are:
                                                                19.	 Gender, Vulnerable Groups & Youth Sector 	
     2.	 Agriculture Sector Working Group.                      	    Working Group.                                  • The cradle of mankind.
     3.	 Wholesale and Retail Trade Sector 	     	              20.	 Macroeconomic Sector Working Group.             • Fisheries industry.
     	   Working Group.                                                                                              • Natural products industry.
                                                                The Second Medium Term Plans Flagship Project  
     4.	 Manufacturing Sector Working Group.                                                                         • The expansion of the sme parks to a 	      	
                                                                focuses on the following broad thematic areas:
     5.	 ICT and BPO Sector Working Group.                      • Creation of Employment.                               total of 47 sme parks in order to cover 	 	
     6.	 Financial Services Sector Working Group.                                                                       the 47 counties.
                                                                • Food Security.
     7.	 Infrastructure Sector Working Group.                                                                        • The single revenue collector.
                                                                • Physical Security.
     8.	 Education, Science and Technology Sector 	                                                                  • Capital markets master planning.
                                                                • Value Systems through the National 	      	
     	   Working Group.                                             Values for Kenya.                                An overview of cross cutting issues under
     9.	 Health Sector Working Group.                           • Climate Change.                                    examination is as follows:
www.vision2030.go.ke   PROGRESS REPORT                     23

Energy                                                       Infrastructure                                      Training of engineers, technologists
                                                                                                                 and technicians

Challenge: Envisioned Rapid industrialization and            Challenge: High cost of infrastructure leading to   Challenge: Low capacity to utilize knowledge,
  adoption of manufacturing.                                   high cost of doing business and reducing level      information in design, production,
                                                               of competitiveness of the country.                  manufacturing and marketing.
Proposals                                                    Proposals                                           Proposal
•	 Conduct an energy mapping survey to                       Focus on National Electronic Single window          Training of Skilled workforce: Engineers,
   generate information on energy requirements
                                                             system and Railway infrastructure.                  Technologists, Technicians and Craftsmen.
   for the manufacturing sector to facilitate
   planning for energy requirements for            
   the country.
•	 Increase to 30% peak energy surplus out
   of the mapping in (i) above within the 2nd      
   MTP period.
•	 Enhance availability of energy to
   manufacturing enterprises to 100%.
•	 Reduce power connection period to
   manufacturing sector to 30 days.



The Science, Technology and Innovation                       Security Sector                                      Lands Sector
(ST&I)

Challenge: Lack of knowledge transfer and                    Challenge: Increasing level of insecurity.          Challenge: Lack of national land mapping.
commercialization of inventions.

Proposal: Knowledge transfer program should                  Proposal: All sectors the identified security and   Proposal
institutionalize internships and industrial                  risk areas. In particular the hot spots in terms    Pursuing the completion of the land spatial plans
attachments, effective linkages with institutions            of energy and roads installations. Physical         so as to enable the estimation of service provision
of higher learning to pilot ST&I needs to                    security, ethnic clashes- volatile regions          requirements. Key alignments are needed for road
be indicated.                                                Institutionalization of the legal frameworks such   networks, tourist circuts, manufacturing plants
                                                             as the Police reforms.                              and parks.
24                        PROGRESS REPORT      www.vision2030.go.ke



     Social Pillar
      Education Sector                                                Health Sector                                                 Environment

      Challenge :  Increased levels of enrollment and need Challenge : Low infrastructural development and   Challenge: Low levels of environmental
      for a more modernized approach to learning.          inadequate equipment.                             management.

      Proposals                                                       Proposals:                                                    Proposals
      Education                                                       One of the flagships proposed is the                          Creation of a national Foundation,  and clear
      School Health and Nutrition: Inter-sectoral                     construction, upgrade and equipping of about                  linkages with other global institutions, that will
      partnerships established between health,                        100 hospitals countrywide to the standard of                  develop a road map for a Green Economy and
      education, the community and the children. Health               level 4 hospitals. There is need for the health               build on emerging initiatives.
      and Water & Sanitation Sectors to provide school                sector to review the health facility infrastructure           improve water resources management (including
      based health services.                                          to address emerging considerations                            increased water retention and storage), and
                                                                      including distance of health facilities and                   mainstream climate change.
      Provision of school infrastructure: Energy Sector               population density.
      to ensure all schools infrastructure have energy
      networks sources installed. The Energy Sector will
      need to factor provision for the number of schools
      needed against the number of children projected to
      be in school.

      Curriculum review and reform: All sectors that
      undertake training need to undertake indicate
      their demands to Kenya Institute of Curriculum
      Development (KICD) for any planned curriculum
      review. For example the youth sector (NYS) and
      TVET institutions.

      ICT Requirements
      Collaboration with ICT Sector to ensure all learning
      institutions (e.g. primary, secondary schools, public
      tertiary institutions, Youth Polytechnics, etc) have
      access to electricity and are provided with ICT
      infrastructure connected to the world wide web.
www.vision2030.go.ke   PROGRESS REPORT                         25




OTHER CROSS-CUTTING AREAS
1. Economic
Enhancement Of Local Content In 	
Government Projects
Government projects world over are meant to          iii. Propose amendments to the Public                    Employment creation
catalyze economic activities through growth of           Procurement and Disposal Act and relevant            The youth and labour sectors need to engage
local industries and creation of employment to           regulations to support the implementation of         in a coss-cutting role to measure  employment
their citizens. However, borne out of experience         (i) and (ii) above.                                  creation against each proposed flagship project.
from the 1st MTP, Government sponsored                                                                        A process to ensure this measure needs to be
flagship projects fell short of this expectations.   One Stop Shop
                                                                                                              coordinated by the MTP Secretariat.
The following measures are proposed to               Registration of businesses (incorporation/
                                                                                                              Public Private Partnership (PPP) frame work
enhance local content in all Government              business name) is still centralized in major urban
                                                                                                              The Bill has since been passed by parliament and
sponsored projects so that the threshold for         towns. Efforts to develop a ‘One-stop-shop’ for
                                                                                                              therefore law. Owing to experience in MTP1,
local content during this 2nd MTP period should      business licensing, registration and taxation
                                                                                                              each sector has continuously face challenges of
be seventy per cent (70%):                           by the Kenya Investment Authority should be
                                                                                                              funding and engaging partnerships to complete
                                                     finalized urgently.
i. Develop and provide guidelines on the                                                                      their proposed projects. This is a critical aspect
   thresholds for local content for projects         Development/Economic Diplomacy                           that each sector needs to articulate to ensure
   and programmes undertaken by public               There is need to have the country establish              realistic goals within this MTP.
   entities. The local content in this context       strong development and economic Independent
                                                                                                              EAC protocol
   will include employment and inputs that are 	     Commissions to build Kenya’s brand globally.
                                                                                                              The social and economic sectors are exposed
   locally available.                                                                                         to the regional integration issues and therefore
                                                     2. Enablers and Macro
ii. Develop guidelines for government sponsored      Devolved system of government                            need to consider the related processes to their
    projects undertaken by international             The sectors are expected to outline the                  sectors. These include flow of goods, people
    companies to ensure sustainable technology       devolved structure and functions. This will              and services, harmonization of the rules of
    transfer and skills enhancement for the 	 	      enable clarity of relationships between counties         origin, labor laws, trade tariffs, shared resources
    local people.                                    and between county and national government.              e.g. Lake Victoria, where applicable.
www.vision2030.go.ke
www.facebook.com/kenyavision2030   
www.twitter.com/@kenyavision2030

Más contenido relacionado

Similar a VISION 2030 PROGRESS REPORT

Tourism Anchor Program
Tourism Anchor ProgramTourism Anchor Program
Tourism Anchor ProgramScott Rains
 
Proposals15march2021
Proposals15march2021Proposals15march2021
Proposals15march2021hayat alishah
 
Uganda investment forum_-_natural_resources_-_einar_bandlien
Uganda investment forum_-_natural_resources_-_einar_bandlienUganda investment forum_-_natural_resources_-_einar_bandlien
Uganda investment forum_-_natural_resources_-_einar_bandlienWilly Mutenza
 
June 2022_Tanzania Country Benefits from Nile Basin Cooperation.pdf
June 2022_Tanzania Country Benefits from Nile Basin Cooperation.pdfJune 2022_Tanzania Country Benefits from Nile Basin Cooperation.pdf
June 2022_Tanzania Country Benefits from Nile Basin Cooperation.pdfPolycarp Otieno Onyango
 
Accenture Vicky Easter Brooke
Accenture   Vicky  Easter BrookeAccenture   Vicky  Easter Brooke
Accenture Vicky Easter Brookecenafrica
 
Mobilizing Young Researchers for Climate Change Mitigation and Community Empo...
Mobilizing Young Researchers for Climate Change Mitigation and Community Empo...Mobilizing Young Researchers for Climate Change Mitigation and Community Empo...
Mobilizing Young Researchers for Climate Change Mitigation and Community Empo...ESD UNU-IAS
 
Zain sustainability-report-english 1
Zain sustainability-report-english 1Zain sustainability-report-english 1
Zain sustainability-report-english 1Business Management
 
Zain sustainability-report-english 1
Zain sustainability-report-english 1Zain sustainability-report-english 1
Zain sustainability-report-english 1Business Management
 
Jan 2022 DR Congo Investment Benefits from NBI Cooperation.pdf
Jan 2022 DR Congo Investment Benefits from NBI Cooperation.pdfJan 2022 DR Congo Investment Benefits from NBI Cooperation.pdf
Jan 2022 DR Congo Investment Benefits from NBI Cooperation.pdfPolycarp Otieno Onyango
 
Manukau matters issue 5 2006
Manukau matters issue 5 2006Manukau matters issue 5 2006
Manukau matters issue 5 2006Vienna Richards
 
Kenya investment benefits from the nile basin cooperation
Kenya investment benefits from the nile basin cooperationKenya investment benefits from the nile basin cooperation
Kenya investment benefits from the nile basin cooperationPolycarp Otieno Onyango
 
Tourismfinal16proposalsbyabad 170315081525
Tourismfinal16proposalsbyabad 170315081525Tourismfinal16proposalsbyabad 170315081525
Tourismfinal16proposalsbyabad 170315081525hayat alishah
 
Tourism final 16 proposals (by abad)
Tourism final 16 proposals (by abad)Tourism final 16 proposals (by abad)
Tourism final 16 proposals (by abad)hayat alishah
 

Similar a VISION 2030 PROGRESS REPORT (20)

Nelsap news april 2020
Nelsap news april 2020Nelsap news april 2020
Nelsap news april 2020
 
Tourism Anchor Program
Tourism Anchor ProgramTourism Anchor Program
Tourism Anchor Program
 
Proposals15march2021
Proposals15march2021Proposals15march2021
Proposals15march2021
 
ASPA-IF4410 - Mixed Use USD
ASPA-IF4410 -  Mixed Use USDASPA-IF4410 -  Mixed Use USD
ASPA-IF4410 - Mixed Use USD
 
Uganda investment forum_-_natural_resources_-_einar_bandlien
Uganda investment forum_-_natural_resources_-_einar_bandlienUganda investment forum_-_natural_resources_-_einar_bandlien
Uganda investment forum_-_natural_resources_-_einar_bandlien
 
June 2022_Tanzania Country Benefits from Nile Basin Cooperation.pdf
June 2022_Tanzania Country Benefits from Nile Basin Cooperation.pdfJune 2022_Tanzania Country Benefits from Nile Basin Cooperation.pdf
June 2022_Tanzania Country Benefits from Nile Basin Cooperation.pdf
 
Accenture Vicky Easter Brooke
Accenture   Vicky  Easter BrookeAccenture   Vicky  Easter Brooke
Accenture Vicky Easter Brooke
 
Mobilizing Young Researchers for Climate Change Mitigation and Community Empo...
Mobilizing Young Researchers for Climate Change Mitigation and Community Empo...Mobilizing Young Researchers for Climate Change Mitigation and Community Empo...
Mobilizing Young Researchers for Climate Change Mitigation and Community Empo...
 
Zain sustainability-report-english 1
Zain sustainability-report-english 1Zain sustainability-report-english 1
Zain sustainability-report-english 1
 
Zain sustainability-report-english 1
Zain sustainability-report-english 1Zain sustainability-report-english 1
Zain sustainability-report-english 1
 
Jan 2022 DR Congo Investment Benefits from NBI Cooperation.pdf
Jan 2022 DR Congo Investment Benefits from NBI Cooperation.pdfJan 2022 DR Congo Investment Benefits from NBI Cooperation.pdf
Jan 2022 DR Congo Investment Benefits from NBI Cooperation.pdf
 
Manukau matters issue 5 2006
Manukau matters issue 5 2006Manukau matters issue 5 2006
Manukau matters issue 5 2006
 
investNarok
investNarokinvestNarok
investNarok
 
Kenya investment benefits from the nile basin cooperation
Kenya investment benefits from the nile basin cooperationKenya investment benefits from the nile basin cooperation
Kenya investment benefits from the nile basin cooperation
 
Emerging Africa Infrastructure Fund
Emerging Africa Infrastructure FundEmerging Africa Infrastructure Fund
Emerging Africa Infrastructure Fund
 
Mission goorgoorlu gsbi 2010
Mission goorgoorlu   gsbi 2010Mission goorgoorlu   gsbi 2010
Mission goorgoorlu gsbi 2010
 
EPCALpaper
EPCALpaperEPCALpaper
EPCALpaper
 
upload web THE JEWEL OF AFRICA.pdf
upload web THE JEWEL OF AFRICA.pdfupload web THE JEWEL OF AFRICA.pdf
upload web THE JEWEL OF AFRICA.pdf
 
Tourismfinal16proposalsbyabad 170315081525
Tourismfinal16proposalsbyabad 170315081525Tourismfinal16proposalsbyabad 170315081525
Tourismfinal16proposalsbyabad 170315081525
 
Tourism final 16 proposals (by abad)
Tourism final 16 proposals (by abad)Tourism final 16 proposals (by abad)
Tourism final 16 proposals (by abad)
 

Más de Muthuri Kinyamu

2013 NATIONAL BRAND AUDIT REPORT
2013 NATIONAL BRAND AUDIT REPORT2013 NATIONAL BRAND AUDIT REPORT
2013 NATIONAL BRAND AUDIT REPORTMuthuri Kinyamu
 
Social Media and Innovation For University Students
Social Media and Innovation For University StudentsSocial Media and Innovation For University Students
Social Media and Innovation For University StudentsMuthuri Kinyamu
 
The Kenya ICT Master Plan 2017- Paul Kukubo
The Kenya ICT Master Plan 2017- Paul KukuboThe Kenya ICT Master Plan 2017- Paul Kukubo
The Kenya ICT Master Plan 2017- Paul KukuboMuthuri Kinyamu
 
Free Laptops for Pupils in Kenya; A Guide on Implementing the Project
Free Laptops for Pupils in Kenya; A Guide on Implementing the ProjectFree Laptops for Pupils in Kenya; A Guide on Implementing the Project
Free Laptops for Pupils in Kenya; A Guide on Implementing the ProjectMuthuri Kinyamu
 
SocialPRO Clubs Featured in Varsity Focus
SocialPRO Clubs Featured in Varsity FocusSocialPRO Clubs Featured in Varsity Focus
SocialPRO Clubs Featured in Varsity FocusMuthuri Kinyamu
 
Possible Solutions to the Crisis in Higher Education in Kenya
Possible Solutions to the Crisis in Higher Education in KenyaPossible Solutions to the Crisis in Higher Education in Kenya
Possible Solutions to the Crisis in Higher Education in KenyaMuthuri Kinyamu
 
The price-of-tribal-politics
The price-of-tribal-politicsThe price-of-tribal-politics
The price-of-tribal-politicsMuthuri Kinyamu
 
Public Relations Effort for an Oxfam Project
Public Relations Effort for an Oxfam ProjectPublic Relations Effort for an Oxfam Project
Public Relations Effort for an Oxfam ProjectMuthuri Kinyamu
 

Más de Muthuri Kinyamu (8)

2013 NATIONAL BRAND AUDIT REPORT
2013 NATIONAL BRAND AUDIT REPORT2013 NATIONAL BRAND AUDIT REPORT
2013 NATIONAL BRAND AUDIT REPORT
 
Social Media and Innovation For University Students
Social Media and Innovation For University StudentsSocial Media and Innovation For University Students
Social Media and Innovation For University Students
 
The Kenya ICT Master Plan 2017- Paul Kukubo
The Kenya ICT Master Plan 2017- Paul KukuboThe Kenya ICT Master Plan 2017- Paul Kukubo
The Kenya ICT Master Plan 2017- Paul Kukubo
 
Free Laptops for Pupils in Kenya; A Guide on Implementing the Project
Free Laptops for Pupils in Kenya; A Guide on Implementing the ProjectFree Laptops for Pupils in Kenya; A Guide on Implementing the Project
Free Laptops for Pupils in Kenya; A Guide on Implementing the Project
 
SocialPRO Clubs Featured in Varsity Focus
SocialPRO Clubs Featured in Varsity FocusSocialPRO Clubs Featured in Varsity Focus
SocialPRO Clubs Featured in Varsity Focus
 
Possible Solutions to the Crisis in Higher Education in Kenya
Possible Solutions to the Crisis in Higher Education in KenyaPossible Solutions to the Crisis in Higher Education in Kenya
Possible Solutions to the Crisis in Higher Education in Kenya
 
The price-of-tribal-politics
The price-of-tribal-politicsThe price-of-tribal-politics
The price-of-tribal-politics
 
Public Relations Effort for an Oxfam Project
Public Relations Effort for an Oxfam ProjectPublic Relations Effort for an Oxfam Project
Public Relations Effort for an Oxfam Project
 

Último

Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxAshokKarra1
 
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYKayeClaireEstoconing
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4JOYLYNSAMANIEGO
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 
Integumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptIntegumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptshraddhaparab530
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSJoshuaGantuangco2
 
Food processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture honsFood processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture honsManeerUddin
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONHumphrey A Beña
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptxmary850239
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxCarlos105
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 

Último (20)

YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptxYOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptx
 
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
Raw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptxRaw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptx
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 
Integumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptIntegumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.ppt
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
 
Food processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture honsFood processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture hons
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptxFINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
 
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptxLEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 

VISION 2030 PROGRESS REPORT

  • 2. www.vision2030.go.ke The Kenya Vision 2030 is the national long-term development blue-print that aims to transform Kenya into a newly industrializing, middle-income country OVERVIEW OF THE VISION providing a high quality of life to all its citizens by 2030 in a clean and secure environment whilst making the country globally competitive. realize an issue-based, people-centred, result- Progress has been made in the achievement of The Vision comprises of three key pillars: oriented and accountable democratic system. projects outlined in the development blueprint Economic; Social; and Political. The Economic through concerted efforts by the implementing Pillar aims to achieve an average economic The three pillars are anchored on the Agencies, comprising of all Ministries and other growth rate of 10 per cent per annum and foundations of macroeconomic stability; Government Departments. sustaining the same until 2030. The Social Pillar infrastructural development; Science, seeks to engender just, cohesive and equitable Technology and Innovation (STI); Land Reforms; The following chapters detail the progress made social development in a clean and secure Human Resources Development; Security and and the outlined plans for the next 5 years, environment, while the Political Pillar aims to Public Sector Reforms. running to 2017.
  • 3. www.vision2030.go.ke ECONOMIC PILLAR
  • 4. 2 PROGRESS REPORT www.vision2030.go.ke Tourism • Under the niche products development the Chyulu Hills Leviathan Cave development phase one is complete. • Launch of UdoBandas completed and Areas of Progress renovations done in Oribi House in Ruma • The Health Spa at Hells Gate is now complete. National Park.The Via Ferrata climbing trail • Kenya Wildlife service has encouraged This tourism product is being undertaken on Mt. Kenya. Technical rock climbing area tourists to tour underutilized parks. The by The KenGen Company to utilize the hot improved with the help of donors. The underutilized parks have also been branded springs and geothermal resources within Narumoru route can now be used by more and themes developed for each. Hell’s Gate National park. people of differing abilities. • Kenya Wildlife Service reviewed conservation • A 5000 capacity Mombasa Convention • The County Council of Isiolo has donated the fees in January 2012 for the Premium parks Centre (MCC) is being constructed by the land for the Isiolo Resort City and is in the (L. Nakuru and Amboseli) to USD 80 up from Kenya Tourism Development Corporation process of finalizing the documentation. USD 60 in low season and USD 75 in high (KTDC) at the Mombasa Haller Park. The season for international visitors. • Land identified for the Turkana Resort City at feasibility study has been done by the • The newly refurbished Naishi guest house at Elliye Springs. Land has also been identified International Finance Corporation(IFC) on the Nakuru Premium Park has been opened. for the Lamu Resort City. MCC and is being evaluated.
  • 5. www.vision2030.go.ke PROGRESS REPORT 3 Agriculture • The feasibility study on local fertilizer Areas of Progress manufacturing has been analyzed and the • The Kenya Vision 2030 identifies process of engaging a strategic private ‘Consolidated Agricultural Reform’ as one investor is on-going though an international of the key flagship projects for the period expression of interest. The technical • Feasibility studies and detailed designs for the 2008–2012. evaluations are at an advanced stage. expansion of the 10,000 ha Turkana Irrigation • Agricultural efficiency is at the core of the Project have been completed and the ground • The establishment of disease free zones three agriculture acts published in January breaking ceremony presided over by the in Arid and Semi-Arid, the Designs for 13 2013. These acts are: The Agriculture, Fish Prime Minister in August, 2012. offices and laboratories in the coastal region and Food Authority act, 2012; The Crops are ready and contracting is on-going. This • In the Tana Delta 4,654 ha expanded for Development act 2012; and the Agricultural programme will cover all the six counties in irrigation i.e. Bura-3238 ha in 2012 from 809 and livestock Research act, 2012. the region: Lamu, Taita Taveta, Tana River, ha in 2008; Hola-1416 ha in 2012 from 0 ha • On the fertilizer cost reduction initiative, Kilifi, Kwale and Mombasa. in 2008. the Government has been procuring and • For the Arid and Semi- Arid Lands (ASALs), • On national development, expansion and distributing fertilizer at a subsidized rate irrigation projects have been undertaken to rehabilitation of irrigation infrastructure, Area to farmers across the country in order to support small scale farmers in Turkana and under irrigation increased from 119,200 ha in stabilize fertilizer prices. the Tana delta. 2008 to 153,800 ha in 2012.
  • 6. 4 PROGRESS REPORT www.vision2030.go.ke Wholesale and retail trade Areas of Progress ● The Mombasa SEZ is being implemented ● 2,000 square kms of land in the Greater first reading in parliament.The 50 acre Tier simultaneously with the Dongo Kundu Free Mombasa area and 700 square kms of land in One market land in Athi River and the 20 acre Transshipment Port (Mombasa). Lamu have been identified for the SEZs. Wholesale Hub land in Maragua have been ● The Dongo Kundu Free Transshipment Port ● The SEZ Bill and Policy already approved by fenced and preliminary designs done by the (Mombasa) will cover 3000 acres. the cabinet and the bill has gone through the Ministry of Public Works.
  • 7. www.vision2030.go.ke PROGRESS REPORT 5 Manufacturing Sector Areas of Progress ● The Vision Delivery Secretariat has endorsed, plans for Eldoret, Juja and Taita Taveta allowance for engineers teaching in a new private sector driven flagship project; is on course. public training institutions is on course. the Latex Manufacturing plant. ● On training of engineers and ● On Transformation of KIRDI, KIRDI has ● The National Industrialization Policy and Bill technicians, started building regional offices all over the 2012 have been approved by cabinet . 1 Plans for Approval and financing of country beginning with Kisumu and Eldoret ● The Jomo Kenyatta University of Agriculture the upgrading of twelve (3 Universities, and increasing the number of researchers and Technology have donated 32 acres of 3 National Polytechnics, 3 National from 115 to 170. land for the development of the Nairobi Training Institutes and 3Youth ● A Memorandum of Understanding has been Industrial and Technology Park in Juja. Polytechnics) training institutions signed to develop a Mini & Integrated Iron ● A 20 acre piece of land has also been into centres of excellence in engineering and Steel Mills in Kenya as a collaborative identified and secured in TaitaTaveta for the training at Khs.12.0 Billion is on course. effort between the Numerical Machining SME Park. 2 Review of terms and conditions Complex and POSCO, a private South Korean of service of the engineering profession Steel company and the third largest steel ● Project proposals for these parks have been and the introduction of non-practicing maker in the world. developed and approved and the master
  • 8. 6 PROGRESS REPORT www.vision2030.go.ke Information Technology Enabled Services (ITES/BPO) Sector Areas of Progress ● The Konza Technology City master plan has and supplying water to the city. been developed and approved. ● A multipurpose dam has been designed ● The Technocity is planned on a for supply of water to the city and the 5,000 acre land and fencing is complete. neighboring communities. ● The Ground breaking ceremony for the ● A 10 km buffer zone has been created Konza Technology City was presided on around the city. by His Excellency the President Hon. Mwai ● The legal notice on the establishment of the Kibaki on the 23nd January 2013. Konza Technolopolis Development Authority ● Nine boreholes have been earmarked for (KOTDA) has already been gazetted and the drilling out of which four boreholes drilled board appointed.
  • 9. www.vision2030.go.ke PROGRESS REPORT 7 Areas of Progress ● The NSE Growth Enterprise Market Segment (GEMS) was launched on the 22nd January 2013. This market segment will cater for the public listing of Small and Medium Enterprises. ● A Concept Note on the Nairobi International Financial Services Sector Financial Services Centre has been developed and reviewed. ● The NIFC steering committee has been appointed and gazetted. ● Real Estates Investment Trusts (REITS) have been gazetted. ● With reference to the deepening of the capital markets, bond trading has been automated and maturity lengthened to 30 years. ● The Capital Markets Master Plan Steering Committee has been inaugurated to develop the Kenya’s securities markets for the next ten years.
  • 11. www.vision2030.go.ke PROGRESS REPORT 9 Education and Training Areas of Progress total of 46 constituencies in ASALs ● The new education policy framework and ● Rehabilitation of 560 schools during the related legislation in is place. This includes current MTP has been achieved. eight (8) Acts of Parliament and Sessional ● Under the computer supply programme Papers on Education, TIVET and ST&I. total of 1, 021 secondary schools received ● 21,400 primary and 600 post primary computers against a target of 1,050 teachers recruited against a target of secondary schools in the current MTP. 28,000 in the current MTP. Major Challenges ● 5 public secondary schools from ● Existence of regional inequalities in terms each constituency are targeted for of access and quality comprehensive ICT infrastructure ● Increasing pupil teacher ratio ● Rehabilitated, expanded and equipped 37 boarding primary schools in 23 out of a
  • 12. 10 PROGRESS REPORT www.vision2030.go.ke Environment, Water & Sanitation Areas of Progress ● A twenty (20) year National Forestry Plan complex is complete. ● Mapping of Kitengela Wildlife and pastoral aimed at increasing the current forest ● Catchment areas around the Lake Victoria zone is on-going. cover to 10% developed. Basin and the lakes catchment were ● National action Plan on climate change ● 5,441 ha of industrial forest plantation rehabilitated. is finalized. and 415,393ha of natural forest have ● The establishment of a 9 kilometer wildlife been rehabilitated. Major Challenges corridor linking Mt. Kenya Forest Reserve ● Kenya’s vulnerability to climate change. ● The proportion of land under forest cover and Lewa Wildlife Conservancy (LWC) increased marginally from 3.47% to 3.82% to the North East of Mt. Kenya has been ● Politicization of resettlements after finalized and is now operational. evictions from catchment areas. ● Digital map for all 22 forest blocks constituting the Mau Forest ● Increasing incidences of wildlife poaching
  • 13. www.vision2030.go.ke PROGRESS REPORT 11 Youth & Sports Areas of Progress ● The Sports Act 2013 is in place paving ● Youth Enterprise Development Fund way the streamlining and management of (YEDF) has increased from KShs 2.2 billion sports. Key is establishment of the Kenya in 2009 to KShs 6.5 billion in 2012. Academy of Sports, the Sports Tribunal and ● YEDF Fund has expanded through leverage the Sports Fund. agreements between the Ministry of Youth ● The National Youth Policy is developed. and Sports and financial institutions It spells out strategic areas that must be Major Challenges addressed in order for Kenya’s youth to ● Acquisition of building sites for play their role in nation building sports stadia ● Piloting of a new curriculum is on-going in ● Bureaucracies especially in acquisition of 47 youth polytechnics (YPs) bills of quantities ● 355 youth polytechnics have been ● Low capacity in YPs equipped with basic and specialized tools
  • 14. 12 PROGRESS REPORT www.vision2030.go.ke Health Areas of Progress ● Under the community health strategy 2530 ● Rehabilitation of health facilities: community units are established. This is to Cumulatively, 70 per cent are completed, empower households and communities to 21 per cent are over half complete and all take charge of improving their own health. repairs are 93 per cent complete. ● Under the output based approach (OBA) ● De-linking the Ministry of Health from phase l and ll, a total of 154, 489 deliveries service delivery: A process of finalizing and increased numbers of anti-natal care the Health Policy to get it enacted as visits were supported. envisaged in the Blue Print has began. ● A comprehensive human resource strategy ● Equitable health financing mechanism: the was developed and launched to address government rolled out a comprehensive staff recruitment, deployment and training medical scheme for Civil Servants and ● The Kenya Medical Supplies Authority the Police through the National Hospital Act is in place. This effectively establishes Insurance Fund. This scheme is expected to KEMSA as a state corporation. be extended to teachers and other groups. Major Challenges ● The health sector services Fund (HSSP) and Hospital Management Services Fund ● Increase in non communicable diseases (HMSF) were established through legal ● Health sector financing is inadequate notice to facilitate pooling of resources ● PPPs are yet to be realized from GoK and Development partners ● Inequalities in access through a sector wide approach (SWAP)
  • 15. www.vision2030.go.ke PROGRESS REPORT 13 Housing & Urbanization Areas of Progress ● The Kenya Informal Settlements ● The draft Housing Bill, 2011 which seeks Improvement Project (KISIP) to facilitate the provision of decent has commenced. and affordable housing to all Kenyans was completed. ● Construction of markets in Nyeri and Kisumu and installation of high ● 991 civil servants housing units were mast floodlighting structures has completed in Nairobi while 222 units are been completed. under construction. ● National Housing Survey is ongoing. This Major Challenges will provide data for effective planning ● High cost of building materials leading to amongst stakeholders low levels of investment in housing ● 900 units in Kibera were completed under ● Resistance by slum dwellers illegally the Slum upgrading program. occupying land meant for physical and ● Eighty one (81) constituency social infrastructure development for Appropriate Building and Technologies relocation to new sites (ABTs) centres have been established ● High cost for land and operationalized. ● Low levels of PPP engagement
  • 16. 14 PROGRESS REPORT www.vision2030.go.ke Gender, Children And Vulnerable Groups Areas of Progress are benefitting from cash transfer Major challenges programmes and the Social Protection ● National Gender and Equality Commission ● Vulnerable groups in the society Policy is finalized. is established as an institution to ensure continue to be faced by a vicious cycle gender provisions in the Constitution are ● Disability fund has been set up to support of poverty due to stigmatization and adhered to. persons with disabilities who have no limited education. source of income. ● Gender and disability mainstreaming are ● Gender divisions in Line ministries incorporated as targets in all MDAs annual ● The Social Assistance Act 2013 is in and Parastatals are ineffective or non- Performance Contracts with standard place to provide for establishment of an functional due to lack of adequate capacity intervention indicators. institutional framework to implement and resources social assistance programmes. ● Over 200,000 poor vulnerable households
  • 17. www.vision2030.go.ke PROGRESS REPORT 15 Labour & Employment Areas of Progress industry attachees. Industrial Training and Attachment Portal (ITAP) was developed ● The national manpower survey is in and launched to provide a platform progress. This will enable a skill inventory for placements. for Kenya. ● National Occupational Safety and Health ● Draft productivity policy and Policy 2012 formulated and approved National Productivity Bill 2012 have by cabinet. been developed. ● Strengthening of links between industry, Major Challenges education, training and research ● Current provident fund (NSSF) is offering institution is steadily being realized inadequate benefits which are unable to through increasing recruitment of sustain post retirement life for Kenyans.
  • 18. www.vision2030.go.ke POLITICAL PILLAR
  • 19. www.vision2030.go.ke PROGRESS REPORT 17 Areas of Progress Constitution Implementation: • Integrated public complaint • Promulgation of the Constitution 2010 and handling mechanism. • Implemented the recommendations of the its implementation. CIPEV (Waki Report). • Facilitated the formation and management • Good progress in achieving electoral and of witness protection agency. • Established and operationalised the National judiciary reforms. Cohesion and Integration Commission; • Constitutional offices have been set up. All Electoral Processes TJRC Process Acts in relation to the Fifth Schedule of the • Established a new National Voter Register Constitution are in place. (within a period of 40 days) which currently • TJRC process successfully completed. • Transition Authority in place and providing contains over 14.3 million registered voters; guidelines on devolution process. • Successful infusion of technology in Legal and Counseling voter registration. • Addressed legal issues affecting post Rule of law election violence victims through providing National Cohesion and Integration legal counselling. • Provided specific amendments on police reform legislation (Police Service • Facilitated operationalisation of laws, • Identified key issues for public interest Commission Act, National Police Service Act, policies and practices that counter ethnic, litigation and developing IDP policy and bill. Independent Police Oversight Act and the race and religious tensions Coroner’s bill). • Coordinated peace and reconciliation Democracy and Public Participation • Facilitated effective investigation, activities through development and • Enhanced democracy and public prosecution and adjudication of corruption advocacy of relevant policies and participation through enactment of related cases. reconciliation advocacy materials; various Acts.
  • 21. www.vision2030.go.ke PROGRESS REPORT 19 Airports/Airstrips potential of 30Mw. • New passenger terminal at Kisumu • Construction of Menengai 1000MW AREAS OF PROGRESS international airport completed plant ongoing. Infrastructure Sector and launched. • Olkaria 4 280MW plant commissioned. Roads • Isiolo international airport runway • Kipevu III 120MW thermal plant in • Thika Highway completed and launched completed and construction of terminal Mombasa commissioned. • Athi- Namanga road completed building commissioned. • JKIA terminal 4 near completion. Public Sector Reforms and launched. • Kenya School of Government established • Email- Oloitokitok road completed. • Rehabilitation of runway at Lodwar with 5 satellite campuses. • Isiolo- Merile road completed. Airstrip complete. • Phase I Embu Airstrip(widening and Land Reforms • Emali-Loitoktok and Mai Mahiu-Narok- resurfacing of the existing runway and • Rehabilitation of Kericho, Kwale, Nyeri, Bomet roads complete. taxiway) complete. Kajiado, Garissa, Mandera, Koibatek, Kisumu, • Eastern and Northern by passes in • Phase I Nyeri Airstrip (reconstruction and Kisii, Naivasha, Migori, Kiambu, Nakuru, Nairobi completed. extension of the runway to 1.3km and the Bomet and Ugenya land registries completed • Construction of Turbi-Moyale construction of a taxiway, apron and • Ministry’s processes and procedures Road commissioned. fence) complete. reviewed and reengineered. • Construction of Kitale-Lokichar-Lodwar- • National Spatial Plan ongoing. Lokichoggio road ongoing. Rail • Construction of Kakamega-Webuye-Kitale • Syokimau railway station completed Police Reforms road on going. and launched. • National police service established. • Construction of Mau Summit-Kericho • The Makadara and Imara stations currently • Inspector General appointed. road ongoing. at 75% and 50% completion respectively. ICT Sector • Rehabilitation of Njambini-Olkalou-Dundori- • Consultations ongoing with China Exim bank • TEAMS, EASSY, SEACOM and LION have Nakuru road complete. for funding for Mombasa – Nairobi – Malaba already landed. Sea-Ports – Kisumu Standard Gauge Rail. • Most of the 47 counties are already • Dredging and deepening of Mombasa Energy Sector connected with terrestrial fibre optic port completed. • Over 832,000 of the MTP target of 1 million infrastructure under the National Optic Fibre • Construction of Berth 19 completed. new customers connected. Backbone Infrastructure (NOFBI) programme. • Groundbreaking for 2nd Container • 17,000 public institutions and shopping Terminal conducted. centres connected to the grid out of MTP Challenges • Groundbreaking for construction of 3 berths target of 20,000. • Funding. at Lamu port underway. • Olkaria II (35MW), Kiambere hydro (82MW) • Lack of quality standards in roads. and Ngong wind (5MW) projects completed. • Bureaucratic procurement procedures. • Six (6) wells drilled in Menengai; 3 with a • Land for various flagship projects.
  • 22. 20 PROGRESS REPORT www.vision2030.go.ke Challenges that need to be overcome; • Funding • Human Capacity/Bureaucracy • Judicial system. • Land for various flagship • Legislation, pace of legislative • Negative value system reforms e.g. procurement law
  • 23. www.vision2030.go.ke www.vision2030.go.ke SECOND MEDIUM TERM PLAN (MTP2)
  • 24. 22 PROGRESS REPORT www.vision2030.go.ke MTP2: Moving Vision 2030 to the 10. Population, Urbanization and Housing Second Phase of Implementation Sector Working Group. New Sectors will also be included within the The five year implementation plan gives the 11. Labour Sector Working Group pillars, specifically within the Economic Pillar a Country an opportunity to reflect on the gains, Cross Cutting Issues/Sectors . seventh sector on oil, gas and mineral resources challenges and opportunities’ of the national 12. Equity and Poverty Elimination Sector will be included. development plan. Working Group. The discovery oil and gas in Kenya, holds The first Medium Term Plan (2008-2012) 13. Science, Technology and Innovation Sector tremendous opportunity for Kenya and will progress is expressed though the previous Working Group. definitely become a driver of economic growth score card. The process of developing the 14. Security Sector Working Group. and social development. It will also spur job second medium term plan is under way by creation and infrastructure development. To this 15. Public Sector Reforms Sector end, the Kenya Vision 2030 Delivery Secretariat the lead agency, the Ministry of Planning and Working Group. National Development and Vision 2030. This is (VDS) undertaking its mandate of providing being undertaken through the following sector 16. Governance, Judiciary, Security and Rule of strategic leadership for Vision 2030 and has working groups: Law Sector Working Group. resolved to start off the process of making 17. Decentralization Sector Working Group. Kenya an Oil, Gas and Minerals manufacturing MEDIUM TERM PLAN SECTOR 18. Environment, Water and Sanitation Sector and trading hub. WORKING GROUPS Working Group. The new MTP2 economic pillar flagship 1. Tourism Sector Working Group. projects are: 19. Gender, Vulnerable Groups & Youth Sector 2. Agriculture Sector Working Group. Working Group. • The cradle of mankind. 3. Wholesale and Retail Trade Sector 20. Macroeconomic Sector Working Group. • Fisheries industry. Working Group. • Natural products industry. The Second Medium Term Plans Flagship Project 4. Manufacturing Sector Working Group. • The expansion of the sme parks to a focuses on the following broad thematic areas: 5. ICT and BPO Sector Working Group. • Creation of Employment. total of 47 sme parks in order to cover 6. Financial Services Sector Working Group. the 47 counties. • Food Security. 7. Infrastructure Sector Working Group. • The single revenue collector. • Physical Security. 8. Education, Science and Technology Sector • Capital markets master planning. • Value Systems through the National Working Group. Values for Kenya. An overview of cross cutting issues under 9. Health Sector Working Group. • Climate Change. examination is as follows:
  • 25. www.vision2030.go.ke PROGRESS REPORT 23 Energy Infrastructure Training of engineers, technologists and technicians Challenge: Envisioned Rapid industrialization and Challenge: High cost of infrastructure leading to Challenge: Low capacity to utilize knowledge, adoption of manufacturing. high cost of doing business and reducing level information in design, production, of competitiveness of the country. manufacturing and marketing. Proposals Proposals Proposal • Conduct an energy mapping survey to Focus on National Electronic Single window Training of Skilled workforce: Engineers, generate information on energy requirements system and Railway infrastructure. Technologists, Technicians and Craftsmen. for the manufacturing sector to facilitate planning for energy requirements for the country. • Increase to 30% peak energy surplus out of the mapping in (i) above within the 2nd MTP period. • Enhance availability of energy to manufacturing enterprises to 100%. • Reduce power connection period to manufacturing sector to 30 days. The Science, Technology and Innovation Security Sector Lands Sector (ST&I) Challenge: Lack of knowledge transfer and Challenge: Increasing level of insecurity. Challenge: Lack of national land mapping. commercialization of inventions. Proposal: Knowledge transfer program should Proposal: All sectors the identified security and Proposal institutionalize internships and industrial risk areas. In particular the hot spots in terms Pursuing the completion of the land spatial plans attachments, effective linkages with institutions of energy and roads installations. Physical so as to enable the estimation of service provision of higher learning to pilot ST&I needs to security, ethnic clashes- volatile regions requirements. Key alignments are needed for road be indicated. Institutionalization of the legal frameworks such networks, tourist circuts, manufacturing plants as the Police reforms. and parks.
  • 26. 24 PROGRESS REPORT www.vision2030.go.ke Social Pillar Education Sector Health Sector Environment Challenge : Increased levels of enrollment and need Challenge : Low infrastructural development and Challenge: Low levels of environmental for a more modernized approach to learning. inadequate equipment. management. Proposals Proposals: Proposals Education One of the flagships proposed is the Creation of a national Foundation, and clear School Health and Nutrition: Inter-sectoral construction, upgrade and equipping of about linkages with other global institutions, that will partnerships established between health, 100 hospitals countrywide to the standard of develop a road map for a Green Economy and education, the community and the children. Health level 4 hospitals. There is need for the health build on emerging initiatives. and Water & Sanitation Sectors to provide school sector to review the health facility infrastructure improve water resources management (including based health services. to address emerging considerations increased water retention and storage), and including distance of health facilities and mainstream climate change. Provision of school infrastructure: Energy Sector population density. to ensure all schools infrastructure have energy networks sources installed. The Energy Sector will need to factor provision for the number of schools needed against the number of children projected to be in school. Curriculum review and reform: All sectors that undertake training need to undertake indicate their demands to Kenya Institute of Curriculum Development (KICD) for any planned curriculum review. For example the youth sector (NYS) and TVET institutions. ICT Requirements Collaboration with ICT Sector to ensure all learning institutions (e.g. primary, secondary schools, public tertiary institutions, Youth Polytechnics, etc) have access to electricity and are provided with ICT infrastructure connected to the world wide web.
  • 27. www.vision2030.go.ke PROGRESS REPORT 25 OTHER CROSS-CUTTING AREAS 1. Economic Enhancement Of Local Content In Government Projects Government projects world over are meant to iii. Propose amendments to the Public Employment creation catalyze economic activities through growth of Procurement and Disposal Act and relevant The youth and labour sectors need to engage local industries and creation of employment to regulations to support the implementation of in a coss-cutting role to measure employment their citizens. However, borne out of experience (i) and (ii) above. creation against each proposed flagship project. from the 1st MTP, Government sponsored A process to ensure this measure needs to be flagship projects fell short of this expectations. One Stop Shop coordinated by the MTP Secretariat. The following measures are proposed to Registration of businesses (incorporation/ Public Private Partnership (PPP) frame work enhance local content in all Government business name) is still centralized in major urban The Bill has since been passed by parliament and sponsored projects so that the threshold for towns. Efforts to develop a ‘One-stop-shop’ for therefore law. Owing to experience in MTP1, local content during this 2nd MTP period should business licensing, registration and taxation each sector has continuously face challenges of be seventy per cent (70%): by the Kenya Investment Authority should be funding and engaging partnerships to complete finalized urgently. i. Develop and provide guidelines on the their proposed projects. This is a critical aspect thresholds for local content for projects Development/Economic Diplomacy that each sector needs to articulate to ensure and programmes undertaken by public There is need to have the country establish realistic goals within this MTP. entities. The local content in this context strong development and economic Independent EAC protocol will include employment and inputs that are Commissions to build Kenya’s brand globally. The social and economic sectors are exposed locally available. to the regional integration issues and therefore 2. Enablers and Macro ii. Develop guidelines for government sponsored Devolved system of government need to consider the related processes to their projects undertaken by international The sectors are expected to outline the sectors. These include flow of goods, people companies to ensure sustainable technology devolved structure and functions. This will and services, harmonization of the rules of transfer and skills enhancement for the enable clarity of relationships between counties origin, labor laws, trade tariffs, shared resources local people. and between county and national government. e.g. Lake Victoria, where applicable.
  • 28. www.vision2030.go.ke www.facebook.com/kenyavision2030 www.twitter.com/@kenyavision2030