WHAT IS ZERO-BASE BUDGETING?

Zero-base Budgeting is a budgeting and financial management strategy to help policy
makers achieve more cost-effective delivery of public services.
The concept of zero-base budgeting has been utilized successfully by private
corporations and recommended for application to the federal budget for some time. For
government use, this planning and budgeting technique endeavors to redirect effort and
funds from lower priority current programs to higher priority new programs, improve
efficiency and effectiveness, and reduce spending.
Traditionally, most government budgets have been constructed by adding to the current
expenditure level such amounts as seem warranted by circumstances. In most
jurisdictions, expenditures for the coming year will exceed those of the current year. For
this reason, most attention is directed to the “increments” that have been added to this
year’s expenditures to reach the proposed budget total. A major flaw in incremental
budgeting is that it assumes the current year’s expenditure level is justifiable and this
may not be true. It may be either too high or too low.
Zero-base budgeting, on the other hand, is a detailed and concentrated study of those
activities that might be considered costly or ineffective and that continue to be funded
primarily because they are never examined.
It may be useful for one or more government programs to be subjected to zero-base
budget analysis every year. In such an analysis it is not assumed that the current year’s
spending for a particular program is justified. On the contrary, the wisdom of spending
any money at all on the program is examined.
These questions are typical for analyses of this type:
   •   Is there any measurable evidence of the value of the program under review?
   •   Are the goals and objectives of the program important enough to warrant the
       expenditure being made?
   •   What would happen if the program were not provided at all?
   •   Are there other less costly and more effective ways of achieving these
       objectives?
   •   Where would the program fit in if all programs were displayed in order of
       importance?
   •   Would the benefits be greater if a portion of the funds spent on the program
       under review were used instead for other programs?
An important element of this budgeting procedure is that it forces prioritization of
government programs and activities. With the prospect of insufficient revenue to match
the demand for spending, it is useful for government to have a ranking of programs and
activities based on proven effectiveness, as well as suggested alternatives to expensive
or ineffective programs.
There are two basic steps to the process of zero-base budgeting. The first step is to
develop what is referred to as “decision packages.” The second is to rank the decision
packages. The decision package is a document that identifies and explains the specific
activity, its goals and objectives, measurement of performance, costs, benefits, and
alternative courses of action. Ranking of decision packages is then accomplished at
each management level until a comprehensive agencywide ranking is obtained.
Conceptually, zero-base budgeting is a systematic logical approach to allocating limited
resources where they will do the most good.
Modified Zero Based Budgeting
Service-level budgeting is a modified zero-base budgeting approach. This concept
matches spending levels with services to be performed. Under zero-base budgeting, a
great deal of effort can be devoted to documenting personnel and expense requirements
that are readily accepted as necessary. Modified zero-base budgeting can avoid this by
starting at a base that is higher than zero. An appropriate starting point for a jurisdiction
might be 80 or 85 percent of current spending levels. High-priority requests above this
level could be identified to restore part or all of the current year’s service levels.
Desirable new programs could also be considered for funding. As a result, a legislative
body might be presented the choice of reducing some current operations in favor of
adopting a new program. Thus a new program might be funded out of savings incurred
by reduction of an existing program. The phrase “service-level budgeting” is in some
cases a better description for this process.

More Related Content

What's hot

Linking Performance and Budgeting: A Framework and Current U.S. Practice
Linking Performance and Budgeting: A Framework and Current U.S. PracticeLinking Performance and Budgeting: A Framework and Current U.S. Practice
Linking Performance and Budgeting: A Framework and Current U.S. PracticeFreeBalance
 
Reserve Study - Financial Analysis
Reserve Study - Financial AnalysisReserve Study - Financial Analysis
Reserve Study - Financial AnalysisJoel Tax
 
Lessons from the US Perfromance Management System by Donald Moynihan
Lessons from the US Perfromance Management System by Donald MoynihanLessons from the US Perfromance Management System by Donald Moynihan
Lessons from the US Perfromance Management System by Donald MoynihanOECD Governance
 
Implementing Strategic Reviews by Mark Bussow
Implementing Strategic Reviews by Mark BussowImplementing Strategic Reviews by Mark Bussow
Implementing Strategic Reviews by Mark BussowOECD Governance
 
Common HOA Budgeting Mistakes for their Reserve Account
Common HOA Budgeting Mistakes for their Reserve AccountCommon HOA Budgeting Mistakes for their Reserve Account
Common HOA Budgeting Mistakes for their Reserve AccountJoel Tax
 
9.00 10.15am How To Initiate A Performance Framework (Pokar Khemani) English
9.00 10.15am How To Initiate A Performance Framework (Pokar Khemani) English9.00 10.15am How To Initiate A Performance Framework (Pokar Khemani) English
9.00 10.15am How To Initiate A Performance Framework (Pokar Khemani) Englishicgfmconference
 
Evolution of budgeting system in malaysia (10 page)
Evolution of budgeting system in malaysia (10 page)Evolution of budgeting system in malaysia (10 page)
Evolution of budgeting system in malaysia (10 page)Mohd Hasim Ujang
 
M&E handout for module 8
M&E handout for module 8M&E handout for module 8
M&E handout for module 8Tony
 
Reforming the reform: Lessons from 15 years of performance budgeting in the N...
Reforming the reform: Lessons from 15 years of performance budgeting in the N...Reforming the reform: Lessons from 15 years of performance budgeting in the N...
Reforming the reform: Lessons from 15 years of performance budgeting in the N...OECD Governance
 
GAO GPRA Modernization Act Overview
GAO GPRA Modernization Act Overview GAO GPRA Modernization Act Overview
GAO GPRA Modernization Act Overview John Kamensky
 
GPRAMA Implementation After Five Years
GPRAMA Implementation After Five YearsGPRAMA Implementation After Five Years
GPRAMA Implementation After Five YearsWashington Evaluators
 
Portfolio management and the ppbe process at the department of energy ppt
Portfolio management and the ppbe process at the department of energy pptPortfolio management and the ppbe process at the department of energy ppt
Portfolio management and the ppbe process at the department of energy pptp6academy
 

What's hot (19)

PIP overview presentation
PIP overview presentationPIP overview presentation
PIP overview presentation
 
CG contact point meeting in Bonn - Introduction
CG contact point meeting in Bonn - IntroductionCG contact point meeting in Bonn - Introduction
CG contact point meeting in Bonn - Introduction
 
Cost benefit analysis
Cost benefit analysisCost benefit analysis
Cost benefit analysis
 
APO Lecture: Best Practices II
APO Lecture: Best Practices IIAPO Lecture: Best Practices II
APO Lecture: Best Practices II
 
Linking Performance and Budgeting: A Framework and Current U.S. Practice
Linking Performance and Budgeting: A Framework and Current U.S. PracticeLinking Performance and Budgeting: A Framework and Current U.S. Practice
Linking Performance and Budgeting: A Framework and Current U.S. Practice
 
Reserve Study - Financial Analysis
Reserve Study - Financial AnalysisReserve Study - Financial Analysis
Reserve Study - Financial Analysis
 
Lessons from the US Perfromance Management System by Donald Moynihan
Lessons from the US Perfromance Management System by Donald MoynihanLessons from the US Perfromance Management System by Donald Moynihan
Lessons from the US Perfromance Management System by Donald Moynihan
 
Implementing Strategic Reviews by Mark Bussow
Implementing Strategic Reviews by Mark BussowImplementing Strategic Reviews by Mark Bussow
Implementing Strategic Reviews by Mark Bussow
 
Result based management
Result based management Result based management
Result based management
 
Budget methods
Budget methodsBudget methods
Budget methods
 
Common HOA Budgeting Mistakes for their Reserve Account
Common HOA Budgeting Mistakes for their Reserve AccountCommon HOA Budgeting Mistakes for their Reserve Account
Common HOA Budgeting Mistakes for their Reserve Account
 
9.00 10.15am How To Initiate A Performance Framework (Pokar Khemani) English
9.00 10.15am How To Initiate A Performance Framework (Pokar Khemani) English9.00 10.15am How To Initiate A Performance Framework (Pokar Khemani) English
9.00 10.15am How To Initiate A Performance Framework (Pokar Khemani) English
 
Chap 8
Chap 8Chap 8
Chap 8
 
Evolution of budgeting system in malaysia (10 page)
Evolution of budgeting system in malaysia (10 page)Evolution of budgeting system in malaysia (10 page)
Evolution of budgeting system in malaysia (10 page)
 
M&E handout for module 8
M&E handout for module 8M&E handout for module 8
M&E handout for module 8
 
Reforming the reform: Lessons from 15 years of performance budgeting in the N...
Reforming the reform: Lessons from 15 years of performance budgeting in the N...Reforming the reform: Lessons from 15 years of performance budgeting in the N...
Reforming the reform: Lessons from 15 years of performance budgeting in the N...
 
GAO GPRA Modernization Act Overview
GAO GPRA Modernization Act Overview GAO GPRA Modernization Act Overview
GAO GPRA Modernization Act Overview
 
GPRAMA Implementation After Five Years
GPRAMA Implementation After Five YearsGPRAMA Implementation After Five Years
GPRAMA Implementation After Five Years
 
Portfolio management and the ppbe process at the department of energy ppt
Portfolio management and the ppbe process at the department of energy pptPortfolio management and the ppbe process at the department of energy ppt
Portfolio management and the ppbe process at the department of energy ppt
 

Viewers also liked

Viewers also liked (8)

Presentation1
Presentation1Presentation1
Presentation1
 
Zero base
Zero baseZero base
Zero base
 
Zero base budgeting ii
Zero base budgeting iiZero base budgeting ii
Zero base budgeting ii
 
Hrm intro 2007 ppt
Hrm intro 2007 pptHrm intro 2007 ppt
Hrm intro 2007 ppt
 
Zero budgeting
Zero budgetingZero budgeting
Zero budgeting
 
Zero based budgeting
Zero based budgetingZero based budgeting
Zero based budgeting
 
Resposibility accounting
Resposibility accountingResposibility accounting
Resposibility accounting
 
Zero Base Budgeting
Zero Base BudgetingZero Base Budgeting
Zero Base Budgeting
 

Similar to Learn about Zero-Base Budgeting and its benefits

Performance based budgeting by sumayya naseem optometrist, mmsph student abas...
Performance based budgeting by sumayya naseem optometrist, mmsph student abas...Performance based budgeting by sumayya naseem optometrist, mmsph student abas...
Performance based budgeting by sumayya naseem optometrist, mmsph student abas...Sumayya Naseem
 
Benefits-led decision making drives value maximisation white paper
Benefits-led decision making drives value maximisation white paperBenefits-led decision making drives value maximisation white paper
Benefits-led decision making drives value maximisation white paperAssociation for Project Management
 
The unwritten rules_of_budgeting
The unwritten rules_of_budgetingThe unwritten rules_of_budgeting
The unwritten rules_of_budgetingMikel Arriaga
 
14 financial administration
14   financial administration14   financial administration
14 financial administrationAnkit Agarwal
 
Example pol 501601 budget and financial management and admini
Example pol 501601 budget and financial management and adminiExample pol 501601 budget and financial management and admini
Example pol 501601 budget and financial management and adminimodi11
 
Anaplan and Deloitte webinar: The fundamentals of zero-based budgeting
Anaplan and Deloitte webinar: The fundamentals of zero-based budgetingAnaplan and Deloitte webinar: The fundamentals of zero-based budgeting
Anaplan and Deloitte webinar: The fundamentals of zero-based budgetingAnaplan
 
Is The Budget Has Outlived Its Usefulness On The 21St...
Is The Budget Has Outlived Its Usefulness On The 21St...Is The Budget Has Outlived Its Usefulness On The 21St...
Is The Budget Has Outlived Its Usefulness On The 21St...Michelle Singh
 
Budget control and budget making techniques in a hospital
Budget control and budget making techniques in a hospitalBudget control and budget making techniques in a hospital
Budget control and budget making techniques in a hospitalmeghadevgan3
 
Budgeting in nursing
 Budgeting in nursing  Budgeting in nursing
Budgeting in nursing Purvi Patel
 
DOC-20230225-WA0005..pdf
DOC-20230225-WA0005..pdfDOC-20230225-WA0005..pdf
DOC-20230225-WA0005..pdfMaharaja870536
 
Principles of Management (MG 6851) Unit 5
Principles of Management (MG 6851) Unit 5Principles of Management (MG 6851) Unit 5
Principles of Management (MG 6851) Unit 5AntBMaro
 
Budgeting for planning and controlling
Budgeting for planning and controllingBudgeting for planning and controlling
Budgeting for planning and controllingCici Salfitri
 
Zero based budgeting: Zero or Hero?
Zero based budgeting: Zero or Hero?Zero based budgeting: Zero or Hero?
Zero based budgeting: Zero or Hero?Mark S. Hopkins
 
Budgeting and cost estimation
Budgeting and cost estimationBudgeting and cost estimation
Budgeting and cost estimationLibra chudry
 
White paper financialmanagementfornpo
White paper financialmanagementfornpoWhite paper financialmanagementfornpo
White paper financialmanagementfornpo1aquibshaikh
 
Reevaluasi Metode Penentuan Prioritas Layanan Pemerintah
Reevaluasi Metode Penentuan Prioritas Layanan Pemerintah Reevaluasi Metode Penentuan Prioritas Layanan Pemerintah
Reevaluasi Metode Penentuan Prioritas Layanan Pemerintah Fahrul Azmi
 
ACTIVITY BASED BUDGETING & BUDGETING CYCLE
ACTIVITY BASED BUDGETING & BUDGETING CYCLEACTIVITY BASED BUDGETING & BUDGETING CYCLE
ACTIVITY BASED BUDGETING & BUDGETING CYCLEANMOL GULATI
 

Similar to Learn about Zero-Base Budgeting and its benefits (20)

Performance based budgeting by sumayya naseem optometrist, mmsph student abas...
Performance based budgeting by sumayya naseem optometrist, mmsph student abas...Performance based budgeting by sumayya naseem optometrist, mmsph student abas...
Performance based budgeting by sumayya naseem optometrist, mmsph student abas...
 
Zero base budgeting
Zero base budgetingZero base budgeting
Zero base budgeting
 
Benefits-led decision making drives value maximisation white paper
Benefits-led decision making drives value maximisation white paperBenefits-led decision making drives value maximisation white paper
Benefits-led decision making drives value maximisation white paper
 
The unwritten rules_of_budgeting
The unwritten rules_of_budgetingThe unwritten rules_of_budgeting
The unwritten rules_of_budgeting
 
14 financial administration
14   financial administration14   financial administration
14 financial administration
 
Example pol 501601 budget and financial management and admini
Example pol 501601 budget and financial management and adminiExample pol 501601 budget and financial management and admini
Example pol 501601 budget and financial management and admini
 
Anaplan and Deloitte webinar: The fundamentals of zero-based budgeting
Anaplan and Deloitte webinar: The fundamentals of zero-based budgetingAnaplan and Deloitte webinar: The fundamentals of zero-based budgeting
Anaplan and Deloitte webinar: The fundamentals of zero-based budgeting
 
Is The Budget Has Outlived Its Usefulness On The 21St...
Is The Budget Has Outlived Its Usefulness On The 21St...Is The Budget Has Outlived Its Usefulness On The 21St...
Is The Budget Has Outlived Its Usefulness On The 21St...
 
BUDGETING TECHNIQUES
BUDGETING TECHNIQUESBUDGETING TECHNIQUES
BUDGETING TECHNIQUES
 
Budget control and budget making techniques in a hospital
Budget control and budget making techniques in a hospitalBudget control and budget making techniques in a hospital
Budget control and budget making techniques in a hospital
 
Budgeting in nursing
 Budgeting in nursing  Budgeting in nursing
Budgeting in nursing
 
DOC-20230225-WA0005..pdf
DOC-20230225-WA0005..pdfDOC-20230225-WA0005..pdf
DOC-20230225-WA0005..pdf
 
Principles of Management (MG 6851) Unit 5
Principles of Management (MG 6851) Unit 5Principles of Management (MG 6851) Unit 5
Principles of Management (MG 6851) Unit 5
 
Budgeting for planning and controlling
Budgeting for planning and controllingBudgeting for planning and controlling
Budgeting for planning and controlling
 
Zero based budgeting: Zero or Hero?
Zero based budgeting: Zero or Hero?Zero based budgeting: Zero or Hero?
Zero based budgeting: Zero or Hero?
 
ZERO BASED BUDGETING.pptx
ZERO BASED BUDGETING.pptxZERO BASED BUDGETING.pptx
ZERO BASED BUDGETING.pptx
 
Budgeting and cost estimation
Budgeting and cost estimationBudgeting and cost estimation
Budgeting and cost estimation
 
White paper financialmanagementfornpo
White paper financialmanagementfornpoWhite paper financialmanagementfornpo
White paper financialmanagementfornpo
 
Reevaluasi Metode Penentuan Prioritas Layanan Pemerintah
Reevaluasi Metode Penentuan Prioritas Layanan Pemerintah Reevaluasi Metode Penentuan Prioritas Layanan Pemerintah
Reevaluasi Metode Penentuan Prioritas Layanan Pemerintah
 
ACTIVITY BASED BUDGETING & BUDGETING CYCLE
ACTIVITY BASED BUDGETING & BUDGETING CYCLEACTIVITY BASED BUDGETING & BUDGETING CYCLE
ACTIVITY BASED BUDGETING & BUDGETING CYCLE
 

Learn about Zero-Base Budgeting and its benefits

  • 1. WHAT IS ZERO-BASE BUDGETING? Zero-base Budgeting is a budgeting and financial management strategy to help policy makers achieve more cost-effective delivery of public services. The concept of zero-base budgeting has been utilized successfully by private corporations and recommended for application to the federal budget for some time. For government use, this planning and budgeting technique endeavors to redirect effort and funds from lower priority current programs to higher priority new programs, improve efficiency and effectiveness, and reduce spending. Traditionally, most government budgets have been constructed by adding to the current expenditure level such amounts as seem warranted by circumstances. In most jurisdictions, expenditures for the coming year will exceed those of the current year. For this reason, most attention is directed to the “increments” that have been added to this year’s expenditures to reach the proposed budget total. A major flaw in incremental budgeting is that it assumes the current year’s expenditure level is justifiable and this may not be true. It may be either too high or too low. Zero-base budgeting, on the other hand, is a detailed and concentrated study of those activities that might be considered costly or ineffective and that continue to be funded primarily because they are never examined. It may be useful for one or more government programs to be subjected to zero-base budget analysis every year. In such an analysis it is not assumed that the current year’s spending for a particular program is justified. On the contrary, the wisdom of spending any money at all on the program is examined. These questions are typical for analyses of this type: • Is there any measurable evidence of the value of the program under review? • Are the goals and objectives of the program important enough to warrant the expenditure being made? • What would happen if the program were not provided at all? • Are there other less costly and more effective ways of achieving these objectives? • Where would the program fit in if all programs were displayed in order of importance? • Would the benefits be greater if a portion of the funds spent on the program under review were used instead for other programs? An important element of this budgeting procedure is that it forces prioritization of government programs and activities. With the prospect of insufficient revenue to match the demand for spending, it is useful for government to have a ranking of programs and activities based on proven effectiveness, as well as suggested alternatives to expensive or ineffective programs. There are two basic steps to the process of zero-base budgeting. The first step is to develop what is referred to as “decision packages.” The second is to rank the decision packages. The decision package is a document that identifies and explains the specific activity, its goals and objectives, measurement of performance, costs, benefits, and
  • 2. alternative courses of action. Ranking of decision packages is then accomplished at each management level until a comprehensive agencywide ranking is obtained. Conceptually, zero-base budgeting is a systematic logical approach to allocating limited resources where they will do the most good. Modified Zero Based Budgeting Service-level budgeting is a modified zero-base budgeting approach. This concept matches spending levels with services to be performed. Under zero-base budgeting, a great deal of effort can be devoted to documenting personnel and expense requirements that are readily accepted as necessary. Modified zero-base budgeting can avoid this by starting at a base that is higher than zero. An appropriate starting point for a jurisdiction might be 80 or 85 percent of current spending levels. High-priority requests above this level could be identified to restore part or all of the current year’s service levels. Desirable new programs could also be considered for funding. As a result, a legislative body might be presented the choice of reducing some current operations in favor of adopting a new program. Thus a new program might be funded out of savings incurred by reduction of an existing program. The phrase “service-level budgeting” is in some cases a better description for this process.