1. MIGRATION Guide to Your First e-Learning Project Dave Goodman SoftAssist, Inc.
2.
3. The next slide addresses some common rationale for investing in eLearning. The Level 1 rational is built upon reducing travel costs, doing low budget training, doing things “quick and cheap”. (low ROI) The upper levels (3 – 5) have their foundations on leverage, increased revenues, improved client satisfaction, etc. (high ROI) Before you migrate a course, find out the investment rationale.
4.
5. Remember – use Blended Learning during Curriculum Development. Pre and post learning elements must be part of your design. ASTD, 2005 study
6.
7. Requirements Analysis Initial Design Prototype Development Review & Edits Development Test Group Review & Edits Approval Quality Control is conducted throughout the project 35% 50% 15% Project Process
12. Level 2 Attributes of a Level 2 Course: Level 1 plus… Animation Stronger Instructional Design Narration More complex assessments Advanced Interactions Effort: 8 - 10 weeks
13. Level 3 Attributes of a Level 3 Course: Level 2 plus… Video Case Scenarios Decision Branching Advanced Instructional Design Performance Based Advanced Interactions Effort: > 10 weeks based upon media required
14. Estimated Project Pricing Levels Level 1 Text, graphics, assessments, some interactions Price: $13 - $15K Level 2 Level 1 + interactions every 3 screens, stronger instructional design, case studies, game, audio, etc. Price: $18K - 22K Level 3 Level 2 + very strong instructional design, animation, video, higher engagement, deeper immersion, etc. Price: $26K and above PowerPoint Conversion Approximately $3K assuming that instructional design effort is included. Template Approximately $7K - $9K
15. In addition to the five levels of elearning discussed, documents and publications can also be converted to online learning training. The pricing for these forms of conversions are usually below $9K. Creating an eBook or flipbook is usually lower in price. Immersive games and virtual reality training are two newer areas of learning that require a separate process and pricing model.
16. Selecting a Project Define a project that has a senior manager who supports it and will act as the project champion. Select a project that has tested and readily available content (if possible). Know your expectations and requirements – be realistic. Understand the information that is presently gathered which might become part of your measurement and analysis tasks, e.g. # of customer objections. Determine if the course should be developed in-house, vendor contract or off-shore outsourcing. Depend upon methods, project management, QC, and team communications to manage the project.
17. Pre-Work SoftAssist uses a 6 page Requirements Analysis document to capture information on needs, measurements, style, colors, assessment, IT standards, media, SCORM, Section 508 compliance and many other concerns.
18. Manage the project flow; establish task deadlines and responsibilities; track changes; and perform quality control throughout.