STRUCTURE PARTS

                                         INTRODUCTION
                                         The glass plant and equipments are supported in a rectangular tubular structure. This
                                         tubular structure consists of galvanized mild steel tubing with cast iron fittings, which is
                                         described in this catalogue. This type of structure provides enough flexibility for future
                                         modifications and is strong enough to support a glass plant.

                                         S.S powder coated tubings and structure parts can also be supplied on request basis.




                                         TUBE SIZE
                                         Since there are various terminologies in common use to determine tube sizes, the following
                                         table is given to compare and relate them to the fitting size reference.


                                                          TUBE                      NOMINAL                    EXTERNAL
                  GUIDE SUPPORT




                                                       DIAMETER                      BORE IN                  DIAMETER IN
                                                       IN INCHES                      MM                          MM

                                                        3/4"                           19                           21.5
                                                        1"                             25                           32.5
                                                        1 1/4"                         30                           41.5
                                                        1 1/2"                         40                           48.3
BRACING IN WALL




                                                        2"                             50                           60.3
                     COUNTER BALANCE




                                         SUPPORTING COLUMN

                                         In the design of tubular steel structure to support glass process plant and pipeline
                         SUPPORT




                                         equipment, a number of basic rules should be followed.

                                         F    The structure should be stiff and should always be braced back to the nearest building
                                              or other stiff feature to give lateral support.

                                         F    All glass units are built up from a fixed point on which whole weight of the column
                                              should be taken. If a total load exceeds the allowable limits, counter balance supports
                                              should be used to relieve excessive weight.

                                         F    All Glass units and their structures expand at different rates as a result of change in
                                              temperature. The unit must, therefore not be subjected to any vertical restraint above
                   GUIDE SUPPORT




                                              the fixed point. Due to this, guides are used which give lateral support without
                                              affecting vertical movement of the glass, relative to the supporting structure. The
                                              distance between guide frames must not exceed 3meters.

                                         F    The whole weight of a column must be taken up from the fixed point. This normally
                                              presents no problem up to DN 300, but with larger columns it may be necessary to take
                                              up some of the weight by means of counterbalance supports.



                                         STRUCTURE FITTINGS
                   GUIDE SUPPORT




                                         Following structure fittings are available to use with galvanized iron tubes in order to form a
                                         tubular structure of a glass plant.

                                         F    These fittings are made of cast iron and are suitable to the galvanize tubes described
                                              earlier.

                                         F    These sliding are provided with grub screws to fix it at required position on galvanized
                                              tube.
                              FPL 0.00
                                         F    These fittings are specially made to construct a tubular structure, which provides
                                              enough flexibility for future modifications without involving any hammering and
                                              welding.


                                                                                                                                  74
PIPELINE COMPONENTS
Since there are various terminologies in common use to determine tube sizes, the following
table is given to compare and relate them to the fitting size reference.


                 BASE                                NB                    CAT. REF.


                                                     25                    ABS 25
      These are to be used in, with vertical
      pipes. Holes are provided for foundation.      30                    ABS 30
                                                     40                    ABS 40
                                                     50                    ABS 50




                BEND                                 NB                    CAT. REF.


                                                     25                    ABN 25
      These are used to build
      frames on vertical pipes.                      30                    ABN 30
                                                     40                    ABN 40
                                                     50                    ABN 50




            DOUBLE BEND                              NB                    CAT. REF.


                                                     25                     ADB 25
      These are used to extend
      frames on horizontal pipes.                    30                     ADB 30
                                                     40                     ADB 40
                                                     50                     ADB 50




                 TEE                                 NB                    CAT. REF.


                                                     25                    AT 25
                                                     30                    AT 30
                                                     40                    AT 40
                                                     50                    AT 50




            DOUBLE TEE                               NB                    CAT. REF.


                                                     25                    ADT 25
                                                     30                    ADT 30
                                                     40                    ADT 40
                                                     50                    ADT 50




                CROSS                                NB                    CAT. REF.


                                                     25                     AX 25
                                                     30                     AX 30
                                                     40                     AX 40
                                                     50                     AX 50



 75
STRUCTURE PARTS


          COUPLER                       NB       CAT. REF.

These are used to couple the vertical   25       ACL 25
pipes where more length is required     30       ACL 30
                                        40       ACL 40
                                        50       ACL 50




       EQUAL BRACKET                    NB       CAT. REF.


                                        25       AEBT 25
                                        30       AEBT 30
                                        40       AEBT 40
                                        50       AEBT 50




     UNEQUAL BRACKET                    NB       CAT. REF.


                                        25      AUBT 25/15
                                        30      AUBT 30/25
                                        40      AUBT 40/25
                                        50      AUBT 50/25




          SUPPORT                       NB       CAT. REF.


                                        15       ASPT 15
                                        25       ASPT 25
                                        30       ASPT 30
                                        40       ASPT 40
                                        50       ASPT 50




            PLUG                        NB       CAT. REF.

These are used to plug the open ends
                                        25       APL 25
of galvanized tubes.
                                        30       APL 30
                                        40       APL 40
                                        50       APL 50




            STUD                        D        CAT. REF.


                                        5/16"    AST 5/16
                                        3/8"     AST 3/8
                                        ½"       AST 1/2




                                                             76
PIPELINE COMPONENTS
GROUTING OF BASE




 1.   Take one cast iron base and four foundation bolts, each with 2 nuts.




 2.   Fit bolts in the base so that the base is raised up to 150 mm from head of bolts.




 3.   Put this assembly on the floor and prepare a rough surface for
      proper bonding of grounding.




 4.   Make a concrete block over the bolts of about 200 x 200 mm up to
      the base of base i.e 150 mm high.




 5.   Prepare separate block for each base instead of making one
      big common block for all bases.




 77
STRUCTURE PARTS

TUBULAR STRUCTURE ASSEMBLING
                                                       A
Structures are designed to support plant and                                 B
other equipment comprising components
exclusively or principally in borosilicate glass 3.3
Mostly         these structures consist of
steel/galvanized tubing in four different
diameters, which is connected using the suitable
fittings. As a result, the structures cannot only be
dismantled and reassembled whenever required
but they can also be modified and added to quite
easily.                                                C

A.    Side the fittings on to the tubes in correct                           D
      sequence and              lightly tighten in
      approximate position.

B.    Assemble one side frame of the structure by
      adding the cross tubes between two vertical
      tubes.
                                                       E
C.    Build up the cross tubes to form the ends of
      the structure.

D.    Add the remaining vertical tubes and cross
      tubes to complete the structure and tighten                            F
      all the fittings.

E.    Hoist the structure and brace it to some
      existing rigid feature.

F.        Grout the foundation bolt and fix the
      structure bases with that.

G.        Adjust bracing to obtain a correct plum in   G
      structure.

H.    Adjust the horizontal frames at correct level.

I.    Assemble the support tubes at their
      positions.




                                                                             I

                                                       H




                                                                    J




                                                                                 78

Más contenido relacionado

La actualidad más candente

Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concreteRajesh Burde
 
Flat slab design
Flat slab designFlat slab design
Flat slab designMoussa Rili
 
shariful alam ( presentation on flat plate )
shariful alam ( presentation on flat plate )shariful alam ( presentation on flat plate )
shariful alam ( presentation on flat plate )sharifulaust
 
Construction Insitu Rc Suspended Floors Using Bm Bending Moment Formula Maths
Construction  Insitu Rc Suspended Floors Using Bm Bending Moment Formula MathsConstruction  Insitu Rc Suspended Floors Using Bm Bending Moment Formula Maths
Construction Insitu Rc Suspended Floors Using Bm Bending Moment Formula MathsDaniel Ross
 
Designing and drawing of flat slab with the help of i.s code
Designing and drawing of flat slab with the help of i.s code Designing and drawing of flat slab with the help of i.s code
Designing and drawing of flat slab with the help of i.s code Sandeep Yadav
 
Flat plate slab design (10.01.03.052)
Flat plate slab design (10.01.03.052)Flat plate slab design (10.01.03.052)
Flat plate slab design (10.01.03.052)Yeasir Gerrard
 
Structural analysis & design of troughed floors
Structural analysis & design of troughed floorsStructural analysis & design of troughed floors
Structural analysis & design of troughed floorsVictor Omotoriogun
 
Design and detailing of flat slabs
Design and detailing of flat slabs Design and detailing of flat slabs
Design and detailing of flat slabs Godfrey James
 
Expansion joints in bridge
Expansion joints in bridgeExpansion joints in bridge
Expansion joints in bridgeDivya Vishnoi
 
Presentation on Slab, Beam & Column
Presentation on Slab, Beam & ColumnPresentation on Slab, Beam & Column
Presentation on Slab, Beam & Columnমু সা
 
Grid waffle slab
Grid waffle slabGrid waffle slab
Grid waffle slabVikas Mehta
 

La actualidad más candente (20)

Ductile detailing ppt
Ductile detailing pptDuctile detailing ppt
Ductile detailing ppt
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
Flat slab design
Flat slab designFlat slab design
Flat slab design
 
shariful alam ( presentation on flat plate )
shariful alam ( presentation on flat plate )shariful alam ( presentation on flat plate )
shariful alam ( presentation on flat plate )
 
Construction Insitu Rc Suspended Floors Using Bm Bending Moment Formula Maths
Construction  Insitu Rc Suspended Floors Using Bm Bending Moment Formula MathsConstruction  Insitu Rc Suspended Floors Using Bm Bending Moment Formula Maths
Construction Insitu Rc Suspended Floors Using Bm Bending Moment Formula Maths
 
Designing and drawing of flat slab with the help of i.s code
Designing and drawing of flat slab with the help of i.s code Designing and drawing of flat slab with the help of i.s code
Designing and drawing of flat slab with the help of i.s code
 
Waffle slab
Waffle slabWaffle slab
Waffle slab
 
Flat plate slab design (10.01.03.052)
Flat plate slab design (10.01.03.052)Flat plate slab design (10.01.03.052)
Flat plate slab design (10.01.03.052)
 
Structural analysis & design of troughed floors
Structural analysis & design of troughed floorsStructural analysis & design of troughed floors
Structural analysis & design of troughed floors
 
Waffle slab
Waffle slabWaffle slab
Waffle slab
 
13828
1382813828
13828
 
Composite construction
Composite constructionComposite construction
Composite construction
 
Waffle slab
Waffle slabWaffle slab
Waffle slab
 
Design and detailing of flat slabs
Design and detailing of flat slabs Design and detailing of flat slabs
Design and detailing of flat slabs
 
Expansion joints in bridge
Expansion joints in bridgeExpansion joints in bridge
Expansion joints in bridge
 
Com flor manual
Com flor manualCom flor manual
Com flor manual
 
Beam design
Beam designBeam design
Beam design
 
Presentation on Slab, Beam & Column
Presentation on Slab, Beam & ColumnPresentation on Slab, Beam & Column
Presentation on Slab, Beam & Column
 
flat Slab
flat Slabflat Slab
flat Slab
 
Grid waffle slab
Grid waffle slabGrid waffle slab
Grid waffle slab
 

Destacado

005=heat exchagner
005=heat exchagner005=heat exchagner
005=heat exchagnernobleglass
 
007 coupling and gaskets
007 coupling and gaskets007 coupling and gaskets
007 coupling and gasketsnobleglass
 
004 vessels and strirrers
004 vessels and strirrers004 vessels and strirrers
004 vessels and strirrersnobleglass
 
006 column components
006 column components006 column components
006 column componentsnobleglass
 
002 pipeline compo
002 pipeline compo002 pipeline compo
002 pipeline componobleglass
 
004 vessels and strirrers
004 vessels and strirrers004 vessels and strirrers
004 vessels and strirrersnobleglass
 
002 pipeline compo
002 pipeline compo002 pipeline compo
002 pipeline componobleglass
 
Borosilicate glass-tube
Borosilicate glass-tubeBorosilicate glass-tube
Borosilicate glass-tubenobleglass
 

Destacado (9)

005=heat exchagner
005=heat exchagner005=heat exchagner
005=heat exchagner
 
007 coupling and gaskets
007 coupling and gaskets007 coupling and gaskets
007 coupling and gaskets
 
004 vessels and strirrers
004 vessels and strirrers004 vessels and strirrers
004 vessels and strirrers
 
006 column components
006 column components006 column components
006 column components
 
002 pipeline compo
002 pipeline compo002 pipeline compo
002 pipeline compo
 
004 vessels and strirrers
004 vessels and strirrers004 vessels and strirrers
004 vessels and strirrers
 
002 pipeline compo
002 pipeline compo002 pipeline compo
002 pipeline compo
 
Borosilicate glass-tube
Borosilicate glass-tubeBorosilicate glass-tube
Borosilicate glass-tube
 
003 valves
003 valves003 valves
003 valves
 

Similar a Structure Parts: Flexible Tubular Steel for Glass Plants

BISOL Solar Company: PV Mounting Systems 2011
BISOL Solar Company: PV Mounting Systems 2011BISOL Solar Company: PV Mounting Systems 2011
BISOL Solar Company: PV Mounting Systems 2011BISOL Solar Company
 
Laxmi Udyog Cementing Aids Catalogue
Laxmi Udyog Cementing Aids CatalogueLaxmi Udyog Cementing Aids Catalogue
Laxmi Udyog Cementing Aids CatalogueEPR (Kuching) Sdn Bhd
 
Anchor rods embeds-fa qs
Anchor rods embeds-fa qsAnchor rods embeds-fa qs
Anchor rods embeds-fa qssai praneeth
 
Seismic optimization of an I shaped shear link damper in EBF and CBF systems
Seismic optimization of an I shaped shear link damper in EBF and CBF systemsSeismic optimization of an I shaped shear link damper in EBF and CBF systems
Seismic optimization of an I shaped shear link damper in EBF and CBF systemsIRJET Journal
 
IRJET - Parametric Study of Cold Form Channel Section with and without Stiffe...
IRJET - Parametric Study of Cold Form Channel Section with and without Stiffe...IRJET - Parametric Study of Cold Form Channel Section with and without Stiffe...
IRJET - Parametric Study of Cold Form Channel Section with and without Stiffe...IRJET Journal
 
Prestressed-concrete-1 (1).pdf structure design
Prestressed-concrete-1 (1).pdf structure designPrestressed-concrete-1 (1).pdf structure design
Prestressed-concrete-1 (1).pdf structure design632k18BilalAhmad
 
Structural Connection Design & Construction Aspect .pptx
Structural Connection Design & Construction Aspect .pptxStructural Connection Design & Construction Aspect .pptx
Structural Connection Design & Construction Aspect .pptxahmad705917
 
IRJET - A Review on Steel Beam-Column Joint to Improve the Performance of...
IRJET -  	  A Review on Steel Beam-Column Joint to Improve the Performance of...IRJET -  	  A Review on Steel Beam-Column Joint to Improve the Performance of...
IRJET - A Review on Steel Beam-Column Joint to Improve the Performance of...IRJET Journal
 
Board 2 bcon draft
Board 2 bcon draftBoard 2 bcon draft
Board 2 bcon draftLeon Lim
 
design-and-installation-guide-for-pvc-fittings-and-laterals-for-solid-wall-pv...
design-and-installation-guide-for-pvc-fittings-and-laterals-for-solid-wall-pv...design-and-installation-guide-for-pvc-fittings-and-laterals-for-solid-wall-pv...
design-and-installation-guide-for-pvc-fittings-and-laterals-for-solid-wall-pv...ManishPatel169454
 
IRJET- Capacity Analysis of Post-Tensioned Steel Structure in Column Removal
IRJET- Capacity Analysis of Post-Tensioned Steel Structure in Column RemovalIRJET- Capacity Analysis of Post-Tensioned Steel Structure in Column Removal
IRJET- Capacity Analysis of Post-Tensioned Steel Structure in Column RemovalIRJET Journal
 
Analysis of Multi-Storey Steel Structure with Different Infills and Steel Bra...
Analysis of Multi-Storey Steel Structure with Different Infills and Steel Bra...Analysis of Multi-Storey Steel Structure with Different Infills and Steel Bra...
Analysis of Multi-Storey Steel Structure with Different Infills and Steel Bra...IRJET Journal
 
pipes fittings &valves
 pipes fittings &valves pipes fittings &valves
pipes fittings &valvesYoga Sathish
 
design-and-drawing Steel structures
design-and-drawing Steel structuresdesign-and-drawing Steel structures
design-and-drawing Steel structuresSurya Swaroop
 

Similar a Structure Parts: Flexible Tubular Steel for Glass Plants (20)

BISOL Solar Company: PV Mounting Systems 2011
BISOL Solar Company: PV Mounting Systems 2011BISOL Solar Company: PV Mounting Systems 2011
BISOL Solar Company: PV Mounting Systems 2011
 
Laxmi Udyog Cementing Aids Catalogue
Laxmi Udyog Cementing Aids CatalogueLaxmi Udyog Cementing Aids Catalogue
Laxmi Udyog Cementing Aids Catalogue
 
Anchor rods embeds-fa qs
Anchor rods embeds-fa qsAnchor rods embeds-fa qs
Anchor rods embeds-fa qs
 
Final detailingpp
Final detailingppFinal detailingpp
Final detailingpp
 
Seismic optimization of an I shaped shear link damper in EBF and CBF systems
Seismic optimization of an I shaped shear link damper in EBF and CBF systemsSeismic optimization of an I shaped shear link damper in EBF and CBF systems
Seismic optimization of an I shaped shear link damper in EBF and CBF systems
 
Structural Steel Work
 Structural Steel  Work Structural Steel  Work
Structural Steel Work
 
Cable stayed bridge
Cable stayed bridgeCable stayed bridge
Cable stayed bridge
 
IRJET - Parametric Study of Cold Form Channel Section with and without Stiffe...
IRJET - Parametric Study of Cold Form Channel Section with and without Stiffe...IRJET - Parametric Study of Cold Form Channel Section with and without Stiffe...
IRJET - Parametric Study of Cold Form Channel Section with and without Stiffe...
 
Prestressed-concrete-1 (1).pdf structure design
Prestressed-concrete-1 (1).pdf structure designPrestressed-concrete-1 (1).pdf structure design
Prestressed-concrete-1 (1).pdf structure design
 
Structural Connection Design & Construction Aspect .pptx
Structural Connection Design & Construction Aspect .pptxStructural Connection Design & Construction Aspect .pptx
Structural Connection Design & Construction Aspect .pptx
 
IRJET - A Review on Steel Beam-Column Joint to Improve the Performance of...
IRJET -  	  A Review on Steel Beam-Column Joint to Improve the Performance of...IRJET -  	  A Review on Steel Beam-Column Joint to Improve the Performance of...
IRJET - A Review on Steel Beam-Column Joint to Improve the Performance of...
 
2505
25052505
2505
 
Board 2 bcon draft
Board 2 bcon draftBoard 2 bcon draft
Board 2 bcon draft
 
design-and-installation-guide-for-pvc-fittings-and-laterals-for-solid-wall-pv...
design-and-installation-guide-for-pvc-fittings-and-laterals-for-solid-wall-pv...design-and-installation-guide-for-pvc-fittings-and-laterals-for-solid-wall-pv...
design-and-installation-guide-for-pvc-fittings-and-laterals-for-solid-wall-pv...
 
IRJET- Capacity Analysis of Post-Tensioned Steel Structure in Column Removal
IRJET- Capacity Analysis of Post-Tensioned Steel Structure in Column RemovalIRJET- Capacity Analysis of Post-Tensioned Steel Structure in Column Removal
IRJET- Capacity Analysis of Post-Tensioned Steel Structure in Column Removal
 
Analysis of Multi-Storey Steel Structure with Different Infills and Steel Bra...
Analysis of Multi-Storey Steel Structure with Different Infills and Steel Bra...Analysis of Multi-Storey Steel Structure with Different Infills and Steel Bra...
Analysis of Multi-Storey Steel Structure with Different Infills and Steel Bra...
 
pipes fittings &valves
 pipes fittings &valves pipes fittings &valves
pipes fittings &valves
 
13920
1392013920
13920
 
20
2020
20
 
design-and-drawing Steel structures
design-and-drawing Steel structuresdesign-and-drawing Steel structures
design-and-drawing Steel structures
 

Más de nobleglass

009 strucutre parts
009 strucutre parts009 strucutre parts
009 strucutre partsnobleglass
 
008 sight floow
008 sight floow008 sight floow
008 sight floownobleglass
 
007 coupling and gaskets
007 coupling and gaskets007 coupling and gaskets
007 coupling and gasketsnobleglass
 
006 column components
006 column components006 column components
006 column componentsnobleglass
 
Simple distilation unit
Simple distilation unitSimple distilation unit
Simple distilation unitnobleglass
 
008 sight floow
008 sight floow008 sight floow
008 sight floownobleglass
 

Más de nobleglass (7)

009 strucutre parts
009 strucutre parts009 strucutre parts
009 strucutre parts
 
008 sight floow
008 sight floow008 sight floow
008 sight floow
 
007 coupling and gaskets
007 coupling and gaskets007 coupling and gaskets
007 coupling and gaskets
 
003 valves
003 valves003 valves
003 valves
 
006 column components
006 column components006 column components
006 column components
 
Simple distilation unit
Simple distilation unitSimple distilation unit
Simple distilation unit
 
008 sight floow
008 sight floow008 sight floow
008 sight floow
 

Último

Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...lizamodels9
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdftbatkhuu1
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 DelhiCall Girls in Delhi
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdftbatkhuu1
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseri bangash
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 

Último (20)

Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdf
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdf
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 

Structure Parts: Flexible Tubular Steel for Glass Plants

  • 1.
  • 2. STRUCTURE PARTS INTRODUCTION The glass plant and equipments are supported in a rectangular tubular structure. This tubular structure consists of galvanized mild steel tubing with cast iron fittings, which is described in this catalogue. This type of structure provides enough flexibility for future modifications and is strong enough to support a glass plant. S.S powder coated tubings and structure parts can also be supplied on request basis. TUBE SIZE Since there are various terminologies in common use to determine tube sizes, the following table is given to compare and relate them to the fitting size reference. TUBE NOMINAL EXTERNAL GUIDE SUPPORT DIAMETER BORE IN DIAMETER IN IN INCHES MM MM 3/4" 19 21.5 1" 25 32.5 1 1/4" 30 41.5 1 1/2" 40 48.3 BRACING IN WALL 2" 50 60.3 COUNTER BALANCE SUPPORTING COLUMN In the design of tubular steel structure to support glass process plant and pipeline SUPPORT equipment, a number of basic rules should be followed. F The structure should be stiff and should always be braced back to the nearest building or other stiff feature to give lateral support. F All glass units are built up from a fixed point on which whole weight of the column should be taken. If a total load exceeds the allowable limits, counter balance supports should be used to relieve excessive weight. F All Glass units and their structures expand at different rates as a result of change in temperature. The unit must, therefore not be subjected to any vertical restraint above GUIDE SUPPORT the fixed point. Due to this, guides are used which give lateral support without affecting vertical movement of the glass, relative to the supporting structure. The distance between guide frames must not exceed 3meters. F The whole weight of a column must be taken up from the fixed point. This normally presents no problem up to DN 300, but with larger columns it may be necessary to take up some of the weight by means of counterbalance supports. STRUCTURE FITTINGS GUIDE SUPPORT Following structure fittings are available to use with galvanized iron tubes in order to form a tubular structure of a glass plant. F These fittings are made of cast iron and are suitable to the galvanize tubes described earlier. F These sliding are provided with grub screws to fix it at required position on galvanized tube. FPL 0.00 F These fittings are specially made to construct a tubular structure, which provides enough flexibility for future modifications without involving any hammering and welding. 74
  • 3. PIPELINE COMPONENTS Since there are various terminologies in common use to determine tube sizes, the following table is given to compare and relate them to the fitting size reference. BASE NB CAT. REF. 25 ABS 25 These are to be used in, with vertical pipes. Holes are provided for foundation. 30 ABS 30 40 ABS 40 50 ABS 50 BEND NB CAT. REF. 25 ABN 25 These are used to build frames on vertical pipes. 30 ABN 30 40 ABN 40 50 ABN 50 DOUBLE BEND NB CAT. REF. 25 ADB 25 These are used to extend frames on horizontal pipes. 30 ADB 30 40 ADB 40 50 ADB 50 TEE NB CAT. REF. 25 AT 25 30 AT 30 40 AT 40 50 AT 50 DOUBLE TEE NB CAT. REF. 25 ADT 25 30 ADT 30 40 ADT 40 50 ADT 50 CROSS NB CAT. REF. 25 AX 25 30 AX 30 40 AX 40 50 AX 50 75
  • 4. STRUCTURE PARTS COUPLER NB CAT. REF. These are used to couple the vertical 25 ACL 25 pipes where more length is required 30 ACL 30 40 ACL 40 50 ACL 50 EQUAL BRACKET NB CAT. REF. 25 AEBT 25 30 AEBT 30 40 AEBT 40 50 AEBT 50 UNEQUAL BRACKET NB CAT. REF. 25 AUBT 25/15 30 AUBT 30/25 40 AUBT 40/25 50 AUBT 50/25 SUPPORT NB CAT. REF. 15 ASPT 15 25 ASPT 25 30 ASPT 30 40 ASPT 40 50 ASPT 50 PLUG NB CAT. REF. These are used to plug the open ends 25 APL 25 of galvanized tubes. 30 APL 30 40 APL 40 50 APL 50 STUD D CAT. REF. 5/16" AST 5/16 3/8" AST 3/8 ½" AST 1/2 76
  • 5. PIPELINE COMPONENTS GROUTING OF BASE 1. Take one cast iron base and four foundation bolts, each with 2 nuts. 2. Fit bolts in the base so that the base is raised up to 150 mm from head of bolts. 3. Put this assembly on the floor and prepare a rough surface for proper bonding of grounding. 4. Make a concrete block over the bolts of about 200 x 200 mm up to the base of base i.e 150 mm high. 5. Prepare separate block for each base instead of making one big common block for all bases. 77
  • 6. STRUCTURE PARTS TUBULAR STRUCTURE ASSEMBLING A Structures are designed to support plant and B other equipment comprising components exclusively or principally in borosilicate glass 3.3 Mostly these structures consist of steel/galvanized tubing in four different diameters, which is connected using the suitable fittings. As a result, the structures cannot only be dismantled and reassembled whenever required but they can also be modified and added to quite easily. C A. Side the fittings on to the tubes in correct D sequence and lightly tighten in approximate position. B. Assemble one side frame of the structure by adding the cross tubes between two vertical tubes. E C. Build up the cross tubes to form the ends of the structure. D. Add the remaining vertical tubes and cross tubes to complete the structure and tighten F all the fittings. E. Hoist the structure and brace it to some existing rigid feature. F. Grout the foundation bolt and fix the structure bases with that. G. Adjust bracing to obtain a correct plum in G structure. H. Adjust the horizontal frames at correct level. I. Assemble the support tubes at their positions. I H J 78