AFRICA RESOURCES
INVESTMENT CONGRESS
          Building the Premier Central African gold producer
          Simon Village – Banro Corporation




IRONMONGERS’ HALL, CITY OF LONDON     TUESDAY-WEDNESDAY,   14-15 JUN 2011
www.ObjectiveCapitalConferences.com
                                                                            0
Building the Premier Central African gold producer




                                      Simon Village
                                    Chairman & CEO
                                          June 2011
Cautionary Notes
This document shall not constitute an offer to sell or the solicitation of an offer to buy any securities of Banro Corporation (“the Company”).

Cautionary Note Concerning Forward-Looking Statements: This presentation contains forward-looking statements. All statements, other than statements of historical
fact, that address activities, events or developments that the "Company believes, expects or anticipates will or may occur in the future (including, without
limitation, statements regarding estimates and/or assumptions in respect of gold production, revenue, cash flow and costs, estimated project economics, mineral resource and
mineral reserve estimates, potential mineralization, potential mineral resources and mineral reserves, projected timing of possible gold production and the Company's
exploration and development plans and objectives with respect to its projects) are forward-looking statements. These forward-looking statements reflect the current
expectations or beliefs of the Company based on information currently available to the Company. Forward-looking statements are subject to a number of risks and
uncertainties that may cause the actual results of the Company to differ materially from those discussed in the forward-looking statements, and even if such actual results are
realized or substantially realized, there can be no assurance that they will have the expected consequences to, or effects on the Company. Factors that could cause actual
results or events to differ materially from current expectations include, among other things: uncertainty of estimates of capital and operating costs, gold production estimates
and estimated economic return; the possibility that actual circumstances will differ from the estimates and assumptions used in the economic studies of Company gold
properties; failure to establish estimated mineral resources or mineral reserves; fluctuations in gold prices and currency exchange rates; uncertainties relating to the
availability and costs of any financing needed in the future; inflation; gold recoveries being less than those indicated by the metallurgical test work carried out to date (there
can be no assurance that gold recoveries in small scale laboratory tests will be duplicated in large tests under on-site conditions or during production); changes in equity
markets; political developments in the Democratic Republic of the Congo; lack of infrastructure; failure to procure or maintain, or delays in procuring or maintaining, permits
and approvals; lack of availability at a reasonable cost or at all, of plants, equipment or labour; inability to attract and retain key management and personnel; changes to
regulations affecting the Company's activities; the uncertainties involved in interpreting drilling results and other geological data; and the other risks disclosed under the
heading "Risk Factors" and elsewhere in the Company's annual information form dated March 29, 2011 filed on SEDAR at www.sedar.com and EDGAR at www.sec.gov. Any
forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or
obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Although the Company believes that the
assumptions inherent in the forward-looking statements are reasonable, forward-looking statements are not guarantees of future performance and accordingly undue reliance
should not be put on such statements due to the inherent uncertainty therein.

The preliminary economic assessment of the Company’s Namoya heap leach project is preliminary in nature and includes inferred mineral resources that are considered too
speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that the
conclusions reached in the preliminary economic assessment will be realized.

Cautionary Note Concerning Resource and Reserve Estimates: The Company’s mineral resource and mineral reserve figures are estimates and no assurances can be given that
the indicated levels of gold will be produced. Such estimates are expressions of judgment based on knowledge, mining experience, analysis of drilling results and industry
practices. Valid estimates made at a given time may significantly change when new information becomes available. While the Company believes that its mineral resource and
mineral reserve estimates are well established, by their nature mineral resource and mineral reserve estimates are imprecise and depend, to a certain extent, upon statistical
inferences which may ultimately prove unreliable. If such estimates are inaccurate or are reduced in the future, this could have a material adverse impact on the Company.
Mineral resources that are not mineral reserves do not have demonstrated economic viability. There is no certainty that mineral resources can be upgraded to mineral reserves
through continued exploration.

Due to the uncertainty that may be attached to inferred mineral resources, it cannot be assumed that all or any part of an inferred mineral resource will be upgraded to an
indicated or measured mineral resource as a result of continued exploration. Confidence in the estimate is insufficient to allow meaningful application of the technical and
economic parameters to enable an evaluation of economic viability worthy of public disclosure (except in certain limited circumstances). Inferred mineral resources are
excluded from estimates forming the basis of a feasibility study.

The United States Securities and Exchange Commission (the "SEC") permits U.S. mining companies, in their filings with the SEC, to disclose only those mineral deposits that a
company can economically and legally extract or produce. Certain terms are used by Banro, such as "measured", "indicated", and "inferred" "resources", that the SEC
guidelines strictly prohibit U.S. registered companies from including in their filings with the SEC. U.S. Investors are urged to consider closely the disclosure in Banro's Form 40-
F Registration Statement, File No. 001-32399, which may be secured from Banro, or from the SEC's website at http://www.sec.gov/edgar.shtml. The Namoya preliminary
economic assessment referred to herein is preliminary in nature and includes inferred mineral resources that are considered too speculative geologically to have the economic
considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that the conclusions reached in the preliminary economic
assessment will be realized. Mineral resources that are not mineral reserves do not have demonstrated economic viability.

Additional information regarding Banro and its gold properties is included in the Company’s annual information form dated March 29, 2011, a copy of which has been filed
on, and can be obtained from, SEDAR at www.sedar.com and EDGAR at www.sec.gov.

Qualified Person: Daniel K. Bansah, who is Vice President, Exploration of the Company and a "qualified person" (as such term is defined in Canadian National Instrument 43-
101), has reviewed the technical information in this presentation.
                                                                                       2
Banro at a Glance – transition to producer


 Offices Toronto (Corporate)
         Bukavu & Kinshasa (Operations)

 Flagship project – Twangiza (Phase I)        Democratic
 with planned gold production in Q4 2011      Republic of the
                                              Congo
 4 additional projects along the belt:

     o   Namoya
     o   Twangiza Phase II
     o   Lugushwa
     o   Kamituga

 TSX, NYSE AMEX: BAA
 US$600 million market cap
 190.7 million shares outstanding
 209.3 million fully diluted

 Financial position
 o Cash $68 million as at June 14th 2011
 o Fully-funded to Twangiza production     Twangiza Phase 1 – Civil works 93%
                                           complete; structural 80% complete

                                3
Twangiza-Namoya gold belt equal in size & geologic
       potential to Ashanti belt in Ghana

Twangiza-Namoya                             Ashanti Gold
Gold Belt (DRC)                             Belt (Ghana)




                  Both maps at same scale
                            4
Board with proven track records in Africa & in Gold

       Simon Village, Chairman & CEO
       • Former Managing Director, World Gold Council; founder of Exchange Traded
         Gold; HSBC Managing Director for Global Mining , Mining Engineer (Anglo
         American/De Beers), joined Banro’s board in 2004; appointed CEO in 2010



        Arnold Kondrat                              Dr. Peter Ruxton
        Exec VP & Director                          Director
        • Founder Banro Corp.                       • Former partner, Actis Capital
        • Active in the DRC since 1996              • Former Exploration
        • President, Sterling Portfolio               Manager, Billiton
          Securities Inc.                           • CEO Gentor Resources;
                                                      director, Platmin; Chairman GGG
                                                      Resources
       Peter Cowley
                                                    Richard Lachcik
       Director
                                                    Director
       • CEO Loncor Resources
                                                    • Partner, Macleod Dixon LLP; chair
       • Former Managing
                                                      of Global Mining Group
         Director, Ashanti Goldfields
                                                    • Specialty in securities law
         Exploration


        Dr. John Clarke                             Bernard van Rooyen
        Director                                    Director
        • Former CEO Nevsun Resources               • Director for Mvelaphanda
        • Former Exec. Director Ashanti               Resources, Ndowana
          Goldfields Ltd.                             Exploration, Northam Platinum &
        • Director Mediterranean                      Trans Hex Group
          Resources

                                  5
Strong in-country expertise; Flat management structure
             Minimal turnover at all levels
                   Board of Directors

                  Executive Committee




                        6
Resources Summary

 2011 budget will increase Reserves by +2mozs

 Growth in Resources & Reserves along the belt



      Property              Measured &             Inferred
                              Indicated

                                Oz gold             Oz gold

 Twangiza                     5,600,000             400,000

 Namoya                       1,138,305             543,125

 Lugushwa                                         2,735,000

 Kamituga                                           915,000

 TOTAL                       6,738,305            4,593,125



                        7
Five significant projects in the Twangiza-Namoya
                       Gold Belt


210 km gold belt
with multiple gold
prospects

Extensive artisanal
gold workings
throughout entire
belt

In order of planned
development:

1. Twangiza Phase I
2. Namoya Heap
   Leach
3. Twangiza Phase II

Exploration:
4. Kamituga
5. Lugushwa




                       8
Targeted production profile


           500,000

           450,000

           400,000

           350,000

 Ounces    300,000
 of gold
           250,000

           200,000

           150,000

           100,000

            50,000

                0
                     2011     2012      2013      2014    2015      2016

                     Twangiza Phase I    Namoya      Twangiza Phase II



                                 9
Twangiza Phase 1 Overview:
                         +1 million ounces of gold

Phase I – Oxide material
Total gold production expected to be
+ 1 million ozs over 8 years

Plant designed to process 1.7mtpa with annual
production of 119,303 ozs* for first 5 years @
cash cost of US$356/oz**

Total capital expenditure – US$209 Million

Planned gold production in Q4 2011
• Royalty payment of 1% of gold revenues
• Net profit payment of 4% (after return of capital)
• Cash flow from Twangiza I to be used to fast track Banro’s second gold mine
    development at Namoya (scheduled for completion by end 2013)

Twangiza Phase II – “Transition” & Sulphide Material
• Separate processing facility
• Recently commissioned economic assessment for Phase II including detailed
  metallurgical study & plant design
• Anticipate production from Twangiza Phase I and Namoya Heap Leach project
  to fund development of Twangiza Phase II
* Based on SRK projections and does not include Management’s plans to increase gold output via
selectivity, grade control and use of 4g/t Au valley fill material (not included in SRK projections)
**Diesel costs represent approximately 40% of the total cash cost


                                                 10
Twangiza Main Pit – Phase I Oxide (1.7mtpa) &
   Phase II (4mtpa) transition/fresh rock


                                             Oxide Pit




                                            Final Pit




              Strip ratio: 1.5:1 over LOM

                     11
Namoya – Low cost heap leach operation
                                                 NAMOYA PROJECT
                                                 (Mwendamboko Prospect; Section 5)                                                                                                                    AMEX




                                                                                                                             560900 mE
                                                                                 560800 mE




                                                                                                                                                                      561000 mE
                                                                                                                                                                                                       TSX:



Namoya – Overview                                                                                  5.0m@13.26g/t         26.0m@13.43g/t
                                                   1000 mN                                                                                                                                  1000 mN




•   100% owned by Banro                            SW
                                                                                                   G5N
                                                                                                                                                 NDD05
                                                                                                                                                    NDD03
                                                                                                                                                                                             NE



•   2.5km long mineralized zone with 4 main
                                                                           G25


                                                                                      6.0m@3.75g/t                                                                                Pit outline
    deposits in 175km2 area
                                                                                                                                                         26.54m@5.96g/t

                                                                                             29.0m@15.10g/t


•   Banro work to date includes:                    900 mN
                                                                                               2.77m@2.53g/t
                                                                                                                                                  39.37m@3.63g/t
                                                                                                                                                                                            900 mN




      • 209 diamond drill holes                              Sericite Schist
                                                                                                                                                                    Base of complete oxidation



      • Extensive resampling of old mine adits
                                                                                                                                         7.27m@1.99g/t
                                                             Quartz Sericite Schist

                                                             Chlorite Schist




      • Preliminary assessments in 2007 & 2011
                                                             Diorite/Quartz Diorite intrusive

                                                             Quartz vein/stockwork                                                                             Top of fresh rock
                                                                                                         0      20      40
                                                             Mineralization intercept                          Metres




    Namoya – Preliminary Assessment 2011               Namoya – Strategy
    •   124,053 oz Au/year                             •                Second development
    •   7 year mine life, open pit                                      project for Banro following
                                                                        Twangiza Phase 1
    •   Total cash cost = US$359/oz
                                                       •                Cash flows from Twangiza
    •   Initial capital cost = $118.2 million
                                                                        Phase 1 and Namoya can
    •   On-going capital costs = $15.1 million                          allow Banro to build hydro
    •   1 year payback on project capex                                 plant required for
                                                                        Twangiza Phase II




                                      12
Twangiza – Namoya infrastructure




                                                                                                                   700000 mE
                                        500000 mE




                                                                           600000 mE
   N2 road under construction by the
                                                                                                                                     Lake Kivu



   Chinese (World Bank Project)
                                                                                                                                                  N
                                                                                                                               Bukavu
                                                                                                                  N2

                                                                                                              Walungu
9700000 mN                                          Shabunda                                                                   N5                9700000 mN

                                                                                                             Lubanda

                                                                                               HEP
                                                                                                                  TWANGIZA
                                                                          KAMITUGA                Mwenga


                 Pangi                                                                                   HEP
                                                                                                                                                 N5

                                                          LUGUSHWA                                                                               Uvira
                                                                                   Itula

                                                                N2
9600000 mN                                                                                                                                          9600000 mN

                                                      Kalole



                LEGEND                                                                                                                           Lake Tanganyika

         Rivers                                                NAMOYA
         Towns
         Main Roads and Towns
             Secondary/other Roads
             Permits for Exploitation




                                                                                                                   700000 mE
                                                                           600000 mE




                                                                                           0      25         50
         Permits granted and under
                                                                                                kilometres                          Fizi
         application
                                                                     13
Hydro power potential


Hydro power generation would advance the rate of development
  in the Twangiza-Namoya Gold Belt & maximize profitability




    At a cost of US$120 million, the first
     phase of a hydro electric power
     generating facility will be built 25km
     from Twangiza with a generation
     capacity of 30MW
    Additional US$60 million to expand
     generation facility to increase
     capacity to 66MW
    Hydro electric power would reduce
     production cash costs by
     approximately US$100/oz for both
     Twangiza Phase I and Phase II




                                  14
Hydro potential will contain cost inflation & reduce
        initial cash costs by at least $100/oz
           450


           400


           350


           300


           250
(US$/oz)
           200


           150


           100


           50


            0
                 2011          2012          2013          2014         2015

                        Twangiza Phase I   Namoya   Twangiza Phase II


                                   15
The Banro Foundation
                      A Responsible approach to operating in the DRC

                                                                New High School near Twangiza
Martin Jones, Head of Banro Foundation
   Founded in 2005, the Banro Foundation has been
    reorganized as a stand-alone charity, focused on
    education, health and infrastructure improvements, as
    well as humanitarian relief.

   Projects completed to date include two high schools, two
    primary schools, a health care centre, a potable water
    project serving 18,000 people, the rehabilitation of over
    100 km of roads and bridges + many more projects.

   In December 2009, Banro was recognized for its
    contributions to Congolese reconstruction with an Award
    of Merit from a leading Congolese youth group.


     Potable Water System for 18,000 People                      New High School near Namoya




                                                16
Relative Valuation – P/NAV




    Note: Purple denotes African Company
    Source: CIBC World Markets




                                       17
Relative Valuation – US$ EV per Ounce




   Source: CIBC World Markets




                                18
Banro – on the cusp of being a leading
         Central African Gold Producer


 Banro has a strong in-country presence with technical capability in
  exploration and project development
 Banro has a World Class project pipeline and is well on its way to being a
  low cost gold producer (Q4 2011)
 The open-pitable, low cost nature of the projects, and unique potential of
  Hydro electric power should differentiate Banro on the Global Cost curve
 The company’s knowledge of the African continent combined with strong
  future cash-flow will allow the Company to consider expanding
  geographically and diversifying the risk associated with operating in an
  emerging country

                           www.banro.com




                              19
Twangiza construction update - video




                      20
Appendix I

                                          Banro Resources

  Property                        Measured                                    Indicated                              Inferred




                       Tons            g/t Au        Oz Au          Tons        g/t Au          Oz Au     Tons       g/t Au      Oz Au




  Twangiza          17,200,000          2.40       1,320,000     90,300,000      1.50      4,280,000    8,280,000      1.70      400,000




   Namoya           4,270,666           2.76        378,969      10,305,495      2.29       759,336     8,952,162      1.89      543,126




 Lugushwa                                                                                               37,000,000     2.30     2,735,000




  Kamituga                                                                                              7,260,000      3.9       915,000




   TOTAL                                           1,698,969                              5,039,336                             4,593,126




 At 1g/t Au cut-off for Kamituga and Lugushwa; 0.5 g/t Au for Twangiza; 0.4 g/t Au for Namoya




                                                           21
Appendix II

                           Banro Warrants

    Date Issued    # of Warrants    Expiry date    Exercise price         Value

   Sept 17, 2008   5,836,811       Sept 17, 2011   US$2.20          US$12,840,984

   March 4, 2011   1,050,000       Feb 24, 2013    CAD$3.25         CAD$3,412,500




                                      22

Más contenido relacionado

La actualidad más candente

Lion One Metals Presentation Oct 2021
Lion One Metals Presentation Oct 2021Lion One Metals Presentation Oct 2021
Lion One Metals Presentation Oct 2021Joe Gray
 
Lion One Metals Presenation August 2021
Lion One Metals Presenation August 2021Lion One Metals Presenation August 2021
Lion One Metals Presenation August 2021Joe Gray
 
February 2016 Corporate Presentation
February 2016 Corporate PresentationFebruary 2016 Corporate Presentation
February 2016 Corporate PresentationFalcoCorporate
 
Fortune Bay - Corporate Presentation - January 2022
Fortune Bay - Corporate Presentation - January 2022Fortune Bay - Corporate Presentation - January 2022
Fortune Bay - Corporate Presentation - January 2022Fortune Bay Corp
 
Annual General & Special Meeting of Shareholders
Annual General  & Special Meeting of Shareholders Annual General  & Special Meeting of Shareholders
Annual General & Special Meeting of Shareholders Teranga Gold
 
ATAC Resources Ltd. Corporate Presentation December 2020
ATAC Resources Ltd. Corporate Presentation December 2020ATAC Resources Ltd. Corporate Presentation December 2020
ATAC Resources Ltd. Corporate Presentation December 2020ATAC Resources Ltd
 
January 2016 Corporate Presentation
January 2016 Corporate PresentationJanuary 2016 Corporate Presentation
January 2016 Corporate PresentationChris Donaldson
 
Great panther silver limited corporate presentation september 8 2016_qr
Great panther silver limited corporate presentation september 8 2016_qrGreat panther silver limited corporate presentation september 8 2016_qr
Great panther silver limited corporate presentation september 8 2016_qrGreat Panther Silver Limited
 
ATAC Resources Ltd. Corporate Presentation February 2021
ATAC Resources Ltd. Corporate Presentation February 2021ATAC Resources Ltd. Corporate Presentation February 2021
ATAC Resources Ltd. Corporate Presentation February 2021ATAC Resources Ltd
 
Inca One Gold Corp Corporate Presentation
Inca One Gold Corp Corporate PresentationInca One Gold Corp Corporate Presentation
Inca One Gold Corp Corporate PresentationMomentumPR
 
Castle Peak Mining Ltd. Investor Presentation
Castle Peak Mining Ltd. Investor PresentationCastle Peak Mining Ltd. Investor Presentation
Castle Peak Mining Ltd. Investor PresentationCompany Spotlight
 
Asanko jv webcast preso final
Asanko jv webcast preso finalAsanko jv webcast preso final
Asanko jv webcast preso finalasanko6699
 
Cascada updated corporate presentation september 2021
Cascada updated corporate presentation september 2021Cascada updated corporate presentation september 2021
Cascada updated corporate presentation september 2021ZhalaRahim
 
Cascada updated corporate presentation july 2021
Cascada updated corporate presentation july 2021Cascada updated corporate presentation july 2021
Cascada updated corporate presentation july 2021ZhalaRahim
 
December 2021 - Riley Gold Corporate Presentation
December 2021  - Riley Gold Corporate PresentationDecember 2021  - Riley Gold Corporate Presentation
December 2021 - Riley Gold Corporate PresentationZhalaRahim1
 
Lion One Metals Presentation July 2021
Lion One Metals Presentation July 2021Lion One Metals Presentation July 2021
Lion One Metals Presentation July 2021Joe Gray
 
Alder Presentation September 2013
Alder Presentation September 2013Alder Presentation September 2013
Alder Presentation September 2013AlderResources
 
12.3 2016 investor presentation
12.3 2016 investor presentation12.3 2016 investor presentation
12.3 2016 investor presentationFalcoCorporate
 

La actualidad más candente (19)

Lion One Metals Presentation Oct 2021
Lion One Metals Presentation Oct 2021Lion One Metals Presentation Oct 2021
Lion One Metals Presentation Oct 2021
 
Lion One Metals Presenation August 2021
Lion One Metals Presenation August 2021Lion One Metals Presenation August 2021
Lion One Metals Presenation August 2021
 
February 2016 Corporate Presentation
February 2016 Corporate PresentationFebruary 2016 Corporate Presentation
February 2016 Corporate Presentation
 
Fortune Bay - Corporate Presentation - January 2022
Fortune Bay - Corporate Presentation - January 2022Fortune Bay - Corporate Presentation - January 2022
Fortune Bay - Corporate Presentation - January 2022
 
Annual General & Special Meeting of Shareholders
Annual General  & Special Meeting of Shareholders Annual General  & Special Meeting of Shareholders
Annual General & Special Meeting of Shareholders
 
ATAC Resources Ltd. Corporate Presentation December 2020
ATAC Resources Ltd. Corporate Presentation December 2020ATAC Resources Ltd. Corporate Presentation December 2020
ATAC Resources Ltd. Corporate Presentation December 2020
 
January 2016 Corporate Presentation
January 2016 Corporate PresentationJanuary 2016 Corporate Presentation
January 2016 Corporate Presentation
 
Great panther silver limited corporate presentation september 8 2016_qr
Great panther silver limited corporate presentation september 8 2016_qrGreat panther silver limited corporate presentation september 8 2016_qr
Great panther silver limited corporate presentation september 8 2016_qr
 
ATAC Resources Ltd. Corporate Presentation February 2021
ATAC Resources Ltd. Corporate Presentation February 2021ATAC Resources Ltd. Corporate Presentation February 2021
ATAC Resources Ltd. Corporate Presentation February 2021
 
Investor Presentation
Investor PresentationInvestor Presentation
Investor Presentation
 
Inca One Gold Corp Corporate Presentation
Inca One Gold Corp Corporate PresentationInca One Gold Corp Corporate Presentation
Inca One Gold Corp Corporate Presentation
 
Castle Peak Mining Ltd. Investor Presentation
Castle Peak Mining Ltd. Investor PresentationCastle Peak Mining Ltd. Investor Presentation
Castle Peak Mining Ltd. Investor Presentation
 
Asanko jv webcast preso final
Asanko jv webcast preso finalAsanko jv webcast preso final
Asanko jv webcast preso final
 
Cascada updated corporate presentation september 2021
Cascada updated corporate presentation september 2021Cascada updated corporate presentation september 2021
Cascada updated corporate presentation september 2021
 
Cascada updated corporate presentation july 2021
Cascada updated corporate presentation july 2021Cascada updated corporate presentation july 2021
Cascada updated corporate presentation july 2021
 
December 2021 - Riley Gold Corporate Presentation
December 2021  - Riley Gold Corporate PresentationDecember 2021  - Riley Gold Corporate Presentation
December 2021 - Riley Gold Corporate Presentation
 
Lion One Metals Presentation July 2021
Lion One Metals Presentation July 2021Lion One Metals Presentation July 2021
Lion One Metals Presentation July 2021
 
Alder Presentation September 2013
Alder Presentation September 2013Alder Presentation September 2013
Alder Presentation September 2013
 
12.3 2016 investor presentation
12.3 2016 investor presentation12.3 2016 investor presentation
12.3 2016 investor presentation
 

Destacado

Unpacking Zimbabwe's Indigenisation Policy, Legislation and Way Forward
Unpacking Zimbabwe's Indigenisation Policy, Legislation and Way ForwardUnpacking Zimbabwe's Indigenisation Policy, Legislation and Way Forward
Unpacking Zimbabwe's Indigenisation Policy, Legislation and Way ForwardObjective Capital Conferences
 
Revitalising the economy and encouraging inward investment
Revitalising the economy and encouraging inward investmentRevitalising the economy and encouraging inward investment
Revitalising the economy and encouraging inward investmentObjective Capital Conferences
 

Destacado (16)

The social agenda: creating a brighter future
The social agenda: creating a brighter futureThe social agenda: creating a brighter future
The social agenda: creating a brighter future
 
Transparency in the extractive industries
Transparency in the extractive industriesTransparency in the extractive industries
Transparency in the extractive industries
 
Artisanal gold mining
Artisanal gold miningArtisanal gold mining
Artisanal gold mining
 
Developing in a giant copper belt
Developing in a giant copper beltDeveloping in a giant copper belt
Developing in a giant copper belt
 
Global gold overview
Global gold overviewGlobal gold overview
Global gold overview
 
The African risk / reward
The African risk / rewardThe African risk / reward
The African risk / reward
 
Unpacking Zimbabwe's Indigenisation Policy, Legislation and Way Forward
Unpacking Zimbabwe's Indigenisation Policy, Legislation and Way ForwardUnpacking Zimbabwe's Indigenisation Policy, Legislation and Way Forward
Unpacking Zimbabwe's Indigenisation Policy, Legislation and Way Forward
 
Revitalising the economy and encouraging inward investment
Revitalising the economy and encouraging inward investmentRevitalising the economy and encouraging inward investment
Revitalising the economy and encouraging inward investment
 
The Southern African lithium opportunity
The Southern African lithium opportunityThe Southern African lithium opportunity
The Southern African lithium opportunity
 
Exploring past gold producers
Exploring past gold producersExploring past gold producers
Exploring past gold producers
 
Investing in african mining equities
Investing in african mining equitiesInvesting in african mining equities
Investing in african mining equities
 
Siribaya: A Special West African Opportunity
Siribaya: A Special West African OpportunitySiribaya: A Special West African Opportunity
Siribaya: A Special West African Opportunity
 
The Zimbabwe investment opportunity
The Zimbabwe investment opportunityThe Zimbabwe investment opportunity
The Zimbabwe investment opportunity
 
South Africa: coal, the fuel of growth
South Africa: coal, the fuel of growthSouth Africa: coal, the fuel of growth
South Africa: coal, the fuel of growth
 
Zimbabwe: a great place to mine?
Zimbabwe: a great place to mine?Zimbabwe: a great place to mine?
Zimbabwe: a great place to mine?
 
Guinea-Bissau: phosphate for food
Guinea-Bissau: phosphate for foodGuinea-Bissau: phosphate for food
Guinea-Bissau: phosphate for food
 

Similar a Building the Premier Central African gold producer

BeMetals Presentation_October 2023.pdf
BeMetals Presentation_October 2023.pdfBeMetals Presentation_October 2023.pdf
BeMetals Presentation_October 2023.pdfDerekIwanaka2
 
BeMetals Presentation_February_15_2024.pdf
BeMetals Presentation_February_15_2024.pdfBeMetals Presentation_February_15_2024.pdf
BeMetals Presentation_February_15_2024.pdfDerekIwanaka1
 
BeMetals Presentation_November 2023.pdf
BeMetals Presentation_November 2023.pdfBeMetals Presentation_November 2023.pdf
BeMetals Presentation_November 2023.pdfDerekIwanaka1
 
BeMetals Presentation_August 4, 2022.pdf
BeMetals Presentation_August 4, 2022.pdfBeMetals Presentation_August 4, 2022.pdf
BeMetals Presentation_August 4, 2022.pdfDerekIwanaka1
 
BeMetals Presentation_July 26, 2022.pdf
BeMetals Presentation_July 26, 2022.pdfBeMetals Presentation_July 26, 2022.pdf
BeMetals Presentation_July 26, 2022.pdfDerekIwanaka1
 
BeMetals Presentation_November 8, 2022.pdf
BeMetals Presentation_November 8, 2022.pdfBeMetals Presentation_November 8, 2022.pdf
BeMetals Presentation_November 8, 2022.pdfDerekIwanaka2
 
BeMetals Presentation - January 4, 2022
BeMetals Presentation - January 4, 2022BeMetals Presentation - January 4, 2022
BeMetals Presentation - January 4, 2022DerekIwanaka1
 
BeMetals Presentation_October 4, 2022.pdf
BeMetals Presentation_October 4, 2022.pdfBeMetals Presentation_October 4, 2022.pdf
BeMetals Presentation_October 4, 2022.pdfDerekIwanaka1
 
BeMetals Presentation_June 1, 2022.pdf
BeMetals Presentation_June 1, 2022.pdfBeMetals Presentation_June 1, 2022.pdf
BeMetals Presentation_June 1, 2022.pdfDerek Iwanaka
 
BeMetals Presentation_May 2022.pdf
BeMetals Presentation_May 2022.pdfBeMetals Presentation_May 2022.pdf
BeMetals Presentation_May 2022.pdfDerek Iwanaka
 
BeMetals Presentation_Updated_April 1, 2024.pdf
BeMetals Presentation_Updated_April 1, 2024.pdfBeMetals Presentation_Updated_April 1, 2024.pdf
BeMetals Presentation_Updated_April 1, 2024.pdfDerekIwanaka1
 
BeMetals Presentation_June 2023.pdf
BeMetals Presentation_June 2023.pdfBeMetals Presentation_June 2023.pdf
BeMetals Presentation_June 2023.pdfDerekIwanaka2
 
BeMetals Presentation_February 1, 2023.pdf
BeMetals Presentation_February 1, 2023.pdfBeMetals Presentation_February 1, 2023.pdf
BeMetals Presentation_February 1, 2023.pdfDerekIwanaka1
 
BeMetals Presentation_March 1, 2023.pdf
BeMetals Presentation_March 1, 2023.pdfBeMetals Presentation_March 1, 2023.pdf
BeMetals Presentation_March 1, 2023.pdfDerekIwanaka1
 
BeMetals Presentation_May 2023.pdf
BeMetals Presentation_May 2023.pdfBeMetals Presentation_May 2023.pdf
BeMetals Presentation_May 2023.pdfDerekIwanaka2
 
BeMetals Presentation_December 1, 2022.pdf
BeMetals Presentation_December 1, 2022.pdfBeMetals Presentation_December 1, 2022.pdf
BeMetals Presentation_December 1, 2022.pdfDerekIwanaka2
 
Investor Presentation - November 2010
Investor Presentation - November 2010Investor Presentation - November 2010
Investor Presentation - November 2010dalradianresources
 
Dalradian corporate presentation sept 10 2013 final
Dalradian corporate presentation sept 10 2013 finalDalradian corporate presentation sept 10 2013 final
Dalradian corporate presentation sept 10 2013 finalDalradianResource
 

Similar a Building the Premier Central African gold producer (20)

BeMetals Presentation_October 2023.pdf
BeMetals Presentation_October 2023.pdfBeMetals Presentation_October 2023.pdf
BeMetals Presentation_October 2023.pdf
 
BeMetals Presentation_February_15_2024.pdf
BeMetals Presentation_February_15_2024.pdfBeMetals Presentation_February_15_2024.pdf
BeMetals Presentation_February_15_2024.pdf
 
BeMetals Presentation_November 2023.pdf
BeMetals Presentation_November 2023.pdfBeMetals Presentation_November 2023.pdf
BeMetals Presentation_November 2023.pdf
 
BeMetals Presentation_August 4, 2022.pdf
BeMetals Presentation_August 4, 2022.pdfBeMetals Presentation_August 4, 2022.pdf
BeMetals Presentation_August 4, 2022.pdf
 
BeMetals Presentation_July 26, 2022.pdf
BeMetals Presentation_July 26, 2022.pdfBeMetals Presentation_July 26, 2022.pdf
BeMetals Presentation_July 26, 2022.pdf
 
BeMetals Presentation_November 8, 2022.pdf
BeMetals Presentation_November 8, 2022.pdfBeMetals Presentation_November 8, 2022.pdf
BeMetals Presentation_November 8, 2022.pdf
 
BeMetals Presentation - January 4, 2022
BeMetals Presentation - January 4, 2022BeMetals Presentation - January 4, 2022
BeMetals Presentation - January 4, 2022
 
BeMetals Presentation_October 4, 2022.pdf
BeMetals Presentation_October 4, 2022.pdfBeMetals Presentation_October 4, 2022.pdf
BeMetals Presentation_October 4, 2022.pdf
 
BeMetals Presentation_June 1, 2022.pdf
BeMetals Presentation_June 1, 2022.pdfBeMetals Presentation_June 1, 2022.pdf
BeMetals Presentation_June 1, 2022.pdf
 
BeMetals Presentation_May 2022.pdf
BeMetals Presentation_May 2022.pdfBeMetals Presentation_May 2022.pdf
BeMetals Presentation_May 2022.pdf
 
Ssp june 27
Ssp june 27Ssp june 27
Ssp june 27
 
BeMetals Presentation_Updated_April 1, 2024.pdf
BeMetals Presentation_Updated_April 1, 2024.pdfBeMetals Presentation_Updated_April 1, 2024.pdf
BeMetals Presentation_Updated_April 1, 2024.pdf
 
BeMetals Presentation_June 2023.pdf
BeMetals Presentation_June 2023.pdfBeMetals Presentation_June 2023.pdf
BeMetals Presentation_June 2023.pdf
 
BeMetals Presentation_February 1, 2023.pdf
BeMetals Presentation_February 1, 2023.pdfBeMetals Presentation_February 1, 2023.pdf
BeMetals Presentation_February 1, 2023.pdf
 
BeMetals Presentation_March 1, 2023.pdf
BeMetals Presentation_March 1, 2023.pdfBeMetals Presentation_March 1, 2023.pdf
BeMetals Presentation_March 1, 2023.pdf
 
BeMetals Presentation_May 2023.pdf
BeMetals Presentation_May 2023.pdfBeMetals Presentation_May 2023.pdf
BeMetals Presentation_May 2023.pdf
 
BeMetals Presentation_December 1, 2022.pdf
BeMetals Presentation_December 1, 2022.pdfBeMetals Presentation_December 1, 2022.pdf
BeMetals Presentation_December 1, 2022.pdf
 
Ssp august
Ssp augustSsp august
Ssp august
 
Investor Presentation - November 2010
Investor Presentation - November 2010Investor Presentation - November 2010
Investor Presentation - November 2010
 
Dalradian corporate presentation sept 10 2013 final
Dalradian corporate presentation sept 10 2013 finalDalradian corporate presentation sept 10 2013 final
Dalradian corporate presentation sept 10 2013 final
 

Más de Objective Capital Conferences

Skin Elements Corporate Presentation - London, Dec 2017
Skin Elements Corporate Presentation - London, Dec 2017 Skin Elements Corporate Presentation - London, Dec 2017
Skin Elements Corporate Presentation - London, Dec 2017 Objective Capital Conferences
 
Century Iron Mines Corporate Presentation - November 2013
Century Iron Mines Corporate Presentation - November 2013Century Iron Mines Corporate Presentation - November 2013
Century Iron Mines Corporate Presentation - November 2013Objective Capital Conferences
 

Más de Objective Capital Conferences (20)

Skin Elements Corporate Presentation - London, Dec 2017
Skin Elements Corporate Presentation - London, Dec 2017 Skin Elements Corporate Presentation - London, Dec 2017
Skin Elements Corporate Presentation - London, Dec 2017
 
Organto Presentation - November 2016
Organto Presentation - November 2016Organto Presentation - November 2016
Organto Presentation - November 2016
 
The next generation in proppants
The next generation in proppantsThe next generation in proppants
The next generation in proppants
 
The Global Proppants Industry
The Global Proppants IndustryThe Global Proppants Industry
The Global Proppants Industry
 
Next-Generation Fly-Ash Based Proppants
Next-Generation Fly-Ash Based ProppantsNext-Generation Fly-Ash Based Proppants
Next-Generation Fly-Ash Based Proppants
 
Goviex
GoviexGoviex
Goviex
 
CanAlaska Uranium
CanAlaska UraniumCanAlaska Uranium
CanAlaska Uranium
 
Uranium Equities
Uranium EquitiesUranium Equities
Uranium Equities
 
The World Nuclear Industry Status Report
The World Nuclear Industry Status ReportThe World Nuclear Industry Status Report
The World Nuclear Industry Status Report
 
KBL Mining Corporate Presentation - June 2015
KBL Mining Corporate Presentation - June 2015KBL Mining Corporate Presentation - June 2015
KBL Mining Corporate Presentation - June 2015
 
Century Iron Mines Corporate Presentation - November 2013
Century Iron Mines Corporate Presentation - November 2013Century Iron Mines Corporate Presentation - November 2013
Century Iron Mines Corporate Presentation - November 2013
 
Canoel International Energy - October 2013
Canoel International Energy - October 2013Canoel International Energy - October 2013
Canoel International Energy - October 2013
 
Century Iron Corporate Presentation - May 2013
Century Iron Corporate Presentation - May 2013Century Iron Corporate Presentation - May 2013
Century Iron Corporate Presentation - May 2013
 
Century Iron Mines Corporation
Century Iron Mines CorporationCentury Iron Mines Corporation
Century Iron Mines Corporation
 
Building the next Saskatchewan potash giant
Building the next Saskatchewan potash giantBuilding the next Saskatchewan potash giant
Building the next Saskatchewan potash giant
 
Building the Italian antimony industry
Building the Italian antimony industryBuilding the Italian antimony industry
Building the Italian antimony industry
 
'In the elevator'
'In the elevator''In the elevator'
'In the elevator'
 
Developing Gold Projects in Tanzania and Namibia
Developing Gold Projects in Tanzania and NamibiaDeveloping Gold Projects in Tanzania and Namibia
Developing Gold Projects in Tanzania and Namibia
 
Building the next gold giant
Building the next gold giantBuilding the next gold giant
Building the next gold giant
 
What is the future of the Rare Earths sector?
What is the future of the Rare Earths sector?What is the future of the Rare Earths sector?
What is the future of the Rare Earths sector?
 

Último

20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdfChris Skinner
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 
Welding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsWelding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsIndiaMART InterMESH Limited
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...Operational Excellence Consulting
 
digital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingdigital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingrajputmeenakshi733
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 
Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckHajeJanKamps
 
BAILMENT & PLEDGE business law notes.pptx
BAILMENT & PLEDGE business law notes.pptxBAILMENT & PLEDGE business law notes.pptx
BAILMENT & PLEDGE business law notes.pptxran17april2001
 
Supercharge Your eCommerce Stores-acowebs
Supercharge Your eCommerce Stores-acowebsSupercharge Your eCommerce Stores-acowebs
Supercharge Your eCommerce Stores-acowebsGOKUL JS
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdftrending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdfMintel Group
 
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...SOFTTECHHUB
 
NAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataNAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Technical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamTechnical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamArik Fletcher
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Introducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsIntroducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsKnowledgeSeed
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesDoe Paoro
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...Hector Del Castillo, CPM, CPMM
 

Último (20)

20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 
Welding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsWelding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan Dynamics
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
 
digital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingdigital marketing , introduction of digital marketing
digital marketing , introduction of digital marketing
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 
Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deck
 
BAILMENT & PLEDGE business law notes.pptx
BAILMENT & PLEDGE business law notes.pptxBAILMENT & PLEDGE business law notes.pptx
BAILMENT & PLEDGE business law notes.pptx
 
Supercharge Your eCommerce Stores-acowebs
Supercharge Your eCommerce Stores-acowebsSupercharge Your eCommerce Stores-acowebs
Supercharge Your eCommerce Stores-acowebs
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdftrending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
 
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
 
NAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataNAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors Data
 
Technical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamTechnical Leaders - Working with the Management Team
Technical Leaders - Working with the Management Team
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Introducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsIntroducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applications
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic Experiences
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
 

Building the Premier Central African gold producer

  • 1. AFRICA RESOURCES INVESTMENT CONGRESS Building the Premier Central African gold producer Simon Village – Banro Corporation IRONMONGERS’ HALL, CITY OF LONDON TUESDAY-WEDNESDAY, 14-15 JUN 2011 www.ObjectiveCapitalConferences.com 0
  • 2. Building the Premier Central African gold producer Simon Village Chairman & CEO June 2011
  • 3. Cautionary Notes This document shall not constitute an offer to sell or the solicitation of an offer to buy any securities of Banro Corporation (“the Company”). Cautionary Note Concerning Forward-Looking Statements: This presentation contains forward-looking statements. All statements, other than statements of historical fact, that address activities, events or developments that the "Company believes, expects or anticipates will or may occur in the future (including, without limitation, statements regarding estimates and/or assumptions in respect of gold production, revenue, cash flow and costs, estimated project economics, mineral resource and mineral reserve estimates, potential mineralization, potential mineral resources and mineral reserves, projected timing of possible gold production and the Company's exploration and development plans and objectives with respect to its projects) are forward-looking statements. These forward-looking statements reflect the current expectations or beliefs of the Company based on information currently available to the Company. Forward-looking statements are subject to a number of risks and uncertainties that may cause the actual results of the Company to differ materially from those discussed in the forward-looking statements, and even if such actual results are realized or substantially realized, there can be no assurance that they will have the expected consequences to, or effects on the Company. Factors that could cause actual results or events to differ materially from current expectations include, among other things: uncertainty of estimates of capital and operating costs, gold production estimates and estimated economic return; the possibility that actual circumstances will differ from the estimates and assumptions used in the economic studies of Company gold properties; failure to establish estimated mineral resources or mineral reserves; fluctuations in gold prices and currency exchange rates; uncertainties relating to the availability and costs of any financing needed in the future; inflation; gold recoveries being less than those indicated by the metallurgical test work carried out to date (there can be no assurance that gold recoveries in small scale laboratory tests will be duplicated in large tests under on-site conditions or during production); changes in equity markets; political developments in the Democratic Republic of the Congo; lack of infrastructure; failure to procure or maintain, or delays in procuring or maintaining, permits and approvals; lack of availability at a reasonable cost or at all, of plants, equipment or labour; inability to attract and retain key management and personnel; changes to regulations affecting the Company's activities; the uncertainties involved in interpreting drilling results and other geological data; and the other risks disclosed under the heading "Risk Factors" and elsewhere in the Company's annual information form dated March 29, 2011 filed on SEDAR at www.sedar.com and EDGAR at www.sec.gov. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Although the Company believes that the assumptions inherent in the forward-looking statements are reasonable, forward-looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such statements due to the inherent uncertainty therein. The preliminary economic assessment of the Company’s Namoya heap leach project is preliminary in nature and includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that the conclusions reached in the preliminary economic assessment will be realized. Cautionary Note Concerning Resource and Reserve Estimates: The Company’s mineral resource and mineral reserve figures are estimates and no assurances can be given that the indicated levels of gold will be produced. Such estimates are expressions of judgment based on knowledge, mining experience, analysis of drilling results and industry practices. Valid estimates made at a given time may significantly change when new information becomes available. While the Company believes that its mineral resource and mineral reserve estimates are well established, by their nature mineral resource and mineral reserve estimates are imprecise and depend, to a certain extent, upon statistical inferences which may ultimately prove unreliable. If such estimates are inaccurate or are reduced in the future, this could have a material adverse impact on the Company. Mineral resources that are not mineral reserves do not have demonstrated economic viability. There is no certainty that mineral resources can be upgraded to mineral reserves through continued exploration. Due to the uncertainty that may be attached to inferred mineral resources, it cannot be assumed that all or any part of an inferred mineral resource will be upgraded to an indicated or measured mineral resource as a result of continued exploration. Confidence in the estimate is insufficient to allow meaningful application of the technical and economic parameters to enable an evaluation of economic viability worthy of public disclosure (except in certain limited circumstances). Inferred mineral resources are excluded from estimates forming the basis of a feasibility study. The United States Securities and Exchange Commission (the "SEC") permits U.S. mining companies, in their filings with the SEC, to disclose only those mineral deposits that a company can economically and legally extract or produce. Certain terms are used by Banro, such as "measured", "indicated", and "inferred" "resources", that the SEC guidelines strictly prohibit U.S. registered companies from including in their filings with the SEC. U.S. Investors are urged to consider closely the disclosure in Banro's Form 40- F Registration Statement, File No. 001-32399, which may be secured from Banro, or from the SEC's website at http://www.sec.gov/edgar.shtml. The Namoya preliminary economic assessment referred to herein is preliminary in nature and includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that the conclusions reached in the preliminary economic assessment will be realized. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Additional information regarding Banro and its gold properties is included in the Company’s annual information form dated March 29, 2011, a copy of which has been filed on, and can be obtained from, SEDAR at www.sedar.com and EDGAR at www.sec.gov. Qualified Person: Daniel K. Bansah, who is Vice President, Exploration of the Company and a "qualified person" (as such term is defined in Canadian National Instrument 43- 101), has reviewed the technical information in this presentation. 2
  • 4. Banro at a Glance – transition to producer Offices Toronto (Corporate) Bukavu & Kinshasa (Operations) Flagship project – Twangiza (Phase I) Democratic with planned gold production in Q4 2011 Republic of the Congo 4 additional projects along the belt: o Namoya o Twangiza Phase II o Lugushwa o Kamituga TSX, NYSE AMEX: BAA US$600 million market cap 190.7 million shares outstanding 209.3 million fully diluted Financial position o Cash $68 million as at June 14th 2011 o Fully-funded to Twangiza production Twangiza Phase 1 – Civil works 93% complete; structural 80% complete 3
  • 5. Twangiza-Namoya gold belt equal in size & geologic potential to Ashanti belt in Ghana Twangiza-Namoya Ashanti Gold Gold Belt (DRC) Belt (Ghana) Both maps at same scale 4
  • 6. Board with proven track records in Africa & in Gold Simon Village, Chairman & CEO • Former Managing Director, World Gold Council; founder of Exchange Traded Gold; HSBC Managing Director for Global Mining , Mining Engineer (Anglo American/De Beers), joined Banro’s board in 2004; appointed CEO in 2010 Arnold Kondrat Dr. Peter Ruxton Exec VP & Director Director • Founder Banro Corp. • Former partner, Actis Capital • Active in the DRC since 1996 • Former Exploration • President, Sterling Portfolio Manager, Billiton Securities Inc. • CEO Gentor Resources; director, Platmin; Chairman GGG Resources Peter Cowley Richard Lachcik Director Director • CEO Loncor Resources • Partner, Macleod Dixon LLP; chair • Former Managing of Global Mining Group Director, Ashanti Goldfields • Specialty in securities law Exploration Dr. John Clarke Bernard van Rooyen Director Director • Former CEO Nevsun Resources • Director for Mvelaphanda • Former Exec. Director Ashanti Resources, Ndowana Goldfields Ltd. Exploration, Northam Platinum & • Director Mediterranean Trans Hex Group Resources 5
  • 7. Strong in-country expertise; Flat management structure Minimal turnover at all levels Board of Directors Executive Committee 6
  • 8. Resources Summary  2011 budget will increase Reserves by +2mozs  Growth in Resources & Reserves along the belt Property Measured & Inferred Indicated Oz gold Oz gold Twangiza 5,600,000 400,000 Namoya 1,138,305 543,125 Lugushwa 2,735,000 Kamituga 915,000 TOTAL 6,738,305 4,593,125 7
  • 9. Five significant projects in the Twangiza-Namoya Gold Belt 210 km gold belt with multiple gold prospects Extensive artisanal gold workings throughout entire belt In order of planned development: 1. Twangiza Phase I 2. Namoya Heap Leach 3. Twangiza Phase II Exploration: 4. Kamituga 5. Lugushwa 8
  • 10. Targeted production profile 500,000 450,000 400,000 350,000 Ounces 300,000 of gold 250,000 200,000 150,000 100,000 50,000 0 2011 2012 2013 2014 2015 2016 Twangiza Phase I Namoya Twangiza Phase II 9
  • 11. Twangiza Phase 1 Overview: +1 million ounces of gold Phase I – Oxide material Total gold production expected to be + 1 million ozs over 8 years Plant designed to process 1.7mtpa with annual production of 119,303 ozs* for first 5 years @ cash cost of US$356/oz** Total capital expenditure – US$209 Million Planned gold production in Q4 2011 • Royalty payment of 1% of gold revenues • Net profit payment of 4% (after return of capital) • Cash flow from Twangiza I to be used to fast track Banro’s second gold mine development at Namoya (scheduled for completion by end 2013) Twangiza Phase II – “Transition” & Sulphide Material • Separate processing facility • Recently commissioned economic assessment for Phase II including detailed metallurgical study & plant design • Anticipate production from Twangiza Phase I and Namoya Heap Leach project to fund development of Twangiza Phase II * Based on SRK projections and does not include Management’s plans to increase gold output via selectivity, grade control and use of 4g/t Au valley fill material (not included in SRK projections) **Diesel costs represent approximately 40% of the total cash cost 10
  • 12. Twangiza Main Pit – Phase I Oxide (1.7mtpa) & Phase II (4mtpa) transition/fresh rock Oxide Pit Final Pit Strip ratio: 1.5:1 over LOM 11
  • 13. Namoya – Low cost heap leach operation NAMOYA PROJECT (Mwendamboko Prospect; Section 5) AMEX 560900 mE 560800 mE 561000 mE TSX: Namoya – Overview 5.0m@13.26g/t 26.0m@13.43g/t 1000 mN 1000 mN • 100% owned by Banro SW G5N NDD05 NDD03 NE • 2.5km long mineralized zone with 4 main G25 6.0m@3.75g/t Pit outline deposits in 175km2 area 26.54m@5.96g/t 29.0m@15.10g/t • Banro work to date includes: 900 mN 2.77m@2.53g/t 39.37m@3.63g/t 900 mN • 209 diamond drill holes Sericite Schist Base of complete oxidation • Extensive resampling of old mine adits 7.27m@1.99g/t Quartz Sericite Schist Chlorite Schist • Preliminary assessments in 2007 & 2011 Diorite/Quartz Diorite intrusive Quartz vein/stockwork Top of fresh rock 0 20 40 Mineralization intercept Metres Namoya – Preliminary Assessment 2011 Namoya – Strategy • 124,053 oz Au/year • Second development • 7 year mine life, open pit project for Banro following Twangiza Phase 1 • Total cash cost = US$359/oz • Cash flows from Twangiza • Initial capital cost = $118.2 million Phase 1 and Namoya can • On-going capital costs = $15.1 million allow Banro to build hydro • 1 year payback on project capex plant required for Twangiza Phase II 12
  • 14. Twangiza – Namoya infrastructure 700000 mE 500000 mE 600000 mE N2 road under construction by the Lake Kivu Chinese (World Bank Project) N Bukavu N2 Walungu 9700000 mN Shabunda N5 9700000 mN Lubanda HEP TWANGIZA KAMITUGA Mwenga Pangi HEP N5 LUGUSHWA Uvira Itula N2 9600000 mN 9600000 mN Kalole LEGEND Lake Tanganyika Rivers NAMOYA Towns Main Roads and Towns Secondary/other Roads Permits for Exploitation 700000 mE 600000 mE 0 25 50 Permits granted and under kilometres Fizi application 13
  • 15. Hydro power potential Hydro power generation would advance the rate of development in the Twangiza-Namoya Gold Belt & maximize profitability  At a cost of US$120 million, the first phase of a hydro electric power generating facility will be built 25km from Twangiza with a generation capacity of 30MW  Additional US$60 million to expand generation facility to increase capacity to 66MW  Hydro electric power would reduce production cash costs by approximately US$100/oz for both Twangiza Phase I and Phase II 14
  • 16. Hydro potential will contain cost inflation & reduce initial cash costs by at least $100/oz 450 400 350 300 250 (US$/oz) 200 150 100 50 0 2011 2012 2013 2014 2015 Twangiza Phase I Namoya Twangiza Phase II 15
  • 17. The Banro Foundation A Responsible approach to operating in the DRC New High School near Twangiza Martin Jones, Head of Banro Foundation  Founded in 2005, the Banro Foundation has been reorganized as a stand-alone charity, focused on education, health and infrastructure improvements, as well as humanitarian relief.  Projects completed to date include two high schools, two primary schools, a health care centre, a potable water project serving 18,000 people, the rehabilitation of over 100 km of roads and bridges + many more projects.  In December 2009, Banro was recognized for its contributions to Congolese reconstruction with an Award of Merit from a leading Congolese youth group. Potable Water System for 18,000 People New High School near Namoya 16
  • 18. Relative Valuation – P/NAV Note: Purple denotes African Company Source: CIBC World Markets 17
  • 19. Relative Valuation – US$ EV per Ounce Source: CIBC World Markets 18
  • 20. Banro – on the cusp of being a leading Central African Gold Producer  Banro has a strong in-country presence with technical capability in exploration and project development  Banro has a World Class project pipeline and is well on its way to being a low cost gold producer (Q4 2011)  The open-pitable, low cost nature of the projects, and unique potential of Hydro electric power should differentiate Banro on the Global Cost curve  The company’s knowledge of the African continent combined with strong future cash-flow will allow the Company to consider expanding geographically and diversifying the risk associated with operating in an emerging country www.banro.com 19
  • 22. Appendix I Banro Resources Property Measured Indicated Inferred Tons g/t Au Oz Au Tons g/t Au Oz Au Tons g/t Au Oz Au Twangiza 17,200,000 2.40 1,320,000 90,300,000 1.50 4,280,000 8,280,000 1.70 400,000 Namoya 4,270,666 2.76 378,969 10,305,495 2.29 759,336 8,952,162 1.89 543,126 Lugushwa 37,000,000 2.30 2,735,000 Kamituga 7,260,000 3.9 915,000 TOTAL 1,698,969 5,039,336 4,593,126 At 1g/t Au cut-off for Kamituga and Lugushwa; 0.5 g/t Au for Twangiza; 0.4 g/t Au for Namoya 21
  • 23. Appendix II Banro Warrants Date Issued # of Warrants Expiry date Exercise price Value Sept 17, 2008 5,836,811 Sept 17, 2011 US$2.20 US$12,840,984 March 4, 2011 1,050,000 Feb 24, 2013 CAD$3.25 CAD$3,412,500 22

Notas del editor

  1. In terms of mining the video footage reflected the North and Main pits, of which this section reflects a cross section through the main pit. The significant widths and higher grade nature of the oxides, combined with the low strip ratio of around 1.5:1, leads to not only the relatively low cash cost by industry standards, but also easier mining. The chart also reflects the boundary between the Phase I oxides and the Phase II Transitional and Fresh rock.
  2. More important to our transition into producer status, and future growth is a very capable and competent management team that we have been able to attract over the past 6 years equipping Banro with the right skills, covering exploration, development and managing open pit gold mining projects in Africa. The management structure is flat, with clear lines of responsibility and accountability in the divisions of exploration, construction, mine management, finance and social. I believe that one of our key strengths is that the Excom is based in country, with the Executive Committee meets every 4 weeks in Bukavu with the key focus on the Twangiza constriction as well as near term reserve i.e. The next mineable ounces, generation.With a very well aligned incentive structure to project and exploration deliverables, the result to date has been a fast tracked production timetable.
  3. In terms of mining the video footage reflected the North and Main pits, of which this section reflects a cross section through the main pit. The significant widths and higher grade nature of the oxides, combined with the low strip ratio of around 1.5:1, leads to not only the relatively low cash cost by industry standards, but also easier mining. The chart also reflects the boundary between the Phase I oxides and the Phase II Transitional and Fresh rock.
  4. In terms of mining the video footage reflected the North and Main pits, of which this section reflects a cross section through the main pit. The significant widths and higher grade nature of the oxides, combined with the low strip ratio of around 1.5:1, leads to not only the relatively low cash cost by industry standards, but also easier mining. The chart also reflects the boundary between the Phase I oxides and the Phase II Transitional and Fresh rock.
  5. In terms of mining the video footage reflected the North and Main pits, of which this section reflects a cross section through the main pit. The significant widths and higher grade nature of the oxides, combined with the low strip ratio of around 1.5:1, leads to not only the relatively low cash cost by industry standards, but also easier mining. The chart also reflects the boundary between the Phase I oxides and the Phase II Transitional and Fresh rock.
  6. In terms of mining the video footage reflected the North and Main pits, of which this section reflects a cross section through the main pit. The significant widths and higher grade nature of the oxides, combined with the low strip ratio of around 1.5:1, leads to not only the relatively low cash cost by industry standards, but also easier mining. The chart also reflects the boundary between the Phase I oxides and the Phase II Transitional and Fresh rock.