SlideShare una empresa de Scribd logo
1 de 6
Descargar para leer sin conexión
No Tiree Array:-

VALEDICTORY
Following SPR’s press release announcing dropping the Tiree Array and hearing on BBC
News, Jonathan Cole, head of offshore wind at SPR, rationalising SPR’s reasons , NTA
was flooded with calls, and emails, from its many supporters with expressions of joy, and
relief.
Many posed the very obvious question :- “ how come it took SPR so long ,and at so
much cost, to come to this conclusion” .
In 2008,during SPR’s site selection process, if SPR had spoken to one of Tiree’s
fisherman SPR would have been told :-" Nae chance.... efter a Tiree storm my
creels at Skerryvore shift 3-5 km .. they got nae chance to build the f..kng
thing”
Many wise Tiree heads endorsed this perspective.
Did SPR check out the local information that the windows on Skerryvore Lighthouse had
been smashed-in during a storm in the 50’s?
Did anyone from SPR stand, for a day, on the track up to Ben Hynish, to look out to
Skerryvore to be staggered by the huge swell over the reef, and in particular over
Mackenzie ‘s Rock, even in benign weather conditions.
In 2008 how diligent or competent, was SPR’s site selection process??
MS’ scoping opinion suggests SPR may not have been as diligent or competent as SPR would have wished.
Was it greed ? Was it simply the site, one of the windiest locations in the UK, blinded SPR’s critical faculties with its potential to
deliver to SPR an unprecedented cash-cow?
Moving forward:NTA, in Mar 2012, was prescient in forecasting what was to transpire in Dec 2012 ie SPR putting the Array on “12 months hold,
and subject to review” This was simple deduction from Jonathan Cole’s statement to Global Offshore Wind, 10 months earlier
in Feb 2012 that; “construction of the Argyll Array will probably take place a “few years” after the first portion of
Iberdrola’s biggest offshore challenge” (ref to the 7.2GW East Anglia Round) with Cole describing the Tiree Array as
“very challenging”, with harsh waters and complex seabed conditions’.

NTA in its own Summer 2013 review
reported,that there had been no
substantive advance in foundation
design and technology

Re Foundations:
The Tiree Array’s seabed conditions, and the problems they
posed for foundation design, were well known to SPR from
the outset.
At the Sept 2011 SPR hosted trip for Tirisdeachs, to the
Walney -Barrow offshore windfarm, the comments made by
DONG’s’s ( Danish Oil and Gas) Walney-Barrow construction
team, were to prove pregnant with significance.
NTA was an attendee. On the conclusion of DONG’s
presentation NTA asked a very specific question re piling.
DONG replied this had not been a problem, the sea bed was
‘soft’ except for 6 piles when they had hit some ’hard’ stuff.
NTA asked what had been the solution. Dong replied, with a
smile “ we just hit the pile-hammer harder !!
VALEDICTORY Cont’d
The attendees pointed out that the Tiree Array site was rock,specifically lewissean gneiss, which was amongst geology’s hardest
rocks. DONG said “ you have a problem” . When asked if explosives were the solution, replied “NO way .. you can only
drill”.
As we drove back for dinner, NTA remembers, only too well, expanding on this subject with SPR’s Project Engineer , who advised
that gravity foundations were not being considered, because the site would have to be leveled. He referred to the sole application of gravity foundations to date ie Thornton Bank, off the Belgian coast , and advised they hadto be dropped half way
through construction, with a switch to jacket foundations .
Mysteriously gravity foundations subsequently were re-introduced into the frame for the Tiree Array.
The cynic in NTA saw this as:Ÿ a superficial attempt to embrace gravity based foundations claims of minimal site preparation. Presumably this was to
deflect the very obvious environmental ,and visual impact issues, raised by drilling and cutting for Jacket foundations.
And
Ÿ an obvious co-incidence with Scottish Government’s promotion of Kishorn as a production centre for concrete gravity
foundations.

NTA, following this development, challenged every UK - European gravity foundation manufacturer to comment on their
suitability for the Tiree Array site. One manufacturer (Vinci) has a chart on their website stating their design to be Tiree Array
suitable. Not one single manufacturer replied
NTA requested the papers from Marine Scotland’s Oct 2013 Gravity Foundations: Offshore Wind Scotland Conference at which
Fergus Ewing MSP, Minister for Energy delivered the Welcoming Address
NTA asked Marine Scotland to comment on the suitability of gravity foundations suitability for the Tiree Array Site. NTA still
awaits Scottish Government’s reply.
Once again NTA re-circulated all UK–European manufacturers to comment. None replied with the exception of Norway’s
SeaTower Concept. SeaTower originally stated their design was Tiree Array suitable but on further interrogation qualified this by
stating:- “The key parameter is whether the penetration resistance of the ground is such that you can penetrate
skirts or not “. This paramater may not be achievable to the Tiree Array site’s geology.

NTA has questioned the banality of Scottish
Government building, and subsidising, test
sites onshore for the next generation of
off- shore 7 MW turbines ie
Samsung(SKorea) at Methil, with Siemens
(Germany) and Mitsubishi(Japan) at
Hunterston.

Manifestly, the main
barrier to any offshore
wind development on the
WC Scotland, is the lack of
tested foundation
technology.
VALEDICTORY Cont’d
At the same time as Scotland stays onshore for testing, France goes offshore to test. The comparable test Alstom (France )
turbine was installed 40 km off the Belgian Coast shore ( note the Jacket foundation). Installation hit bad weather. It took 6
weeks. The installation vessel ,Fred Olsen’s Bold Tern,may have cost approx US$175,000 per day !!!

Any wonder that off shore wind generation is the most expensive source of electricity.
For all these reasons it is no surprise that SPR has dropped the Tiree Array. But SPR has surprised NTA, and many other
observers, as to why it took SPR so long, and at so much cost, to come to this conclusion.
The Tiree Array’s technology trajectory of construction and generation has apparently, at a stroke, pushed back from its original
perceived 2016-2018 trajectory, to 2030-2040.

NTA is not so naïve as to claim its campaign has achieved the dropping of the
proposed Tiree Array.
NTA may have raised the bar of the quality and substance of the interrogation of Government,and the Developer,to substantiate
their claims, with regard to the development of the proposed Tiree Array.
NTA questioned the efficacy of Scottish Governments’ energy policy, and every technical and economic survey associated with
this possible development. The latter proved naïve and self seeking in the promotion of Governments and the Developer’s
nebulous ,and specious claims of socio-economic gain plus community benefit.
These were supposedly to be derived from the Operation and Maintenance(O&M ) strategy.
SPR and Government played down the basic fundamental that dictates wind farm O&M strategy. It is dictated jointly and
severally by the turbine and offshore HVDC converter manufacture.

O&M is not the decision of the developer

.

The trajectory of O&M is the emergent adoption of specialist manned O&M vessels operating within the off shore wind farm.
Siemens, this summer, committed to the long term charter of two Norwegian built vessels. The Dutch have followed up with a
comparable design. The Danes are marketing a jack-up O&M vessel produced.
Alas there is no sign of the resurrection of Scottish shipbuilding to design and build such vessels.
VALEDICTORY Cont’d

Community Consultation:- The licensing process puts great store in a developer’s Community Consultation process.
NTA shredded SPR‘s community consultation in a comprehensive submission to Marine Scotland.

Visualisations/montages:- NTA produced the first visualisations/montages of the proposed Tiree Array. SPR produced
theirs, reluctantly 6 months later.
VALEDICTORY Cont’d
HVDC Converter Station :- NTA, at a public meeting, may have embarrassed SPR sufficiently to reveal substantive
details of any onshore HVDC station, whilst SPR ducked the issue of deemed consent.
Basking Sharks:- NTA addressed a major basking shark conference informing on the grave environmental consequences
from any development and construction of the Tiree Array site.

Marine Scotland’s Draft Licensing and Consent Manual: Recently NTA completed a forensic line by line
critique of the Marine Scotland’s Draft Licensing and Copnsent Manual. As proposed, it is a developers dream of general
suggestions for ‘shoulds, coulds and maybe’s’ , with no sanctions for any breach ,as opposed to list of ‘must, shall and
will’ directives.
NTA’s critique has been accepted by Marine Scotland. It has been passed to the consultants for consideration into the further
drafting of the manual.

Renewable subsidy :-NTA has been a consistent advocate to UK and Scottish Government that Renewable subsidies –
especially for offshore wind – should be cut if they fail to come down in cost under strict time limits.
The Renewables Industry flagged up, 18 months ago, their commitment to a 2020 target of £100/mw to secure subsidy. Ever
since,the Renewables Industry has been back-tracking, blaming Government for the industries failure to meet its own targets!!
The Tiree Array site remains on a planning map,
as does the possible adoption of the OWW2
,and WW3 sites.
But dropping the proposed Tiree Array implies
that neither of these may be developed until the
required technology trajectory catches up.

It is speculated that this
may not be achieved till
2030-2040, by which time
global energy developments
may render theses sites
irrelevant and redundant.
VALEDICTORY Cont’d

Should the trajectory of global energy development, and global energy consumption render the original proposed Tiree (Array) and the proposed, for
adoption, OWW2/WW3 sites redundant, then NTA will have achieved its
objective.
Meanwhile the decision to drop the Array leaves Tiree to its stunning beauty,and spectacular seascapes .

Dec 2013

Más contenido relacionado

La actualidad más candente

Offshore wind and marine energy workshop280212 presentación javier marqués
Offshore wind and marine energy workshop280212 presentación javier marquésOffshore wind and marine energy workshop280212 presentación javier marqués
Offshore wind and marine energy workshop280212 presentación javier marquésBritish Embassy Madrid
 
Offshore Wind – A New Market for Land-Based Wind Developers and Their Supply ...
Offshore Wind – A New Market for Land-Based Wind Developers and Their Supply ...Offshore Wind – A New Market for Land-Based Wind Developers and Their Supply ...
Offshore Wind – A New Market for Land-Based Wind Developers and Their Supply ...Energy Network marcus evans
 
World ROV Operations Market Forecast 2015-2019 Leaflet + Contents
World ROV Operations Market Forecast 2015-2019 Leaflet + ContentsWorld ROV Operations Market Forecast 2015-2019 Leaflet + Contents
World ROV Operations Market Forecast 2015-2019 Leaflet + ContentsDouglas-Westwood
 
Open hydro presentation workshop 20100507
Open hydro presentation   workshop 20100507Open hydro presentation   workshop 20100507
Open hydro presentation workshop 20100507Green17Creative
 
World Onshore Pipelines Market Forecast 2015-2019 Leaflet + Contents
World Onshore Pipelines Market Forecast 2015-2019 Leaflet + ContentsWorld Onshore Pipelines Market Forecast 2015-2019 Leaflet + Contents
World Onshore Pipelines Market Forecast 2015-2019 Leaflet + ContentsDouglas-Westwood
 

La actualidad más candente (8)

Offshore wind and marine energy workshop280212 presentación javier marqués
Offshore wind and marine energy workshop280212 presentación javier marquésOffshore wind and marine energy workshop280212 presentación javier marqués
Offshore wind and marine energy workshop280212 presentación javier marqués
 
Open Hydro
Open HydroOpen Hydro
Open Hydro
 
Offshore Wind – A New Market for Land-Based Wind Developers and Their Supply ...
Offshore Wind – A New Market for Land-Based Wind Developers and Their Supply ...Offshore Wind – A New Market for Land-Based Wind Developers and Their Supply ...
Offshore Wind – A New Market for Land-Based Wind Developers and Their Supply ...
 
World ROV Operations Market Forecast 2015-2019 Leaflet + Contents
World ROV Operations Market Forecast 2015-2019 Leaflet + ContentsWorld ROV Operations Market Forecast 2015-2019 Leaflet + Contents
World ROV Operations Market Forecast 2015-2019 Leaflet + Contents
 
Open Hydro
Open HydroOpen Hydro
Open Hydro
 
Open hydro presentation workshop 20100507
Open hydro presentation   workshop 20100507Open hydro presentation   workshop 20100507
Open hydro presentation workshop 20100507
 
G.E.T. Smart - Smart Renewables: Principal Power Presentation
G.E.T. Smart - Smart Renewables: Principal Power PresentationG.E.T. Smart - Smart Renewables: Principal Power Presentation
G.E.T. Smart - Smart Renewables: Principal Power Presentation
 
World Onshore Pipelines Market Forecast 2015-2019 Leaflet + Contents
World Onshore Pipelines Market Forecast 2015-2019 Leaflet + ContentsWorld Onshore Pipelines Market Forecast 2015-2019 Leaflet + Contents
World Onshore Pipelines Market Forecast 2015-2019 Leaflet + Contents
 

Destacado

2013 рік - підсумки і плани ДемАльянсу
2013 рік - підсумки і плани ДемАльянсу2013 рік - підсумки і плани ДемАльянсу
2013 рік - підсумки і плани ДемАльянсуVera Gruzova
 
Volcanesexposicionfinal2 131116080406-phpapp02
Volcanesexposicionfinal2 131116080406-phpapp02Volcanesexposicionfinal2 131116080406-phpapp02
Volcanesexposicionfinal2 131116080406-phpapp02Elena Bermúdez Redrajo
 
3 Ideas para acelerar la entrega
3 Ideas para acelerar la entrega3 Ideas para acelerar la entrega
3 Ideas para acelerar la entregaLourenco P Soares
 
US CH 15 Anti immigrant feelings
US CH 15 Anti immigrant feelingsUS CH 15 Anti immigrant feelings
US CH 15 Anti immigrant feelingsservingdlord
 
Trabajogestinprogramacindidctica 131116080416-phpapp01
Trabajogestinprogramacindidctica 131116080416-phpapp01Trabajogestinprogramacindidctica 131116080416-phpapp01
Trabajogestinprogramacindidctica 131116080416-phpapp01Elena Bermúdez Redrajo
 
Penetrar un servidor unix por el puerto 139 con metasploit
Penetrar un servidor unix por el puerto 139 con metasploitPenetrar un servidor unix por el puerto 139 con metasploit
Penetrar un servidor unix por el puerto 139 con metasploitBTshell-Fran
 
IMAGE ACQUISITION IN AN UNDERWATER VISION SYSTEM WITH NIR AND VIS ILLUMINATION
IMAGE ACQUISITION IN AN UNDERWATER VISION SYSTEM WITH NIR AND VIS ILLUMINATIONIMAGE ACQUISITION IN AN UNDERWATER VISION SYSTEM WITH NIR AND VIS ILLUMINATION
IMAGE ACQUISITION IN AN UNDERWATER VISION SYSTEM WITH NIR AND VIS ILLUMINATIONcsandit
 
Subvención Diputación Foral Bizkaia 2014. Puesta en Marcha y Creación de Empr...
Subvención Diputación Foral Bizkaia 2014. Puesta en Marcha y Creación de Empr...Subvención Diputación Foral Bizkaia 2014. Puesta en Marcha y Creación de Empr...
Subvención Diputación Foral Bizkaia 2014. Puesta en Marcha y Creación de Empr...Proyecta Asesoría Integral, S.L.
 
Devel::hdb debugger talk
Devel::hdb debugger talkDevel::hdb debugger talk
Devel::hdb debugger talkabrummett
 
RobertoAlfanoALPSCertificate
RobertoAlfanoALPSCertificateRobertoAlfanoALPSCertificate
RobertoAlfanoALPSCertificateRoberto Alfano
 
INTELLIGENT AND PERVASIVE ARCHIVING FRAMEWORK TO ENHANCE THE USABILITY OF THE...
INTELLIGENT AND PERVASIVE ARCHIVING FRAMEWORK TO ENHANCE THE USABILITY OF THE...INTELLIGENT AND PERVASIVE ARCHIVING FRAMEWORK TO ENHANCE THE USABILITY OF THE...
INTELLIGENT AND PERVASIVE ARCHIVING FRAMEWORK TO ENHANCE THE USABILITY OF THE...csandit
 
FRIDAY FRIENDS PRESENTATION ammended dfinal
FRIDAY FRIENDS PRESENTATION ammended dfinalFRIDAY FRIENDS PRESENTATION ammended dfinal
FRIDAY FRIENDS PRESENTATION ammended dfinalAnderson Marion
 
RobertoAlfanoFireAwareness2014Certificate
RobertoAlfanoFireAwareness2014CertificateRobertoAlfanoFireAwareness2014Certificate
RobertoAlfanoFireAwareness2014CertificateRoberto Alfano
 

Destacado (15)

2013 рік - підсумки і плани ДемАльянсу
2013 рік - підсумки і плани ДемАльянсу2013 рік - підсумки і плани ДемАльянсу
2013 рік - підсумки і плани ДемАльянсу
 
A4 Image
A4 ImageA4 Image
A4 Image
 
Volcanesexposicionfinal2 131116080406-phpapp02
Volcanesexposicionfinal2 131116080406-phpapp02Volcanesexposicionfinal2 131116080406-phpapp02
Volcanesexposicionfinal2 131116080406-phpapp02
 
3 Ideas para acelerar la entrega
3 Ideas para acelerar la entrega3 Ideas para acelerar la entrega
3 Ideas para acelerar la entrega
 
US CH 15 Anti immigrant feelings
US CH 15 Anti immigrant feelingsUS CH 15 Anti immigrant feelings
US CH 15 Anti immigrant feelings
 
Trabajogestinprogramacindidctica 131116080416-phpapp01
Trabajogestinprogramacindidctica 131116080416-phpapp01Trabajogestinprogramacindidctica 131116080416-phpapp01
Trabajogestinprogramacindidctica 131116080416-phpapp01
 
Penetrar un servidor unix por el puerto 139 con metasploit
Penetrar un servidor unix por el puerto 139 con metasploitPenetrar un servidor unix por el puerto 139 con metasploit
Penetrar un servidor unix por el puerto 139 con metasploit
 
IMAGE ACQUISITION IN AN UNDERWATER VISION SYSTEM WITH NIR AND VIS ILLUMINATION
IMAGE ACQUISITION IN AN UNDERWATER VISION SYSTEM WITH NIR AND VIS ILLUMINATIONIMAGE ACQUISITION IN AN UNDERWATER VISION SYSTEM WITH NIR AND VIS ILLUMINATION
IMAGE ACQUISITION IN AN UNDERWATER VISION SYSTEM WITH NIR AND VIS ILLUMINATION
 
Subvención Diputación Foral Bizkaia 2014. Puesta en Marcha y Creación de Empr...
Subvención Diputación Foral Bizkaia 2014. Puesta en Marcha y Creación de Empr...Subvención Diputación Foral Bizkaia 2014. Puesta en Marcha y Creación de Empr...
Subvención Diputación Foral Bizkaia 2014. Puesta en Marcha y Creación de Empr...
 
Devel::hdb debugger talk
Devel::hdb debugger talkDevel::hdb debugger talk
Devel::hdb debugger talk
 
Aranetxea 2014
Aranetxea 2014Aranetxea 2014
Aranetxea 2014
 
RobertoAlfanoALPSCertificate
RobertoAlfanoALPSCertificateRobertoAlfanoALPSCertificate
RobertoAlfanoALPSCertificate
 
INTELLIGENT AND PERVASIVE ARCHIVING FRAMEWORK TO ENHANCE THE USABILITY OF THE...
INTELLIGENT AND PERVASIVE ARCHIVING FRAMEWORK TO ENHANCE THE USABILITY OF THE...INTELLIGENT AND PERVASIVE ARCHIVING FRAMEWORK TO ENHANCE THE USABILITY OF THE...
INTELLIGENT AND PERVASIVE ARCHIVING FRAMEWORK TO ENHANCE THE USABILITY OF THE...
 
FRIDAY FRIENDS PRESENTATION ammended dfinal
FRIDAY FRIENDS PRESENTATION ammended dfinalFRIDAY FRIENDS PRESENTATION ammended dfinal
FRIDAY FRIENDS PRESENTATION ammended dfinal
 
RobertoAlfanoFireAwareness2014Certificate
RobertoAlfanoFireAwareness2014CertificateRobertoAlfanoFireAwareness2014Certificate
RobertoAlfanoFireAwareness2014Certificate
 

Similar a Valdicotry final final 10.00 20 dec

Geographical Articles
Geographical ArticlesGeographical Articles
Geographical ArticlesTom Hayes
 
Offshore Wind Farming in the US: Commercial Activities, Regulation & Contracts
Offshore Wind Farming in the US: Commercial Activities, Regulation & ContractsOffshore Wind Farming in the US: Commercial Activities, Regulation & Contracts
Offshore Wind Farming in the US: Commercial Activities, Regulation & ContractsLugenbuhl, Wheaton, Peck, Rankin & Hubbard
 
Painel 3 – Ocean Energy: The British Experience
Painel 3 – Ocean Energy: The British ExperiencePainel 3 – Ocean Energy: The British Experience
Painel 3 – Ocean Energy: The British ExperienceUKinBrazilNetwork
 
20160615 EI Energy Systems final
20160615 EI Energy Systems final20160615 EI Energy Systems final
20160615 EI Energy Systems finalMatthew Hannon
 
The Future of the North Sea_FINAL with Page Border
The Future of the North Sea_FINAL with Page BorderThe Future of the North Sea_FINAL with Page Border
The Future of the North Sea_FINAL with Page BorderTim Shingler
 
The Severn Estuary - A sustainable low carbon energy resource - Peter Kydd
The Severn Estuary - A sustainable low carbon energy resource - Peter KyddThe Severn Estuary - A sustainable low carbon energy resource - Peter Kydd
The Severn Estuary - A sustainable low carbon energy resource - Peter KyddSustainable Severn
 
4th Year Project Proposal Presentation
4th Year Project Proposal Presentation4th Year Project Proposal Presentation
4th Year Project Proposal Presentationewanbaird
 
IPP for CUC CNMI/USA Modern Independent Energy Plant in the CNMI, an Overseas...
IPP for CUC CNMI/USA Modern Independent Energy Plant in the CNMI, an Overseas...IPP for CUC CNMI/USA Modern Independent Energy Plant in the CNMI, an Overseas...
IPP for CUC CNMI/USA Modern Independent Energy Plant in the CNMI, an Overseas...Victor Popolitov
 
OceanEnergyDeliverable-Revised
OceanEnergyDeliverable-RevisedOceanEnergyDeliverable-Revised
OceanEnergyDeliverable-Revisedberndgeels
 
Nuclear Power Stations In Britain
Nuclear Power Stations In BritainNuclear Power Stations In Britain
Nuclear Power Stations In Britaintudorgeog
 
Visite du parc éolien Thorntonbank - Introduction to offshore wind
Visite du parc éolien Thorntonbank - Introduction to offshore windVisite du parc éolien Thorntonbank - Introduction to offshore wind
Visite du parc éolien Thorntonbank - Introduction to offshore windCCILVN
 
Offshore cabeling: Cabling maintenance planning processes
Offshore cabeling: Cabling maintenance planning processesOffshore cabeling: Cabling maintenance planning processes
Offshore cabeling: Cabling maintenance planning processesTorben Haagh
 
Cal Marine Power & Water "straw" scam presentation
Cal Marine Power & Water "straw" scam presentationCal Marine Power & Water "straw" scam presentation
Cal Marine Power & Water "straw" scam presentationFingerPointer
 
Potential for Wind Power Development in Prince Edward Island,Canada
Potential for Wind Power Development in Prince Edward Island,CanadaPotential for Wind Power Development in Prince Edward Island,Canada
Potential for Wind Power Development in Prince Edward Island,CanadaOrkhan Baghirli
 

Similar a Valdicotry final final 10.00 20 dec (20)

Geographical Articles
Geographical ArticlesGeographical Articles
Geographical Articles
 
RINA_Paper
RINA_PaperRINA_Paper
RINA_Paper
 
Offshore Wind Farming in the US: Commercial Activities, Regulation & Contracts
Offshore Wind Farming in the US: Commercial Activities, Regulation & ContractsOffshore Wind Farming in the US: Commercial Activities, Regulation & Contracts
Offshore Wind Farming in the US: Commercial Activities, Regulation & Contracts
 
Painel 3 – Ocean Energy: The British Experience
Painel 3 – Ocean Energy: The British ExperiencePainel 3 – Ocean Energy: The British Experience
Painel 3 – Ocean Energy: The British Experience
 
20160615 EI Energy Systems final
20160615 EI Energy Systems final20160615 EI Energy Systems final
20160615 EI Energy Systems final
 
The Future of the North Sea_FINAL with Page Border
The Future of the North Sea_FINAL with Page BorderThe Future of the North Sea_FINAL with Page Border
The Future of the North Sea_FINAL with Page Border
 
The Severn Estuary - A sustainable low carbon energy resource - Peter Kydd
The Severn Estuary - A sustainable low carbon energy resource - Peter KyddThe Severn Estuary - A sustainable low carbon energy resource - Peter Kydd
The Severn Estuary - A sustainable low carbon energy resource - Peter Kydd
 
SW Cleantech pack
SW Cleantech packSW Cleantech pack
SW Cleantech pack
 
CCS for Gas-Fired Power Plants presented at the MIT Carbon Sequestration Foru...
CCS for Gas-Fired Power Plants presented at the MIT Carbon Sequestration Foru...CCS for Gas-Fired Power Plants presented at the MIT Carbon Sequestration Foru...
CCS for Gas-Fired Power Plants presented at the MIT Carbon Sequestration Foru...
 
4th Year Project Proposal Presentation
4th Year Project Proposal Presentation4th Year Project Proposal Presentation
4th Year Project Proposal Presentation
 
IPP for CUC CNMI/USA Modern Independent Energy Plant in the CNMI, an Overseas...
IPP for CUC CNMI/USA Modern Independent Energy Plant in the CNMI, an Overseas...IPP for CUC CNMI/USA Modern Independent Energy Plant in the CNMI, an Overseas...
IPP for CUC CNMI/USA Modern Independent Energy Plant in the CNMI, an Overseas...
 
OceanEnergyDeliverable-Revised
OceanEnergyDeliverable-RevisedOceanEnergyDeliverable-Revised
OceanEnergyDeliverable-Revised
 
Nuclear Power Stations In Britain
Nuclear Power Stations In BritainNuclear Power Stations In Britain
Nuclear Power Stations In Britain
 
Visite du parc éolien Thorntonbank - Introduction to offshore wind
Visite du parc éolien Thorntonbank - Introduction to offshore windVisite du parc éolien Thorntonbank - Introduction to offshore wind
Visite du parc éolien Thorntonbank - Introduction to offshore wind
 
2011 Energy Summit - OCI Presentation by David Marinacci
2011 Energy Summit - OCI Presentation by David Marinacci2011 Energy Summit - OCI Presentation by David Marinacci
2011 Energy Summit - OCI Presentation by David Marinacci
 
marine_action_plan
marine_action_planmarine_action_plan
marine_action_plan
 
Offshore cabeling: Cabling maintenance planning processes
Offshore cabeling: Cabling maintenance planning processesOffshore cabeling: Cabling maintenance planning processes
Offshore cabeling: Cabling maintenance planning processes
 
Cal Marine Power & Water "straw" scam presentation
Cal Marine Power & Water "straw" scam presentationCal Marine Power & Water "straw" scam presentation
Cal Marine Power & Water "straw" scam presentation
 
Swansea lagoon presentation by ioan jenkins
Swansea lagoon presentation by ioan jenkinsSwansea lagoon presentation by ioan jenkins
Swansea lagoon presentation by ioan jenkins
 
Potential for Wind Power Development in Prince Edward Island,Canada
Potential for Wind Power Development in Prince Edward Island,CanadaPotential for Wind Power Development in Prince Edward Island,Canada
Potential for Wind Power Development in Prince Edward Island,Canada
 

Último

08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Enterprise Knowledge
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CVKhem
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 

Último (20)

08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 

Valdicotry final final 10.00 20 dec

  • 1. No Tiree Array:- VALEDICTORY Following SPR’s press release announcing dropping the Tiree Array and hearing on BBC News, Jonathan Cole, head of offshore wind at SPR, rationalising SPR’s reasons , NTA was flooded with calls, and emails, from its many supporters with expressions of joy, and relief. Many posed the very obvious question :- “ how come it took SPR so long ,and at so much cost, to come to this conclusion” . In 2008,during SPR’s site selection process, if SPR had spoken to one of Tiree’s fisherman SPR would have been told :-" Nae chance.... efter a Tiree storm my creels at Skerryvore shift 3-5 km .. they got nae chance to build the f..kng thing” Many wise Tiree heads endorsed this perspective. Did SPR check out the local information that the windows on Skerryvore Lighthouse had been smashed-in during a storm in the 50’s? Did anyone from SPR stand, for a day, on the track up to Ben Hynish, to look out to Skerryvore to be staggered by the huge swell over the reef, and in particular over Mackenzie ‘s Rock, even in benign weather conditions. In 2008 how diligent or competent, was SPR’s site selection process?? MS’ scoping opinion suggests SPR may not have been as diligent or competent as SPR would have wished. Was it greed ? Was it simply the site, one of the windiest locations in the UK, blinded SPR’s critical faculties with its potential to deliver to SPR an unprecedented cash-cow? Moving forward:NTA, in Mar 2012, was prescient in forecasting what was to transpire in Dec 2012 ie SPR putting the Array on “12 months hold, and subject to review” This was simple deduction from Jonathan Cole’s statement to Global Offshore Wind, 10 months earlier in Feb 2012 that; “construction of the Argyll Array will probably take place a “few years” after the first portion of Iberdrola’s biggest offshore challenge” (ref to the 7.2GW East Anglia Round) with Cole describing the Tiree Array as “very challenging”, with harsh waters and complex seabed conditions’. NTA in its own Summer 2013 review reported,that there had been no substantive advance in foundation design and technology Re Foundations: The Tiree Array’s seabed conditions, and the problems they posed for foundation design, were well known to SPR from the outset. At the Sept 2011 SPR hosted trip for Tirisdeachs, to the Walney -Barrow offshore windfarm, the comments made by DONG’s’s ( Danish Oil and Gas) Walney-Barrow construction team, were to prove pregnant with significance. NTA was an attendee. On the conclusion of DONG’s presentation NTA asked a very specific question re piling. DONG replied this had not been a problem, the sea bed was ‘soft’ except for 6 piles when they had hit some ’hard’ stuff. NTA asked what had been the solution. Dong replied, with a smile “ we just hit the pile-hammer harder !!
  • 2. VALEDICTORY Cont’d The attendees pointed out that the Tiree Array site was rock,specifically lewissean gneiss, which was amongst geology’s hardest rocks. DONG said “ you have a problem” . When asked if explosives were the solution, replied “NO way .. you can only drill”. As we drove back for dinner, NTA remembers, only too well, expanding on this subject with SPR’s Project Engineer , who advised that gravity foundations were not being considered, because the site would have to be leveled. He referred to the sole application of gravity foundations to date ie Thornton Bank, off the Belgian coast , and advised they hadto be dropped half way through construction, with a switch to jacket foundations . Mysteriously gravity foundations subsequently were re-introduced into the frame for the Tiree Array. The cynic in NTA saw this as:Ÿ a superficial attempt to embrace gravity based foundations claims of minimal site preparation. Presumably this was to deflect the very obvious environmental ,and visual impact issues, raised by drilling and cutting for Jacket foundations. And Ÿ an obvious co-incidence with Scottish Government’s promotion of Kishorn as a production centre for concrete gravity foundations. NTA, following this development, challenged every UK - European gravity foundation manufacturer to comment on their suitability for the Tiree Array site. One manufacturer (Vinci) has a chart on their website stating their design to be Tiree Array suitable. Not one single manufacturer replied NTA requested the papers from Marine Scotland’s Oct 2013 Gravity Foundations: Offshore Wind Scotland Conference at which Fergus Ewing MSP, Minister for Energy delivered the Welcoming Address NTA asked Marine Scotland to comment on the suitability of gravity foundations suitability for the Tiree Array Site. NTA still awaits Scottish Government’s reply. Once again NTA re-circulated all UK–European manufacturers to comment. None replied with the exception of Norway’s SeaTower Concept. SeaTower originally stated their design was Tiree Array suitable but on further interrogation qualified this by stating:- “The key parameter is whether the penetration resistance of the ground is such that you can penetrate skirts or not “. This paramater may not be achievable to the Tiree Array site’s geology. NTA has questioned the banality of Scottish Government building, and subsidising, test sites onshore for the next generation of off- shore 7 MW turbines ie Samsung(SKorea) at Methil, with Siemens (Germany) and Mitsubishi(Japan) at Hunterston. Manifestly, the main barrier to any offshore wind development on the WC Scotland, is the lack of tested foundation technology.
  • 3. VALEDICTORY Cont’d At the same time as Scotland stays onshore for testing, France goes offshore to test. The comparable test Alstom (France ) turbine was installed 40 km off the Belgian Coast shore ( note the Jacket foundation). Installation hit bad weather. It took 6 weeks. The installation vessel ,Fred Olsen’s Bold Tern,may have cost approx US$175,000 per day !!! Any wonder that off shore wind generation is the most expensive source of electricity. For all these reasons it is no surprise that SPR has dropped the Tiree Array. But SPR has surprised NTA, and many other observers, as to why it took SPR so long, and at so much cost, to come to this conclusion. The Tiree Array’s technology trajectory of construction and generation has apparently, at a stroke, pushed back from its original perceived 2016-2018 trajectory, to 2030-2040. NTA is not so naïve as to claim its campaign has achieved the dropping of the proposed Tiree Array. NTA may have raised the bar of the quality and substance of the interrogation of Government,and the Developer,to substantiate their claims, with regard to the development of the proposed Tiree Array. NTA questioned the efficacy of Scottish Governments’ energy policy, and every technical and economic survey associated with this possible development. The latter proved naïve and self seeking in the promotion of Governments and the Developer’s nebulous ,and specious claims of socio-economic gain plus community benefit. These were supposedly to be derived from the Operation and Maintenance(O&M ) strategy. SPR and Government played down the basic fundamental that dictates wind farm O&M strategy. It is dictated jointly and severally by the turbine and offshore HVDC converter manufacture. O&M is not the decision of the developer . The trajectory of O&M is the emergent adoption of specialist manned O&M vessels operating within the off shore wind farm. Siemens, this summer, committed to the long term charter of two Norwegian built vessels. The Dutch have followed up with a comparable design. The Danes are marketing a jack-up O&M vessel produced. Alas there is no sign of the resurrection of Scottish shipbuilding to design and build such vessels.
  • 4. VALEDICTORY Cont’d Community Consultation:- The licensing process puts great store in a developer’s Community Consultation process. NTA shredded SPR‘s community consultation in a comprehensive submission to Marine Scotland. Visualisations/montages:- NTA produced the first visualisations/montages of the proposed Tiree Array. SPR produced theirs, reluctantly 6 months later.
  • 5. VALEDICTORY Cont’d HVDC Converter Station :- NTA, at a public meeting, may have embarrassed SPR sufficiently to reveal substantive details of any onshore HVDC station, whilst SPR ducked the issue of deemed consent. Basking Sharks:- NTA addressed a major basking shark conference informing on the grave environmental consequences from any development and construction of the Tiree Array site. Marine Scotland’s Draft Licensing and Consent Manual: Recently NTA completed a forensic line by line critique of the Marine Scotland’s Draft Licensing and Copnsent Manual. As proposed, it is a developers dream of general suggestions for ‘shoulds, coulds and maybe’s’ , with no sanctions for any breach ,as opposed to list of ‘must, shall and will’ directives. NTA’s critique has been accepted by Marine Scotland. It has been passed to the consultants for consideration into the further drafting of the manual. Renewable subsidy :-NTA has been a consistent advocate to UK and Scottish Government that Renewable subsidies – especially for offshore wind – should be cut if they fail to come down in cost under strict time limits. The Renewables Industry flagged up, 18 months ago, their commitment to a 2020 target of £100/mw to secure subsidy. Ever since,the Renewables Industry has been back-tracking, blaming Government for the industries failure to meet its own targets!! The Tiree Array site remains on a planning map, as does the possible adoption of the OWW2 ,and WW3 sites. But dropping the proposed Tiree Array implies that neither of these may be developed until the required technology trajectory catches up. It is speculated that this may not be achieved till 2030-2040, by which time global energy developments may render theses sites irrelevant and redundant.
  • 6. VALEDICTORY Cont’d Should the trajectory of global energy development, and global energy consumption render the original proposed Tiree (Array) and the proposed, for adoption, OWW2/WW3 sites redundant, then NTA will have achieved its objective. Meanwhile the decision to drop the Array leaves Tiree to its stunning beauty,and spectacular seascapes . Dec 2013