INTRODUCTION
Aviation plays a major role in today’s social and
 economic scenarios.
It offers a quick, reliable and safe way of taking
 people to their destination, for business
 reasons, holidays or family visits.
Even after a century of flight, weather is still the
 factor most likely to result in accidents with
 fatalities.
An increasing demand for air travel is the first
 challenge to the future of air transport.
 A flight delay is a delay in which an airline     CAUSES
  flight takes off and/or lands later than its       Maintenance problems
  scheduled time. A flight is considered             Crew problems
  delayed when it is 15 minutes later than its
                                                     Aircraft cleaning
  scheduled time. (Hauke et al, 2001)
                                                     Baggage loading
 Occasional delays are part of air travel today.
                                                     Fueling
  Much as we dislike delays, they are yet
  unavoidable, even in the well-run airlines.        Extreme weather
                                                     Congestion in air traffic
                                                     Security issues
 Aviation weather hazards do not only unleash its impact on
  aircrafts in flights but also affects those packed at the
  Aerodromes.
 Therefore, a good knowledge of this subject matter becomes
  very important to Aircraft operators, pilots and flight crew
  members
 Should the safety of lives and properties be ensured and risks
  reduced to the barest minimum.


 The great increase in air traffic has led to a large increase in the
  demand for airport capacity.
 Also, the months of May to October are months of the rainy
  season, characterized by severe thunderstorms and line squalls
  and its attendant turbulence, microbursts and lighting.
AIM
To examine the various weather hazards that affect
  the effective flight operation in the aviation industry.

OBJECTIVES
o study the weather approach to problems of flight
 delays and cancellation.
To analyse the weather parameters that likely affects
 the smooth flight operations.
To see if by human efforts, air crashes due to natural
 (weather) hazards such as thunderstorms, wind shear,
 precipitation can be mitigated.
 The study area for this report is the Murtala
  Mohammed International Airport , Ikeja, Lagos State,
  Nigeria. It lies between latitude 6021I11II N and
  longitude 3023I44II E. It is the busiest airport in Nigeria.
 It is the major airport serving the city of Lagos,
  Southwestern Nigeria and the entire nation, with an
  average of 300 aircraft movements a day. It caters for
  more than 5 million a year.
 Lagos state is a coastal state bounded to the south by
  the Atlantic Ocean and the other sides by neighboring
  states.
                                                      Total           %           freight    Total Aircraft
                                            Year      Passengers      Increase    (tons)     Movements
                                               2003         3362464                  51826                     62439
                                               2004         3576189          6       89496                     67208
                                               2005         3817338         6.3      63807                     70893
                                               2006         3848757         0.8      83598                     74650
                                               2007         4162424         7.5                                81537
                                               2008         5136920       23.4                                 77472
                                               2009         5644572         9.9                                84588
                                               2010         6273454       11.1                                 96919
                                               2011         6748290         7.6                               105215
• Flight delay is a complex phenomenon, because it can be
  due to problems at the origin airport, at the destination
  airport, or during airborne.
• Flight schedules are often subjected to irregularity. Due to
  the tight connection among airlines resources, delays could
  dramatically propagate over time and space unless the
  proper recovery actions are taken. (Wu, 2005).
• In addition, there are general arrival and departure delays.
  This usually indicates that arrival traffic is doing airborne
  holding or departing traffic is experiencing longer than
  normal taxi times or holding at the gate. These could be
  due to a number of reasons, including thunderstorms in the
  area, a high departure demand, or a runway change.
  (Aisling and Kenneth, 1999).
WEATHER HAZARDS ON FLIGHT OPERATIONS
      REDUCED (POOR) VISIBILITY
Fog
 It forms over land usually under clear
  skies and light winds typically after
  midnight and peaks early in the
  morning. After sunrise, the fog begins
  to burn off from the edges over land.
Precipitation
 Rain can reduce visibility; however,
  the restriction is seldom less than one
  mile other than in the heaviest
  showers beneath cumulonimbus
  clouds. Drizzle, because of the greater
  number of drops in each volume of
  air, is usually more effective than rain
  at reducing the visibility, especially
  when accompanied by fog.
Wind Shear
 Wind shear is a change in wind direction
   and/or wind speed over the distance
   between two points.
 If the points are in a vertical direction then it
   is called vertical shear, if they are in a
   horizontal direction than it is called
   horizontal shear.
 In the aviation world, the major concern is
   how abruptly the change occurs.
 Depending on the aircraft type, it may take a
   significant time to correct the situation,
   placing the aircraft in peril, particularly
   during takeoff and landing.

Turbulence
 Turbulence is the direct result of wind shear.
    The stronger the shear the greater the
    tendency for the laminar flow of the air to
    break down into eddies resulting in
    turbulence.
CONSEQUENCES OF WEATHER HAZARDS
DATA USED                        METHODOLOGY
 The data collected for the      The Histograms were plotted for the
  use of the study is known as     data from the divisions in Aircraft
  Daily Flight Schedule Report.    operations. This is to show the
                                   frequent occurrence of factors
 This data was collected from
                                   responsible for the problems of
  flight operations data unit of   flight operations.
  AIR NIGERIA AIRWAYS, ikeja,
  Lagos State. The data ranges  Also, line graphs, showing the
                                   relationship between some weather
  between May-October 2011         parameters(rainfall, windspeed, and
  and May-October 2012.            thunderstorm) that also contributes
 The meteorological data used     to problems of flight operations.
  were collected from the         The monthly means of these
  Nigeria Meteorological           parameters were used for the
  Agency, Ikeja office, Lagos.     analysis for the period of my stay on
                                      Industrial Training (May-October).
18
                         16   14.29
                         14                                                                                                                               13.19
  Percentage of Delays


                                                                                                                                    12.09                                          2011
                         12                                                                                               10.99                10.99
                                      9.89                                                                      9.89                                                               2012
                         10
                          8
                          6                   4.4
                          4                                    3.3                3.3                                                                                 3.3
                                                      2.2                                  2.2
                          2
                                                                          0                             0
                          0




                                                                     Divisions in Aircraft Operations
                                             Graph of Percentage Delays from Divisions in Aircraft Operations (MAY)

                         18
                              16.16
                         16                                                                                                            15.15
                                                                                                                                                              14.14
                         14
                         12                                                                                                                                                        2011
                                                                                                                             10.1
Percentage of Delays




                         10                                                                                                                                                        2012
                                               8.08                                                                                                8.08
                          8
                                      6.06
                          6                                                                                        5.05
                                                                                    4.04     4.04                                                                           4.04
                          4                                               3.03
                                                                2.02
                          2
                                                        0                                                   0
                          0




                                                             Divisions in Aircraft Operations
                                              Graph of Percentage Delays from Divisions in Aircraft Operations (JUNE)
20                                                                                                       18.68
                                       18
                                       16
                Percentage of Delays

                                                   13.19                                                                                                   13.19                      2011
                                       14
                                       12                                                                                            10.99                                            2012
                                                                                                                                                                       9.89
                                       10                   8.79
                                            7.69                                                7.69
                                        8
                                                                                                                           5.49
                                        6
                                        4                                                                                                                                            3.3

                                        2                            1.1
                                                                              0            0                 0       0
                                        0




                                                                             Divisions in Aircraft Operations
                                                    Graph of Percentage Delays from Divisions in Aircraft Operations (JULY)
                                       20                                                                                                    18.25
                                       18
                                                                                                                                                        15.87
                                       16
Percentage of Delays




                                                                                                                                                                   14.29
                                                                                                                                  13.49
                                       14
                                       12                                                                                                                                            2011
                                                   10.32
                                       10                                                                                                                                            2012
                                            7.94
                                        8                  6.35
                                                                                                                         5.56
                                        6
                                        4                                                      2.38                                                                           2.38
                                                                           1.59                                  1.59
                                        2
                                                                     0                 0                 0
                                        0




                                                                                  Divisions in Aircraft Operations
                                                             Graph of Percentage Delays from Divisions in Aircraft Operations(AUGUST)
18
                                                           15.7
                                              16                                                                                                   14.53
                                                                                                                                                                                                 2011
                       Percentage of Delays
                                              14
                                                                                                                                                                      11.63                      2012
                                              12                                                                                                                                         11.05
                                                   9.2                                                                                                       9.65
                                              10                                                                                                                                8.14
                                               8                    6.4                                      6.98
                                               6
                                                                            3.49
                                               4
                                                                                                                      1.74      1.5
                                               2
                                                                                      0          0                                          0
                                               0




                                                                                                         Divisions in Aircraft Operations
                                                                            Graph of Percentage Delays from Divisions in Aircraft Operations (SEPT)
                                              18
                                              16
                                                   14.29
                                              14                                                                                                                        12.99
                                                                                                                                                     11.69                                       2011
                                              12
                                                            10.39                                                                                              9.96                              2012
                                              10
Percentage of Delays




                                               8                                                                                 6.49       6.49                                  6.93
                                                                                                                        5.19                                                                5.63
                                               6
                                               4                              3.46
                                                                     2.16                 2.6
                                                                                                               1.73
                                               2
                                                                                                     0
                                               0




                                                                                            Divisions in Aircraft Operations
                                                                             Graph of Percentage Delays from Divisions in Aircraft Operations (OCT.)
210                                                                                                19

                      200                                                                                                18.5

                      190                                                                                                18

                      180                                                                                                17.5

                      170                                                                                                17
RAINFALL (mm)




                      160                                                                                                16.5
                                                                                                                                 RR   Th
                      150                                                                                                16

                      140                                                                                                15.5

                      130                                                                                                15

                      120                                                                                                14.5

                      110                                                                                                14
                             MAY    JUN                   JUL               AUG                 SEP          OCT
                                          Line Graph of Variation between Thunderstorm and Rainfall (2011)



                       200                                                                                                      22

                       190                                                                                                      21

                       180                                                                                                      20
      RAINFALL (mm)




                       170                                                                                                      19

                       160                                                                                                      18

                       150                                                                                                      17     RR

                       140                                                                                                      16     Th

                       130                                                                                                      15

                       120                                                                                                      14
                              MAY     JUN                       JUL               AUG                 SEP          OCT


                                          Line Graph of Variation between Thunderstorm and Rainfall (2012)
3.15                                                                                             19

                    3.1                                                                                             18.5

                   3.05                                                                                             18
                                                                                                                    17.5
WIND SPEED (m/s)




                         3
                                                                                                                    17
                   2.95
                                                                                                                    16.5
                    2.9
                                                                                                                    16     Wind
                   2.85
                                                                                                                    15.5   Th
                    2.8                                                                                             15
                   2.75                                                                                             14.5
                    2.7                                                                                             14
                             MAY     JUN                JUL              AUG              SEP                 OCT

                                   Line Graph of Variation between Thunderstorm and Windspeed (2011)
                   3.1                                                                                              21.5


                                                                                                                    20.5
                    3

                                                                                                                    19.5
                   2.9

                                                                                                                    18.5
WIND SPEED (m/s)




                   2.8
                                                                                                                    17.5
                                                                                                                           Wind
                   2.7
                                                                                                                    16.5   Th

                   2.6
                                                                                                                    15.5


                   2.5                                                                                              14.5
                             MAY    JUN                JUL              AUG               SEP                 OCT


                                          Line Graph of Variation between Thunderstorm and Windspeed (2012)
RESULTS AND DISCUSSION
 The graphs 1-6 which shows the number of delays with their
  respective delay reasons, there were some delay reasons that had
  low number of delays while some has a high number of delays.
 The months of July and August, 2012 recorded the highest
  percentage delays due to weather with amounting to 18.68% and
  18.25% respectively.
 Thus, there was an upward trend in the percentage which implies
  that there were delays and flight operation problems due to bad
  weather.
 The Graphs 7-10 show the weather effects on delays caused by
  thunderstorms, wind speed and rainfall which are the weather
  variables considered.
 These then show that in most cases, an increase in thunderstorm
  occurrence leads to an increase in the rainfall occurrence (as well
  as rainfall amount). Also, an increase in the win speed also
  corresponds to an increase in the thunderstorms
CONCLUSION
From May to October, the percentage and the numbers
 of delays due to weather hazards show that the issue of
 delays due to weather hazards is to be taken with
 utmost seriousness.
In conclusion, weather hazards are one of the
 significant factors of flight operations, therefore pilots
 and aviation managers needs to have the knowledge of
 weather hazards integrated into flight operational
 guidelines.
 NIMET should be issuing a comprehensive daily weather report
  before the daily flight scheduled are been planned.
 The Government should embark on projects to improve weather
  study and acquire weather equipment that would ensure that
  pilots are kept abreast of weather information at any time.
 The Government should provide the Federal Airport Authority of
  Nigeria (FAAN) the installation of MeteoSat Second Generation
  (MSG) ground receiver; installation of thunderstorm detectors;
  construction of Weather Forecasting and Climate research Centre.
 Also the construction as procurement and installation of Doppler
  Weather Radars (DWR); installation of low-level wind shear alert
  system (LLWAS) at the two wings of the airports; procurement and
  installation of Upper Air sounding equipment.
THANK
 YOU

Más contenido relacionado

Similar a Aviation Flight Schedules

Challenges and Opportunities for AI and Data analytics in Offshore wind
Challenges and Opportunities for AI and Data analytics in Offshore windChallenges and Opportunities for AI and Data analytics in Offshore wind
Challenges and Opportunities for AI and Data analytics in Offshore windFacultad de Informática UCM
 
U.S. Passenger Airlines 2013 FInancial and Operational Results
U.S. Passenger Airlines 2013 FInancial and Operational ResultsU.S. Passenger Airlines 2013 FInancial and Operational Results
U.S. Passenger Airlines 2013 FInancial and Operational ResultsAirlines for America (A4A)
 
THE IMPACT OF ON TIME PERFORMANCE ON OPERATION MANAGEMENT AND PASSENGER LOYAL...
THE IMPACT OF ON TIME PERFORMANCE ON OPERATION MANAGEMENT AND PASSENGER LOYAL...THE IMPACT OF ON TIME PERFORMANCE ON OPERATION MANAGEMENT AND PASSENGER LOYAL...
THE IMPACT OF ON TIME PERFORMANCE ON OPERATION MANAGEMENT AND PASSENGER LOYAL...Reefear Ajang
 
AGIFORS Operations Conference Presentation
AGIFORS Operations Conference PresentationAGIFORS Operations Conference Presentation
AGIFORS Operations Conference PresentationJoshua Marks
 
Predicting Flight Delays with Error Calculation using Machine Learned Classif...
Predicting Flight Delays with Error Calculation using Machine Learned Classif...Predicting Flight Delays with Error Calculation using Machine Learned Classif...
Predicting Flight Delays with Error Calculation using Machine Learned Classif...IRJET Journal
 
Navigating Through the Fog: Solutions for Clearing the Air and Visibility
Navigating Through the Fog: Solutions for Clearing the Air and VisibilityNavigating Through the Fog: Solutions for Clearing the Air and Visibility
Navigating Through the Fog: Solutions for Clearing the Air and Visibilityfogcontrolsolutions1
 
Sensor Integration and Data Fusion from a High Definition Helicopter Mapping ...
Sensor Integration and Data Fusion from a High Definition Helicopter Mapping ...Sensor Integration and Data Fusion from a High Definition Helicopter Mapping ...
Sensor Integration and Data Fusion from a High Definition Helicopter Mapping ...MattBethel1
 
The characterisation of hail and fraudulent impacts to vehicle body panels
The characterisation of hail and fraudulent impacts to vehicle body panelsThe characterisation of hail and fraudulent impacts to vehicle body panels
The characterisation of hail and fraudulent impacts to vehicle body panelsVisvarajah Somasundaram
 
Portable Small-Scale Vertical Axis Wind Turbine with Pitch Angle Control Syst...
Portable Small-Scale Vertical Axis Wind Turbine with Pitch Angle Control Syst...Portable Small-Scale Vertical Axis Wind Turbine with Pitch Angle Control Syst...
Portable Small-Scale Vertical Axis Wind Turbine with Pitch Angle Control Syst...IRJET Journal
 
eVTOL – Electric Vertical Take-Off and Landing
eVTOL – Electric Vertical Take-Off and LandingeVTOL – Electric Vertical Take-Off and Landing
eVTOL – Electric Vertical Take-Off and LandingIRJET Journal
 
Aea Deicing V24 Revb
Aea Deicing V24 RevbAea Deicing V24 Revb
Aea Deicing V24 Revbguest78ed2f4
 
Low Cost Carrier Tigerair Australia-Strategies, safety, sustainability and gr...
Low Cost Carrier Tigerair Australia-Strategies, safety, sustainability and gr...Low Cost Carrier Tigerair Australia-Strategies, safety, sustainability and gr...
Low Cost Carrier Tigerair Australia-Strategies, safety, sustainability and gr...Liu Dongyangyang
 
Commercial-aircraft-operation.pptx
Commercial-aircraft-operation.pptxCommercial-aircraft-operation.pptx
Commercial-aircraft-operation.pptxFlorianusAdel1
 
STUDY AND CONTROL THE IMPACT OF AVIATION AND CLIMATIC CHANGES AND METRICS
STUDY AND CONTROL THE IMPACT OF AVIATION AND CLIMATIC CHANGES AND METRICSSTUDY AND CONTROL THE IMPACT OF AVIATION AND CLIMATIC CHANGES AND METRICS
STUDY AND CONTROL THE IMPACT OF AVIATION AND CLIMATIC CHANGES AND METRICSIAEME Publication
 
TAV Airports Holding Management Presentation September 2013
TAV Airports Holding Management Presentation September 2013TAV Airports Holding Management Presentation September 2013
TAV Airports Holding Management Presentation September 2013Tav Airports
 

Similar a Aviation Flight Schedules (20)

Challenges and Opportunities for AI and Data analytics in Offshore wind
Challenges and Opportunities for AI and Data analytics in Offshore windChallenges and Opportunities for AI and Data analytics in Offshore wind
Challenges and Opportunities for AI and Data analytics in Offshore wind
 
U.S. Passenger Airlines 2013 FInancial and Operational Results
U.S. Passenger Airlines 2013 FInancial and Operational ResultsU.S. Passenger Airlines 2013 FInancial and Operational Results
U.S. Passenger Airlines 2013 FInancial and Operational Results
 
Quick History and Notable Successes in Aviation Weather Safety
Quick History and Notable Successes in Aviation Weather SafetyQuick History and Notable Successes in Aviation Weather Safety
Quick History and Notable Successes in Aviation Weather Safety
 
Presentations
PresentationsPresentations
Presentations
 
THE IMPACT OF ON TIME PERFORMANCE ON OPERATION MANAGEMENT AND PASSENGER LOYAL...
THE IMPACT OF ON TIME PERFORMANCE ON OPERATION MANAGEMENT AND PASSENGER LOYAL...THE IMPACT OF ON TIME PERFORMANCE ON OPERATION MANAGEMENT AND PASSENGER LOYAL...
THE IMPACT OF ON TIME PERFORMANCE ON OPERATION MANAGEMENT AND PASSENGER LOYAL...
 
AGIFORS Operations Conference Presentation
AGIFORS Operations Conference PresentationAGIFORS Operations Conference Presentation
AGIFORS Operations Conference Presentation
 
Predicting Flight Delays with Error Calculation using Machine Learned Classif...
Predicting Flight Delays with Error Calculation using Machine Learned Classif...Predicting Flight Delays with Error Calculation using Machine Learned Classif...
Predicting Flight Delays with Error Calculation using Machine Learned Classif...
 
Navigating Through the Fog: Solutions for Clearing the Air and Visibility
Navigating Through the Fog: Solutions for Clearing the Air and VisibilityNavigating Through the Fog: Solutions for Clearing the Air and Visibility
Navigating Through the Fog: Solutions for Clearing the Air and Visibility
 
Sensor Integration and Data Fusion from a High Definition Helicopter Mapping ...
Sensor Integration and Data Fusion from a High Definition Helicopter Mapping ...Sensor Integration and Data Fusion from a High Definition Helicopter Mapping ...
Sensor Integration and Data Fusion from a High Definition Helicopter Mapping ...
 
SNEAPA 2013 Friday g5 1_45_airport_planningv2
SNEAPA 2013 Friday g5 1_45_airport_planningv2SNEAPA 2013 Friday g5 1_45_airport_planningv2
SNEAPA 2013 Friday g5 1_45_airport_planningv2
 
The characterisation of hail and fraudulent impacts to vehicle body panels
The characterisation of hail and fraudulent impacts to vehicle body panelsThe characterisation of hail and fraudulent impacts to vehicle body panels
The characterisation of hail and fraudulent impacts to vehicle body panels
 
Portable Small-Scale Vertical Axis Wind Turbine with Pitch Angle Control Syst...
Portable Small-Scale Vertical Axis Wind Turbine with Pitch Angle Control Syst...Portable Small-Scale Vertical Axis Wind Turbine with Pitch Angle Control Syst...
Portable Small-Scale Vertical Axis Wind Turbine with Pitch Angle Control Syst...
 
eVTOL – Electric Vertical Take-Off and Landing
eVTOL – Electric Vertical Take-Off and LandingeVTOL – Electric Vertical Take-Off and Landing
eVTOL – Electric Vertical Take-Off and Landing
 
Aea Deicing V24 Revb
Aea Deicing V24 RevbAea Deicing V24 Revb
Aea Deicing V24 Revb
 
Aea Deicing V24 Revb
Aea Deicing V24 RevbAea Deicing V24 Revb
Aea Deicing V24 Revb
 
Low Cost Carrier Tigerair Australia-Strategies, safety, sustainability and gr...
Low Cost Carrier Tigerair Australia-Strategies, safety, sustainability and gr...Low Cost Carrier Tigerair Australia-Strategies, safety, sustainability and gr...
Low Cost Carrier Tigerair Australia-Strategies, safety, sustainability and gr...
 
Presentation 3Q12
Presentation 3Q12Presentation 3Q12
Presentation 3Q12
 
Commercial-aircraft-operation.pptx
Commercial-aircraft-operation.pptxCommercial-aircraft-operation.pptx
Commercial-aircraft-operation.pptx
 
STUDY AND CONTROL THE IMPACT OF AVIATION AND CLIMATIC CHANGES AND METRICS
STUDY AND CONTROL THE IMPACT OF AVIATION AND CLIMATIC CHANGES AND METRICSSTUDY AND CONTROL THE IMPACT OF AVIATION AND CLIMATIC CHANGES AND METRICS
STUDY AND CONTROL THE IMPACT OF AVIATION AND CLIMATIC CHANGES AND METRICS
 
TAV Airports Holding Management Presentation September 2013
TAV Airports Holding Management Presentation September 2013TAV Airports Holding Management Presentation September 2013
TAV Airports Holding Management Presentation September 2013
 

Último

Sonam +91-9537192988-Mind-blowing skills and techniques of Ahmedabad Call Girls
Sonam +91-9537192988-Mind-blowing skills and techniques of Ahmedabad Call GirlsSonam +91-9537192988-Mind-blowing skills and techniques of Ahmedabad Call Girls
Sonam +91-9537192988-Mind-blowing skills and techniques of Ahmedabad Call GirlsNiya Khan
 
VIP Call Girls Service Cuttack Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Cuttack Aishwarya 8250192130 Independent Escort Servic...VIP Call Girls Service Cuttack Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Cuttack Aishwarya 8250192130 Independent Escort Servic...Suhani Kapoor
 
Dubai Call Girls Demons O525547819 Call Girls IN DUbai Natural Big Boody
Dubai Call Girls Demons O525547819 Call Girls IN DUbai Natural Big BoodyDubai Call Girls Demons O525547819 Call Girls IN DUbai Natural Big Boody
Dubai Call Girls Demons O525547819 Call Girls IN DUbai Natural Big Boodykojalkojal131
 
Experience Certificate - Marketing Analyst-Soham Mondal.pdf
Experience Certificate - Marketing Analyst-Soham Mondal.pdfExperience Certificate - Marketing Analyst-Soham Mondal.pdf
Experience Certificate - Marketing Analyst-Soham Mondal.pdfSoham Mondal
 
CFO_SB_Career History_Multi Sector Experience
CFO_SB_Career History_Multi Sector ExperienceCFO_SB_Career History_Multi Sector Experience
CFO_SB_Career History_Multi Sector ExperienceSanjay Bokadia
 
VIP Call Girl Cuttack Aashi 8250192130 Independent Escort Service Cuttack
VIP Call Girl Cuttack Aashi 8250192130 Independent Escort Service CuttackVIP Call Girl Cuttack Aashi 8250192130 Independent Escort Service Cuttack
VIP Call Girl Cuttack Aashi 8250192130 Independent Escort Service CuttackSuhani Kapoor
 
Internshala Student Partner 6.0 Jadavpur University Certificate
Internshala Student Partner 6.0 Jadavpur University CertificateInternshala Student Partner 6.0 Jadavpur University Certificate
Internshala Student Partner 6.0 Jadavpur University CertificateSoham Mondal
 
Résumé (2 pager - 12 ft standard syntax)
Résumé (2 pager -  12 ft standard syntax)Résumé (2 pager -  12 ft standard syntax)
Résumé (2 pager - 12 ft standard syntax)Soham Mondal
 
Final Completion Certificate of Marketing Management Internship
Final Completion Certificate of Marketing Management InternshipFinal Completion Certificate of Marketing Management Internship
Final Completion Certificate of Marketing Management InternshipSoham Mondal
 
VIP Russian Call Girls Amravati Chhaya 8250192130 Independent Escort Service ...
VIP Russian Call Girls Amravati Chhaya 8250192130 Independent Escort Service ...VIP Russian Call Girls Amravati Chhaya 8250192130 Independent Escort Service ...
VIP Russian Call Girls Amravati Chhaya 8250192130 Independent Escort Service ...Suhani Kapoor
 
PM Job Search Council Info Session - PMI Silver Spring Chapter
PM Job Search Council Info Session - PMI Silver Spring ChapterPM Job Search Council Info Session - PMI Silver Spring Chapter
PM Job Search Council Info Session - PMI Silver Spring ChapterHector Del Castillo, CPM, CPMM
 
VIP Kolkata Call Girl Lake Gardens 👉 8250192130 Available With Room
VIP Kolkata Call Girl Lake Gardens 👉 8250192130  Available With RoomVIP Kolkata Call Girl Lake Gardens 👉 8250192130  Available With Room
VIP Kolkata Call Girl Lake Gardens 👉 8250192130 Available With Roomdivyansh0kumar0
 
VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...
VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...
VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...Suhani Kapoor
 
Booking open Available Pune Call Girls Ambegaon Khurd 6297143586 Call Hot In...
Booking open Available Pune Call Girls Ambegaon Khurd  6297143586 Call Hot In...Booking open Available Pune Call Girls Ambegaon Khurd  6297143586 Call Hot In...
Booking open Available Pune Call Girls Ambegaon Khurd 6297143586 Call Hot In...Call Girls in Nagpur High Profile
 
Delhi Call Girls In Atta Market 9711199012 Book Your One night Stand Call Girls
Delhi Call Girls In Atta Market 9711199012 Book Your One night Stand Call GirlsDelhi Call Girls In Atta Market 9711199012 Book Your One night Stand Call Girls
Delhi Call Girls In Atta Market 9711199012 Book Your One night Stand Call Girlsshivangimorya083
 
Preventing and ending sexual harassment in the workplace.pptx
Preventing and ending sexual harassment in the workplace.pptxPreventing and ending sexual harassment in the workplace.pptx
Preventing and ending sexual harassment in the workplace.pptxGry Tina Tinde
 
The Impact of Socioeconomic Status on Education.pdf
The Impact of Socioeconomic Status on Education.pdfThe Impact of Socioeconomic Status on Education.pdf
The Impact of Socioeconomic Status on Education.pdftheknowledgereview1
 
Zeeman Effect normal and Anomalous zeeman effect
Zeeman Effect normal and Anomalous zeeman effectZeeman Effect normal and Anomalous zeeman effect
Zeeman Effect normal and Anomalous zeeman effectPriyanshuRawat56
 
Delhi Call Girls South Ex 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls South Ex 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip CallDelhi Call Girls South Ex 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls South Ex 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Callshivangimorya083
 
VIP High Profile Call Girls Jamshedpur Aarushi 8250192130 Independent Escort ...
VIP High Profile Call Girls Jamshedpur Aarushi 8250192130 Independent Escort ...VIP High Profile Call Girls Jamshedpur Aarushi 8250192130 Independent Escort ...
VIP High Profile Call Girls Jamshedpur Aarushi 8250192130 Independent Escort ...Suhani Kapoor
 

Último (20)

Sonam +91-9537192988-Mind-blowing skills and techniques of Ahmedabad Call Girls
Sonam +91-9537192988-Mind-blowing skills and techniques of Ahmedabad Call GirlsSonam +91-9537192988-Mind-blowing skills and techniques of Ahmedabad Call Girls
Sonam +91-9537192988-Mind-blowing skills and techniques of Ahmedabad Call Girls
 
VIP Call Girls Service Cuttack Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Cuttack Aishwarya 8250192130 Independent Escort Servic...VIP Call Girls Service Cuttack Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Cuttack Aishwarya 8250192130 Independent Escort Servic...
 
Dubai Call Girls Demons O525547819 Call Girls IN DUbai Natural Big Boody
Dubai Call Girls Demons O525547819 Call Girls IN DUbai Natural Big BoodyDubai Call Girls Demons O525547819 Call Girls IN DUbai Natural Big Boody
Dubai Call Girls Demons O525547819 Call Girls IN DUbai Natural Big Boody
 
Experience Certificate - Marketing Analyst-Soham Mondal.pdf
Experience Certificate - Marketing Analyst-Soham Mondal.pdfExperience Certificate - Marketing Analyst-Soham Mondal.pdf
Experience Certificate - Marketing Analyst-Soham Mondal.pdf
 
CFO_SB_Career History_Multi Sector Experience
CFO_SB_Career History_Multi Sector ExperienceCFO_SB_Career History_Multi Sector Experience
CFO_SB_Career History_Multi Sector Experience
 
VIP Call Girl Cuttack Aashi 8250192130 Independent Escort Service Cuttack
VIP Call Girl Cuttack Aashi 8250192130 Independent Escort Service CuttackVIP Call Girl Cuttack Aashi 8250192130 Independent Escort Service Cuttack
VIP Call Girl Cuttack Aashi 8250192130 Independent Escort Service Cuttack
 
Internshala Student Partner 6.0 Jadavpur University Certificate
Internshala Student Partner 6.0 Jadavpur University CertificateInternshala Student Partner 6.0 Jadavpur University Certificate
Internshala Student Partner 6.0 Jadavpur University Certificate
 
Résumé (2 pager - 12 ft standard syntax)
Résumé (2 pager -  12 ft standard syntax)Résumé (2 pager -  12 ft standard syntax)
Résumé (2 pager - 12 ft standard syntax)
 
Final Completion Certificate of Marketing Management Internship
Final Completion Certificate of Marketing Management InternshipFinal Completion Certificate of Marketing Management Internship
Final Completion Certificate of Marketing Management Internship
 
VIP Russian Call Girls Amravati Chhaya 8250192130 Independent Escort Service ...
VIP Russian Call Girls Amravati Chhaya 8250192130 Independent Escort Service ...VIP Russian Call Girls Amravati Chhaya 8250192130 Independent Escort Service ...
VIP Russian Call Girls Amravati Chhaya 8250192130 Independent Escort Service ...
 
PM Job Search Council Info Session - PMI Silver Spring Chapter
PM Job Search Council Info Session - PMI Silver Spring ChapterPM Job Search Council Info Session - PMI Silver Spring Chapter
PM Job Search Council Info Session - PMI Silver Spring Chapter
 
VIP Kolkata Call Girl Lake Gardens 👉 8250192130 Available With Room
VIP Kolkata Call Girl Lake Gardens 👉 8250192130  Available With RoomVIP Kolkata Call Girl Lake Gardens 👉 8250192130  Available With Room
VIP Kolkata Call Girl Lake Gardens 👉 8250192130 Available With Room
 
VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...
VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...
VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...
 
Booking open Available Pune Call Girls Ambegaon Khurd 6297143586 Call Hot In...
Booking open Available Pune Call Girls Ambegaon Khurd  6297143586 Call Hot In...Booking open Available Pune Call Girls Ambegaon Khurd  6297143586 Call Hot In...
Booking open Available Pune Call Girls Ambegaon Khurd 6297143586 Call Hot In...
 
Delhi Call Girls In Atta Market 9711199012 Book Your One night Stand Call Girls
Delhi Call Girls In Atta Market 9711199012 Book Your One night Stand Call GirlsDelhi Call Girls In Atta Market 9711199012 Book Your One night Stand Call Girls
Delhi Call Girls In Atta Market 9711199012 Book Your One night Stand Call Girls
 
Preventing and ending sexual harassment in the workplace.pptx
Preventing and ending sexual harassment in the workplace.pptxPreventing and ending sexual harassment in the workplace.pptx
Preventing and ending sexual harassment in the workplace.pptx
 
The Impact of Socioeconomic Status on Education.pdf
The Impact of Socioeconomic Status on Education.pdfThe Impact of Socioeconomic Status on Education.pdf
The Impact of Socioeconomic Status on Education.pdf
 
Zeeman Effect normal and Anomalous zeeman effect
Zeeman Effect normal and Anomalous zeeman effectZeeman Effect normal and Anomalous zeeman effect
Zeeman Effect normal and Anomalous zeeman effect
 
Delhi Call Girls South Ex 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls South Ex 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip CallDelhi Call Girls South Ex 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls South Ex 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
 
VIP High Profile Call Girls Jamshedpur Aarushi 8250192130 Independent Escort ...
VIP High Profile Call Girls Jamshedpur Aarushi 8250192130 Independent Escort ...VIP High Profile Call Girls Jamshedpur Aarushi 8250192130 Independent Escort ...
VIP High Profile Call Girls Jamshedpur Aarushi 8250192130 Independent Escort ...
 

Aviation Flight Schedules

  • 1. A RESEARCH WORK ON THE EFFECTS OF WEATHER HAZARDS ON AVIATION FLIGHT SCHEDULES AND OPERATIONS BY AKANDE SAMUEL OLUMIDE Centre for Space Research and Applications FEDERAL UNIVERSITY OF TECHNOLOGY, AKURE ONDO STATE, NIGERIA olusamakande@yahoo.com +234-7032320763
  • 2. INTRODUCTION Aviation plays a major role in today’s social and economic scenarios. It offers a quick, reliable and safe way of taking people to their destination, for business reasons, holidays or family visits. Even after a century of flight, weather is still the factor most likely to result in accidents with fatalities. An increasing demand for air travel is the first challenge to the future of air transport.
  • 3.  A flight delay is a delay in which an airline CAUSES flight takes off and/or lands later than its  Maintenance problems scheduled time. A flight is considered  Crew problems delayed when it is 15 minutes later than its  Aircraft cleaning scheduled time. (Hauke et al, 2001)  Baggage loading  Occasional delays are part of air travel today.  Fueling Much as we dislike delays, they are yet unavoidable, even in the well-run airlines.  Extreme weather  Congestion in air traffic  Security issues
  • 4.  Aviation weather hazards do not only unleash its impact on aircrafts in flights but also affects those packed at the Aerodromes.  Therefore, a good knowledge of this subject matter becomes very important to Aircraft operators, pilots and flight crew members  Should the safety of lives and properties be ensured and risks reduced to the barest minimum.  The great increase in air traffic has led to a large increase in the demand for airport capacity.  Also, the months of May to October are months of the rainy season, characterized by severe thunderstorms and line squalls and its attendant turbulence, microbursts and lighting.
  • 5. AIM To examine the various weather hazards that affect the effective flight operation in the aviation industry. OBJECTIVES o study the weather approach to problems of flight delays and cancellation. To analyse the weather parameters that likely affects the smooth flight operations. To see if by human efforts, air crashes due to natural (weather) hazards such as thunderstorms, wind shear, precipitation can be mitigated.
  • 6.  The study area for this report is the Murtala Mohammed International Airport , Ikeja, Lagos State, Nigeria. It lies between latitude 6021I11II N and longitude 3023I44II E. It is the busiest airport in Nigeria.  It is the major airport serving the city of Lagos, Southwestern Nigeria and the entire nation, with an average of 300 aircraft movements a day. It caters for more than 5 million a year.  Lagos state is a coastal state bounded to the south by the Atlantic Ocean and the other sides by neighboring states. Total % freight Total Aircraft Year Passengers Increase (tons) Movements 2003 3362464 51826 62439 2004 3576189 6 89496 67208 2005 3817338 6.3 63807 70893 2006 3848757 0.8 83598 74650 2007 4162424 7.5 81537 2008 5136920 23.4 77472 2009 5644572 9.9 84588 2010 6273454 11.1 96919 2011 6748290 7.6 105215
  • 7. • Flight delay is a complex phenomenon, because it can be due to problems at the origin airport, at the destination airport, or during airborne. • Flight schedules are often subjected to irregularity. Due to the tight connection among airlines resources, delays could dramatically propagate over time and space unless the proper recovery actions are taken. (Wu, 2005). • In addition, there are general arrival and departure delays. This usually indicates that arrival traffic is doing airborne holding or departing traffic is experiencing longer than normal taxi times or holding at the gate. These could be due to a number of reasons, including thunderstorms in the area, a high departure demand, or a runway change. (Aisling and Kenneth, 1999).
  • 8. WEATHER HAZARDS ON FLIGHT OPERATIONS REDUCED (POOR) VISIBILITY Fog  It forms over land usually under clear skies and light winds typically after midnight and peaks early in the morning. After sunrise, the fog begins to burn off from the edges over land. Precipitation  Rain can reduce visibility; however, the restriction is seldom less than one mile other than in the heaviest showers beneath cumulonimbus clouds. Drizzle, because of the greater number of drops in each volume of air, is usually more effective than rain at reducing the visibility, especially when accompanied by fog.
  • 9. Wind Shear  Wind shear is a change in wind direction and/or wind speed over the distance between two points.  If the points are in a vertical direction then it is called vertical shear, if they are in a horizontal direction than it is called horizontal shear.  In the aviation world, the major concern is how abruptly the change occurs.  Depending on the aircraft type, it may take a significant time to correct the situation, placing the aircraft in peril, particularly during takeoff and landing. Turbulence  Turbulence is the direct result of wind shear. The stronger the shear the greater the tendency for the laminar flow of the air to break down into eddies resulting in turbulence.
  • 11.
  • 12.
  • 13. DATA USED METHODOLOGY  The data collected for the  The Histograms were plotted for the use of the study is known as data from the divisions in Aircraft Daily Flight Schedule Report. operations. This is to show the frequent occurrence of factors  This data was collected from responsible for the problems of flight operations data unit of flight operations. AIR NIGERIA AIRWAYS, ikeja, Lagos State. The data ranges  Also, line graphs, showing the relationship between some weather between May-October 2011 parameters(rainfall, windspeed, and and May-October 2012. thunderstorm) that also contributes  The meteorological data used to problems of flight operations. were collected from the  The monthly means of these Nigeria Meteorological parameters were used for the Agency, Ikeja office, Lagos. analysis for the period of my stay on Industrial Training (May-October).
  • 14. 18 16 14.29 14 13.19 Percentage of Delays 12.09 2011 12 10.99 10.99 9.89 9.89 2012 10 8 6 4.4 4 3.3 3.3 3.3 2.2 2.2 2 0 0 0 Divisions in Aircraft Operations Graph of Percentage Delays from Divisions in Aircraft Operations (MAY) 18 16.16 16 15.15 14.14 14 12 2011 10.1 Percentage of Delays 10 2012 8.08 8.08 8 6.06 6 5.05 4.04 4.04 4.04 4 3.03 2.02 2 0 0 0 Divisions in Aircraft Operations Graph of Percentage Delays from Divisions in Aircraft Operations (JUNE)
  • 15. 20 18.68 18 16 Percentage of Delays 13.19 13.19 2011 14 12 10.99 2012 9.89 10 8.79 7.69 7.69 8 5.49 6 4 3.3 2 1.1 0 0 0 0 0 Divisions in Aircraft Operations Graph of Percentage Delays from Divisions in Aircraft Operations (JULY) 20 18.25 18 15.87 16 Percentage of Delays 14.29 13.49 14 12 2011 10.32 10 2012 7.94 8 6.35 5.56 6 4 2.38 2.38 1.59 1.59 2 0 0 0 0 Divisions in Aircraft Operations Graph of Percentage Delays from Divisions in Aircraft Operations(AUGUST)
  • 16. 18 15.7 16 14.53 2011 Percentage of Delays 14 11.63 2012 12 11.05 9.2 9.65 10 8.14 8 6.4 6.98 6 3.49 4 1.74 1.5 2 0 0 0 0 Divisions in Aircraft Operations Graph of Percentage Delays from Divisions in Aircraft Operations (SEPT) 18 16 14.29 14 12.99 11.69 2011 12 10.39 9.96 2012 10 Percentage of Delays 8 6.49 6.49 6.93 5.19 5.63 6 4 3.46 2.16 2.6 1.73 2 0 0 Divisions in Aircraft Operations Graph of Percentage Delays from Divisions in Aircraft Operations (OCT.)
  • 17. 210 19 200 18.5 190 18 180 17.5 170 17 RAINFALL (mm) 160 16.5 RR Th 150 16 140 15.5 130 15 120 14.5 110 14 MAY JUN JUL AUG SEP OCT Line Graph of Variation between Thunderstorm and Rainfall (2011) 200 22 190 21 180 20 RAINFALL (mm) 170 19 160 18 150 17 RR 140 16 Th 130 15 120 14 MAY JUN JUL AUG SEP OCT Line Graph of Variation between Thunderstorm and Rainfall (2012)
  • 18. 3.15 19 3.1 18.5 3.05 18 17.5 WIND SPEED (m/s) 3 17 2.95 16.5 2.9 16 Wind 2.85 15.5 Th 2.8 15 2.75 14.5 2.7 14 MAY JUN JUL AUG SEP OCT Line Graph of Variation between Thunderstorm and Windspeed (2011) 3.1 21.5 20.5 3 19.5 2.9 18.5 WIND SPEED (m/s) 2.8 17.5 Wind 2.7 16.5 Th 2.6 15.5 2.5 14.5 MAY JUN JUL AUG SEP OCT Line Graph of Variation between Thunderstorm and Windspeed (2012)
  • 19. RESULTS AND DISCUSSION  The graphs 1-6 which shows the number of delays with their respective delay reasons, there were some delay reasons that had low number of delays while some has a high number of delays.  The months of July and August, 2012 recorded the highest percentage delays due to weather with amounting to 18.68% and 18.25% respectively.  Thus, there was an upward trend in the percentage which implies that there were delays and flight operation problems due to bad weather.  The Graphs 7-10 show the weather effects on delays caused by thunderstorms, wind speed and rainfall which are the weather variables considered.  These then show that in most cases, an increase in thunderstorm occurrence leads to an increase in the rainfall occurrence (as well as rainfall amount). Also, an increase in the win speed also corresponds to an increase in the thunderstorms
  • 20. CONCLUSION From May to October, the percentage and the numbers of delays due to weather hazards show that the issue of delays due to weather hazards is to be taken with utmost seriousness. In conclusion, weather hazards are one of the significant factors of flight operations, therefore pilots and aviation managers needs to have the knowledge of weather hazards integrated into flight operational guidelines.
  • 21.  NIMET should be issuing a comprehensive daily weather report before the daily flight scheduled are been planned.  The Government should embark on projects to improve weather study and acquire weather equipment that would ensure that pilots are kept abreast of weather information at any time.  The Government should provide the Federal Airport Authority of Nigeria (FAAN) the installation of MeteoSat Second Generation (MSG) ground receiver; installation of thunderstorm detectors; construction of Weather Forecasting and Climate research Centre.  Also the construction as procurement and installation of Doppler Weather Radars (DWR); installation of low-level wind shear alert system (LLWAS) at the two wings of the airports; procurement and installation of Upper Air sounding equipment.