SlideShare una empresa de Scribd logo
1 de 59
Descargar para leer sin conexión
Brain Power Center
PMP Preparation course
‫تعالى‬ ‫قال‬:
‫ُّا‬َ‫ن‬ِ‫إ‬ ُ‫س‬‫ُّا‬َ‫ن‬‫ال‬ ‫َا‬‫ه‬ُُّ‫ي‬َ‫أ‬ ‫َا‬‫ي‬‫ُم‬‫ك‬‫َا‬‫ن‬ْ‫ق‬َ‫ل‬َ‫خ‬ٍ‫ر‬َ‫ك‬َ‫ذ‬ ‫ُّن‬‫م‬
‫َى‬‫ث‬‫ُن‬‫أ‬َ‫و‬ْ‫م‬ُ‫ك‬‫َا‬‫ن‬ْ‫ل‬َ‫ع‬َ‫ج‬َ‫و‬‫ًا‬‫ب‬‫ُو‬‫ع‬ُ‫ش‬
َ‫ل‬‫َائ‬‫ب‬َ‫ق‬َ‫و‬‫ال‬ َ‫د‬‫ن‬‫ع‬ ْ‫م‬ُ‫ك‬َ‫م‬َ‫ر‬ْ‫ك‬َ‫أ‬ َُّ‫ن‬ِ‫إ‬ ‫ُوا‬‫ف‬َ‫ر‬‫َا‬‫ع‬َ‫ت‬‫ل‬‫ُّه‬َ‫ل‬
ٌ‫ري‬‫َب‬‫خ‬ ٌ‫م‬‫ي‬‫َل‬‫ع‬ َ‫ه‬َُّ‫ل‬‫ال‬ َُّ‫ن‬ِ‫إ‬ ْ‫م‬ُ‫ك‬‫َا‬‫ق‬ْ‫ت‬َ‫أ‬.
‫ق‬‫د‬‫ص‬‫م‬‫ي‬‫ظ‬‫ع‬‫ل‬‫ا‬ ‫هلل‬‫ا‬
‫سورة‬‫الحجرات‬13 OSO A2013
Quote
General Manager Account Dept.
Personnel Dept.
Our organization
OSO A2013
Project Team & PM Team
Projectmanagementteam
PHRM : the processes that ORGANIZE, MANAGE, and LEAD the project team.
Managing and leading the project team
Influencing the project team (Human Factors)
Professional and ethical behavior
• Project Team/ Staff :People with ASSIGNED ROLES and responsibilities for completing the project
• Project management team (Core/Executive) :Responsible for Management & Leadership activities
• For smaller projects, the project management responsibilities can be shared by the entire team or administered solely by the PM.
P R O J E C T H U M A N R E S O U R C E M A N A G E M E N T
OSO A2013
Human Factors
interactions
OSO A2013
Project
constraints
Scope
Quality
Schedule
Budget
Resources
Risk
P ro j e c t h u m a n r e s o u r c e m a n a g e m e n t
P ro c e s s e s
OSO A2013
P ro jec t M a n a gemen t P ro cess G ro u p a n d K n owledge A r e a M a p p i n g
Knowledge Area Initiating Planning Executing M& C Closing
4. Project Integration
Management
4Develop
Project Charter
4.2 Develop Project
Management Plan
4.3 Direct & Manage Project
Work
4.4 Monitor & Control Project Work
4.5 Perform Integrated Change
Control
4.6 Close Project
or Phase
5. Project Scope Management
5Plan Scope Management
5.2 Collect Requirements
5.3 Define Scope
5.4 Create WBS
5.5 Validate Scope
5.6 Control Scope
6. Project Time Management
6Plan Schedule Management
6.2 Define Activities
6.3 Sequence Activities
6.4 Estimate Activity Resources
6.5 Estimate Activity Durations
6.6 Develop Schedule
6.7 Control Schedule
7. Project Cost Management
7Plan Cost Management
7.2 Estimate Costs
7.3 Determine Budget
7.4 Control Costs
8. Project Quality Management 8Plan Quality Management 8.2 Perform Quality Assurance 8.3 Control Quality
9. Project Human Resource
Management
9.1 Plan Human Resource
Management
9.2 Acquire Project Team
9.3 Develop Project Team
9.4 Manage Project Team
10. Project Communications
Management
10Plan Communications Management 10.2 Manage Communications 10.3 Control Communications
11. Project Risk Management
11Plan Risk Management
11.2 Identify Risks
11.3 Perform Qualitative Risk Analysis
11.4 Perform Quantitative Risk Analysis
11.5 Plan Risk Responses
11.6 Control Risks
12. Project Procurement
Management
12Plan Procurement Management 12.2 Conduct Procurements 12.3 Control Procurements
12.4 Close
Procurements
13. Project Stakeholder
Management
13Identify
Stakeholders
13.2 Plan Stakeholder
Management
13.3 Manage Stakeholder
Engagement
13.4 Control Stakeholder
Engagement
OSO A2013
methodology
Process
W h a t
(definition)
How
(ITTO)
W h y
( objectives)
OSO A2013
Outputs
Human resource management plan
Tools & Techniques
Organization charts
and position
descriptions
Networking
Organizational
theory
Expert judgment Meetings
Inputs
Project management plan
Activity resource
requirements
Enterprise environmental
factors
Organizational process
assets
Process of:
• Identifying and documenting
project:
• roles,
• responsibilities,
• required skills,
• reporting relationships
• Creating staffing
management plan.
The key benefit :
• Establishes
• project roles and
responsibilities
• project organization charts
• staffing management plan
Objectives&ITTO9.1 Plan Human Resource
Management
OSO A2013
ITTO
OSO A2013
Human recourses plan
Organizational
Process Assets
Tools &
Techniques
Inputs Outputs
Enterprise
Environmental
Factors
Activity
resources
requirements
Networking
Organizational
Theory
Organization
Charts and
Position
Descriptions
Expert judgment
Meetings
9.1 Plan Human Resource
Management
11.2 Identify Risks
7.2 Estimate Costs
9.1 Plan Human Resource Management
Human resource management plan
Enterprise/ Organization
Enterprise environmental
factors
Organizational process assets
6.4 Estimate Activity Resources
Activity resource requirements
4.2 Develop Project Management Plan
Project Management Plan
DataFlowDiagram
9.1 Plan Human Resource Management
OSO A2013
Project Management Plan
• Project LIFE CYCLE & phase processes
• HOW work will be executed
• change management plan
• configuration management
• How INTEGRITY of the project baselines
• Needs and methods of communication.
Activity Resource Requirements
• Human RESOURCE needs for the project.
• The PRELIMINARY required project team members
and their competencies are progressively elaborated
as part of the Plan Human Resource Management
process
Enterprise Environmental Factors
• Organizational culture and structure,
• EXISTING human resources,
• Geographical dispersion of team members,
• Personnel administration policies
• Marketplace conditions.
Organizational Process Assets
• Organizational standard processes, policies, and
role descriptions
• Templates for organizational charts and position
descriptions
• Lessons learned on organizational structures
• Escalation procedures for handling issues.
9.1.1Inputs
9.1 Plan Human Resource Management
OSO A2013
9.1.2.1 Organization Charts and
Position Descriptions:
• Various FORMATS exist to document team
member roles and responsibilities.
(hierarchical, matrix, and text-oriented).
9.1.2.2 Networking
• the formal and informal INTERACTION with
others in an organization, industry, or
professional environment.
9.1.2.3 Organizational Theory
• provides information regarding the way in
which people, teams, and organizational units
BEHAVE
9.1.2.4 Expert Judgment
• List preliminary requirements /required skills;
• Assess the roles required
• Determine the preliminary effort level and
number of resources needed
• Determine reporting relationships
9.1.2.5 Meetings
• leverage a combination of other tools and
techniques to allow for all project management
team members to reach consensus on the
human resource management plan
9.1.2T&T
9.1 Plan Human Resource Management
OSO A2013
9.1.2T&T
9.1 Plan Human Resource Management
OSO A2013
to ensure that each WORK PACKAGE has an unambiguous OWNER and
that ALL team members have a CLEAR understanding of their roles and responsibilities.
Project X
Civil works
excavation
Admin &
finance
workshop
secretary
9.1.2.1 Organization Charts &
Position Descriptions:
PM
Project
Controls
Planning &
cost DM
Planning
Engineer
Cost Control
Engineer
Tech. Clerk
Technical
DM
Contract
Admin.
Admin & Fin
Financial DM HR DM Admin. DM
Construction
Earth works
TM
Concrete
works TM
E/M TM
9.1.2.1
9.1.2.1 Organization Charts &
Position Descriptions:
9.1.2T&T
9.1 Plan Human Resource Management
WBS –OBS – RBS ? See sample’s slideOSO A2013
9.1.2T&T
Responsible “Doer”
• Individual(s) (Many) who perform an activity or take part
in a decision—responsible for action/implementation.
Accountable “Buck Stops Here”
• Individual (ONE!!) who has ultimate decision making
and approval authority. Typically the owner of the
budget.
Consulted “In the Loop”
• Individual(s) (Many) who need to have input into a
decision or action before it occurs.
Informed “FYI”
• Individual(s) (Many) who must be informed that a
decision or action has taken place.
RACI
Activity PM PCM CM
Create charter A R I
Create MPR I A I
Issue Change Order I R A
9.1.2.1
Grid that shows the project RESOURCES assigned to each work package
• all ACTIVITIES associated with one person and
• all PEOPLE associated with one activity.
This also ensures that there is only ONE PERSON
accountable for any one task to avoid confusion of
responsibility
9.1.2.1 Organization Charts &
Position Descriptions:
9.1 Plan Human Resource Management
OSO A2013
9.1.2.1.
When details are required descriptions can be specified in text-oriented formats (job descriptions ) it contains of :
9.1.2.1 Organization Charts &
Position Descriptions:
9.1 Plan Human Resource Management
9.1.2T&T
OSO A2013
Job
Description
• Manage the strategic aspects of large
engagements and mitigates any risk.
* Oversees senior managers and
managers working on client
engagements within practice.
* Review high-level deliverables across
practice.
Skills
• 15 years experience in similar position.
• Excellent communication skills.
• English written and spoken.
Education • Bachelor degree in Civil Engineering
Project Director
Formal or informal interaction with others
constructive way to understand political and interpersonal factors >
impact the Effectiveness of various staffing management options
include proactive correspondence and …
Luncheon
meetings
Meetings Events
Trade conferences
Symposia /
seminar
9.1.2.2 Networking9.1 Plan Human Resource Management
9.1.2T&T
OSO A2013
Provides information regarding the way
in which PEOPLE, teams, and
organizational units BEHAVE
shorten TIME, COST, and EFFORT
needed to create the plan human
resource management process outputs
improve planning efficiency
9 .1 . 2 . 3 Organizational Theory9.1 Plan Human Resource Management
9.1.2T&T
• Maslow’s Hierarchy of Needs
• McGregor’s Theory of X&Y
• Theory Z (William Ouchi)
• Herzberg's two factor theory
• Theory ?
OSO A2013
Roles and
responsibilities.
Project
organization
charts.
Staffing
management
plan
• The FUNCTION assigned to a person
in the project. (civil engineer)
Role
• The RIGHT to apply project resources,
MAKE decisions
Authority
• The assigned DUTIES and workResponsibility
• The skill and capacity required to
complete assigned activities
Competency
9.1.3.1 Human Resource
Management Plan
(lack of required competencies > > training, hiring, schedule
changes, or scope changes are initiated).
TIMETABLES for staff acquisition and
release
identification of TRAINING needs
TEAM-BUILDING strategies
plans for RECOGNITION and rewards
programs
compliance considerations, SAFETY
issues
the impact of the staffing management
plan on the ORGANIZATION
staffingmanagementplan
9.1 Plan Human Resource Management
9.1.3Outputs
HOW project human resources should be
defined, staffed, managed, released :
OSO A2013
Process of:
• confirming human
resource availability
• obtaining the team
necessary to
complete project
activities.
The key benefit :
• outlining and guiding
the team selection
and responsibility
assignment to obtain
a successful team
Insufficient human resources or capabilities
decrease the probability of success and, in a worst case scenario, could result in
project cancellation.
Failure to acquire the necessary human resources
affect project schedules, budgets, customer satisfaction, quality, and risks.
PM negotiate and influence others
to provide the required human resources.
9 . 2 A c q u i r e P r o j e c t Te a m
ITTO&DFD
collective
bargaining
agreements
use of
subcontractor
personnel
matrix project
environment
internal or
external
reporting
relationships
OSO A2013
The project management team may or may not have DIRECT
CONTROL over team member selection because of :
OSO A2013
Resource calendars
Project Staff
Assignments
project Management
Plan (U)
Inputs Outputs
Negotiation
Acquisition
Pre-Assignment
Organizational
Process Assets
Project
Management Plan
Enterprise
Environmental
Factors
Virtual Teams
Multi-criteria
decision analysis
Tools &
Techniques
9 . 2 A c q u i r e P r o j e c t Te a m
ITTO&DFD
data flow Diagram
9 . 2 A c q u i r e P r o j e c t Te a m
ITTO&DFD
Outputs
Project staff
assignments
Resource calendars
Project management
plan updates
Tools & Techniques
Pre-
assignment
Negotiation Acquisition
Virtual
teams
Multi-criteria
decision
analysis
Inputs
Human resource
management plan
Enterprise
environmental factors
Organizational
process assets
OSO A2013
Human resource management plan
• Roles and responsibilities (positions, skills,
and competencies)
• Project organization charts (number of people)
• Staffing management plan (time periods each
project team member)
Enterprise environmental factors:
• Existing information on human resources
• Personnel administration policies
• Organizational structure
• Colocation or multiple locations.
Organizational process assets
• Organizational standard policies, processes,
and procedures
9 . 2 A c q u i r e P r o j e c t Te a m
9.2.1Inputs
OSO A2013
Pre-assignment
• selected in advance
Negotiation
• FM: competent staff -required time frame -able,
willing, and authorized
• Other PM teams : assign scarce or specialized
human resources;
• External org. :scarce, specialized, qualified
Acquisition
• organization is unable to provide the staff
needed to complete a project (acquired from
outside sources).
Virtual teams
• groups of people with a shared goal who
fulfill their roles with little or no time spent
meeting face to face.
Multi-criteria decision analysis
• criteria are developed and used to rate or
score potential team members. Availability –
Cost – Experience – Ability – Knowledge –
Skills – Attitude - International factors
9 . 2 A c q u i r e P r o j e c t Te a m
9.2.2T&T
OSO A2013
project team
DIRECTORY
Assignments Documentation
Memos to
team
members
Names
inserted into other
parts of the project
management plan
9 . 2 A c q u i r e P r o j e c t Te a m
9.2.3Outputs
OSO A2013
Process of:
• improving
• COMPETENCIES,
• team member INTERACTION,
• overall team ENVIRONMENT
• to ENHANCE project performance.
The key benefit :
• it results in
• improved TEAMWORK,
• enhanced people SKILLS competencies,
• MOTIVATED employees,
• reduced staff TURNOVER rates,
• improved overall Project PERFORMANCE
Improving knowledge and skills :
• increase ability to complete deliverables,
• lowering costs,
• reducing schedules,
• improving quality
Improving feelings of trust and
agreement among :
• raise morale,
• lower conflict,
• increase team work;
Creating a dynamic, cohesive &
collaborative :
• improve productivity, team spirit, cooperation
• allow cross training and mentoring , share
knowledge and expertise
Team members often have diverse industry experience, know multiple languages, and sometimes operate in the “TEAM
LANGUAGE” that may be a different language or norm than their native one
9 . 3 D e ve l o p P r o j e c t Te a m
Objectives
OSO A2013
OSO A2013
Team Performance
Assessment
Training
Team-Building
Activities
Interpersonal
Skills
Project Staff
Assignments
Resource calendars
project
Management Plan
Ground Rules
Co-Location
Recognition and
Rewards
EEF (u)
Personnel
assessment tools
9 . 3 D e ve l o p P r o j e c t Te a m
Objectives
Inputs Outputs
Tools &
Techniques
Inputs
Human resource
management plan
Project staff assignments
Resource calendars
Tools & Techniques
Interpersonal skills
Training
Team-building activities
Ground rules
Colocation
Recognition and rewards
Personnel assessment
tools
Outputs
Team performance
assessments
Enterprise environmental
factors updates
D a t a F l o w D i a g r a mPMBOK
P-275
9 . 3 D e ve l o p P r o j e c t Te a m
ITTO&DFD
OSO A2013
Human resource management plan
• provides guidance on HOW project human
resources should be defined, staffed,
managed, controlled, and eventually
released
Project staff assignments
• documents identify the PEOPLE who are on
the team
Resource calendars
• identify TIMES when the project team
members can participate in team
development activities
9 . 3 D e ve l o p P r o j e c t Te a m
9.3.1Inputs
OSO A2013
Interpersonal (soft ) skills
• COMMUNICATION skills (emotional
,intelligence, conflict resolution,
negotiation, influence, team building,
group facilitation)
Training
• all activities designed to enhance
the COMPETENCIES of the project
team members.
Team-building activities
• To improve INTERPERSONAL
relationships & to help individual
team members work together
effectively
Ground rules*
• establish clear EXPECTATIONS
regarding acceptable behavior by
project team members
Colocation “tight matrix”
• involves placing the project team
members in the same physical
LOCATION to enhance their ability
to perform as a team
Recognition and rewards
• given to any individual will be
effective only if it SATISFIES a need
which is valued by that individual
Personnel assessment tools
• give the project manager and the
project team INSIGHT into areas of
strength and weakness
9 . 3 D e ve l o p P r o j e c t Te a m
9.3.2T&T
OSO A2013
Forming
• team MEETS and learns about the project /formal roles
&Responsibilities.
• Team members tend to be independent and not as open in this phase.
Storming
• the team begins to ADDRESS the project work,
• If team members are not collaborative and open to differing ideas and
perspectives, the environment can become counterproductive.
Norming
• team members begin to WORK TOGETHER and adjust their work
habits and behaviors to support the team. The team learns to trust
each other.
Performing
• Teams that reach the performing stage function as a WELL-
ORGANIZED unit.
• They are interdependent and work through issues smoothly and
effectively.
Adjourning
• the team COMPLETES the work and moves on from the project.
• This typically occurs when staff is released from the project
9 . 3 D e ve l o p P r o j e c t Te a m
9.3.2T&T
OSO A2013
Team performance assessments
• skills’ Improvements
Competencies Improvements
Reduced staff turnover rate
Increased team cohesiveness
Enterprise environmental factors
updates
• personnel administration
• employee training records
• skill assessments
High-performance teams
• characterized by
• TASK-oriented
• RESULTS-oriented outcomes.
MEASURED in terms of
• technical success according
to agreed-upon :
9 . 3 D e ve l o p P r o j e c t Te a m
9.3.3Outputs
OBJECTIVES
• including quality
levels
SCHEDULE
• finished on time
BUDGET
• finished within
financial constraints
OSO A2013
Project Title: Date
Prepare:
Technical Performance:
Comments
……
Training need:
….
Recommendation
………..
Expectations
150 100 50
Exceeds Meets need imp.
50 75 100 125 150
Scope
Quality
Schedule
Cost
Process of:
• TRACKING team member performance
• Providing feedback,
• resolving issues
• Managing team changes
• .. to OPTIMIZE project PERFORMANCE.
The key benefit :
• It influences team BEHAVIOR
• manages CONFLICT
• resolves ISSUES
• appraises team member PERFORMANCE
As a result of managing the project team
• change requests are submitted,
• the human resource management plan is updated
• issues are resolved,
• input is provided for performance appraisals,
• lessons learned are added to the organization’s
database.
skills to create high-performance teams:
• communication
• conflict management
• negotiation,
• leadership
Project managers should provide
• challenging assignments to team members
• recognition for high performance
9.4 Manage
Project Team
Objectives
OSO A2013
OSO A2013
EEF (U)
Organizational
Process Assets (U)
Project
management plan
(U)
Requested Changes
Inputs Tools &
Techniques
Outputs
Conflict
Management
Project
Performance
Appraisals
Observation and
Conversation
OPA
Project Staff
Assignments
Team Performance
Assessment
project Management Plan
Interpersonal
skills
Issue log
Work performance reports
Project documents
updates
9.4 Manage
Project Team
ITTO
D a t a F l o w D i a g r a m
Inputs
• Human resource management plan
• Project staff assignments
• Team performance assessments
• Issue log
• Work performance reports
• Organizational process assets
Tools &
Techniques
• Observation and conversation
• Project performance appraisals
• Conflict management
• Interpersonal skills
Outputs
• Change requests
• Project management plan updates
• Project documents updates
• Enterprise environmental factors updates
• Organizational process assets updates
ITTO&DFD
OSO A2013
9.4 Manage
Project Team
Human resource management plan
• Roles and responsibilities,
• Project organization,
• Staffing management plan.
Project staff assignments
• provide documentation, which includes the list
of project team members
Team performance assessments
• continually assessing team’s performance
• actions can be taken to resolve issues
• modify communication, address conflict
• improve team interaction
Issue log
• used to document and monitor who is
responsible for resolving specific issues by a
target date.
Work performance reports
• current project status compared to forecasts.
• assists in determining:
• future human resource requirements
• recognition and rewards
• updates to the staffing management plan.
Organizational process assets
• Certificates of appreciation,
• Newsletters, Websites,
• Bonus structures, Corporate apparel,
• Other organizational perquisites
9.4.1Inputs
OSO A2013
9.4 Manage
Project Team
Observation and conversation
• used to stay in touch with the work and attitudes of
project team members
Project performance appraisals
• clarification of roles and responsibilities,
• constructive feedback to team members,
• discovery of unknown or unresolved issues,
• development of individual training plans,
• the establishment of specific goals for future time
periods.
Conflict management
• Sources of conflict include : scarce resources,
scheduling priorities, personal work styles.
• Team ground rules, group norms and solid project
management practices reduce the amount of conflict
Interpersonal skills
• Leadership
• Influencing
• Effective decision making
9.4.2T&T
Types of powers
360-degree principle
Leadership Styles
OSO A2013
9.4 Manage
Project Team
Withdraw/ Avoid
• RETREATING from an actual or potential conflict situation
• POSTPONING the issue to be better prepared or to be resolved by others.
Smooth/ Accommodate*
• Emphasizing areas of AGREEMENT rather than areas of difference
• conceding one’s position to the needs of others to maintain harmony and
relationships.
Compromise /Reconcile
• Searching for solutions that bring some DEGREE of satisfaction to all parties in
order to temporarily or partially resolve the conflict.
Force / Direct
• Pushing ONE’s viewpoint at the expense of others;
• offering only WIN-LOSE solutions,
• usually enforced through a power position to resolve an emergency.
Collaborate /Problem Solve
• Incorporating MULTIPLE viewpoints and insights from differing perspectives
• requires a cooperative attitude and open dialogue that typically leads to
consensus & commitment
9.4.2T&T
seven reasons for conflict
OSO A2013
Smooth/ Accommodate*
5 GT Diagrams
9.4 Manage
Project Team
ability to resolve conflict
>> PM success.
Factors influence conflict
resolution methods :
 Relative importance
 Time pressure
 Position taken by
persons involved
 Motivation to resolve on
a long/short-term basis
Exercise: Conflict Management
Description
Collaborate
ProblemSolve
Force
Direct
Smooth
Accommodate
Compromise
Reconcile
Withdraw
Avoid
1 "Do it my way!"
2 "Let's calm down and get the job done!"
3 “Let us do a little of what both of you suggest”
4 “Let's deal with this issue next week"
5 “Sandy and Amanda, both of you want this project to cause as little distraction to your
departments as possible. With that in mind, I am sure we can come to an agreement on the
purchase of equipment and what is best for the project."
6 “We have talked about new computers enough. I do not want to get the computers, and that
is it!"
7 "Sandy, you say that the project should include the purchase of new computers, and Amanda,
you say that the project can use existing equipment. I suggest we perform the following test on
the existing equipment to determine if it needs to be replaced."
8 “Let's what everyone thinks, and try to reach a consensus”
R
R
R
R
R
R
R
R
Change requests
• Staffing changes (by choice /uncontrollable events) can
affect the rest of the project management plan.
Project
management plan
updates
• Human resource management plan.
Project documents
updates
• Issue log,
• Roles description
• Project staff assignments.
Enterprise
environmental
factors updates
• Input to organizational performance appraisals
• Personnel skill updates.
Organizational
process assets
updates
• Historical information & lessons learned documentation
• Templates
• Organizational standard processes
9.4.3Outputs
OSO A2013
9.4 Manage
Project Team
EEF
OPA
OSO A2013
4.2 Develop
Project M Plan
6.4 Estimate A
Resources
Integration Scope Time Cost Quality H. Resource Comm’n. Risk Stakeholders
Enterprise/
Organization
9.1 Plan H R
Management
Project staff
assignments
Project M plan
(U)
6.5 Estimate A.
Durations
Project M Plan A Resource
requirements
Resource
calendars
H. Resource M
plan
11.2 Identify
Risks
9.3 Develop
Project Team
9.4 Manage
Project Team
EEF (U)
Requested
Changes
.
Team Perf.
assessments
.
.
.
9.2 Acquire
Project Team
7.2 Estimate
Costs
6.6 Develop
Schedule
7.3 Determine
Budget
10 q – 20 min
Samples & examples
9.1.2 Plan Human
Resource
Management T&T
9.1.2.1 WBS-
RBS-OBS
9.1.2.3 T&T
Organizational
Theory
Maslow’s
Hierarchy of
Needs
McGregor’s
Theory of X&Y
Theory Z
(William Ouchi)
Herzberg's two
factor theory
9.1.3.1 Human
Resource
Management Plan
OUTPUTS
Sample of
Roles and
responsibilities
Resource
calendars:
resource
histogram
HRM Plan
sample
9.3.2 Develop
Project Team – T&T
Ground rules
sample
9.3.3 Develop
Project Team –
Outputs
Team
performance
assessments
sample
9.4.2 Manage
Project Team T&T
Types of
powers
Leadership
Styles
seven reasons
for conflict
Interpersonal
skills
5 general
techniques for
resolving
conflict.
OSO A2013
PM
Project Controls
Planning & cost
DM
Technical DM
Contract Admin.
Admin & Fin
Financial DM
HR DM
Admin. DM
Construction
Earth works TM
Concrete works
TM
E/M TM
ProjectEWR
Human
resource
Project Controls
Admin & Fin
Construction
Materials
Construction
Mat’l
E/M Mat’l
Consumables.
Equipment
Plants
Vehicles
Machineries
BPBCbuilding
Engineering
Design
Arch
Structural
design
EM designTesting
Construction
Civil works
Earth works
Concrete works
Masonry
Electro-Mech.
Elect
Plumbing
A-C
F- F
Landscaping
Procurement
Sub-contract
Supply
(WBS) designed to show how project deliverables are
broken down into work packages
(OBS) is arranged according to an organization’s
departments, or teams with the project activities
or WP listed under each department
(RBS) resources related by category /type -
facilitate planning & controlling of project work
WBS –OBS – RBS ?
9.1.2.1 Organization Charts &
Position Descriptions:
9.1.2T&T
9.1 Plan Human Resource Management
9.1.2.1
OSO A2013
Maslow’s Hierarchy of Needs
Self-
actualization
Esteem ( to be
accepted and
valued by others)
Love and belonging
Safety needs
Physiological needs
9.1 Plan Human Resource Management
9.1.2 Tools &Techniques:
9 . 1 . 2 . 3 Organizational Theory
food
HouseWedding
AwardCEO
OSO A2013
McGregor’s
Theory of:
9.1 Plan Human Resource Management
9.1.2 Tools &Techniques:
9 . 1 . 2 . 3 Organizational Theory
X & Y
OSO A2013
"Japanese management" style
Focused on increasing
• employee LOYALTY to the company
• by providing a job for life
• with a strong focus on the well-being of the
employee,
• both ON and OFF the job.
Tends to promote :
• stable employment,
• HIGH PRODUCTIVITY,
• high employee MORALE and SATISFACTION
Long-term
employment and job
security
Collective
responsibility
Implicit, control with
explicit, formalized
measures
Collective decision-
making
Slow evaluation and
promotion
Moderately
specialized careers
Concern for a total
person, including
their family
Theory Z
(William Ouchi)
9.1 Plan Human Resource Management
9.1.2 Tools &Techniques:
9 . 1 . 2 . 3 Organizational Theory
OSO A2013
Presents two dimensional paradigm of factors affecting peoples attitudes about work:
Herzberg's two
factor theory
9.1 Plan Human Resource Management
9.1.2 Tools &Techniques:
9 . 1 . 2 . 3 Organizational Theory
give positive
satisfaction
do not give
positive
satisfaction,
Absence >
results
dissatisfaction
MOTIVATORS
HYGIENEFACTORS
9.1.2 Tools &Techniques
OSO A2013
Theory of ?
9.1 Plan Human Resource Management
9.1.2 Tools &Techniques:
9 . 1 . 2 . 3 Organizational Theory
OSO A2013
9.1.2 Tools
&Techniques
1 2
5
8
9
8
7
6
5
2 2 2
1 3
8
16
25
33
40
46
51 53 55 57
0
10
20
30
40
50
60
0
2
4
6
8
10
Jan-13 Feb-13 Mar-13 Apr-13 May-13 Jun-13 Jul-13 Aug-13 Sep-13 Oct-13 Nov-13 Dec-13
Resource calendars: resource histogram
Job JD RD Jan-13 Feb-13 Mar-13 Apr-13 May-13 Jun-13 Jul-13 Aug-13 Sep-13 Oct-13 Nov-13 Dec-13
PM 1-Jan 31-Dec 1 1 1 1 1 1 1 1 1 1 1 1
Cost control Engineer 1-Feb 31-Oct 1 1 1 1 1 1
Planning Engineer 1-Feb 31-Oct 1 2 2 2 1 1 1
Material engineer 1-Mar 31-Aug 1 1 1 1
Construction Manager 1-Mar 30-Sep 1 1 1 1 1 1 1
Contract Admin & QS 1-Feb 31-Dec 1 2 2 3 2 2 2 1 1 1 1
monthly M-P 1 2 5 8 9 8 7 6 5 2 2 2
Cum M-P 1 3 8 16 25 33 40 46 51 53 55 57
9.1 Plan Human Resource Management
9.1.3 Outputs:
9.1.3.1 Human Resource Management Plan
9 . 1 . 3 . 1
OSO A2013
HRM Plan sample
9.1 Plan Human Resource Management
9.1.3 Outputs:
9.1.3.1 Human Resource Management Plan
9 . 1 . 3
OSO A2013
Tools&Techniques
9.3 Develop Project Team
9.3.2 Develop Project Team – T & T
 Everyone will participate and take ownership of group projects.
 Team members will complete assignments on time.
 Meetings will start and end on time – no backtracking if someone is late.
 Each meeting will have a note taker (rotating task) who will distribute notes
and record decisions and assignments.
 Anyone who is absent from a meeting is responsible for finding out what
they missed.
 Respect the value of each individual's contribution.
 Resolution of differences will typically be by majority decision, but on key
issues the group will reach consensus
9.3.2
OSO A2013
Typesofpowers
Legitimate (positional)
• derived from the position a person
holds in an organization's hierarchy
(company's CEO).
Expert power
• Knowledge is power - derived from
possessing knowledge or expertise
in a particular area.
Referent Power
• derived from the interpersonal
relationships that a person
cultivates with other people in the
organization.
Coercive Power
• derived from a person's ability to
influence others via threats,
punishments or sanctions.
Reward Power
• arises from the ability of a person to
influence the allocation of incentives
in an organization.
9.4 Manage Project Team
“Halo effect”:
The assumption that because the
person is good at a technology he
will also be good at managing a
project.9 . 4 . 3
OSO A2013
Leadership
Styles
9.4 Manage Project Team
Leadership Styles
9 . 4 . 3
OSO A2013
360-degree principle
self
Manager
Peer
Subordinate
Peer
9 . 4 . 3
OSO A2013
T&T
seven reasons for conflict scheduling
Priorities
scarce resources
Technical
Administrative
cost
personal work styles.
seven reasons for
conflict, in order of most
common to least
common
9.4.2 Manage Project Team- T & T
9.4 Manage Project Team
9.4.2
OSO A2013
T&T 9.4.2 Manage Project Team- T&T
OSO A2013
9.4.2
T&T
Collaborate /Problem Solve
Withdraw/ Avoid Smooth/ Accommodate
Force / Direct
Compromise /Reconcile
OSO A2013
9.4.2

Más contenido relacionado

La actualidad más candente

Project Scope Management - PMBOK6
Project Scope Management - PMBOK6Project Scope Management - PMBOK6
Project Scope Management - PMBOK6Agus Suhanto
 
PMP Chap 6 - Project Time management - Part1
PMP Chap 6 - Project Time management - Part1PMP Chap 6 - Project Time management - Part1
PMP Chap 6 - Project Time management - Part1Anand Bobade
 
Project human resources management
Project human resources managementProject human resources management
Project human resources managementFirmansyah Ashari
 
PMP 47 process definitions
PMP 47 process definitionsPMP 47 process definitions
PMP 47 process definitionsAnand Bobade
 
Chap 6.2 Define Activity
Chap 6.2 Define ActivityChap 6.2 Define Activity
Chap 6.2 Define ActivityAnand Bobade
 
Project management
Project managementProject management
Project managementNihal Ranjan
 
PMP Chap 5 - Project Scope Management - Part1
PMP Chap 5 - Project Scope Management - Part1PMP Chap 5 - Project Scope Management - Part1
PMP Chap 5 - Project Scope Management - Part1Anand Bobade
 
Chap 9.4 Develop Team
Chap 9.4  Develop TeamChap 9.4  Develop Team
Chap 9.4 Develop TeamAnand Bobade
 
Step by Step Guide to Project Management
Step by Step Guide to Project ManagementStep by Step Guide to Project Management
Step by Step Guide to Project ManagementBrendon Yip
 
Project human resource management
Project human resource managementProject human resource management
Project human resource managementParth Krishna
 
Project human resource management
Project human resource managementProject human resource management
Project human resource managementYogender Singh Rana
 
Factors for Successful Projects
Factors for Successful ProjectsFactors for Successful Projects
Factors for Successful ProjectsTrevor Roberts
 

La actualidad más candente (20)

Project Scope Management - PMBOK6
Project Scope Management - PMBOK6Project Scope Management - PMBOK6
Project Scope Management - PMBOK6
 
PMP Chap 6 - Project Time management - Part1
PMP Chap 6 - Project Time management - Part1PMP Chap 6 - Project Time management - Part1
PMP Chap 6 - Project Time management - Part1
 
Project human resources management
Project human resources managementProject human resources management
Project human resources management
 
PMP 47 process definitions
PMP 47 process definitionsPMP 47 process definitions
PMP 47 process definitions
 
Chap 6.2 Define Activity
Chap 6.2 Define ActivityChap 6.2 Define Activity
Chap 6.2 Define Activity
 
PMO-Framework
PMO-FrameworkPMO-Framework
PMO-Framework
 
Project Resource Management
Project Resource ManagementProject Resource Management
Project Resource Management
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
 
Project management
Project managementProject management
Project management
 
PMP Chap 5 - Project Scope Management - Part1
PMP Chap 5 - Project Scope Management - Part1PMP Chap 5 - Project Scope Management - Part1
PMP Chap 5 - Project Scope Management - Part1
 
Chap 9.4 Develop Team
Chap 9.4  Develop TeamChap 9.4  Develop Team
Chap 9.4 Develop Team
 
Project management
Project managementProject management
Project management
 
Project organisation structure
Project organisation structureProject organisation structure
Project organisation structure
 
Step by Step Guide to Project Management
Step by Step Guide to Project ManagementStep by Step Guide to Project Management
Step by Step Guide to Project Management
 
Project management
Project managementProject management
Project management
 
Chapter 4
Chapter 4Chapter 4
Chapter 4
 
Project human resource management
Project human resource managementProject human resource management
Project human resource management
 
Project human resource management
Project human resource managementProject human resource management
Project human resource management
 
2_Project Scope Management
2_Project Scope Management2_Project Scope Management
2_Project Scope Management
 
Factors for Successful Projects
Factors for Successful ProjectsFactors for Successful Projects
Factors for Successful Projects
 

Similar a 09 project human resources management pmbok 5th

09 Project Human Resources management based on PMBOK5
09 Project Human Resources management based on PMBOK5 09 Project Human Resources management based on PMBOK5
09 Project Human Resources management based on PMBOK5 Omer Alsayed PhD,MBA, PMP®
 
Workshop microsoft office MS Project.pptx
Workshop microsoft office MS Project.pptxWorkshop microsoft office MS Project.pptx
Workshop microsoft office MS Project.pptxHelenCandy2
 
Project management i
Project management iProject management i
Project management iSteve Khan
 
NCV 3 Project Management Hands-On Support Slide Show - Module 1
NCV 3 Project Management Hands-On Support Slide Show - Module 1NCV 3 Project Management Hands-On Support Slide Show - Module 1
NCV 3 Project Management Hands-On Support Slide Show - Module 1Future Managers
 
Amanda langford final_presentation
Amanda langford final_presentationAmanda langford final_presentation
Amanda langford final_presentationAMANDAALANGFORD
 
The Art Of Project Management
The Art Of Project ManagementThe Art Of Project Management
The Art Of Project Managementhatemk
 
9.0 Project Resource Management Overview
9.0 Project Resource Management Overview9.0 Project Resource Management Overview
9.0 Project Resource Management OverviewDavidMcLachlan1
 
Presentation project management
Presentation project managementPresentation project management
Presentation project managementFlobz Caloy
 
Enterprise Project Management
Enterprise Project ManagementEnterprise Project Management
Enterprise Project ManagementPeter1020
 
Final paper project management inf 410
Final paper project management inf 410Final paper project management inf 410
Final paper project management inf 410Kelvin Crenshaw
 
PMP as per PMBOK 6
PMP as per PMBOK 6PMP as per PMBOK 6
PMP as per PMBOK 6Amit Gupta
 
How to do Project Work and Administration Process correctly - Sameer Mitter
How to do Project Work and Administration Process correctly - Sameer MitterHow to do Project Work and Administration Process correctly - Sameer Mitter
How to do Project Work and Administration Process correctly - Sameer MitterSameer Mitter
 
Final paper project management inf 410
Final paper project management inf 410Final paper project management inf 410
Final paper project management inf 410Kelvin Crenshaw
 
The Powerof One+Pmo Overview
The Powerof One+Pmo OverviewThe Powerof One+Pmo Overview
The Powerof One+Pmo OverviewDJ EVERETTE
 
ICT4GOV PROJECT MANAGEMENT
ICT4GOV PROJECT MANAGEMENTICT4GOV PROJECT MANAGEMENT
ICT4GOV PROJECT MANAGEMENTJohn Macasio
 

Similar a 09 project human resources management pmbok 5th (20)

09 Project Human Resources management based on PMBOK5
09 Project Human Resources management based on PMBOK5 09 Project Human Resources management based on PMBOK5
09 Project Human Resources management based on PMBOK5
 
Workshop microsoft office MS Project.pptx
Workshop microsoft office MS Project.pptxWorkshop microsoft office MS Project.pptx
Workshop microsoft office MS Project.pptx
 
Project management i
Project management iProject management i
Project management i
 
NCV 3 Project Management Hands-On Support Slide Show - Module 1
NCV 3 Project Management Hands-On Support Slide Show - Module 1NCV 3 Project Management Hands-On Support Slide Show - Module 1
NCV 3 Project Management Hands-On Support Slide Show - Module 1
 
Project Management
Project ManagementProject Management
Project Management
 
W frec04
W frec04W frec04
W frec04
 
Amanda langford final_presentation
Amanda langford final_presentationAmanda langford final_presentation
Amanda langford final_presentation
 
The Art Of Project Management
The Art Of Project ManagementThe Art Of Project Management
The Art Of Project Management
 
9.0 Project Resource Management Overview
9.0 Project Resource Management Overview9.0 Project Resource Management Overview
9.0 Project Resource Management Overview
 
Presentation project management
Presentation project managementPresentation project management
Presentation project management
 
Enterprise Project Management
Enterprise Project ManagementEnterprise Project Management
Enterprise Project Management
 
Final paper project management inf 410
Final paper project management inf 410Final paper project management inf 410
Final paper project management inf 410
 
PMP as per PMBOK 6
PMP as per PMBOK 6PMP as per PMBOK 6
PMP as per PMBOK 6
 
How to do Project Work and Administration Process correctly - Sameer Mitter
How to do Project Work and Administration Process correctly - Sameer MitterHow to do Project Work and Administration Process correctly - Sameer Mitter
How to do Project Work and Administration Process correctly - Sameer Mitter
 
Project Human Resource Management
Project Human Resource ManagementProject Human Resource Management
Project Human Resource Management
 
Final paper project management inf 410
Final paper project management inf 410Final paper project management inf 410
Final paper project management inf 410
 
The Powerof One+Pmo Overview
The Powerof One+Pmo OverviewThe Powerof One+Pmo Overview
The Powerof One+Pmo Overview
 
pmppgoav14.ppt
pmppgoav14.pptpmppgoav14.ppt
pmppgoav14.ppt
 
ICT4GOV PROJECT MANAGEMENT
ICT4GOV PROJECT MANAGEMENTICT4GOV PROJECT MANAGEMENT
ICT4GOV PROJECT MANAGEMENT
 
Pmo
PmoPmo
Pmo
 

Más de Omer Alsayed PhD,MBA, PMP®

Project stakeholders management arabic ادارة المعنيين في المشروع
Project stakeholders management arabic ادارة المعنيين في المشروعProject stakeholders management arabic ادارة المعنيين في المشروع
Project stakeholders management arabic ادارة المعنيين في المشروعOmer Alsayed PhD,MBA, PMP®
 
برنامج حصاد المياه خطوة نحو تنمية الموارد الطبيعية
برنامج حصاد المياه  خطوة نحو تنمية الموارد الطبيعيةبرنامج حصاد المياه  خطوة نحو تنمية الموارد الطبيعية
برنامج حصاد المياه خطوة نحو تنمية الموارد الطبيعيةOmer Alsayed PhD,MBA, PMP®
 
09 PMP Project Human Resources Management PMBOK 5th edittion
09 PMP Project Human Resources Management PMBOK 5th edittion09 PMP Project Human Resources Management PMBOK 5th edittion
09 PMP Project Human Resources Management PMBOK 5th edittionOmer Alsayed PhD,MBA, PMP®
 
وأحسن الناس من بين الورى رجل
وأحسن الناس من بين الورى رجلوأحسن الناس من بين الورى رجل
وأحسن الناس من بين الورى رجلOmer Alsayed PhD,MBA, PMP®
 
Project risk management for water harvesting in Darfur إدارة مخاطر المشروعات ...
Project risk management for water harvesting in Darfur إدارة مخاطر المشروعات ...Project risk management for water harvesting in Darfur إدارة مخاطر المشروعات ...
Project risk management for water harvesting in Darfur إدارة مخاطر المشروعات ...Omer Alsayed PhD,MBA, PMP®
 

Más de Omer Alsayed PhD,MBA, PMP® (20)

Project stakeholders management arabic ادارة المعنيين في المشروع
Project stakeholders management arabic ادارة المعنيين في المشروعProject stakeholders management arabic ادارة المعنيين في المشروع
Project stakeholders management arabic ادارة المعنيين في المشروع
 
04 project integration management
04 project integration management04 project integration management
04 project integration management
 
برنامج حصاد المياه خطوة نحو تنمية الموارد الطبيعية
برنامج حصاد المياه  خطوة نحو تنمية الموارد الطبيعيةبرنامج حصاد المياه  خطوة نحو تنمية الموارد الطبيعية
برنامج حصاد المياه خطوة نحو تنمية الموارد الطبيعية
 
05 project scope management
05 project scope management05 project scope management
05 project scope management
 
04 project integration management
04 project integration management04 project integration management
04 project integration management
 
07 project cost management
07 project cost management07 project cost management
07 project cost management
 
06 project time management m
06 project time management m06 project time management m
06 project time management m
 
08 project quality management
08 project quality management08 project quality management
08 project quality management
 
10 project communications
10 project communications10 project communications
10 project communications
 
09 project human res 2014
09 project human res 201409 project human res 2014
09 project human res 2014
 
13 project stakeholders management
13 project stakeholders management13 project stakeholders management
13 project stakeholders management
 
12 project procurement management
12 project procurement management12 project procurement management
12 project procurement management
 
11 project risk management
11 project risk management11 project risk management
11 project risk management
 
09 project human res 2014
09 project human res 201409 project human res 2014
09 project human res 2014
 
Practical project management 12 feb 2014
Practical project management 12 feb 2014Practical project management 12 feb 2014
Practical project management 12 feb 2014
 
05 project scope management
05 project scope management05 project scope management
05 project scope management
 
Practical project management based on PMBOK5
Practical project management based on PMBOK5Practical project management based on PMBOK5
Practical project management based on PMBOK5
 
09 PMP Project Human Resources Management PMBOK 5th edittion
09 PMP Project Human Resources Management PMBOK 5th edittion09 PMP Project Human Resources Management PMBOK 5th edittion
09 PMP Project Human Resources Management PMBOK 5th edittion
 
وأحسن الناس من بين الورى رجل
وأحسن الناس من بين الورى رجلوأحسن الناس من بين الورى رجل
وأحسن الناس من بين الورى رجل
 
Project risk management for water harvesting in Darfur إدارة مخاطر المشروعات ...
Project risk management for water harvesting in Darfur إدارة مخاطر المشروعات ...Project risk management for water harvesting in Darfur إدارة مخاطر المشروعات ...
Project risk management for water harvesting in Darfur إدارة مخاطر المشروعات ...
 

Último

Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in PhilippinesDavidSamuel525586
 
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...ssuserf63bd7
 
Welding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsWelding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsIndiaMART InterMESH Limited
 
Healthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterHealthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterJamesConcepcion7
 
BAILMENT & PLEDGE business law notes.pptx
BAILMENT & PLEDGE business law notes.pptxBAILMENT & PLEDGE business law notes.pptx
BAILMENT & PLEDGE business law notes.pptxran17april2001
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Send Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSendBig4
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryEffective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryWhittensFineJewelry1
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdfChris Skinner
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfShashank Mehta
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxappkodes
 
Introducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsIntroducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsKnowledgeSeed
 
WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfJamesConcepcion7
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfJamesConcepcion7
 
business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxShruti Mittal
 

Último (20)

Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in Philippines
 
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
 
Welding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsWelding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan Dynamics
 
Healthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterHealthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare Newsletter
 
BAILMENT & PLEDGE business law notes.pptx
BAILMENT & PLEDGE business law notes.pptxBAILMENT & PLEDGE business law notes.pptx
BAILMENT & PLEDGE business law notes.pptx
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
WAM Corporate Presentation April 12 2024.pdf
WAM Corporate Presentation April 12 2024.pdfWAM Corporate Presentation April 12 2024.pdf
WAM Corporate Presentation April 12 2024.pdf
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Send Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.com
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryEffective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdf
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptx
 
Introducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsIntroducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applications
 
WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdf
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdf
 
business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptx
 

09 project human resources management pmbok 5th

  • 1. Brain Power Center PMP Preparation course
  • 2. ‫تعالى‬ ‫قال‬: ‫ُّا‬َ‫ن‬ِ‫إ‬ ُ‫س‬‫ُّا‬َ‫ن‬‫ال‬ ‫َا‬‫ه‬ُُّ‫ي‬َ‫أ‬ ‫َا‬‫ي‬‫ُم‬‫ك‬‫َا‬‫ن‬ْ‫ق‬َ‫ل‬َ‫خ‬ٍ‫ر‬َ‫ك‬َ‫ذ‬ ‫ُّن‬‫م‬ ‫َى‬‫ث‬‫ُن‬‫أ‬َ‫و‬ْ‫م‬ُ‫ك‬‫َا‬‫ن‬ْ‫ل‬َ‫ع‬َ‫ج‬َ‫و‬‫ًا‬‫ب‬‫ُو‬‫ع‬ُ‫ش‬ َ‫ل‬‫َائ‬‫ب‬َ‫ق‬َ‫و‬‫ال‬ َ‫د‬‫ن‬‫ع‬ ْ‫م‬ُ‫ك‬َ‫م‬َ‫ر‬ْ‫ك‬َ‫أ‬ َُّ‫ن‬ِ‫إ‬ ‫ُوا‬‫ف‬َ‫ر‬‫َا‬‫ع‬َ‫ت‬‫ل‬‫ُّه‬َ‫ل‬ ٌ‫ري‬‫َب‬‫خ‬ ٌ‫م‬‫ي‬‫َل‬‫ع‬ َ‫ه‬َُّ‫ل‬‫ال‬ َُّ‫ن‬ِ‫إ‬ ْ‫م‬ُ‫ك‬‫َا‬‫ق‬ْ‫ت‬َ‫أ‬. ‫ق‬‫د‬‫ص‬‫م‬‫ي‬‫ظ‬‫ع‬‫ل‬‫ا‬ ‫هلل‬‫ا‬ ‫سورة‬‫الحجرات‬13 OSO A2013
  • 3. Quote General Manager Account Dept. Personnel Dept. Our organization OSO A2013
  • 4. Project Team & PM Team Projectmanagementteam PHRM : the processes that ORGANIZE, MANAGE, and LEAD the project team. Managing and leading the project team Influencing the project team (Human Factors) Professional and ethical behavior • Project Team/ Staff :People with ASSIGNED ROLES and responsibilities for completing the project • Project management team (Core/Executive) :Responsible for Management & Leadership activities • For smaller projects, the project management responsibilities can be shared by the entire team or administered solely by the PM. P R O J E C T H U M A N R E S O U R C E M A N A G E M E N T OSO A2013 Human Factors
  • 6. P ro j e c t h u m a n r e s o u r c e m a n a g e m e n t P ro c e s s e s OSO A2013
  • 7. P ro jec t M a n a gemen t P ro cess G ro u p a n d K n owledge A r e a M a p p i n g Knowledge Area Initiating Planning Executing M& C Closing 4. Project Integration Management 4Develop Project Charter 4.2 Develop Project Management Plan 4.3 Direct & Manage Project Work 4.4 Monitor & Control Project Work 4.5 Perform Integrated Change Control 4.6 Close Project or Phase 5. Project Scope Management 5Plan Scope Management 5.2 Collect Requirements 5.3 Define Scope 5.4 Create WBS 5.5 Validate Scope 5.6 Control Scope 6. Project Time Management 6Plan Schedule Management 6.2 Define Activities 6.3 Sequence Activities 6.4 Estimate Activity Resources 6.5 Estimate Activity Durations 6.6 Develop Schedule 6.7 Control Schedule 7. Project Cost Management 7Plan Cost Management 7.2 Estimate Costs 7.3 Determine Budget 7.4 Control Costs 8. Project Quality Management 8Plan Quality Management 8.2 Perform Quality Assurance 8.3 Control Quality 9. Project Human Resource Management 9.1 Plan Human Resource Management 9.2 Acquire Project Team 9.3 Develop Project Team 9.4 Manage Project Team 10. Project Communications Management 10Plan Communications Management 10.2 Manage Communications 10.3 Control Communications 11. Project Risk Management 11Plan Risk Management 11.2 Identify Risks 11.3 Perform Qualitative Risk Analysis 11.4 Perform Quantitative Risk Analysis 11.5 Plan Risk Responses 11.6 Control Risks 12. Project Procurement Management 12Plan Procurement Management 12.2 Conduct Procurements 12.3 Control Procurements 12.4 Close Procurements 13. Project Stakeholder Management 13Identify Stakeholders 13.2 Plan Stakeholder Management 13.3 Manage Stakeholder Engagement 13.4 Control Stakeholder Engagement OSO A2013
  • 8. methodology Process W h a t (definition) How (ITTO) W h y ( objectives) OSO A2013
  • 9. Outputs Human resource management plan Tools & Techniques Organization charts and position descriptions Networking Organizational theory Expert judgment Meetings Inputs Project management plan Activity resource requirements Enterprise environmental factors Organizational process assets Process of: • Identifying and documenting project: • roles, • responsibilities, • required skills, • reporting relationships • Creating staffing management plan. The key benefit : • Establishes • project roles and responsibilities • project organization charts • staffing management plan Objectives&ITTO9.1 Plan Human Resource Management OSO A2013
  • 10. ITTO OSO A2013 Human recourses plan Organizational Process Assets Tools & Techniques Inputs Outputs Enterprise Environmental Factors Activity resources requirements Networking Organizational Theory Organization Charts and Position Descriptions Expert judgment Meetings 9.1 Plan Human Resource Management
  • 11. 11.2 Identify Risks 7.2 Estimate Costs 9.1 Plan Human Resource Management Human resource management plan Enterprise/ Organization Enterprise environmental factors Organizational process assets 6.4 Estimate Activity Resources Activity resource requirements 4.2 Develop Project Management Plan Project Management Plan DataFlowDiagram 9.1 Plan Human Resource Management OSO A2013
  • 12. Project Management Plan • Project LIFE CYCLE & phase processes • HOW work will be executed • change management plan • configuration management • How INTEGRITY of the project baselines • Needs and methods of communication. Activity Resource Requirements • Human RESOURCE needs for the project. • The PRELIMINARY required project team members and their competencies are progressively elaborated as part of the Plan Human Resource Management process Enterprise Environmental Factors • Organizational culture and structure, • EXISTING human resources, • Geographical dispersion of team members, • Personnel administration policies • Marketplace conditions. Organizational Process Assets • Organizational standard processes, policies, and role descriptions • Templates for organizational charts and position descriptions • Lessons learned on organizational structures • Escalation procedures for handling issues. 9.1.1Inputs 9.1 Plan Human Resource Management OSO A2013
  • 13. 9.1.2.1 Organization Charts and Position Descriptions: • Various FORMATS exist to document team member roles and responsibilities. (hierarchical, matrix, and text-oriented). 9.1.2.2 Networking • the formal and informal INTERACTION with others in an organization, industry, or professional environment. 9.1.2.3 Organizational Theory • provides information regarding the way in which people, teams, and organizational units BEHAVE 9.1.2.4 Expert Judgment • List preliminary requirements /required skills; • Assess the roles required • Determine the preliminary effort level and number of resources needed • Determine reporting relationships 9.1.2.5 Meetings • leverage a combination of other tools and techniques to allow for all project management team members to reach consensus on the human resource management plan 9.1.2T&T 9.1 Plan Human Resource Management OSO A2013
  • 14. 9.1.2T&T 9.1 Plan Human Resource Management OSO A2013 to ensure that each WORK PACKAGE has an unambiguous OWNER and that ALL team members have a CLEAR understanding of their roles and responsibilities. Project X Civil works excavation Admin & finance workshop secretary 9.1.2.1 Organization Charts & Position Descriptions:
  • 15. PM Project Controls Planning & cost DM Planning Engineer Cost Control Engineer Tech. Clerk Technical DM Contract Admin. Admin & Fin Financial DM HR DM Admin. DM Construction Earth works TM Concrete works TM E/M TM 9.1.2.1 9.1.2.1 Organization Charts & Position Descriptions: 9.1.2T&T 9.1 Plan Human Resource Management WBS –OBS – RBS ? See sample’s slideOSO A2013
  • 16. 9.1.2T&T Responsible “Doer” • Individual(s) (Many) who perform an activity or take part in a decision—responsible for action/implementation. Accountable “Buck Stops Here” • Individual (ONE!!) who has ultimate decision making and approval authority. Typically the owner of the budget. Consulted “In the Loop” • Individual(s) (Many) who need to have input into a decision or action before it occurs. Informed “FYI” • Individual(s) (Many) who must be informed that a decision or action has taken place. RACI Activity PM PCM CM Create charter A R I Create MPR I A I Issue Change Order I R A 9.1.2.1 Grid that shows the project RESOURCES assigned to each work package • all ACTIVITIES associated with one person and • all PEOPLE associated with one activity. This also ensures that there is only ONE PERSON accountable for any one task to avoid confusion of responsibility 9.1.2.1 Organization Charts & Position Descriptions: 9.1 Plan Human Resource Management OSO A2013
  • 17. 9.1.2.1. When details are required descriptions can be specified in text-oriented formats (job descriptions ) it contains of : 9.1.2.1 Organization Charts & Position Descriptions: 9.1 Plan Human Resource Management 9.1.2T&T OSO A2013 Job Description • Manage the strategic aspects of large engagements and mitigates any risk. * Oversees senior managers and managers working on client engagements within practice. * Review high-level deliverables across practice. Skills • 15 years experience in similar position. • Excellent communication skills. • English written and spoken. Education • Bachelor degree in Civil Engineering Project Director
  • 18. Formal or informal interaction with others constructive way to understand political and interpersonal factors > impact the Effectiveness of various staffing management options include proactive correspondence and … Luncheon meetings Meetings Events Trade conferences Symposia / seminar 9.1.2.2 Networking9.1 Plan Human Resource Management 9.1.2T&T OSO A2013
  • 19. Provides information regarding the way in which PEOPLE, teams, and organizational units BEHAVE shorten TIME, COST, and EFFORT needed to create the plan human resource management process outputs improve planning efficiency 9 .1 . 2 . 3 Organizational Theory9.1 Plan Human Resource Management 9.1.2T&T • Maslow’s Hierarchy of Needs • McGregor’s Theory of X&Y • Theory Z (William Ouchi) • Herzberg's two factor theory • Theory ? OSO A2013
  • 20. Roles and responsibilities. Project organization charts. Staffing management plan • The FUNCTION assigned to a person in the project. (civil engineer) Role • The RIGHT to apply project resources, MAKE decisions Authority • The assigned DUTIES and workResponsibility • The skill and capacity required to complete assigned activities Competency 9.1.3.1 Human Resource Management Plan (lack of required competencies > > training, hiring, schedule changes, or scope changes are initiated). TIMETABLES for staff acquisition and release identification of TRAINING needs TEAM-BUILDING strategies plans for RECOGNITION and rewards programs compliance considerations, SAFETY issues the impact of the staffing management plan on the ORGANIZATION staffingmanagementplan 9.1 Plan Human Resource Management 9.1.3Outputs HOW project human resources should be defined, staffed, managed, released : OSO A2013
  • 21. Process of: • confirming human resource availability • obtaining the team necessary to complete project activities. The key benefit : • outlining and guiding the team selection and responsibility assignment to obtain a successful team Insufficient human resources or capabilities decrease the probability of success and, in a worst case scenario, could result in project cancellation. Failure to acquire the necessary human resources affect project schedules, budgets, customer satisfaction, quality, and risks. PM negotiate and influence others to provide the required human resources. 9 . 2 A c q u i r e P r o j e c t Te a m ITTO&DFD collective bargaining agreements use of subcontractor personnel matrix project environment internal or external reporting relationships OSO A2013 The project management team may or may not have DIRECT CONTROL over team member selection because of :
  • 22. OSO A2013 Resource calendars Project Staff Assignments project Management Plan (U) Inputs Outputs Negotiation Acquisition Pre-Assignment Organizational Process Assets Project Management Plan Enterprise Environmental Factors Virtual Teams Multi-criteria decision analysis Tools & Techniques 9 . 2 A c q u i r e P r o j e c t Te a m ITTO&DFD
  • 23. data flow Diagram 9 . 2 A c q u i r e P r o j e c t Te a m ITTO&DFD Outputs Project staff assignments Resource calendars Project management plan updates Tools & Techniques Pre- assignment Negotiation Acquisition Virtual teams Multi-criteria decision analysis Inputs Human resource management plan Enterprise environmental factors Organizational process assets OSO A2013
  • 24. Human resource management plan • Roles and responsibilities (positions, skills, and competencies) • Project organization charts (number of people) • Staffing management plan (time periods each project team member) Enterprise environmental factors: • Existing information on human resources • Personnel administration policies • Organizational structure • Colocation or multiple locations. Organizational process assets • Organizational standard policies, processes, and procedures 9 . 2 A c q u i r e P r o j e c t Te a m 9.2.1Inputs OSO A2013
  • 25. Pre-assignment • selected in advance Negotiation • FM: competent staff -required time frame -able, willing, and authorized • Other PM teams : assign scarce or specialized human resources; • External org. :scarce, specialized, qualified Acquisition • organization is unable to provide the staff needed to complete a project (acquired from outside sources). Virtual teams • groups of people with a shared goal who fulfill their roles with little or no time spent meeting face to face. Multi-criteria decision analysis • criteria are developed and used to rate or score potential team members. Availability – Cost – Experience – Ability – Knowledge – Skills – Attitude - International factors 9 . 2 A c q u i r e P r o j e c t Te a m 9.2.2T&T OSO A2013
  • 26. project team DIRECTORY Assignments Documentation Memos to team members Names inserted into other parts of the project management plan 9 . 2 A c q u i r e P r o j e c t Te a m 9.2.3Outputs OSO A2013
  • 27. Process of: • improving • COMPETENCIES, • team member INTERACTION, • overall team ENVIRONMENT • to ENHANCE project performance. The key benefit : • it results in • improved TEAMWORK, • enhanced people SKILLS competencies, • MOTIVATED employees, • reduced staff TURNOVER rates, • improved overall Project PERFORMANCE Improving knowledge and skills : • increase ability to complete deliverables, • lowering costs, • reducing schedules, • improving quality Improving feelings of trust and agreement among : • raise morale, • lower conflict, • increase team work; Creating a dynamic, cohesive & collaborative : • improve productivity, team spirit, cooperation • allow cross training and mentoring , share knowledge and expertise Team members often have diverse industry experience, know multiple languages, and sometimes operate in the “TEAM LANGUAGE” that may be a different language or norm than their native one 9 . 3 D e ve l o p P r o j e c t Te a m Objectives OSO A2013
  • 28. OSO A2013 Team Performance Assessment Training Team-Building Activities Interpersonal Skills Project Staff Assignments Resource calendars project Management Plan Ground Rules Co-Location Recognition and Rewards EEF (u) Personnel assessment tools 9 . 3 D e ve l o p P r o j e c t Te a m Objectives Inputs Outputs Tools & Techniques
  • 29. Inputs Human resource management plan Project staff assignments Resource calendars Tools & Techniques Interpersonal skills Training Team-building activities Ground rules Colocation Recognition and rewards Personnel assessment tools Outputs Team performance assessments Enterprise environmental factors updates D a t a F l o w D i a g r a mPMBOK P-275 9 . 3 D e ve l o p P r o j e c t Te a m ITTO&DFD OSO A2013
  • 30. Human resource management plan • provides guidance on HOW project human resources should be defined, staffed, managed, controlled, and eventually released Project staff assignments • documents identify the PEOPLE who are on the team Resource calendars • identify TIMES when the project team members can participate in team development activities 9 . 3 D e ve l o p P r o j e c t Te a m 9.3.1Inputs OSO A2013
  • 31. Interpersonal (soft ) skills • COMMUNICATION skills (emotional ,intelligence, conflict resolution, negotiation, influence, team building, group facilitation) Training • all activities designed to enhance the COMPETENCIES of the project team members. Team-building activities • To improve INTERPERSONAL relationships & to help individual team members work together effectively Ground rules* • establish clear EXPECTATIONS regarding acceptable behavior by project team members Colocation “tight matrix” • involves placing the project team members in the same physical LOCATION to enhance their ability to perform as a team Recognition and rewards • given to any individual will be effective only if it SATISFIES a need which is valued by that individual Personnel assessment tools • give the project manager and the project team INSIGHT into areas of strength and weakness 9 . 3 D e ve l o p P r o j e c t Te a m 9.3.2T&T OSO A2013
  • 32. Forming • team MEETS and learns about the project /formal roles &Responsibilities. • Team members tend to be independent and not as open in this phase. Storming • the team begins to ADDRESS the project work, • If team members are not collaborative and open to differing ideas and perspectives, the environment can become counterproductive. Norming • team members begin to WORK TOGETHER and adjust their work habits and behaviors to support the team. The team learns to trust each other. Performing • Teams that reach the performing stage function as a WELL- ORGANIZED unit. • They are interdependent and work through issues smoothly and effectively. Adjourning • the team COMPLETES the work and moves on from the project. • This typically occurs when staff is released from the project 9 . 3 D e ve l o p P r o j e c t Te a m 9.3.2T&T OSO A2013
  • 33. Team performance assessments • skills’ Improvements Competencies Improvements Reduced staff turnover rate Increased team cohesiveness Enterprise environmental factors updates • personnel administration • employee training records • skill assessments High-performance teams • characterized by • TASK-oriented • RESULTS-oriented outcomes. MEASURED in terms of • technical success according to agreed-upon : 9 . 3 D e ve l o p P r o j e c t Te a m 9.3.3Outputs OBJECTIVES • including quality levels SCHEDULE • finished on time BUDGET • finished within financial constraints OSO A2013 Project Title: Date Prepare: Technical Performance: Comments …… Training need: …. Recommendation ……….. Expectations 150 100 50 Exceeds Meets need imp. 50 75 100 125 150 Scope Quality Schedule Cost
  • 34. Process of: • TRACKING team member performance • Providing feedback, • resolving issues • Managing team changes • .. to OPTIMIZE project PERFORMANCE. The key benefit : • It influences team BEHAVIOR • manages CONFLICT • resolves ISSUES • appraises team member PERFORMANCE As a result of managing the project team • change requests are submitted, • the human resource management plan is updated • issues are resolved, • input is provided for performance appraisals, • lessons learned are added to the organization’s database. skills to create high-performance teams: • communication • conflict management • negotiation, • leadership Project managers should provide • challenging assignments to team members • recognition for high performance 9.4 Manage Project Team Objectives OSO A2013
  • 35. OSO A2013 EEF (U) Organizational Process Assets (U) Project management plan (U) Requested Changes Inputs Tools & Techniques Outputs Conflict Management Project Performance Appraisals Observation and Conversation OPA Project Staff Assignments Team Performance Assessment project Management Plan Interpersonal skills Issue log Work performance reports Project documents updates 9.4 Manage Project Team ITTO
  • 36. D a t a F l o w D i a g r a m Inputs • Human resource management plan • Project staff assignments • Team performance assessments • Issue log • Work performance reports • Organizational process assets Tools & Techniques • Observation and conversation • Project performance appraisals • Conflict management • Interpersonal skills Outputs • Change requests • Project management plan updates • Project documents updates • Enterprise environmental factors updates • Organizational process assets updates ITTO&DFD OSO A2013 9.4 Manage Project Team
  • 37. Human resource management plan • Roles and responsibilities, • Project organization, • Staffing management plan. Project staff assignments • provide documentation, which includes the list of project team members Team performance assessments • continually assessing team’s performance • actions can be taken to resolve issues • modify communication, address conflict • improve team interaction Issue log • used to document and monitor who is responsible for resolving specific issues by a target date. Work performance reports • current project status compared to forecasts. • assists in determining: • future human resource requirements • recognition and rewards • updates to the staffing management plan. Organizational process assets • Certificates of appreciation, • Newsletters, Websites, • Bonus structures, Corporate apparel, • Other organizational perquisites 9.4.1Inputs OSO A2013 9.4 Manage Project Team
  • 38. Observation and conversation • used to stay in touch with the work and attitudes of project team members Project performance appraisals • clarification of roles and responsibilities, • constructive feedback to team members, • discovery of unknown or unresolved issues, • development of individual training plans, • the establishment of specific goals for future time periods. Conflict management • Sources of conflict include : scarce resources, scheduling priorities, personal work styles. • Team ground rules, group norms and solid project management practices reduce the amount of conflict Interpersonal skills • Leadership • Influencing • Effective decision making 9.4.2T&T Types of powers 360-degree principle Leadership Styles OSO A2013 9.4 Manage Project Team
  • 39. Withdraw/ Avoid • RETREATING from an actual or potential conflict situation • POSTPONING the issue to be better prepared or to be resolved by others. Smooth/ Accommodate* • Emphasizing areas of AGREEMENT rather than areas of difference • conceding one’s position to the needs of others to maintain harmony and relationships. Compromise /Reconcile • Searching for solutions that bring some DEGREE of satisfaction to all parties in order to temporarily or partially resolve the conflict. Force / Direct • Pushing ONE’s viewpoint at the expense of others; • offering only WIN-LOSE solutions, • usually enforced through a power position to resolve an emergency. Collaborate /Problem Solve • Incorporating MULTIPLE viewpoints and insights from differing perspectives • requires a cooperative attitude and open dialogue that typically leads to consensus & commitment 9.4.2T&T seven reasons for conflict OSO A2013 Smooth/ Accommodate* 5 GT Diagrams 9.4 Manage Project Team ability to resolve conflict >> PM success. Factors influence conflict resolution methods :  Relative importance  Time pressure  Position taken by persons involved  Motivation to resolve on a long/short-term basis
  • 40. Exercise: Conflict Management Description Collaborate ProblemSolve Force Direct Smooth Accommodate Compromise Reconcile Withdraw Avoid 1 "Do it my way!" 2 "Let's calm down and get the job done!" 3 “Let us do a little of what both of you suggest” 4 “Let's deal with this issue next week" 5 “Sandy and Amanda, both of you want this project to cause as little distraction to your departments as possible. With that in mind, I am sure we can come to an agreement on the purchase of equipment and what is best for the project." 6 “We have talked about new computers enough. I do not want to get the computers, and that is it!" 7 "Sandy, you say that the project should include the purchase of new computers, and Amanda, you say that the project can use existing equipment. I suggest we perform the following test on the existing equipment to determine if it needs to be replaced." 8 “Let's what everyone thinks, and try to reach a consensus” R R R R R R R R
  • 41. Change requests • Staffing changes (by choice /uncontrollable events) can affect the rest of the project management plan. Project management plan updates • Human resource management plan. Project documents updates • Issue log, • Roles description • Project staff assignments. Enterprise environmental factors updates • Input to organizational performance appraisals • Personnel skill updates. Organizational process assets updates • Historical information & lessons learned documentation • Templates • Organizational standard processes 9.4.3Outputs OSO A2013 9.4 Manage Project Team
  • 42. EEF OPA OSO A2013 4.2 Develop Project M Plan 6.4 Estimate A Resources Integration Scope Time Cost Quality H. Resource Comm’n. Risk Stakeholders Enterprise/ Organization 9.1 Plan H R Management Project staff assignments Project M plan (U) 6.5 Estimate A. Durations Project M Plan A Resource requirements Resource calendars H. Resource M plan 11.2 Identify Risks 9.3 Develop Project Team 9.4 Manage Project Team EEF (U) Requested Changes . Team Perf. assessments . . . 9.2 Acquire Project Team 7.2 Estimate Costs 6.6 Develop Schedule 7.3 Determine Budget
  • 43. 10 q – 20 min
  • 44. Samples & examples 9.1.2 Plan Human Resource Management T&T 9.1.2.1 WBS- RBS-OBS 9.1.2.3 T&T Organizational Theory Maslow’s Hierarchy of Needs McGregor’s Theory of X&Y Theory Z (William Ouchi) Herzberg's two factor theory 9.1.3.1 Human Resource Management Plan OUTPUTS Sample of Roles and responsibilities Resource calendars: resource histogram HRM Plan sample 9.3.2 Develop Project Team – T&T Ground rules sample 9.3.3 Develop Project Team – Outputs Team performance assessments sample 9.4.2 Manage Project Team T&T Types of powers Leadership Styles seven reasons for conflict Interpersonal skills 5 general techniques for resolving conflict. OSO A2013
  • 45. PM Project Controls Planning & cost DM Technical DM Contract Admin. Admin & Fin Financial DM HR DM Admin. DM Construction Earth works TM Concrete works TM E/M TM ProjectEWR Human resource Project Controls Admin & Fin Construction Materials Construction Mat’l E/M Mat’l Consumables. Equipment Plants Vehicles Machineries BPBCbuilding Engineering Design Arch Structural design EM designTesting Construction Civil works Earth works Concrete works Masonry Electro-Mech. Elect Plumbing A-C F- F Landscaping Procurement Sub-contract Supply (WBS) designed to show how project deliverables are broken down into work packages (OBS) is arranged according to an organization’s departments, or teams with the project activities or WP listed under each department (RBS) resources related by category /type - facilitate planning & controlling of project work WBS –OBS – RBS ? 9.1.2.1 Organization Charts & Position Descriptions: 9.1.2T&T 9.1 Plan Human Resource Management 9.1.2.1 OSO A2013
  • 46. Maslow’s Hierarchy of Needs Self- actualization Esteem ( to be accepted and valued by others) Love and belonging Safety needs Physiological needs 9.1 Plan Human Resource Management 9.1.2 Tools &Techniques: 9 . 1 . 2 . 3 Organizational Theory food HouseWedding AwardCEO OSO A2013
  • 47. McGregor’s Theory of: 9.1 Plan Human Resource Management 9.1.2 Tools &Techniques: 9 . 1 . 2 . 3 Organizational Theory X & Y OSO A2013
  • 48. "Japanese management" style Focused on increasing • employee LOYALTY to the company • by providing a job for life • with a strong focus on the well-being of the employee, • both ON and OFF the job. Tends to promote : • stable employment, • HIGH PRODUCTIVITY, • high employee MORALE and SATISFACTION Long-term employment and job security Collective responsibility Implicit, control with explicit, formalized measures Collective decision- making Slow evaluation and promotion Moderately specialized careers Concern for a total person, including their family Theory Z (William Ouchi) 9.1 Plan Human Resource Management 9.1.2 Tools &Techniques: 9 . 1 . 2 . 3 Organizational Theory OSO A2013
  • 49. Presents two dimensional paradigm of factors affecting peoples attitudes about work: Herzberg's two factor theory 9.1 Plan Human Resource Management 9.1.2 Tools &Techniques: 9 . 1 . 2 . 3 Organizational Theory give positive satisfaction do not give positive satisfaction, Absence > results dissatisfaction MOTIVATORS HYGIENEFACTORS 9.1.2 Tools &Techniques OSO A2013
  • 50. Theory of ? 9.1 Plan Human Resource Management 9.1.2 Tools &Techniques: 9 . 1 . 2 . 3 Organizational Theory OSO A2013 9.1.2 Tools &Techniques
  • 51. 1 2 5 8 9 8 7 6 5 2 2 2 1 3 8 16 25 33 40 46 51 53 55 57 0 10 20 30 40 50 60 0 2 4 6 8 10 Jan-13 Feb-13 Mar-13 Apr-13 May-13 Jun-13 Jul-13 Aug-13 Sep-13 Oct-13 Nov-13 Dec-13 Resource calendars: resource histogram Job JD RD Jan-13 Feb-13 Mar-13 Apr-13 May-13 Jun-13 Jul-13 Aug-13 Sep-13 Oct-13 Nov-13 Dec-13 PM 1-Jan 31-Dec 1 1 1 1 1 1 1 1 1 1 1 1 Cost control Engineer 1-Feb 31-Oct 1 1 1 1 1 1 Planning Engineer 1-Feb 31-Oct 1 2 2 2 1 1 1 Material engineer 1-Mar 31-Aug 1 1 1 1 Construction Manager 1-Mar 30-Sep 1 1 1 1 1 1 1 Contract Admin & QS 1-Feb 31-Dec 1 2 2 3 2 2 2 1 1 1 1 monthly M-P 1 2 5 8 9 8 7 6 5 2 2 2 Cum M-P 1 3 8 16 25 33 40 46 51 53 55 57 9.1 Plan Human Resource Management 9.1.3 Outputs: 9.1.3.1 Human Resource Management Plan 9 . 1 . 3 . 1 OSO A2013
  • 52. HRM Plan sample 9.1 Plan Human Resource Management 9.1.3 Outputs: 9.1.3.1 Human Resource Management Plan 9 . 1 . 3 OSO A2013
  • 53. Tools&Techniques 9.3 Develop Project Team 9.3.2 Develop Project Team – T & T  Everyone will participate and take ownership of group projects.  Team members will complete assignments on time.  Meetings will start and end on time – no backtracking if someone is late.  Each meeting will have a note taker (rotating task) who will distribute notes and record decisions and assignments.  Anyone who is absent from a meeting is responsible for finding out what they missed.  Respect the value of each individual's contribution.  Resolution of differences will typically be by majority decision, but on key issues the group will reach consensus 9.3.2 OSO A2013
  • 54. Typesofpowers Legitimate (positional) • derived from the position a person holds in an organization's hierarchy (company's CEO). Expert power • Knowledge is power - derived from possessing knowledge or expertise in a particular area. Referent Power • derived from the interpersonal relationships that a person cultivates with other people in the organization. Coercive Power • derived from a person's ability to influence others via threats, punishments or sanctions. Reward Power • arises from the ability of a person to influence the allocation of incentives in an organization. 9.4 Manage Project Team “Halo effect”: The assumption that because the person is good at a technology he will also be good at managing a project.9 . 4 . 3 OSO A2013
  • 55. Leadership Styles 9.4 Manage Project Team Leadership Styles 9 . 4 . 3 OSO A2013
  • 57. T&T seven reasons for conflict scheduling Priorities scarce resources Technical Administrative cost personal work styles. seven reasons for conflict, in order of most common to least common 9.4.2 Manage Project Team- T & T 9.4 Manage Project Team 9.4.2 OSO A2013
  • 58. T&T 9.4.2 Manage Project Team- T&T OSO A2013 9.4.2
  • 59. T&T Collaborate /Problem Solve Withdraw/ Avoid Smooth/ Accommodate Force / Direct Compromise /Reconcile OSO A2013 9.4.2