           Subcontractor Management
                            An introduction
                           Norman Housden




Copyright protected 2011      Confidential - Optimatrix         1
Optimatrix
                                                 Index
• Introduction
• SCM – A team event.
• Subcontractor Manager - Responsibilities
• Subcontractor source and selection.
• Subcontractor engagement.
• Subcontractor Negotiation.
• SME interface with Subcontractor.
• Subcontractor Performance.
• Documentation – Version control.




   Copyright protected 2011                  Confidential - Optimatrix         2
Optimatrix
                                          Introduction
• Subcontractor management is a team effort that relies on many disciplines spanning all phases of
the contract life.

• The Subcontractor manager has responsibility to ensure that each discipline undertakes, and completes on
schedule, relevant assigned activity and that nothing falls through the cracks.

• Well-written and managed subcontracts, regardless of size, result in success on the prime contract, a satisfied
customer, and a positive relationship with the subcontractor.

• Effective management of Subcontractors relies on effective Relationship Management (understanding the
Subcontractor drivers and constraints).




   Copyright protected 2011                     Confidential - Optimatrix                                       3
Legal           Commercial
                                                                                                                    Sub 1
                                                                                                                                        Optimatrix
                                                                                           Subcontractor
                                                                             Finance           lead               HR

      Legal           Commercial
                                    Sub 2
                                                                                          Gov          System
              Subcontractor                                                                             Eng
Finance           lead             HR                                                                                                 Legal       Commercial
                                                                                                                                                                    Sub 5

                                                                          Exp &                                                           Subcontractor
          Gov         System                                               Sec                                               Finance          lead             HR
                       Eng                  Prime
                                                       Cost       Comm
                                                                                             Systems
                                                       Mod                                     Eng                                      Gov        System
                                                        el                                                                                          Eng

                                                      Finance
                                                                          Sub Contractor               Legal
                                                                           Management

                                                         Gov
                                                                                                  Bid
      Legal           Commercial                                                                 Mngnt
                                    Sub 3                                  HR
                                                                                                                  Risk
                                                                                                MA
Finance   Subcontractor            HR                                                                                             Legal          Commercial
              lead                                                                                                                                             Sub 6

          Gov         System
                                                  Legal           Commercial                                                Finance     Subcontractor         HR
                       Eng
                                                                                  Sub 4                                                     lead


                                                          Subcontractor                                                                Gov       System
                                            Finance                             HR                                                                Eng
                                                              lead



                                                       Gov        System
          Copyright protected 2011                                 EngConfidential         - Optimatrix                                                               4
Optimatrix

      Subcontractor Managers Responsibilities

• Prime interface between Prime and Subcontractor.
• Develops and maintains Subcontractor source and selection plan.
• Develops and maintains Subcontractor engagement plan.
• Co-ordinates and manages the SME interface with Subcontractor.
• Monitors and manages Subcontractor performance.
• Ensures, as appropriate, flow-down of end-customer terms and conditions.
• Ensures flow-up of negotiated A’s, D’s, R’s & E’s. (Assumptions; Dependencies; Risk's and Exclusions)
• Identifies and mitigates all risks associated to the subcontractor.




   Copyright protected 2011                   Confidential - Optimatrix                                   5
Optimatrix
              Subcontractor source and selection
•The Subcontractor manager co-ordinates the Subcontractor source and selection plan.
     • Identifies and engages SME Stakeholders.
     • With SME input identifies potential Subcontractors.
           • Establishes initial contact and qualifies interest.
           • Establishes relevant NDA.
     • Develops (from SME input) and co-ordinates issue of formal RFI documentation, including:
           • Overview.
           • High level requirement documents, (outline SOW including statements on required annex’s A,D,R
           &E, CDRL’s , Compliancy matrix etc.).
           • Statement on applicable T’s& C’s (those which Prime will negotiate on).
           • Statement on Billing and Payment policy.
           • RFI response schedule.
           • Communication Channels (for requirement clarification – SPOC prinicples).
     • Co-ordinates and disseminates all clarification questions and responses.
     • Develops (from SME input) acceptance / scoring criteria. (scoring matrix).
     • Co-ordinates review panel of SME stakeholders, and manages down select process.
     • Communicates selection panel decision.
     • Manages RFP issue to selected Subcontractors



   Copyright protected 2011                 Confidential - Optimatrix                                    6
Optimatrix
       Subcontractor source and selection (cont.)
•Develops specific Subcontractor RFP plan.
     • Establish business worth to the subcontractor (core, % of turnover, new market entry etc).
     • Undertakes due diligence – (D&B etc).
     • Develops (from SME input) and co-ordinates issue of formal RFP documentation, including:
           • Overview.
           • Decomposed requirement documents, (initial SOW including required all annex’s (A,D,R &E, CDRL’s ,
           Compliancy matrix etc.).
           • Applicable T’s& C’s (those which Prime will negotiate on).
           • Billing and Payment plan.
           • Commercial response Schedule.
     • Co-ordinates and disseminates all clarification questions and responses.
     • Co-ordinates Subcontractor Audits / Presentations (as appropriate).
     • Develops (From SME input) Acceptance / Scoring criteria. (scoring matrix).
     • Co-ordinates review panel of SME stakeholders, and manages down select process.
     • Communicates selection panel decision.

Whilst specific Subcontractors will be selected to proceed, the information gathered and assessments undertaken
of non-selected Subcontractors should be maintained in a Subcontractor database, as initial reference for future
sourcing activity or should a need arise to replace the selected Subcontractor.
  Copyright protected 2011                    Confidential - Optimatrix                                      7
Optimatrix
                         Subcontractor engagement
•Develops specific Subcontractor engagement plan.
     • Co-ordinate relevant TA, MOU, MOA.
     • Where applicable co-ordinate export licence activity (TAA; ITAR; EAR ; F680 etc)
     • Establishes organisational hierarchy charts – Peer review and escalation
     • Develops Subcontract management schedule – All gates and deliverables to be included (this schedule
     must align to Prime requirements, however needs to realistically accommodate subcontractors needs.).
     • Establish Actions Log – For the daily management of all actions that are sub – schedule level or are on the
     schedule but require specific activity.
     • Develops meeting calendar - To include PMR; Commercial; Technical and Finance.
     • Within the Project database establish file structure for all Subcontractor management documents – including
     SOW, T’s & C’s, CDRL’s and SRDL's. (see Document and version Control).




   Copyright protected 2011                   Confidential - Optimatrix                                       8
Subcontractor Negotiation Optimatrix
It must be remembered that every interface, however innocuous, is a potential negotiation with a
subcontractor. As such all project team members must ensure that they do not unwittingly enable the
subcontractor the opportunity to manipulate any aspect of the terms or requirements through informal
agreement. Simple guidelines should be followed:

• Internally identify the key individuals in Prime organisation, who have relevant authority for specific
negotiation areas (e.g. T’s & C’s = Commercial lead). These leads are responsible for:
       • Establishing the Primes baseline.
       • Gap analysis, from Subcontractors position.
       • Identify drivers / lever’s to change Subcontractors position.
       • With SCM develop combined Negotiation Plan.
• Identify the Subcontractor personnel with authority to negotiate.
       • Identify escalation route.
• Schedule specific meetings to negotiate, (as opposed to technical reviews or planning meetings).
       • Appoint lead (single) negotiator.
       • Develop meeting strategy (targets, acceptable, concessions available).
       • Avoid (where possible),providing Subcontractor with knowledge of outside issues, as these could
       be used by them. (i.e. customer / governance time schedules).
       • On key requirements, if agreement cannot be reached “park” the point and proceed with other
       elements, return later in the negotiation at a suitable point where the Subcontractor has identified a
       concession the Prime is able to concede, barter.
       • Close the meeting when all items have been discussed. Document all areas of agreement and
       outstanding issues. Schedule follow up meeting providing sufficient time to assess the position.
Copyright protected 2011                     Confidential - Optimatrix                                          9
Optimatrix
                 Subcontractor Negotiation (cont.)
• With the relevant SME’s review the open issues to identify other negotiation tactics or mitigation activity.
(Engaging escalation where appropriate)
• Review the varying scenarios of not reaching agreement on each and multiple open issues and determine
the minimum point where proceeding is viable.
• Brief Senior Management on position and action plan as necessary.
• Continue this process until such point as suitable agreement is reached or the viability to proceed
(including timescales), is compromised.


Whilst not covered directly it must be noted that an exit strategy must be developed with regard to any
Subcontractor relationship areas to be considered include:
      • Termination for convenience.
      • Termination for breach / anticipatory breach.
      • End of project / contract end.
      • Fundamental change in client project definition.

All of these aspects should be in the T’s & C’s however it is important to detail the rights and obligations of
both parties, including such things as the return of data and IP ownership of completed development.




Copyright protected 2011                     Confidential - Optimatrix                                            10
Optimatrix
             SME interface with Subcontractor
   Whilst the SCM should act as the SPOC (Single Point Of Contact) with the subcontractor, this cannot be
   allowed to restrict the required detailed interface between the Prime SME’s and their Subcontractor
   counterparts, necessary to develop the technical and commercial aspects of the Subcontract. However the
   same disciplines of document control, authority and control of released information must be adhered to.
   Examples are shown below:

   • An Prime single point of maintenance for each and all contract related documentation is established,
   (including but not exclusive to T’s & C’s; SOW; TA and Billing and Payment plan).
   • Meeting plans, objectives and minutes to be documented for each meeting by the Prime meeting lead.
   • SCM to add all actions to Actions Log and is responsible to manage performance .
   • SME to promptly advise SCM on progress of actions (both SME & Subcontractor), when completed or date
   requirement changed.
   • In order to ensure clarity of requirement no customer generated information shall be provided to the
   Subcontractor, unless previously agreed with the SCM.
   • The organisational structure shall show the authority of SME’s against each element of the contract.
   • No verbal or written agreement shall be made which remove or alter any of the Primes or flowed down
   Customer requirement outside the authority of the SME. Any, which the SME is authorised to agree, must be
   documented (as detailed above), in the relevant document and be notified to the SCM.


Copyright protected 2011                   Confidential - Optimatrix                                    11
Optimatrix
                      Subcontractor performance
The performance of Subcontractors is obviously critical to any project. During the selection process it is
important to ascertain, where possible, evidence of both technical performance on similar business, but also
the culture and methodology of the organisation. Understanding the approval and governance requirements
and processes will enable more accurate planning, but also may provide further insight into their decision
making process and key authorities.
It should also be recognised that whilst the performance of a subcontractor prior to selection, and during bid
preparation, may show key indication of the culture and the priority they place on a particular project, it must be
remembered that the delivery phase is a different scenario and is likely to be undertaken by diverse areas of
the business. Not withstanding this it is essential that each stage is subject to the same rigour of performance
measurement and has defined resolution and mitigation routes where performance does not meet the
requirements. Dependent on the nature and phase of the contract, it is possible to use incentives or penalties,
however these, amongst other commercial remedies, must have been previously established via the
commercial SME. Key areas to consider for all phases include:

• Reporting
     •Schedules – For each phase of the project a detailed schedule, including project gates and deliverables
     should be established, and proactively maintained by the SCM, (this is a working document not a record
     of what has happened).
     • Technical reports – establish the content, format and timing, (to be included in the schedule), required.
     • Quality and security certification – establish applicability and timing, (to be included in the schedule),
     required.
Copyright protected 2011                     Confidential - Optimatrix                                        12
Optimatrix
                Subcontractor performance (cont.)
• Testing and acceptance
       • Acceptance criteria must be clearly pre-defined and articulated in the SOW.
       • Testing and acceptance should be clear deliverables detailed in the schedule ( even if an iterative
       delivery approach is adopted).
•Issue resolution and mitigation
       • SCM, with input from SME, is responsible for Subcontractor management including performance
       issues, these in the most part will be undertaken in accord with the Subcontractor however there may be
       instances where a more compelling approach may be necessary. In all circumstances the following
       should be considered:
              • Impact on the project – cost, quality and schedule.
              • Remedy – route to recover with zero project impact.
              • Remedy – route to recover with mitigation action.
              • Cause of issue and future avoidance.
       • Resolution types
              • Harmonious – the resolution and recovery is amicably agreed or the impact is not deemed to
              warrant further pursuit by the Prime.
              • Disputed – where the Prime does not believe that the Subcontractor either fully accepts
              responsibility for or does not provide acceptable resolution to the issue, the Prime may need to
              utilise any of the following:
                      • Escalation.
                      • Commercial incentive or penalty.
                      • Contractual remedies.
Copyright protected 2011                   Confidential - Optimatrix                                      13
Optimatrix
                Subcontractor performance (cont.)
•Reporting
     • Project shchedules, CDRL’s, SRDL’s and Compliancy matrices – dependent on phase of the project.
     • Action log – SCM should establish and maintain daily, an action log, to manage those activities and
     deliverables that are not identified in the schedule.
     • KPI’s - these will change dependent on the phase of the project, however all KPI’s need to be relevant;
     unambiguous; current and “owned”.
     • Informal – whilst it is recognised that this form of information transfer will happen, it must be noted that
     these “reporting” mechanisms, although extremely valuable to managing the subcontract, must never be
     interpreted as contractually binding.
• Meetings & reviews
     • PMR’s (Project Management Reviews) – formal PMR’s should be established, the frequency of these
     will be dependent on the phase of the project but should be at a minimum monthly. They are to review
     the overall progress of the project and cover key areas including, cost; risk; schedule; management and
     programmatic issues. It is recommended that these follow a set agenda and template reports and KPI’s
     are used.
     • Technical – dependent on phase of the project, but should adhere to SME interface guidelines.
     • Visits & Site audits - Appropriate levels of Subcontractor site visits should be conducted dependent on
     the nature and phase of the project, these should adhere to SME interface guidelines and where they are
     specific audits should be formally undertaken.
     • Contract negotiation meetings - dependent on phase of the project, but should adhere to
     Subcontractor negotiation guidelines.
Copyright protected 2011                     Confidential - Optimatrix                                        14
Optimatrix
                 Documentation – Version control
With all contractual relationships, the clarity of the supporting documentation is critical, as is ensuring that the route
to the final document can be traced. It is also worth noting that usually it is only when things go badly wrong are the
documents required, as such the last position to be in when trying to rely on written agreement is for it to be
incomplete, ambiguous, contradictory or even there to be multiple copies of the “truth”. To avoid this simple
guidelines should be followed.

• All Subcontractors requirements documents should be authored and maintained by the Prime authorised
personnel appropriate to the document (e.g. T’s & C’s = commercial lead). These include but are not limited to
SOW; T’s & C’s, CDRL’s; SRDL's and Schedules.
       • Subcontractors must respond using the Prime documents, (developing their own documentation should be
       avoided.).
       • All such documents should be version controlled and use track changes, comments should be applied either
       on the document or separately on a change log (if the quantity of changes is large), detailing the reason for
       the change.
       • Following review meetings any changes must be made within two working days and issued to the defined
       distribution list.
• Meeting plans and objectives should be documented and copied to SCM prior to each meeting (SCM to store in
database).
•Meeting minutes to be issued to the Subcontractor and SCM within two days of the meeting detailing all
actions,(including due date and owner), and understandings.
• Action Log to be maintained daily and issued to defined distribution list. Date and issue controlled.
   Copyright protected 2011                       Confidential - Optimatrix                                          15

More Related Content

Recently uploaded

HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfAmzadHosen3
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756dollysharma2066
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 

Recently uploaded (20)

HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 

Featured

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by HubspotMarius Sescu
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTExpeed Software
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsPixeldarts
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthThinkNow
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfmarketingartwork
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024Neil Kimberley
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)contently
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024Albert Qian
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsKurio // The Social Media Age(ncy)
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Search Engine Journal
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summarySpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentLily Ray
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best PracticesVit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project managementMindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...RachelPearson36
 

Featured (20)

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPT
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage Engineerings
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 

Subcontractor management guidelines

  • 1. Optimatrix Subcontractor Management An introduction Norman Housden Copyright protected 2011 Confidential - Optimatrix 1
  • 2. Optimatrix Index • Introduction • SCM – A team event. • Subcontractor Manager - Responsibilities • Subcontractor source and selection. • Subcontractor engagement. • Subcontractor Negotiation. • SME interface with Subcontractor. • Subcontractor Performance. • Documentation – Version control. Copyright protected 2011 Confidential - Optimatrix 2
  • 3. Optimatrix Introduction • Subcontractor management is a team effort that relies on many disciplines spanning all phases of the contract life. • The Subcontractor manager has responsibility to ensure that each discipline undertakes, and completes on schedule, relevant assigned activity and that nothing falls through the cracks. • Well-written and managed subcontracts, regardless of size, result in success on the prime contract, a satisfied customer, and a positive relationship with the subcontractor. • Effective management of Subcontractors relies on effective Relationship Management (understanding the Subcontractor drivers and constraints). Copyright protected 2011 Confidential - Optimatrix 3
  • 4. Legal Commercial Sub 1 Optimatrix Subcontractor Finance lead HR Legal Commercial Sub 2 Gov System Subcontractor Eng Finance lead HR Legal Commercial Sub 5 Exp & Subcontractor Gov System Sec Finance lead HR Eng Prime Cost Comm Systems Mod Eng Gov System el Eng Finance Sub Contractor Legal Management Gov Bid Legal Commercial Mngnt Sub 3 HR Risk MA Finance Subcontractor HR Legal Commercial lead Sub 6 Gov System Legal Commercial Finance Subcontractor HR Eng Sub 4 lead Subcontractor Gov System Finance HR Eng lead Gov System Copyright protected 2011 EngConfidential - Optimatrix 4
  • 5. Optimatrix Subcontractor Managers Responsibilities • Prime interface between Prime and Subcontractor. • Develops and maintains Subcontractor source and selection plan. • Develops and maintains Subcontractor engagement plan. • Co-ordinates and manages the SME interface with Subcontractor. • Monitors and manages Subcontractor performance. • Ensures, as appropriate, flow-down of end-customer terms and conditions. • Ensures flow-up of negotiated A’s, D’s, R’s & E’s. (Assumptions; Dependencies; Risk's and Exclusions) • Identifies and mitigates all risks associated to the subcontractor. Copyright protected 2011 Confidential - Optimatrix 5
  • 6. Optimatrix Subcontractor source and selection •The Subcontractor manager co-ordinates the Subcontractor source and selection plan. • Identifies and engages SME Stakeholders. • With SME input identifies potential Subcontractors. • Establishes initial contact and qualifies interest. • Establishes relevant NDA. • Develops (from SME input) and co-ordinates issue of formal RFI documentation, including: • Overview. • High level requirement documents, (outline SOW including statements on required annex’s A,D,R &E, CDRL’s , Compliancy matrix etc.). • Statement on applicable T’s& C’s (those which Prime will negotiate on). • Statement on Billing and Payment policy. • RFI response schedule. • Communication Channels (for requirement clarification – SPOC prinicples). • Co-ordinates and disseminates all clarification questions and responses. • Develops (from SME input) acceptance / scoring criteria. (scoring matrix). • Co-ordinates review panel of SME stakeholders, and manages down select process. • Communicates selection panel decision. • Manages RFP issue to selected Subcontractors Copyright protected 2011 Confidential - Optimatrix 6
  • 7. Optimatrix Subcontractor source and selection (cont.) •Develops specific Subcontractor RFP plan. • Establish business worth to the subcontractor (core, % of turnover, new market entry etc). • Undertakes due diligence – (D&B etc). • Develops (from SME input) and co-ordinates issue of formal RFP documentation, including: • Overview. • Decomposed requirement documents, (initial SOW including required all annex’s (A,D,R &E, CDRL’s , Compliancy matrix etc.). • Applicable T’s& C’s (those which Prime will negotiate on). • Billing and Payment plan. • Commercial response Schedule. • Co-ordinates and disseminates all clarification questions and responses. • Co-ordinates Subcontractor Audits / Presentations (as appropriate). • Develops (From SME input) Acceptance / Scoring criteria. (scoring matrix). • Co-ordinates review panel of SME stakeholders, and manages down select process. • Communicates selection panel decision. Whilst specific Subcontractors will be selected to proceed, the information gathered and assessments undertaken of non-selected Subcontractors should be maintained in a Subcontractor database, as initial reference for future sourcing activity or should a need arise to replace the selected Subcontractor. Copyright protected 2011 Confidential - Optimatrix 7
  • 8. Optimatrix Subcontractor engagement •Develops specific Subcontractor engagement plan. • Co-ordinate relevant TA, MOU, MOA. • Where applicable co-ordinate export licence activity (TAA; ITAR; EAR ; F680 etc) • Establishes organisational hierarchy charts – Peer review and escalation • Develops Subcontract management schedule – All gates and deliverables to be included (this schedule must align to Prime requirements, however needs to realistically accommodate subcontractors needs.). • Establish Actions Log – For the daily management of all actions that are sub – schedule level or are on the schedule but require specific activity. • Develops meeting calendar - To include PMR; Commercial; Technical and Finance. • Within the Project database establish file structure for all Subcontractor management documents – including SOW, T’s & C’s, CDRL’s and SRDL's. (see Document and version Control). Copyright protected 2011 Confidential - Optimatrix 8
  • 9. Subcontractor Negotiation Optimatrix It must be remembered that every interface, however innocuous, is a potential negotiation with a subcontractor. As such all project team members must ensure that they do not unwittingly enable the subcontractor the opportunity to manipulate any aspect of the terms or requirements through informal agreement. Simple guidelines should be followed: • Internally identify the key individuals in Prime organisation, who have relevant authority for specific negotiation areas (e.g. T’s & C’s = Commercial lead). These leads are responsible for: • Establishing the Primes baseline. • Gap analysis, from Subcontractors position. • Identify drivers / lever’s to change Subcontractors position. • With SCM develop combined Negotiation Plan. • Identify the Subcontractor personnel with authority to negotiate. • Identify escalation route. • Schedule specific meetings to negotiate, (as opposed to technical reviews or planning meetings). • Appoint lead (single) negotiator. • Develop meeting strategy (targets, acceptable, concessions available). • Avoid (where possible),providing Subcontractor with knowledge of outside issues, as these could be used by them. (i.e. customer / governance time schedules). • On key requirements, if agreement cannot be reached “park” the point and proceed with other elements, return later in the negotiation at a suitable point where the Subcontractor has identified a concession the Prime is able to concede, barter. • Close the meeting when all items have been discussed. Document all areas of agreement and outstanding issues. Schedule follow up meeting providing sufficient time to assess the position. Copyright protected 2011 Confidential - Optimatrix 9
  • 10. Optimatrix Subcontractor Negotiation (cont.) • With the relevant SME’s review the open issues to identify other negotiation tactics or mitigation activity. (Engaging escalation where appropriate) • Review the varying scenarios of not reaching agreement on each and multiple open issues and determine the minimum point where proceeding is viable. • Brief Senior Management on position and action plan as necessary. • Continue this process until such point as suitable agreement is reached or the viability to proceed (including timescales), is compromised. Whilst not covered directly it must be noted that an exit strategy must be developed with regard to any Subcontractor relationship areas to be considered include: • Termination for convenience. • Termination for breach / anticipatory breach. • End of project / contract end. • Fundamental change in client project definition. All of these aspects should be in the T’s & C’s however it is important to detail the rights and obligations of both parties, including such things as the return of data and IP ownership of completed development. Copyright protected 2011 Confidential - Optimatrix 10
  • 11. Optimatrix SME interface with Subcontractor Whilst the SCM should act as the SPOC (Single Point Of Contact) with the subcontractor, this cannot be allowed to restrict the required detailed interface between the Prime SME’s and their Subcontractor counterparts, necessary to develop the technical and commercial aspects of the Subcontract. However the same disciplines of document control, authority and control of released information must be adhered to. Examples are shown below: • An Prime single point of maintenance for each and all contract related documentation is established, (including but not exclusive to T’s & C’s; SOW; TA and Billing and Payment plan). • Meeting plans, objectives and minutes to be documented for each meeting by the Prime meeting lead. • SCM to add all actions to Actions Log and is responsible to manage performance . • SME to promptly advise SCM on progress of actions (both SME & Subcontractor), when completed or date requirement changed. • In order to ensure clarity of requirement no customer generated information shall be provided to the Subcontractor, unless previously agreed with the SCM. • The organisational structure shall show the authority of SME’s against each element of the contract. • No verbal or written agreement shall be made which remove or alter any of the Primes or flowed down Customer requirement outside the authority of the SME. Any, which the SME is authorised to agree, must be documented (as detailed above), in the relevant document and be notified to the SCM. Copyright protected 2011 Confidential - Optimatrix 11
  • 12. Optimatrix Subcontractor performance The performance of Subcontractors is obviously critical to any project. During the selection process it is important to ascertain, where possible, evidence of both technical performance on similar business, but also the culture and methodology of the organisation. Understanding the approval and governance requirements and processes will enable more accurate planning, but also may provide further insight into their decision making process and key authorities. It should also be recognised that whilst the performance of a subcontractor prior to selection, and during bid preparation, may show key indication of the culture and the priority they place on a particular project, it must be remembered that the delivery phase is a different scenario and is likely to be undertaken by diverse areas of the business. Not withstanding this it is essential that each stage is subject to the same rigour of performance measurement and has defined resolution and mitigation routes where performance does not meet the requirements. Dependent on the nature and phase of the contract, it is possible to use incentives or penalties, however these, amongst other commercial remedies, must have been previously established via the commercial SME. Key areas to consider for all phases include: • Reporting •Schedules – For each phase of the project a detailed schedule, including project gates and deliverables should be established, and proactively maintained by the SCM, (this is a working document not a record of what has happened). • Technical reports – establish the content, format and timing, (to be included in the schedule), required. • Quality and security certification – establish applicability and timing, (to be included in the schedule), required. Copyright protected 2011 Confidential - Optimatrix 12
  • 13. Optimatrix Subcontractor performance (cont.) • Testing and acceptance • Acceptance criteria must be clearly pre-defined and articulated in the SOW. • Testing and acceptance should be clear deliverables detailed in the schedule ( even if an iterative delivery approach is adopted). •Issue resolution and mitigation • SCM, with input from SME, is responsible for Subcontractor management including performance issues, these in the most part will be undertaken in accord with the Subcontractor however there may be instances where a more compelling approach may be necessary. In all circumstances the following should be considered: • Impact on the project – cost, quality and schedule. • Remedy – route to recover with zero project impact. • Remedy – route to recover with mitigation action. • Cause of issue and future avoidance. • Resolution types • Harmonious – the resolution and recovery is amicably agreed or the impact is not deemed to warrant further pursuit by the Prime. • Disputed – where the Prime does not believe that the Subcontractor either fully accepts responsibility for or does not provide acceptable resolution to the issue, the Prime may need to utilise any of the following: • Escalation. • Commercial incentive or penalty. • Contractual remedies. Copyright protected 2011 Confidential - Optimatrix 13
  • 14. Optimatrix Subcontractor performance (cont.) •Reporting • Project shchedules, CDRL’s, SRDL’s and Compliancy matrices – dependent on phase of the project. • Action log – SCM should establish and maintain daily, an action log, to manage those activities and deliverables that are not identified in the schedule. • KPI’s - these will change dependent on the phase of the project, however all KPI’s need to be relevant; unambiguous; current and “owned”. • Informal – whilst it is recognised that this form of information transfer will happen, it must be noted that these “reporting” mechanisms, although extremely valuable to managing the subcontract, must never be interpreted as contractually binding. • Meetings & reviews • PMR’s (Project Management Reviews) – formal PMR’s should be established, the frequency of these will be dependent on the phase of the project but should be at a minimum monthly. They are to review the overall progress of the project and cover key areas including, cost; risk; schedule; management and programmatic issues. It is recommended that these follow a set agenda and template reports and KPI’s are used. • Technical – dependent on phase of the project, but should adhere to SME interface guidelines. • Visits & Site audits - Appropriate levels of Subcontractor site visits should be conducted dependent on the nature and phase of the project, these should adhere to SME interface guidelines and where they are specific audits should be formally undertaken. • Contract negotiation meetings - dependent on phase of the project, but should adhere to Subcontractor negotiation guidelines. Copyright protected 2011 Confidential - Optimatrix 14
  • 15. Optimatrix Documentation – Version control With all contractual relationships, the clarity of the supporting documentation is critical, as is ensuring that the route to the final document can be traced. It is also worth noting that usually it is only when things go badly wrong are the documents required, as such the last position to be in when trying to rely on written agreement is for it to be incomplete, ambiguous, contradictory or even there to be multiple copies of the “truth”. To avoid this simple guidelines should be followed. • All Subcontractors requirements documents should be authored and maintained by the Prime authorised personnel appropriate to the document (e.g. T’s & C’s = commercial lead). These include but are not limited to SOW; T’s & C’s, CDRL’s; SRDL's and Schedules. • Subcontractors must respond using the Prime documents, (developing their own documentation should be avoided.). • All such documents should be version controlled and use track changes, comments should be applied either on the document or separately on a change log (if the quantity of changes is large), detailing the reason for the change. • Following review meetings any changes must be made within two working days and issued to the defined distribution list. • Meeting plans and objectives should be documented and copied to SCM prior to each meeting (SCM to store in database). •Meeting minutes to be issued to the Subcontractor and SCM within two days of the meeting detailing all actions,(including due date and owner), and understandings. • Action Log to be maintained daily and issued to defined distribution list. Date and issue controlled. Copyright protected 2011 Confidential - Optimatrix 15