SlideShare una empresa de Scribd logo
1 de 24
Project Management

     Chris Imondi
     Ejvin Berry

     FIRSTFare – October 15th, 2011
What is a Project?
   One goal + some parameters:
       Scope

       Time

       Cost

       Quality

       Risk
Project Success
Requirements to survive the process:
 Happy customers

 On time deliverables

 On budget

 Optimistic investors

 Team cohesion



Congratulations… but if you have problems
  “surviving”, you’ll have problems “thriving”
  as an engineering organization…
Project Successes
   Customers who generate new requirements
   Under budget
   Innovation
   Investors are paid
   Team talent pool intensifies
   Leftover energy? Diversify:
     Create community infrastructure like FLL
       teams, or academic mentorship
Project Manager
   Primary Roles:
     Build a team (organize existing
       resources)
     Maintain/Analyze data and schedule

     Schedule resources

     Organize capital (money + manpower)

     Manage conflict (interference)

     Review work – Initiate Design Reviews
What is Project Management?




         Novations Group, Inc., "Tools and Techniques
                of Project Management, v6.1"
Initiation
   Occurs at the start of the project
   Contains clear project goals and parameters
   Often involves the customer
   Your big chance to control scope

Initiation will take place between 5am and
    midnight on Kickoff Day.
Planning
   This is the opportunity to modify:
     Team structure

     Tactics – Define “envelopes”

     Schedule:

       Chronological schedules

       Cost schedules – when to buy?

     Acceptable risks – Weigh your skills and
      your needs with your “wants”
Early vs. Late Project Planning
   Unexpected
    problems late in
    development kill
    projects
   Time spent up front
    to understand the
    requirements, anal
    yze, and correctly
    design a solution
    saves big in the
    end
Executing
   Do what you planned.
   Do only what you planned.
   Feedback and repeat.

Note: It is important to document activities
  during the execution phase.
Monitoring and Controlling
   Gather feedback via Design Review
   Sort feedback
   Make decisions regarding remaining
    resources
   Manage schedule changes
Closing
   A project is closed when a successful
    Final Design Review is held between
    design, management and the
    customer.
   This is a formal process in which you
    sell your product to the customer.
   Which projects need to close?
       Minor components vs. Entire robots
   Who is your customer?
Now it’s time to manage…

   If you were looking for someone to
    spell it out for you; here’s your
    chance…
First: Team Structure

   Match people with their strengths
     It may be helpful, particularly for rookie
       teams, to develop a skills matrix.
     This will help identify training needs, or
       where you need to get more outside help
       (a trainer, or a hired gun?)
   Develop an organization chart, matching
    team members to their responsibilities.
Second: Plan the work…
   Work Breakdown Structure (or WBS) =
    Everything you want to do on the project
     Determine the form and function of every
      part, and what they all do for you
      (Functional Efficiency Technique)
     Also any related work –
      fundraising, major events, support
      equipment
     This ultimately becomes your project
      plan, as detailed as you choose to plan
      and schedule it.
   Match with your team structure.
Plan the work (cont.). . .
    Estimate each item or system using a
     Resource Loading Diagram along with a
     Network Diagram:
      How much time (work hours) do you think
       it will take?
      How many people do you have? How
       much time do they have?
      How many days/ hours will each item
       take?
      Where are you short handed? Make sure
       you aren’t double booking people.
Develop a Project Schedule
   Make a simple project schedule, easy to read and
    status.
   Stick to your plan
   Monitor progress – fill in the bars, but not if they are
    not done.
   Adjust on the fly – you may have to give up some
    goals, or shift more people to key tasks that are
    falling behind. Enlist more experts?
   Keep everyone productive, but don’t forget this is all
    fun!
   Communicate!
Third: Execute - do some work
Fourth: Design Reviews
   Plan and schedule design reviews
        Every day, if required, until design completion
   Document (as specifically as possible) how
    subsystems will work together and connect
    as they are designed, built and integrated
   Check your interfaces in the reviews – if
    there is change, it must be fully
    investigated, understood and agreed to
Fifth: Risk Management

   Also known as “what-ifs”
   Leave a little time for disasters and
    unforeseen details
   Testing is essential to reduce risk
   Set goals for features or functions that
    would be “nice to have”
     If there is insufficient time, the project will
       still be successful without them
Risk Management (cont.)

   FMEA (Failure Modes and Effects Analysis)
     Consider system components

     Identify symptoms of failure

     Identify root cause

     Predict consequences to other sub-
      systems
     Rank failure modes by severity (1,2,3)

     Rank failure modes by probability (1,2,3)

   Example FMEA.
References

   MBA.com
   PMI PMBOK Guide

   Contact:
       Chris Imondi, chris.m.imondi@boeing.com
       Ejvin Berry, ejvin.m.berry@boeing.com
Questions ????

Más contenido relacionado

La actualidad más candente

Managing Multiple Projects: 5 Most Common Mistakes and Strategies to Resolve ...
Managing Multiple Projects: 5 Most Common Mistakes and Strategies to Resolve ...Managing Multiple Projects: 5 Most Common Mistakes and Strategies to Resolve ...
Managing Multiple Projects: 5 Most Common Mistakes and Strategies to Resolve ...devans00
 
Why Projects Fail: Obstacles and Solutions
Why Projects Fail: Obstacles and SolutionsWhy Projects Fail: Obstacles and Solutions
Why Projects Fail: Obstacles and SolutionsMichael Krigsman
 
Not all projects are the same: One size does not fit all for managing projects
Not all projects are the same: One size does not fit all for managing projectsNot all projects are the same: One size does not fit all for managing projects
Not all projects are the same: One size does not fit all for managing projectsImprovement Skills Consulting Ltd.
 
Success factors for Enterprise Project Management
Success factors for Enterprise Project ManagementSuccess factors for Enterprise Project Management
Success factors for Enterprise Project ManagementAmarnath Gupta
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Managementcwarren
 
Top Ten Reasons Why Projects Fail
Top Ten Reasons Why Projects FailTop Ten Reasons Why Projects Fail
Top Ten Reasons Why Projects Failjpstewar
 
Project post-mortem analysis
Project post-mortem analysisProject post-mortem analysis
Project post-mortem analysisJaiveer Singh
 
Project Management 101: Communication is 90% of the Job
Project Management 101: Communication is 90% of the JobProject Management 101: Communication is 90% of the Job
Project Management 101: Communication is 90% of the JobBeth Fischi, PMP
 
Project management best practices
Project management best practicesProject management best practices
Project management best practicesJackson Chan
 
Shot note about project management
Shot note about project managementShot note about project management
Shot note about project managementAHM Pervej Kabir
 
Managing Creativity
Managing CreativityManaging Creativity
Managing CreativitySusan Steele
 
Why Projects Fail + Four Steps to Succeed
Why Projects Fail + Four Steps to SucceedWhy Projects Fail + Four Steps to Succeed
Why Projects Fail + Four Steps to SucceedKevin Wordon
 
Post mortem report
Post mortem reportPost mortem report
Post mortem reportKuaci Pedas
 
How PMOs Save Money
How PMOs Save MoneyHow PMOs Save Money
How PMOs Save Moneydblumhorst
 
From Ideas to Gameplan - Scoping and Scheduling Creative Projects Webinar
From Ideas to Gameplan -  Scoping and Scheduling Creative Projects WebinarFrom Ideas to Gameplan -  Scoping and Scheduling Creative Projects Webinar
From Ideas to Gameplan - Scoping and Scheduling Creative Projects Webinardobbid
 
Why Do So Many Software Projects Fail?
Why Do So Many Software Projects Fail?Why Do So Many Software Projects Fail?
Why Do So Many Software Projects Fail?Phil Comelio
 
Why do projects fail - the project execution maturity model - basic collabor...
Why do projects fail  - the project execution maturity model - basic collabor...Why do projects fail  - the project execution maturity model - basic collabor...
Why do projects fail - the project execution maturity model - basic collabor...Pinnacle Strategies
 
Project Management Workshop
Project Management WorkshopProject Management Workshop
Project Management WorkshopJosh Folgado
 

La actualidad más candente (20)

Managing Multiple Projects: 5 Most Common Mistakes and Strategies to Resolve ...
Managing Multiple Projects: 5 Most Common Mistakes and Strategies to Resolve ...Managing Multiple Projects: 5 Most Common Mistakes and Strategies to Resolve ...
Managing Multiple Projects: 5 Most Common Mistakes and Strategies to Resolve ...
 
Why Projects Fail: Obstacles and Solutions
Why Projects Fail: Obstacles and SolutionsWhy Projects Fail: Obstacles and Solutions
Why Projects Fail: Obstacles and Solutions
 
Pre mortem-pradeeep patel
Pre mortem-pradeeep patelPre mortem-pradeeep patel
Pre mortem-pradeeep patel
 
Not all projects are the same: One size does not fit all for managing projects
Not all projects are the same: One size does not fit all for managing projectsNot all projects are the same: One size does not fit all for managing projects
Not all projects are the same: One size does not fit all for managing projects
 
Success factors for Enterprise Project Management
Success factors for Enterprise Project ManagementSuccess factors for Enterprise Project Management
Success factors for Enterprise Project Management
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
 
Top Ten Reasons Why Projects Fail
Top Ten Reasons Why Projects FailTop Ten Reasons Why Projects Fail
Top Ten Reasons Why Projects Fail
 
Project post-mortem analysis
Project post-mortem analysisProject post-mortem analysis
Project post-mortem analysis
 
Project management
Project managementProject management
Project management
 
Project Management 101: Communication is 90% of the Job
Project Management 101: Communication is 90% of the JobProject Management 101: Communication is 90% of the Job
Project Management 101: Communication is 90% of the Job
 
Project management best practices
Project management best practicesProject management best practices
Project management best practices
 
Shot note about project management
Shot note about project managementShot note about project management
Shot note about project management
 
Managing Creativity
Managing CreativityManaging Creativity
Managing Creativity
 
Why Projects Fail + Four Steps to Succeed
Why Projects Fail + Four Steps to SucceedWhy Projects Fail + Four Steps to Succeed
Why Projects Fail + Four Steps to Succeed
 
Post mortem report
Post mortem reportPost mortem report
Post mortem report
 
How PMOs Save Money
How PMOs Save MoneyHow PMOs Save Money
How PMOs Save Money
 
From Ideas to Gameplan - Scoping and Scheduling Creative Projects Webinar
From Ideas to Gameplan -  Scoping and Scheduling Creative Projects WebinarFrom Ideas to Gameplan -  Scoping and Scheduling Creative Projects Webinar
From Ideas to Gameplan - Scoping and Scheduling Creative Projects Webinar
 
Why Do So Many Software Projects Fail?
Why Do So Many Software Projects Fail?Why Do So Many Software Projects Fail?
Why Do So Many Software Projects Fail?
 
Why do projects fail - the project execution maturity model - basic collabor...
Why do projects fail  - the project execution maturity model - basic collabor...Why do projects fail  - the project execution maturity model - basic collabor...
Why do projects fail - the project execution maturity model - basic collabor...
 
Project Management Workshop
Project Management WorkshopProject Management Workshop
Project Management Workshop
 

Similar a First fare 2011 project-management

Postmortemanalysis 120520033844-phpapp02
Postmortemanalysis 120520033844-phpapp02Postmortemanalysis 120520033844-phpapp02
Postmortemanalysis 120520033844-phpapp02Loriebel Manabat
 
importance of resources allocation in formal method of software engineering ...
 importance of resources allocation in formal method of software engineering ... importance of resources allocation in formal method of software engineering ...
importance of resources allocation in formal method of software engineering ...Abdul Naqashbandi
 
Project Management for Freelancers
Project Management for FreelancersProject Management for Freelancers
Project Management for FreelancersCrystal Williams
 
Project Plan Development - A FlackVentures Training Example
Project Plan Development - A FlackVentures Training ExampleProject Plan Development - A FlackVentures Training Example
Project Plan Development - A FlackVentures Training ExampleKate Pynn
 
Project Management Overview
Project Management OverviewProject Management Overview
Project Management Overviewcford1973
 
Best Practices When Moving To Agile Project Management
Best Practices When Moving To Agile Project ManagementBest Practices When Moving To Agile Project Management
Best Practices When Moving To Agile Project ManagementRobert McGeachy
 
Project Management online sample (1) (1).pptx
Project Management online sample (1) (1).pptxProject Management online sample (1) (1).pptx
Project Management online sample (1) (1).pptxStanleyChabata1
 
Project Management Complete Concept
Project Management Complete Concept Project Management Complete Concept
Project Management Complete Concept MuhammadTalha436
 
Drs 255 project management skills
Drs 255 project management skillsDrs 255 project management skills
Drs 255 project management skillspaulyeboah
 
Current Trends in Agile - opening keynote for Agile Israel 2014
Current Trends in Agile - opening keynote for Agile Israel 2014Current Trends in Agile - opening keynote for Agile Israel 2014
Current Trends in Agile - opening keynote for Agile Israel 2014Yuval Yeret
 
04. Project planning and management.pptx
04. Project planning and management.pptx04. Project planning and management.pptx
04. Project planning and management.pptxALI2H
 
Building the case for custom software
Building the case for custom softwareBuilding the case for custom software
Building the case for custom softwareguestded015
 

Similar a First fare 2011 project-management (20)

Postmortemanalysis 120520033844-phpapp02
Postmortemanalysis 120520033844-phpapp02Postmortemanalysis 120520033844-phpapp02
Postmortemanalysis 120520033844-phpapp02
 
An Introduction to Project management(project management tutorials)
An Introduction to Project management(project management tutorials)An Introduction to Project management(project management tutorials)
An Introduction to Project management(project management tutorials)
 
importance of resources allocation in formal method of software engineering ...
 importance of resources allocation in formal method of software engineering ... importance of resources allocation in formal method of software engineering ...
importance of resources allocation in formal method of software engineering ...
 
lecture16.ppt
lecture16.pptlecture16.ppt
lecture16.ppt
 
Ben Mkt 347 Week 4
Ben Mkt 347 Week 4Ben Mkt 347 Week 4
Ben Mkt 347 Week 4
 
Project Management
Project ManagementProject Management
Project Management
 
Project Management for Freelancers
Project Management for FreelancersProject Management for Freelancers
Project Management for Freelancers
 
Project Plan Development - A FlackVentures Training Example
Project Plan Development - A FlackVentures Training ExampleProject Plan Development - A FlackVentures Training Example
Project Plan Development - A FlackVentures Training Example
 
Project Management Overview
Project Management OverviewProject Management Overview
Project Management Overview
 
Project Management
Project ManagementProject Management
Project Management
 
Best Practices When Moving To Agile Project Management
Best Practices When Moving To Agile Project ManagementBest Practices When Moving To Agile Project Management
Best Practices When Moving To Agile Project Management
 
Project Management online sample (1) (1).pptx
Project Management online sample (1) (1).pptxProject Management online sample (1) (1).pptx
Project Management online sample (1) (1).pptx
 
Project Management Complete Concept
Project Management Complete Concept Project Management Complete Concept
Project Management Complete Concept
 
D10 Project Management
D10 Project ManagementD10 Project Management
D10 Project Management
 
D10 Project Management
D10 Project ManagementD10 Project Management
D10 Project Management
 
Drs 255 project management skills
Drs 255 project management skillsDrs 255 project management skills
Drs 255 project management skills
 
Current Trends in Agile - opening keynote for Agile Israel 2014
Current Trends in Agile - opening keynote for Agile Israel 2014Current Trends in Agile - opening keynote for Agile Israel 2014
Current Trends in Agile - opening keynote for Agile Israel 2014
 
Project Management
Project ManagementProject Management
Project Management
 
04. Project planning and management.pptx
04. Project planning and management.pptx04. Project planning and management.pptx
04. Project planning and management.pptx
 
Building the case for custom software
Building the case for custom softwareBuilding the case for custom software
Building the case for custom software
 

Más de Oregon FIRST Robotics

Oregon FIRST PNW Championship Poster 2014 3
Oregon FIRST PNW Championship Poster 2014 3Oregon FIRST PNW Championship Poster 2014 3
Oregon FIRST PNW Championship Poster 2014 3Oregon FIRST Robotics
 
Oregon FIRST PNW Championship Poster 2014 2
Oregon FIRST PNW Championship Poster 2014 2Oregon FIRST PNW Championship Poster 2014 2
Oregon FIRST PNW Championship Poster 2014 2Oregon FIRST Robotics
 
Oregon FIRST PNW Championship Poster 2014 1
Oregon FIRST PNW Championship Poster 2014 1Oregon FIRST PNW Championship Poster 2014 1
Oregon FIRST PNW Championship Poster 2014 1Oregon FIRST Robotics
 
Oregon FIRST PNW Championship Poster 2014 4
Oregon FIRST PNW Championship Poster 2014 4Oregon FIRST PNW Championship Poster 2014 4
Oregon FIRST PNW Championship Poster 2014 4Oregon FIRST Robotics
 
First fare 2013 business plan presentation
First fare 2013   business plan presentationFirst fare 2013   business plan presentation
First fare 2013 business plan presentationOregon FIRST Robotics
 
First fare 2013 competitive analysis presentation
First fare 2013   competitive analysis presentationFirst fare 2013   competitive analysis presentation
First fare 2013 competitive analysis presentationOregon FIRST Robotics
 
First fare 2013 website design for frc teams
First fare 2013   website design for frc teamsFirst fare 2013   website design for frc teams
First fare 2013 website design for frc teamsOregon FIRST Robotics
 
FIRSTFare 2013 overview of electronics-2014
FIRSTFare 2013   overview of electronics-2014FIRSTFare 2013   overview of electronics-2014
FIRSTFare 2013 overview of electronics-2014Oregon FIRST Robotics
 
First fare 2013 manipulators firstfare 2013
First fare 2013   manipulators firstfare 2013First fare 2013   manipulators firstfare 2013
First fare 2013 manipulators firstfare 2013Oregon FIRST Robotics
 
First fare 2013 district model overview 2014
First fare 2013   district model overview 2014First fare 2013   district model overview 2014
First fare 2013 district model overview 2014Oregon FIRST Robotics
 
First fare 2013 crowdfunding 101 (beginner) with notes
First fare 2013   crowdfunding 101 (beginner) with notesFirst fare 2013   crowdfunding 101 (beginner) with notes
First fare 2013 crowdfunding 101 (beginner) with notesOregon FIRST Robotics
 
2013 Oregon Dept. of Education Grant Overview for FIRST Teams
2013 Oregon Dept. of Education Grant Overview for FIRST Teams2013 Oregon Dept. of Education Grant Overview for FIRST Teams
2013 Oregon Dept. of Education Grant Overview for FIRST TeamsOregon FIRST Robotics
 
2013 Oregon Dept. of Education FIRST Grant Overview
2013 Oregon Dept. of Education FIRST Grant Overview 2013 Oregon Dept. of Education FIRST Grant Overview
2013 Oregon Dept. of Education FIRST Grant Overview Oregon FIRST Robotics
 
FIRST Robotics Oregon Dept Of Education Grants - 2013
FIRST Robotics Oregon Dept Of Education Grants - 2013FIRST Robotics Oregon Dept Of Education Grants - 2013
FIRST Robotics Oregon Dept Of Education Grants - 2013Oregon FIRST Robotics
 
2013 FRC Autodesk Oregon Regional -- All you need to know webinar
2013 FRC Autodesk Oregon Regional -- All you need to know webinar2013 FRC Autodesk Oregon Regional -- All you need to know webinar
2013 FRC Autodesk Oregon Regional -- All you need to know webinarOregon FIRST Robotics
 
2013 Autodesk Oregon Regional Poster.11x17
2013 Autodesk Oregon Regional Poster.11x172013 Autodesk Oregon Regional Poster.11x17
2013 Autodesk Oregon Regional Poster.11x17Oregon FIRST Robotics
 
2013 Autodesk Oregon Regional Poster - 4
2013 Autodesk Oregon Regional Poster - 42013 Autodesk Oregon Regional Poster - 4
2013 Autodesk Oregon Regional Poster - 4Oregon FIRST Robotics
 
2013 Autodesk Oregon Regional Poster - 3
2013 Autodesk Oregon Regional Poster - 32013 Autodesk Oregon Regional Poster - 3
2013 Autodesk Oregon Regional Poster - 3Oregon FIRST Robotics
 

Más de Oregon FIRST Robotics (20)

Oregon FIRST PNW Championship Poster 2014 3
Oregon FIRST PNW Championship Poster 2014 3Oregon FIRST PNW Championship Poster 2014 3
Oregon FIRST PNW Championship Poster 2014 3
 
Oregon FIRST PNW Championship Poster 2014 2
Oregon FIRST PNW Championship Poster 2014 2Oregon FIRST PNW Championship Poster 2014 2
Oregon FIRST PNW Championship Poster 2014 2
 
Oregon FIRST PNW Championship Poster 2014 1
Oregon FIRST PNW Championship Poster 2014 1Oregon FIRST PNW Championship Poster 2014 1
Oregon FIRST PNW Championship Poster 2014 1
 
Oregon FIRST PNW Championship Poster 2014 4
Oregon FIRST PNW Championship Poster 2014 4Oregon FIRST PNW Championship Poster 2014 4
Oregon FIRST PNW Championship Poster 2014 4
 
First fare 2013 business plan presentation
First fare 2013   business plan presentationFirst fare 2013   business plan presentation
First fare 2013 business plan presentation
 
First fare 2013 competitive analysis presentation
First fare 2013   competitive analysis presentationFirst fare 2013   competitive analysis presentation
First fare 2013 competitive analysis presentation
 
First fare 2013 website design for frc teams
First fare 2013   website design for frc teamsFirst fare 2013   website design for frc teams
First fare 2013 website design for frc teams
 
First fare 2013 pneumatics 2013
First fare 2013   pneumatics 2013First fare 2013   pneumatics 2013
First fare 2013 pneumatics 2013
 
FIRSTFare 2013 overview of electronics-2014
FIRSTFare 2013   overview of electronics-2014FIRSTFare 2013   overview of electronics-2014
FIRSTFare 2013 overview of electronics-2014
 
First fare 2013 manipulators firstfare 2013
First fare 2013   manipulators firstfare 2013First fare 2013   manipulators firstfare 2013
First fare 2013 manipulators firstfare 2013
 
First fare 2013 district model overview 2014
First fare 2013   district model overview 2014First fare 2013   district model overview 2014
First fare 2013 district model overview 2014
 
First fare 2013 crowdfunding 101 (beginner) with notes
First fare 2013   crowdfunding 101 (beginner) with notesFirst fare 2013   crowdfunding 101 (beginner) with notes
First fare 2013 crowdfunding 101 (beginner) with notes
 
First fare 2013 basic-labview
First fare 2013   basic-labviewFirst fare 2013   basic-labview
First fare 2013 basic-labview
 
2013 Oregon Dept. of Education Grant Overview for FIRST Teams
2013 Oregon Dept. of Education Grant Overview for FIRST Teams2013 Oregon Dept. of Education Grant Overview for FIRST Teams
2013 Oregon Dept. of Education Grant Overview for FIRST Teams
 
2013 Oregon Dept. of Education FIRST Grant Overview
2013 Oregon Dept. of Education FIRST Grant Overview 2013 Oregon Dept. of Education FIRST Grant Overview
2013 Oregon Dept. of Education FIRST Grant Overview
 
FIRST Robotics Oregon Dept Of Education Grants - 2013
FIRST Robotics Oregon Dept Of Education Grants - 2013FIRST Robotics Oregon Dept Of Education Grants - 2013
FIRST Robotics Oregon Dept Of Education Grants - 2013
 
2013 FRC Autodesk Oregon Regional -- All you need to know webinar
2013 FRC Autodesk Oregon Regional -- All you need to know webinar2013 FRC Autodesk Oregon Regional -- All you need to know webinar
2013 FRC Autodesk Oregon Regional -- All you need to know webinar
 
2013 Autodesk Oregon Regional Poster.11x17
2013 Autodesk Oregon Regional Poster.11x172013 Autodesk Oregon Regional Poster.11x17
2013 Autodesk Oregon Regional Poster.11x17
 
2013 Autodesk Oregon Regional Poster - 4
2013 Autodesk Oregon Regional Poster - 42013 Autodesk Oregon Regional Poster - 4
2013 Autodesk Oregon Regional Poster - 4
 
2013 Autodesk Oregon Regional Poster - 3
2013 Autodesk Oregon Regional Poster - 32013 Autodesk Oregon Regional Poster - 3
2013 Autodesk Oregon Regional Poster - 3
 

Último

Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptxSherlyMaeNeri
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomnelietumpap1
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSJoshuaGantuangco2
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfMr Bounab Samir
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxDr.Ibrahim Hassaan
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parentsnavabharathschool99
 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxChelloAnnAsuncion2
 
Q4 English4 Week3 PPT Melcnmg-based.pptx
Q4 English4 Week3 PPT Melcnmg-based.pptxQ4 English4 Week3 PPT Melcnmg-based.pptx
Q4 English4 Week3 PPT Melcnmg-based.pptxnelietumpap1
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 

Último (20)

Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptx
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptxYOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choom
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptxFINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptx
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parents
 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
 
Q4 English4 Week3 PPT Melcnmg-based.pptx
Q4 English4 Week3 PPT Melcnmg-based.pptxQ4 English4 Week3 PPT Melcnmg-based.pptx
Q4 English4 Week3 PPT Melcnmg-based.pptx
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptxLEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
 

First fare 2011 project-management

  • 1.
  • 2. Project Management Chris Imondi Ejvin Berry FIRSTFare – October 15th, 2011
  • 3. What is a Project?  One goal + some parameters:  Scope  Time  Cost  Quality  Risk
  • 4. Project Success Requirements to survive the process:  Happy customers  On time deliverables  On budget  Optimistic investors  Team cohesion Congratulations… but if you have problems “surviving”, you’ll have problems “thriving” as an engineering organization…
  • 5. Project Successes  Customers who generate new requirements  Under budget  Innovation  Investors are paid  Team talent pool intensifies  Leftover energy? Diversify:  Create community infrastructure like FLL teams, or academic mentorship
  • 6. Project Manager  Primary Roles:  Build a team (organize existing resources)  Maintain/Analyze data and schedule  Schedule resources  Organize capital (money + manpower)  Manage conflict (interference)  Review work – Initiate Design Reviews
  • 7. What is Project Management? Novations Group, Inc., "Tools and Techniques of Project Management, v6.1"
  • 8. Initiation  Occurs at the start of the project  Contains clear project goals and parameters  Often involves the customer  Your big chance to control scope Initiation will take place between 5am and midnight on Kickoff Day.
  • 9. Planning  This is the opportunity to modify:  Team structure  Tactics – Define “envelopes”  Schedule:  Chronological schedules  Cost schedules – when to buy?  Acceptable risks – Weigh your skills and your needs with your “wants”
  • 10. Early vs. Late Project Planning  Unexpected problems late in development kill projects  Time spent up front to understand the requirements, anal yze, and correctly design a solution saves big in the end
  • 11. Executing  Do what you planned.  Do only what you planned.  Feedback and repeat. Note: It is important to document activities during the execution phase.
  • 12. Monitoring and Controlling  Gather feedback via Design Review  Sort feedback  Make decisions regarding remaining resources  Manage schedule changes
  • 13. Closing  A project is closed when a successful Final Design Review is held between design, management and the customer.  This is a formal process in which you sell your product to the customer.  Which projects need to close?  Minor components vs. Entire robots  Who is your customer?
  • 14. Now it’s time to manage…  If you were looking for someone to spell it out for you; here’s your chance…
  • 15. First: Team Structure  Match people with their strengths  It may be helpful, particularly for rookie teams, to develop a skills matrix.  This will help identify training needs, or where you need to get more outside help (a trainer, or a hired gun?)  Develop an organization chart, matching team members to their responsibilities.
  • 16. Second: Plan the work…  Work Breakdown Structure (or WBS) = Everything you want to do on the project  Determine the form and function of every part, and what they all do for you (Functional Efficiency Technique)  Also any related work – fundraising, major events, support equipment  This ultimately becomes your project plan, as detailed as you choose to plan and schedule it.  Match with your team structure.
  • 17. Plan the work (cont.). . .  Estimate each item or system using a Resource Loading Diagram along with a Network Diagram:  How much time (work hours) do you think it will take?  How many people do you have? How much time do they have?  How many days/ hours will each item take?  Where are you short handed? Make sure you aren’t double booking people.
  • 18. Develop a Project Schedule  Make a simple project schedule, easy to read and status.  Stick to your plan  Monitor progress – fill in the bars, but not if they are not done.  Adjust on the fly – you may have to give up some goals, or shift more people to key tasks that are falling behind. Enlist more experts?  Keep everyone productive, but don’t forget this is all fun!  Communicate!
  • 19. Third: Execute - do some work
  • 20. Fourth: Design Reviews  Plan and schedule design reviews  Every day, if required, until design completion  Document (as specifically as possible) how subsystems will work together and connect as they are designed, built and integrated  Check your interfaces in the reviews – if there is change, it must be fully investigated, understood and agreed to
  • 21. Fifth: Risk Management  Also known as “what-ifs”  Leave a little time for disasters and unforeseen details  Testing is essential to reduce risk  Set goals for features or functions that would be “nice to have”  If there is insufficient time, the project will still be successful without them
  • 22. Risk Management (cont.)  FMEA (Failure Modes and Effects Analysis)  Consider system components  Identify symptoms of failure  Identify root cause  Predict consequences to other sub- systems  Rank failure modes by severity (1,2,3)  Rank failure modes by probability (1,2,3)  Example FMEA.
  • 23. References  MBA.com  PMI PMBOK Guide  Contact:  Chris Imondi, chris.m.imondi@boeing.com  Ejvin Berry, ejvin.m.berry@boeing.com