Table of Contents

• Introduction to Work Breakdown Structure

• 5 steps to define a project

• Process breakdown structure and Communication
  plan

• Key factors to remember

                      GGSB- Project Management    2
Work breakdown structure

• Importance of a clear structure
  – Cope with details
  – Stay focused
  – Satisfy stakeholders


• 5 steps guide provides a well structured guide


                    GGSB- Project Management       3
Step 1: Define the scope

• Brief but specific definition of result or mission

• Focuses on the project purpose throughout its life

• Agreement between costumer and project manager

• To plan and control performance

            The key stone of a project

                       GGSB- Project Management        4
Project Scope Checklist
                                         Overall goal
1/ Project objectives                    what, when, how much

2/ Deliverables                          Major expected outputs
                                         Natural and significant events
3/ Milestones                             time, cost, resources

4/ Technical requirements                To assure performance
5/ Limits and exclusion                  Avoid false expectations
                                         Understanding and agreement of
6/ Reviews with costumers                expectations

       Avoid scope creep : added costs or delays
                            GGSB- Project Management                      5
Step 2: Establishing priorities
• Primary job of the Project Manager




                  GGSB- Project Management   6
• Need to define priorities  priority matrix


                                              • Which criterions
                                                have to be:
                                                 – Constrained
                                                 – Enhanced
                                                 – Accepted


       Creates shared expectations
       Avoids misunderstanding
                   GGSB- Project Management                   7
• Variation of priorities
Microsoft / Event

• Which criteria can be compromised?

• Priorities may change


      Need for vigilance and anticipation

                    GGSB- Project Management   8
Step 3: Create the WBS

                       • Outline of the project
                         with different levels of
                         detail

                       • Evaluation of
                             – Cost
                             – Time
                             – Technical performance
         GGSB- Project Management                 9
• Work package
  – The basic unit of planning, scheduling and
    controlling
  – Maximum 10 days
  – Independent from other work packages
  – No more than 1 sub-deliverable


• Components
  What/ How long/ Cost/ How much/ Who / How well

                    GGSB- Project Management     10
WBS Example




                                                                 GGSB- Project Management   11
Reference: Gray and Larson, Project Management, Irwin/McGraw-Hill, 2000
Step 4: WBS in Organisations
• Result of linking the WBS with the
  organisational units (hereafter OU):

OBS (Organizational Breakdown Structure)

                   Framework to summarize OU work performance


  Purposes         Identify OU responsible for Work Packages

                   Tie the OUs to control cost accounts

                   GGSB- Project Management                    12
Example: Integration of WBS and OBS
          Level
                                                                           Personal computer
            1                                                                  prototype
                                                                                             1.0                                                                             More
                                   1.2                   1.3                      1.1                                                          1.4                           items
            2                Vendor,                 Mouse,                 Disk                                                   Microprocessor
                            software,               keyboard,             storage                                                       unit
                           applications               voice                units
                                                                                                                           1.4.1                                    1.4.2
                                   ~                    ~ 1.1.1                   1.1.2               1.1.3
            3
                                                        Floppy            Optical                  Hard              Internal                          BIOS (basic
                                                                                                                     memory                           input/output
                                                         ~                    ~                                        unit                              system)

                                                                                                                 1.4.1.1           1.4.1.2           1.4.2.1     1.4.2.2       1.4.2.3
            4
                                                                                                              ROM            RAM                I/O            File         Utilities
                                                                                                                 ~                 ~             ~              ~             ~
                         Lowest manageable                     1.1.3.1             1.1.3.2             1.1.3.3              1.1.3.4
            5              subdeliverables               Motor              Circuit                Chassis           Read/write
                                                                            board                   frame              head
                                                                                                                                              Cost account
                                                                              Cost                                    1.1.3.4.1
                                                                                                                                                number
                                          Design
                   Manufacturing                                            account
                                         Production                           Cost                   Cost
                                                                            account                account                                   Work packages
 Organization                                                                 Cost                                      Cost                 WP1.1.3.4.2.1
                                            Test
                                                                            account                                   account                WP1.1.3.4.2.2
                                                               Cost
                                         Purchasing                                                                                          WP1.1.3.4.2.3
                                                             account
                                                                                                                                                 Budget by
                                                                              Cost
                                         Software                                                                                                 period
                                                                            account

                                                                       GGSB- Project Management                                                                                   13
Reference: Gray and Larson, Project Management, Irwin/McGraw-Hill, 2000
Step 5: Coding WBS for IS

• Codes define levels and elements in
   – WBS
   – Work Packages
   – Budget/cost information




• Allows reports to be consolidated at any level in
  the organization structure

                         GGSB- Project Management     14
Example: Integration of WBS and OBS




          3R-237A-P2-33.61
          Facility Area Pipe 2” WP#

                 GGSB- Project Management   15
Process Breakdown Structure
 • PBS vs. WBS

                                  Process-oriented projects
       USE
                                   Intangible projects: phases


• Project organized around phases

                  GGSB- Project Management                 16
Communication Plan

• Project Communication Plan
  – WWWH the information will be transmeted

• 5 Steps
  –   Stakhoder analysis
  –   Information needs
  –   Sources of Information
  –   Disseminiation modes
  –   Responsibility and timing

                       GGSB- Project Management   17
Key factors to remember
• Scope definition                     focuses on end items
• Priorities (PM)                      trade-off decisions
• BS                                   project control



                       Key stones

• Use of WBS, PBS or RM depends on size and nature
• First step of planning / Major reason for failure

                     GGSB- Project Management                  18
Thank you

We would be delighted to answer any question.




                 GGSB- Project Management   19

Más contenido relacionado

La actualidad más candente

Introduction-to-project-management
Introduction-to-project-managementIntroduction-to-project-management
Introduction-to-project-management
Savaş Şakar
 
An Introduction To Project Management
An Introduction To Project ManagementAn Introduction To Project Management
An Introduction To Project Management
Ashish Mittal
 
Project Management PPT
Project Management PPTProject Management PPT
Project Management PPT
bletindia
 

La actualidad más candente (20)

Chap 6 Developing A Project Plan
Chap 6 Developing A Project PlanChap 6 Developing A Project Plan
Chap 6 Developing A Project Plan
 
Lecture 1. general introduction to project management
Lecture 1. general introduction to project management Lecture 1. general introduction to project management
Lecture 1. general introduction to project management
 
Project initiation
Project initiationProject initiation
Project initiation
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
The role and responsibilities of the project manager
The role and responsibilities of the project manager The role and responsibilities of the project manager
The role and responsibilities of the project manager
 
Introduction-to-project-management
Introduction-to-project-managementIntroduction-to-project-management
Introduction-to-project-management
 
An Introduction To Project Management
An Introduction To Project ManagementAn Introduction To Project Management
An Introduction To Project Management
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
 
Project planning and scheduling techniques
Project planning and scheduling techniquesProject planning and scheduling techniques
Project planning and scheduling techniques
 
project management concepts
project management conceptsproject management concepts
project management concepts
 
Project manager
Project managerProject manager
Project manager
 
Project management structures
Project management structuresProject management structures
Project management structures
 
Elements of Project Management
Elements of Project ManagementElements of Project Management
Elements of Project Management
 
The role of the project manager
The role of the project managerThe role of the project manager
The role of the project manager
 
Project Management
Project ManagementProject Management
Project Management
 
Project Management PPT
Project Management PPTProject Management PPT
Project Management PPT
 
Estimating Time & Costs
 Estimating Time & Costs Estimating Time & Costs
Estimating Time & Costs
 
Chap 2 Organization Strategy
Chap 2 Organization StrategyChap 2 Organization Strategy
Chap 2 Organization Strategy
 
Project Management vs. Program Management: Strategies for Transition Success
Project Management vs. Program Management: Strategies for Transition SuccessProject Management vs. Program Management: Strategies for Transition Success
Project Management vs. Program Management: Strategies for Transition Success
 
10. Project Quality Management
10. Project Quality Management 10. Project Quality Management
10. Project Quality Management
 

Similar a Project management: defining the project

Project mangement chp 1 12
Project mangement chp 1 12Project mangement chp 1 12
Project mangement chp 1 12
Dreams Design
 
Short Term Planning and Lean
Short Term Planning and LeanShort Term Planning and Lean
Short Term Planning and Lean
istarkov
 
Feature Prioritization Rmpdma Public
Feature Prioritization Rmpdma PublicFeature Prioritization Rmpdma Public
Feature Prioritization Rmpdma Public
Signarama Dtc
 
Newhouse capability modeling v2
Newhouse capability modeling v2Newhouse capability modeling v2
Newhouse capability modeling v2
NASAPMC
 
Chapter 2
Chapter 2Chapter 2
Chapter 2
Mr SMAK
 
Chapter 2 ASE
Chapter 2 ASEChapter 2 ASE
Chapter 2 ASE
Mr SMAK
 

Similar a Project management: defining the project (20)

NG BB 11 Power Steering
NG BB 11 Power SteeringNG BB 11 Power Steering
NG BB 11 Power Steering
 
NG BB 11 Power Steering
NG BB 11 Power SteeringNG BB 11 Power Steering
NG BB 11 Power Steering
 
Oracle R12 Upgrade Lessons Learned
Oracle R12 Upgrade Lessons LearnedOracle R12 Upgrade Lessons Learned
Oracle R12 Upgrade Lessons Learned
 
Lean at Yahoo in 2008
Lean at Yahoo in 2008Lean at Yahoo in 2008
Lean at Yahoo in 2008
 
Iss 05
Iss 05Iss 05
Iss 05
 
Rash
RashRash
Rash
 
Project mangement chp 1 12
Project mangement chp 1 12Project mangement chp 1 12
Project mangement chp 1 12
 
Sage Project Management
Sage Project Management Sage Project Management
Sage Project Management
 
P&msp2010 04 wbs-and-estimation
P&msp2010 04 wbs-and-estimationP&msp2010 04 wbs-and-estimation
P&msp2010 04 wbs-and-estimation
 
Short Term Planning and Lean
Short Term Planning and LeanShort Term Planning and Lean
Short Term Planning and Lean
 
Feature Prioritization Rmpdma Public
Feature Prioritization Rmpdma PublicFeature Prioritization Rmpdma Public
Feature Prioritization Rmpdma Public
 
Newhouse capability modeling v2
Newhouse capability modeling v2Newhouse capability modeling v2
Newhouse capability modeling v2
 
7 (+/- 2) Steps to Agility
7 (+/- 2) Steps to Agility7 (+/- 2) Steps to Agility
7 (+/- 2) Steps to Agility
 
Software proposal sample_project_1-_web_site_development_by_zx_7_of_november_...
Software proposal sample_project_1-_web_site_development_by_zx_7_of_november_...Software proposal sample_project_1-_web_site_development_by_zx_7_of_november_...
Software proposal sample_project_1-_web_site_development_by_zx_7_of_november_...
 
Rajesh Paleru
Rajesh PaleruRajesh Paleru
Rajesh Paleru
 
Agile Project Management in a Waterfall World: Managing Sprints with Predicti...
Agile Project Management in a Waterfall World: Managing Sprints with Predicti...Agile Project Management in a Waterfall World: Managing Sprints with Predicti...
Agile Project Management in a Waterfall World: Managing Sprints with Predicti...
 
Work Breakdown Structure
Work Breakdown StructureWork Breakdown Structure
Work Breakdown Structure
 
Chapter 2
Chapter 2Chapter 2
Chapter 2
 
Chapter 2 ASE
Chapter 2 ASEChapter 2 ASE
Chapter 2 ASE
 
Source control - what you need to know
Source control - what you need to knowSource control - what you need to know
Source control - what you need to know
 

Último

Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
amitlee9823
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Abortion pills in Kuwait Cytotec pills in Kuwait
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Dipal Arora
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
Matteo Carbone
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
lizamodels9
 

Último (20)

VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 

Project management: defining the project

  • 1. Project Management: Defining the project By O. Vadillo D. Dimitrov C. Klein F. Bourret GGSB- Project Management 1
  • 2. Table of Contents • Introduction to Work Breakdown Structure • 5 steps to define a project • Process breakdown structure and Communication plan • Key factors to remember GGSB- Project Management 2
  • 3. Work breakdown structure • Importance of a clear structure – Cope with details – Stay focused – Satisfy stakeholders • 5 steps guide provides a well structured guide GGSB- Project Management 3
  • 4. Step 1: Define the scope • Brief but specific definition of result or mission • Focuses on the project purpose throughout its life • Agreement between costumer and project manager • To plan and control performance  The key stone of a project GGSB- Project Management 4
  • 5. Project Scope Checklist Overall goal 1/ Project objectives what, when, how much 2/ Deliverables Major expected outputs Natural and significant events 3/ Milestones  time, cost, resources 4/ Technical requirements To assure performance 5/ Limits and exclusion Avoid false expectations Understanding and agreement of 6/ Reviews with costumers expectations  Avoid scope creep : added costs or delays GGSB- Project Management 5
  • 6. Step 2: Establishing priorities • Primary job of the Project Manager GGSB- Project Management 6
  • 7. • Need to define priorities  priority matrix • Which criterions have to be: – Constrained – Enhanced – Accepted Creates shared expectations Avoids misunderstanding GGSB- Project Management 7
  • 8. • Variation of priorities Microsoft / Event • Which criteria can be compromised? • Priorities may change Need for vigilance and anticipation GGSB- Project Management 8
  • 9. Step 3: Create the WBS • Outline of the project with different levels of detail • Evaluation of – Cost – Time – Technical performance GGSB- Project Management 9
  • 10. • Work package – The basic unit of planning, scheduling and controlling – Maximum 10 days – Independent from other work packages – No more than 1 sub-deliverable • Components What/ How long/ Cost/ How much/ Who / How well GGSB- Project Management 10
  • 11. WBS Example GGSB- Project Management 11 Reference: Gray and Larson, Project Management, Irwin/McGraw-Hill, 2000
  • 12. Step 4: WBS in Organisations • Result of linking the WBS with the organisational units (hereafter OU): OBS (Organizational Breakdown Structure) Framework to summarize OU work performance Purposes Identify OU responsible for Work Packages Tie the OUs to control cost accounts GGSB- Project Management 12
  • 13. Example: Integration of WBS and OBS Level Personal computer 1 prototype 1.0 More 1.2 1.3 1.1 1.4 items 2 Vendor, Mouse, Disk Microprocessor software, keyboard, storage unit applications voice units 1.4.1 1.4.2 ~ ~ 1.1.1 1.1.2 1.1.3 3 Floppy Optical Hard Internal BIOS (basic memory input/output ~ ~ unit system) 1.4.1.1 1.4.1.2 1.4.2.1 1.4.2.2 1.4.2.3 4 ROM RAM I/O File Utilities ~ ~ ~ ~ ~ Lowest manageable 1.1.3.1 1.1.3.2 1.1.3.3 1.1.3.4 5 subdeliverables Motor Circuit Chassis Read/write board frame head Cost account Cost 1.1.3.4.1 number Design Manufacturing account Production Cost Cost account account Work packages Organization Cost Cost WP1.1.3.4.2.1 Test account account WP1.1.3.4.2.2 Cost Purchasing WP1.1.3.4.2.3 account Budget by Cost Software period account GGSB- Project Management 13 Reference: Gray and Larson, Project Management, Irwin/McGraw-Hill, 2000
  • 14. Step 5: Coding WBS for IS • Codes define levels and elements in – WBS – Work Packages – Budget/cost information • Allows reports to be consolidated at any level in the organization structure GGSB- Project Management 14
  • 15. Example: Integration of WBS and OBS 3R-237A-P2-33.61 Facility Area Pipe 2” WP# GGSB- Project Management 15
  • 16. Process Breakdown Structure • PBS vs. WBS Process-oriented projects USE Intangible projects: phases • Project organized around phases GGSB- Project Management 16
  • 17. Communication Plan • Project Communication Plan – WWWH the information will be transmeted • 5 Steps – Stakhoder analysis – Information needs – Sources of Information – Disseminiation modes – Responsibility and timing GGSB- Project Management 17
  • 18. Key factors to remember • Scope definition  focuses on end items • Priorities (PM)  trade-off decisions • BS  project control Key stones • Use of WBS, PBS or RM depends on size and nature • First step of planning / Major reason for failure GGSB- Project Management 18