SlideShare una empresa de Scribd logo
1 de 45
Descargar para leer sin conexión
Managing Light Rail …
at Light Speed!
Wendy Kaszycki, CCM PE
Director of Project Management
Exposition Metro Line Construction Authority
Overview
• Setting the Context
• Previous Process
• Document Upload Interface
• Results in Contract Management
• Results in SharePoint
• Conclusions
2
SETTING THE CONTEXT
3
Photos courtesy of EMLCA
About Expo
• Exposition Metro Line Construction Authority
• Created in 2003 by SB 504
• Design and build Expo Light Rail
• Rail will be operated by Metro
LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY
4
Expo LRT Project
Connecting the Beach to downtown LA!
5
PHASE 1
PHASE 2
Project Stats
Phase 1 Phase 2
STATIONS 12 7
DAILY RIDERSHIP 27,000 64,000
COST $930 million $1.5 billion
OPENING DATE 2012 2015
6
Phase 1 Process
• Paper
– EMAIL PDF’S OR CD’S TO DOCUMENT CONTROL
• Excel Logs
– INCOMING
– OUTGOING
• Routing Sheets
– LEAD IDENTIFIES DISTRIBUTION
– DOCUMENTS DISTRIBUTED TO SELECTED USERS
• Databases
– ACCESS FOR COST PROPOSALS AND CHANGE ORDERS
– METRO DATABASE FOR RFIS AND SUBMITTALS
7
Phase 2 Project Controls
• Contract Management (PCM)
– CONTRACT DOCUMENTS
– BUDGETING AND FORECASTING
• SharePoint
– DOCUMENT STORAGE/FILES
– LINKS TO PCM
• FIS
– METRO’S FINANCIAL SYSTEM
– CAPTURES ACTUAL EXPENDITURES
• P6
– SCHEDULING
8
Customized Components
• Web Interface
– ALLOWS COLLABORATION
– CONTRACTORS UPLOAD TO PCM AND SHAREPOINT
• SharePoint “smart folders”
– CUSTOMIZED AUTO-ROUTING
• “Actual Cost Mapping”
– REPORTS BUDGET, COMMITMENTS & ACTUALS TOGETHER
• EAC Upload/Export
– ALLOWS WAREHOUSING OF ESTIMATE AT COMPLETIONS
– FACILITATES REPORTING AND COMPARISONS
9
DOCUMENT UPLOAD INTERFACE
10
Photos courtesy of EMLCA
Web-Based DUI
• Mandatory
– MAJOR CONTRACTORS UPLOAD
• Parameters for Upload
– CONTRACT
– DOCUMENT TYPE
• Features
– CHANGE DOCUMENTS LINKED TO RELATED DOCUMENTS
– SUBMITTALS LINK TO UPLOADED SUBMITTAL LOG
11
Defining the DUI
12
1
• Reviewed Contracts
• Developed Process Flow
• Define Document Types, Screens, Modules
2
• Provided Mapping Specs for Data
• Default basic information (contract, to/from)
• Defined numbering convention for documents
3
• Wrote “hover over” Tool Tips
RFI Process Flow
13
2-Page Process flow for RFI Process
CO Process Flow
14
2-Page Process flow for Change Process
Sample Mapping Spec
15
Screen content maps to PCM data fields
DUI – What Users See
• User PCM Access and
Security determine
– PROJECT LIST
– DOCUMENT TYPES
16
DUI – RFI’s
• Add New RFI
• Revise RFI
– SELECT FROM PREVIOUSLY ONE
• Design-Bid-Build Projects
– A/E PROPOSED SOLUTIONS
17
DUI – New RFI’s
• Features
– DEFAULT TO/FROM
– TOOL TIPS
– CAPTURES CONTRACTOR’S
DOC #
• Completeness Check
– REQUIRED FIELDS
HIGHLIGHTED IF BLANK
WHEN “SUBMIT”
• Attachments
– REQUIRED FOR ALL DOCS
18
Sample Tool Tips Spec
19
Minimal Training due to Tool Tips for all fields
DUI –Proposals
• Proposals link to related documents
DUI – Other Correspondence
• Other Correspondence
– MAPS TO CORRESPONDENCE REC’D
• Document Type
– CUSTOM FIELD
– DYNAMIC DROPDOWN TO
DICTIONARY IN PCM
– SEPARATE SHAREPOINT FOLDERS BY
DOCUMENT TYPE
21
Upon Submitting Document
• Content Integrity
– ERRORS IF NOT ACCEPTABLE TO BOTH PCM AND SHAREPOINT
• Capacity
– ACCEPTS MULTIPLE ATTACHMENTS
– UP TO 100 MB TOTAL
• Automates Some Document Control Functions
– LOGS APPROPRIATE INFO IN PCM; CLOSES RELATED DOCUMENT
– USES PCM “VERSIONS”
– FILES IN SHAREPOINT FOLDER
22
1. Sends receipt email to user
2. cc: to Expo gmail account (by project)
ALSO IMPORTED TO PCM CORRESPONDENCE RECEIVED
Auto-Distribution
23
1: SAMPLE EMAIL TO USER
2: SAMPLES TO EXPO GMAIL AND PCM
RESULTS IN PCM
24
Photos courtesy of EMLCA
PCM - Proposals
Links Attachment to SharePoint
Logs
Contractor’s
Doc #
Creates
CM Doc
PCM - PROPOSALS
Creates Version
PCM – PROPOSALS
• PCM logs
– Contain DUI assigned & Contractor’s document
numbers
– Can be exported to Excel and sorted
PCM – PROPOSALS
Change Management
Writes
Referenced
Document Info
Uploads Contract
Number to
Custom Field
Assigns CM Doc # with
prefix for Contractor
PCM – PROPOSALS
Change Management
Sort by Change
Management
Number
Custom Contract Number
– Written by DUI
– Used in layouts
PCM – PROPOSALS
Related RFI
Change Management Number written
to related document
RESULTS IN SHAREPOINT
31
Photos courtesy of EMLCA
SharePoint - Upload
• Document Properties
• Date and Time stamped
• “Versions” if same
document file is
uploaded to same
SharePoint folder
SharePoint – File Structure
• Elements
– PHASE
– PROJECT
– CONTRACT
– DOCUMENT DIRECTION
– DOCUMENT TYPE
– SPEC SECTION (RFI’S & SUBMITTALS)
SharePoint – Folder Properties
• Customized Solution
– AUTO-ROUTING BY
DOCUMENT TYPE
• Defined Parameters
– INCOMING VS. OUTGOING:
• Info used in email
message
Incoming Message
• Identifies Lead and other Reviewers
• Indicates Due Dates
• Links directly to Document in SharePoint
35
Outgoing Message
• Emails to Contractor
• cc’s to Expo Staff
• Links directly to Document in SharePoint
36
System Coding
• Long-term relationship with Partners Consulting
• Previous Projects
– INTEGRATED EXPEDITION WITH JDE’S AND AN IN-HOUSE
FINANCIAL SYSTEM
– CONVERTED EXPEDITION 8.5 TO PCM12
– AUTOMATED P5/P6 BASELINING
• Proven Record of Success
37
Integration Methodology
• Needs analysis based on experience and best practices
• Develop integrations
• Rollout & refine
38
CONCLUSIONS
39
Photos courtesy of EMLCA
Challenges
• Diverse Users/Computers
– DIFFERENT WEB BROWSERS
– OUTSIDE USERS OWN IT CONSTRAINTS/LIMITATIONS
• Large Files
– ESPECIALLY DRAWING SUBMITTALS
• User Reluctance
– LOG IN TO GET DOCUMENTS VS PDF ATTACHMENTS
40
W I I F M
41
W I I F M
What’s In It For Me
42
WIIFM
• Streamlined Processes
– PAPERLESS COMMUNICATIONS
– MINIMIZES USER ENTRY & ELIMINATES USER ERROR
– REDUCES DUPLICATION (SINGLE POINT OF DATA ENTRY)
• User Access to Documents from Any Location
• Project Performance
– QUICKER RESPONSE AND BETTER COMMUNICATION
– BETTER DOCUMENTATION FOR CLAIMS AVOIDANCE
– EFFICIENT MANAGEMENT OF RESOURCES
– CREDIBLE REPORTING
• Proactive vs. Reactive Problem Resolution
– TEAM FREE TO ANALYZE, CONTROL AND CORRECT
43
Keys to Success
44
• Prior use of Expedition/PCM
• Extensive definition of policies
and processes
• Specifications & Documentation
• Testing, Testing, Testing
• Dedicated Resources to
Integration Team
• Operations Team Participation
QUESTIONS?
45
Photos courtesy of EMLCA

Más contenido relacionado

Similar a Managing light rail at light speed ppt

9 ASUG82967 - Successful implementation of SAP Product Lifecycle Management a...
9 ASUG82967 - Successful implementation of SAP Product Lifecycle Management a...9 ASUG82967 - Successful implementation of SAP Product Lifecycle Management a...
9 ASUG82967 - Successful implementation of SAP Product Lifecycle Management a...
ghaeltailyn
 
Program management at an electric utility
Program management at an electric utilityProgram management at an electric utility
Program management at an electric utility
p6academy
 
New Tech for Project Managers
New Tech for Project ManagersNew Tech for Project Managers
New Tech for Project Managers
Pratip Mallik
 

Similar a Managing light rail at light speed ppt (20)

Epc presentation robert foxpresentation
Epc presentation robert foxpresentationEpc presentation robert foxpresentation
Epc presentation robert foxpresentation
 
Gilreath diving into the details apwa_presentation_final
Gilreath diving into the details apwa_presentation_finalGilreath diving into the details apwa_presentation_final
Gilreath diving into the details apwa_presentation_final
 
9 ASUG82967 - Successful implementation of SAP Product Lifecycle Management a...
9 ASUG82967 - Successful implementation of SAP Product Lifecycle Management a...9 ASUG82967 - Successful implementation of SAP Product Lifecycle Management a...
9 ASUG82967 - Successful implementation of SAP Product Lifecycle Management a...
 
A machine learning and data science pipeline for real companies
A machine learning and data science pipeline for real companiesA machine learning and data science pipeline for real companies
A machine learning and data science pipeline for real companies
 
Software Project Management Presentation Final
Software Project Management Presentation FinalSoftware Project Management Presentation Final
Software Project Management Presentation Final
 
Epm demonstration projerct online and project server 2013
Epm demonstration projerct online and project server 2013Epm demonstration projerct online and project server 2013
Epm demonstration projerct online and project server 2013
 
Program management at an electric utility
Program management at an electric utilityProgram management at an electric utility
Program management at an electric utility
 
Cloud Readiness 101: Analyzing and Visualizing Your IT Infrastructure
Cloud Readiness 101: Analyzing and Visualizing Your IT InfrastructureCloud Readiness 101: Analyzing and Visualizing Your IT Infrastructure
Cloud Readiness 101: Analyzing and Visualizing Your IT Infrastructure
 
New Tech for Project Managers
New Tech for Project ManagersNew Tech for Project Managers
New Tech for Project Managers
 
Sept 2017 network design
Sept 2017   network designSept 2017   network design
Sept 2017 network design
 
Project Controls Expo, 13th Nov 2013 - "Loading Cost and Activity data into P...
Project Controls Expo, 13th Nov 2013 - "Loading Cost and Activity data into P...Project Controls Expo, 13th Nov 2013 - "Loading Cost and Activity data into P...
Project Controls Expo, 13th Nov 2013 - "Loading Cost and Activity data into P...
 
3 Ways That Data Helps Reduce Review Cycles - Webinar, May 2016
3 Ways That Data Helps Reduce Review Cycles - Webinar, May 20163 Ways That Data Helps Reduce Review Cycles - Webinar, May 2016
3 Ways That Data Helps Reduce Review Cycles - Webinar, May 2016
 
data Artisans Product Announcement
data Artisans Product Announcementdata Artisans Product Announcement
data Artisans Product Announcement
 
UPDM & APR Implementation for Gas Transmission
UPDM & APR Implementation for Gas TransmissionUPDM & APR Implementation for Gas Transmission
UPDM & APR Implementation for Gas Transmission
 
Webinar: Leveraging New Technologies with Migration
Webinar: Leveraging New Technologies with MigrationWebinar: Leveraging New Technologies with Migration
Webinar: Leveraging New Technologies with Migration
 
205260 managing light rail projects with a lightweight team
205260 managing light rail projects with a lightweight team205260 managing light rail projects with a lightweight team
205260 managing light rail projects with a lightweight team
 
2014 CUTC Summer Meeting: Lisa Loyo
2014 CUTC Summer Meeting: Lisa Loyo2014 CUTC Summer Meeting: Lisa Loyo
2014 CUTC Summer Meeting: Lisa Loyo
 
SharePoint Saturday Louisville 2012
SharePoint Saturday Louisville 2012SharePoint Saturday Louisville 2012
SharePoint Saturday Louisville 2012
 
Spm lecture-3
Spm lecture-3Spm lecture-3
Spm lecture-3
 
Lect3
Lect3Lect3
Lect3
 

Más de p6academy

20160405 How to Install Primavera P6 16.1 Professional desktop
20160405 How to Install Primavera P6 16.1 Professional desktop20160405 How to Install Primavera P6 16.1 Professional desktop
20160405 How to Install Primavera P6 16.1 Professional desktop
p6academy
 

Más de p6academy (20)

Oracle OpenWorld 2015
Oracle OpenWorld 2015Oracle OpenWorld 2015
Oracle OpenWorld 2015
 
Plan and Execute the Right Projects— Easily and Affordably
Plan and Execute the Right Projects—  Easily and AffordablyPlan and Execute the Right Projects—  Easily and Affordably
Plan and Execute the Right Projects— Easily and Affordably
 
What's New In Primavera P6 EPPM 17.1
What's New In Primavera P6 EPPM 17.1What's New In Primavera P6 EPPM 17.1
What's New In Primavera P6 EPPM 17.1
 
Oracle Primavera Unifier What's New in Release 16.2
Oracle Primavera Unifier What's New in Release 16.2Oracle Primavera Unifier What's New in Release 16.2
Oracle Primavera Unifier What's New in Release 16.2
 
Oracle What's New In Primavera P6 16.2
Oracle What's New In Primavera P6 16.2Oracle What's New In Primavera P6 16.2
Oracle What's New In Primavera P6 16.2
 
What's New in Primavera Prime 16.1
What's New in Primavera Prime 16.1What's New in Primavera Prime 16.1
What's New in Primavera Prime 16.1
 
What's New in Primavera Gateway 16.1
What's New in Primavera Gateway 16.1What's New in Primavera Gateway 16.1
What's New in Primavera Gateway 16.1
 
What's New In Primavera Analytics 16.1
What's New In Primavera Analytics 16.1What's New In Primavera Analytics 16.1
What's New In Primavera Analytics 16.1
 
What's New in Unifier 16.1
What's New in Unifier 16.1What's New in Unifier 16.1
What's New in Unifier 16.1
 
20160405 How to Install Primavera P6 16.1 Professional desktop
20160405 How to Install Primavera P6 16.1 Professional desktop20160405 How to Install Primavera P6 16.1 Professional desktop
20160405 How to Install Primavera P6 16.1 Professional desktop
 
Oracle Primavera P6 16.1 Announced
Oracle Primavera P6 16.1 AnnouncedOracle Primavera P6 16.1 Announced
Oracle Primavera P6 16.1 Announced
 
Oracle Primavera Unifier 16.1
Oracle Primavera Unifier 16.1Oracle Primavera Unifier 16.1
Oracle Primavera Unifier 16.1
 
P6 Release 8 Application Considerations Overview
P6 Release 8 Application Considerations OverviewP6 Release 8 Application Considerations Overview
P6 Release 8 Application Considerations Overview
 
Administering Users, Access and Views in P6 EPPM (Web) Release 8 and later
Administering Users, Access and Views in P6 EPPM  (Web) Release 8 and laterAdministering Users, Access and Views in P6 EPPM  (Web) Release 8 and later
Administering Users, Access and Views in P6 EPPM (Web) Release 8 and later
 
P6 Release 8 Installation Orientation
P6 Release 8 Installation OrientationP6 Release 8 Installation Orientation
P6 Release 8 Installation Orientation
 
Oracle Primavera P6 R8 Release Value Proposition
Oracle Primavera P6 R8 Release Value PropositionOracle Primavera P6 R8 Release Value Proposition
Oracle Primavera P6 R8 Release Value Proposition
 
Oracle Primavera P6 v7 Release Value Proposition
Oracle Primavera P6 v7 Release Value Proposition Oracle Primavera P6 v7 Release Value Proposition
Oracle Primavera P6 v7 Release Value Proposition
 
Oracle Primavera P6 Release Content Document (RCD)
Oracle Primavera P6 Release Content Document (RCD)Oracle Primavera P6 Release Content Document (RCD)
Oracle Primavera P6 Release Content Document (RCD)
 
Oracle Support Accreditation – Level 1 Study Guide
Oracle Support Accreditation – Level 1 Study GuideOracle Support Accreditation – Level 1 Study Guide
Oracle Support Accreditation – Level 1 Study Guide
 
Oracle Primavera Support Accreditation Study Guide
Oracle Primavera Support Accreditation Study GuideOracle Primavera Support Accreditation Study Guide
Oracle Primavera Support Accreditation Study Guide
 

Managing light rail at light speed ppt

  • 1. Managing Light Rail … at Light Speed! Wendy Kaszycki, CCM PE Director of Project Management Exposition Metro Line Construction Authority
  • 2. Overview • Setting the Context • Previous Process • Document Upload Interface • Results in Contract Management • Results in SharePoint • Conclusions 2
  • 3. SETTING THE CONTEXT 3 Photos courtesy of EMLCA
  • 4. About Expo • Exposition Metro Line Construction Authority • Created in 2003 by SB 504 • Design and build Expo Light Rail • Rail will be operated by Metro LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY 4
  • 5. Expo LRT Project Connecting the Beach to downtown LA! 5 PHASE 1 PHASE 2
  • 6. Project Stats Phase 1 Phase 2 STATIONS 12 7 DAILY RIDERSHIP 27,000 64,000 COST $930 million $1.5 billion OPENING DATE 2012 2015 6
  • 7. Phase 1 Process • Paper – EMAIL PDF’S OR CD’S TO DOCUMENT CONTROL • Excel Logs – INCOMING – OUTGOING • Routing Sheets – LEAD IDENTIFIES DISTRIBUTION – DOCUMENTS DISTRIBUTED TO SELECTED USERS • Databases – ACCESS FOR COST PROPOSALS AND CHANGE ORDERS – METRO DATABASE FOR RFIS AND SUBMITTALS 7
  • 8. Phase 2 Project Controls • Contract Management (PCM) – CONTRACT DOCUMENTS – BUDGETING AND FORECASTING • SharePoint – DOCUMENT STORAGE/FILES – LINKS TO PCM • FIS – METRO’S FINANCIAL SYSTEM – CAPTURES ACTUAL EXPENDITURES • P6 – SCHEDULING 8
  • 9. Customized Components • Web Interface – ALLOWS COLLABORATION – CONTRACTORS UPLOAD TO PCM AND SHAREPOINT • SharePoint “smart folders” – CUSTOMIZED AUTO-ROUTING • “Actual Cost Mapping” – REPORTS BUDGET, COMMITMENTS & ACTUALS TOGETHER • EAC Upload/Export – ALLOWS WAREHOUSING OF ESTIMATE AT COMPLETIONS – FACILITATES REPORTING AND COMPARISONS 9
  • 11. Web-Based DUI • Mandatory – MAJOR CONTRACTORS UPLOAD • Parameters for Upload – CONTRACT – DOCUMENT TYPE • Features – CHANGE DOCUMENTS LINKED TO RELATED DOCUMENTS – SUBMITTALS LINK TO UPLOADED SUBMITTAL LOG 11
  • 12. Defining the DUI 12 1 • Reviewed Contracts • Developed Process Flow • Define Document Types, Screens, Modules 2 • Provided Mapping Specs for Data • Default basic information (contract, to/from) • Defined numbering convention for documents 3 • Wrote “hover over” Tool Tips
  • 13. RFI Process Flow 13 2-Page Process flow for RFI Process
  • 14. CO Process Flow 14 2-Page Process flow for Change Process
  • 15. Sample Mapping Spec 15 Screen content maps to PCM data fields
  • 16. DUI – What Users See • User PCM Access and Security determine – PROJECT LIST – DOCUMENT TYPES 16
  • 17. DUI – RFI’s • Add New RFI • Revise RFI – SELECT FROM PREVIOUSLY ONE • Design-Bid-Build Projects – A/E PROPOSED SOLUTIONS 17
  • 18. DUI – New RFI’s • Features – DEFAULT TO/FROM – TOOL TIPS – CAPTURES CONTRACTOR’S DOC # • Completeness Check – REQUIRED FIELDS HIGHLIGHTED IF BLANK WHEN “SUBMIT” • Attachments – REQUIRED FOR ALL DOCS 18
  • 19. Sample Tool Tips Spec 19 Minimal Training due to Tool Tips for all fields
  • 20. DUI –Proposals • Proposals link to related documents
  • 21. DUI – Other Correspondence • Other Correspondence – MAPS TO CORRESPONDENCE REC’D • Document Type – CUSTOM FIELD – DYNAMIC DROPDOWN TO DICTIONARY IN PCM – SEPARATE SHAREPOINT FOLDERS BY DOCUMENT TYPE 21
  • 22. Upon Submitting Document • Content Integrity – ERRORS IF NOT ACCEPTABLE TO BOTH PCM AND SHAREPOINT • Capacity – ACCEPTS MULTIPLE ATTACHMENTS – UP TO 100 MB TOTAL • Automates Some Document Control Functions – LOGS APPROPRIATE INFO IN PCM; CLOSES RELATED DOCUMENT – USES PCM “VERSIONS” – FILES IN SHAREPOINT FOLDER 22
  • 23. 1. Sends receipt email to user 2. cc: to Expo gmail account (by project) ALSO IMPORTED TO PCM CORRESPONDENCE RECEIVED Auto-Distribution 23 1: SAMPLE EMAIL TO USER 2: SAMPLES TO EXPO GMAIL AND PCM
  • 24. RESULTS IN PCM 24 Photos courtesy of EMLCA
  • 25. PCM - Proposals Links Attachment to SharePoint Logs Contractor’s Doc # Creates CM Doc
  • 27. PCM – PROPOSALS • PCM logs – Contain DUI assigned & Contractor’s document numbers – Can be exported to Excel and sorted
  • 28. PCM – PROPOSALS Change Management Writes Referenced Document Info Uploads Contract Number to Custom Field Assigns CM Doc # with prefix for Contractor
  • 29. PCM – PROPOSALS Change Management Sort by Change Management Number Custom Contract Number – Written by DUI – Used in layouts
  • 30. PCM – PROPOSALS Related RFI Change Management Number written to related document
  • 31. RESULTS IN SHAREPOINT 31 Photos courtesy of EMLCA
  • 32. SharePoint - Upload • Document Properties • Date and Time stamped • “Versions” if same document file is uploaded to same SharePoint folder
  • 33. SharePoint – File Structure • Elements – PHASE – PROJECT – CONTRACT – DOCUMENT DIRECTION – DOCUMENT TYPE – SPEC SECTION (RFI’S & SUBMITTALS)
  • 34. SharePoint – Folder Properties • Customized Solution – AUTO-ROUTING BY DOCUMENT TYPE • Defined Parameters – INCOMING VS. OUTGOING: • Info used in email message
  • 35. Incoming Message • Identifies Lead and other Reviewers • Indicates Due Dates • Links directly to Document in SharePoint 35
  • 36. Outgoing Message • Emails to Contractor • cc’s to Expo Staff • Links directly to Document in SharePoint 36
  • 37. System Coding • Long-term relationship with Partners Consulting • Previous Projects – INTEGRATED EXPEDITION WITH JDE’S AND AN IN-HOUSE FINANCIAL SYSTEM – CONVERTED EXPEDITION 8.5 TO PCM12 – AUTOMATED P5/P6 BASELINING • Proven Record of Success 37
  • 38. Integration Methodology • Needs analysis based on experience and best practices • Develop integrations • Rollout & refine 38
  • 40. Challenges • Diverse Users/Computers – DIFFERENT WEB BROWSERS – OUTSIDE USERS OWN IT CONSTRAINTS/LIMITATIONS • Large Files – ESPECIALLY DRAWING SUBMITTALS • User Reluctance – LOG IN TO GET DOCUMENTS VS PDF ATTACHMENTS 40
  • 41. W I I F M 41
  • 42. W I I F M What’s In It For Me 42
  • 43. WIIFM • Streamlined Processes – PAPERLESS COMMUNICATIONS – MINIMIZES USER ENTRY & ELIMINATES USER ERROR – REDUCES DUPLICATION (SINGLE POINT OF DATA ENTRY) • User Access to Documents from Any Location • Project Performance – QUICKER RESPONSE AND BETTER COMMUNICATION – BETTER DOCUMENTATION FOR CLAIMS AVOIDANCE – EFFICIENT MANAGEMENT OF RESOURCES – CREDIBLE REPORTING • Proactive vs. Reactive Problem Resolution – TEAM FREE TO ANALYZE, CONTROL AND CORRECT 43
  • 44. Keys to Success 44 • Prior use of Expedition/PCM • Extensive definition of policies and processes • Specifications & Documentation • Testing, Testing, Testing • Dedicated Resources to Integration Team • Operations Team Participation