THE UNIQUE ROLE OF WIND TURBINE STEP-UP (WTSU)
TRANSFORMERS
Introduction:
Harnessing wind energy to perform work is not a new concept.

Since the earliest of times, wind power has been captured with sails to allow traders,
merchants and explorers to ply their trades and discover the world around them.

On land, windmills have been used for irrigation, grinding grains, and performing crude
manufacturing for centuries. Even the generation of electricity from wind power is not a
new idea. What is new, however, is the scale at which this renewable energy source is
being used today.

Early wind generation served a local need, often supplying power for isolated
equipment. Today, wind energy represents nearly 5% of the US electrical generation
and is targeted to reach 20% in the foreseeable future.

For this to happen, wind turbine outputs need to be gathered, stepped-up to
transmission levels and passed across the nation’s interconnected power grid to the end
users. The role of the Wind Turbine Step-Up (WTSU) transformer in this process is
critical and, as such, its design needs to be carefully and thoughtfully analyzed and
reevaluated in our view.

Historically this WTSU transformer function has been handled by conventional, “off the
shelf” distribution transformers, but the relatively large numbers of recent failures
would strongly suggest that WTSU transformer designs need to be made substantially
more robust. WTSU transformers are neither conventional “off the shelf” distribution
transformers nor are they conventional “off the shelf” power generator step-up
transformers. WTSU transformers fall somewhere in between and as such, we believe,
require a unique design standard.

Although off-shore wind farms using dry-type transformers are beginning to grow in
popularity, for this discussion we will look only at liquid-filled transformers that are
normally associated with inland wind farm sites.

Transformer Loading:
Wind turbine output voltages typically range from 480 volts to 690 volts. This turbine
output is then delivered to the WTSU transformers and transformed to a collector
voltage of 13,800 to 46,000 volts. The turbines are highly dependant upon local
climatic conditions; and this dependency can result in yearly average load factor as low
as 35%. Both conventional distribution transformers and power generator step-up
transformers are typically subjected to more constant loading at, or slightly above, their
theoretical maximum rating. This high level of loading stresses insulation thermally and
leads to reduced insulation life. On the other hand, the relatively light loading of WTSU
transformer has a favorable effect on insulation life but introduces two unique and



Pacific Crest Transformers                                                                   2
300 West Antelope Road – Medford, Oregon 97503
Tel : (541) 826 – 2113 Fax : (541) 826 - 8847
functionally significant problems with which other types of conventional transformers do
not have to deal.

The first problem is that, when lightly loaded or idle, the core losses become a more
significant economic factor while the coil or winding losses become less significant and
de-emphasized. Typically used price evaluation formulae do not apply to this scenario.
NEMA TP1 and DOE efficiencies are not modeled for the operational scenario where
average loading is near 30-35% and, consequently, should be cautiously applied when
calculating the total cost of ownership for WTSU transformers

The second problem is that the WTSU transformer goes into thermal cycling as a
function of these varying loads. This causes repeated thermal stress on the winding,
clamping structure, seals and gaskets. Repeated thermal cycling causes nitrogen gas to
be absorbed into the hot oil and then released as the oil cools, forming bubbles within
the oil which can migrate into the insulation and windings to create hot spots and
partial discharges which can damage insulation. The thermal cycling can also cause
accelerated aging of internal and external electrical connections.

These cumulative effects put the WTSU transformer at a higher risk of insulation and
dielectric failure than either the typical “off the shelf” distribution transformer or the
power generator step-up transformer experiences.

Harmonics and Non-Sinusoidal loads:
Another unique aspect of WTSU transformers is the fact that they are switched in the
line with solid state controls to limit the inrush currents. This differs widely from the
typical step-up transformer which must be designed to withstand high magnetizing
inrush currents which cause core saturation, and in the extreme Ferroresonance.

While potentially aiding in the initial energization, these same electronic controls
contribute damaging harmonic voltage frequencies that, when coupled with the non-
sinusoidal wave forms from the wind turbines, cannot be ignored from a heating point
of view. Conventional distribution transformers do not typically see non-linear loads
that require preventative steps due to harmonic loading. When a rectifier/chopper
system is used, the WTSU transformer must be designed for harmonics similar to
rectifier transformers, taking the additional loading into consideration as well as
providing electrostatic shields to prevent the transfer of harmonic frequencies between
the primary and secondary windings, quite dissimilar to conventional distribution
transformers.

Transformer sizing and voltage variation:
WTSU transformers are designed such that the voltage is matched to the generator
(e.g. wind turbine) output voltage exactly. There is no “designed in” over-voltage
capacity to overcome voltage fluctuations, as is typically done on distribution and
power transformer designs which allow for up to 10% over-voltage. Further, it should


Pacific Crest Transformers                                                                   3
300 West Antelope Road – Medford, Oregon 97503
Tel : (541) 826 – 2113 Fax : (541) 826 - 8847
be noted that the generator output current is monitored at millisecond intervals and the
generator limited to allow up to 5% over-current for 10 seconds before it is taken off
the system. Therefore, the WTSU transformer size ( kVA or MVA) is designed to match
the generator output with no overload sizing. Since overload sizing is a common
protective practice with “off the shelf” distribution or power step-up generator
transformers, the WTSU transformer design must be uniquely robust to function
without it.


Requirement to withstand Fault Currents:
Typically, conventional distribution transformers, power transformers, and other types
of step-up transformers will “drop out” when subjected to an under-voltage or over-
current situation caused by a fault. Once the fault has cleared, the distribution
transformer is brought back on-line either individually or with it’s local feeder in
conjunction with automatic reclosures. Wind turbine generators, on the other hand, in
order to maintain network stability are only allowed to disconnect from the system due
to network disturbances within certain, carefully controlled network guidelines
developed for generating plants. Depending upon the specific network regulations, the
length of time the generator is required to stay on line can vary. During this time the
generator will continue to deliver an abnormally low voltage to the WTSU transformer.
Therefore, during near-to generator faults, the generator may be required to carry as
low as 15% rated voltage for a few cycles and then ramp back up to full volts a few
seconds after fault clearing. This means that the WTSU transformer must be uniquely
designed with enough “ruggedness” to withstand full short circuit current during the
initial few cycles when the maximum mechanical forces are exerted upon the WTSU
transformer windings.

Since wind turbines must stay connected during disturbances in the network, the WTSU
transformers must be designed to withstand the full mechanical effects of short circuits.

Conclusions:
The role of WTSU transformers in today’s wind generation scheme is unique; it’s design
must be equally unique and robust. The combination of wide variations in loading;
harmonic loads from associated control electronics and generators; sizing without
protection for over-voltages, under-voltages or over-loading; and the requirement to
“ride through” transient events and faults sets the WTSU apart from it’s more
conventional, “off the shelf” counterparts. It is neither a conventional distribution
transformer nor is it a conventional generator step-up transformer.

“Off the shelf” . . . doesn’t belong . . . “down on the farm”!




Pacific Crest Transformers                                                                  4
300 West Antelope Road – Medford, Oregon 97503
Tel : (541) 826 – 2113 Fax : (541) 826 - 8847

Más contenido relacionado

La actualidad más candente

132KV SUBSTATION UPPTCL
132KV SUBSTATION UPPTCL132KV SUBSTATION UPPTCL
132KV SUBSTATION UPPTCLAman Rajput
 
Substations
SubstationsSubstations
Substationsitfakash
 
Training report of secl , khairha coal mine , sohagpur area for electrical
Training report of secl , khairha coal mine , sohagpur area for electricalTraining report of secl , khairha coal mine , sohagpur area for electrical
Training report of secl , khairha coal mine , sohagpur area for electricalPiyush Dwivedi
 
Presentation on KESCO sub-station, kanpur
Presentation on KESCO sub-station, kanpurPresentation on KESCO sub-station, kanpur
Presentation on KESCO sub-station, kanpurShubham Sachan
 
132 KV GSS NPH jodhpur treaning report
132 KV GSS NPH jodhpur treaning report 132 KV GSS NPH jodhpur treaning report
132 KV GSS NPH jodhpur treaning report imkanhaiyalal
 
Electric substation
Electric substation Electric substation
Electric substation ANNU KUMAR
 
Presentation on substations
Presentation on substationsPresentation on substations
Presentation on substationsvishalgohel12195
 
Sub Station Training Program
Sub Station Training ProgramSub Station Training Program
Sub Station Training ProgramArul Balan
 
Distribution transformer ultimate power suppliers
Distribution transformer ultimate power suppliersDistribution transformer ultimate power suppliers
Distribution transformer ultimate power suppliersShakti Electronics
 
Electrical substation general_equipments
Electrical substation general_equipmentsElectrical substation general_equipments
Electrical substation general_equipmentsEman Dacanay
 
Equipments in switchyard and its protection
Equipments in switchyard and its protectionEquipments in switchyard and its protection
Equipments in switchyard and its protectionJayashree Behera
 
On load tap changer in a.c. locomotive transformer & air blast circuit b...
On load tap changer in a.c. locomotive transformer  & air blast circuit b...On load tap changer in a.c. locomotive transformer  & air blast circuit b...
On load tap changer in a.c. locomotive transformer & air blast circuit b...vishalgohel12195
 
Economic Loading of Distribution Transformer PPT
Economic Loading of Distribution Transformer PPTEconomic Loading of Distribution Transformer PPT
Economic Loading of Distribution Transformer PPTSANTOSHYADAV406
 
Powerpoint Presentation on Series Reactors
Powerpoint Presentation on Series ReactorsPowerpoint Presentation on Series Reactors
Powerpoint Presentation on Series ReactorsSuresh Mohta
 
C.S.P.D.C.L.AMBIKAPUR (TOWN)
C.S.P.D.C.L.AMBIKAPUR (TOWN)C.S.P.D.C.L.AMBIKAPUR (TOWN)
C.S.P.D.C.L.AMBIKAPUR (TOWN)saurabhVEC
 

La actualidad más candente (20)

132KV SUBSTATION UPPTCL
132KV SUBSTATION UPPTCL132KV SUBSTATION UPPTCL
132KV SUBSTATION UPPTCL
 
Substations
SubstationsSubstations
Substations
 
5. Switchyard & Substation
5. Switchyard & Substation5. Switchyard & Substation
5. Switchyard & Substation
 
Training report of secl , khairha coal mine , sohagpur area for electrical
Training report of secl , khairha coal mine , sohagpur area for electricalTraining report of secl , khairha coal mine , sohagpur area for electrical
Training report of secl , khairha coal mine , sohagpur area for electrical
 
ppt
pptppt
ppt
 
Presentation on KESCO sub-station, kanpur
Presentation on KESCO sub-station, kanpurPresentation on KESCO sub-station, kanpur
Presentation on KESCO sub-station, kanpur
 
132 KV GSS NPH jodhpur treaning report
132 KV GSS NPH jodhpur treaning report 132 KV GSS NPH jodhpur treaning report
132 KV GSS NPH jodhpur treaning report
 
Summer Training presentation on 132/33 KV sub-station Minto park, Allahabad
Summer Training presentation on 132/33 KV sub-station Minto park, AllahabadSummer Training presentation on 132/33 KV sub-station Minto park, Allahabad
Summer Training presentation on 132/33 KV sub-station Minto park, Allahabad
 
Substation
SubstationSubstation
Substation
 
Electric substation
Electric substation Electric substation
Electric substation
 
Presentation on substations
Presentation on substationsPresentation on substations
Presentation on substations
 
Sub Station Training Program
Sub Station Training ProgramSub Station Training Program
Sub Station Training Program
 
Distribution transformer ultimate power suppliers
Distribution transformer ultimate power suppliersDistribution transformer ultimate power suppliers
Distribution transformer ultimate power suppliers
 
Electrical substation general_equipments
Electrical substation general_equipmentsElectrical substation general_equipments
Electrical substation general_equipments
 
Equipments in switchyard and its protection
Equipments in switchyard and its protectionEquipments in switchyard and its protection
Equipments in switchyard and its protection
 
On load tap changer in a.c. locomotive transformer & air blast circuit b...
On load tap changer in a.c. locomotive transformer  & air blast circuit b...On load tap changer in a.c. locomotive transformer  & air blast circuit b...
On load tap changer in a.c. locomotive transformer & air blast circuit b...
 
Economic Loading of Distribution Transformer PPT
Economic Loading of Distribution Transformer PPTEconomic Loading of Distribution Transformer PPT
Economic Loading of Distribution Transformer PPT
 
Powerpoint Presentation on Series Reactors
Powerpoint Presentation on Series ReactorsPowerpoint Presentation on Series Reactors
Powerpoint Presentation on Series Reactors
 
General electric
General electricGeneral electric
General electric
 
C.S.P.D.C.L.AMBIKAPUR (TOWN)
C.S.P.D.C.L.AMBIKAPUR (TOWN)C.S.P.D.C.L.AMBIKAPUR (TOWN)
C.S.P.D.C.L.AMBIKAPUR (TOWN)
 

Destacado

Pct Solution For Emerging Energy Markets
Pct Solution For Emerging Energy MarketsPct Solution For Emerging Energy Markets
Pct Solution For Emerging Energy Marketspacificcresttrans
 
Unique Role Of Wtsu Transformers
Unique Role Of Wtsu TransformersUnique Role Of Wtsu Transformers
Unique Role Of Wtsu Transformerspacificcresttrans
 
Report on matched-melt coordination as used for selecting windfarm fuses
Report on matched-melt coordination as used for selecting windfarm fusesReport on matched-melt coordination as used for selecting windfarm fuses
Report on matched-melt coordination as used for selecting windfarm fusespacificcresttrans
 
Datasheet Padmount Transformer
Datasheet Padmount TransformerDatasheet Padmount Transformer
Datasheet Padmount Transformerpacificcresttrans
 
Pacific Crest Transformers - On Going Green
Pacific Crest Transformers - On Going GreenPacific Crest Transformers - On Going Green
Pacific Crest Transformers - On Going Greenpacificcresttrans
 

Destacado (6)

Pct Solution For Emerging Energy Markets
Pct Solution For Emerging Energy MarketsPct Solution For Emerging Energy Markets
Pct Solution For Emerging Energy Markets
 
Unique Role Of Wtsu Transformers
Unique Role Of Wtsu TransformersUnique Role Of Wtsu Transformers
Unique Role Of Wtsu Transformers
 
Transformer Smart Grid
Transformer Smart GridTransformer Smart Grid
Transformer Smart Grid
 
Report on matched-melt coordination as used for selecting windfarm fuses
Report on matched-melt coordination as used for selecting windfarm fusesReport on matched-melt coordination as used for selecting windfarm fuses
Report on matched-melt coordination as used for selecting windfarm fuses
 
Datasheet Padmount Transformer
Datasheet Padmount TransformerDatasheet Padmount Transformer
Datasheet Padmount Transformer
 
Pacific Crest Transformers - On Going Green
Pacific Crest Transformers - On Going GreenPacific Crest Transformers - On Going Green
Pacific Crest Transformers - On Going Green
 

Similar a Unique Role Wind Turbine

Chep 02 Power Frequency Disturbance
Chep 02 Power Frequency DisturbanceChep 02 Power Frequency Disturbance
Chep 02 Power Frequency DisturbancePiyush Tandel
 
IRJET- Load Sharing of Transformer using Microcontroller
IRJET- Load Sharing of Transformer using MicrocontrollerIRJET- Load Sharing of Transformer using Microcontroller
IRJET- Load Sharing of Transformer using MicrocontrollerIRJET Journal
 
Protection of power transformer
Protection of power transformerProtection of power transformer
Protection of power transformerRitesh Verma
 
C121738
C121738C121738
C121738irjes
 
Report on 220kv substation at Jassure
Report on 220kv substation at JassureReport on 220kv substation at Jassure
Report on 220kv substation at JassureShuvam Pathania
 
Siemens transformers
Siemens transformersSiemens transformers
Siemens transformersSouvik Dutta
 
Gt substitution-issues
Gt substitution-issuesGt substitution-issues
Gt substitution-issuesvidyarupak
 
Design of substation (with Transformer Design)
Design of substation (with Transformer Design) Design of substation (with Transformer Design)
Design of substation (with Transformer Design) SayanSarkar55
 
4. Generator Step Up Transformer
4. Generator Step Up Transformer4. Generator Step Up Transformer
4. Generator Step Up TransformerChinedu Isiadinso
 
EID_Unit 01_000.ppt
EID_Unit 01_000.pptEID_Unit 01_000.ppt
EID_Unit 01_000.pptssuser1b882d
 
3 phase transformer protection
3 phase transformer protection3 phase transformer protection
3 phase transformer protectionHimanshu Paghdal
 
Inrush current reduction in three phase power transformer by using prefluxing...
Inrush current reduction in three phase power transformer by using prefluxing...Inrush current reduction in three phase power transformer by using prefluxing...
Inrush current reduction in three phase power transformer by using prefluxing...IAEME Publication
 
Amanppt 140826070457-phpapp02
Amanppt 140826070457-phpapp02Amanppt 140826070457-phpapp02
Amanppt 140826070457-phpapp02Md Hasan
 
Voltage and power quality control in wind power applications by svc
Voltage and power quality control in wind power applications by svcVoltage and power quality control in wind power applications by svc
Voltage and power quality control in wind power applications by svcHari Prasath
 
Wind energy conversion systems using fuzzy controlled statcom for power qua
Wind energy conversion systems using fuzzy controlled statcom for power quaWind energy conversion systems using fuzzy controlled statcom for power qua
Wind energy conversion systems using fuzzy controlled statcom for power quaIAEME Publication
 

Similar a Unique Role Wind Turbine (20)

Chep 02 Power Frequency Disturbance
Chep 02 Power Frequency DisturbanceChep 02 Power Frequency Disturbance
Chep 02 Power Frequency Disturbance
 
IRJET- Load Sharing of Transformer using Microcontroller
IRJET- Load Sharing of Transformer using MicrocontrollerIRJET- Load Sharing of Transformer using Microcontroller
IRJET- Load Sharing of Transformer using Microcontroller
 
Protection of power transformer
Protection of power transformerProtection of power transformer
Protection of power transformer
 
C121738
C121738C121738
C121738
 
Report on 220kv substation at Jassure
Report on 220kv substation at JassureReport on 220kv substation at Jassure
Report on 220kv substation at Jassure
 
Siemens transformers
Siemens transformersSiemens transformers
Siemens transformers
 
Gt substitution-issues
Gt substitution-issuesGt substitution-issues
Gt substitution-issues
 
Design of substation (with Transformer Design)
Design of substation (with Transformer Design) Design of substation (with Transformer Design)
Design of substation (with Transformer Design)
 
4. Generator Step Up Transformer
4. Generator Step Up Transformer4. Generator Step Up Transformer
4. Generator Step Up Transformer
 
5 power house
5 power house5 power house
5 power house
 
EID_Unit 01_000.ppt
EID_Unit 01_000.pptEID_Unit 01_000.ppt
EID_Unit 01_000.ppt
 
3 phase transformer protection
3 phase transformer protection3 phase transformer protection
3 phase transformer protection
 
Inrush current reduction in three phase power transformer by using prefluxing...
Inrush current reduction in three phase power transformer by using prefluxing...Inrush current reduction in three phase power transformer by using prefluxing...
Inrush current reduction in three phase power transformer by using prefluxing...
 
Advances in power systems
Advances in power systemsAdvances in power systems
Advances in power systems
 
losses in transmission line.pdf
losses in transmission line.pdflosses in transmission line.pdf
losses in transmission line.pdf
 
Amanppt 140826070457-phpapp02
Amanppt 140826070457-phpapp02Amanppt 140826070457-phpapp02
Amanppt 140826070457-phpapp02
 
Voltage and power quality control in wind power applications by svc
Voltage and power quality control in wind power applications by svcVoltage and power quality control in wind power applications by svc
Voltage and power quality control in wind power applications by svc
 
Wind energy conversion systems using fuzzy controlled statcom for power qua
Wind energy conversion systems using fuzzy controlled statcom for power quaWind energy conversion systems using fuzzy controlled statcom for power qua
Wind energy conversion systems using fuzzy controlled statcom for power qua
 
132 33kv substation
132 33kv substation132 33kv substation
132 33kv substation
 
132_33kv_substation.ppt
132_33kv_substation.ppt132_33kv_substation.ppt
132_33kv_substation.ppt
 

Último

Microservices, Docker deploy and Microservices source code in C#
Microservices, Docker deploy and Microservices source code in C#Microservices, Docker deploy and Microservices source code in C#
Microservices, Docker deploy and Microservices source code in C#Karmanjay Verma
 
Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...
Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...
Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...Jeffrey Haguewood
 
Glenn Lazarus- Why Your Observability Strategy Needs Security Observability
Glenn Lazarus- Why Your Observability Strategy Needs Security ObservabilityGlenn Lazarus- Why Your Observability Strategy Needs Security Observability
Glenn Lazarus- Why Your Observability Strategy Needs Security Observabilityitnewsafrica
 
QCon London: Mastering long-running processes in modern architectures
QCon London: Mastering long-running processes in modern architecturesQCon London: Mastering long-running processes in modern architectures
QCon London: Mastering long-running processes in modern architecturesBernd Ruecker
 
Testing tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examplesTesting tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examplesKari Kakkonen
 
Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Farhan Tariq
 
2024 April Patch Tuesday
2024 April Patch Tuesday2024 April Patch Tuesday
2024 April Patch TuesdayIvanti
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxLoriGlavin3
 
Transcript: New from BookNet Canada for 2024: BNC SalesData and LibraryData -...
Transcript: New from BookNet Canada for 2024: BNC SalesData and LibraryData -...Transcript: New from BookNet Canada for 2024: BNC SalesData and LibraryData -...
Transcript: New from BookNet Canada for 2024: BNC SalesData and LibraryData -...BookNet Canada
 
Generative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfGenerative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfIngrid Airi González
 
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better StrongerModern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better Strongerpanagenda
 
Generative AI - Gitex v1Generative AI - Gitex v1.pptx
Generative AI - Gitex v1Generative AI - Gitex v1.pptxGenerative AI - Gitex v1Generative AI - Gitex v1.pptx
Generative AI - Gitex v1Generative AI - Gitex v1.pptxfnnc6jmgwh
 
All These Sophisticated Attacks, Can We Really Detect Them - PDF
All These Sophisticated Attacks, Can We Really Detect Them - PDFAll These Sophisticated Attacks, Can We Really Detect Them - PDF
All These Sophisticated Attacks, Can We Really Detect Them - PDFMichael Gough
 
Infrared simulation and processing on Nvidia platforms
Infrared simulation and processing on Nvidia platformsInfrared simulation and processing on Nvidia platforms
Infrared simulation and processing on Nvidia platformsYoss Cohen
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxLoriGlavin3
 
Landscape Catalogue 2024 Australia-1.pdf
Landscape Catalogue 2024 Australia-1.pdfLandscape Catalogue 2024 Australia-1.pdf
Landscape Catalogue 2024 Australia-1.pdfAarwolf Industries LLC
 
A Framework for Development in the AI Age
A Framework for Development in the AI AgeA Framework for Development in the AI Age
A Framework for Development in the AI AgeCprime
 
Data governance with Unity Catalog Presentation
Data governance with Unity Catalog PresentationData governance with Unity Catalog Presentation
Data governance with Unity Catalog PresentationKnoldus Inc.
 
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...Alkin Tezuysal
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxLoriGlavin3
 

Último (20)

Microservices, Docker deploy and Microservices source code in C#
Microservices, Docker deploy and Microservices source code in C#Microservices, Docker deploy and Microservices source code in C#
Microservices, Docker deploy and Microservices source code in C#
 
Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...
Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...
Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...
 
Glenn Lazarus- Why Your Observability Strategy Needs Security Observability
Glenn Lazarus- Why Your Observability Strategy Needs Security ObservabilityGlenn Lazarus- Why Your Observability Strategy Needs Security Observability
Glenn Lazarus- Why Your Observability Strategy Needs Security Observability
 
QCon London: Mastering long-running processes in modern architectures
QCon London: Mastering long-running processes in modern architecturesQCon London: Mastering long-running processes in modern architectures
QCon London: Mastering long-running processes in modern architectures
 
Testing tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examplesTesting tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examples
 
Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...
 
2024 April Patch Tuesday
2024 April Patch Tuesday2024 April Patch Tuesday
2024 April Patch Tuesday
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
 
Transcript: New from BookNet Canada for 2024: BNC SalesData and LibraryData -...
Transcript: New from BookNet Canada for 2024: BNC SalesData and LibraryData -...Transcript: New from BookNet Canada for 2024: BNC SalesData and LibraryData -...
Transcript: New from BookNet Canada for 2024: BNC SalesData and LibraryData -...
 
Generative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfGenerative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdf
 
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better StrongerModern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
 
Generative AI - Gitex v1Generative AI - Gitex v1.pptx
Generative AI - Gitex v1Generative AI - Gitex v1.pptxGenerative AI - Gitex v1Generative AI - Gitex v1.pptx
Generative AI - Gitex v1Generative AI - Gitex v1.pptx
 
All These Sophisticated Attacks, Can We Really Detect Them - PDF
All These Sophisticated Attacks, Can We Really Detect Them - PDFAll These Sophisticated Attacks, Can We Really Detect Them - PDF
All These Sophisticated Attacks, Can We Really Detect Them - PDF
 
Infrared simulation and processing on Nvidia platforms
Infrared simulation and processing on Nvidia platformsInfrared simulation and processing on Nvidia platforms
Infrared simulation and processing on Nvidia platforms
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptx
 
Landscape Catalogue 2024 Australia-1.pdf
Landscape Catalogue 2024 Australia-1.pdfLandscape Catalogue 2024 Australia-1.pdf
Landscape Catalogue 2024 Australia-1.pdf
 
A Framework for Development in the AI Age
A Framework for Development in the AI AgeA Framework for Development in the AI Age
A Framework for Development in the AI Age
 
Data governance with Unity Catalog Presentation
Data governance with Unity Catalog PresentationData governance with Unity Catalog Presentation
Data governance with Unity Catalog Presentation
 
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
 

Unique Role Wind Turbine

  • 1. THE UNIQUE ROLE OF WIND TURBINE STEP-UP (WTSU) TRANSFORMERS
  • 2. Introduction: Harnessing wind energy to perform work is not a new concept. Since the earliest of times, wind power has been captured with sails to allow traders, merchants and explorers to ply their trades and discover the world around them. On land, windmills have been used for irrigation, grinding grains, and performing crude manufacturing for centuries. Even the generation of electricity from wind power is not a new idea. What is new, however, is the scale at which this renewable energy source is being used today. Early wind generation served a local need, often supplying power for isolated equipment. Today, wind energy represents nearly 5% of the US electrical generation and is targeted to reach 20% in the foreseeable future. For this to happen, wind turbine outputs need to be gathered, stepped-up to transmission levels and passed across the nation’s interconnected power grid to the end users. The role of the Wind Turbine Step-Up (WTSU) transformer in this process is critical and, as such, its design needs to be carefully and thoughtfully analyzed and reevaluated in our view. Historically this WTSU transformer function has been handled by conventional, “off the shelf” distribution transformers, but the relatively large numbers of recent failures would strongly suggest that WTSU transformer designs need to be made substantially more robust. WTSU transformers are neither conventional “off the shelf” distribution transformers nor are they conventional “off the shelf” power generator step-up transformers. WTSU transformers fall somewhere in between and as such, we believe, require a unique design standard. Although off-shore wind farms using dry-type transformers are beginning to grow in popularity, for this discussion we will look only at liquid-filled transformers that are normally associated with inland wind farm sites. Transformer Loading: Wind turbine output voltages typically range from 480 volts to 690 volts. This turbine output is then delivered to the WTSU transformers and transformed to a collector voltage of 13,800 to 46,000 volts. The turbines are highly dependant upon local climatic conditions; and this dependency can result in yearly average load factor as low as 35%. Both conventional distribution transformers and power generator step-up transformers are typically subjected to more constant loading at, or slightly above, their theoretical maximum rating. This high level of loading stresses insulation thermally and leads to reduced insulation life. On the other hand, the relatively light loading of WTSU transformer has a favorable effect on insulation life but introduces two unique and Pacific Crest Transformers 2 300 West Antelope Road – Medford, Oregon 97503 Tel : (541) 826 – 2113 Fax : (541) 826 - 8847
  • 3. functionally significant problems with which other types of conventional transformers do not have to deal. The first problem is that, when lightly loaded or idle, the core losses become a more significant economic factor while the coil or winding losses become less significant and de-emphasized. Typically used price evaluation formulae do not apply to this scenario. NEMA TP1 and DOE efficiencies are not modeled for the operational scenario where average loading is near 30-35% and, consequently, should be cautiously applied when calculating the total cost of ownership for WTSU transformers The second problem is that the WTSU transformer goes into thermal cycling as a function of these varying loads. This causes repeated thermal stress on the winding, clamping structure, seals and gaskets. Repeated thermal cycling causes nitrogen gas to be absorbed into the hot oil and then released as the oil cools, forming bubbles within the oil which can migrate into the insulation and windings to create hot spots and partial discharges which can damage insulation. The thermal cycling can also cause accelerated aging of internal and external electrical connections. These cumulative effects put the WTSU transformer at a higher risk of insulation and dielectric failure than either the typical “off the shelf” distribution transformer or the power generator step-up transformer experiences. Harmonics and Non-Sinusoidal loads: Another unique aspect of WTSU transformers is the fact that they are switched in the line with solid state controls to limit the inrush currents. This differs widely from the typical step-up transformer which must be designed to withstand high magnetizing inrush currents which cause core saturation, and in the extreme Ferroresonance. While potentially aiding in the initial energization, these same electronic controls contribute damaging harmonic voltage frequencies that, when coupled with the non- sinusoidal wave forms from the wind turbines, cannot be ignored from a heating point of view. Conventional distribution transformers do not typically see non-linear loads that require preventative steps due to harmonic loading. When a rectifier/chopper system is used, the WTSU transformer must be designed for harmonics similar to rectifier transformers, taking the additional loading into consideration as well as providing electrostatic shields to prevent the transfer of harmonic frequencies between the primary and secondary windings, quite dissimilar to conventional distribution transformers. Transformer sizing and voltage variation: WTSU transformers are designed such that the voltage is matched to the generator (e.g. wind turbine) output voltage exactly. There is no “designed in” over-voltage capacity to overcome voltage fluctuations, as is typically done on distribution and power transformer designs which allow for up to 10% over-voltage. Further, it should Pacific Crest Transformers 3 300 West Antelope Road – Medford, Oregon 97503 Tel : (541) 826 – 2113 Fax : (541) 826 - 8847
  • 4. be noted that the generator output current is monitored at millisecond intervals and the generator limited to allow up to 5% over-current for 10 seconds before it is taken off the system. Therefore, the WTSU transformer size ( kVA or MVA) is designed to match the generator output with no overload sizing. Since overload sizing is a common protective practice with “off the shelf” distribution or power step-up generator transformers, the WTSU transformer design must be uniquely robust to function without it. Requirement to withstand Fault Currents: Typically, conventional distribution transformers, power transformers, and other types of step-up transformers will “drop out” when subjected to an under-voltage or over- current situation caused by a fault. Once the fault has cleared, the distribution transformer is brought back on-line either individually or with it’s local feeder in conjunction with automatic reclosures. Wind turbine generators, on the other hand, in order to maintain network stability are only allowed to disconnect from the system due to network disturbances within certain, carefully controlled network guidelines developed for generating plants. Depending upon the specific network regulations, the length of time the generator is required to stay on line can vary. During this time the generator will continue to deliver an abnormally low voltage to the WTSU transformer. Therefore, during near-to generator faults, the generator may be required to carry as low as 15% rated voltage for a few cycles and then ramp back up to full volts a few seconds after fault clearing. This means that the WTSU transformer must be uniquely designed with enough “ruggedness” to withstand full short circuit current during the initial few cycles when the maximum mechanical forces are exerted upon the WTSU transformer windings. Since wind turbines must stay connected during disturbances in the network, the WTSU transformers must be designed to withstand the full mechanical effects of short circuits. Conclusions: The role of WTSU transformers in today’s wind generation scheme is unique; it’s design must be equally unique and robust. The combination of wide variations in loading; harmonic loads from associated control electronics and generators; sizing without protection for over-voltages, under-voltages or over-loading; and the requirement to “ride through” transient events and faults sets the WTSU apart from it’s more conventional, “off the shelf” counterparts. It is neither a conventional distribution transformer nor is it a conventional generator step-up transformer. “Off the shelf” . . . doesn’t belong . . . “down on the farm”! Pacific Crest Transformers 4 300 West Antelope Road – Medford, Oregon 97503 Tel : (541) 826 – 2113 Fax : (541) 826 - 8847