Project Communications Management
Processes required to ensure timely and appropriate generation, collection,
distribution, storage, retrieval and ultimate disposition of project
information. This knowledge area is made up of five processes to
determine what to communicate, to whom, how often, and when to
reevaluate the plan
An effective project manager spends about 90% of his time communicating
and 50% of that time is spent communicating with the project team
Pankaj Sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Sender The person who needs to initiate the communication
Receiver The person who gets the message
Medium The thing used to transmit the message
Feedback A response to a message
Noise Something that interferes with the message
Encode Modify a message so that it can be sent
Decode Modify a message that has been sent so that it can
be understood
Communication Model – Various Elements
Pankaj Sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Revising Key Terms : Communication Model
Exercise 1: Communication Model
1. _____________ is used to transmit the message
2. The person who gets the message is _____________
3. Something that interferes with the message is
_______________
Pankaj Sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Revising Key Terms : Communication Model
Answers to Exercise : Communication Model
1. Medium is used to transmit the message.
2. The person who gets the message is Receiver.
3. Something that interferes with the message is Noise.
Pankaj Sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
 Formal vs Informal
 Verbal vs Non-verbal
 Official vs Non-official
 Written vs Oral
 Vertical vs Horizontal
Kinds of Communication
Pankaj Sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Kinds of Communication
Communication
Type
Example
Formal Written RFP, Project Charter
Informal Written E-mail, Memos
Formal Verbal Speech
Informal Verbal Conversations
Pankaj Sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
 Nonverbal Communication
 Means gestures, facial expressions, and physical appearance while you
are communicating your message
 Para lingual Communication
 Is the tone and pitch of your voice when you are telling people what’s going
on with your project
 Feedback
 Is when you respond to communication.
 Active listening
 When you give feedback to someone who is speaking
Additional Information
Pankaj Sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Revising Key Terms : Kinds of Communication
Exercise 2: Kinds of Communication
1. The Project manager writes a requirement specification for your project. This is an
example of ___________ kind of communication.
A. Informal verbal
B. Informal written
C. Formal verbal
D. Formal written
2. You sent an email to some of your team members to get more information about an
issue that has been identified on your project. This is an example of ___________ kind
of communication
A. Informal verbal
B. Informal written
C. Formal verbal
D. Formal written
Pankaj Sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Revising Key Terms : Kinds of Communication
Answers to Exercise 2: Kinds of Communication
1. The Project manager writes a requirement specification for your project. This is an
example of ___________ kind of communication.
A. Informal verbal
B. Informal written
C. Formal verbal
D. Formal written
2. You sent an email to some of your team members to get more information about an
issue that has been identified on your project. This is an example of ___________ kind
of communication
A. Informal verbal
B. Informal written
C. Formal verbal
D. Formal written
Pankaj Sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Communication Management Processes
Process Process Group
Plan Communications
management
Planning
Manage Communications Executing
Control Communications Monitoring and Controlling
Pankaj Sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Plan Communication Management
Determining the project stakeholder information needs and defining a
communication approach. It entails:
□ How often communication will be distributed and updated
□ Mode of communication (email, teleconference etc)
□ Information that will be included in the project communications
□ Stakeholders that will receive this information
Pankaj Sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Plan Communications Management
Inputs Tools and Techniques Outputs
 Project
management plan
Stakeholder
Register
 Enterprise
Environmental
Factors
 Organizational
Process Assets
 Communications
requirements analysis
 Communications
technology
 Communication models
 Communication method
 Meetings
 Communications
Management Plan
 Project
document updates
Pankaj Sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Plan Communications Management - Inputs
Pankaj Sharma, 9810996356
Project Management Plan provides information on how the project will
be executed , monitored , controlled , and closed.
Stakeholder Register provides the information needed to plan the
communication with project stakeholders.
Enterprise Environmental Factors , plan communication management
process is tightly linked with enterprise environmental factors, since the
structure of an organization will have a major effect on the project’s
communication requirements.
Organization Process Assets, Lesson learned and historical information
are of particular importance because they can provide insights on both the
decision taken regarding communication issues and the result of the
decision in previous similar project
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Plan Communications Management - Tools and
Techniques
Pankaj Sharma, 9810996356
Communication Requirements Analysis , The analysis of the
communication requirements determine the information needs of
the project stakeholders. The project manager should also consider the
number of potential communication channel or paths as an indicator of the
complexity of a project’s communications. For Example if there are n
people involve in a project communication. The total number of channels
would be n(n-1)/2
4 people – 6 channels
6 people – 15 channels
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Plan Communications Management - Tools and
Techniques
Pankaj Sharma, 9810996356
Communication Technology, The method used to transfer information
among project stakeholder may vary significantly. For example, a project
team may use technique from brief conversation to extended meetings, or
from simple written documents to extensive materials which are accessible
online as a method of communication .
Factors that can affect the choice of communication technology include :
 Urgency of the need for information
 Availability of technology
 Ease of use
 Project environment
 Sensitivity and confidentiality of the information
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Plan Communications Management - Tools and
Techniques
Pankaj Sharma, 9810996356
Communication Models, Basic model of communication includes
following parameters
 Encode : Thoughts and ideas translated to a language which can be
understood by other
 Message & Feedback Message : Output of encoding
 Medium : The method used to convey the message
 Decode : Converting feedback back to understandable form
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Plan Communications Management - Tools and
Techniques
Pankaj Sharma, 9810996356
Communication Methods are broadly classified into
 Interactive communication
 Push Communication
 Pull Communication
Meetings , The plan communication process requires discussion and
dialogue with the project team to determine the most appropriate way to
Update and communicate project information and to respond to request
from various stakeholders for that information. These discussions and
dialogue are commonly facilitated through meetings, which may be
conducted face to face or online and in different locations, such as the
project site or customer’s site.
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Plan Communications Management - Outputs
Pankaj Sharma, 9810996356
Communication Management Plan contains the following
information
 Stakeholder communication requirements
 Information to be communicated including language , format , content
and level of detail;
 Reason for distribution of that information
 Time frame and frequency for the distribution of required information
and receipt of acknowledgement or response , if applicable
 Person responsible for communicating the information
 Person responsible for authorizing release of confidential information
 Person or groups who will receive the information
 Person or groups who will receive the information
 Methods or technologies used to convey the information, such as
memos, e-mail, and /or press releases;
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Plan Communications Management - Outputs
Pankaj Sharma, 9810996356
Communication Management Plan contains the following
information
 Methods or technologies used to convey the information, such as
memos, e-mail, and /or press releases;
 Glossary of common terminology
 Flow charts of the information flow in the project, workflows with
possible sequence of authorization , list of report, and meeting plans
etc and
 Communication constraints usually derived from a specific legislation
or regulation , technology , and organization policies etc
The communications management plan can also include guidelines and
templates for project status meetings , project team meetings , e-
meetings and e-mail messages.
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Communication Plan
Communication Format Frequency Distribution
Team Briefing Restricted Intranet Daily at 9:00 Team and stakeholders
with access to secure
project info area
Weekly Web Bulletin Internal Intranet Weekly Team, sponsor, senior
management
Technical Incident
Report
Email Immediately after Incident Webmaster, IT Department
Budget and Schedule
Detail
Spreadsheets and Detailed
Gantt Chart
Bi-Weekly Sponsor, Senior
Management
Accomplishments and
Setbacks
Email and Intranet Weekly All internal stakeholders
Schedule Milestones Email and Intranet Weekly All internal stakeholders
Cost-to-Date Milestones Email and Intranet Weekly All internal stakeholders
Current Top 5 Risks Email and Intranet Weekly All internal stakeholders
Pankaj Sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Manage Communications
This process updates stakeholders on the progress of the project as per the
communications management plan. The information that gets distributed
includes status reports, review meetings etc
Pankaj Sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Manage Communications
Inputs Tools and Techniques Outputs
 Communication
management plan
 Work performance
reports
 Enterprise
environmental factors
 Organizational
process assets
□ Communication
technology
□ Communication models
□ Communications method
□ Information management
system
□ Performance reporting
 Project
communications
 Project
management plan
updates
 Project
document updates
Organizational
Process assets
updates
Pankaj Sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Control Communications Process
This process tracks how the project is progressing against the plan
and provide report to stakeholders on status, progress metrics
(Schedule and Cost variance) and forecasts
Pankaj Sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Control Communications Process
Inputs Tools and Techniques Outputs
 Project
management plan
 Project
communications
 Issue log
 Work performance
data
 Organizational
Process assets
□ Information
management system
□ Expert Judgment
□ Meetings
 Work
performance
information
 Change
requests
 Project
management plan
updates
 Project
document updates
 Organizational
Process assets
updates
Pankaj Sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Communication Channels
 Channels = n(n-1)/2
Where n is the number of people on the project
 If there are five people on the project, then we have 10
communication channels.
 This is calculated as follows: 5*(5-1) /2 = 10
Project Communication Management
Pankaj Sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Communication Filtering
Ambiguous language
Predefined mindset
Hidden agenda in message content
Senders reputation
Senders status in the organization
Dysfunctional emotional behavior
Environmental Background
When a portion of the message is lost in communication.
Common reasons of filtering:
Pankaj Sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Revising Key Terms : Complete the following
Exercise : Communication Management
1. A contract is always __________ communication
2. A stakeholder with high interest and low power must be kept
_______ of your project’s progress
3. Information should be distributed to all _______
Pankaj Sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Revising Key Terms : Complete the following
Answers to Exercise : Communication Management
1. A contract is always formal communication
2. A stakeholder with high interest and low power must be kept
Informed of your project’s progress
3. Information should be distributed to all stakeholders
Pankaj Sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
Practicing the concept
Exercise 4: Number of Lines of Communication
You are managing a project with five team members and one
sponsor. Draw all the channels of communication on this picture.
Solution: Lines of Communication = 6 * (6 – 1)/2 = 15
Pankaj Sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356
Connoisseur Solutions
QUIZ !
Pankaj Sharma, 9810996356
Pankaj Sharma - Mobile No -919810996356

Más contenido relacionado

La actualidad más candente

Project communication management
Project communication managementProject communication management
Project communication managementDikshant Ghimire
 
11. Project Communication Management
11. Project Communication Management11. Project Communication Management
11. Project Communication ManagementBhuWan Khadka
 
Importance of Communication in Project Managment
Importance of Communication in Project ManagmentImportance of Communication in Project Managment
Importance of Communication in Project Managmentlisamdrake
 
PMP Chap 10 - Project Communication Management Details
PMP  Chap 10 - Project Communication Management DetailsPMP  Chap 10 - Project Communication Management Details
PMP Chap 10 - Project Communication Management DetailsAnand Bobade
 
Project Stakeholder Management - PMBOK 5
Project Stakeholder Management - PMBOK 5Project Stakeholder Management - PMBOK 5
Project Stakeholder Management - PMBOK 5pankajsh10
 
Project managent communication
Project managent communicationProject managent communication
Project managent communicationAmbr Malyk
 
Project communications management
Project communications managementProject communications management
Project communications managementSanket Gandhi
 
Pmp chap13 - project stakeholder management details
Pmp chap13 - project stakeholder management detailsPmp chap13 - project stakeholder management details
Pmp chap13 - project stakeholder management detailsAnand Bobade
 
Project communications management
Project communications managementProject communications management
Project communications managementPrabudh Dhingra
 
Project Communications Management - PMBOK6
Project Communications Management - PMBOK6Project Communications Management - PMBOK6
Project Communications Management - PMBOK6Agus Suhanto
 
PMP Chap 13 - Project stakeholder management Overview
PMP Chap 13 - Project stakeholder management OverviewPMP Chap 13 - Project stakeholder management Overview
PMP Chap 13 - Project stakeholder management OverviewAnand Bobade
 
Project Human Resource Management - PMBOK 5
Project Human Resource Management - PMBOK 5Project Human Resource Management - PMBOK 5
Project Human Resource Management - PMBOK 5pankajsh10
 
PMP Training - 10 project communication management
PMP Training - 10 project communication managementPMP Training - 10 project communication management
PMP Training - 10 project communication managementejlp12
 
PMP Chap9 - Project Human Resource management
PMP Chap9 - Project Human Resource managementPMP Chap9 - Project Human Resource management
PMP Chap9 - Project Human Resource managementAnand Bobade
 
PM Project-Charter.pptx
PM Project-Charter.pptxPM Project-Charter.pptx
PM Project-Charter.pptxNimra zaman
 
The project management process groups a case study
The project management process groups a case studyThe project management process groups a case study
The project management process groups a case studyAfdalArifAmandaPutra
 
Chap 10.2 Manage Communication
Chap 10.2  Manage CommunicationChap 10.2  Manage Communication
Chap 10.2 Manage CommunicationAnand Bobade
 

La actualidad más candente (20)

Project communication management
Project communication managementProject communication management
Project communication management
 
11. Project Communication Management
11. Project Communication Management11. Project Communication Management
11. Project Communication Management
 
Importance of Communication in Project Managment
Importance of Communication in Project ManagmentImportance of Communication in Project Managment
Importance of Communication in Project Managment
 
PMP Chap 10 - Project Communication Management Details
PMP  Chap 10 - Project Communication Management DetailsPMP  Chap 10 - Project Communication Management Details
PMP Chap 10 - Project Communication Management Details
 
Project Stakeholder Management - PMBOK 5
Project Stakeholder Management - PMBOK 5Project Stakeholder Management - PMBOK 5
Project Stakeholder Management - PMBOK 5
 
Project managent communication
Project managent communicationProject managent communication
Project managent communication
 
Project communications management
Project communications managementProject communications management
Project communications management
 
Pmp chap13 - project stakeholder management details
Pmp chap13 - project stakeholder management detailsPmp chap13 - project stakeholder management details
Pmp chap13 - project stakeholder management details
 
Project communications management
Project communications managementProject communications management
Project communications management
 
Project Communications Management - PMBOK6
Project Communications Management - PMBOK6Project Communications Management - PMBOK6
Project Communications Management - PMBOK6
 
PMP Chap 13 - Project stakeholder management Overview
PMP Chap 13 - Project stakeholder management OverviewPMP Chap 13 - Project stakeholder management Overview
PMP Chap 13 - Project stakeholder management Overview
 
Project Human Resource Management - PMBOK 5
Project Human Resource Management - PMBOK 5Project Human Resource Management - PMBOK 5
Project Human Resource Management - PMBOK 5
 
PMP Training - 10 project communication management
PMP Training - 10 project communication managementPMP Training - 10 project communication management
PMP Training - 10 project communication management
 
Project Communications Management
Project Communications ManagementProject Communications Management
Project Communications Management
 
PMP Chap9 - Project Human Resource management
PMP Chap9 - Project Human Resource managementPMP Chap9 - Project Human Resource management
PMP Chap9 - Project Human Resource management
 
PM Project-Charter.pptx
PM Project-Charter.pptxPM Project-Charter.pptx
PM Project-Charter.pptx
 
Pmp communication chapter 10
Pmp communication chapter 10Pmp communication chapter 10
Pmp communication chapter 10
 
The project management process groups a case study
The project management process groups a case studyThe project management process groups a case study
The project management process groups a case study
 
Chap 10.2 Manage Communication
Chap 10.2  Manage CommunicationChap 10.2  Manage Communication
Chap 10.2 Manage Communication
 
project management concepts
project management conceptsproject management concepts
project management concepts
 

Destacado

Project Integration Management
Project Integration ManagementProject Integration Management
Project Integration Managementpankajsh10
 
Project cost management PMBOK 5th Edition
Project cost management PMBOK 5th EditionProject cost management PMBOK 5th Edition
Project cost management PMBOK 5th Editionpankajsh10
 
Project Procurement Management PMBOK 5
Project Procurement Management PMBOK 5Project Procurement Management PMBOK 5
Project Procurement Management PMBOK 5pankajsh10
 
Project Quality Management - PMBOK 5th Edition
Project Quality Management - PMBOK 5th EditionProject Quality Management - PMBOK 5th Edition
Project Quality Management - PMBOK 5th Editionpankajsh10
 
Project Time Management - PMBOK 5th Edition
Project  Time Management - PMBOK 5th EditionProject  Time Management - PMBOK 5th Edition
Project Time Management - PMBOK 5th Editionpankajsh10
 
Project Scope Management - PMBOK 5th Edition
Project Scope Management - PMBOK 5th EditionProject Scope Management - PMBOK 5th Edition
Project Scope Management - PMBOK 5th Editionpankajsh10
 
Project Management Framework - PMBOK 5
Project Management Framework - PMBOK 5Project Management Framework - PMBOK 5
Project Management Framework - PMBOK 5pankajsh10
 
Project Risk Management - PMBOK5
Project Risk Management - PMBOK5Project Risk Management - PMBOK5
Project Risk Management - PMBOK5pankajsh10
 
Pmp – pmbok 5th edition chapter4 project integration management final
Pmp – pmbok 5th edition chapter4 project integration management finalPmp – pmbok 5th edition chapter4 project integration management final
Pmp – pmbok 5th edition chapter4 project integration management finalYudha Pratama, PMP
 
PMBOK 5th edition Project Integration Management
PMBOK 5th edition Project Integration ManagementPMBOK 5th edition Project Integration Management
PMBOK 5th edition Project Integration ManagementSudhanshu Singh MBA,PMP
 
PMBOKから学ぶプロジェクトマネジメント #1 プロジェクトの正体、マネージャの心構え
PMBOKから学ぶプロジェクトマネジメント #1 プロジェクトの正体、マネージャの心構え PMBOKから学ぶプロジェクトマネジメント #1 プロジェクトの正体、マネージャの心構え
PMBOKから学ぶプロジェクトマネジメント #1 プロジェクトの正体、マネージャの心構え Yuichi Minowa
 
プロジェクトの構造
プロジェクトの構造プロジェクトの構造
プロジェクトの構造尚 鈴木
 
Jenkinsを使ったコンシューマゲームでのデプロイとテスト
Jenkinsを使ったコンシューマゲームでのデプロイとテストJenkinsを使ったコンシューマゲームでのデプロイとテスト
Jenkinsを使ったコンシューマゲームでのデプロイとテストHiroyuki Tanaka
 
ウォーターフォールでカンバンやってみた!
ウォーターフォールでカンバンやってみた!ウォーターフォールでカンバンやってみた!
ウォーターフォールでカンバンやってみた!尚 鈴木
 
ようこそ!“プロジェクトマネジメント保健室”へ!
ようこそ!“プロジェクトマネジメント保健室”へ!ようこそ!“プロジェクトマネジメント保健室”へ!
ようこそ!“プロジェクトマネジメント保健室”へ!Ayako Togaeri
 
Scrum始めました
Scrum始めましたScrum始めました
Scrum始めましたminamo
 
[G-Tech2014講演資料] プロジェクト・コスト・マネジメントの核心 - グローバルナレッジ
[G-Tech2014講演資料] プロジェクト・コスト・マネジメントの核心 - グローバルナレッジ[G-Tech2014講演資料] プロジェクト・コスト・マネジメントの核心 - グローバルナレッジ
[G-Tech2014講演資料] プロジェクト・コスト・マネジメントの核心 - グローバルナレッジTrainocate Japan, Ltd.
 
すぐに分かる!プロジェクト計画の作り方
すぐに分かる!プロジェクト計画の作り方すぐに分かる!プロジェクト計画の作り方
すぐに分かる!プロジェクト計画の作り方Eisuke Sugitani
 
よりぬきPmbok~ゲーム開発風味~ Web02
よりぬきPmbok~ゲーム開発風味~ Web02よりぬきPmbok~ゲーム開発風味~ Web02
よりぬきPmbok~ゲーム開発風味~ Web02minamo
 

Destacado (20)

Project Integration Management
Project Integration ManagementProject Integration Management
Project Integration Management
 
Project cost management PMBOK 5th Edition
Project cost management PMBOK 5th EditionProject cost management PMBOK 5th Edition
Project cost management PMBOK 5th Edition
 
Project Procurement Management PMBOK 5
Project Procurement Management PMBOK 5Project Procurement Management PMBOK 5
Project Procurement Management PMBOK 5
 
Project Quality Management - PMBOK 5th Edition
Project Quality Management - PMBOK 5th EditionProject Quality Management - PMBOK 5th Edition
Project Quality Management - PMBOK 5th Edition
 
Project Time Management - PMBOK 5th Edition
Project  Time Management - PMBOK 5th EditionProject  Time Management - PMBOK 5th Edition
Project Time Management - PMBOK 5th Edition
 
Project Scope Management - PMBOK 5th Edition
Project Scope Management - PMBOK 5th EditionProject Scope Management - PMBOK 5th Edition
Project Scope Management - PMBOK 5th Edition
 
Project Management Framework - PMBOK 5
Project Management Framework - PMBOK 5Project Management Framework - PMBOK 5
Project Management Framework - PMBOK 5
 
Project Risk Management - PMBOK5
Project Risk Management - PMBOK5Project Risk Management - PMBOK5
Project Risk Management - PMBOK5
 
Pmp – pmbok 5th edition chapter4 project integration management final
Pmp – pmbok 5th edition chapter4 project integration management finalPmp – pmbok 5th edition chapter4 project integration management final
Pmp – pmbok 5th edition chapter4 project integration management final
 
PMBOK 5th edition Project Integration Management
PMBOK 5th edition Project Integration ManagementPMBOK 5th edition Project Integration Management
PMBOK 5th edition Project Integration Management
 
PMP PPTs PMBOK 5th Edition - Author Pankaj Sharma, PMP,PMI-ACP
PMP PPTs PMBOK 5th Edition - Author Pankaj Sharma, PMP,PMI-ACPPMP PPTs PMBOK 5th Edition - Author Pankaj Sharma, PMP,PMI-ACP
PMP PPTs PMBOK 5th Edition - Author Pankaj Sharma, PMP,PMI-ACP
 
PMBOKから学ぶプロジェクトマネジメント #1 プロジェクトの正体、マネージャの心構え
PMBOKから学ぶプロジェクトマネジメント #1 プロジェクトの正体、マネージャの心構え PMBOKから学ぶプロジェクトマネジメント #1 プロジェクトの正体、マネージャの心構え
PMBOKから学ぶプロジェクトマネジメント #1 プロジェクトの正体、マネージャの心構え
 
プロジェクトの構造
プロジェクトの構造プロジェクトの構造
プロジェクトの構造
 
Jenkinsを使ったコンシューマゲームでのデプロイとテスト
Jenkinsを使ったコンシューマゲームでのデプロイとテストJenkinsを使ったコンシューマゲームでのデプロイとテスト
Jenkinsを使ったコンシューマゲームでのデプロイとテスト
 
ウォーターフォールでカンバンやってみた!
ウォーターフォールでカンバンやってみた!ウォーターフォールでカンバンやってみた!
ウォーターフォールでカンバンやってみた!
 
ようこそ!“プロジェクトマネジメント保健室”へ!
ようこそ!“プロジェクトマネジメント保健室”へ!ようこそ!“プロジェクトマネジメント保健室”へ!
ようこそ!“プロジェクトマネジメント保健室”へ!
 
Scrum始めました
Scrum始めましたScrum始めました
Scrum始めました
 
[G-Tech2014講演資料] プロジェクト・コスト・マネジメントの核心 - グローバルナレッジ
[G-Tech2014講演資料] プロジェクト・コスト・マネジメントの核心 - グローバルナレッジ[G-Tech2014講演資料] プロジェクト・コスト・マネジメントの核心 - グローバルナレッジ
[G-Tech2014講演資料] プロジェクト・コスト・マネジメントの核心 - グローバルナレッジ
 
すぐに分かる!プロジェクト計画の作り方
すぐに分かる!プロジェクト計画の作り方すぐに分かる!プロジェクト計画の作り方
すぐに分かる!プロジェクト計画の作り方
 
よりぬきPmbok~ゲーム開発風味~ Web02
よりぬきPmbok~ゲーム開発風味~ Web02よりぬきPmbok~ゲーム開発風味~ Web02
よりぬきPmbok~ゲーム開発風味~ Web02
 

Similar a Project communications management (PMBOK 5th Edition)

Communication management
Communication management Communication management
Communication management ammara2010
 
4. Communication Management
4. Communication Management4. Communication Management
4. Communication ManagementSanjay Rajpoot
 
Communication a success to project management
Communication a success to project managementCommunication a success to project management
Communication a success to project managementShankar Mandapaka
 
Communication Management
Communication ManagementCommunication Management
Communication ManagementSanjay Rajpoot
 
Communication planning
Communication planningCommunication planning
Communication planningSomashekar S.M
 
Communication Management by Avinash Khirwar
Communication Management by Avinash KhirwarCommunication Management by Avinash Khirwar
Communication Management by Avinash KhirwarPriyashaShukla
 
PROJECT COMMUNICATION MANAGEMENT Ch9.ppt
PROJECT COMMUNICATION MANAGEMENT Ch9.pptPROJECT COMMUNICATION MANAGEMENT Ch9.ppt
PROJECT COMMUNICATION MANAGEMENT Ch9.pptLoryNeri
 
Project Communications Management - Information Technology
Project Communications Management - Information TechnologyProject Communications Management - Information Technology
Project Communications Management - Information TechnologyIshan Parekh
 
Communications Management Presentation
Communications Management PresentationCommunications Management Presentation
Communications Management Presentationbrianbish10795
 
SnapComms roi-case-study-Rogers
SnapComms roi-case-study-RogersSnapComms roi-case-study-Rogers
SnapComms roi-case-study-RogersSnapComms
 
Change Management Guide
Change Management GuideChange Management Guide
Change Management GuideMatthew Rees
 
Meeting minutes communication across globe
Meeting minutes communication across globeMeeting minutes communication across globe
Meeting minutes communication across globeVenkata Sreedhar
 
Communications Management PlanProject Name
Communications Management PlanProject NameCommunications Management PlanProject Name
Communications Management PlanProject NameLynellBull52
 
009. project communication management
009. project communication management009. project communication management
009. project communication managementBoobalan G
 
Online PMP Training Material for PMP Exam - Communications Management Knowled...
Online PMP Training Material for PMP Exam - Communications Management Knowled...Online PMP Training Material for PMP Exam - Communications Management Knowled...
Online PMP Training Material for PMP Exam - Communications Management Knowled...GlobalSkillup
 

Similar a Project communications management (PMBOK 5th Edition) (20)

Communication management
Communication management Communication management
Communication management
 
4. Communication Management
4. Communication Management4. Communication Management
4. Communication Management
 
Sales process
Sales processSales process
Sales process
 
Communication a success to project management
Communication a success to project managementCommunication a success to project management
Communication a success to project management
 
Communication Management
Communication ManagementCommunication Management
Communication Management
 
Communication planning
Communication planningCommunication planning
Communication planning
 
Session 16 4th edition
Session 16 4th editionSession 16 4th edition
Session 16 4th edition
 
PMP Preparation - 10 Communication Management
PMP Preparation - 10 Communication ManagementPMP Preparation - 10 Communication Management
PMP Preparation - 10 Communication Management
 
Stakeholder Communication
Stakeholder CommunicationStakeholder Communication
Stakeholder Communication
 
Communication Management by Avinash Khirwar
Communication Management by Avinash KhirwarCommunication Management by Avinash Khirwar
Communication Management by Avinash Khirwar
 
PROJECT COMMUNICATION MANAGEMENT Ch9.ppt
PROJECT COMMUNICATION MANAGEMENT Ch9.pptPROJECT COMMUNICATION MANAGEMENT Ch9.ppt
PROJECT COMMUNICATION MANAGEMENT Ch9.ppt
 
Project Communications Management - Information Technology
Project Communications Management - Information TechnologyProject Communications Management - Information Technology
Project Communications Management - Information Technology
 
Communications Management Presentation
Communications Management PresentationCommunications Management Presentation
Communications Management Presentation
 
SnapComms roi-case-study-Rogers
SnapComms roi-case-study-RogersSnapComms roi-case-study-Rogers
SnapComms roi-case-study-Rogers
 
Change Management Guide
Change Management GuideChange Management Guide
Change Management Guide
 
Meeting minutes communication across globe
Meeting minutes communication across globeMeeting minutes communication across globe
Meeting minutes communication across globe
 
Communications Management PlanProject Name
Communications Management PlanProject NameCommunications Management PlanProject Name
Communications Management PlanProject Name
 
009. project communication management
009. project communication management009. project communication management
009. project communication management
 
Online PMP Training Material for PMP Exam - Communications Management Knowled...
Online PMP Training Material for PMP Exam - Communications Management Knowled...Online PMP Training Material for PMP Exam - Communications Management Knowled...
Online PMP Training Material for PMP Exam - Communications Management Knowled...
 
Free PMP Exam Q & A
Free PMP Exam Q & AFree PMP Exam Q & A
Free PMP Exam Q & A
 

Último

Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 

Último (20)

Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 

Project communications management (PMBOK 5th Edition)

  • 1. Connoisseur Solutions Project Communications Management Pankaj Sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 2. Connoisseur Solutions Project Communications Management Processes required to ensure timely and appropriate generation, collection, distribution, storage, retrieval and ultimate disposition of project information. This knowledge area is made up of five processes to determine what to communicate, to whom, how often, and when to reevaluate the plan An effective project manager spends about 90% of his time communicating and 50% of that time is spent communicating with the project team Pankaj Sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 3. Connoisseur Solutions Sender The person who needs to initiate the communication Receiver The person who gets the message Medium The thing used to transmit the message Feedback A response to a message Noise Something that interferes with the message Encode Modify a message so that it can be sent Decode Modify a message that has been sent so that it can be understood Communication Model – Various Elements Pankaj Sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 4. Connoisseur Solutions Revising Key Terms : Communication Model Exercise 1: Communication Model 1. _____________ is used to transmit the message 2. The person who gets the message is _____________ 3. Something that interferes with the message is _______________ Pankaj Sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 5. Connoisseur Solutions Revising Key Terms : Communication Model Answers to Exercise : Communication Model 1. Medium is used to transmit the message. 2. The person who gets the message is Receiver. 3. Something that interferes with the message is Noise. Pankaj Sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 6. Connoisseur Solutions  Formal vs Informal  Verbal vs Non-verbal  Official vs Non-official  Written vs Oral  Vertical vs Horizontal Kinds of Communication Pankaj Sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 7. Connoisseur Solutions Kinds of Communication Communication Type Example Formal Written RFP, Project Charter Informal Written E-mail, Memos Formal Verbal Speech Informal Verbal Conversations Pankaj Sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 8. Connoisseur Solutions  Nonverbal Communication  Means gestures, facial expressions, and physical appearance while you are communicating your message  Para lingual Communication  Is the tone and pitch of your voice when you are telling people what’s going on with your project  Feedback  Is when you respond to communication.  Active listening  When you give feedback to someone who is speaking Additional Information Pankaj Sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 9. Connoisseur Solutions Revising Key Terms : Kinds of Communication Exercise 2: Kinds of Communication 1. The Project manager writes a requirement specification for your project. This is an example of ___________ kind of communication. A. Informal verbal B. Informal written C. Formal verbal D. Formal written 2. You sent an email to some of your team members to get more information about an issue that has been identified on your project. This is an example of ___________ kind of communication A. Informal verbal B. Informal written C. Formal verbal D. Formal written Pankaj Sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 10. Connoisseur Solutions Revising Key Terms : Kinds of Communication Answers to Exercise 2: Kinds of Communication 1. The Project manager writes a requirement specification for your project. This is an example of ___________ kind of communication. A. Informal verbal B. Informal written C. Formal verbal D. Formal written 2. You sent an email to some of your team members to get more information about an issue that has been identified on your project. This is an example of ___________ kind of communication A. Informal verbal B. Informal written C. Formal verbal D. Formal written Pankaj Sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 11. Connoisseur Solutions Communication Management Processes Process Process Group Plan Communications management Planning Manage Communications Executing Control Communications Monitoring and Controlling Pankaj Sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 12. Connoisseur Solutions Plan Communication Management Determining the project stakeholder information needs and defining a communication approach. It entails: □ How often communication will be distributed and updated □ Mode of communication (email, teleconference etc) □ Information that will be included in the project communications □ Stakeholders that will receive this information Pankaj Sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 13. Connoisseur Solutions Plan Communications Management Inputs Tools and Techniques Outputs  Project management plan Stakeholder Register  Enterprise Environmental Factors  Organizational Process Assets  Communications requirements analysis  Communications technology  Communication models  Communication method  Meetings  Communications Management Plan  Project document updates Pankaj Sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 14. Connoisseur Solutions Plan Communications Management - Inputs Pankaj Sharma, 9810996356 Project Management Plan provides information on how the project will be executed , monitored , controlled , and closed. Stakeholder Register provides the information needed to plan the communication with project stakeholders. Enterprise Environmental Factors , plan communication management process is tightly linked with enterprise environmental factors, since the structure of an organization will have a major effect on the project’s communication requirements. Organization Process Assets, Lesson learned and historical information are of particular importance because they can provide insights on both the decision taken regarding communication issues and the result of the decision in previous similar project Pankaj Sharma - Mobile No -919810996356
  • 15. Connoisseur Solutions Plan Communications Management - Tools and Techniques Pankaj Sharma, 9810996356 Communication Requirements Analysis , The analysis of the communication requirements determine the information needs of the project stakeholders. The project manager should also consider the number of potential communication channel or paths as an indicator of the complexity of a project’s communications. For Example if there are n people involve in a project communication. The total number of channels would be n(n-1)/2 4 people – 6 channels 6 people – 15 channels Pankaj Sharma - Mobile No -919810996356
  • 16. Connoisseur Solutions Plan Communications Management - Tools and Techniques Pankaj Sharma, 9810996356 Communication Technology, The method used to transfer information among project stakeholder may vary significantly. For example, a project team may use technique from brief conversation to extended meetings, or from simple written documents to extensive materials which are accessible online as a method of communication . Factors that can affect the choice of communication technology include :  Urgency of the need for information  Availability of technology  Ease of use  Project environment  Sensitivity and confidentiality of the information Pankaj Sharma - Mobile No -919810996356
  • 17. Connoisseur Solutions Plan Communications Management - Tools and Techniques Pankaj Sharma, 9810996356 Communication Models, Basic model of communication includes following parameters  Encode : Thoughts and ideas translated to a language which can be understood by other  Message & Feedback Message : Output of encoding  Medium : The method used to convey the message  Decode : Converting feedback back to understandable form Pankaj Sharma - Mobile No -919810996356
  • 18. Connoisseur Solutions Plan Communications Management - Tools and Techniques Pankaj Sharma, 9810996356 Communication Methods are broadly classified into  Interactive communication  Push Communication  Pull Communication Meetings , The plan communication process requires discussion and dialogue with the project team to determine the most appropriate way to Update and communicate project information and to respond to request from various stakeholders for that information. These discussions and dialogue are commonly facilitated through meetings, which may be conducted face to face or online and in different locations, such as the project site or customer’s site. Pankaj Sharma - Mobile No -919810996356
  • 19. Connoisseur Solutions Plan Communications Management - Outputs Pankaj Sharma, 9810996356 Communication Management Plan contains the following information  Stakeholder communication requirements  Information to be communicated including language , format , content and level of detail;  Reason for distribution of that information  Time frame and frequency for the distribution of required information and receipt of acknowledgement or response , if applicable  Person responsible for communicating the information  Person responsible for authorizing release of confidential information  Person or groups who will receive the information  Person or groups who will receive the information  Methods or technologies used to convey the information, such as memos, e-mail, and /or press releases; Pankaj Sharma - Mobile No -919810996356
  • 20. Connoisseur Solutions Plan Communications Management - Outputs Pankaj Sharma, 9810996356 Communication Management Plan contains the following information  Methods or technologies used to convey the information, such as memos, e-mail, and /or press releases;  Glossary of common terminology  Flow charts of the information flow in the project, workflows with possible sequence of authorization , list of report, and meeting plans etc and  Communication constraints usually derived from a specific legislation or regulation , technology , and organization policies etc The communications management plan can also include guidelines and templates for project status meetings , project team meetings , e- meetings and e-mail messages. Pankaj Sharma - Mobile No -919810996356
  • 21. Connoisseur Solutions Communication Plan Communication Format Frequency Distribution Team Briefing Restricted Intranet Daily at 9:00 Team and stakeholders with access to secure project info area Weekly Web Bulletin Internal Intranet Weekly Team, sponsor, senior management Technical Incident Report Email Immediately after Incident Webmaster, IT Department Budget and Schedule Detail Spreadsheets and Detailed Gantt Chart Bi-Weekly Sponsor, Senior Management Accomplishments and Setbacks Email and Intranet Weekly All internal stakeholders Schedule Milestones Email and Intranet Weekly All internal stakeholders Cost-to-Date Milestones Email and Intranet Weekly All internal stakeholders Current Top 5 Risks Email and Intranet Weekly All internal stakeholders Pankaj Sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 22. Connoisseur Solutions Manage Communications This process updates stakeholders on the progress of the project as per the communications management plan. The information that gets distributed includes status reports, review meetings etc Pankaj Sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 23. Connoisseur Solutions Manage Communications Inputs Tools and Techniques Outputs  Communication management plan  Work performance reports  Enterprise environmental factors  Organizational process assets □ Communication technology □ Communication models □ Communications method □ Information management system □ Performance reporting  Project communications  Project management plan updates  Project document updates Organizational Process assets updates Pankaj Sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 24. Connoisseur Solutions Control Communications Process This process tracks how the project is progressing against the plan and provide report to stakeholders on status, progress metrics (Schedule and Cost variance) and forecasts Pankaj Sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 25. Connoisseur Solutions Control Communications Process Inputs Tools and Techniques Outputs  Project management plan  Project communications  Issue log  Work performance data  Organizational Process assets □ Information management system □ Expert Judgment □ Meetings  Work performance information  Change requests  Project management plan updates  Project document updates  Organizational Process assets updates Pankaj Sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 26. Connoisseur Solutions Communication Channels  Channels = n(n-1)/2 Where n is the number of people on the project  If there are five people on the project, then we have 10 communication channels.  This is calculated as follows: 5*(5-1) /2 = 10 Project Communication Management Pankaj Sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 27. Connoisseur Solutions Communication Filtering Ambiguous language Predefined mindset Hidden agenda in message content Senders reputation Senders status in the organization Dysfunctional emotional behavior Environmental Background When a portion of the message is lost in communication. Common reasons of filtering: Pankaj Sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 28. Connoisseur Solutions Revising Key Terms : Complete the following Exercise : Communication Management 1. A contract is always __________ communication 2. A stakeholder with high interest and low power must be kept _______ of your project’s progress 3. Information should be distributed to all _______ Pankaj Sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 29. Connoisseur Solutions Revising Key Terms : Complete the following Answers to Exercise : Communication Management 1. A contract is always formal communication 2. A stakeholder with high interest and low power must be kept Informed of your project’s progress 3. Information should be distributed to all stakeholders Pankaj Sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 30. Connoisseur Solutions Practicing the concept Exercise 4: Number of Lines of Communication You are managing a project with five team members and one sponsor. Draw all the channels of communication on this picture. Solution: Lines of Communication = 6 * (6 – 1)/2 = 15 Pankaj Sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356
  • 31. Connoisseur Solutions QUIZ ! Pankaj Sharma, 9810996356 Pankaj Sharma - Mobile No -919810996356