- 8. Cost of multitasking
Source: Gerald Weinberg, Quality Software Management:
Vol. 1 System Thinking
- 10. Catching up
UM… HOW DOES THIS
DARN CODE WORK,
AGAIN?
- 19. Total time: 26% better
Average cycle time: 59% better
Predictability*: 89% better
*Standard deviation
- 25. Average cycle time: 50% better
Pessimistic scenario: 53% better
Predictability*: 65% better
*80th percentile
- 34. Cost of blocked work: 1% worse
Cost of idle capacity: 1% worse
Average cycle time: 28% better
Source: Don Reinertsen, #lkce12 keynote
- 45. Cost of blocked work: 1% worse
What’s the value of
blocked or rejected
work?
- 47. Cost of idle capacity: 1% worse
Is capacity wasted or
used to do
something else?