SlideShare una empresa de Scribd logo
1 de 8
Descargar para leer sin conexión
Project Management for Results




  Earn 35 PDUs
  and 30 CPE
  Credits!


  Complete                 April 19–23, 2010 | Atlanta, GA
  Your Project
                           Featuring Project Management Methodology Specifically
  on Time,                 Designed to Help You:
  Within                     Define and Plan Major Projects
  Budget                     Track and Manage Projects with Greater Accuracy
                             Define Project Goals and Successfully Complete Project Requirements
  and to the
                             Remain within Project Scope
  Customer’s                 Manage and Report Project Data and Enhance Performance
  Expectations               Master the Process of Closing and Executing Projects
                             Visualize and Plan Project Activities Using a Work Breakdown Structure



In Association with:


                       ®                              www.ASMIweb.com/PMRAtlanta 1
                                                          www.ASMIweb.com/PMRAtlanta
day one
                    Project Management for Results

                    April 19, 2010
                    8:30                                           1:00
                    Registration & Continental Breakfast
                                                                   Project Initiation Phase
                                                                     Implement key stakeholder techniques for
                    9:00
                                                                     the first customer/sponsor meetings
                    Introduction to Project Management:
                                                                     Identify and describe project requirements
                    The Latest Methodologies in                      in clear terms
                    Project Management According to
                    the PMBOK®
                      Describe the differences between             Project Organization Phase
                      operations, projects and programs              Align project team requirements
                      Define roles, review the necessary skills       with current organizational structure
                      of project managers and identify possible      and standards
                      competency gaps                                Define roles and develop necessary skills to
                                                                     effectively deliver on planned objectives

                    Review the Terminology: Understand
                    Key Concepts and Terms                         Creating the Project Charter
                      Review key project management                  Review criteria to determine exactly what is
                      terminology as it relates to the PMBOK®        needed in the project charter documents
                      and project management methodology             Utilize best-in-class techniques for
                      Differentiate the various roles and            executing a project charter with full
                      responsibilities of project stakeholders       sponsor’s approval


                                                                   4:00
                    Develop Project Management Skills              Day One Adjourns
                    for Success
                      Utilize various methods to enhance project
                      team building
                      Understand the key organizational
                      influences that may affect a project


                    12:00
                    Lunch Break




          who should attend:
            Project Managers                                          Procurement Managers
            Portfolio Managers                                        Acquisition and Procurement Staff
            Program Managers                                          IT Architects
                ®
            PMP s                                                     IT Specialists
            Project Support Staff                                     CAPMs
            Program Analysts                                          Contract Managers


2         www.ASMIweb.com/PMRAtlanta
day two
         Project Management for Results

         April 20, 2010
         8:30                                           1:00
         Registration & Continental Breakfast
                                                        Use the Work Breakdown Structure
                                                        for Effective Estimating
         9:00
                                                          Differentiate cost estimating and
         Key Techniques for Defining                       cost budgeting
         a Project
                                                          Develop an expected value process to
           Understand and identify the components of      create a defensible contingency reserve
           a project description document
           Create and describe the purpose of a
           project priority matrix                      Develop a Preliminary Schedule
                                                          Create a network diagram and identify the
                                                          critical path
         Plan the Project Infrastructure
                                                          Identify early and late schedules and
           Determine the purpose of defining the           produce a preliminary Gantt Chart using
           project infrastructure                         this information
           Develop quality standards based on project
           goals and contract requirements
                                                        Construct the Network Diagram
                                                          Monitor project timing and resources and
         Visualize and Plan the Project                   manage the links between them
         Activities Using a Work Breakdown                Establish then minimize realistic project
         Structure                                        duration while maintaining overall cost and
           Understand the purpose of a Work               design requirements
           Breakdown Structure (WBS)
           Create a WBS using two techniques            4:00
                                                        Day Two Adjourns

         12:00
         Lunch Break




top five reasons to attend:

 Successfully              Break project        Develop               Understand              Acquire the
 bring a project           work down into       project               critical factors        necessary units to
 from initiation to        meaningful tasks     performance           for reclaiming          sit for the PMP®
 execution                                      measurement           troubled projects       examination
                                                and reporting
                                                standards




                                                                               www.ASMIweb.com/PMRAtlanta               3
day three
                     Project Management for Results

                     April 21, 2010
                     8:30                                            1:00
                     Registration & Continental Breakfast            Utilize and Load
                                                                     Organizational Resources
                     9:00                                              Maintain and assign people, facility and
                     Define Project Estimates                           equipment resources accordingly
                       Differentiate between a contingency reserve     Actively adjust loads and variable expenses
                       and a management reserve                        and understand the difference between
                       Use your WBS to provide a more accurate         generic and specific-level resources
                       project estimate
                                                                     Create the Project Budget
                     Analyze the Network Diagram                       Identify your costs and develop your own
                       Resolve project and program problems and        project budgeting process
                       make decisions                                  Create a baseline to determine if the
                       Establish then minimize realistic project       project is on track and help chart the project
                       duration while maintaining overall cost and     and progress
                       design requirements
                                                                     Optimize the Project Plan
                     Manage Project Progress: Integrating              Develop key strategies for creating and
                     the Gantt Chart                                   optimizing the project plan
                       Graphically document, manage and                Manage project status and anticipate
                       monitor project progress to effectively         problems that can hurt project progress
                       minimize setbacks
                       Maintain project scope and take corrective    4:00
                       action to get projects back on course         Day Three Adjourns




                     12:00
                     Lunch Break




            PMP® exam voucher: $600 ($450 for PMI Members)
            If you plan on taking the PMP Exam, you may purchase a voucher from The Performance Institute for
            $600. The benefits of purchasing the voucher from the Institute are:
              No out-of-pocket expense to register for the exam
              All costs associated with PMP certification are included on one invoice
              Add all PMP certification expenses to the cost of this training




4           www.ASMIweb.com/PMRAtlanta
day four
     Project Management for Results

     April 22, 2010
     8:30                                               1:00
     Registration & Continental Breakfast
                                                        Assemble the Project Team
                                                          Assess project human capital needs
     9:00
                                                          and negotiate staff assignments with
     Identify Risks                                       senior leadership
       Identify and evaluate project risk                 Lead exercises that promote overall
       Identify specific risks by project and by work      team success
       package or activity

                                                        Understand the Project Manager’s
     Utilize Risk Analysis Techniques                   Role in Team Development
       Determine how risk management will be              Overcome the many challenges to being an
       executed, who will be involved and the             effective project leader
       precise techniques to use                          Strengthen your leadership skills by
       Objectively analyze the probability and            assessing, developing and advancing
       impact of each possible risk                       management capabilities


     Design a Risk Management Plan                      Report Project Status
       Create a risk management plan to ensure            Record and report project status using
       successful project execution                       different methods
       Analyze, control and mitigate risks using this     Ensure data accuracy when giving real
       effective tool                                     project status reports


     12:00                                              4:00
     Lunch Break                                        Day Four Adjourns




key methodologies covered
The project management process described in this course enables project managers
to produce project deliverables in the least amount of time, for the lowest cost and
with the highest quality. Developed from the Project Management Body of Knowledge
(PMBOK®) and produced by The Project Management Institute (PMI), this course
teaches project managers to develop specific goals, objectives and deliverables to
control the elements of projects.




                                                                              www.ASMIweb.com/PMRAtlanta         5
day five
                  Project Management for Results

                  April 23, 2010
                  8:30                                           1:00
                  Registration & Continental Breakfast
                                                                 Monitor and Control Project Processes
                                                                   Utilize proper measures and metrics to
                  9:00
                                                                   gauge project processes
                  Deal with Change
                                                                   Effectively report project processes and
                    Manage and communicate project change          make enhancements
                    Create a change management system to
                    avoid confusion and keep your projects
                    on track                                     Execute the Project Closeout Phase
                                                                   Name the three steps to closing out a
                                                                   project and several choices for project
                  Establish Change Management                      closeout activities
                  Control Procedures                               Conduct a project closeout review
                    Initiate a change management process
                    within your project
                    Enhance project team success through         Document Lessons Learned
                    effective change initiatives                   Document project successes and
                                                                   improvements
                                                                   Implement a system to ensure data and
                  Adjust the Scope for                             metrics for further projects
                  Schedule Changes
                    Schedule changes that can uncontrollably     4:00
                    alter the project scope                      Conference Adjourns
                    Keep your project within scope and on time
                    using best practices

                  12:00
                  Lunch Break




          sponsorship opportunities
          As a conference and training provider, The American Strategic Management Institute is an
          expert in bringing together leaders to share and discuss best practices and innovations. We
          connect decision-makers with respected solution providers.

          ASMI offers four different pre-designed sponsorship packages:
          • Event Co-Sponsor • Session Sponsor • Luncheon Sponsor • Exhibit Booth Sponsor

          For more information on sponsorships or to get started, please contact Meredith Mason at
          202-739-9707 or email her at Meredith.Mason@ASMIweb.com

6         www.ASMIweb.com/PMRAtlanta
Project Management for Results

 Logistics & Registration
 Venue and Hotel:                                                     PDUs
 Project Management for Results will be hosted at The                                               PMI Registered Education Provider
 Westin Buckhead in Atlanta, GA. Continental breakfast and                                          PDU Credits: Up to 35
                                                                  ®                                    As a PMI Registered Education Provider (R.E.P), The
 refreshments will be provided for delegates on each day.
                                                                      Performance Institute has agreed to abide by PMI established quality assurance
                                                                      criteria. “PMI” and the PMI logo are service and trademarks registered in the
 Conference Address:                                                  United States and other nations; “PMP” is a certification mark registered in
 The Westin Buckhead Atlanta                                          the United States and other nations; “PMBOK” and “CAPM” are trademarks
                                                                      registered in the United States and other nations by the Project Management
 3391 Peachtree Road, NE                                              Institute, Inc., which is not affiliated with The Performance Institute. Earning
 Atlanta, GA 30326                                                    PMI Credits: The Performance Institute is a Registered Education Provider of
                                                                      The Project Management Institute. All of our project management trainings,
 (404) 365-0065                                                       conferences and webinars offer credits to help you take the PMP Exam or stay
                                                                      accredited with PMI.
 A limited number of rooms have been reserved at The Westin
 Buckhead Atlanta at the prevailing rate of $196.00 until March
 19, 2010. Please call the hotel directly and reference code
                                                                      CPE Credits:
 “The Performance Institute” when making reservations to get                       Delivery Method: Group-live
 the discounted rate.                                                              Program Level: Basic
                                                                                   Prerequisites: None
 The Westin Buckhead Atlanta                                                       Advanced Preparation: None
 3391 Peachtree Road, NE                                              CPE Credits: 15 Credits
 Atlanta, GA 30326                                                    The American Strategic Management Institute (ASMI) is registered with the
                                                                      National Association of State Boards of Accountancy (NASBA) as a sponsor of
 (404) 365-0065                                                       continuing professional education on the National Registry of CPE Sponsors.
 http://www.starwoodhotels.com/westin/property/                       State boards of accountancy have final authority on the acceptance of individual
 overview/index.html?propertyID=1485                                  courses for CPE credit. Complaints regarding sponsors may be addressed to
                                                                      the National Registry of CPE Sponsors, 150 Fourth Avenue North, Nashville, TN
                                                                      37219-2417. Website: www.nasba.org.

 Tuition & Group Discounts:
 The tuition rate for attending Project Management for                Quality Assurance
 Results Week is as follows:                                          ASMI strives to provide you with the most productive and effective
  Offerings                            Rate         PDUs              educational experience possible. If after completing the course you feel
                                                                      there is some way we can improve, please write your comments on the
  Full Project Management                                             evaluation form provided upon your arrival. Should you feel dissatisfied
                                      $2299           35              with your learning experience and wish to request a credit or refund,
  for Results Week                                                    please submit it in writing no later than 10 business days after the end of
                                                                      the training to: ASMI: Corporate Headquarters; 805 15th Street NW, 3rd
  Project Management for
                                      $1399           21              Floor; Washington, D.C. 20005
  Results (3 Days)
                                                                      Note: As speakers are confirmed six months before the event, some
  Earned Value Management             $999            14              speaker changes or topic changes may occur in the program. ASMI is not
                                                                      responsible for speaker changes, but will work to ensure a comparable
 * For information on group discounts, please contact                 speaker is located to participate in the program.
   Dave Yerks at 858-866-9381 or email him at
                                                                      If for any reason ASMI decides to cancel this conference, ASMI
   David.Yerks@ASMIweb.com                                            accepts no responsibility for covering airfare, hotel or other costs incurred
                                                                      by registrants, including delegates, sponsors and guests.


                                                                      Discounts and Payment

“Very interesting                                                     • All ‘Early Bird’ Discounts must require payment at time of registration
                                                                        and before the cut-off date in order to receive any discount.

 combination of                                                       • Any discounts offered whether by ASMI (including team discounts) must
                                                                        also require payment at the time of registration.
                                                                      • All discount offers cannot be combined with any other offer.
                                                                      • Discounts cannot be applied retroactively
 system and strategy. Real                                            Payment must be secured prior to the conference. If payment is not
                                                                      received by the conference start date, a method of payment must
 demonstration of how to.”                                            be presented at the time of registration in order to guarantee your
                                                                      participation at the event.


 Teri Burks,
 Regional Project Manager, USDA

                                                                                                    www.ASMIweb.com/PMRAtlanta                               7
Project Management for Results

    Logistics & Registration
    to register
                 Call                                    Fax this Form to                                 Visit
                 877-992-9522                            866-234-0680                                     www.ASMIweb.com/PMRAtlanta



     Registration Form
            Yes! Register me for Full Project Management for Results Week
            Please call me. I am interested in a special Group Discount for my team


     Delegate Information


     Name                                                                            Title




     Organization                                                                    Dept.




     Address




     City                                                                            State                                    Zip




     Telephone                                              Fax                                         Email



     Payment Information:
       Check         Purchase Order / Training Form                                  Credit Card


     Credit Card Number                                                Expiration Date                                        Verification no.




     Name on Card                                                      Billing Zip



     Please make checks payable to: The Performance Institute

     CANCELLATION POLICY: ASMI will provide a full refund less a $399 administration fee for cancellations requested four weeks prior
     to the event start date unless cancellation occurs within two weeks prior to the event start date. If a cancellation is requested less than
     two weeks prior to the event start date, no refund will be issued. Registrants who fail to attend and do not cancel prior to the event
     will be charged the entire registration fee. All cancellations must be requested through the cancellation link found in your attendance
     confirmation email. Please note that cancellation is not final until you receive a cancellation confirmation email.

            I have read and accepted the Cancellation Policy above.

     ACKNOWLEDGED AND AGREED

     By: __________________________________________________________________________________________             Date: _______________________

                                                                                                                         Priority Code: T348-WEB



8   www.ASMIweb.com/PMRAtlanta

Más contenido relacionado

La actualidad más candente (19)

T355 p iweb
T355 p iwebT355 p iweb
T355 p iweb
 
T328
T328T328
T328
 
T328
T328T328
T328
 
T328
T328T328
T328
 
T355
T355T355
T355
 
T349 Pi Web
T349 Pi WebT349 Pi Web
T349 Pi Web
 
T343
T343T343
T343
 
Best Practices Frameworks 101
Best Practices Frameworks 101Best Practices Frameworks 101
Best Practices Frameworks 101
 
T347 P Iweb
T347 P IwebT347 P Iweb
T347 P Iweb
 
T347
T347T347
T347
 
Pmp exam overview
Pmp exam overviewPmp exam overview
Pmp exam overview
 
Strivent Service Offerings Differentiators Web 2 9
Strivent Service Offerings  Differentiators Web 2 9Strivent Service Offerings  Differentiators Web 2 9
Strivent Service Offerings Differentiators Web 2 9
 
Romeo.mitchell
Romeo.mitchellRomeo.mitchell
Romeo.mitchell
 
Resolving TIAs
Resolving TIAsResolving TIAs
Resolving TIAs
 
Louis.cioletti
Louis.ciolettiLouis.cioletti
Louis.cioletti
 
T329
T329T329
T329
 
T328
T328T328
T328
 
T328
T328T328
T328
 
ThinkICT -Process and Tools for PM
ThinkICT -Process and Tools for PMThinkICT -Process and Tools for PM
ThinkICT -Process and Tools for PM
 

Destacado (9)

T900
T900T900
T900
 
H B Q I Aprilnewsletter
H B Q I AprilnewsletterH B Q I Aprilnewsletter
H B Q I Aprilnewsletter
 
B280 Web
B280 WebB280 Web
B280 Web
 
S274
S274S274
S274
 
P711
P711P711
P711
 
W233
W233W233
W233
 
T354 pi
T354 piT354 pi
T354 pi
 
B305
B305B305
B305
 
Wsr
WsrWsr
Wsr
 

Similar a T348 Asm Iweb (17)

T348 P Iweb
T348 P IwebT348 P Iweb
T348 P Iweb
 
T349
T349T349
T349
 
T335 Asmiweb
T335 AsmiwebT335 Asmiweb
T335 Asmiweb
 
T355
T355T355
T355
 
T328
T328T328
T328
 
T355 p iweb
T355 p iwebT355 p iweb
T355 p iweb
 
T349
T349T349
T349
 
T335 Web
T335 WebT335 Web
T335 Web
 
T335 Web
T335 WebT335 Web
T335 Web
 
T335asmi
T335asmiT335asmi
T335asmi
 
T356
T356T356
T356
 
T356 Asmi
T356 AsmiT356 Asmi
T356 Asmi
 
T344
T344T344
T344
 
T344 Web
T344 WebT344 Web
T344 Web
 
T335
T335T335
T335
 
T329
T329T329
T329
 
Essentials egov ict_project_management_v1
Essentials egov ict_project_management_v1Essentials egov ict_project_management_v1
Essentials egov ict_project_management_v1
 

Más de performanceweb (20)

Cheatsheet
CheatsheetCheatsheet
Cheatsheet
 
5 Deadly Workplace Legal Risks
5 Deadly Workplace Legal Risks5 Deadly Workplace Legal Risks
5 Deadly Workplace Legal Risks
 
T354
T354T354
T354
 
T354
T354T354
T354
 
T358
T358T358
T358
 
T354
T354T354
T354
 
T354 asmi
T354 asmiT354 asmi
T354 asmi
 
T358
T358T358
T358
 
P769
P769P769
P769
 
P769
P769P769
P769
 
E136
E136E136
E136
 
B331
B331B331
B331
 
P765
P765P765
P765
 
P765
P765P765
P765
 
P765
P765P765
P765
 
T354
T354T354
T354
 
B329
B329B329
B329
 
B316
B316B316
B316
 
Wsr
WsrWsr
Wsr
 
T376
T376T376
T376
 

T348 Asm Iweb

  • 1. Project Management for Results Earn 35 PDUs and 30 CPE Credits! Complete April 19–23, 2010 | Atlanta, GA Your Project Featuring Project Management Methodology Specifically on Time, Designed to Help You: Within Define and Plan Major Projects Budget Track and Manage Projects with Greater Accuracy Define Project Goals and Successfully Complete Project Requirements and to the Remain within Project Scope Customer’s Manage and Report Project Data and Enhance Performance Expectations Master the Process of Closing and Executing Projects Visualize and Plan Project Activities Using a Work Breakdown Structure In Association with: ® www.ASMIweb.com/PMRAtlanta 1 www.ASMIweb.com/PMRAtlanta
  • 2. day one Project Management for Results April 19, 2010 8:30 1:00 Registration & Continental Breakfast Project Initiation Phase Implement key stakeholder techniques for 9:00 the first customer/sponsor meetings Introduction to Project Management: Identify and describe project requirements The Latest Methodologies in in clear terms Project Management According to the PMBOK® Describe the differences between Project Organization Phase operations, projects and programs Align project team requirements Define roles, review the necessary skills with current organizational structure of project managers and identify possible and standards competency gaps Define roles and develop necessary skills to effectively deliver on planned objectives Review the Terminology: Understand Key Concepts and Terms Creating the Project Charter Review key project management Review criteria to determine exactly what is terminology as it relates to the PMBOK® needed in the project charter documents and project management methodology Utilize best-in-class techniques for Differentiate the various roles and executing a project charter with full responsibilities of project stakeholders sponsor’s approval 4:00 Develop Project Management Skills Day One Adjourns for Success Utilize various methods to enhance project team building Understand the key organizational influences that may affect a project 12:00 Lunch Break who should attend: Project Managers Procurement Managers Portfolio Managers Acquisition and Procurement Staff Program Managers IT Architects ® PMP s IT Specialists Project Support Staff CAPMs Program Analysts Contract Managers 2 www.ASMIweb.com/PMRAtlanta
  • 3. day two Project Management for Results April 20, 2010 8:30 1:00 Registration & Continental Breakfast Use the Work Breakdown Structure for Effective Estimating 9:00 Differentiate cost estimating and Key Techniques for Defining cost budgeting a Project Develop an expected value process to Understand and identify the components of create a defensible contingency reserve a project description document Create and describe the purpose of a project priority matrix Develop a Preliminary Schedule Create a network diagram and identify the critical path Plan the Project Infrastructure Identify early and late schedules and Determine the purpose of defining the produce a preliminary Gantt Chart using project infrastructure this information Develop quality standards based on project goals and contract requirements Construct the Network Diagram Monitor project timing and resources and Visualize and Plan the Project manage the links between them Activities Using a Work Breakdown Establish then minimize realistic project Structure duration while maintaining overall cost and Understand the purpose of a Work design requirements Breakdown Structure (WBS) Create a WBS using two techniques 4:00 Day Two Adjourns 12:00 Lunch Break top five reasons to attend: Successfully Break project Develop Understand Acquire the bring a project work down into project critical factors necessary units to from initiation to meaningful tasks performance for reclaiming sit for the PMP® execution measurement troubled projects examination and reporting standards www.ASMIweb.com/PMRAtlanta 3
  • 4. day three Project Management for Results April 21, 2010 8:30 1:00 Registration & Continental Breakfast Utilize and Load Organizational Resources 9:00 Maintain and assign people, facility and Define Project Estimates equipment resources accordingly Differentiate between a contingency reserve Actively adjust loads and variable expenses and a management reserve and understand the difference between Use your WBS to provide a more accurate generic and specific-level resources project estimate Create the Project Budget Analyze the Network Diagram Identify your costs and develop your own Resolve project and program problems and project budgeting process make decisions Create a baseline to determine if the Establish then minimize realistic project project is on track and help chart the project duration while maintaining overall cost and and progress design requirements Optimize the Project Plan Manage Project Progress: Integrating Develop key strategies for creating and the Gantt Chart optimizing the project plan Graphically document, manage and Manage project status and anticipate monitor project progress to effectively problems that can hurt project progress minimize setbacks Maintain project scope and take corrective 4:00 action to get projects back on course Day Three Adjourns 12:00 Lunch Break PMP® exam voucher: $600 ($450 for PMI Members) If you plan on taking the PMP Exam, you may purchase a voucher from The Performance Institute for $600. The benefits of purchasing the voucher from the Institute are: No out-of-pocket expense to register for the exam All costs associated with PMP certification are included on one invoice Add all PMP certification expenses to the cost of this training 4 www.ASMIweb.com/PMRAtlanta
  • 5. day four Project Management for Results April 22, 2010 8:30 1:00 Registration & Continental Breakfast Assemble the Project Team Assess project human capital needs 9:00 and negotiate staff assignments with Identify Risks senior leadership Identify and evaluate project risk Lead exercises that promote overall Identify specific risks by project and by work team success package or activity Understand the Project Manager’s Utilize Risk Analysis Techniques Role in Team Development Determine how risk management will be Overcome the many challenges to being an executed, who will be involved and the effective project leader precise techniques to use Strengthen your leadership skills by Objectively analyze the probability and assessing, developing and advancing impact of each possible risk management capabilities Design a Risk Management Plan Report Project Status Create a risk management plan to ensure Record and report project status using successful project execution different methods Analyze, control and mitigate risks using this Ensure data accuracy when giving real effective tool project status reports 12:00 4:00 Lunch Break Day Four Adjourns key methodologies covered The project management process described in this course enables project managers to produce project deliverables in the least amount of time, for the lowest cost and with the highest quality. Developed from the Project Management Body of Knowledge (PMBOK®) and produced by The Project Management Institute (PMI), this course teaches project managers to develop specific goals, objectives and deliverables to control the elements of projects. www.ASMIweb.com/PMRAtlanta 5
  • 6. day five Project Management for Results April 23, 2010 8:30 1:00 Registration & Continental Breakfast Monitor and Control Project Processes Utilize proper measures and metrics to 9:00 gauge project processes Deal with Change Effectively report project processes and Manage and communicate project change make enhancements Create a change management system to avoid confusion and keep your projects on track Execute the Project Closeout Phase Name the three steps to closing out a project and several choices for project Establish Change Management closeout activities Control Procedures Conduct a project closeout review Initiate a change management process within your project Enhance project team success through Document Lessons Learned effective change initiatives Document project successes and improvements Implement a system to ensure data and Adjust the Scope for metrics for further projects Schedule Changes Schedule changes that can uncontrollably 4:00 alter the project scope Conference Adjourns Keep your project within scope and on time using best practices 12:00 Lunch Break sponsorship opportunities As a conference and training provider, The American Strategic Management Institute is an expert in bringing together leaders to share and discuss best practices and innovations. We connect decision-makers with respected solution providers. ASMI offers four different pre-designed sponsorship packages: • Event Co-Sponsor • Session Sponsor • Luncheon Sponsor • Exhibit Booth Sponsor For more information on sponsorships or to get started, please contact Meredith Mason at 202-739-9707 or email her at Meredith.Mason@ASMIweb.com 6 www.ASMIweb.com/PMRAtlanta
  • 7. Project Management for Results Logistics & Registration Venue and Hotel: PDUs Project Management for Results will be hosted at The PMI Registered Education Provider Westin Buckhead in Atlanta, GA. Continental breakfast and PDU Credits: Up to 35 ® As a PMI Registered Education Provider (R.E.P), The refreshments will be provided for delegates on each day. Performance Institute has agreed to abide by PMI established quality assurance criteria. “PMI” and the PMI logo are service and trademarks registered in the Conference Address: United States and other nations; “PMP” is a certification mark registered in The Westin Buckhead Atlanta the United States and other nations; “PMBOK” and “CAPM” are trademarks registered in the United States and other nations by the Project Management 3391 Peachtree Road, NE Institute, Inc., which is not affiliated with The Performance Institute. Earning Atlanta, GA 30326 PMI Credits: The Performance Institute is a Registered Education Provider of The Project Management Institute. All of our project management trainings, (404) 365-0065 conferences and webinars offer credits to help you take the PMP Exam or stay accredited with PMI. A limited number of rooms have been reserved at The Westin Buckhead Atlanta at the prevailing rate of $196.00 until March 19, 2010. Please call the hotel directly and reference code CPE Credits: “The Performance Institute” when making reservations to get Delivery Method: Group-live the discounted rate. Program Level: Basic Prerequisites: None The Westin Buckhead Atlanta Advanced Preparation: None 3391 Peachtree Road, NE CPE Credits: 15 Credits Atlanta, GA 30326 The American Strategic Management Institute (ASMI) is registered with the National Association of State Boards of Accountancy (NASBA) as a sponsor of (404) 365-0065 continuing professional education on the National Registry of CPE Sponsors. http://www.starwoodhotels.com/westin/property/ State boards of accountancy have final authority on the acceptance of individual overview/index.html?propertyID=1485 courses for CPE credit. Complaints regarding sponsors may be addressed to the National Registry of CPE Sponsors, 150 Fourth Avenue North, Nashville, TN 37219-2417. Website: www.nasba.org. Tuition & Group Discounts: The tuition rate for attending Project Management for Quality Assurance Results Week is as follows: ASMI strives to provide you with the most productive and effective Offerings Rate PDUs educational experience possible. If after completing the course you feel there is some way we can improve, please write your comments on the Full Project Management evaluation form provided upon your arrival. Should you feel dissatisfied $2299 35 with your learning experience and wish to request a credit or refund, for Results Week please submit it in writing no later than 10 business days after the end of the training to: ASMI: Corporate Headquarters; 805 15th Street NW, 3rd Project Management for $1399 21 Floor; Washington, D.C. 20005 Results (3 Days) Note: As speakers are confirmed six months before the event, some Earned Value Management $999 14 speaker changes or topic changes may occur in the program. ASMI is not responsible for speaker changes, but will work to ensure a comparable * For information on group discounts, please contact speaker is located to participate in the program. Dave Yerks at 858-866-9381 or email him at If for any reason ASMI decides to cancel this conference, ASMI David.Yerks@ASMIweb.com accepts no responsibility for covering airfare, hotel or other costs incurred by registrants, including delegates, sponsors and guests. Discounts and Payment “Very interesting • All ‘Early Bird’ Discounts must require payment at time of registration and before the cut-off date in order to receive any discount. combination of • Any discounts offered whether by ASMI (including team discounts) must also require payment at the time of registration. • All discount offers cannot be combined with any other offer. • Discounts cannot be applied retroactively system and strategy. Real Payment must be secured prior to the conference. If payment is not received by the conference start date, a method of payment must demonstration of how to.” be presented at the time of registration in order to guarantee your participation at the event. Teri Burks, Regional Project Manager, USDA www.ASMIweb.com/PMRAtlanta 7
  • 8. Project Management for Results Logistics & Registration to register Call Fax this Form to Visit 877-992-9522 866-234-0680 www.ASMIweb.com/PMRAtlanta Registration Form Yes! Register me for Full Project Management for Results Week Please call me. I am interested in a special Group Discount for my team Delegate Information Name Title Organization Dept. Address City State Zip Telephone Fax Email Payment Information: Check Purchase Order / Training Form Credit Card Credit Card Number Expiration Date Verification no. Name on Card Billing Zip Please make checks payable to: The Performance Institute CANCELLATION POLICY: ASMI will provide a full refund less a $399 administration fee for cancellations requested four weeks prior to the event start date unless cancellation occurs within two weeks prior to the event start date. If a cancellation is requested less than two weeks prior to the event start date, no refund will be issued. Registrants who fail to attend and do not cancel prior to the event will be charged the entire registration fee. All cancellations must be requested through the cancellation link found in your attendance confirmation email. Please note that cancellation is not final until you receive a cancellation confirmation email. I have read and accepted the Cancellation Policy above. ACKNOWLEDGED AND AGREED By: __________________________________________________________________________________________ Date: _______________________ Priority Code: T348-WEB 8 www.ASMIweb.com/PMRAtlanta