Pre-Salt Oil: Developing The Frontier

        José Sergio Gabrielli de Azevedo
                                     CEO
                     November, 16th 2011
                              JP Morgan




                                           1
DISCLAIMER




  This presentation may contain forward-looking      Cautionary statement for U.S. investors:
  statements. Such statements reflect only the
  expectations of the Company's management           The United States Securities and Exchange
  regarding the future conditions of the economy,    Commission permits oil and gas companies,
  the industry, the performance and financial        in their filings with the SEC, to disclose
  results of the Company, among other factors.       proved reserves that a company has
  Such terms as "anticipate", "believe", "expect",   demonstrated by actual production or
  "forecast", "intend", "plan", "project", "seek",   conclusive formation tests to be economically
  "should", along with similar expressions, are      and legally viable under existing economic
  used to identify such statements. These            and operating conditions. We use certain
  predictions    evidently   involve   risks   and   terms in this presentation, such as
  uncertainties, whether foreseen or not by the      discoveries, that the SEC’s guidelines strictly
  Company. Consequently, these statements do         prohibit us from including in filings with the
  not represent assurance of future results of the   SEC.
  Company. Therefore, the Company's future
  results of operations may differ from current
  expectations, and readers must not base their
  expectations solely on the information presented
  herein. The Company is not obliged to update
  the presentation and forward-looking statements
  in light of new information or future
  developments. Amounts informed for the year
  2011 and upcoming years are either estimates
  or targets.




                                                                                                       2
PRE-SALT’S SHORT LAG BETWEEN DISCOVERY AND FIRST-OIL, AND FAST PROJECTED
RAMP-UP
 Oil Production




                                                                                                                                   Years after
                                                                                                                                   Discovery
                  1    3   5   7   9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51 53 55 57 59 61 63

                           Pre-Salt                GoM (USA)                 North Sea                  Campos Basin
                      Discovery: SS032 (1947)    Discovery: Q/13ª (1963)   Discovery: Garoupa (1974)    Discovery: Parati (2006)
                       First oil: SS032 (1947)     First Oil: Dan (1972)    First oil: Enchova (1977)     First oil: Tupi (2009)




                                                                                                                                            3
SANTOS PRE-SALT MASTER PLAN’S HIGHLIGHTS FROM 2006 TO 2010 ...
                     Infraestructure
  Definitive Systems
       FPSOs/




                                                                                                         Lula Pilot (AR)
           FPSOs/EWTs




                                                                                       Tupi (CSV)         Guará (DP)
           New Rigs




                                               2                   2               1                 3              6



                                                                        Júpiter
           Discoveries




                                       Pre-Salt/Parati   Carioca                          Iracema
                                                                          Iara
                                                                       Bem-Te-Vi        (cernambi)         Franco
                                        Tupi (Lula)      Caramba
                                                                         Guará
                 ...
                                            2006              2007            2008              2009              2010


                                                                                                                           4
... AND FROM 2011 ONWARDS

                                                                      Route 2                               Route 3
      Infrastructure




                          Pipeline
                       Lula-Mexilhão
                                                                                        Replic.              Replic.
 Definitive Systems




                                       Guará                        Guará                 1                 3, 4, 5, 6,
                                       Pilot                        Norte                                      7, 8
      FPSOs/




                                                                                         Replic.
                                                Lula NE             Cernambi               2
                                                                                                            Tranfer of
                                                 Pilot                 Sul                Tranfer of          Rights
                                                                                            Rights          2, 3 and 4
                                                                                              1
     FPSOs/EWTs




                            3          4 EWTs       3 EWTs               5 EWTs                    5 EWTs
     New Rigs




                             6           8                   8 already contracted + 21 to be contracted



         ...                2011       2012          2013                 2014                      2015      2016+



                                                                                                                      5
MORE DRILLING RIGS WILL ENABLE A FASTER RAMP-UP OF THE NEW PLATFORMS


         20              To reach 50% of capacity
                         To reach 75% of capacity
         16

                                                                                                         Forecast
         12
Months




         8


         4


         0
              P-43         P-48            P-50          P-52      P-54   P-53     P-51       FPSO      P-57
                                                                                            CAPIXABA
              2004        2005            2006           2007      2007   2008     2009          2010   2010

                         Water Depth              2006    2008   2010      2011   2012    2013
                      Up to 1,000 meters           6       11     11
                     1,000 to 2,000 meters         19      19     21        +2     +1      +1
                      Over 2,000 meters            2       3      15        +10   +13      +1


                                                                                                                    6
CAPITAL COSTS: PRE-SALT vs. CAMPOS
 Similar equipment and processes: main difference is drilling and completion
                                 PRE-SALT
                            CAPEX DISTRIBUTION

                     27%                              20%




                                       53%

             Gathering         Completion + Drilling            Units

                DEEPWATER PROJECTS IN CAMPOS BASIN*
                        CAPEX DISTRIBUTION

                33,3%                                          33,3%
                                                                                              Additional drilling and completion cost in
                                                                                              the pre-salt compared with an generic
                                                                                              deepwater project in Campos basin can be
                                                                                              partially or fully offset by higher quality and
                                                                                              quantity of oil expected in the pre-salt area.
                             33,3%

              Gathering         Completion + Drilling            Units

* Generic example, considering that these rates can change among the different existing projects in Campos Basin                                7
8
PRE-SALT’S ECONOMICS: PRODUCTIVITY GAINS ...




   Average drilling time of the wells completed                                      Drilling needs
                  during the year


                                                                                               - 15%
            100%




                                                  Number of wells (phase 1a)
                      85%
                               75%
                                         66%




      2006/2007    2008     2009      2010                                     PN 2010-2014      PN 2010-2015




                                                                                                                8
… RESULTING IN A HIGHER EXPECTED NPV


                                              Investment
        200%


        150%


        100%                                                           - 45%

        50%             100%
                                                   81%
                                                                     - 32%            55%
         0%
               PLANSAL 2008 (2008-2030)   PLANSAL 2009 (2008-2030)           PLANSAL 2010 (2008-2030)




                                          Net Present Value
        200%


        150%


        100%
                                                                                      152%
        50%             100%                       118%


         0%
               PLANSAL 2008 (2008-2030)   PLANSAL 2009 (2008-2030)           PLANSAL 2010 (2008-2030)




                                                                                                        9
NATURAL GAS PRODUCTION
Start-up of Plangas and Pre-salt projects will substantially increase capacity


                                                                                         Manaus
                                                                                 Coari
                                                                   Jurua Urucu




                                                                                                    UTGCA      Mexilhão
                                                                                                                                 Urugua
                                                                                                  UGN
                                                                                                  RPBC


                                                                                                            PMLZ-1        Lula

Million m3
 100                                  2011-15                                                                         95
                              Non-Associated Natural Gas
  80                           Mexilhão – 15MM m3/day
                                                              75
                             Uruguá-Tambaú – 10 MM m3/day                               2015-20
  60                  55
                                                                                 Associated Natural Gas
             42                   Juruá – 2 MM m3/day
                                                                                    from the Pre-salt
  40                            Associated Natural Gas                       Natural gas production from

  20                           Increasing production in the                      Pre-salt in Santos Basin to
                                Campos and Santos Basins                          surpass 20 MM m3/day
    0
             2010     2011                                    2015                                                   2020

                                                                                                                                          10
LOGISTICS AND INFRASTRUCTURE




                               11
E&P INVESTMENTS IN BRAZIL
Pre-salt now more than half of development spending over the next five years


               Pre-Salt                                                Post-Salt
            US$ 53.4 Billion                                         US$ 64.3 Billion


            13%       12%               Tranfer
                                 2%        of                       21%                 22%
                                        Rights

                                 21%


            54%
                                                                     57%




                   Development         Infrastructure and support         Exploration




                                                                                              12
PETROBRAS’ TOTAL RESERVES AND POTENTIAL RECOVERABLE VOLUMES
Continuous growth from deeper discoveries                                                                 Potential
                                                                                                          increase
 Million boe
   30.000




   25.000




   20.000




   15.000




   10.000




    5.000




       0




               Onshore   0-300 m   300-1500 m   > 1500 m   Pre-salt's Recoverable Volume   Transfer of Rights

                                                                                                                  13
PRODUCTION TARGETS
With broad access to new reserves, Petrobras can more than double its production in
the next decade
                                                                                                                                                      6,418
                                                                                                                                                        142
                                                                                                                                                        246

                                                                                                                                                       1.120


                                                                                                  3,993
                                                                                                                         + 35 Systems
                                                                                                    125
                                                                                                    180
                                                     2,772                                          618
                          2,516      2,575
               2,386                                    96
                            96            93
                 99                                    141           +10 Post-Salt Projects
                           132           144           435                                                                                   4,910
                111        317           334                          +8 Pre-Salt Projects
                321
                                                                     +1 Transfer of Rights
                                                                                                                3,070
                                                                                                                                                        845
’000 boe/day




                                                                                                                        Transfer of Rights
               1.855      1.971          2.004        2.100            Added Capacity
                                                                      Oil: 2,300,000 bpd            13
                                                                                                                            Pre-Salt                   1,148
                                                                                                    543

               2008       2009           2010         2011                                         2015                                                2020




               Oil Production - Brazil           Natural Gas Production - Brazil       Oil Production - International   Natural Gas Production - International



                                                                                                                                                                 14
MAIN E&P PROJECTS                                                                                       Natural Gas

Large projects sustain production increases                                                             Pre-Salt and Transfer of Rights

                                                                                                        Post-Salt

                                                                                                        EWTs

            Lula Pilot
         FPSO BW Cidade
          Angra dos Reis
           100.000 bpd
                                                                       Juruá GNA

                                                                         Lula NE
                                                                                                                  Franco 1
                                                                                                                 Transfer of
                                                                      FPSO Cidade de                               Rights

                                                
         Cachalote and            Mexilhão                                Paraty                                    FPSO

                           
          Baleia Franca           Jaqueta            Guará Pilot 2     120.000 bpd                              150.000 bpd
         FPSO Capixaba              HG              FPSO Cidade de
          100.000 bpd                                  São Paulo       Parque das      Guará (North)             FPSO P-67
                                  Tambaú              120.000 bpd        Baleias           FPSO                  Replicant 2
                               FPSO Cidade de                           FPSO P-58

                                                
             Uruguá                                                                     150.000 bpd             150.000 bpd

                           
         FPSO Cidade de            Santos                              180.000 bpd                              BMS-9 our11
             Santos                  NG                Baleia Azul
                                                    FPSO Cidade de                     Cernambi South
Th bpd     35.000 bpd
                                                        Anchieta
                                                                        Papa-Terra          FPSO                3.070
                                 Marlim Sul                            TLWP P-61 &       150.000 bpd
                                                      100.000 bpd

                                                
                                 module 3                               FPSO P-63

                           
3000        Jubarte                                 (FPSO Espadarte    150.000 bpd
                                  SS P-56
           FPSO P-57                                  reallocation)
                                100.000 bpd
          180.000 bpd
                                                                                                                 FPSO P-66
2500                                                                                                            Replicant 1
                                2.100                                                                           150.000 bpd
          2.004                                                                          Baleia Azul
                                                      Roncador                              FPSO                BMS-9 or 11
2000                                                                    Roncador
                                                      module 3          Módule 4         60.000 bpd

                                                
                               EWTs Lula NE e          SS P-55                                                   Maromba
                                                                        FPSO P-62

                           
            Tiro Pilot            Cernambi           180.000 bpd                                                   FPSO
1500                                                                   180.000 bpd
              SS-11            FPSO BW Cidade                                                                   100.000 bpd
         Atlantic Zephir         São Vicente                                                 Siri
                                                       Tiro/Sidon
          30.000 bpd             30.000 bpd                              Aruanã        Jaqueta e FPSO          ESP/Marimbá
1000                                                FPSO Cidade de
                                                                          FPSO           50.000 bpd                FPSO
                                                          Itajaí
                                                                       100.000 bpd                              40.000 bpd
                                                      80.000 bpd

                           
           EWT Guará            EWT Carioca
 500      FPSO Dynamic
            Producer
           30.000 bpd
                               FPSO Dynamic
                                  Producer
                                 30.000 bpd
                                                      4 EWTs
                                                       Pre-salt
                                                                         3 EWTs
                                                                         Pre-salt
                                                                                          5 EWTs
                                                                                          Pre-salt
                                                                                                                    5 EWTs
                                                                                                                    Pre-salt
   0
             2010                 2011               2012               2013              2014                       2015

                                                                                                                                          15
VARREDURA PROJECT
Technological development and exploratory optimization in existing concessions


        Discoveries in Pre-salt
       Descobertas do Pr é-sal                 Recoverable volumes
        Campos Basin 2009/10
       na Bacia de Campos
       2009/10 (VARREDURA)
        (Varredura)
                                               discovered:
                                                Post-salt: 1,105 MM boe
                                               (Marimbá, Marlim Sul and Pampo)

                                               Pre-salt: 1,130 MM boe*
                                               (Barracuda, Caratinga, Marlim,
                                               Marlim Leste, Albacora and Albacora
                                               Leste)
                                                 *No volumes have been announced for the Marlim
                                                              Leste and Albacora Leste discoveries



                                               67 exploratory wells will be drilled
          Wells productivity close to
                                              between 2011 and 2015 in production
                 15,000 bpd
                                                     areas in Campos basin



                                                                                                     16
CUTTING-EDGE TECHNOLOGIES




             OIL/WATER SUBSEA                            RAW WATER
                SEPARATION                                INJECTION
         - Resolves limitations from growing   - Increases production in existing
        water production                       systems
        - Separates water and oil under the    - 3 subsea systems for pumping raw
        sea, reinjecting water and relieving   water (with little treatment) to
        the size of the surface equipment      pressurize the reservoir, increasing
        on the platform                        recovery factor without increasing
        - Field: Marlim (Nov/2011)             surface systems. Pioneer in the
                                               world in such water depth
                                               - Field: Albacora (Dec/2011)

                                                                                      17
NEW VESSELS AND EQUIPMENTS
 Resources required for production growth
                                                                                                      Delivery Plan (to be contracted)
                                                                     Current Situation                      Accumulated Value
                        Critical Resources                               (Dec/10)
                                                                                                    By 2013       By 2015        By 2020
          Drilling Rigs Water Depth Above 2.000 m                              15                     39           37 (1)           65 (2)

                     Supply and Special Vessel                                287                    423           479              568

              Production Platforms (SS and FPSO)                               44                     54            61               94

                     Others (Jacket and TLWP)                                  78                     80            81               83




                                      Supply Vessel                                 Drilling Rig                            FPSO


                                                          DRILLING RIGS UNDER CONTRACT

                             Water Depth                      2006          2008             2010          2011     2012      2013
                          Up to 1,000 meters                    6             11               11
                         1,000 to 2,000 meters                 19             19               21           +2       +1        +1
                           Over 2,000 meters                    2              3               15          +10      +13        +1


(1) The contracts for two rigs reallocated from international operations expire in 2015
(2) Long-term demand will be adjusted according to new assessments                                                                           18
19
 19

Más contenido relacionado

Destacado

Exploration & Production Update (6 Oct 2011)
Exploration & Production Update (6 Oct 2011)Exploration & Production Update (6 Oct 2011)
Exploration & Production Update (6 Oct 2011)Eni
 
15 09-2008 Almir Guilherme Barbassa - Supply Chain for the Pre-salt Developme...
15 09-2008 Almir Guilherme Barbassa - Supply Chain for the Pre-salt Developme...15 09-2008 Almir Guilherme Barbassa - Supply Chain for the Pre-salt Developme...
15 09-2008 Almir Guilherme Barbassa - Supply Chain for the Pre-salt Developme...Petrobras
 
Pre-Salt # Exploiting Brazil’s Petroleum Reserves
Pre-Salt # Exploiting Brazil’s Petroleum ReservesPre-Salt # Exploiting Brazil’s Petroleum Reserves
Pre-Salt # Exploiting Brazil’s Petroleum ReservesClaudio A. Pinho
 
Antonio Carlos Pinto - "Pre-Salt: Challenges and Opportunities for the Brazil...
Antonio Carlos Pinto - "Pre-Salt: Challenges and Opportunities for the Brazil...Antonio Carlos Pinto - "Pre-Salt: Challenges and Opportunities for the Brazil...
Antonio Carlos Pinto - "Pre-Salt: Challenges and Opportunities for the Brazil...Petrobras
 
Santos Basin Development
Santos Basin DevelopmentSantos Basin Development
Santos Basin DevelopmentPetrobras
 
Brazilian-Pre-Salt-Update-Citibank-Global-Energy-and-Utilities-Conference-Boston
Brazilian-Pre-Salt-Update-Citibank-Global-Energy-and-Utilities-Conference-BostonBrazilian-Pre-Salt-Update-Citibank-Global-Energy-and-Utilities-Conference-Boston
Brazilian-Pre-Salt-Update-Citibank-Global-Energy-and-Utilities-Conference-BostonPetrobras
 
Pre-salt: overview and opportunities - Rio Oil & Gas 2012
Pre-salt: overview and opportunities - Rio Oil & Gas 2012Pre-salt: overview and opportunities - Rio Oil & Gas 2012
Pre-salt: overview and opportunities - Rio Oil & Gas 2012Petrobras
 
Brazilian Pre-Salt: Update
Brazilian Pre-Salt: UpdateBrazilian Pre-Salt: Update
Brazilian Pre-Salt: UpdatePetrobras
 
18 09-2008 Francisco Nepomuceno Filho na Rio Oil and gas Expo Conference no R...
18 09-2008 Francisco Nepomuceno Filho na Rio Oil and gas Expo Conference no R...18 09-2008 Francisco Nepomuceno Filho na Rio Oil and gas Expo Conference no R...
18 09-2008 Francisco Nepomuceno Filho na Rio Oil and gas Expo Conference no R...Petrobras
 
Deepwater oilgasmalaysia 0407.tuan-hay_ewe
Deepwater oilgasmalaysia 0407.tuan-hay_eweDeepwater oilgasmalaysia 0407.tuan-hay_ewe
Deepwater oilgasmalaysia 0407.tuan-hay_ewehdvmal
 
Miami Pré Sal José Formigalli
Miami Pré Sal José FormigalliMiami Pré Sal José Formigalli
Miami Pré Sal José FormigalliPetrobras
 

Destacado (13)

Exploration & Production Update (6 Oct 2011)
Exploration & Production Update (6 Oct 2011)Exploration & Production Update (6 Oct 2011)
Exploration & Production Update (6 Oct 2011)
 
15 09-2008 Almir Guilherme Barbassa - Supply Chain for the Pre-salt Developme...
15 09-2008 Almir Guilherme Barbassa - Supply Chain for the Pre-salt Developme...15 09-2008 Almir Guilherme Barbassa - Supply Chain for the Pre-salt Developme...
15 09-2008 Almir Guilherme Barbassa - Supply Chain for the Pre-salt Developme...
 
Pre-Salt # Exploiting Brazil’s Petroleum Reserves
Pre-Salt # Exploiting Brazil’s Petroleum ReservesPre-Salt # Exploiting Brazil’s Petroleum Reserves
Pre-Salt # Exploiting Brazil’s Petroleum Reserves
 
Antonio Carlos Pinto - "Pre-Salt: Challenges and Opportunities for the Brazil...
Antonio Carlos Pinto - "Pre-Salt: Challenges and Opportunities for the Brazil...Antonio Carlos Pinto - "Pre-Salt: Challenges and Opportunities for the Brazil...
Antonio Carlos Pinto - "Pre-Salt: Challenges and Opportunities for the Brazil...
 
Santos Basin Development
Santos Basin DevelopmentSantos Basin Development
Santos Basin Development
 
Brazilian-Pre-Salt-Update-Citibank-Global-Energy-and-Utilities-Conference-Boston
Brazilian-Pre-Salt-Update-Citibank-Global-Energy-and-Utilities-Conference-BostonBrazilian-Pre-Salt-Update-Citibank-Global-Energy-and-Utilities-Conference-Boston
Brazilian-Pre-Salt-Update-Citibank-Global-Energy-and-Utilities-Conference-Boston
 
Pre-Salt’s Reality: Update
Pre-Salt’s Reality: UpdatePre-Salt’s Reality: Update
Pre-Salt’s Reality: Update
 
Pre-salt: overview and opportunities - Rio Oil & Gas 2012
Pre-salt: overview and opportunities - Rio Oil & Gas 2012Pre-salt: overview and opportunities - Rio Oil & Gas 2012
Pre-salt: overview and opportunities - Rio Oil & Gas 2012
 
Brazilian Pre-Salt: Update
Brazilian Pre-Salt: UpdateBrazilian Pre-Salt: Update
Brazilian Pre-Salt: Update
 
Pre-salt, Local Content Policy & New bidding rounds
Pre-salt, Local Content Policy & New bidding roundsPre-salt, Local Content Policy & New bidding rounds
Pre-salt, Local Content Policy & New bidding rounds
 
18 09-2008 Francisco Nepomuceno Filho na Rio Oil and gas Expo Conference no R...
18 09-2008 Francisco Nepomuceno Filho na Rio Oil and gas Expo Conference no R...18 09-2008 Francisco Nepomuceno Filho na Rio Oil and gas Expo Conference no R...
18 09-2008 Francisco Nepomuceno Filho na Rio Oil and gas Expo Conference no R...
 
Deepwater oilgasmalaysia 0407.tuan-hay_ewe
Deepwater oilgasmalaysia 0407.tuan-hay_eweDeepwater oilgasmalaysia 0407.tuan-hay_ewe
Deepwater oilgasmalaysia 0407.tuan-hay_ewe
 
Miami Pré Sal José Formigalli
Miami Pré Sal José FormigalliMiami Pré Sal José Formigalli
Miami Pré Sal José Formigalli
 

Más de Petrobras

Strategic Plan 2040 || Business and Management Plan 2019-2023
Strategic Plan 2040 || Business and Management Plan 2019-2023Strategic Plan 2040 || Business and Management Plan 2019-2023
Strategic Plan 2040 || Business and Management Plan 2019-2023Petrobras
 
Plano Estratégico 2040 || Plano de Negócios e Gestão 2019-2023
Plano Estratégico 2040 || Plano de Negócios e Gestão 2019-2023Plano Estratégico 2040 || Plano de Negócios e Gestão 2019-2023
Plano Estratégico 2040 || Plano de Negócios e Gestão 2019-2023Petrobras
 
Petrobras Overview - September 2018
Petrobras Overview - September 2018Petrobras Overview - September 2018
Petrobras Overview - September 2018Petrobras
 
Apresentação Investor Day, São Paulo, 2018
Apresentação Investor Day, São Paulo, 2018Apresentação Investor Day, São Paulo, 2018
Apresentação Investor Day, São Paulo, 2018Petrobras
 
Petrobras Investor Day - London 2018
Petrobras Investor Day - London 2018Petrobras Investor Day - London 2018
Petrobras Investor Day - London 2018Petrobras
 
Sustentabilidade 2017
Sustentabilidade 2017Sustentabilidade 2017
Sustentabilidade 2017Petrobras
 
Apresentacao png-2018-2022-webcast-ingles
Apresentacao png-2018-2022-webcast-inglesApresentacao png-2018-2022-webcast-ingles
Apresentacao png-2018-2022-webcast-inglesPetrobras
 
Apresentação PNG 2018-2022
Apresentação PNG 2018-2022Apresentação PNG 2018-2022
Apresentação PNG 2018-2022Petrobras
 
Apresentação de Pedro Parente no Investor Day Nova York
Apresentação de Pedro Parente no Investor Day Nova YorkApresentação de Pedro Parente no Investor Day Nova York
Apresentação de Pedro Parente no Investor Day Nova YorkPetrobras
 
Apresentação de Pedro Parente no Investor Day Londres
Apresentação de Pedro Parente no Investor Day LondresApresentação de Pedro Parente no Investor Day Londres
Apresentação de Pedro Parente no Investor Day LondresPetrobras
 
Apresentação de Pedro Parente no Investor Day São Paulo
Apresentação de Pedro Parente no Investor Day São PauloApresentação de Pedro Parente no Investor Day São Paulo
Apresentação de Pedro Parente no Investor Day São PauloPetrobras
 
Visão Geral 2017 fevereiro
Visão Geral   2017 fevereiro Visão Geral   2017 fevereiro
Visão Geral 2017 fevereiro Petrobras
 
Petrobras General Overview
Petrobras General OverviewPetrobras General Overview
Petrobras General OverviewPetrobras
 
Petrobras at a Glance
Petrobras at a GlancePetrobras at a Glance
Petrobras at a GlancePetrobras
 
Visão Geral Petrobras
Visão Geral PetrobrasVisão Geral Petrobras
Visão Geral PetrobrasPetrobras
 
Strategic Plan and 2017-2021 Business & Management Plan
Strategic Plan and 2017-2021 Business & Management PlanStrategic Plan and 2017-2021 Business & Management Plan
Strategic Plan and 2017-2021 Business & Management PlanPetrobras
 
Plano Estratégico e Plano de Negócios e Gestão 2017-2021
Plano Estratégico e Plano de Negócios e Gestão 2017-2021Plano Estratégico e Plano de Negócios e Gestão 2017-2021
Plano Estratégico e Plano de Negócios e Gestão 2017-2021Petrobras
 
Plano de Negócios e Gestão 2015 – 2019
Plano de Negócios e Gestão 2015 – 2019 Plano de Negócios e Gestão 2015 – 2019
Plano de Negócios e Gestão 2015 – 2019 Petrobras
 
Webcast 1T16
Webcast 1T16Webcast 1T16
Webcast 1T16Petrobras
 
Webcast 1Q16
Webcast 1Q16Webcast 1Q16
Webcast 1Q16Petrobras
 

Más de Petrobras (20)

Strategic Plan 2040 || Business and Management Plan 2019-2023
Strategic Plan 2040 || Business and Management Plan 2019-2023Strategic Plan 2040 || Business and Management Plan 2019-2023
Strategic Plan 2040 || Business and Management Plan 2019-2023
 
Plano Estratégico 2040 || Plano de Negócios e Gestão 2019-2023
Plano Estratégico 2040 || Plano de Negócios e Gestão 2019-2023Plano Estratégico 2040 || Plano de Negócios e Gestão 2019-2023
Plano Estratégico 2040 || Plano de Negócios e Gestão 2019-2023
 
Petrobras Overview - September 2018
Petrobras Overview - September 2018Petrobras Overview - September 2018
Petrobras Overview - September 2018
 
Apresentação Investor Day, São Paulo, 2018
Apresentação Investor Day, São Paulo, 2018Apresentação Investor Day, São Paulo, 2018
Apresentação Investor Day, São Paulo, 2018
 
Petrobras Investor Day - London 2018
Petrobras Investor Day - London 2018Petrobras Investor Day - London 2018
Petrobras Investor Day - London 2018
 
Sustentabilidade 2017
Sustentabilidade 2017Sustentabilidade 2017
Sustentabilidade 2017
 
Apresentacao png-2018-2022-webcast-ingles
Apresentacao png-2018-2022-webcast-inglesApresentacao png-2018-2022-webcast-ingles
Apresentacao png-2018-2022-webcast-ingles
 
Apresentação PNG 2018-2022
Apresentação PNG 2018-2022Apresentação PNG 2018-2022
Apresentação PNG 2018-2022
 
Apresentação de Pedro Parente no Investor Day Nova York
Apresentação de Pedro Parente no Investor Day Nova YorkApresentação de Pedro Parente no Investor Day Nova York
Apresentação de Pedro Parente no Investor Day Nova York
 
Apresentação de Pedro Parente no Investor Day Londres
Apresentação de Pedro Parente no Investor Day LondresApresentação de Pedro Parente no Investor Day Londres
Apresentação de Pedro Parente no Investor Day Londres
 
Apresentação de Pedro Parente no Investor Day São Paulo
Apresentação de Pedro Parente no Investor Day São PauloApresentação de Pedro Parente no Investor Day São Paulo
Apresentação de Pedro Parente no Investor Day São Paulo
 
Visão Geral 2017 fevereiro
Visão Geral   2017 fevereiro Visão Geral   2017 fevereiro
Visão Geral 2017 fevereiro
 
Petrobras General Overview
Petrobras General OverviewPetrobras General Overview
Petrobras General Overview
 
Petrobras at a Glance
Petrobras at a GlancePetrobras at a Glance
Petrobras at a Glance
 
Visão Geral Petrobras
Visão Geral PetrobrasVisão Geral Petrobras
Visão Geral Petrobras
 
Strategic Plan and 2017-2021 Business & Management Plan
Strategic Plan and 2017-2021 Business & Management PlanStrategic Plan and 2017-2021 Business & Management Plan
Strategic Plan and 2017-2021 Business & Management Plan
 
Plano Estratégico e Plano de Negócios e Gestão 2017-2021
Plano Estratégico e Plano de Negócios e Gestão 2017-2021Plano Estratégico e Plano de Negócios e Gestão 2017-2021
Plano Estratégico e Plano de Negócios e Gestão 2017-2021
 
Plano de Negócios e Gestão 2015 – 2019
Plano de Negócios e Gestão 2015 – 2019 Plano de Negócios e Gestão 2015 – 2019
Plano de Negócios e Gestão 2015 – 2019
 
Webcast 1T16
Webcast 1T16Webcast 1T16
Webcast 1T16
 
Webcast 1Q16
Webcast 1Q16Webcast 1Q16
Webcast 1Q16
 

Último

Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdftbatkhuu1
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...lizamodels9
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 

Último (20)

Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdf
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 

Developing Brazil's Pre-Salt Oil Frontier

  • 1. Pre-Salt Oil: Developing The Frontier José Sergio Gabrielli de Azevedo CEO November, 16th 2011 JP Morgan 1
  • 2. DISCLAIMER This presentation may contain forward-looking Cautionary statement for U.S. investors: statements. Such statements reflect only the expectations of the Company's management The United States Securities and Exchange regarding the future conditions of the economy, Commission permits oil and gas companies, the industry, the performance and financial in their filings with the SEC, to disclose results of the Company, among other factors. proved reserves that a company has Such terms as "anticipate", "believe", "expect", demonstrated by actual production or "forecast", "intend", "plan", "project", "seek", conclusive formation tests to be economically "should", along with similar expressions, are and legally viable under existing economic used to identify such statements. These and operating conditions. We use certain predictions evidently involve risks and terms in this presentation, such as uncertainties, whether foreseen or not by the discoveries, that the SEC’s guidelines strictly Company. Consequently, these statements do prohibit us from including in filings with the not represent assurance of future results of the SEC. Company. Therefore, the Company's future results of operations may differ from current expectations, and readers must not base their expectations solely on the information presented herein. The Company is not obliged to update the presentation and forward-looking statements in light of new information or future developments. Amounts informed for the year 2011 and upcoming years are either estimates or targets. 2
  • 3. PRE-SALT’S SHORT LAG BETWEEN DISCOVERY AND FIRST-OIL, AND FAST PROJECTED RAMP-UP Oil Production Years after Discovery 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51 53 55 57 59 61 63 Pre-Salt GoM (USA) North Sea Campos Basin Discovery: SS032 (1947) Discovery: Q/13ª (1963) Discovery: Garoupa (1974) Discovery: Parati (2006) First oil: SS032 (1947) First Oil: Dan (1972) First oil: Enchova (1977) First oil: Tupi (2009) 3
  • 4. SANTOS PRE-SALT MASTER PLAN’S HIGHLIGHTS FROM 2006 TO 2010 ... Infraestructure Definitive Systems FPSOs/ Lula Pilot (AR) FPSOs/EWTs Tupi (CSV) Guará (DP) New Rigs 2 2 1 3 6 Júpiter Discoveries Pre-Salt/Parati Carioca Iracema Iara Bem-Te-Vi (cernambi) Franco Tupi (Lula) Caramba Guará ... 2006 2007 2008 2009 2010 4
  • 5. ... AND FROM 2011 ONWARDS Route 2 Route 3 Infrastructure Pipeline Lula-Mexilhão Replic. Replic. Definitive Systems Guará Guará 1 3, 4, 5, 6, Pilot Norte 7, 8 FPSOs/ Replic. Lula NE Cernambi 2 Tranfer of Pilot Sul Tranfer of Rights Rights 2, 3 and 4 1 FPSOs/EWTs 3 4 EWTs 3 EWTs 5 EWTs 5 EWTs New Rigs 6 8 8 already contracted + 21 to be contracted ... 2011 2012 2013 2014 2015 2016+ 5
  • 6. MORE DRILLING RIGS WILL ENABLE A FASTER RAMP-UP OF THE NEW PLATFORMS 20 To reach 50% of capacity To reach 75% of capacity 16 Forecast 12 Months 8 4 0 P-43 P-48 P-50 P-52 P-54 P-53 P-51 FPSO P-57 CAPIXABA 2004 2005 2006 2007 2007 2008 2009 2010 2010 Water Depth 2006 2008 2010 2011 2012 2013 Up to 1,000 meters 6 11 11 1,000 to 2,000 meters 19 19 21 +2 +1 +1 Over 2,000 meters 2 3 15 +10 +13 +1 6
  • 7. CAPITAL COSTS: PRE-SALT vs. CAMPOS Similar equipment and processes: main difference is drilling and completion PRE-SALT CAPEX DISTRIBUTION 27% 20% 53% Gathering Completion + Drilling Units DEEPWATER PROJECTS IN CAMPOS BASIN* CAPEX DISTRIBUTION 33,3% 33,3% Additional drilling and completion cost in the pre-salt compared with an generic deepwater project in Campos basin can be partially or fully offset by higher quality and quantity of oil expected in the pre-salt area. 33,3% Gathering Completion + Drilling Units * Generic example, considering that these rates can change among the different existing projects in Campos Basin 7
  • 8. 8 PRE-SALT’S ECONOMICS: PRODUCTIVITY GAINS ... Average drilling time of the wells completed Drilling needs during the year - 15% 100% Number of wells (phase 1a) 85% 75% 66% 2006/2007 2008 2009 2010 PN 2010-2014 PN 2010-2015 8
  • 9. … RESULTING IN A HIGHER EXPECTED NPV Investment 200% 150% 100% - 45% 50% 100% 81% - 32% 55% 0% PLANSAL 2008 (2008-2030) PLANSAL 2009 (2008-2030) PLANSAL 2010 (2008-2030) Net Present Value 200% 150% 100% 152% 50% 100% 118% 0% PLANSAL 2008 (2008-2030) PLANSAL 2009 (2008-2030) PLANSAL 2010 (2008-2030) 9
  • 10. NATURAL GAS PRODUCTION Start-up of Plangas and Pre-salt projects will substantially increase capacity Manaus Coari Jurua Urucu UTGCA Mexilhão Urugua UGN RPBC PMLZ-1 Lula Million m3 100 2011-15 95 Non-Associated Natural Gas 80 Mexilhão – 15MM m3/day 75 Uruguá-Tambaú – 10 MM m3/day 2015-20 60 55 Associated Natural Gas 42 Juruá – 2 MM m3/day from the Pre-salt 40 Associated Natural Gas Natural gas production from 20 Increasing production in the Pre-salt in Santos Basin to Campos and Santos Basins surpass 20 MM m3/day 0 2010 2011 2015 2020 10
  • 12. E&P INVESTMENTS IN BRAZIL Pre-salt now more than half of development spending over the next five years Pre-Salt Post-Salt US$ 53.4 Billion US$ 64.3 Billion 13% 12% Tranfer 2% of 21% 22% Rights 21% 54% 57% Development Infrastructure and support Exploration 12
  • 13. PETROBRAS’ TOTAL RESERVES AND POTENTIAL RECOVERABLE VOLUMES Continuous growth from deeper discoveries Potential increase Million boe 30.000 25.000 20.000 15.000 10.000 5.000 0 Onshore 0-300 m 300-1500 m > 1500 m Pre-salt's Recoverable Volume Transfer of Rights 13
  • 14. PRODUCTION TARGETS With broad access to new reserves, Petrobras can more than double its production in the next decade 6,418 142 246 1.120 3,993 + 35 Systems 125 180 2,772 618 2,516 2,575 2,386 96 96 93 99 141 +10 Post-Salt Projects 132 144 435 4,910 111 317 334 +8 Pre-Salt Projects 321 +1 Transfer of Rights 3,070 845 ’000 boe/day Transfer of Rights 1.855 1.971 2.004 2.100 Added Capacity Oil: 2,300,000 bpd 13 Pre-Salt 1,148 543 2008 2009 2010 2011 2015 2020 Oil Production - Brazil Natural Gas Production - Brazil Oil Production - International Natural Gas Production - International 14
  • 15. MAIN E&P PROJECTS Natural Gas Large projects sustain production increases Pre-Salt and Transfer of Rights Post-Salt EWTs Lula Pilot FPSO BW Cidade Angra dos Reis 100.000 bpd  Juruá GNA Lula NE Franco 1 Transfer of FPSO Cidade de Rights  Cachalote and Mexilhão Paraty FPSO  Baleia Franca Jaqueta Guará Pilot 2 120.000 bpd 150.000 bpd FPSO Capixaba HG FPSO Cidade de 100.000 bpd São Paulo Parque das Guará (North) FPSO P-67 Tambaú 120.000 bpd Baleias FPSO Replicant 2 FPSO Cidade de FPSO P-58  Uruguá 150.000 bpd 150.000 bpd  FPSO Cidade de Santos 180.000 bpd BMS-9 our11 Santos NG Baleia Azul FPSO Cidade de Cernambi South Th bpd 35.000 bpd Anchieta Papa-Terra FPSO 3.070 Marlim Sul TLWP P-61 & 150.000 bpd 100.000 bpd  module 3 FPSO P-63  3000 Jubarte (FPSO Espadarte 150.000 bpd SS P-56 FPSO P-57 reallocation) 100.000 bpd 180.000 bpd FPSO P-66 2500 Replicant 1 2.100 150.000 bpd 2.004 Baleia Azul Roncador FPSO BMS-9 or 11 2000 Roncador module 3 Módule 4 60.000 bpd  EWTs Lula NE e SS P-55 Maromba FPSO P-62  Tiro Pilot Cernambi 180.000 bpd FPSO 1500 180.000 bpd SS-11 FPSO BW Cidade 100.000 bpd Atlantic Zephir São Vicente Siri Tiro/Sidon 30.000 bpd 30.000 bpd Aruanã Jaqueta e FPSO ESP/Marimbá 1000 FPSO Cidade de FPSO 50.000 bpd FPSO Itajaí 100.000 bpd 40.000 bpd 80.000 bpd  EWT Guará EWT Carioca 500 FPSO Dynamic Producer 30.000 bpd FPSO Dynamic Producer 30.000 bpd  4 EWTs Pre-salt 3 EWTs Pre-salt 5 EWTs Pre-salt 5 EWTs Pre-salt 0 2010 2011 2012 2013 2014 2015 15
  • 16. VARREDURA PROJECT Technological development and exploratory optimization in existing concessions Discoveries in Pre-salt Descobertas do Pr é-sal Recoverable volumes Campos Basin 2009/10 na Bacia de Campos 2009/10 (VARREDURA) (Varredura) discovered: Post-salt: 1,105 MM boe (Marimbá, Marlim Sul and Pampo) Pre-salt: 1,130 MM boe* (Barracuda, Caratinga, Marlim, Marlim Leste, Albacora and Albacora Leste) *No volumes have been announced for the Marlim Leste and Albacora Leste discoveries 67 exploratory wells will be drilled Wells productivity close to between 2011 and 2015 in production 15,000 bpd areas in Campos basin 16
  • 17. CUTTING-EDGE TECHNOLOGIES OIL/WATER SUBSEA RAW WATER SEPARATION INJECTION - Resolves limitations from growing - Increases production in existing water production systems - Separates water and oil under the - 3 subsea systems for pumping raw sea, reinjecting water and relieving water (with little treatment) to the size of the surface equipment pressurize the reservoir, increasing on the platform recovery factor without increasing - Field: Marlim (Nov/2011) surface systems. Pioneer in the world in such water depth - Field: Albacora (Dec/2011) 17
  • 18. NEW VESSELS AND EQUIPMENTS Resources required for production growth Delivery Plan (to be contracted) Current Situation Accumulated Value Critical Resources (Dec/10) By 2013 By 2015 By 2020 Drilling Rigs Water Depth Above 2.000 m 15 39 37 (1) 65 (2) Supply and Special Vessel 287 423 479 568 Production Platforms (SS and FPSO) 44 54 61 94 Others (Jacket and TLWP) 78 80 81 83 Supply Vessel Drilling Rig FPSO DRILLING RIGS UNDER CONTRACT Water Depth 2006 2008 2010 2011 2012 2013 Up to 1,000 meters 6 11 11 1,000 to 2,000 meters 19 19 21 +2 +1 +1 Over 2,000 meters 2 3 15 +10 +13 +1 (1) The contracts for two rigs reallocated from international operations expire in 2015 (2) Long-term demand will be adjusted according to new assessments 18