Building Morphology Factors
Building Construction process comprises with many stages.

They basically consist of two parts
    Pre Construction
    Post Construction


The Designing process of a building project belongs to the Pre
construction stage.

Considering about the Design Morphology Factors comes
under this Designing stage.
Cost of Construction changes in a rapid manner due to many
reasons.

Therefore a proper analysis of Building Morphology Factors are
essential to reduce cost of Construction.

This presentation is aimed at understanding what the Design
Morphology Factors are.

This discusses about;
        What the Morphology Factors are.
        A practical example on implementing Morphology Factors.
        Analysis and Recommendations of alternatives Designs
        using Morphology Factors.
        Impact of Morphology Factors on Cost of Construction.
Main design Morphology Factors that are considered are;

   Shape of the building
            – Orientation, Proximity and Similarity factors
   Size of the building
   Storey height
   Total height of the building
   Number of storey
   Grouping Buildings
            – Orientation, Proximity and Similarity factors
Shape and Size are interrelated factors.

Both relates with the floor space required by the client.

Research has showed that SQUARE shape is the most cost
effective shape.

When designing the shape the ORIENTATION, PROXMITY
and SIMILARITY factors must be concerned.

If the new building is in a similar shape as the existing
buildings, placing the building in the correct orientation and
proximity becomes easy.
Service integration must be concerned.

For example;
      Air conditioning
      Fire fighting system
      Electrical lighting
      Telecommunication systems


If storey height is not decided according to service integration
requirement;
      Problems occur during installation
      Service lines will be installed in an irregular manner.


Proper height must be selected during designing.
Directly connects with the number of storey and storey height.

Higher the building goes;
   Stronger the structure
   should be.
   Workers, equipment,                             More
   material etc must be           RESULT         Financial
   transported continuously to                  Requirement
   upper floors.
   More scaffolding
   requirement.
Must design to the required number only.

Over designing could result in a stronger structure.

If designed correctly, can avoid expensive foundation types.
Two methods can be used;
      Vertical Grouping
          - Common Walls and Foundations
      Horizontal Grouping
          - Common Roofs


Can be used in Building complexes like Apartment buildings.

Another advantage is reduction of circulation spaces and
service cores.

When grouped buildings can share circulation spaces and
service cores.
SHAPE and SIZE

Designed by UDA designers.

Shape Designed due to
Architectural Influence.

Office areas are located on
either side of the vertical
circulation area.
Recommendation on SHAPE and SIZE

If built in square shape, spaces on either side of the vertical
circulation space could be used.

It increases the efficiency of land usage.

Land value is very high.

Design Efficiency Calculation

Floor area of H-shaped building        = 2744.28 m2
Floor area if designed as a square shape = 3528.36 m2

Wastage of Floor Area                   = 784.08 m2
Recommendation on SHAPE and SIZE

If the building is built without changing the required floor area
land area could have been saved.

Design Efficiency Calculation

Perimeter of the H-shaped building       = 1039.36 ft.

Perimeter if designed as a square shape = 692.82 ft


Design efficiency = (1039.36 – 692.82) x 100       =     50.02%
                           692.82

                   Square shape is 50.02% more effective.
Recommendation on SHAPE and SIZE

The existing main building has a L shape.

If the new building is designed to have the same shape
(similarity factor) orientation of the building could have been
easy.

Since the shape is different the main parts of the building faces
east and west.

Therefore the heat gain through direct sun light is more and
uncomfortable.
HEIGHT of the Building

Storey height is 3600 mm.

Ceiling to be a Lowered 600 mm from the soffit of the slab.

Each floor is designed to be constructed with a proper ducting
for A/C, and other services.

Comprising with 14 storeys.
Recommendation on HEIGHT

The location has natural ventilation.

Natural ventilation method can be easily applied for upper floors.

Therefore A/C ducting is not required for upper floors.

So storey height can be reduced.

It is cost effective because;
     Reduces Construction cost.
     Reduces service installation cost.
     Reduces services maintenance cost.
GROUPING BUILDINGS

New building is constructed few feet away from the existing
main building.

At the designing stage it was decided to group the buildings.

But later it was decided not to due to heavy demolition work of
the existing building.

Recommendation on GROUPING BUILDINGS

Grouping buildings could have reduced the circulation space
needed for the new building.
Design economics helps us to understand the best cost
effective way proceed with the construction.

Discussion between construction professionals prior the
construction helps them to understand these cost effective way.

Each construction has its own cost effective ways.

To understand these ways Building Morphology Factors can be
used.

Concerning about Morphology factors during designing stage is
very important.
The designing stage of a building project is the best stage to
reduce unnecessary costs of the project.

Building Morphology Factors are the key to understand the
ways of reducing unnecessary costs.

Shape, Size, Storey height, Total height, Grouping factors can
be analyzed carefully to make a project cost effective.

Therefore a proper knowledge on Building Morphology is
necessary for construction professionals.
Morphology factors

Más contenido relacionado

La actualidad más candente

Group Assignment:IBS System
Group Assignment:IBS SystemGroup Assignment:IBS System
Group Assignment:IBS System
마 이환
 
Building services- telecommunications for high rise building
Building services- telecommunications for high rise buildingBuilding services- telecommunications for high rise building
Building services- telecommunications for high rise building
Chiam Jiane
 
PRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEMPRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEM
Sagar Shah
 
Construction process
Construction processConstruction process
Construction process
Mazen Al-Qadi
 
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAMDIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
Anep Botak
 

La actualidad más candente (20)

Group Assignment:IBS System
Group Assignment:IBS SystemGroup Assignment:IBS System
Group Assignment:IBS System
 
B.tech Project 1 - Industrialised Building Systems
B.tech Project 1 - Industrialised Building SystemsB.tech Project 1 - Industrialised Building Systems
B.tech Project 1 - Industrialised Building Systems
 
Bc open pre fabricated construction system
Bc open pre fabricated construction systemBc open pre fabricated construction system
Bc open pre fabricated construction system
 
Building services- telecommunications for high rise building
Building services- telecommunications for high rise buildingBuilding services- telecommunications for high rise building
Building services- telecommunications for high rise building
 
Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)
 
Building technology 1 "Industrialized Building System" IBS
Building technology 1 "Industrialized Building System" IBSBuilding technology 1 "Industrialized Building System" IBS
Building technology 1 "Industrialized Building System" IBS
 
Resources of Construction Industry
Resources of Construction IndustryResources of Construction Industry
Resources of Construction Industry
 
Blockwork system
Blockwork systemBlockwork system
Blockwork system
 
Construction Contract in Malaysia
Construction Contract in MalaysiaConstruction Contract in Malaysia
Construction Contract in Malaysia
 
Defects in buildings & remedies
Defects in buildings & remediesDefects in buildings & remedies
Defects in buildings & remedies
 
bs:copbs101
bs:copbs101bs:copbs101
bs:copbs101
 
PRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEMPRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEM
 
Building Technology Project 1
Building Technology Project 1Building Technology Project 1
Building Technology Project 1
 
Precast concrete construction
Precast concrete constructionPrecast concrete construction
Precast concrete construction
 
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGSADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
 
Certificates and payments
Certificates and paymentsCertificates and payments
Certificates and payments
 
Site possession
Site possessionSite possession
Site possession
 
Construction process
Construction processConstruction process
Construction process
 
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAMDIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
 
Procurement types
Procurement typesProcurement types
Procurement types
 

Destacado

Factors Affecting Blava Morph
Factors Affecting Blava MorphFactors Affecting Blava Morph
Factors Affecting Blava Morph
Ecumene
 
Power transmission(ppt)
Power transmission(ppt)Power transmission(ppt)
Power transmission(ppt)
zeeshan715
 
Hvac Presentation
Hvac PresentationHvac Presentation
Hvac Presentation
Choong KW
 

Destacado (11)

Factors Affecting Blava Morph
Factors Affecting Blava MorphFactors Affecting Blava Morph
Factors Affecting Blava Morph
 
Urban morphology
Urban morphologyUrban morphology
Urban morphology
 
Urban morphology, elements of urban design
Urban morphology, elements of urban designUrban morphology, elements of urban design
Urban morphology, elements of urban design
 
Power transmission & distribution
Power transmission & distributionPower transmission & distribution
Power transmission & distribution
 
Electricity transmission, generation and distribution
Electricity transmission, generation and distributionElectricity transmission, generation and distribution
Electricity transmission, generation and distribution
 
Types of air conditioning systems
Types of air conditioning systemsTypes of air conditioning systems
Types of air conditioning systems
 
Power transmission(ppt)
Power transmission(ppt)Power transmission(ppt)
Power transmission(ppt)
 
HVAC Sysems & AHU
HVAC Sysems & AHUHVAC Sysems & AHU
HVAC Sysems & AHU
 
Refrigration & air conditioning
Refrigration & air conditioningRefrigration & air conditioning
Refrigration & air conditioning
 
Air conditioning system
Air conditioning systemAir conditioning system
Air conditioning system
 
Hvac Presentation
Hvac PresentationHvac Presentation
Hvac Presentation
 

Similar a Morphology factors

Assessment of the Effect of Plan Shapes on Cost of Institutional Buildings in...
Assessment of the Effect of Plan Shapes on Cost of Institutional Buildings in...Assessment of the Effect of Plan Shapes on Cost of Institutional Buildings in...
Assessment of the Effect of Plan Shapes on Cost of Institutional Buildings in...
IJRES Journal
 
Assessment of the Effect of Plan Shapes on Cost of Institutional Buildings in...
Assessment of the Effect of Plan Shapes on Cost of Institutional Buildings in...Assessment of the Effect of Plan Shapes on Cost of Institutional Buildings in...
Assessment of the Effect of Plan Shapes on Cost of Institutional Buildings in...
irjes
 

Similar a Morphology factors (20)

Assessment of the Effect of Plan Shapes on Cost of Institutional Buildings in...
Assessment of the Effect of Plan Shapes on Cost of Institutional Buildings in...Assessment of the Effect of Plan Shapes on Cost of Institutional Buildings in...
Assessment of the Effect of Plan Shapes on Cost of Institutional Buildings in...
 
Assessment of the Effect of Plan Shapes on Cost of Institutional Buildings in...
Assessment of the Effect of Plan Shapes on Cost of Institutional Buildings in...Assessment of the Effect of Plan Shapes on Cost of Institutional Buildings in...
Assessment of the Effect of Plan Shapes on Cost of Institutional Buildings in...
 
Modular construction
Modular constructionModular construction
Modular construction
 
final report draft.pdf
final report draft.pdffinal report draft.pdf
final report draft.pdf
 
Preliminary estimate
Preliminary estimatePreliminary estimate
Preliminary estimate
 
High rise
High riseHigh rise
High rise
 
BIM9 Fenestra Pro
BIM9 Fenestra ProBIM9 Fenestra Pro
BIM9 Fenestra Pro
 
What BIPV does to YOU R1
What BIPV does to YOU R1What BIPV does to YOU R1
What BIPV does to YOU R1
 
What BIPV does to YOU R1
What BIPV does to YOU R1What BIPV does to YOU R1
What BIPV does to YOU R1
 
Integrating Sustainability Strategies in Design and Practice - ادماج استراتجي...
Integrating Sustainability Strategies in Design and Practice - ادماج استراتجي...Integrating Sustainability Strategies in Design and Practice - ادماج استراتجي...
Integrating Sustainability Strategies in Design and Practice - ادماج استراتجي...
 
Construction Planning and Scheduling of Residential Building by MS Project by...
Construction Planning and Scheduling of Residential Building by MS Project by...Construction Planning and Scheduling of Residential Building by MS Project by...
Construction Planning and Scheduling of Residential Building by MS Project by...
 
BUILDING CONSTRUCTION AND PLANNING
BUILDING CONSTRUCTION AND PLANNINGBUILDING CONSTRUCTION AND PLANNING
BUILDING CONSTRUCTION AND PLANNING
 
COST EFFECIENT CHAP 2 ppt.pptx
COST EFFECIENT CHAP 2 ppt.pptxCOST EFFECIENT CHAP 2 ppt.pptx
COST EFFECIENT CHAP 2 ppt.pptx
 
Analysis of Wind Response on Different Shapes of High Rise Mivan Wall Buildin...
Analysis of Wind Response on Different Shapes of High Rise Mivan Wall Buildin...Analysis of Wind Response on Different Shapes of High Rise Mivan Wall Buildin...
Analysis of Wind Response on Different Shapes of High Rise Mivan Wall Buildin...
 
150316 high rise design
150316 high rise design150316 high rise design
150316 high rise design
 
Model brief
Model briefModel brief
Model brief
 
Assignment - S Hotel (Presentation Slide)
Assignment - S Hotel (Presentation Slide)Assignment - S Hotel (Presentation Slide)
Assignment - S Hotel (Presentation Slide)
 
Types Fabrication Drawings: Their Importance and Benefits
Types Fabrication Drawings: Their Importance and BenefitsTypes Fabrication Drawings: Their Importance and Benefits
Types Fabrication Drawings: Their Importance and Benefits
 
Analysis of Formwork in Multistory Building
Analysis of Formwork in Multistory BuildingAnalysis of Formwork in Multistory Building
Analysis of Formwork in Multistory Building
 
기스본 도심상업개발을 위한 도시 디자인 가이드북
기스본 도심상업개발을 위한 도시 디자인 가이드북기스본 도심상업개발을 위한 도시 디자인 가이드북
기스본 도심상업개발을 위한 도시 디자인 가이드북
 

Último

Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 

Último (20)

SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptx
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 

Morphology factors

  • 1.
  • 3. Building Construction process comprises with many stages. They basically consist of two parts  Pre Construction  Post Construction The Designing process of a building project belongs to the Pre construction stage. Considering about the Design Morphology Factors comes under this Designing stage.
  • 4. Cost of Construction changes in a rapid manner due to many reasons. Therefore a proper analysis of Building Morphology Factors are essential to reduce cost of Construction. This presentation is aimed at understanding what the Design Morphology Factors are. This discusses about; What the Morphology Factors are. A practical example on implementing Morphology Factors. Analysis and Recommendations of alternatives Designs using Morphology Factors. Impact of Morphology Factors on Cost of Construction.
  • 5. Main design Morphology Factors that are considered are; Shape of the building – Orientation, Proximity and Similarity factors Size of the building Storey height Total height of the building Number of storey Grouping Buildings – Orientation, Proximity and Similarity factors
  • 6. Shape and Size are interrelated factors. Both relates with the floor space required by the client. Research has showed that SQUARE shape is the most cost effective shape. When designing the shape the ORIENTATION, PROXMITY and SIMILARITY factors must be concerned. If the new building is in a similar shape as the existing buildings, placing the building in the correct orientation and proximity becomes easy.
  • 7. Service integration must be concerned. For example; Air conditioning Fire fighting system Electrical lighting Telecommunication systems If storey height is not decided according to service integration requirement; Problems occur during installation Service lines will be installed in an irregular manner. Proper height must be selected during designing.
  • 8. Directly connects with the number of storey and storey height. Higher the building goes; Stronger the structure should be. Workers, equipment, More material etc must be RESULT Financial transported continuously to Requirement upper floors. More scaffolding requirement.
  • 9. Must design to the required number only. Over designing could result in a stronger structure. If designed correctly, can avoid expensive foundation types.
  • 10. Two methods can be used; Vertical Grouping - Common Walls and Foundations Horizontal Grouping - Common Roofs Can be used in Building complexes like Apartment buildings. Another advantage is reduction of circulation spaces and service cores. When grouped buildings can share circulation spaces and service cores.
  • 11. SHAPE and SIZE Designed by UDA designers. Shape Designed due to Architectural Influence. Office areas are located on either side of the vertical circulation area.
  • 12. Recommendation on SHAPE and SIZE If built in square shape, spaces on either side of the vertical circulation space could be used. It increases the efficiency of land usage. Land value is very high. Design Efficiency Calculation Floor area of H-shaped building = 2744.28 m2 Floor area if designed as a square shape = 3528.36 m2 Wastage of Floor Area = 784.08 m2
  • 13. Recommendation on SHAPE and SIZE If the building is built without changing the required floor area land area could have been saved. Design Efficiency Calculation Perimeter of the H-shaped building = 1039.36 ft. Perimeter if designed as a square shape = 692.82 ft Design efficiency = (1039.36 – 692.82) x 100 = 50.02% 692.82 Square shape is 50.02% more effective.
  • 14. Recommendation on SHAPE and SIZE The existing main building has a L shape. If the new building is designed to have the same shape (similarity factor) orientation of the building could have been easy. Since the shape is different the main parts of the building faces east and west. Therefore the heat gain through direct sun light is more and uncomfortable.
  • 15. HEIGHT of the Building Storey height is 3600 mm. Ceiling to be a Lowered 600 mm from the soffit of the slab. Each floor is designed to be constructed with a proper ducting for A/C, and other services. Comprising with 14 storeys.
  • 16. Recommendation on HEIGHT The location has natural ventilation. Natural ventilation method can be easily applied for upper floors. Therefore A/C ducting is not required for upper floors. So storey height can be reduced. It is cost effective because; Reduces Construction cost. Reduces service installation cost. Reduces services maintenance cost.
  • 17. GROUPING BUILDINGS New building is constructed few feet away from the existing main building. At the designing stage it was decided to group the buildings. But later it was decided not to due to heavy demolition work of the existing building. Recommendation on GROUPING BUILDINGS Grouping buildings could have reduced the circulation space needed for the new building.
  • 18. Design economics helps us to understand the best cost effective way proceed with the construction. Discussion between construction professionals prior the construction helps them to understand these cost effective way. Each construction has its own cost effective ways. To understand these ways Building Morphology Factors can be used. Concerning about Morphology factors during designing stage is very important.
  • 19. The designing stage of a building project is the best stage to reduce unnecessary costs of the project. Building Morphology Factors are the key to understand the ways of reducing unnecessary costs. Shape, Size, Storey height, Total height, Grouping factors can be analyzed carefully to make a project cost effective. Therefore a proper knowledge on Building Morphology is necessary for construction professionals.