Seismic Structural
 Considerations
      JCC Training

            by
 Paul W. McMullin, SE, PhD
       October 15, 2009
The Paper Clip Test




© Dunn Associates Inc, 2009
Concept of Selected Deformation




© Dunn Associates Inc, 2009
Early Use of Moment Connections


          Flatiron Building, NYC
           • One of the first steel frame
             buildings
           • Portal frame moment
             connections at all wind girders.
          Early Steel Frames- all
          moment connected




© Dunn Associates Inc, 2009
Construction Changes that led to
                                    Northridge Failures


          Fewer, but larger moment
          frames
           • Heavier connections
          Changed from Riveted to
          Welded construction
          Used lower toughness
          welding rod
           • Welds went down fast
           • Not permitted in pipelines
          Quality control problems




© Dunn Associates Inc, 2009
Acceleration Record from Northridge




                                From the Strong Motion Database (SMDB, 2000a)


© Dunn Associates Inc, 2009
Northridge Earthquake


          Magnitude 6.7                     Building Inventory
           • Estimated Economic             Damage
           • Loss = $49.3 billion            • 100 buildings with minor
                                               fractures
                                             • 100 buildings with major
                                               fractures
                                             • 30 buildings with
                                               major fractures in 90%
                                               of all connections




© Dunn Associates Inc, 2009
Fracture Causes


          Welding
           • Low Toughness Weld Metal
           • Slag Inclusions
           • Lack of fusion
          Mismatched Yield Strengths
          Erroneous Joint Detailing
          Weld Constraint by Heavy
          Sections
          Slab Interaction with Column




© Dunn Associates Inc, 2009
Changes: Code


          Code limited approved filler
          metals
          Inspection requirements
          tightened
          Limited connection types
          Quality control significantly
          increased




© Dunn Associates Inc, 2009
Changes: Weld Access Hole




© Dunn Associates Inc, 2009
Connections: WUF-W




© Dunn Associates Inc, 2009
Connections: Extended Flange




© Dunn Associates Inc, 2009
Connections: Flange Cover Plate




© Dunn Associates Inc, 2009
Connections: Reduced Beam
                                       Section




© Dunn Associates Inc, 2009
Connections: Bolted End Plate




© Dunn Associates Inc, 2009
Connections: SidePlate




© Dunn Associates Inc, 2009
Protected Zone Requirements


          No discontinuities in           Get protected zone from
          protected zone                  drawings or engineer
           •   Arc Strikes                Mark protected zones with
           •   Erection Aids              bright paint after erection and
           •   Air-arc Gouging            after fire coating
           •   Thermal Cutting
          Not permitted
           •   Welded studs
           •   Shot pins
           •   Screws
           •   Welds
           •   Holes



© Dunn Associates Inc, 2009
Protected Zones: Dog Bone




© Dunn Associates Inc, 2009
Protected Zones:
                              Concentric Braced Frame




© Dunn Associates Inc, 2009
Protected Zones:
                              Concentric Braced Frame




© Dunn Associates Inc, 2009
Protected Zones:
                              Eccentric Braced Frame




© Dunn Associates Inc, 2009
Protected Zones:
                              Eccentric Braced Frame




© Dunn Associates Inc, 2009
Connections


          Bolted End Plate


          Reduced Beam
          Section (“Dog
          Bone”)


          SidePlate™




© Dunn Associates Inc, 2009
Reduced Beam Section Connection


                                            Advantages
                                            • Approved
                                            • Reduces column-beam weld
                                              stresses
                                            Disadvantages
                                            • Milling of beam flange
                                            • 80%-90% reliable
                                            • Looks odd




© Dunn Associates Inc, 2009
Reduced Beam Section Connection


                                            Watch for:
                                            • Protected Zone (nicks, arc
                                              strikes, shot pins, welds)
                                            • Smoothness of Cut
                                            • Bracing just outside cut




© Dunn Associates Inc, 2009
SidePlate Connection



                                       Advantages
                                        • Approved- seismic &
                                          progressive collapse
                                        • Eliminates beam-column weld
                                        • High reliability
                                        • Looks strong
                                       Disadvantages
                                        • Licensing fee
                                        • Flip columns in shop




© Dunn Associates Inc, 2009
Step 1: Column Tree Assembly




         Rotate Column to Column1intoColumn Sub-Assembly (Not Shown Here).
            Bring inRotate Applyand andPosition Weld intoTack into Place
                    Side Plates Weld 2Weld 2, toSide Plates Apply
                     Bring in Sidewith to Bring in Temporary Plates
                                     Horiz. Other Alignment,
     Bring in Horizontal Shear Plates, Tack, CheckApply Other Dogs Welds 1 and 3
                     Apply Welds Apply 3, Tack NS/FS. Position
                            Begin Plates, Shear Plates,
                      After that, Column Sub-Assembly Complete.
© Dunn Associates Inc, 2009
Step 2: Full-Length Beam Assembly




               Begin Full-Length Full-LengthTack & and into Position 5 Shown)
                   Bring inFull-Length Beam Beam Weld Inverted As
                          Rotate Beam Assembly Tack Apply Position
                           Bring in Cover Plates, (Beam into Weld
                            Erection Angle, Assembly Complete




© Dunn Associates Inc, 2009
Step 3: Erect Column Trees & Full-Length Beams with six 7/8” A325 Bolts Each End




© Dunn Associates Inc, 2009
SidePlate Connection




© Dunn Associates Inc, 2009
SidePlate Connection


                                                 Watch for:
                                                 1) Joint Gap
                                                 2) Protected Zone (nicks, arc
                                                    strikes, shot pins, welds)
                                                 3) SidePlate attachments

                              1

                                  3       2




© Dunn Associates Inc, 2009
SidePlate Protected Zone




© Dunn Associates Inc, 2009
SidePlate: WELDING OK




© Dunn Associates Inc, 2009
What keeps us from backtracking?


          Special Inspection                Good Communication
           •   Ensure done well              • RFIs that are researched &
           •   Ultrasonic                      propose solutions
           •   Mag Particle ends             • Notify us ahead of certain
                                               activities (pours, fire coating)
          Shop Drawings                      • Tell us about problems as soon
           •   Complete                        as you know (even your screw-
           •   Well detailed                   ups)
           •   Contractor review             Think/Plan Ahead
          Shop vs Field Welds                • Catch problems
           • Define up-front                 • Give us time to determine a
                                               solution
           • Shop welds- faster, higher
             quality
           • Field welds- some pieces too
             big for shop

© Dunn Associates Inc, 2009
Our Liability


          STRUCTURAL ENGINEER                     CONTRACTOR
          Becomes liable when:                    Becomes liable when:
           • Omit information                     • Deviate from approved plans
           • Don’t follow the State of the          and specs
             Art (code is minimum)                • Material/workmanship/Quality
                                                    problems



                Regardless of who is liable, if
                there is a problem, we all get
                   dragged into the mess
© Dunn Associates Inc, 2009

Más contenido relacionado

La actualidad más candente

Connections in steel structures
Connections in steel structuresConnections in steel structures
Connections in steel structuresRizwan Khurram
 
Refractory manufcturing,properties
Refractory  manufcturing,propertiesRefractory  manufcturing,properties
Refractory manufcturing,propertiespradeepdeepi
 
Portland cement mfg. process for finance, subsidy & project related support...
Portland cement mfg. process   for finance, subsidy & project related support...Portland cement mfg. process   for finance, subsidy & project related support...
Portland cement mfg. process for finance, subsidy & project related support...Radha Krishna Sahoo
 
Tata krosaki refractory overview
Tata krosaki refractory overviewTata krosaki refractory overview
Tata krosaki refractory overviewjoyhindari
 
Metal joining Processes( Riveting, Soldering, Welding)
Metal joining Processes( Riveting, Soldering, Welding)Metal joining Processes( Riveting, Soldering, Welding)
Metal joining Processes( Riveting, Soldering, Welding)prashantborakhede1
 
C 8 - investment casting
C   8 - investment castingC   8 - investment casting
C 8 - investment castingcpandiv
 
REPAIRING WORKS FOR CRACKS ...
																		     REPAIRING WORKS FOR CRACKS 				 				                  ...																		     REPAIRING WORKS FOR CRACKS 				 				                  ...
REPAIRING WORKS FOR CRACKS ...sathish sak
 
alloys and their properties
 alloys and their properties alloys and their properties
alloys and their propertiesAfzal Zubair
 
Formwork Presentation for Construction Technology
Formwork Presentation for Construction TechnologyFormwork Presentation for Construction Technology
Formwork Presentation for Construction TechnologyI'mMiss Lily
 
3 weld symbols
3 weld symbols3 weld symbols
3 weld symbolsdepedavr44
 
DESIGN OF CONNECTIONS IN STEEL STRUCTURE
DESIGN OF CONNECTIONS IN STEEL  STRUCTURE   DESIGN OF CONNECTIONS IN STEEL  STRUCTURE
DESIGN OF CONNECTIONS IN STEEL STRUCTURE devang1471998
 

La actualidad más candente (20)

Connections in steel structures
Connections in steel structuresConnections in steel structures
Connections in steel structures
 
Refractory manufcturing,properties
Refractory  manufcturing,propertiesRefractory  manufcturing,properties
Refractory manufcturing,properties
 
Portland cement mfg. process for finance, subsidy & project related support...
Portland cement mfg. process   for finance, subsidy & project related support...Portland cement mfg. process   for finance, subsidy & project related support...
Portland cement mfg. process for finance, subsidy & project related support...
 
Tata krosaki refractory overview
Tata krosaki refractory overviewTata krosaki refractory overview
Tata krosaki refractory overview
 
Welded joints
Welded jointsWelded joints
Welded joints
 
Metal joining Processes( Riveting, Soldering, Welding)
Metal joining Processes( Riveting, Soldering, Welding)Metal joining Processes( Riveting, Soldering, Welding)
Metal joining Processes( Riveting, Soldering, Welding)
 
C 8 - investment casting
C   8 - investment castingC   8 - investment casting
C 8 - investment casting
 
Casting
Casting Casting
Casting
 
REPAIRING WORKS FOR CRACKS ...
																		     REPAIRING WORKS FOR CRACKS 				 				                  ...																		     REPAIRING WORKS FOR CRACKS 				 				                  ...
REPAIRING WORKS FOR CRACKS ...
 
alloys and their properties
 alloys and their properties alloys and their properties
alloys and their properties
 
Forging processes
Forging processesForging processes
Forging processes
 
Bendable concrete
Bendable concreteBendable concrete
Bendable concrete
 
DURABILITY OF CONCRETE (CONCRETE TECHNOLOGY)
DURABILITY OF CONCRETE (CONCRETE TECHNOLOGY)DURABILITY OF CONCRETE (CONCRETE TECHNOLOGY)
DURABILITY OF CONCRETE (CONCRETE TECHNOLOGY)
 
Welding of ci
Welding of ciWelding of ci
Welding of ci
 
Chlor alkali
Chlor alkaliChlor alkali
Chlor alkali
 
Formwork Presentation for Construction Technology
Formwork Presentation for Construction TechnologyFormwork Presentation for Construction Technology
Formwork Presentation for Construction Technology
 
3 weld symbols
3 weld symbols3 weld symbols
3 weld symbols
 
DESIGN OF CONNECTIONS IN STEEL STRUCTURE
DESIGN OF CONNECTIONS IN STEEL  STRUCTURE   DESIGN OF CONNECTIONS IN STEEL  STRUCTURE
DESIGN OF CONNECTIONS IN STEEL STRUCTURE
 
Cement
CementCement
Cement
 
Specifications of steel
Specifications of steel Specifications of steel
Specifications of steel
 

Destacado

Connection and Bracing
Connection and BracingConnection and Bracing
Connection and Bracingsuddal
 
03 2frame Str Steel Jan07sbq&C2213&42
03 2frame Str Steel  Jan07sbq&C2213&4203 2frame Str Steel  Jan07sbq&C2213&42
03 2frame Str Steel Jan07sbq&C2213&42nik kin
 
Seismic Bracing- Non-Structural Elements
Seismic Bracing- Non-Structural ElementsSeismic Bracing- Non-Structural Elements
Seismic Bracing- Non-Structural ElementsPaul McMullin
 
Seismic retrofit methods
Seismic retrofit methodsSeismic retrofit methods
Seismic retrofit methodsPaul McMullin
 
Steel connections
Steel connectionsSteel connections
Steel connectionsbabunaveen
 
Aisc 341 05+supliment
Aisc 341 05+suplimentAisc 341 05+supliment
Aisc 341 05+suplimentUTCB
 
IDEA StatiCa Seel Connections - seminar Genk/Kortrijk nov 2016
IDEA StatiCa Seel Connections - seminar Genk/Kortrijk nov 2016IDEA StatiCa Seel Connections - seminar Genk/Kortrijk nov 2016
IDEA StatiCa Seel Connections - seminar Genk/Kortrijk nov 2016Jo Gijbels
 
Voice, Video and Data: Retrofitting Existing Properties
Voice, Video and Data: Retrofitting Existing PropertiesVoice, Video and Data: Retrofitting Existing Properties
Voice, Video and Data: Retrofitting Existing PropertiesMike Whaling
 
Disaster resistant
Disaster resistantDisaster resistant
Disaster resistantKris Kiran
 
EVALUATION OF RESTORING FORCE CHARACTERISTICS OF MUD-WALLS CONSIDERING EFFECT...
EVALUATION OF RESTORING FORCE CHARACTERISTICS OF MUD-WALLS CONSIDERING EFFECT...EVALUATION OF RESTORING FORCE CHARACTERISTICS OF MUD-WALLS CONSIDERING EFFECT...
EVALUATION OF RESTORING FORCE CHARACTERISTICS OF MUD-WALLS CONSIDERING EFFECT...Hiroyuki Nakaji
 
Structural health monitoring 2011-wei fan-83-111
Structural health monitoring 2011-wei fan-83-111Structural health monitoring 2011-wei fan-83-111
Structural health monitoring 2011-wei fan-83-111Hajar Ch
 
SEISMIC STRUCTURAL HEALTH MONITORING AND REAL‐TIME DATA BROADCASTING SPECIAL ...
SEISMIC STRUCTURAL HEALTH MONITORING AND REAL‐TIME DATA BROADCASTING SPECIAL ...SEISMIC STRUCTURAL HEALTH MONITORING AND REAL‐TIME DATA BROADCASTING SPECIAL ...
SEISMIC STRUCTURAL HEALTH MONITORING AND REAL‐TIME DATA BROADCASTING SPECIAL ...Full Scale Dynamics
 
Seismic Considerations Seminar | Portland, Oregon
Seismic Considerations Seminar | Portland, OregonSeismic Considerations Seminar | Portland, Oregon
Seismic Considerations Seminar | Portland, OregonNishkianDean
 
Seismic Vulnerability Assessment Using Field Survey and Remote Sensing Techni...
Seismic Vulnerability Assessment Using Field Survey and Remote Sensing Techni...Seismic Vulnerability Assessment Using Field Survey and Remote Sensing Techni...
Seismic Vulnerability Assessment Using Field Survey and Remote Sensing Techni...Maurizio Pollino
 
Structural Health Monitoring platform presentation at NI week 2016
Structural Health Monitoring platform presentation at NI week 2016Structural Health Monitoring platform presentation at NI week 2016
Structural Health Monitoring platform presentation at NI week 2016IRS srl
 
Offshore research measurements & focus on structural health monitoring
Offshore research measurements & focus on structural health monitoringOffshore research measurements & focus on structural health monitoring
Offshore research measurements & focus on structural health monitoringPieter Jan Jordaens
 
Structural Health Monitoring: The paradigm and the benefits shown in some mon...
Structural Health Monitoring: The paradigm and the benefits shown in some mon...Structural Health Monitoring: The paradigm and the benefits shown in some mon...
Structural Health Monitoring: The paradigm and the benefits shown in some mon...Full Scale Dynamics
 

Destacado (20)

Connection and Bracing
Connection and BracingConnection and Bracing
Connection and Bracing
 
03 2frame Str Steel Jan07sbq&C2213&42
03 2frame Str Steel  Jan07sbq&C2213&4203 2frame Str Steel  Jan07sbq&C2213&42
03 2frame Str Steel Jan07sbq&C2213&42
 
Seismic Bracing- Non-Structural Elements
Seismic Bracing- Non-Structural ElementsSeismic Bracing- Non-Structural Elements
Seismic Bracing- Non-Structural Elements
 
Seismic retrofit methods
Seismic retrofit methodsSeismic retrofit methods
Seismic retrofit methods
 
Steel connections
Steel connectionsSteel connections
Steel connections
 
Aisc 341 05+supliment
Aisc 341 05+suplimentAisc 341 05+supliment
Aisc 341 05+supliment
 
IDEA StatiCa Seel Connections - seminar Genk/Kortrijk nov 2016
IDEA StatiCa Seel Connections - seminar Genk/Kortrijk nov 2016IDEA StatiCa Seel Connections - seminar Genk/Kortrijk nov 2016
IDEA StatiCa Seel Connections - seminar Genk/Kortrijk nov 2016
 
Voice, Video and Data: Retrofitting Existing Properties
Voice, Video and Data: Retrofitting Existing PropertiesVoice, Video and Data: Retrofitting Existing Properties
Voice, Video and Data: Retrofitting Existing Properties
 
Disaster resistant
Disaster resistantDisaster resistant
Disaster resistant
 
EVALUATION OF RESTORING FORCE CHARACTERISTICS OF MUD-WALLS CONSIDERING EFFECT...
EVALUATION OF RESTORING FORCE CHARACTERISTICS OF MUD-WALLS CONSIDERING EFFECT...EVALUATION OF RESTORING FORCE CHARACTERISTICS OF MUD-WALLS CONSIDERING EFFECT...
EVALUATION OF RESTORING FORCE CHARACTERISTICS OF MUD-WALLS CONSIDERING EFFECT...
 
Structural health monitoring 2011-wei fan-83-111
Structural health monitoring 2011-wei fan-83-111Structural health monitoring 2011-wei fan-83-111
Structural health monitoring 2011-wei fan-83-111
 
SEISMIC STRUCTURAL HEALTH MONITORING AND REAL‐TIME DATA BROADCASTING SPECIAL ...
SEISMIC STRUCTURAL HEALTH MONITORING AND REAL‐TIME DATA BROADCASTING SPECIAL ...SEISMIC STRUCTURAL HEALTH MONITORING AND REAL‐TIME DATA BROADCASTING SPECIAL ...
SEISMIC STRUCTURAL HEALTH MONITORING AND REAL‐TIME DATA BROADCASTING SPECIAL ...
 
Seismic Considerations Seminar | Portland, Oregon
Seismic Considerations Seminar | Portland, OregonSeismic Considerations Seminar | Portland, Oregon
Seismic Considerations Seminar | Portland, Oregon
 
Seismic Vulnerability Assessment Using Field Survey and Remote Sensing Techni...
Seismic Vulnerability Assessment Using Field Survey and Remote Sensing Techni...Seismic Vulnerability Assessment Using Field Survey and Remote Sensing Techni...
Seismic Vulnerability Assessment Using Field Survey and Remote Sensing Techni...
 
Structural Health Monitoring platform presentation at NI week 2016
Structural Health Monitoring platform presentation at NI week 2016Structural Health Monitoring platform presentation at NI week 2016
Structural Health Monitoring platform presentation at NI week 2016
 
Green Retrofitting 101
Green Retrofitting 101Green Retrofitting 101
Green Retrofitting 101
 
Offshore research measurements & focus on structural health monitoring
Offshore research measurements & focus on structural health monitoringOffshore research measurements & focus on structural health monitoring
Offshore research measurements & focus on structural health monitoring
 
Retrofitting and rehabilitation
Retrofitting and rehabilitationRetrofitting and rehabilitation
Retrofitting and rehabilitation
 
Considerations for Seismic Retrofitting
Considerations for Seismic RetrofittingConsiderations for Seismic Retrofitting
Considerations for Seismic Retrofitting
 
Structural Health Monitoring: The paradigm and the benefits shown in some mon...
Structural Health Monitoring: The paradigm and the benefits shown in some mon...Structural Health Monitoring: The paradigm and the benefits shown in some mon...
Structural Health Monitoring: The paradigm and the benefits shown in some mon...
 

Similar a Seismic Structural Considerations in Steel

Ejot Solar Fasteners
Ejot Solar FastenersEjot Solar Fasteners
Ejot Solar Fastenersklubbering
 
Infiniband 4X/12X & CX4 Nx Cable Presentation Jan2009
Infiniband 4X/12X & CX4 Nx Cable Presentation Jan2009Infiniband 4X/12X & CX4 Nx Cable Presentation Jan2009
Infiniband 4X/12X & CX4 Nx Cable Presentation Jan2009mikeasavage
 
Flexibile vs. Rigid Couplings
Flexibile vs. Rigid CouplingsFlexibile vs. Rigid Couplings
Flexibile vs. Rigid CouplingsDesign World
 
SynTerra / US Bridge Presentation (10 24 11)
SynTerra / US Bridge Presentation (10 24 11)SynTerra / US Bridge Presentation (10 24 11)
SynTerra / US Bridge Presentation (10 24 11)dgonano
 

Similar a Seismic Structural Considerations in Steel (7)

Ejot Solar Fasteners
Ejot Solar FastenersEjot Solar Fasteners
Ejot Solar Fasteners
 
Infiniband 4X/12X & CX4 Nx Cable Presentation Jan2009
Infiniband 4X/12X & CX4 Nx Cable Presentation Jan2009Infiniband 4X/12X & CX4 Nx Cable Presentation Jan2009
Infiniband 4X/12X & CX4 Nx Cable Presentation Jan2009
 
Bogner Industrial
Bogner IndustrialBogner Industrial
Bogner Industrial
 
Flexibile vs. Rigid Couplings
Flexibile vs. Rigid CouplingsFlexibile vs. Rigid Couplings
Flexibile vs. Rigid Couplings
 
Overmold Design Guide
Overmold Design GuideOvermold Design Guide
Overmold Design Guide
 
Fasteners Presentation
Fasteners PresentationFasteners Presentation
Fasteners Presentation
 
SynTerra / US Bridge Presentation (10 24 11)
SynTerra / US Bridge Presentation (10 24 11)SynTerra / US Bridge Presentation (10 24 11)
SynTerra / US Bridge Presentation (10 24 11)
 

Último

call girls in Kaushambi (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
call girls in Kaushambi (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...call girls in Kaushambi (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
call girls in Kaushambi (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...Delhi Call girls
 
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...ranjana rawat
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...Pooja Nehwal
 
call girls in Vasundhra (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
call girls in Vasundhra (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...call girls in Vasundhra (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
call girls in Vasundhra (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...Delhi Call girls
 
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)amitlee9823
 
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...Pooja Nehwal
 
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...amitlee9823
 
Government polytechnic college-1.pptxabcd
Government polytechnic college-1.pptxabcdGovernment polytechnic college-1.pptxabcd
Government polytechnic college-1.pptxabcdshivubhavv
 
Tapestry Clothing Brands: Collapsing the Funnel
Tapestry Clothing Brands: Collapsing the FunnelTapestry Clothing Brands: Collapsing the Funnel
Tapestry Clothing Brands: Collapsing the Funneljen_giacalone
 
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Call Girls in Nagpur High Profile
 
call girls in Dakshinpuri (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Dakshinpuri  (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️call girls in Dakshinpuri  (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Dakshinpuri (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...amitlee9823
 
Editorial design Magazine design project.pdf
Editorial design Magazine design project.pdfEditorial design Magazine design project.pdf
Editorial design Magazine design project.pdftbatkhuu1
 
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts ServiceVVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Servicearoranaina404
 
💫✅jodhpur 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATISFACT...
💫✅jodhpur 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATISFACT...💫✅jodhpur 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATISFACT...
💫✅jodhpur 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATISFACT...sonalitrivedi431
 
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...Call Girls in Nagpur High Profile
 
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️soniya singh
 
UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...
UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...
UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...RitikaRoy32
 

Último (20)

call girls in Kaushambi (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
call girls in Kaushambi (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...call girls in Kaushambi (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
call girls in Kaushambi (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
 
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...
 
call girls in Vasundhra (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
call girls in Vasundhra (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...call girls in Vasundhra (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
call girls in Vasundhra (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
 
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
 
B. Smith. (Architectural Portfolio.).pdf
B. Smith. (Architectural Portfolio.).pdfB. Smith. (Architectural Portfolio.).pdf
B. Smith. (Architectural Portfolio.).pdf
 
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
 
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
 
Government polytechnic college-1.pptxabcd
Government polytechnic college-1.pptxabcdGovernment polytechnic college-1.pptxabcd
Government polytechnic college-1.pptxabcd
 
Tapestry Clothing Brands: Collapsing the Funnel
Tapestry Clothing Brands: Collapsing the FunnelTapestry Clothing Brands: Collapsing the Funnel
Tapestry Clothing Brands: Collapsing the Funnel
 
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
 
call girls in Dakshinpuri (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Dakshinpuri  (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️call girls in Dakshinpuri  (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Dakshinpuri (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
 
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
 
Editorial design Magazine design project.pdf
Editorial design Magazine design project.pdfEditorial design Magazine design project.pdf
Editorial design Magazine design project.pdf
 
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts ServiceVVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
 
💫✅jodhpur 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATISFACT...
💫✅jodhpur 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATISFACT...💫✅jodhpur 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATISFACT...
💫✅jodhpur 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATISFACT...
 
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
 
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
 
UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...
UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...
UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...
 

Seismic Structural Considerations in Steel

  • 1. Seismic Structural Considerations JCC Training by Paul W. McMullin, SE, PhD October 15, 2009
  • 2. The Paper Clip Test © Dunn Associates Inc, 2009
  • 3. Concept of Selected Deformation © Dunn Associates Inc, 2009
  • 4. Early Use of Moment Connections Flatiron Building, NYC • One of the first steel frame buildings • Portal frame moment connections at all wind girders. Early Steel Frames- all moment connected © Dunn Associates Inc, 2009
  • 5. Construction Changes that led to Northridge Failures Fewer, but larger moment frames • Heavier connections Changed from Riveted to Welded construction Used lower toughness welding rod • Welds went down fast • Not permitted in pipelines Quality control problems © Dunn Associates Inc, 2009
  • 6. Acceleration Record from Northridge From the Strong Motion Database (SMDB, 2000a) © Dunn Associates Inc, 2009
  • 7. Northridge Earthquake Magnitude 6.7 Building Inventory • Estimated Economic Damage • Loss = $49.3 billion • 100 buildings with minor fractures • 100 buildings with major fractures • 30 buildings with major fractures in 90% of all connections © Dunn Associates Inc, 2009
  • 8. Fracture Causes Welding • Low Toughness Weld Metal • Slag Inclusions • Lack of fusion Mismatched Yield Strengths Erroneous Joint Detailing Weld Constraint by Heavy Sections Slab Interaction with Column © Dunn Associates Inc, 2009
  • 9. Changes: Code Code limited approved filler metals Inspection requirements tightened Limited connection types Quality control significantly increased © Dunn Associates Inc, 2009
  • 10. Changes: Weld Access Hole © Dunn Associates Inc, 2009
  • 11. Connections: WUF-W © Dunn Associates Inc, 2009
  • 12. Connections: Extended Flange © Dunn Associates Inc, 2009
  • 13. Connections: Flange Cover Plate © Dunn Associates Inc, 2009
  • 14. Connections: Reduced Beam Section © Dunn Associates Inc, 2009
  • 15. Connections: Bolted End Plate © Dunn Associates Inc, 2009
  • 16. Connections: SidePlate © Dunn Associates Inc, 2009
  • 17. Protected Zone Requirements No discontinuities in Get protected zone from protected zone drawings or engineer • Arc Strikes Mark protected zones with • Erection Aids bright paint after erection and • Air-arc Gouging after fire coating • Thermal Cutting Not permitted • Welded studs • Shot pins • Screws • Welds • Holes © Dunn Associates Inc, 2009
  • 18. Protected Zones: Dog Bone © Dunn Associates Inc, 2009
  • 19. Protected Zones: Concentric Braced Frame © Dunn Associates Inc, 2009
  • 20. Protected Zones: Concentric Braced Frame © Dunn Associates Inc, 2009
  • 21. Protected Zones: Eccentric Braced Frame © Dunn Associates Inc, 2009
  • 22. Protected Zones: Eccentric Braced Frame © Dunn Associates Inc, 2009
  • 23. Connections Bolted End Plate Reduced Beam Section (“Dog Bone”) SidePlate™ © Dunn Associates Inc, 2009
  • 24. Reduced Beam Section Connection Advantages • Approved • Reduces column-beam weld stresses Disadvantages • Milling of beam flange • 80%-90% reliable • Looks odd © Dunn Associates Inc, 2009
  • 25. Reduced Beam Section Connection Watch for: • Protected Zone (nicks, arc strikes, shot pins, welds) • Smoothness of Cut • Bracing just outside cut © Dunn Associates Inc, 2009
  • 26. SidePlate Connection Advantages • Approved- seismic & progressive collapse • Eliminates beam-column weld • High reliability • Looks strong Disadvantages • Licensing fee • Flip columns in shop © Dunn Associates Inc, 2009
  • 27. Step 1: Column Tree Assembly Rotate Column to Column1intoColumn Sub-Assembly (Not Shown Here). Bring inRotate Applyand andPosition Weld intoTack into Place Side Plates Weld 2Weld 2, toSide Plates Apply Bring in Sidewith to Bring in Temporary Plates Horiz. Other Alignment, Bring in Horizontal Shear Plates, Tack, CheckApply Other Dogs Welds 1 and 3 Apply Welds Apply 3, Tack NS/FS. Position Begin Plates, Shear Plates, After that, Column Sub-Assembly Complete. © Dunn Associates Inc, 2009
  • 28. Step 2: Full-Length Beam Assembly Begin Full-Length Full-LengthTack & and into Position 5 Shown) Bring inFull-Length Beam Beam Weld Inverted As Rotate Beam Assembly Tack Apply Position Bring in Cover Plates, (Beam into Weld Erection Angle, Assembly Complete © Dunn Associates Inc, 2009
  • 29. Step 3: Erect Column Trees & Full-Length Beams with six 7/8” A325 Bolts Each End © Dunn Associates Inc, 2009
  • 30. SidePlate Connection © Dunn Associates Inc, 2009
  • 31. SidePlate Connection Watch for: 1) Joint Gap 2) Protected Zone (nicks, arc strikes, shot pins, welds) 3) SidePlate attachments 1 3 2 © Dunn Associates Inc, 2009
  • 32. SidePlate Protected Zone © Dunn Associates Inc, 2009
  • 33. SidePlate: WELDING OK © Dunn Associates Inc, 2009
  • 34. What keeps us from backtracking? Special Inspection Good Communication • Ensure done well • RFIs that are researched & • Ultrasonic propose solutions • Mag Particle ends • Notify us ahead of certain activities (pours, fire coating) Shop Drawings • Tell us about problems as soon • Complete as you know (even your screw- • Well detailed ups) • Contractor review Think/Plan Ahead Shop vs Field Welds • Catch problems • Define up-front • Give us time to determine a solution • Shop welds- faster, higher quality • Field welds- some pieces too big for shop © Dunn Associates Inc, 2009
  • 35. Our Liability STRUCTURAL ENGINEER CONTRACTOR Becomes liable when: Becomes liable when: • Omit information • Deviate from approved plans • Don’t follow the State of the and specs Art (code is minimum) • Material/workmanship/Quality problems Regardless of who is liable, if there is a problem, we all get dragged into the mess © Dunn Associates Inc, 2009