Climbing the Ladder
Means Letting Go
Attributes that make you good at one
level, can derail you at the next

Debbie Bigelow Crawford, PMP

“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2013 Permission is granted to PMI for PMI® Marketplace use only.
Performance Areas for a Traditional
High Performing Project Manager

Problem Solving and Decision Making

Interpersonal Dynamics

Management / Leadership

“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2013 Permission is granted to PMI for PMI® Marketplace use only.
What Do You Expect From a High
Performing Project Manager?
Personal Organization and Time
Management

Problem Solving and Decision Making

Interpersonal Dynamics

Management / Leadership

“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2013 Permission is granted to PMI for PMI® Marketplace use only.
What are the Performance Indicators?
The Performance Indicators for the Personal Organization
and Time Management section demonstrate the PM’s:

• Capacity to organize priorities
• Ability to manage time

• Follow through to complete tasks.

“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2013 Permission is granted to PMI for PMI® Marketplace use only.
What are the Performance Drivers?

“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2013 Permission is granted to PMI for PMI® Marketplace use only.
What Do You Expect From a High
Performing Project Manager?
Personal Organization and Time
Management

Problem Solving and Decision Making

Interpersonal Dynamics

Management / Leadership

“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2013 Permission is granted to PMI for PMI® Marketplace use only.
What are the Performance Indicators?
The Performance Indicators for the Problem Solving
and Decision Making section demonstrate the PM’s:

• Problem-solving style
• Analyze issues, evaluate alternatives, and make

decisions
• Potential to understand complex issues and to
strategize.

“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2013 Permission is granted to PMI for PMI® Marketplace use only.
What are the Performance Drivers?

“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2013 Permission is granted to PMI for PMI® Marketplace use only.
What Do You Expect From a High
Performing Project Manager?
Personal Organization and Time
Management

Problem Solving and Decision Making

Interpersonal Dynamics

Management / Leadership

“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2013 Permission is granted to PMI for PMI® Marketplace use only.
What are the Performance Indicators?
The Performance Indicators for the Interpersonal
Dynamics section demonstrate the PM’s:

• Style of interacting with others
• Capacity to initiate, develop, and maintain
relationships
• Willingness to consider other points of view

“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2013 Permission is granted to PMI for PMI® Marketplace use only.
What are the Performance Drivers?

“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2013 Permission is granted to PMI for PMI® Marketplace use only.
What Do You Expect From a High
Performing Project Manager?
Personal Organization and Time
Management

Problem Solving and Decision Making

Interpersonal Dynamics

Management / Leadership

“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2013 Permission is granted to PMI for PMI® Marketplace use only.
What are the Performance Indicators?
The Performance Indicators the Management
section demonstrate the PM’s:

• Capacity to
– establish goals,
– coordinate tasks on behalf of a team

– communicate directly

• Potential to provide coaching and support
• Persist to overcome challenges.

“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2013 Permission is granted to PMI for PMI® Marketplace use only.
What are the Performance Drivers?

“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2013 Permission is granted to PMI for PMI® Marketplace use only.
Are There Performance Inhibitors for
the Traditional Project Manager?

YES
Gregariousness: Comfort with meeting new
people and initiating conversations

Unlikely to sacrifice job performance
to make new acquaintances

Motivated to meet new people, perhaps
at the expense of achieving work goals

“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2013 Permission is granted to PMI for PMI® Marketplace use only.
A Competent Project Manager’s Profile
Personal Organization and Time Management

Problem Solving and Decision Making

Interpersonal Dynamics

Management

“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2013 Permission is granted to PMI for PMI® Marketplace use only.
This Is Changing….
WHY??
• Flattening of organizations
• Technology
• Changing Business Environment

“PMI” isis a registered trade and service mark of the Project Management Institute, Inc.
“PMI” a registered trade and service mark of the Project Management Institute, Inc.
©2013 Permission isis granted to PMI for PMI® Marketplace use only.
©2012 Permission granted to PMI for PMI® Marketplace use only.
What Do Today’s Project Manager’s
Need?
The Deck has been shuffled….
Same competencies….

Just different scores in those competencies

“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2013 Permission is granted to PMI for PMI® Marketplace use only.
Where’s the Shift?
Senior Project Managers…LEADERS… now need
higher attributes of:
• Analytical Thinking
• Conceptual Ideas

• Visionary Ability
• Influencing Skills

“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2013 Permission is granted to PMI for PMI® Marketplace use only.
Where’s the Shift?
• Influencing without authority

• Moving people to action
• Stronger Negotiation
• More Assertive
• More Aggressive
• More Confident

“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2013 Permission is granted to PMI for PMI® Marketplace use only.
What Should One Look For?

Business Acumen: combination of understanding
of where project/program play into the bigger
organizational picture.
It’s a way of thinking – a more strategic approach

“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2013 Permission is granted to PMI for PMI® Marketplace use only.
Higher Scores in Influencing Traits

Assertiveness

Aggressiveness

Ego Resilience

Ego Strength

Empathy

“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2013 Permission is granted to PMI for PMI® Marketplace use only.
Higher Scores

Abstract
Reasoning

Gregariousness
Used to be an inhibitor!

Idea Orientation

Prioritization

“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2013 Permission is granted to PMI for PMI® Marketplace use only.
Lower Scores

External Structure

Cautiousness

Thoroughness

Sociability

“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2013 Permission is granted to PMI for PMI® Marketplace use only.
Other Factors
• Experience

• Creating Habits of Keeping Pulse of Industry
• Stronger Organizational Awareness

“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2013 Permission is granted to PMI for PMI® Marketplace use only.
Competent Project Manager vs
Competent PM Leader
Management/
Leadership

Problem
Solving

Interpersonal
Dynamics

Assertiveness
24
90

Abstract
Reasoning
60
99

Sociability
11
60

Aggressiveness
86
28
Ego Strength
2
78

Idea
Orientation
49
80

Gregariousness
12
82
Empathy
79
90

Risk
Empathy
70
98

60

98

Organizational
Time
Management

External
Structure
39
4
Cautiousness
44
18

Thoroughness
82
5

Skepticism
92
2

“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2013 Permission is granted to PMI for PMI® Marketplace use only.
Don’t Get Derailed!
PROJECT

LEADER

Demonstrate you are a
Project Management Leader!

The BEHAVIORS you need to develop
Then the BEHAVIORS you need to shed
Know the ATTRIBUTES you need

“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2013 Permission is granted to PMI for PMI® Marketplace use only.
Contact Information
Debbie Bigelow Crawford, PMP

dbcrawford@pmsolutions.com
484-450-0101
www.pmcollege.com

Visit
in the exhibit hall …
Booth #21!
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2013 Permission is granted to PMI for PMI® Marketplace use only.

Más contenido relacionado

La actualidad más candente

Business Design Concepts
Business Design ConceptsBusiness Design Concepts
Business Design ConceptsStan Kirkwood
 
Enterprise Gamification as Methodology to Promote Employee Engagement
Enterprise Gamification as Methodology to Promote Employee EngagementEnterprise Gamification as Methodology to Promote Employee Engagement
Enterprise Gamification as Methodology to Promote Employee EngagementPatrick Bartl
 
Business Analytics
Business AnalyticsBusiness Analytics
Business AnalyticsPrem Anand
 
Netforte Company Presentation
Netforte Company Presentation Netforte Company Presentation
Netforte Company Presentation LucieColt
 

La actualidad más candente (8)

Business Design Concepts
Business Design ConceptsBusiness Design Concepts
Business Design Concepts
 
Enterprise Gamification as Methodology to Promote Employee Engagement
Enterprise Gamification as Methodology to Promote Employee EngagementEnterprise Gamification as Methodology to Promote Employee Engagement
Enterprise Gamification as Methodology to Promote Employee Engagement
 
Bi risk services 2013
Bi risk services 2013Bi risk services 2013
Bi risk services 2013
 
Value proposition
Value propositionValue proposition
Value proposition
 
Study "Customer Advisory Boards"
Study "Customer Advisory Boards"Study "Customer Advisory Boards"
Study "Customer Advisory Boards"
 
Anglum Group Overview
Anglum Group OverviewAnglum Group Overview
Anglum Group Overview
 
Business Analytics
Business AnalyticsBusiness Analytics
Business Analytics
 
Netforte Company Presentation
Netforte Company Presentation Netforte Company Presentation
Netforte Company Presentation
 

Destacado

Data to capture those at risk of exclusion
Data to capture those at risk of exclusionData to capture those at risk of exclusion
Data to capture those at risk of exclusionMihail Peleah
 
3 Strategies for Overcoming Resource Management Challenges
3 Strategies for Overcoming Resource Management Challenges3 Strategies for Overcoming Resource Management Challenges
3 Strategies for Overcoming Resource Management ChallengesPM Solutions
 
126621676 teste-pt-evaluarea-copiilor-cu-dizabilitati
126621676 teste-pt-evaluarea-copiilor-cu-dizabilitati126621676 teste-pt-evaluarea-copiilor-cu-dizabilitati
126621676 teste-pt-evaluarea-copiilor-cu-dizabilitatiAndreea Cozma
 
The Project Management Process - Week 11 Contemporary Issues
The Project Management Process - Week 11   Contemporary IssuesThe Project Management Process - Week 11   Contemporary Issues
The Project Management Process - Week 11 Contemporary IssuesCraig Brown
 
Doors, Walls and Old Trees: Prioritizing to Get Simple
Doors, Walls and Old Trees: Prioritizing to Get SimpleDoors, Walls and Old Trees: Prioritizing to Get Simple
Doors, Walls and Old Trees: Prioritizing to Get SimpleJason Ulaszek
 
26 Time Management Hacks I Wish I'd Known at 20
26 Time Management Hacks I Wish I'd Known at 2026 Time Management Hacks I Wish I'd Known at 20
26 Time Management Hacks I Wish I'd Known at 20Étienne Garbugli
 

Destacado (7)

5minutes of power
5minutes of power5minutes of power
5minutes of power
 
Data to capture those at risk of exclusion
Data to capture those at risk of exclusionData to capture those at risk of exclusion
Data to capture those at risk of exclusion
 
3 Strategies for Overcoming Resource Management Challenges
3 Strategies for Overcoming Resource Management Challenges3 Strategies for Overcoming Resource Management Challenges
3 Strategies for Overcoming Resource Management Challenges
 
126621676 teste-pt-evaluarea-copiilor-cu-dizabilitati
126621676 teste-pt-evaluarea-copiilor-cu-dizabilitati126621676 teste-pt-evaluarea-copiilor-cu-dizabilitati
126621676 teste-pt-evaluarea-copiilor-cu-dizabilitati
 
The Project Management Process - Week 11 Contemporary Issues
The Project Management Process - Week 11   Contemporary IssuesThe Project Management Process - Week 11   Contemporary Issues
The Project Management Process - Week 11 Contemporary Issues
 
Doors, Walls and Old Trees: Prioritizing to Get Simple
Doors, Walls and Old Trees: Prioritizing to Get SimpleDoors, Walls and Old Trees: Prioritizing to Get Simple
Doors, Walls and Old Trees: Prioritizing to Get Simple
 
26 Time Management Hacks I Wish I'd Known at 20
26 Time Management Hacks I Wish I'd Known at 2026 Time Management Hacks I Wish I'd Known at 20
26 Time Management Hacks I Wish I'd Known at 20
 

Similar a Climbing the Ladder Means Letting Go: Attributes that make you good at one level, can derail you at the next

PMI Global Congress North America 2015 - Change the system, not the people.
PMI Global Congress North America 2015 - Change the system, not the people.PMI Global Congress North America 2015 - Change the system, not the people.
PMI Global Congress North America 2015 - Change the system, not the people.Michal Raczka
 
Project management and organizational change management
Project management and organizational change managementProject management and organizational change management
Project management and organizational change managementSusan Boyd
 
An Introduction to Visual Management Systems
An Introduction to Visual Management SystemsAn Introduction to Visual Management Systems
An Introduction to Visual Management SystemsDerek Huether
 
Scope: Mastering the Fuzzy Constraint
Scope: Mastering the Fuzzy ConstraintScope: Mastering the Fuzzy Constraint
Scope: Mastering the Fuzzy Constraintbbigelow
 
Ev08 sep17 pmi_virtual_teams(final)1 (2)
Ev08 sep17 pmi_virtual_teams(final)1 (2)Ev08 sep17 pmi_virtual_teams(final)1 (2)
Ev08 sep17 pmi_virtual_teams(final)1 (2)Marcia B. Riley
 
Pmi lebanon conference workshop-initiating proftiable projects-saadi adra
Pmi lebanon conference workshop-initiating proftiable projects-saadi adraPmi lebanon conference workshop-initiating proftiable projects-saadi adra
Pmi lebanon conference workshop-initiating proftiable projects-saadi adraPMILebanonChapter
 
Huron Consulting : CRM Visioning for Bloomer
Huron Consulting : CRM Visioning for BloomerHuron Consulting : CRM Visioning for Bloomer
Huron Consulting : CRM Visioning for BloomerAmi Reese
 
Managing an ITIL SaaS implementation IT program
Managing an ITIL SaaS implementation IT programManaging an ITIL SaaS implementation IT program
Managing an ITIL SaaS implementation IT programGottfried Rudorfer
 
What Separates Top PMO Practitioners from the Failures?
What Separates Top PMO Practitioners from the Failures?What Separates Top PMO Practitioners from the Failures?
What Separates Top PMO Practitioners from the Failures?KeyedIn Solutions Inc.
 
Master mentors presentation
Master mentors presentationMaster mentors presentation
Master mentors presentationVarun Sahu
 
Market Yourself Using Social Media - PMIWDC 2012 Project Management Symposium...
Market Yourself Using Social Media - PMIWDC 2012 Project Management Symposium...Market Yourself Using Social Media - PMIWDC 2012 Project Management Symposium...
Market Yourself Using Social Media - PMIWDC 2012 Project Management Symposium...Hector Del Castillo, CPM, CPMM
 
The Product Manager Pathfinder - AIPMM Presentation - ProductCamp SV Spring 2012
The Product Manager Pathfinder - AIPMM Presentation - ProductCamp SV Spring 2012The Product Manager Pathfinder - AIPMM Presentation - ProductCamp SV Spring 2012
The Product Manager Pathfinder - AIPMM Presentation - ProductCamp SV Spring 2012Hector Del Castillo, CPM, CPMM
 
Sneak peek na15 agl01 leading construction industry to lean-agile (leagile)...
Sneak peek na15 agl01   leading construction industry to lean-agile (leagile)...Sneak peek na15 agl01   leading construction industry to lean-agile (leagile)...
Sneak peek na15 agl01 leading construction industry to lean-agile (leagile)...Iram hasan
 
(Scaling) agile through the lens of a Business Analyst using SAFe
(Scaling) agile through the lens of a Business Analyst using SAFe(Scaling) agile through the lens of a Business Analyst using SAFe
(Scaling) agile through the lens of a Business Analyst using SAFeAustraliaChapterIIBA
 
Role of Business Analysis in Modern Project Management
Role of Business Analysis in Modern Project ManagementRole of Business Analysis in Modern Project Management
Role of Business Analysis in Modern Project ManagementGail Raynus, PMP
 

Similar a Climbing the Ladder Means Letting Go: Attributes that make you good at one level, can derail you at the next (20)

PMI Global Congress North America 2015 - Change the system, not the people.
PMI Global Congress North America 2015 - Change the system, not the people.PMI Global Congress North America 2015 - Change the system, not the people.
PMI Global Congress North America 2015 - Change the system, not the people.
 
Project management and organizational change management
Project management and organizational change managementProject management and organizational change management
Project management and organizational change management
 
Click with Ease
Click with EaseClick with Ease
Click with Ease
 
An Introduction to Visual Management Systems
An Introduction to Visual Management SystemsAn Introduction to Visual Management Systems
An Introduction to Visual Management Systems
 
PMI Global Congress 2012
PMI Global Congress 2012PMI Global Congress 2012
PMI Global Congress 2012
 
Managing the People Side of Change: An Applied Framework
Managing the People Side of Change:  An Applied FrameworkManaging the People Side of Change:  An Applied Framework
Managing the People Side of Change: An Applied Framework
 
SMAC and Transforming Innovation
SMAC and Transforming InnovationSMAC and Transforming Innovation
SMAC and Transforming Innovation
 
Scope: Mastering the Fuzzy Constraint
Scope: Mastering the Fuzzy ConstraintScope: Mastering the Fuzzy Constraint
Scope: Mastering the Fuzzy Constraint
 
Ev08 sep17 pmi_virtual_teams(final)1 (2)
Ev08 sep17 pmi_virtual_teams(final)1 (2)Ev08 sep17 pmi_virtual_teams(final)1 (2)
Ev08 sep17 pmi_virtual_teams(final)1 (2)
 
Pmi lebanon conference workshop-initiating proftiable projects-saadi adra
Pmi lebanon conference workshop-initiating proftiable projects-saadi adraPmi lebanon conference workshop-initiating proftiable projects-saadi adra
Pmi lebanon conference workshop-initiating proftiable projects-saadi adra
 
Huron Consulting : CRM Visioning for Bloomer
Huron Consulting : CRM Visioning for BloomerHuron Consulting : CRM Visioning for Bloomer
Huron Consulting : CRM Visioning for Bloomer
 
Managing an ITIL SaaS implementation IT program
Managing an ITIL SaaS implementation IT programManaging an ITIL SaaS implementation IT program
Managing an ITIL SaaS implementation IT program
 
What Separates Top PMO Practitioners from the Failures?
What Separates Top PMO Practitioners from the Failures?What Separates Top PMO Practitioners from the Failures?
What Separates Top PMO Practitioners from the Failures?
 
Master mentors presentation
Master mentors presentationMaster mentors presentation
Master mentors presentation
 
Market Yourself Using Social Media - PMIWDC 2012 Project Management Symposium...
Market Yourself Using Social Media - PMIWDC 2012 Project Management Symposium...Market Yourself Using Social Media - PMIWDC 2012 Project Management Symposium...
Market Yourself Using Social Media - PMIWDC 2012 Project Management Symposium...
 
The Product Manager Pathfinder - AIPMM Presentation - ProductCamp SV Spring 2012
The Product Manager Pathfinder - AIPMM Presentation - ProductCamp SV Spring 2012The Product Manager Pathfinder - AIPMM Presentation - ProductCamp SV Spring 2012
The Product Manager Pathfinder - AIPMM Presentation - ProductCamp SV Spring 2012
 
Sneak peek na15 agl01 leading construction industry to lean-agile (leagile)...
Sneak peek na15 agl01   leading construction industry to lean-agile (leagile)...Sneak peek na15 agl01   leading construction industry to lean-agile (leagile)...
Sneak peek na15 agl01 leading construction industry to lean-agile (leagile)...
 
Focus on the Customer
Focus on the CustomerFocus on the Customer
Focus on the Customer
 
(Scaling) agile through the lens of a Business Analyst using SAFe
(Scaling) agile through the lens of a Business Analyst using SAFe(Scaling) agile through the lens of a Business Analyst using SAFe
(Scaling) agile through the lens of a Business Analyst using SAFe
 
Role of Business Analysis in Modern Project Management
Role of Business Analysis in Modern Project ManagementRole of Business Analysis in Modern Project Management
Role of Business Analysis in Modern Project Management
 

Más de PM Solutions

The State of the Project Management Office (PMO) 2014
The State of the Project Management Office (PMO) 2014The State of the Project Management Office (PMO) 2014
The State of the Project Management Office (PMO) 2014PM Solutions
 
State of Project Portfolio Management (PPM) 2013 Research Report
State of Project Portfolio Management (PPM) 2013 Research ReportState of Project Portfolio Management (PPM) 2013 Research Report
State of Project Portfolio Management (PPM) 2013 Research ReportPM Solutions
 
PMO of the Year Award 2011 eBook
PMO of the Year Award 2011 eBookPMO of the Year Award 2011 eBook
PMO of the Year Award 2011 eBookPM Solutions
 
Research Report: Strategies for Project Recovery
Research Report: Strategies for Project RecoveryResearch Report: Strategies for Project Recovery
Research Report: Strategies for Project RecoveryPM Solutions
 
Practical Strategies for Project Recovery Webinar Slides
Practical Strategies for Project Recovery Webinar SlidesPractical Strategies for Project Recovery Webinar Slides
Practical Strategies for Project Recovery Webinar SlidesPM Solutions
 
PMO of the Year Award 2010 eBook
PMO of the Year Award 2010 eBookPMO of the Year Award 2010 eBook
PMO of the Year Award 2010 eBookPM Solutions
 

Más de PM Solutions (6)

The State of the Project Management Office (PMO) 2014
The State of the Project Management Office (PMO) 2014The State of the Project Management Office (PMO) 2014
The State of the Project Management Office (PMO) 2014
 
State of Project Portfolio Management (PPM) 2013 Research Report
State of Project Portfolio Management (PPM) 2013 Research ReportState of Project Portfolio Management (PPM) 2013 Research Report
State of Project Portfolio Management (PPM) 2013 Research Report
 
PMO of the Year Award 2011 eBook
PMO of the Year Award 2011 eBookPMO of the Year Award 2011 eBook
PMO of the Year Award 2011 eBook
 
Research Report: Strategies for Project Recovery
Research Report: Strategies for Project RecoveryResearch Report: Strategies for Project Recovery
Research Report: Strategies for Project Recovery
 
Practical Strategies for Project Recovery Webinar Slides
Practical Strategies for Project Recovery Webinar SlidesPractical Strategies for Project Recovery Webinar Slides
Practical Strategies for Project Recovery Webinar Slides
 
PMO of the Year Award 2010 eBook
PMO of the Year Award 2010 eBookPMO of the Year Award 2010 eBook
PMO of the Year Award 2010 eBook
 

Último

Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...noida100girls
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdfOrient Homes
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 

Último (20)

Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdf
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 

Climbing the Ladder Means Letting Go: Attributes that make you good at one level, can derail you at the next

  • 1. Climbing the Ladder Means Letting Go Attributes that make you good at one level, can derail you at the next Debbie Bigelow Crawford, PMP “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2013 Permission is granted to PMI for PMI® Marketplace use only.
  • 2. Performance Areas for a Traditional High Performing Project Manager Problem Solving and Decision Making Interpersonal Dynamics Management / Leadership “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2013 Permission is granted to PMI for PMI® Marketplace use only.
  • 3. What Do You Expect From a High Performing Project Manager? Personal Organization and Time Management Problem Solving and Decision Making Interpersonal Dynamics Management / Leadership “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2013 Permission is granted to PMI for PMI® Marketplace use only.
  • 4. What are the Performance Indicators? The Performance Indicators for the Personal Organization and Time Management section demonstrate the PM’s: • Capacity to organize priorities • Ability to manage time • Follow through to complete tasks. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2013 Permission is granted to PMI for PMI® Marketplace use only.
  • 5. What are the Performance Drivers? “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2013 Permission is granted to PMI for PMI® Marketplace use only.
  • 6. What Do You Expect From a High Performing Project Manager? Personal Organization and Time Management Problem Solving and Decision Making Interpersonal Dynamics Management / Leadership “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2013 Permission is granted to PMI for PMI® Marketplace use only.
  • 7. What are the Performance Indicators? The Performance Indicators for the Problem Solving and Decision Making section demonstrate the PM’s: • Problem-solving style • Analyze issues, evaluate alternatives, and make decisions • Potential to understand complex issues and to strategize. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2013 Permission is granted to PMI for PMI® Marketplace use only.
  • 8. What are the Performance Drivers? “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2013 Permission is granted to PMI for PMI® Marketplace use only.
  • 9. What Do You Expect From a High Performing Project Manager? Personal Organization and Time Management Problem Solving and Decision Making Interpersonal Dynamics Management / Leadership “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2013 Permission is granted to PMI for PMI® Marketplace use only.
  • 10. What are the Performance Indicators? The Performance Indicators for the Interpersonal Dynamics section demonstrate the PM’s: • Style of interacting with others • Capacity to initiate, develop, and maintain relationships • Willingness to consider other points of view “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2013 Permission is granted to PMI for PMI® Marketplace use only.
  • 11. What are the Performance Drivers? “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2013 Permission is granted to PMI for PMI® Marketplace use only.
  • 12. What Do You Expect From a High Performing Project Manager? Personal Organization and Time Management Problem Solving and Decision Making Interpersonal Dynamics Management / Leadership “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2013 Permission is granted to PMI for PMI® Marketplace use only.
  • 13. What are the Performance Indicators? The Performance Indicators the Management section demonstrate the PM’s: • Capacity to – establish goals, – coordinate tasks on behalf of a team – communicate directly • Potential to provide coaching and support • Persist to overcome challenges. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2013 Permission is granted to PMI for PMI® Marketplace use only.
  • 14. What are the Performance Drivers? “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2013 Permission is granted to PMI for PMI® Marketplace use only.
  • 15. Are There Performance Inhibitors for the Traditional Project Manager? YES Gregariousness: Comfort with meeting new people and initiating conversations Unlikely to sacrifice job performance to make new acquaintances Motivated to meet new people, perhaps at the expense of achieving work goals “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2013 Permission is granted to PMI for PMI® Marketplace use only.
  • 16. A Competent Project Manager’s Profile Personal Organization and Time Management Problem Solving and Decision Making Interpersonal Dynamics Management “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2013 Permission is granted to PMI for PMI® Marketplace use only.
  • 17. This Is Changing…. WHY?? • Flattening of organizations • Technology • Changing Business Environment “PMI” isis a registered trade and service mark of the Project Management Institute, Inc. “PMI” a registered trade and service mark of the Project Management Institute, Inc. ©2013 Permission isis granted to PMI for PMI® Marketplace use only. ©2012 Permission granted to PMI for PMI® Marketplace use only.
  • 18. What Do Today’s Project Manager’s Need? The Deck has been shuffled…. Same competencies…. Just different scores in those competencies “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2013 Permission is granted to PMI for PMI® Marketplace use only.
  • 19. Where’s the Shift? Senior Project Managers…LEADERS… now need higher attributes of: • Analytical Thinking • Conceptual Ideas • Visionary Ability • Influencing Skills “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2013 Permission is granted to PMI for PMI® Marketplace use only.
  • 20. Where’s the Shift? • Influencing without authority • Moving people to action • Stronger Negotiation • More Assertive • More Aggressive • More Confident “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2013 Permission is granted to PMI for PMI® Marketplace use only.
  • 21. What Should One Look For? Business Acumen: combination of understanding of where project/program play into the bigger organizational picture. It’s a way of thinking – a more strategic approach “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2013 Permission is granted to PMI for PMI® Marketplace use only.
  • 22. Higher Scores in Influencing Traits Assertiveness Aggressiveness Ego Resilience Ego Strength Empathy “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2013 Permission is granted to PMI for PMI® Marketplace use only.
  • 23. Higher Scores Abstract Reasoning Gregariousness Used to be an inhibitor! Idea Orientation Prioritization “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2013 Permission is granted to PMI for PMI® Marketplace use only.
  • 24. Lower Scores External Structure Cautiousness Thoroughness Sociability “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2013 Permission is granted to PMI for PMI® Marketplace use only.
  • 25. Other Factors • Experience • Creating Habits of Keeping Pulse of Industry • Stronger Organizational Awareness “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2013 Permission is granted to PMI for PMI® Marketplace use only.
  • 26. Competent Project Manager vs Competent PM Leader Management/ Leadership Problem Solving Interpersonal Dynamics Assertiveness 24 90 Abstract Reasoning 60 99 Sociability 11 60 Aggressiveness 86 28 Ego Strength 2 78 Idea Orientation 49 80 Gregariousness 12 82 Empathy 79 90 Risk Empathy 70 98 60 98 Organizational Time Management External Structure 39 4 Cautiousness 44 18 Thoroughness 82 5 Skepticism 92 2 “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2013 Permission is granted to PMI for PMI® Marketplace use only.
  • 27. Don’t Get Derailed! PROJECT LEADER Demonstrate you are a Project Management Leader! The BEHAVIORS you need to develop Then the BEHAVIORS you need to shed Know the ATTRIBUTES you need “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2013 Permission is granted to PMI for PMI® Marketplace use only.
  • 28. Contact Information Debbie Bigelow Crawford, PMP dbcrawford@pmsolutions.com 484-450-0101 www.pmcollege.com Visit in the exhibit hall … Booth #21! “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2013 Permission is granted to PMI for PMI® Marketplace use only.

Notas del editor

  1. There’s a lot of discussion about the “traditional project manager” and the new, business-driven project manager. People are looking to find out where the gap is. How can we get PMs who have been in the business for years and new, upcoming PMs understand the important new role they play. What are the personality attributes and behaviors they need to develop….and when? There have been a lot of changes in the industry over the last few decades….in the 60s, PM was all about the “science”; in the 80’s, it moved into soft skills for negotiating, influencing, motivating team, and now in the 2000s, there is a huge integration with business. What I’d like to do with this presentation is to walk you through what the typical personality profile for a traditional PM looks like….and then point out the changes for this new, emerging business-driven project manager. When you contrast both, you’ll begin to see some of the behaviors you now demonstrate might need some changing if you want to move up the ladder.
  2. In this presentation, I want to show how the performance areas for a traditional project manager and then the performance areas for an emerging project management leader. Not incidentally, the performance areas are the same. The greatest difference that you will see, will be the degree or strength of the attribute drivers, and a result, the demonstrated behaviors. So….What’s an “attribute driver”?? Personality attributes are either DRIVERS , which pushes their performance in a positive direction, or INHIBITORS, which can interfere with their job performance.Why is this important? Well, if you want to move from being viewed as a SME (an expert planner, scheduler, controller…a person who takes limited risk, dealing with “technical issues”)…or a Valuable Resource (who is more general, not just technical…someone who puts problems in context and offers new perspectives, who is more transparent and communicative, and a little more of a risk taker)…or, ultimately, if you want to be viewed as a Trusted Advisor, (Divergent thnker, reflective, takes initiative, not reactive) you are going to need to understand the attributes it takes…and then start demonstrating behaviors that validate you HAVE those attributes.So when we look at “Performance Areas”, what we are really looking at are the attributes and behaviors that research has shown are objectively measured and directly linked to high performing project managers. The first of the these 4 Performance Areas is Personal Organization and Time Management.
  3. So we know what the performance indicators are….what attributes (Performance Drivers) should we be looking at? And then what behavior tendencies?
  4. Behavioral Tendencies Independently sets goals, objectives, and priorities Implication: Tends to proactively set goals and effectively prioritize critical tasks.Manages multiple tasks and activities Implication: Should be able to coordinate multiple activities effectively.Follows established policies and procedures Implication: Is usually inclined to accomplish tasks according to established procedures, but at times may not adhere to them strictly.Works quickly Implication: Is inclined to move quickly in an effort to produce results.
  5. Recognizes problems, issues, and opportunities Implication: Should be able to effectively recognize opportunities; is likely to see angles that others do not.Gathers and analyzes data Implication: Is apt to seek out and analyze relevant data in order to understand subtle trends and complex relationships.Synthesizes information Implication: Is apt to effectively distill information into a coherent and logical framework.Creates new concepts and approaches to solve problems Implication: Tends to devise creative solutions.
  6. Behavioral Tendencies Develops new contacts and initiates relationships Implication: Is not apt to become sidetracked from core tasks in order to network and meet new people.Maintains existing relationships Implication: May not maintain the contact necessary to sustain relationships.Demonstrates an eagerness to help others Implication: Is unlikely to volunteer help.Considers others’ points of view with an open mind Implication: May have difficulty accepting others’ input.
  7. Behavioral Tendencies Confidently expresses ideas and opinions Implication: Seems capable of communicating in a self-assured manner in certain situations.Persuasively sells ideas to gain support and buy-in Implication: Tends to have difficulty convincing staff members or colleagues to support initiatives or to take action.Is willing to make tough decisions Implication: Seems capable of making difficult decisions in certain situations.Is persistent Implication: Tends to persevere in order to overcome obstacles.