Project Name: TMS and GTM Requirements
Date of Last Review: August 13 2012
Project Deliverables WBS # Owner Status Due Date Comments
1 Project Kick Off 1.1.1.2 Mance A Delivered Monday, July 30, 2012
2 Finalize Stephenville's Requirements 1.2.4.8 Murali V Delivered Friday, August 10, 2012
3 Finalize St.John's Requirements 1.2.5.8 Murali V Tuesday, August 21, 2012
4 Finalize Davis Requirements 1.2.6.8 Murali V Tuesday, August 28, 2012
5 Finalize Houston Requirements 1.2.7.8 Murali V Monday, September 3, 2012
6 Complete Vendor 2 Demo Session 1.6.6.5 Murali V Tuesday, October 16, 2012
7 Complete Vendor 3 Demo Session 1.6.7.5 Murali V Thursday, October 25, 2012
8 D3 - Complete (TO-BE) Integration Functional/Process Scenarios 1.7.3 Murali V Wednesday, October 24, 2012
9 D4 - Complete Vendor Software Evaluation Matrix 1.8.3 Murali V Monday, October 29, 2012
Deliverables Traceability Matrix for North American Transportation Management/
Trade Compliance Solution Assessment Project.
Del.ID
Reviewed By:
Traceability Matrix V5 MV 08142012
Last Updated 01/23/01 2
10 Finalized Integration Product/Vendor 1.9.4 Murali V Friday, November 2, 2012
11 D5 - Complete Project Plan 1.10.3 Murali V Friday, November 9, 2012
12 D6 - Complete Evaluation Matrix and Recommendation Document 1.11.8 Mance A Thursday, November 29, 2012
13
This document caters to tracing the Change Requests as well, along with business, functional and technical requirements for TMS and GTM Requirements (North American Transportation Management/Trade
Compliance Solution Overview). Set the current status of the requirement and update the comments of a requirement periodically.
Traceability Matrix V5 MV 08142012
Last Updated 01/23/01 2

Más contenido relacionado

Destacado

Requirements Traceability Links
Requirements Traceability LinksRequirements Traceability Links
Requirements Traceability LinksEccam
 
05 pmp scope management exam
05 pmp scope management exam05 pmp scope management exam
05 pmp scope management examJamil Faraj , PMP
 
Tips For Solving PMP Exam Questions
Tips For Solving PMP Exam QuestionsTips For Solving PMP Exam Questions
Tips For Solving PMP Exam Questionstfhakam
 
Sqa, test scenarios and test cases
Sqa, test scenarios and test casesSqa, test scenarios and test cases
Sqa, test scenarios and test casesConfiz
 
Inter requirement traceability matrix : Ready template
Inter requirement traceability matrix : Ready templateInter requirement traceability matrix : Ready template
Inter requirement traceability matrix : Ready templateDhawal Thakkar PMP
 
online book sale srs Apeksha
online book sale srs Apekshaonline book sale srs Apeksha
online book sale srs Apekshaapekshasoni123
 
Software Estimation Techniques
Software Estimation TechniquesSoftware Estimation Techniques
Software Estimation Techniqueskamal
 
Computer System Validation
Computer System ValidationComputer System Validation
Computer System ValidationEric Silva
 
Work breakdown structure ppt
Work breakdown structure pptWork breakdown structure ppt
Work breakdown structure pptnazi2020
 
Business Intelligence Presentation (1/2)
Business Intelligence Presentation (1/2)Business Intelligence Presentation (1/2)
Business Intelligence Presentation (1/2)Bernardo Najlis
 
Business intelligence ppt
Business intelligence pptBusiness intelligence ppt
Business intelligence pptsujithkylm007
 

Destacado (17)

Requirements Traceability Links
Requirements Traceability LinksRequirements Traceability Links
Requirements Traceability Links
 
Chap014
Chap014Chap014
Chap014
 
05 pmp scope management exam
05 pmp scope management exam05 pmp scope management exam
05 pmp scope management exam
 
Tips For Solving PMP Exam Questions
Tips For Solving PMP Exam QuestionsTips For Solving PMP Exam Questions
Tips For Solving PMP Exam Questions
 
Pmp session 2
Pmp session 2Pmp session 2
Pmp session 2
 
BPD Design Template
BPD Design TemplateBPD Design Template
BPD Design Template
 
Sqa, test scenarios and test cases
Sqa, test scenarios and test casesSqa, test scenarios and test cases
Sqa, test scenarios and test cases
 
Requirements Management
Requirements ManagementRequirements Management
Requirements Management
 
Inter requirement traceability matrix : Ready template
Inter requirement traceability matrix : Ready templateInter requirement traceability matrix : Ready template
Inter requirement traceability matrix : Ready template
 
online book sale srs Apeksha
online book sale srs Apekshaonline book sale srs Apeksha
online book sale srs Apeksha
 
Basic software testing v2.20
Basic software testing v2.20Basic software testing v2.20
Basic software testing v2.20
 
Pmp5
Pmp5Pmp5
Pmp5
 
Software Estimation Techniques
Software Estimation TechniquesSoftware Estimation Techniques
Software Estimation Techniques
 
Computer System Validation
Computer System ValidationComputer System Validation
Computer System Validation
 
Work breakdown structure ppt
Work breakdown structure pptWork breakdown structure ppt
Work breakdown structure ppt
 
Business Intelligence Presentation (1/2)
Business Intelligence Presentation (1/2)Business Intelligence Presentation (1/2)
Business Intelligence Presentation (1/2)
 
Business intelligence ppt
Business intelligence pptBusiness intelligence ppt
Business intelligence ppt
 

Más de Murali Venkatesh

Overview about Emerging Technologies
Overview about Emerging TechnologiesOverview about Emerging Technologies
Overview about Emerging TechnologiesMurali Venkatesh
 
Future of supply chain using 5G, IoT and Blockchain by Murali Venkatesh
Future of supply chain using 5G, IoT and Blockchain by Murali VenkateshFuture of supply chain using 5G, IoT and Blockchain by Murali Venkatesh
Future of supply chain using 5G, IoT and Blockchain by Murali VenkateshMurali Venkatesh
 
Product tracking and tracing with Blockchain and Internet of Things
Product tracking and tracing with Blockchain and Internet of ThingsProduct tracking and tracing with Blockchain and Internet of Things
Product tracking and tracing with Blockchain and Internet of ThingsMurali Venkatesh
 
Solution in detail oil and gas hydrocarbon accounting for oil and gas
Solution in detail  oil and gas  hydrocarbon accounting for oil and gasSolution in detail  oil and gas  hydrocarbon accounting for oil and gas
Solution in detail oil and gas hydrocarbon accounting for oil and gasMurali Venkatesh
 
I gave Management Consulting Training - PPT Outline by Murali Venkatesh
I gave Management Consulting Training - PPT Outline by Murali VenkateshI gave Management Consulting Training - PPT Outline by Murali Venkatesh
I gave Management Consulting Training - PPT Outline by Murali VenkateshMurali Venkatesh
 
Example: AS-IS Diagram by Murali Venkatesh
Example: AS-IS Diagram by Murali VenkateshExample: AS-IS Diagram by Murali Venkatesh
Example: AS-IS Diagram by Murali VenkateshMurali Venkatesh
 
Prestiva PMP process approach
Prestiva PMP process approachPrestiva PMP process approach
Prestiva PMP process approachMurali Venkatesh
 
Prestiva nomination: SAP IS-OIL TSW, SPW, TRM, GTM
Prestiva nomination:   SAP IS-OIL TSW, SPW, TRM, GTMPrestiva nomination:   SAP IS-OIL TSW, SPW, TRM, GTM
Prestiva nomination: SAP IS-OIL TSW, SPW, TRM, GTMMurali Venkatesh
 
Prestiva ETRM process allegro
Prestiva ETRM process allegroPrestiva ETRM process allegro
Prestiva ETRM process allegroMurali Venkatesh
 

Más de Murali Venkatesh (12)

Overview about Emerging Technologies
Overview about Emerging TechnologiesOverview about Emerging Technologies
Overview about Emerging Technologies
 
Future of supply chain using 5G, IoT and Blockchain by Murali Venkatesh
Future of supply chain using 5G, IoT and Blockchain by Murali VenkateshFuture of supply chain using 5G, IoT and Blockchain by Murali Venkatesh
Future of supply chain using 5G, IoT and Blockchain by Murali Venkatesh
 
Product tracking and tracing with Blockchain and Internet of Things
Product tracking and tracing with Blockchain and Internet of ThingsProduct tracking and tracing with Blockchain and Internet of Things
Product tracking and tracing with Blockchain and Internet of Things
 
Solution in detail oil and gas hydrocarbon accounting for oil and gas
Solution in detail  oil and gas  hydrocarbon accounting for oil and gasSolution in detail  oil and gas  hydrocarbon accounting for oil and gas
Solution in detail oil and gas hydrocarbon accounting for oil and gas
 
I gave Management Consulting Training - PPT Outline by Murali Venkatesh
I gave Management Consulting Training - PPT Outline by Murali VenkateshI gave Management Consulting Training - PPT Outline by Murali Venkatesh
I gave Management Consulting Training - PPT Outline by Murali Venkatesh
 
Example: AS-IS Diagram by Murali Venkatesh
Example: AS-IS Diagram by Murali VenkateshExample: AS-IS Diagram by Murali Venkatesh
Example: AS-IS Diagram by Murali Venkatesh
 
Prestiva PMP process approach
Prestiva PMP process approachPrestiva PMP process approach
Prestiva PMP process approach
 
Prestiva nomination: SAP IS-OIL TSW, SPW, TRM, GTM
Prestiva nomination:   SAP IS-OIL TSW, SPW, TRM, GTMPrestiva nomination:   SAP IS-OIL TSW, SPW, TRM, GTM
Prestiva nomination: SAP IS-OIL TSW, SPW, TRM, GTM
 
Prestiva ETRM process allegro
Prestiva ETRM process allegroPrestiva ETRM process allegro
Prestiva ETRM process allegro
 
prestiva_blackhat
prestiva_blackhatprestiva_blackhat
prestiva_blackhat
 
prestiva_SEO_knowledge
prestiva_SEO_knowledgeprestiva_SEO_knowledge
prestiva_SEO_knowledge
 
prestiva SEO Knowledge
prestiva SEO Knowledgeprestiva SEO Knowledge
prestiva SEO Knowledge
 

Example - Traceability Matrix by Murali Venkatesh

  • 1. Project Name: TMS and GTM Requirements Date of Last Review: August 13 2012 Project Deliverables WBS # Owner Status Due Date Comments 1 Project Kick Off 1.1.1.2 Mance A Delivered Monday, July 30, 2012 2 Finalize Stephenville's Requirements 1.2.4.8 Murali V Delivered Friday, August 10, 2012 3 Finalize St.John's Requirements 1.2.5.8 Murali V Tuesday, August 21, 2012 4 Finalize Davis Requirements 1.2.6.8 Murali V Tuesday, August 28, 2012 5 Finalize Houston Requirements 1.2.7.8 Murali V Monday, September 3, 2012 6 Complete Vendor 2 Demo Session 1.6.6.5 Murali V Tuesday, October 16, 2012 7 Complete Vendor 3 Demo Session 1.6.7.5 Murali V Thursday, October 25, 2012 8 D3 - Complete (TO-BE) Integration Functional/Process Scenarios 1.7.3 Murali V Wednesday, October 24, 2012 9 D4 - Complete Vendor Software Evaluation Matrix 1.8.3 Murali V Monday, October 29, 2012 Deliverables Traceability Matrix for North American Transportation Management/ Trade Compliance Solution Assessment Project. Del.ID Reviewed By: Traceability Matrix V5 MV 08142012 Last Updated 01/23/01 2
  • 2. 10 Finalized Integration Product/Vendor 1.9.4 Murali V Friday, November 2, 2012 11 D5 - Complete Project Plan 1.10.3 Murali V Friday, November 9, 2012 12 D6 - Complete Evaluation Matrix and Recommendation Document 1.11.8 Mance A Thursday, November 29, 2012 13 This document caters to tracing the Change Requests as well, along with business, functional and technical requirements for TMS and GTM Requirements (North American Transportation Management/Trade Compliance Solution Overview). Set the current status of the requirement and update the comments of a requirement periodically. Traceability Matrix V5 MV 08142012 Last Updated 01/23/01 2