The Project Format Project Development & Organization Management Levels of Construction Basic Management Activities
Project Development and Organization Life Cycle of the Construction Project Development Process
START
Concept and Feasibility Studies ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Concept and Feasibility Studies ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Engineering and Design ,[object Object],[object Object],[object Object],[object Object],[object Object]
Engineering and Design ,[object Object],[object Object],[object Object],[object Object],[object Object],This is where the first of  5 phases in the Basic Architectural Service  begins: Schematic Design ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Engineering and Design ,[object Object],[object Object],[object Object],This is where the second and third of  5 phases in the Basic Architectural Service  begins: Design Development Construction Documentation ,[object Object]
Procurement ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],This is where the forth of  5 phases in the Basic Architectural Service  begins: Bidding & Negotiation
Construction ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],This is where the last of  5 phases in the Basic Architectural Service  begins: Construction Administration
Construction ,[object Object],[object Object],[object Object],[object Object]
Start-up and Implementation ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Operation & Utilization ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Construction Projects develop in a sequential or linear fashion: A need for a facility is identified by the owner Initial feasibility and cost projections are developed  Decision to proceed with conceptual design is made and a design professional is chosen and retained  Conceptual design and scope of work is developed to include an approximate estimate of cost  Decision is made to proceed with the development of final design documentation, which fully defines the project for construction purposes  Conceptual and Feasibility Studies Engineering and Design
Construction Projects develop in a sequential or linear fashion: Based on final design documents, the project is advertised and proposals to include quotations for construction are solicited  Based on proposals received, a contractor is selected and notice to proceed is given.  Acceptance of proposal by owner will form a contract for the work  Process of construction is started.  Work is completed and facility is available for acceptance and occupancy/utilization  Procurement  Construction
Construction Projects develop in a sequential or linear fashion: In complex projects, a period of testing determines if the facility operates as designed and planned  Facility operates and is maintained during specified service life  Facility is disposed of if appropriate or maintained in perpetuity  Start-up & Implementation  Operation & Utilization Average operational life of a building = 25-30 years
Development Process Concept & Feasibility ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Development Process Engineering & Design ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Development Process Procurement ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Development Process Construction ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Development Process Start-up & Implementation ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Development Process Operation & Utilization ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Management Levels of Construction Four Levels of Hierarchy Organizational Project Operation (and Process) Task
Organizational ,[object Object],[object Object],[object Object]
Project ,[object Object],[object Object]
Operation (and Process) ,[object Object],[object Object]
Task ,[object Object]
Organizational Structure of Construction Management Basic Management Activities Organizational Concepts
Basic Management Activities ,[object Object],[object Object],[object Object],[object Object]
Basic Management Activities Planning ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Basic Management Activities Planning ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Basic Management Activities Organizing ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Basic Management Activities Scoping ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Basic Management Activities Controlling ,[object Object],[object Object],[object Object],[object Object]
NEXT LECTURE ,[object Object],[object Object]

More Related Content

What's hot

Process of pre construction phase drawbacks
Process of pre construction phase drawbacksProcess of pre construction phase drawbacks
Process of pre construction phase drawbacksglibson rojer
 
Planning & Scheduling of Commercial Building using Microsoft Project & Applic...
Planning & Scheduling of Commercial Building using Microsoft Project & Applic...Planning & Scheduling of Commercial Building using Microsoft Project & Applic...
Planning & Scheduling of Commercial Building using Microsoft Project & Applic...IRJET Journal
 
Construction Project Managment Techniques
Construction Project Managment TechniquesConstruction Project Managment Techniques
Construction Project Managment Techniquesguestc8140fe
 
3 pm3 c_2-%20estimating%20costs
3 pm3 c_2-%20estimating%20costs3 pm3 c_2-%20estimating%20costs
3 pm3 c_2-%20estimating%20costsharwoodr
 
Improving engineering productivity_loss_zhao-dungan
Improving engineering productivity_loss_zhao-dunganImproving engineering productivity_loss_zhao-dungan
Improving engineering productivity_loss_zhao-dunganignitetribes
 
Project Control- Overview Presentation Tafseer
Project Control- Overview Presentation   TafseerProject Control- Overview Presentation   Tafseer
Project Control- Overview Presentation TafseerKishan Solankimbaccepmp
 
Lecture slides4; Construction Project Planning
Lecture slides4; Construction Project PlanningLecture slides4; Construction Project Planning
Lecture slides4; Construction Project PlanningJB Nartey
 
EPA Project - Andy Smith
EPA Project - Andy SmithEPA Project - Andy Smith
EPA Project - Andy SmithAndy Smith
 
VERTEX Construction Claim Visuals - AACE Northeast Total Cost Management Sym...
VERTEX Construction Claim Visuals  - AACE Northeast Total Cost Management Sym...VERTEX Construction Claim Visuals  - AACE Northeast Total Cost Management Sym...
VERTEX Construction Claim Visuals - AACE Northeast Total Cost Management Sym...Lisa Dehner
 
Stages In Construction
Stages In ConstructionStages In Construction
Stages In ConstructionAB MAKASANA
 
A case study of Delay Analysis of construction project: Al Kut Olympic Stadiu...
A case study of Delay Analysis of construction project: Al Kut Olympic Stadiu...A case study of Delay Analysis of construction project: Al Kut Olympic Stadiu...
A case study of Delay Analysis of construction project: Al Kut Olympic Stadiu...Gaurav Verma
 
Delay analysis ... wise after the event.
Delay analysis ... wise after the event.Delay analysis ... wise after the event.
Delay analysis ... wise after the event.Tim Lloyd
 
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...iosrjce
 
Project Controls Technician Apprentice - Joining the puzzle together by "Shan...
Project Controls Technician Apprentice - Joining the puzzle together by "Shan...Project Controls Technician Apprentice - Joining the puzzle together by "Shan...
Project Controls Technician Apprentice - Joining the puzzle together by "Shan...Project Controls Expo
 
Project controls
Project controlsProject controls
Project controlsAshok Kumar
 
Project Controls Expo 09/10 Nov London 2011 - An Introduction to Performance ...
Project Controls Expo 09/10 Nov London 2011 - An Introduction to Performance ...Project Controls Expo 09/10 Nov London 2011 - An Introduction to Performance ...
Project Controls Expo 09/10 Nov London 2011 - An Introduction to Performance ...Project Controls Expo
 

What's hot (20)

Process of pre construction phase drawbacks
Process of pre construction phase drawbacksProcess of pre construction phase drawbacks
Process of pre construction phase drawbacks
 
Planning & Scheduling of Commercial Building using Microsoft Project & Applic...
Planning & Scheduling of Commercial Building using Microsoft Project & Applic...Planning & Scheduling of Commercial Building using Microsoft Project & Applic...
Planning & Scheduling of Commercial Building using Microsoft Project & Applic...
 
Construction Project Managment Techniques
Construction Project Managment TechniquesConstruction Project Managment Techniques
Construction Project Managment Techniques
 
3 pm3 c_2-%20estimating%20costs
3 pm3 c_2-%20estimating%20costs3 pm3 c_2-%20estimating%20costs
3 pm3 c_2-%20estimating%20costs
 
Improving engineering productivity_loss_zhao-dungan
Improving engineering productivity_loss_zhao-dunganImproving engineering productivity_loss_zhao-dungan
Improving engineering productivity_loss_zhao-dungan
 
Project Control- Overview Presentation Tafseer
Project Control- Overview Presentation   TafseerProject Control- Overview Presentation   Tafseer
Project Control- Overview Presentation Tafseer
 
Lecture slides4; Construction Project Planning
Lecture slides4; Construction Project PlanningLecture slides4; Construction Project Planning
Lecture slides4; Construction Project Planning
 
EPA Project - Andy Smith
EPA Project - Andy SmithEPA Project - Andy Smith
EPA Project - Andy Smith
 
VERTEX Construction Claim Visuals - AACE Northeast Total Cost Management Sym...
VERTEX Construction Claim Visuals  - AACE Northeast Total Cost Management Sym...VERTEX Construction Claim Visuals  - AACE Northeast Total Cost Management Sym...
VERTEX Construction Claim Visuals - AACE Northeast Total Cost Management Sym...
 
Stages In Construction
Stages In ConstructionStages In Construction
Stages In Construction
 
Cost Control Process for Construction
Cost Control Process for ConstructionCost Control Process for Construction
Cost Control Process for Construction
 
Claim Presentation Rev 03 FINAL
Claim Presentation Rev 03 FINALClaim Presentation Rev 03 FINAL
Claim Presentation Rev 03 FINAL
 
A case study of Delay Analysis of construction project: Al Kut Olympic Stadiu...
A case study of Delay Analysis of construction project: Al Kut Olympic Stadiu...A case study of Delay Analysis of construction project: Al Kut Olympic Stadiu...
A case study of Delay Analysis of construction project: Al Kut Olympic Stadiu...
 
Project Control System
Project Control SystemProject Control System
Project Control System
 
Claims and Counterclaims Preparation, Analysis, Assessment and Successful Set...
Claims and Counterclaims Preparation, Analysis, Assessment and Successful Set...Claims and Counterclaims Preparation, Analysis, Assessment and Successful Set...
Claims and Counterclaims Preparation, Analysis, Assessment and Successful Set...
 
Delay analysis ... wise after the event.
Delay analysis ... wise after the event.Delay analysis ... wise after the event.
Delay analysis ... wise after the event.
 
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...
 
Project Controls Technician Apprentice - Joining the puzzle together by "Shan...
Project Controls Technician Apprentice - Joining the puzzle together by "Shan...Project Controls Technician Apprentice - Joining the puzzle together by "Shan...
Project Controls Technician Apprentice - Joining the puzzle together by "Shan...
 
Project controls
Project controlsProject controls
Project controls
 
Project Controls Expo 09/10 Nov London 2011 - An Introduction to Performance ...
Project Controls Expo 09/10 Nov London 2011 - An Introduction to Performance ...Project Controls Expo 09/10 Nov London 2011 - An Introduction to Performance ...
Project Controls Expo 09/10 Nov London 2011 - An Introduction to Performance ...
 

Viewers also liked

Planning A Complex Project
Planning A Complex ProjectPlanning A Complex Project
Planning A Complex ProjectChris Carson
 
Final Draft- FDI Project DLA
Final Draft- FDI Project DLAFinal Draft- FDI Project DLA
Final Draft- FDI Project DLALisha Murali
 
Defective Construction Work
Defective Construction WorkDefective Construction Work
Defective Construction WorkAdiirfan Che-ani
 
Environment at site – construction management
Environment at site – construction managementEnvironment at site – construction management
Environment at site – construction managementsrinivas2036
 
Construction Project Management.
Construction Project Management.Construction Project Management.
Construction Project Management.Yousef Abujubba
 
Observation, Inference, and Prediction Review
Observation, Inference, and Prediction ReviewObservation, Inference, and Prediction Review
Observation, Inference, and Prediction Reviewcjunsay
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Managementjohnkirth1898
 
Basic quality concepts(3)
Basic quality concepts(3)Basic quality concepts(3)
Basic quality concepts(3)ngiyari
 
Zamchick Presentation Tech
Zamchick Presentation TechZamchick Presentation Tech
Zamchick Presentation Techjeremyshapiro
 
The 7 characteristics of container native infrastructure, LinuxCon/ContainerC...
The 7 characteristics of container native infrastructure, LinuxCon/ContainerC...The 7 characteristics of container native infrastructure, LinuxCon/ContainerC...
The 7 characteristics of container native infrastructure, LinuxCon/ContainerC...Casey Bisson
 
웹2.0 시대, 보조공학의 의미와 발전
웹2.0 시대, 보조공학의 의미와 발전웹2.0 시대, 보조공학의 의미와 발전
웹2.0 시대, 보조공학의 의미와 발전김 성남
 
微软精英挑战赛获奖作品
微软精英挑战赛获奖作品微软精英挑战赛获奖作品
微软精英挑战赛获奖作品dasiyjun
 
Mobile Consumer Report 2013 por Nielsen
Mobile Consumer Report 2013 por NielsenMobile Consumer Report 2013 por Nielsen
Mobile Consumer Report 2013 por NielsenIAB México
 
Linkedin for Business & Personal Branding
Linkedin for Business & Personal BrandingLinkedin for Business & Personal Branding
Linkedin for Business & Personal BrandingBWEST Interactive
 
Why And How Our Schools Need To Be
Why And How Our Schools Need To BeWhy And How Our Schools Need To Be
Why And How Our Schools Need To Beemchoy1
 

Viewers also liked (20)

Planning A Complex Project
Planning A Complex ProjectPlanning A Complex Project
Planning A Complex Project
 
Final Draft- FDI Project DLA
Final Draft- FDI Project DLAFinal Draft- FDI Project DLA
Final Draft- FDI Project DLA
 
Defective Construction Work
Defective Construction WorkDefective Construction Work
Defective Construction Work
 
Environment at site – construction management
Environment at site – construction managementEnvironment at site – construction management
Environment at site – construction management
 
Construction Project Management.
Construction Project Management.Construction Project Management.
Construction Project Management.
 
Observation, Inference, and Prediction Review
Observation, Inference, and Prediction ReviewObservation, Inference, and Prediction Review
Observation, Inference, and Prediction Review
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
 
Basic quality concepts(3)
Basic quality concepts(3)Basic quality concepts(3)
Basic quality concepts(3)
 
Join Kessef Today
Join Kessef TodayJoin Kessef Today
Join Kessef Today
 
Zamchick Presentation Tech
Zamchick Presentation TechZamchick Presentation Tech
Zamchick Presentation Tech
 
The 7 characteristics of container native infrastructure, LinuxCon/ContainerC...
The 7 characteristics of container native infrastructure, LinuxCon/ContainerC...The 7 characteristics of container native infrastructure, LinuxCon/ContainerC...
The 7 characteristics of container native infrastructure, LinuxCon/ContainerC...
 
웹2.0 시대, 보조공학의 의미와 발전
웹2.0 시대, 보조공학의 의미와 발전웹2.0 시대, 보조공학의 의미와 발전
웹2.0 시대, 보조공학의 의미와 발전
 
Ur-Energy October 12, 2012 Webcast Presentation
Ur-Energy October 12, 2012 Webcast PresentationUr-Energy October 12, 2012 Webcast Presentation
Ur-Energy October 12, 2012 Webcast Presentation
 
ACH 216 Lecture 09 (Issues During Project)
ACH 216 Lecture 09 (Issues During Project)ACH 216 Lecture 09 (Issues During Project)
ACH 216 Lecture 09 (Issues During Project)
 
Ur-Energy 2015 Year End Webcast and Teleconference
Ur-Energy 2015 Year End Webcast and TeleconferenceUr-Energy 2015 Year End Webcast and Teleconference
Ur-Energy 2015 Year End Webcast and Teleconference
 
微软精英挑战赛获奖作品
微软精英挑战赛获奖作品微软精英挑战赛获奖作品
微软精英挑战赛获奖作品
 
Mobile Consumer Report 2013 por Nielsen
Mobile Consumer Report 2013 por NielsenMobile Consumer Report 2013 por Nielsen
Mobile Consumer Report 2013 por Nielsen
 
Linkedin for Business & Personal Branding
Linkedin for Business & Personal BrandingLinkedin for Business & Personal Branding
Linkedin for Business & Personal Branding
 
Why And How Our Schools Need To Be
Why And How Our Schools Need To BeWhy And How Our Schools Need To Be
Why And How Our Schools Need To Be
 
January 2012 Ur-Energy Corporate Presentation
January 2012 Ur-Energy Corporate PresentationJanuary 2012 Ur-Energy Corporate Presentation
January 2012 Ur-Energy Corporate Presentation
 

Similar to ACH 216 Lecture 02 (Project Format)

VA Cx Presentation_SRE Training 2013 Final_v2
VA Cx Presentation_SRE Training 2013 Final_v2VA Cx Presentation_SRE Training 2013 Final_v2
VA Cx Presentation_SRE Training 2013 Final_v2Jerry Bauers
 
Building Performance Evaluation - Post Occupancy Evaluation
Building Performance Evaluation - Post Occupancy EvaluationBuilding Performance Evaluation - Post Occupancy Evaluation
Building Performance Evaluation - Post Occupancy EvaluationGalala University
 
Arrange building applications and approvals.pdf
Arrange building applications and approvals.pdfArrange building applications and approvals.pdf
Arrange building applications and approvals.pdfDereje Jima
 
Construction project management
Construction project managementConstruction project management
Construction project managementsaif hasan
 
Project and project management
Project and project managementProject and project management
Project and project managementwodato
 
Chetan Sharma - Mechanical Engineer
Chetan Sharma - Mechanical EngineerChetan Sharma - Mechanical Engineer
Chetan Sharma - Mechanical EngineerCHETAN SHARMA
 
Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Mostafa Sayed
 
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.pptCONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.pptpisal3
 
Project Delivery Education Program
Project Delivery Education ProgramProject Delivery Education Program
Project Delivery Education ProgramFrank Cunha
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Amir Mohammed
 
Study on Procurement Method Selection Procedure in Construction Industry
Study on Procurement Method Selection Procedure in Construction IndustryStudy on Procurement Method Selection Procedure in Construction Industry
Study on Procurement Method Selection Procedure in Construction IndustryIRJET Journal
 
Project management
Project managementProject management
Project managementBenjamin Tan
 
Egyps 2017 technical conference power point template
Egyps 2017 technical conference power point template Egyps 2017 technical conference power point template
Egyps 2017 technical conference power point template Dr. Mohamed A. El-Reedy
 
2.1 integration management
2.1 integration management2.1 integration management
2.1 integration managementIrefuser1
 
Stakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction IndustryStakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction IndustryAkshika Mahanama
 

Similar to ACH 216 Lecture 02 (Project Format) (20)

Total-Project-Cost.pptx
Total-Project-Cost.pptxTotal-Project-Cost.pptx
Total-Project-Cost.pptx
 
VA Cx Presentation_SRE Training 2013 Final_v2
VA Cx Presentation_SRE Training 2013 Final_v2VA Cx Presentation_SRE Training 2013 Final_v2
VA Cx Presentation_SRE Training 2013 Final_v2
 
EA credit 3
EA credit 3EA credit 3
EA credit 3
 
Building Performance Evaluation - Post Occupancy Evaluation
Building Performance Evaluation - Post Occupancy EvaluationBuilding Performance Evaluation - Post Occupancy Evaluation
Building Performance Evaluation - Post Occupancy Evaluation
 
Arrange building applications and approvals.pdf
Arrange building applications and approvals.pdfArrange building applications and approvals.pdf
Arrange building applications and approvals.pdf
 
Construction project management
Construction project managementConstruction project management
Construction project management
 
Project and project management
Project and project managementProject and project management
Project and project management
 
Chetan Sharma - Mechanical Engineer
Chetan Sharma - Mechanical EngineerChetan Sharma - Mechanical Engineer
Chetan Sharma - Mechanical Engineer
 
PM ppt unit 1.ppt
PM ppt unit 1.pptPM ppt unit 1.ppt
PM ppt unit 1.ppt
 
Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)
 
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.pptCONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
 
Project Delivery Education Program
Project Delivery Education ProgramProject Delivery Education Program
Project Delivery Education Program
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...
 
Study on Procurement Method Selection Procedure in Construction Industry
Study on Procurement Method Selection Procedure in Construction IndustryStudy on Procurement Method Selection Procedure in Construction Industry
Study on Procurement Method Selection Procedure in Construction Industry
 
PPRPreparationGuide
PPRPreparationGuidePPRPreparationGuide
PPRPreparationGuide
 
Project management
Project managementProject management
Project management
 
Egyps 2017 technical conference power point template
Egyps 2017 technical conference power point template Egyps 2017 technical conference power point template
Egyps 2017 technical conference power point template
 
ALAA Y ABUGHAIDAH
ALAA Y ABUGHAIDAHALAA Y ABUGHAIDAH
ALAA Y ABUGHAIDAH
 
2.1 integration management
2.1 integration management2.1 integration management
2.1 integration management
 
Stakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction IndustryStakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction Industry
 

More from Anne Arundel Community College

ACH 216 Lecture 10 (Materials Mgmt & Quality Assurance)
ACH 216 Lecture 10 (Materials Mgmt & Quality Assurance)ACH 216 Lecture 10 (Materials Mgmt & Quality Assurance)
ACH 216 Lecture 10 (Materials Mgmt & Quality Assurance)Anne Arundel Community College
 

More from Anne Arundel Community College (20)

Green team iceland presentation with audio
Green team iceland presentation with audioGreen team iceland presentation with audio
Green team iceland presentation with audio
 
ACH 122 Lecture 05a (Brick Masonry)
ACH 122 Lecture 05a (Brick Masonry)ACH 122 Lecture 05a (Brick Masonry)
ACH 122 Lecture 05a (Brick Masonry)
 
ACH 122 Lecture 02 (Sustainability Leed)
ACH 122 Lecture 02 (Sustainability Leed)ACH 122 Lecture 02 (Sustainability Leed)
ACH 122 Lecture 02 (Sustainability Leed)
 
ACH 122 Lecture 04a (Excavation & Foundations P1)
ACH 122 Lecture 04a (Excavation & Foundations P1)ACH 122 Lecture 04a (Excavation & Foundations P1)
ACH 122 Lecture 04a (Excavation & Foundations P1)
 
ACH 218 Lecture 04 (Marketing In Construction) Part 2
ACH 218 Lecture 04 (Marketing In Construction) Part 2ACH 218 Lecture 04 (Marketing In Construction) Part 2
ACH 218 Lecture 04 (Marketing In Construction) Part 2
 
ACH 218 Lecture 04 (Marketing In Construction) Part 1
ACH 218 Lecture 04 (Marketing In Construction) Part 1ACH 218 Lecture 04 (Marketing In Construction) Part 1
ACH 218 Lecture 04 (Marketing In Construction) Part 1
 
ACH 218 Lecture 03 (Organizational Structure) Part1
ACH 218 Lecture 03 (Organizational Structure) Part1ACH 218 Lecture 03 (Organizational Structure) Part1
ACH 218 Lecture 03 (Organizational Structure) Part1
 
ACH 218 Lecture 03 (Organizational Structure) Part1
ACH 218 Lecture 03 (Organizational Structure) Part1ACH 218 Lecture 03 (Organizational Structure) Part1
ACH 218 Lecture 03 (Organizational Structure) Part1
 
ACH 122 Lecture 01 (Bldg Codes)
ACH 122 Lecture 01 (Bldg Codes)ACH 122 Lecture 01 (Bldg Codes)
ACH 122 Lecture 01 (Bldg Codes)
 
ACH 122 Lecture 01 (Bldg Codes)
ACH 122 Lecture 01 (Bldg Codes)ACH 122 Lecture 01 (Bldg Codes)
ACH 122 Lecture 01 (Bldg Codes)
 
ACH 122 Lecture 01 (Bldg Codes)
ACH 122 Lecture 01 (Bldg Codes)ACH 122 Lecture 01 (Bldg Codes)
ACH 122 Lecture 01 (Bldg Codes)
 
ACH 245 Lecture 02 (Intro To Cad 2010)
ACH 245 Lecture 02 (Intro To Cad 2010)ACH 245 Lecture 02 (Intro To Cad 2010)
ACH 245 Lecture 02 (Intro To Cad 2010)
 
ACH 245 Lecture 03 (Drawing 2010)
ACH 245 Lecture 03 (Drawing 2010)ACH 245 Lecture 03 (Drawing 2010)
ACH 245 Lecture 03 (Drawing 2010)
 
Ach 245 Lecture 01 (Fundamentals) Vista
Ach 245 Lecture 01 (Fundamentals) VistaAch 245 Lecture 01 (Fundamentals) Vista
Ach 245 Lecture 01 (Fundamentals) Vista
 
ACH 216 Lecture 12 (Closeut & Turnover)
ACH 216 Lecture 12 (Closeut & Turnover)ACH 216 Lecture 12 (Closeut & Turnover)
ACH 216 Lecture 12 (Closeut & Turnover)
 
ACH 121 Lecture 14 (Finishes)
ACH 121 Lecture 14 (Finishes)ACH 121 Lecture 14 (Finishes)
ACH 121 Lecture 14 (Finishes)
 
ACH 121 Lecture 13 (Special Construction)
ACH 121 Lecture 13 (Special Construction)ACH 121 Lecture 13 (Special Construction)
ACH 121 Lecture 13 (Special Construction)
 
ACH 216 Lecture 11 (Safety)
ACH 216 Lecture 11 (Safety)ACH 216 Lecture 11 (Safety)
ACH 216 Lecture 11 (Safety)
 
ACH 216 Lecture 08 (Scheduling)
ACH 216 Lecture 08 (Scheduling)ACH 216 Lecture 08 (Scheduling)
ACH 216 Lecture 08 (Scheduling)
 
ACH 216 Lecture 10 (Materials Mgmt & Quality Assurance)
ACH 216 Lecture 10 (Materials Mgmt & Quality Assurance)ACH 216 Lecture 10 (Materials Mgmt & Quality Assurance)
ACH 216 Lecture 10 (Materials Mgmt & Quality Assurance)
 

Recently uploaded

'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,Aginakm1
 
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`dajasot375
 
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一Fi L
 
Design principles on typography in design
Design principles on typography in designDesign principles on typography in design
Design principles on typography in designnooreen17
 
Untitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxUntitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxmapanig881
 
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree 毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree ttt fff
 
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024CristobalHeraud
 
group_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfgroup_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfneelspinoy
 
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degreeyuu sss
 
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCRCall In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCRdollysharma2066
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdfSwaraliBorhade
 
How to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AIHow to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AIyuj
 
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档208367051
 
Call Girls Meghani Nagar 7397865700 Independent Call Girls
Call Girls Meghani Nagar 7397865700  Independent Call GirlsCall Girls Meghani Nagar 7397865700  Independent Call Girls
Call Girls Meghani Nagar 7397865700 Independent Call Girlsssuser7cb4ff
 
Architecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdfArchitecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdfSumit Lathwal
 
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degreeyuu sss
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Rndexperts
 
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
PORTAFOLIO   2024_  ANASTASIYA  KUDINOVAPORTAFOLIO   2024_  ANASTASIYA  KUDINOVA
PORTAFOLIO 2024_ ANASTASIYA KUDINOVAAnastasiya Kudinova
 
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCRdollysharma2066
 
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...katerynaivanenko1
 

Recently uploaded (20)

'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
 
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
 
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
 
Design principles on typography in design
Design principles on typography in designDesign principles on typography in design
Design principles on typography in design
 
Untitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxUntitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptx
 
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree 毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
 
group_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfgroup_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdf
 
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
 
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCRCall In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf
 
How to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AIHow to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AI
 
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
 
Call Girls Meghani Nagar 7397865700 Independent Call Girls
Call Girls Meghani Nagar 7397865700  Independent Call GirlsCall Girls Meghani Nagar 7397865700  Independent Call Girls
Call Girls Meghani Nagar 7397865700 Independent Call Girls
 
Architecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdfArchitecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdf
 
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025
 
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
PORTAFOLIO   2024_  ANASTASIYA  KUDINOVAPORTAFOLIO   2024_  ANASTASIYA  KUDINOVA
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
 
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
 
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
 

ACH 216 Lecture 02 (Project Format)

  • 1. The Project Format Project Development & Organization Management Levels of Construction Basic Management Activities
  • 2. Project Development and Organization Life Cycle of the Construction Project Development Process
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
  • 14. Construction Projects develop in a sequential or linear fashion: A need for a facility is identified by the owner Initial feasibility and cost projections are developed Decision to proceed with conceptual design is made and a design professional is chosen and retained Conceptual design and scope of work is developed to include an approximate estimate of cost Decision is made to proceed with the development of final design documentation, which fully defines the project for construction purposes Conceptual and Feasibility Studies Engineering and Design
  • 15. Construction Projects develop in a sequential or linear fashion: Based on final design documents, the project is advertised and proposals to include quotations for construction are solicited Based on proposals received, a contractor is selected and notice to proceed is given. Acceptance of proposal by owner will form a contract for the work Process of construction is started. Work is completed and facility is available for acceptance and occupancy/utilization Procurement Construction
  • 16. Construction Projects develop in a sequential or linear fashion: In complex projects, a period of testing determines if the facility operates as designed and planned Facility operates and is maintained during specified service life Facility is disposed of if appropriate or maintained in perpetuity Start-up & Implementation Operation & Utilization Average operational life of a building = 25-30 years
  • 17.
  • 18.
  • 19.
  • 20.
  • 21.
  • 22.
  • 23. Management Levels of Construction Four Levels of Hierarchy Organizational Project Operation (and Process) Task
  • 24.
  • 25.
  • 26.
  • 27.
  • 28. Organizational Structure of Construction Management Basic Management Activities Organizational Concepts
  • 29.
  • 30.
  • 31.
  • 32.
  • 33.
  • 34.