Bringing you the latest in trenchless technology
                                & land–based utility pipeline engineering
                                        Trenchless Middle East Edition. October 2011


TRENCHLESS MIDDLE EAST 2011
INTERNATIONAL EXHIBITION AND CONFERENCE
Jumeirah Beach Conference & Exhibition Centre, Dubai, UAE
10 -11 October 2011
Exhibition and Conference Preview




KEEPING the
middle east moving

   2011



CONFERENCE PROGRAMME
REGISTRATION DETAILS
EXHIBITOR INFORMATION



ENTRANCE TO THE EXHIBITION IS FREE OF CHARGE
REGISTER ONLINE: WWW.TRENCHLESSMIDDLEEAST.COM
AND RECEIVE YOUR FREE GIFT ON ARRIVAL AT THE SHOW
Welcome.....
                                                                           I am very pleased to welcome you to the fourth issue of NO-DIG WORLD, a
                                                                           publication that doubles as the Show Guide to the upcoming TRENCHLESS
                                                                           MIDDLE EAST 2011 event being held at the Jumeirah Beach Conference &
               Publisher
               Paul Harwood                                                Exhibition Centre, Dubai, UAE on 10 - 11 October 2011, supported by The
               T	 + 44 (0) 845 094 8066                                    International Society for Trenchless Technology (ISTT) and the Institution of
               E	 pharwood@westrade.co.uk                                  Civil Engineers (ICE).
                                                                              Known also as No-Dig technology and as NDRC (Non Disruptive Road
               Advertising
               Stuart Hillyard                                             Crossing) in the Gulf region, Trenchless Technology embraces techniques
               Gary King                                                   from micro tunnelling and directional drilling to pipe bursting, lining and inspection systems,
               T	 + 44 (0) 845 094 8066                                    aimed at minimising or eliminating the need for disruptive excavations whilst providing a quick,
               E	 shillyard@westrade.co.uk
                                                                           efficient and economical solution to the construction and renovation of sewers, water mains,
               Design & Production                                         electricity cables and telecommunications networks.
               Trevor Dorrell                                                 This is a developing global Industry. Products and techniques are reviewed and improved
               T	 + 44 (0) 845 094 8066                                    on a regular basis. New innovations are proven to enhance performance. Major projects are
               E	 trevor@frontpagepublishing.co.uk
                                                                           completed every day somewhere around the world, proving that trenchless techniques provide
               The publishers accept no responsibility in respect of       economic solutions and reduced environmental impact. The social costs are reduced, benefiting
               advertisements appearing in the magazine and the
                                                                           communities, as well as the travelling public.
               opinions expressed in editorial material or otherwise do
               not necessarily represent the views of the publishers.
                                                                              The two day exhibition will be complemented by a conference programme, assembled in
               The publishers accept no responsibility for actions         collaboration with the International Society for Trenchless Technology (ISTT). The conference will
               taken on the basis of any information contained             include presentations by local and international speakers, thus providing an exciting platform for
               within this magazine. The publishers cannot accept
               liability for any loss arising from the late appearance
                                                                           delegates to learn, debate, share knowledge, benchmark, and network with like minded industry
               or non-publication of any advertisement for any reason      colleagues.
               whatsoever.                                                    We, here at Westrade, are specialist organisers of shows focused on promoting the latest
               ISSN 1479-0815
                                                                           equipment and techniques used in Trenchless Technology which is now becoming the preferred
                                                                           option for utility installation and repair, designed to keep traffic on the move.
                                                                              If you haven’t yet planned your visit to Trenchless Middle East, don’t miss this opportunity to
                                                                           come and see this unique line-up of products on display from exhibitors worldwide, and talk to the
                                                                           experts who can provide solutions to the challenges ahead.
                                    2011                                      For all information on how to get here and where to stay, visit our website
                                                                           www.trenchlessmiddleeast.com I am sure you will find time invested here will be both profitable
                                                                           and enjoyable.
                                                                              The success of Trenchless Middle East is of course dependant on the support of the industry.
                                                                           We offer our thanks to all exhibitors for their participation and professional displays and of course
                                                                           to our sponsors. Their commitment and support to the event is greatly appreciated.

                       International Society                               Paul Harwood
                       For Trenchless Technology                           Sales and Marketing Director
                                                                           Westrade Group Ltd.
Organised by



                                                                          Contents

               TRENCHLESS MIDDLE EAST is
               organised by                                               CONFERENCE programme and timetable                                                     Page 24 - 25


                                                                          EXHIBITION floor plan                                                                        Page 26
                         WESTRADE GROUP LTD

               Westrade Group Ltd,
               112-114 High Street,                                       exhibitor profiles                                                                           PAge 27
               Rickmansworth, Herts,
               WD3 1AQ UK
               Tel: +44 (0) 845 094 8066
               Fax: +44 (0) 870 429 9275
               Web: www.westrade.co.uk
                                                                          product guide page 32


               Sponsors
exhibitor NEWS


FULL HOUSE AT                                                                                                                                                                            REHABILITATION PROJECT
TRENchLESS MIDDLE EAST 2011, DUBAI
I am very pleased to welcome you to                Products and techniques are reviewed       organisers of shows focused on promoting       their advice and assistance in compiling
                                                                                                                                                                                         in Kingdom of Saudi Arabia
the fourth issue of NO-DIG WORLD, a            and improved on a regular basis. New           the latest equipment and techniques used       our Conference programme. We also
publication that doubles as the Show           innovations are proven to enhance              in Trenchless Technology which is rapidly      welcome the support of The Institution      International Aramoon Corp (IAC), is the first Trenchless      Extensive cleaning was made to facilitate the CCTV              During the preparation and installation of CIPP-UV
Guide to the upcoming TRENCHLESS               performance. Major projects are completed      becoming the preferred option for utility      of Civil Engineers (ICE) and we welcome     Technology specialized local contractor in Saudi Arabia.    robotic inspection and as a result, several problems           system IAC had given very careful attention for safety
MIDDLE EAST 2011 Exhibition and                every day somewhere around the world,          installation and repair around the world.      their members to the event. Last but by     The CEO  President of IAC, Faiz Al-Elweet reports that     were identified in the pipelines, such as infiltration, wall   precautions especially when rehabilitating sewer
Conference being held at the Jumeirah          proving that trenchless techniques                 If you haven’t yet planned your visit to   no means least, we acknowledge the huge     IAC has recently completed a rehabilitation project in      incrustations, partial blockages, severe corrosion.            infrastructure in heavy traffic areas.
Beach Conference  Exhibition Centre in        provide economic solutions and reduced         TRENCHLESS MIDDLE EAST 2011, don’t             support from our sponsors and exhibitors.   KSA for The Water Authority of Eastern Province. The
Dubai, UAE, on 10 -11 October 2011.            environmental impact. The social costs are     miss this opportunity to come and see                                                      client was facing severe problems in their gravity sewers
   Known also as No-Dig and also as            minimised, benefitting communities, as         this unique line-up of products on display     See you at the show in Dubai, 10-11         (600mm and 700mm pipelines).
NDRC (Non Disruptive Road Crossing) in         well as the travelling public.                 from exhibitors worldwide, and talk to the     October!
the Gulf region, Trenchless Technology             The two day exhibition will be             experts who can provide solutions to the
embraces techniques from micro                 complemented by a top quality                  challenges ahead.
tunnelling and directional drilling, to pipe   conference programme, assembled in                 For all information on how to get here
bursting, lining and inspection systems,       collaboration with the International Society   and where to stay, visit our website
aimed at minimising or eliminating             for Trenchless Technology (ISTT). The          www.trenchlessmiddleeast.com I am sure
the need for disruptive excavations            conference will include presentations by       you will find time invested here will be

                                                                                                                                                         2011
whilst providing a quick, efficient and        local and international speakers, thus         both profitable and enjoyable.
economical solution to the construction        providing an exciting platform for delegates       The success of Trenchless Middle East
and renovation of sewers, water mains,         to learn, debate, share knowledge,             is of course dependant on the support of
electricity cables and telecommunications      benchmark, and network with like minded        the industry.
networks.                                      industry colleagues.                               We offer our thanks to The International
   This is a developing global Industry.           We, here at Westrade, are specialist       Society (ISTT) for their support, as well as

                                                                                                                                                                                                                                                        IAC combined Jet-Vacuum Truck ready for
                                                                                                                                                                                                                                                        cleaning works
                                                                                                                                                                                                                                                                                                                      Liner material installation
                                                                                                                                                                                           CCTV inspection work in progress
                                                                                                                                                                                                                                                        After evaluation and condition assessment, IAC
                                                                                                                                                                                                                                                     recommended No-Dig pipe rehabilitation using CIPP-UV              The CIPP-UV system is designed for fast and efficient
                                                                                                                                                                                            IAC were called upon to discuss the project and          system for the gravity sewer pipelines in order to restore     onsite installation that minimizes the economic, social
                                                                                                                                                                                         perform inspection  condition assessment for the           the 100% hydraulic efficiency and structural strength of       and environmental impacts. IAC is well prepared to meet
                                                                                                                                                                                         gravity sewers, including providing services for pipeline   the pipelines.                                                 the demand in the Region and has the full capability to
                                                                                                                                                                                         rehabilitation works. The pipeline material was ductile                                                                    undertake such No-Dig repair  rehabilitation works of
                                                                                                                                                                                         iron with a total length of 2300m. The pipes were                                                                          wastewater network for the clients. n
                                                                                                                                                                                         located at an average depth of 4m below the ground
                                                                                                                                                                                         surface in Dammam City - KSA.




                                                                                                                                                                                                                                                       IAC employee prepares for working in confined
                                                                                                                                                                                                                                                       space (Manhole)
                                                                                                                                                                                                                                                                                                                      Site engineer operates  controls the UV
                                                                                                                                                                                                                                                        BKP Berolina-Liner System, the CIPP-UV system                 curing system
                                                                                                                                                                                                                                                     supplier of equipment, liners and training, had made
                                                                                                                                                                                           CCTV inspection during cleaning process                   the structural calculation and liner design based on the       www.aramoon.com
                                                                                                                                                                                                                                                     information provided by IAC.                                   general@aramoon.com




4 No-Dig World 2011 	                                                                                                                                  www.trenchlessmiddleeast.com      www.trenchlessmiddleeast.com	                                                                                                                                 No-Dig World 2011 5
exhibitor NEWS                                                                                                                                                                                                                                                                                                                    exhibitor NEWS



Vermeer new technology                                                                                                                                                                               IAC specialized                                                                                                                                               Stop
                                                                                                topography in the area, which included               the gun barrel straight hole, a 490mm hole      local                                                                                                                                                         Press
                                                                                                                                                                                                     contractor
                                                                                                very hilly terrain, a stream, and existing           opener was selected, which allowed for a
                                                                                                wet well elevations raised many concerns.            20mm annulus. The cutter was built with
                                                                                                The greatest challenge, however, wasn’t              standard roller cone cutters, and the pipe                                                                                                                                                                    At the time of going to press we have
                                                                                                the topography. The line would be bored              was installed successfully, averaging around                                                                                                                                                                  learned that the ISTT (International
                                                                                                through layered shale and limestone rock.            3m per hour.                                    International Aramoon Corp. (IAC) is the             Leak Detection and Repair for about 15,000Km        successfully executed and ongoing projects           Society for Trenchless Technology)
                                                                                                    A 343mm cutter was used for the pilot               As the hole opener approached the softer     pioneer and the first specialized local contractor   of pipelines for various diameters and 550,000      for Sewer Networks are about (40,000m)               are in the process of finalising the
                                                                                                bore, and the AXIS system achieved an average        rock, production increased and the last 85m     in the Kingdom of Saudi Arabia with core             House Connections in the various cities in          including flow control  diversion (i.e. By-Pass,    affiliated agreement for a UAE Society
                                                                                                production rate of 4.3m per hour. Though             section was completed in under 8 hours.         specialty in the field of No-Dig Pipe Inspection,    Saudi Arabia.                                       dewatering…etc), Hydro-Jet Cleaning, CCTV            for Trenchless Technology. An official
                                                                                                the pilot alone could have been considered                                                           Condition Assessment and Rehabilitation.                 IAC had developed locally “WATCH LEAK”          Robotic Inspection, Pipelines Condition              signing of the agreement will take place
                                                                                                a challenge, the real test was yet to come.                                                              The CEO  President of IAC, Eng. Faiz            software, which is a Water Management               Assessment, Pipelines Rehabilitation (MH-MH          at Trenchless Middle East 2011. Further
                                                                                                Rock bores had been completed for smaller                                                            Al-Elweet says (IAC) is an engineering contractor    System to monitor and quantify leaks in Water       Internal Lining).                                    information about the Society will also
                                                                                                pipe installations, but prior to this project, the                                                   which has been founded in Riyadh since 1990.         Supply Networks.                                        IAC introduces several Trenchless                be available.
A new technology is entering the guided         pipe sizes and materials.                       system had not been used to upsize in rock.                                                          IAC is specialized in Water Leak Detection,              The traditional water audit collects the        Techniques and cost effective solutions for No-
boring industry, primarily focused on gravity      A recent project was the successful          In order to install the HDPE with an OD of                                                           Test and Repair for Water and Sewer Networks         data manually during a single historic time,        Dig Pipes Rehabilitation such as Cured In Place
sewer installations. The AXIS™ Guided           installation of a 153m section of 450mm         470mm, a larger hole would need to be cut,                                                           without Excavation, by using Trenchless              but “WATCHLEAK” collect real-time network           Pipe System using Ultra Violet Rays (CIPP-UV)
Boring System is capable of achieving           HDPE pipe. The goal was to eliminate a          while still maintaining the perfect line and                                                         Technology.                                          information. This software is a GIS based web       and Spiral Wounding System as well as Spot
pinpoint line and grade accuracy in a variety   pump station and convert the existing sewer     grade achieved on the pilot shot.                                                                        Head Office of IAC is in Riyadh and it has       interface tool in order to help the Water Network   Lining Technique for sectional repair of all types
of ground conditions, and for many different    from a forced main to gravity flow. The             Requiring a minimum over-cut due to                                                              branch offices in Dammam/ Al-Khobar, Ahsa,           Operation  Maintenance staff to identify           of host pipes.
                                                                                                                                                                                                     Tabuk, Madinah and Abha in KSA.                      District Meter Area (DMA) with higher water
                                                                                                                                                                                                         We have undertaken projects throughout           usage and to react before developing a visible                                                            International Society

Bursting with rope                                                                                                                                                                                   Saudi Arabia and since last five years we have
                                                                                                                                                                                                     executed ( progressing) projects for Water
                                                                                                                                                                                                                                                          and costly failure.
                                                                                                                                                                                                                                                              During the last five years, IAC has
                                                                                                                                                                                                                                                                                                                                                                    For Trenchless Technology



ABS Trenchless has introduced                                                                                                                        tonnes, the 420 m section was reached in
the rope bursting system – the                                                                                                                       only one drill string. Project Manager Marco
world’s first large pipe bursting                                                                                                                    Wulff said “This is the first time that a 420
system with a rope as the pulling                                                                                                                    m section was burst in only one string.”
mechanism and a pulling force of                                                                                                                         Trenchless techniques were chosen for
more than 1,000 kN.                                                                                                                                  this job as the site was close to a nature
                                                                                                                                                     reserve and for the preservation of trees.
                                                                                                                                                         In addition to this, due to the amount of
                                                                                                                                                     water that was involved, it would have been
                                                                                                                                                     impossible to do use the traditional open-cut
                                                                                                                                                     method. Special tools were needed as the
                                                                                                                                                     concrete pipes had curves and bends that
                                                                                                                                                     are quite difficult to crack.
                                                                                                                                                         The advantage to using a rope is that
                                                                                                                                                     it can be redirected with a pulley and can
                                                                                                                                                     burst more of the diameter. Only taking
The rope bursting system (RBS),                 pipes. The single operator is able to control   Roping in France                                     two days to complete the bursting, the full
from the ABS Trenchless GmbH company            everything from a safe distance above the       ABS Trenchless, with Entreprise de Travaux           project was done in just one week.
in Germany, uses an innovative clamping         pulling unit, as the Burster is operated by     Publics GIROUD GARANPON, Isére, France,
technology in order to complete relining        radio remote control – an important safety      recently completed a project in Vorion, near
jobs with long pulling distances exceeding      feature to the machine.                         Grenoble, France with the RBS helping to
1,000 m. This is done in one run, using             In addition to the safe handling, the new   supply cleaner drinking water to the town.
only one machine pit in certain soil            rope pull technology makes the work much           For this project the team used a RBS
conditions. The RBS-Burster line is available   easier for the operator as there is no need     1,200 machine to burst through two
with pulling capacities between 40 and          for rods to be removed.                         sections of water pipelines. The old pipes,
190 tonnes.                                         Along with pipe bursting, the pulling       which had an OD 250 mm for a 420 m
   With the use of return pulleys, this         system can also be adapted for slip lining,     section and an OD 200 mm for a 210 m
technology also makes it possible to            relining and swagelining jobs, making the       section were replaced with new HDPE OD
overdrive larger doglegs and bent old           machine very versatile.                         250 mm pipes. With a pulling force of 40




6 No-Dig World 2011 	                                                                                                                                           www.trenchlessmiddleeast.com         www.trenchlessmiddleeast.com	                                                                                                                                                    No-Dig World 2011 7
exhibitor NEWS                                                                                                                                                                                                                                                                                                                    exhibitor NEWS



ConShield Solutions                                                                                                                                                                                           Launch of the Goodeng HDD machine - GD 8000-LL
                                                                                                                                                                                                              China-Burma oil  gas pipeline                  it was off the assembly line on 22nd              channel has taken shape, which are the            finished successfully. It was designed by
For thirty years, ConShield has engineered              PERMACAST® is our engineered mortar             highly resistant to abrasion. This process also   studs. All inlet and outlet pipe connections are    Project, contracted by PetroChina               of January and immediately loaded for             northeast of China (China-Russia crude            Zhongyuan Petroleum Explore Bureau
solutions to reinforce, seal and protect existing   liner system for manholes. Specially                provides waterproofing, sealing, structural       sealed directly to the inlet/outlet pipes so they   Daqing Oilfield Construction Group.             shipment to be sent to “China-Burma oil          oil pipeline), Northwest (Central Asia Gas        Projects Construction Main Company and
underground structures for both storm water         formulated ultra-high strength mortar is            reinforcement and corrosion protection, www.      cannot leak.                                                                                        gas pipeline project” worksite in Burma on        Pipeline), Southwest Land (China-Burma oil        constructed by Jiangsu Keyi Company using
and sanitary environments; from manholes            centrifugally cast from our patented robotic        centripipe.com                                       For severe corrosion, our COR+GARD®              The launch ceremony of GD8000-LL HDD            behalf of China Petroleum.                        and gas pipelines) and marine (sea lanes          Goodeng Machine Model GD8000-LL.
to catch basins, wet wells and lift stations as     applicator. It guarantees a consistently dense          PERMAFORM® is the system for complete         100% solids epoxy is spun on to form a              Machine for China-Burma oil  gas pipeline          Except for the structural parts, the power,   through the Malacca Strait). It diversifies           The horizontal length of the project is
well as CMP to RCP, because just one product        and uniform liner at whatever thickness (1/2”       replacement of old manholes without digging       protective, composite barrier. In all cases,        project was held in Goodeng machine’s           hydraulic, electrical, the appliance control      the oil transport channels and protects the       1887.52 meters and the real working length
cannot effectively overcome every problem in        to 2”) is best suited for the condition, depth,     or disrupting flows. This process pours a         each material is applied safely and uniformly       production base – Jiangsu Goodeng               are all imported from abroad. It uses split       energy supply security in China. It is the        is 1890.34 meters (The width of the Gan
every system.                                       diameter, traffic loading, and ground water         seamless and structurally independent             from above without entry into the manhole.          Engineering Machinery Assembling Co., Ltd       and double caterpillar. The maximum pull         fourth energy import channel after the Sino-      river is 1363.82 m, the width of sand and
     ConmicShield®, the liquid additive that        pressure. The highest quality is guaranteed         “manhole within a manhole” for the best long-        The II Barrier® is the best solution we         on Jan. 23rd , 2011. On this day, a colourful   push force is 8100KN, the maximum torque          Kazakhstan oil pipeline, the Central Asian        riverbank is 526.52 m). The project pipe is
prevents Microbiologically Induced Corrosion        each and every time since application does          term solution to serious manhole problems.        have found for sealing the chimney when             ball swayed to welcome every guest, and         is 165000N.M, which was independently             natural gas pipeline, oil pipeline between        508×10L415 diameter arc welding steel pipe.
(MIC) in concrete sewer pipe and structures. It     not depend upon a person working inside                 When biogenic or chemical corrosion is        resetting frames and covers. COR+FLEX®              gun salutes declared the beginning of the       researched, developed, and manufactured           China and Russia; it relieves China’s                 Which adopts strengthen three-coat PE
is dosed directly into the concrete mix that can    cramped and hazardous conditions. Our               the problem, a plastic liner is embedded into     works best when doing an internal chimney           ceremony.                                       by Goodeng machine. With advanced                 dependence on the Malacca Strait and              anti-rotten.
be used in shotcrete, precast and ready mix,        formulations are high-strength, quick-setting       the structurally independent concrete wall and    seal without digging.                                  Guests included the general manager of       senses, excellent performance, top quality        reduces the risk of importing crude oil at sea.       The entry angle is 9°and out is 6°.
for both new structures and can be used to          and corrosion-resistant. www.permaform.net          anchored securely with its interlocking tees or                                                       Daqing Oilfield Construction Group Pipeline     service, the large-scale machine produced by                                                            The curvature radius is 762m (150 OD).
rehab existing structures. ConmicShield®, has           CentriPipeTM Centrifugally Cast Concrete                                                                                                              Crossing Company, Mr. Guan Lizhi, Dafeng        Goodeng machine has become the preferred          Goodeng Machine Model GD8000-                         The project crosses the Jiangxi Gan river.
proven performance since 1996 with several          Pipe. is a cost-effective, NO DIG solution for                                                                                                            people’s government mayor, Mr. Wang Hai,        product for China National Petroleum              LL Finishes the following project                     The geology of the river bed is very
case studies from all over the country.             structural lining of culverts using a spin caster                                                                                                         Jiangsu Goodeng Engineering Machinery           Corporation, China Petroleum  Chemical           successfully: Jiangxi Province Main               complex because it contains a fault area,
     ConmicShield®, has a 100 year design           and our specialty mortar, PL-8000.                                                                                                                        Assembling Co., Ltd general manager, Chen       Corporation, and many other construction          project.The first step of Jiangxi                 pebble stone area, gravel sand area and
life and offers full thickness protection for           The precisely placed and compacted                                                                                                                    Fenggang, and other management leaders.         units.                                            Province gas pipeline—Gan river HDD               rough soft clay (including many stones). It is
a fraction of the cost of plastic liners or         concrete liner is applied at the best design                                                                                                                 GD8000-LL HDD Machine was appointed              The strategic meaning of China-Burma          Project                                           obvious that the project is complicated as it is
polymer coatings. For case studies technical        thickness for the diameter and conditions.                                                                                                                by China National Petroleum Corporation         oil  gas pipeline project : with the China-                                                        also difficult to control the angle and azimuth.
information and specifications go to                    It contains rust inhibitors to prevent                                                                                                                Daqing oilfield Construction Group. After the   Burma oil  gas pipeline project started, the     On May 13th, 2011, the project in                 The HDD project is the biggest in scale,
www.conshield.com                                   corrosion of the old metal culvert and it is                                                                                                              successful completion of commissioning,         strategic pattern of four oil and gas import      Fengcheng City Jiangxi province was               longest in length, most complex.




impreg, cured in place
pipelining
                                                    then 150 miles each year and distributing
                                                    their products all over the world.
                                                        Cured by Steam or latest UV – Technology
                                                    the iMPREG Liners are the benchmark for
                                                    being the strongest, most cost effective and
                                                    most environmentally friendly products in
                                                    the market.
                                                        Made in Germany, the iMPREG Liner
                                                    is manufactured fully quality controlled
                                                    according DIN EN ISO 9001. Additionally
                                                    the iMPREG Liner is certified by the DIBT
                                                    (German Institute for construction techniques)
                                                    and meets several industry standards.
                                                        Compared to conventional felt liners the
                                                    iMPREG GRP Liners show five times more
                                                    strength, 100% water tightness and provide              A pipe section can be rehabilitated in        manufacture liners up to DIA 1600!
                                                    minimum 50 years of Service.                        less then a day. An installation range of DIA        Additionally to the liner manufacture
Over the years ‘cured in place pipelining’              The iMPREG Liners come already pre-             150mm – DIA 1300mm and even more                  iMPREG provides training on side as well
methods for sewer and drainage pipes                impregnated with special resins and ready           can be installed in maximum lengths up            as on their own training course. With two
becomes more and more a key role in the             to use on the job side. Shelf lives up to six       to 300 meters each. In middle of 2012             own lining equipments and a team of
no-dig business.                                    months and easy container shipment keeps            iMPREG is planing to open the new part            professionals iMPREG provides a world wide
   iMPREG is currently manufacturing more           your construction flexible abroad.                  of the production plant and is than able to       support.




8 No-Dig World 2011 	                                                                                                                                                 www.trenchlessmiddleeast.com            www.trenchlessmiddleeast.com	                                                                                                                                             No-Dig World 2011 9
Company News                                                                                                                                                                                                                                                                                                 Company News


                                                                                                                                                                                   of traffic. Hydraulic intermediate jacking stations serve      Project data
                                                                                                                                                                                   to reduce the friction forces prevailing in such long-
                                                                                                                                                                                   distance tunnelling projects. Herrenknecht had already         Wastewater tunnel in Warsaw, Poland
                                                                                                                                                                                   adapted these interjack stations exactly to the thin walls     Geology: 70% coarse and fine sand, 30% clay and loam,
                                                                                                                                                                                   of the Hobas GRP pipes installed in Warsaw. The longest        gravel, boulders
                                                                                                                                                                                   section revealed yet another particular feature: two           Tunnel lengths: total of 5,860 m, 16 drives of 80 to 930
                                                                                                                                                                                   underground curves with a radius of 450m and 900m              meters
                                                                                                                                                                                   had to be realized. Thanks to the Herrenknecht SLS             Particular features: high groundwater level, long-distance
                                                                                                                                                                                   RV navigation system the cutterhead is guided exactly          driving, curve drives
                                                                                                                                                                                   with millimeter precision, the machine operators also
                                                                                                                                                                                   mastered this task in a precise and safe manner.               Machine data
                                                                                                                                                                                      December 14, 2010 saw completion of the last section
                                                                                                                                                                                   representing a significant milestone for this wastewater       Herrenknecht M-1083M, AVND2000AB with Extension
                                                                                                                                                                                   project in Warsaw. During the construction project, the        Kit, excavation diameter 3,025mm Herrenknecht
                                                                                                                                                                                   Herrenknecht equipment achieved impressive advance             M-1363M, AVND2400AB, excavation diameter 3,025mm
                                                                                                                                                                                   rates of up to 36 meters a day (double shift) and an
                                                                                                                                                                                   average of 20 meters per day.                                  Cutterhead: mixed-soil cutterheads fitted with disc
                                                                                                                                                                                      To complete the entire sewer system and connect it          cutters and cutting knives
                                                                                                                                                                                   with “Czajka” wastewater treatment plant (WWTP), PRG           Max. torque: 780kNm, 1,200kNm
                                                                                                                                                                                   Metro Sp.z.o.o. and Hydrobudowa 9 S.A. are additionally
                                                                                                                                                                                   realizing the 1,300m long Vistula River Crossing tunnel with   Tunnel lining: Pipe Jacking
                                                                                                                                                                                   a Herrenknecht large diameter tunnel boring machine. The
                                                                                                                                                                                   Mixshield S-642 with a diameter of 5.35m was successfully
                                                                                                                                                                                   accepted in February 2011 in the Schwanau/Germany
                                                                                                                                                                                   plant of Herrenknecht. Once this tunnel is completed the
                                                                                                                                                                                   Czajka WWTP could go into operation. n




Warsaw: Major pipe jacking
process successfully completed
Clean water for the Vistula river
The underground connection to the new “Czajka”              banks of the Vistula over the long term. Hydrobudowa       dewater and seal the requisite construction shafts prior
wastewater treatment plant in Warsaw has been               9 S.A., PRG Metro Sp.z.o.o. and KWG (PBG Group)            to tunnelling. The Herrenknecht AVND pipe jacking
completed successfully and on time. Two Herrenknecht        have been commissioned to connect the plant with the       machines proved its worth during this tunnelling
AVND micromachines handled the difficult drives with        underground wastewater network.                            process. Where required, these machines secure the
a total of 5,860 meters with bravura. Apart from pipe          The Polish contractors selected the pipe jacking        tunnel face using a support fluid (bentonite and water
jacking with extraordinarily large diameters of 3 meters,   method for their tunnel project and relied on the          mixture) and an additional compressed air cushion in
the extreme winter conditions and a high groundwater        two AVND2000AB (with Extension Kit, Ø 3,025mm)             the split excavation chamber, allowing safe tunnelling
level demanded top performance by everyone involved.        and AVND2400AB (Ø 3,025mm) hydroshields from               under water pressure. The separation of solids of the
    With performances of up to 36 meters a day, the         Herrenknecht. This type of machine is worldwide in         excavated material from fluids was realized with the
Herrenknecht machines blazed the trail for an efficient     use in the construction of supply and disposal tunnels;    Herrenknecht Separation Plant HSP500, providing a
new wastewater system in the Polish capital fast and        they master tunnelling through groundwater and can         capacity of 400 to 500 m3/h depending on the particle
efficiently.                                                penetrate a wide range of heterogeneous soils. In          size distribution.
    Warsaw, Poland / Schwanau, Germany, 6. April            Warsaw, the machines tunnelled at depths of 10 to 14          During the particularly cold winter months of 2010,
2011. Wastewater systems in many large cities have          meters reaching their final targets after boring through   the site team continued tunnelling work despite some
already reached their limits requiring modernization        5,860 meters of soil comprising coarse and fine sand,      extremely low temperatures and a lengthy period of frost.
or expansion in order to avoid overflowing into nearby      clay, loam, gravel and boulders.                              The Herrenknecht micromachines completed a total
rivers. For this reason, the city of Warsaw is investing       Apart from the unusually large diameter of 3 meters     of 16 drives, some with short distances starting at 80
in the construction of a state-of-the-art wastewater        for the pipe jacking method, another challenge was         meters, but also including long-distance sections of 800
treatment system. This will treat the wastewater            represented by a high groundwater level which in           meters and more. The longest individual drive was 930
produced by 80 percent of Warsaw’s inhabitants,             some places reached up to 8 meters above the top           meters. The hydroshields safely underpassed a six-lane
thereby improving the quality of water and life along the   of the pipes. The site teams were therefore obliged to     highway without having any negative impact on the flow




 10     	
10 No-Dig World 2011 	                                                                                                                          Global Focus Middle East 2009
                                                                                                                                                www.trenchlessmiddleeast.com
Company News




beton  rohrbau
highly customer-orientated
beton  rohrbau is one of the leading companies in civil     of beton  rohrbau have many years of experience in            treatment plants and pumping stations, micro-tunnelling
and construction engineering for the public sector.          providing water and sewage services for the public sector      and pipe jacking, the laying and sinking of pipes, caissons
   Throughout Germany and abroad, clients in the public      and have been recruited from the regions where the             and storm water clarification plants and as well as turnkey
water and sewage sector provide beton  rohrbau with a       projects take place. With the most up-to-date and innovative   civil engineering projects is one of the main reasons why it
high level of confidence. With nationwide branches beton    technology, the equipment and machinery of beton              enjoys the confidence of its clients in the public sector.
rohrbau is well equipped and highly customer-orientated.     rohrbau satisfy all current requirements. The technical            With a workforce of some 500 members of staff the
   Besides Germany projects are also executed through        and commercial capabilities have made it a consistent          beton  rohrbau group meanwhile achieves an annual
subsidiaries and holding companies in Bahrain, Bulgaria,     partner for the public water and sewage sector in Germany      turnover of around 100 mi. Euros. At its various regional
Georgia, Kazakhstan, Mauritius, Nigeria, Romania, Russian    and Abroad. The scope of beton  rohrbau encompasses           locations, beton  rohrbau is one of the most efficient
Federation, Turkey and the United Kingdom. The employees     sewer pipes, portable water, pressurized pipes, sewage         and productive companies. n	




12 No-Dig World 2011 	                                                                                                                                 www.trenchlessmiddleeast.com
Company News



TT-Middle East/TT-UK, successes
in Oman, Saudi Arabia and the UAE
TT-Middle East/TT-UK have been offering their range of
Trenchless Technology (NDRC) products throughout the
Middle East for many years with notable successes in
Oman, Saudi Arabia and the UAE.

A 30” diameter x 110m long steel oil pipeline exchange
project under a major highway between Damman and
Riyadh was completed using a Grundoram Taurus.




                                                           Grundodrill HDD working in Oman


                                                         HDD drill rod rescue using Grundoram technology saved the company DCL significant financial implications such as
                                                         the total cost of a lost drilled bore, contractual penalties, ongoing cost delays in commissioning the final pipelines and
                                                         all associated costs involved in planning a new bore and the actual costs of duplicating all the undertakings of a new
                                                         bore/installation, etc…




  Taurus Grundoram installing a 30” steel
  pipe under the Damman-Riyadh Highway

Grundomat Soil Displacement Hammers and
Grundodrill HDD rigs are now in daily use throughout
the region laying fibre optic network systems; notable
success has been achieved by Omani companies with
Grundomats and a Grundodrill 15X.



                                                           HDD Drill Rod Rescue using Grundoram


                                                         Due to the success of the HDD Drill Rod Rescue above, DCL went on to purchase a Prime Drilling PD 250/90 HDD
                                                         System. n




  Grundomat road crossing in Oman                          Prime Drilling PD 250/90 System




14 No-Dig World 2011 	                                                                                                                             www.trenchlessmiddleeast.com
Company News




Save Water, Save Money …
Innovative shaft sealing                                         cleaned up before being disposed as waste water.
technologies for tunnelling                                          This means you have to pay for supply, cleaning and
                                                                 removing the sealing water every day of tunnelling. As
pumps – no additional sealing                                    alternative grease lubricated packing glands are used
water required                                                   associated with reduced wear life of the gland and
                                                                 shaft sleeve.
Though our Earth is made up of 2/3 water, only 1/100                 Nevertheless a permanent greasing of the gland using
of that water is drinkable. The rest is salt water or            a grease pump is necessary as well as periodic on-site
permanently frozen and we can’t drink it, wash with it, or       refilling of the storage tank.
use it to water plants. Water is a limited resource!                 Our experienced team of engineers and technicians
    Therefore, it is important that we use our water             designed an innovative shaft sealing solution tailored to
wisely and do not waste it. For future generations we            the task. Our experience which we have gained in a large
all must do our part to save water, particularly in industrial   number of applications is included in the development
application.                                                     and design of our own mechanical seal type HGD which
    Most of these efforts can be reached priceless and as        is available in single- acting and double-acting designs.
a benefit you can save money by saving water -                   In double acting design this seal is supplied with sealing
using innovative shaft sealing technologies for your slurry      water from an unpressurized storage tank. Continuous
pumps. As a standard for slurry pumps in tunnelling              external sealing water distribution is therefore not
packing glands and expeller units combined with packing          essential. In single acting design no additional sealing
rings are installed as state of the art shaft sealing            water is required while pump operation.
technologies. Shaft seals of pumps which convey sludges              For rough conditions in tunnelling we use application-
and slurries containing solid particles require constant         optimized materials for the sliding and counter rings.
supply of sealing water in order to cool, lubricate and              This ensures reliable operation in a large number of
keep the seal clean. Furthermore a permanent dripping            slurry pump applications in direct pipe, utility- and traffic-
of sealing water is essential for a trouble free operation       tunnelling today.
of packing glands. While boring the tunnel a constant                Save Water using innovative shaft sealing technologies
sealing water supply to discharge and feed pumps must            for tunnelling pumps. n
be assured.
    After having been charged with particles it has to be        See Arthur Habermann Gmbh  Co. Kg on stand 53.




16 No-Dig World 2011 	                                                                                                            www.trenchlessmiddleeast.com
Company News                                                                                                                                                                                                                              Company News



                                                                                                                                  also offer support as a competent partners in all
                                                                                                                                  technical and commercial issues.
                                                                                                                                     The technologies on offer from Fluvius include
                                                                                                                                  full lining systems for pipelines in diameters from 28
                                                                                                                                  mm up to 800 mm using CIPP technology as well
                                                                                                                                  as lateral lining and lateral sealing systems that can
                                                                                                                                  negotiate bends up to 90o and diameter transitions
                                                                                                                                  in a single installation. Liners are also offered
                                                                                                                                  for localised repairs (‘patches’) where full length
                                                                                                                                  rehabilitation is not required in diameters from 100
                                                                                                                                  mm up to 900 mm.
                                                                                                                                     In larger man-entry diameters Fluvius also offers a
                                                                                                                                  range of Kevlar/EPDM manually installed pipe joint
                                                                                                                                  seals. For manhole rehabilitation the company has
                                                                                                                                  cementitious grout lining options offering structural
                                                                                                                                  repair and saltwater resistance, as well as localised
                                                                                                                                  manhole leak sealing systems.                            Fluvius offers ‘patch’ repair localised lining systems
                                                                                                                                      Commenting on the event Sebastian Schmitz,
                                                                                                                                  Managing Director of Fluvius said:
                                                                                                                                     “Trenchless Middle East 2011 will give us another
                                                                                                                                  springboard into areas of the world that require the
                                                                                                                                  sort of technology we have on offer. Our technical
 Full length lining utilising an inversion drum installation technique                                                            team will be at the event offering current and any
                                                                                                                                  potential new clientelle guidance through the Fluvius
                                                                                                                                  range of systems.” n



EUROPEAN REHABILITATION
TECHNOLOGY GOES GLOBAL
                                                                         Fluvius GmbH of Germany, in association with its
                                                                         Eastern European partner Sanikom in Slovenia,
                                                                         sells products primarily for the trenchless repair
                                                                         of wastewater pipe systems with the product focus
                                                                         being mainly on full-length and localised repair up to
                                                                         a pipe diameter of 800 mm.
                                                                            The company’s range includes the full spectrum
                                                                         of consumables, such as resin systems, liners,
                                                                         fibreglass complexes, renovation packers and
                                                                         products for flow control and test technology as
                                                                         well as accessories, that are required for trenchless
                                                                         installations in wastewater systems, as well as
                                                                         specialist technical equipment that is designed
                                                                         either in-house to the highest quality standards
                                                                         or as products sourced from other renowned
                                                                         manufacturers. The various renovation methods
                                                                         offered carry a range of globally recognised industry
                                                                         approvals and certificates.
                                                                            Fluvius can provide clients with solution
                                                                         proposals and entire systems for the renovation and
                                                                         maintenance of defective wastewater pipes. With
                                                                         experienced employees that have been active in this
 Manhole rehabilitation systems are included in the Fluvius range.       industry sector for many years, the company can




18 No-Dig World 2011 	                                                                           www.trenchlessmiddleeast.com     www.trenchlessmiddleeast.com	                                                                                     No-Dig World 2011 19
Company News                                                                                                                                                                                                                                                                                            Company News



Horizontal directional drilling
technique for DN 900 pipes
Horizontal directional drilling technique              The horizontal directional drilling technique
used for pipe-by-pipe pulling-in of DN 900             using ductile iron pipes
ductile iron pipes in Belgium                          Pipes having the positive locking BLS®/VRS®-T                                                                                                                                                                                                         Fig. 7, left : Opening leading into socket on
                                                       push-in joint (Fig. 1), combined with a cement                                                                                                                                                                                                        DN 600 to DN 1000 size BLS®/VRS®-T push-in
Introduction                                           mortar coating to EN 15542 [1] as an external                                                                                                                                                                                                         joints
Constantly spreading built-up areas, wide multi-lane   protection able to withstand high mechanical
                                                                                                                                                                                                                                                                                                             Fig. 8, right : Insertion of locking segments
roads or complicated routes are making it              loads (Fig. 2), are available for the trenchless
increasingly difficult and expensive to replace        installation of ductile iron pipes by the horizontal
existing pipeline systems, or lay new ones, by         directional drilling (HDD) technique.                    Fig 3. Construction of the DN 900 BLS®/VRS®-T
the open trench technique. This is why trenchless         The BLS®/VRS®-T push-in joint is a restrained         push-in joint with fixing clip for trenchless
installation techniques have been under                socket joint in which a welding bead is applied to       pipeline installation
development and in use for some 30 years now.          the spigot end in the factory. A locking chamber       Ductile iron pipes can be trenchlessly installed
   The continuing development of the machinery         cast into the socket receives the locks or locking     by the HDD technique both as a fully assembled
used is going hand in hand with the modification       segments which, once the spigot end has been           pipe string and by pipe-by-pipe connection. The            Fig 4. 1000 kN drilling rig
of a pipe material with a great tradition,             pushed into the socket, are inserted through           possible length of pipeline which can be pulled in is
namely ductile iron, and with changes in the           openings in the end-face of the socket which           determined by the permitted tractive force
technology of making restrained joints between         lead into the locking chamber. If axial tractive       on the restrained push-in joint. Details can be         Installation of a drinking water pipeline
pipes of this material. A successful example of        forces are exerted on the joint, either by the         found in DVGW-Arbeitsblatt GW 321 [2] and               using DN 900 ductile iron pipes
such new joints is the positive locking BLS®/          internal pressure or by the use of the pipes for       in the manual entitled “Trenchless Installation         Pidpa is one of the largest Flemish water suppliers and                                                                                Fig. 9: Pulling-in of the pipes; the push-in joint
VRS®-T push-in joint. This joint is flexible and       a trenchless pulling-in technique, the welding         of Ductile Cast Iron Pipes” [3]. Because of             supplies fresh drinking water to more than a million people.                                                                           is protected by shrink-on material and a sheet-
enables pipes to be laid to tight radiuses by an       bead is supported against these locks or locking       the results of externally monitored type tests          The company distributes its drinking water by means                                                                                    metal cone slid over the top
angular deflection at the sockets. The welding         segments and in this way transmits a very high         (internal pressure tests under product standard         of a 12,581 km long pipeline network. The municipality
bead, which is applied to the spigot end in the        force (Fig. 3).                                        EN 545 [4]), the values of permitted tractive           of Grobbendonk (a small town with just over 10,000                                                                                  damage from being done to the shrink-on sleeve in the bore
factory, and the metallic locking segments, which                                                             force specified in the latter are in some cases         inhabitants), is situated right next to the Albert Canal, an        Fig. 5: Upsizing heads                                          as the pipeline is subsequently being pulled in.
are supported in the locking chamber cast into                                                                higher than those specified in DVGW-Arbeitsblatt        artificial waterway 129.5 km long which connects the two
the socket, enable very high longitudinal forces                                                              GW 321 [2] (Table 1).                                   Belgian towns of Liège and Antwerp. The existing pipeline                                                                           To sum up
to be transmitted.                                                                                                                                                    needed to be relaid due to the construction of a new bridge.                                                                        Ductile iron pipes with restrained BLS®/VRS®-T
                                                                                                                                                                          In part of the area, the new pipeline runs directly along                                                                       push-in joints are very well suited to trenchless
                                                                                                                                                                      the Albert Canal. If open trenches had been used, the water                                                                         installation and have already shown this to be the case on a
                                                                                                                                                                      would have had to be predrained from them, an expensive                                                                             large number of completed projects.
                                                                                                                                                                      undertaking. This was avoided by the trenchless installation                                                                           The possibility of particularly high forces being
                                                                                                                                                                      of ductile iron pipes by the horizontal directional drilling        Fig. 6: Pipes being connected on a connecting                   transmitted from pipe to pipe allows economical and cost-
                                                                                                                                                                      technique with the pipes pulled in pipe-by-pipe.                    ramp                                                            saving installation and enables very long runs of pipe to be
                                                                                                                                                                          It was possible to make use in this case of the experience                                                                      pulled in when using trenchless installation techniques. n
                                                                                                                                                                      gained on a project involving DN 600 nominal size pipes          DN 900 BLS®/VRS®-T push-in joint are inserted, once the
  Fig 1. The BLS®/VRS®-T push-in joint                                                                                                                                which was completed in 2008 in the town of Ghent [5], also       spigot end of the pipe has been inserted in the next socket,       Project data
                                                                                                                                                                      in Belgium.                                                      in the locking chamber (Fig. 8) through the opening leading        •	HDD installation of individually connected
                                                                                                                                                                          A 1000 kN drilling rig (Fig. 4) was used for the drilling    into the socket (Fig. 7) and are distributed around the            •	DN 900 BLS® pipes
                                                                                                                                                                      and the subsequent pulling-in of the ductile iron pipes. The     circumference of the pipe alternately to the left and the right.   •	Pipe external protection: cement mortar
                                                                                                                                                                      pilot bore having been made, it was widened step by step by          In a trenchless installation technique, the segments are       •	coating to EN 15542 [1]
                                                                                                                                                                      special upsizing heads (Fig. 5). The pipes were connected        then secured with a steel fixing clip.                             •	Length of pipeline: 342 m
                                                                                                                                                                      on one by one on a special connecting ramp. The first pipe           This ensures that the locking segments are at all              •	Drilling rig: 1,000 kN
                                                                                                                                                                      was connected (Fig. 6) to the traction string and the barrel     times firmly in abutment as the pipe is pulled in.                 •	Permitted tractive force for DN 900 BLS®
                                                                                                                                                                      reamer by means of a BLS®/VRS®-T traction head with                  Once the locking segments have been inserted, the              •	pipes: 1,845 kN
                                                                                                                                                                      built-in force-measuring equipment.                              socket joints are protected by a shrink-on sleeve. The sheet-      •	Max. tractive force which occurred: 500 kN
                                                                                                                                                                          To make the connection, the segments for locking the         metal cone (Fig. 9) which is slid on prevents any possible
                                                                                                                                                                                                                                                                                                          See Duktus Pipe Systems Fzco on stand 13.

                                                                                                                                                                      References
  Fig 2. The cement mortar coating to EN 15542                                                                                                                        [1] EN 15542, Ductile iron pipes, fittings and accessories - External cement mortar coating for pipes – requirements and test methods 2008
                                                                                                                                                                      [2] DVGW-Arbeitsblatt GW 321, Horizontal directional drilling for gas and water pipelines – requirements, quality assurance and testing 2003-10
                                                                                                                                                                      [3] Buderus Manual - Trenchless Installation of Ductile Cast Iron Pipes 2009-07
                                                                                                                                                                      [4] EN 545, Ductile iron pipes, fittings, accessories and
                                                                                                                                                                      their joints for water pipelines - requirements and test methods 2006
                                                                                                                                                                      [5] Ertelt, S.: Einzelrohreinzug ductiler Gussrohre
                                                                                                                                                                      beim HDD-Verfahren – Fortsetzung einer Erfolgsgeschichte [Pipe-by-pipe pulling-in of ductile iron pipes by the HDD technique – a continuing success story] GUSSROHR-TECHNIK 43 (2009), p. 72 ff
20 No-Dig World 2011 	                                                                                                                www.trenchlessmiddleeast.com
No-Dig World 2011
No-Dig World 2011
No-Dig World 2011
No-Dig World 2011
No-Dig World 2011
No-Dig World 2011
No-Dig World 2011
No-Dig World 2011

Más contenido relacionado

Destacado

ProCor audience survey results
ProCor audience survey resultsProCor audience survey results
ProCor audience survey resultsprocor
 
Comunicación estratégica de Aqualand
Comunicación estratégica de AqualandComunicación estratégica de Aqualand
Comunicación estratégica de Aqualandkristinaah
 
Frederik Smit, Hans Moerel, Kees van der Wolf & Peter Sleegers (1999). Buildi...
Frederik Smit, Hans Moerel, Kees van der Wolf & Peter Sleegers (1999). Buildi...Frederik Smit, Hans Moerel, Kees van der Wolf & Peter Sleegers (1999). Buildi...
Frederik Smit, Hans Moerel, Kees van der Wolf & Peter Sleegers (1999). Buildi...Frederik Smit
 
Kevan Bilton Exact Target Email Marketing 2.0
Kevan Bilton Exact Target Email Marketing 2.0Kevan Bilton Exact Target Email Marketing 2.0
Kevan Bilton Exact Target Email Marketing 2.0Michael Leander
 
Servicios de marketing y diseño en "Ruiz Prieto Asesores".
Servicios de marketing y diseño en "Ruiz Prieto Asesores".Servicios de marketing y diseño en "Ruiz Prieto Asesores".
Servicios de marketing y diseño en "Ruiz Prieto Asesores".Ruiz Prieto Asesores
 
Visual cryptography1
Visual cryptography1Visual cryptography1
Visual cryptography1patisa
 
Microsharing Im Unternehmen: Wie Dokumentieren und Lernen Teil der täglichen ...
Microsharing Im Unternehmen: Wie Dokumentieren und Lernen Teil der täglichen ...Microsharing Im Unternehmen: Wie Dokumentieren und Lernen Teil der täglichen ...
Microsharing Im Unternehmen: Wie Dokumentieren und Lernen Teil der täglichen ...Communardo GmbH
 
IT-Link - Company Profile
IT-Link - Company Profile IT-Link - Company Profile
IT-Link - Company Profile IT-Link
 
Personal disciplina
Personal disciplinaPersonal disciplina
Personal disciplinaconvertidor
 
Entity Search & Getting to Understand Freebase by Jonathan Goodman
Entity Search & Getting to Understand Freebase by Jonathan GoodmanEntity Search & Getting to Understand Freebase by Jonathan Goodman
Entity Search & Getting to Understand Freebase by Jonathan GoodmanSearch Marketing Expo - SMX
 
Monografia balonmano
Monografia balonmanoMonografia balonmano
Monografia balonmanoKarina PS
 
Wojna austriacko-pruska-wojna-austrii-z-prusami-i-wlochami-w-1866-roku
Wojna austriacko-pruska-wojna-austrii-z-prusami-i-wlochami-w-1866-rokuWojna austriacko-pruska-wojna-austrii-z-prusami-i-wlochami-w-1866-roku
Wojna austriacko-pruska-wojna-austrii-z-prusami-i-wlochami-w-1866-rokuKsięgarnia Grzbiet
 
Presentación BONCASA Construcciones
Presentación BONCASA ConstruccionesPresentación BONCASA Construcciones
Presentación BONCASA ConstruccionesBoncasa Inmobiliaria
 

Destacado (20)

ProCor audience survey results
ProCor audience survey resultsProCor audience survey results
ProCor audience survey results
 
Formations PAO & 3D
Formations PAO & 3DFormations PAO & 3D
Formations PAO & 3D
 
Comunicación estratégica de Aqualand
Comunicación estratégica de AqualandComunicación estratégica de Aqualand
Comunicación estratégica de Aqualand
 
Frederik Smit, Hans Moerel, Kees van der Wolf & Peter Sleegers (1999). Buildi...
Frederik Smit, Hans Moerel, Kees van der Wolf & Peter Sleegers (1999). Buildi...Frederik Smit, Hans Moerel, Kees van der Wolf & Peter Sleegers (1999). Buildi...
Frederik Smit, Hans Moerel, Kees van der Wolf & Peter Sleegers (1999). Buildi...
 
Kevan Bilton Exact Target Email Marketing 2.0
Kevan Bilton Exact Target Email Marketing 2.0Kevan Bilton Exact Target Email Marketing 2.0
Kevan Bilton Exact Target Email Marketing 2.0
 
Trabajotesismelinda
TrabajotesismelindaTrabajotesismelinda
Trabajotesismelinda
 
Family Law Magazine
Family Law MagazineFamily Law Magazine
Family Law Magazine
 
Capitulo 3.5: Sistemas sanitarios más cercanos
Capitulo 3.5: Sistemas sanitarios más cercanosCapitulo 3.5: Sistemas sanitarios más cercanos
Capitulo 3.5: Sistemas sanitarios más cercanos
 
Servicios de marketing y diseño en "Ruiz Prieto Asesores".
Servicios de marketing y diseño en "Ruiz Prieto Asesores".Servicios de marketing y diseño en "Ruiz Prieto Asesores".
Servicios de marketing y diseño en "Ruiz Prieto Asesores".
 
Visual cryptography1
Visual cryptography1Visual cryptography1
Visual cryptography1
 
Microsharing Im Unternehmen: Wie Dokumentieren und Lernen Teil der täglichen ...
Microsharing Im Unternehmen: Wie Dokumentieren und Lernen Teil der täglichen ...Microsharing Im Unternehmen: Wie Dokumentieren und Lernen Teil der täglichen ...
Microsharing Im Unternehmen: Wie Dokumentieren und Lernen Teil der täglichen ...
 
Online Werbung
Online WerbungOnline Werbung
Online Werbung
 
IT-Link - Company Profile
IT-Link - Company Profile IT-Link - Company Profile
IT-Link - Company Profile
 
Personal disciplina
Personal disciplinaPersonal disciplina
Personal disciplina
 
Entity Search & Getting to Understand Freebase by Jonathan Goodman
Entity Search & Getting to Understand Freebase by Jonathan GoodmanEntity Search & Getting to Understand Freebase by Jonathan Goodman
Entity Search & Getting to Understand Freebase by Jonathan Goodman
 
Determinación de Hemoglobina A2
Determinación de Hemoglobina A2Determinación de Hemoglobina A2
Determinación de Hemoglobina A2
 
Monografia balonmano
Monografia balonmanoMonografia balonmano
Monografia balonmano
 
Wojna austriacko-pruska-wojna-austrii-z-prusami-i-wlochami-w-1866-roku
Wojna austriacko-pruska-wojna-austrii-z-prusami-i-wlochami-w-1866-rokuWojna austriacko-pruska-wojna-austrii-z-prusami-i-wlochami-w-1866-roku
Wojna austriacko-pruska-wojna-austrii-z-prusami-i-wlochami-w-1866-roku
 
Presentación BONCASA Construcciones
Presentación BONCASA ConstruccionesPresentación BONCASA Construcciones
Presentación BONCASA Construcciones
 
A Framework for Semantic Business Process Management in E-Government
A Framework for Semantic Business Process Management in E-Government   A Framework for Semantic Business Process Management in E-Government
A Framework for Semantic Business Process Management in E-Government
 

Similar a No-Dig World 2011

Oil and Gas Technology Forum Drilling Day
Oil and Gas Technology Forum Drilling DayOil and Gas Technology Forum Drilling Day
Oil and Gas Technology Forum Drilling DayArena International
 
MET3 Overview- Key Success Factors to better Technology Transfer
MET3 Overview- Key Success Factors to better Technology TransferMET3 Overview- Key Success Factors to better Technology Transfer
MET3 Overview- Key Success Factors to better Technology Transfermet3project
 
COMS International Conference on Commercialization of Micro and Nanotechnology
COMS International Conference on Commercialization of Micro and NanotechnologyCOMS International Conference on Commercialization of Micro and Nanotechnology
COMS International Conference on Commercialization of Micro and NanotechnologyHigh Tech Systems Park
 
The Trading Show 2013 London Prospectus
The Trading Show 2013 London   ProspectusThe Trading Show 2013 London   Prospectus
The Trading Show 2013 London ProspectusVictorterrapinn
 
Resumé of Arno de Beer - 8512175136080
Resumé of Arno de Beer - 8512175136080Resumé of Arno de Beer - 8512175136080
Resumé of Arno de Beer - 8512175136080Arno de Beer
 
A Guide to delighting EXPO 2020 visitors & capturing their attention
A Guide to delighting EXPO 2020 visitors & capturing their attentionA Guide to delighting EXPO 2020 visitors & capturing their attention
A Guide to delighting EXPO 2020 visitors & capturing their attentionGemma Fabian
 
9th International Conference & Exhibition on Operating Pressure Equipment...
9th International Conference & Exhibition on Operating Pressure Equipment...9th International Conference & Exhibition on Operating Pressure Equipment...
9th International Conference & Exhibition on Operating Pressure Equipment...sajeeray
 
TEC Group - company brochure
TEC Group - company brochureTEC Group - company brochure
TEC Group - company brochurejamesaccd
 
Clarion Coporate Brochure
Clarion Coporate BrochureClarion Coporate Brochure
Clarion Coporate Brochurecamilapaula
 
Internship Report_Vishak
Internship Report_VishakInternship Report_Vishak
Internship Report_VishakVishak Nambiar
 
Bridge Design Exchange Brochure
Bridge Design Exchange BrochureBridge Design Exchange Brochure
Bridge Design Exchange BrochureIQPCExchanges
 
Innovations™ Magazine January - March 2014
Innovations™ Magazine January - March 2014 Innovations™ Magazine January - March 2014
Innovations™ Magazine January - March 2014 T.D. Williamson
 
Report annual Tecnova 2014
Report annual Tecnova 2014Report annual Tecnova 2014
Report annual Tecnova 2014Tecnova
 
Planning-a-Conference-Centre-2009-V3-Feb-2013.pdf
Planning-a-Conference-Centre-2009-V3-Feb-2013.pdfPlanning-a-Conference-Centre-2009-V3-Feb-2013.pdf
Planning-a-Conference-Centre-2009-V3-Feb-2013.pdfBinhabSultan
 
HSE Conference Qatar Dec 5
HSE Conference Qatar Dec 5HSE Conference Qatar Dec 5
HSE Conference Qatar Dec 5harrissafety
 
2008 Design Management Europe DME Award book of winners
2008 Design Management Europe DME Award book of winners2008 Design Management Europe DME Award book of winners
2008 Design Management Europe DME Award book of winnersDUCO
 

Similar a No-Dig World 2011 (20)

Oil and Gas Technology Forum Drilling Day
Oil and Gas Technology Forum Drilling DayOil and Gas Technology Forum Drilling Day
Oil and Gas Technology Forum Drilling Day
 
CDE future sonar webinar
CDE future sonar webinar CDE future sonar webinar
CDE future sonar webinar
 
MET3 Overview- Key Success Factors to better Technology Transfer
MET3 Overview- Key Success Factors to better Technology TransferMET3 Overview- Key Success Factors to better Technology Transfer
MET3 Overview- Key Success Factors to better Technology Transfer
 
COMS International Conference on Commercialization of Micro and Nanotechnology
COMS International Conference on Commercialization of Micro and NanotechnologyCOMS International Conference on Commercialization of Micro and Nanotechnology
COMS International Conference on Commercialization of Micro and Nanotechnology
 
The Trading Show 2013 London Prospectus
The Trading Show 2013 London   ProspectusThe Trading Show 2013 London   Prospectus
The Trading Show 2013 London Prospectus
 
Resumé of Arno de Beer - 8512175136080
Resumé of Arno de Beer - 8512175136080Resumé of Arno de Beer - 8512175136080
Resumé of Arno de Beer - 8512175136080
 
A Guide to delighting EXPO 2020 visitors & capturing their attention
A Guide to delighting EXPO 2020 visitors & capturing their attentionA Guide to delighting EXPO 2020 visitors & capturing their attention
A Guide to delighting EXPO 2020 visitors & capturing their attention
 
9th International Conference & Exhibition on Operating Pressure Equipment...
9th International Conference & Exhibition on Operating Pressure Equipment...9th International Conference & Exhibition on Operating Pressure Equipment...
9th International Conference & Exhibition on Operating Pressure Equipment...
 
TEC Group - company brochure
TEC Group - company brochureTEC Group - company brochure
TEC Group - company brochure
 
Vyapaar Brochure
Vyapaar BrochureVyapaar Brochure
Vyapaar Brochure
 
Clarion Events
Clarion EventsClarion Events
Clarion Events
 
Clarion Coporate Brochure
Clarion Coporate BrochureClarion Coporate Brochure
Clarion Coporate Brochure
 
Internship Report_Vishak
Internship Report_VishakInternship Report_Vishak
Internship Report_Vishak
 
Bridge Design Exchange Brochure
Bridge Design Exchange BrochureBridge Design Exchange Brochure
Bridge Design Exchange Brochure
 
incubate
incubateincubate
incubate
 
Innovations™ Magazine January - March 2014
Innovations™ Magazine January - March 2014 Innovations™ Magazine January - March 2014
Innovations™ Magazine January - March 2014
 
Report annual Tecnova 2014
Report annual Tecnova 2014Report annual Tecnova 2014
Report annual Tecnova 2014
 
Planning-a-Conference-Centre-2009-V3-Feb-2013.pdf
Planning-a-Conference-Centre-2009-V3-Feb-2013.pdfPlanning-a-Conference-Centre-2009-V3-Feb-2013.pdf
Planning-a-Conference-Centre-2009-V3-Feb-2013.pdf
 
HSE Conference Qatar Dec 5
HSE Conference Qatar Dec 5HSE Conference Qatar Dec 5
HSE Conference Qatar Dec 5
 
2008 Design Management Europe DME Award book of winners
2008 Design Management Europe DME Award book of winners2008 Design Management Europe DME Award book of winners
2008 Design Management Europe DME Award book of winners
 

Más de Russian website "About Trenchless" (7)

Masgnb seminar operator_gnb_2013-program
Masgnb seminar operator_gnb_2013-programMasgnb seminar operator_gnb_2013-program
Masgnb seminar operator_gnb_2013-program
 
Masgnb seminar itr_2013-program
Masgnb seminar itr_2013-programMasgnb seminar itr_2013-program
Masgnb seminar itr_2013-program
 
Moletrac brochure dom_09-2012
Moletrac brochure dom_09-2012Moletrac brochure dom_09-2012
Moletrac brochure dom_09-2012
 
Журнал РОБТ №3 (апрель 2011)
Журнал РОБТ №3 (апрель 2011)Журнал РОБТ №3 (апрель 2011)
Журнал РОБТ №3 (апрель 2011)
 
Nodig Moscow 2012 conference programme
Nodig Moscow 2012 conference programmeNodig Moscow 2012 conference programme
Nodig Moscow 2012 conference programme
 
Instrukcija ridgid-seektech-sr-20
Instrukcija ridgid-seektech-sr-20Instrukcija ridgid-seektech-sr-20
Instrukcija ridgid-seektech-sr-20
 
Catalog Universal HDD 2010
Catalog Universal HDD 2010Catalog Universal HDD 2010
Catalog Universal HDD 2010
 

No-Dig World 2011

  • 1. Bringing you the latest in trenchless technology & land–based utility pipeline engineering Trenchless Middle East Edition. October 2011 TRENCHLESS MIDDLE EAST 2011 INTERNATIONAL EXHIBITION AND CONFERENCE Jumeirah Beach Conference & Exhibition Centre, Dubai, UAE 10 -11 October 2011 Exhibition and Conference Preview KEEPING the middle east moving 2011 CONFERENCE PROGRAMME REGISTRATION DETAILS EXHIBITOR INFORMATION ENTRANCE TO THE EXHIBITION IS FREE OF CHARGE REGISTER ONLINE: WWW.TRENCHLESSMIDDLEEAST.COM AND RECEIVE YOUR FREE GIFT ON ARRIVAL AT THE SHOW
  • 2.
  • 3. Welcome..... I am very pleased to welcome you to the fourth issue of NO-DIG WORLD, a publication that doubles as the Show Guide to the upcoming TRENCHLESS MIDDLE EAST 2011 event being held at the Jumeirah Beach Conference & Publisher Paul Harwood Exhibition Centre, Dubai, UAE on 10 - 11 October 2011, supported by The T + 44 (0) 845 094 8066 International Society for Trenchless Technology (ISTT) and the Institution of E pharwood@westrade.co.uk Civil Engineers (ICE). Known also as No-Dig technology and as NDRC (Non Disruptive Road Advertising Stuart Hillyard Crossing) in the Gulf region, Trenchless Technology embraces techniques Gary King from micro tunnelling and directional drilling to pipe bursting, lining and inspection systems, T + 44 (0) 845 094 8066 aimed at minimising or eliminating the need for disruptive excavations whilst providing a quick, E shillyard@westrade.co.uk efficient and economical solution to the construction and renovation of sewers, water mains, Design & Production electricity cables and telecommunications networks. Trevor Dorrell This is a developing global Industry. Products and techniques are reviewed and improved T + 44 (0) 845 094 8066 on a regular basis. New innovations are proven to enhance performance. Major projects are E trevor@frontpagepublishing.co.uk completed every day somewhere around the world, proving that trenchless techniques provide The publishers accept no responsibility in respect of economic solutions and reduced environmental impact. The social costs are reduced, benefiting advertisements appearing in the magazine and the communities, as well as the travelling public. opinions expressed in editorial material or otherwise do not necessarily represent the views of the publishers. The two day exhibition will be complemented by a conference programme, assembled in The publishers accept no responsibility for actions collaboration with the International Society for Trenchless Technology (ISTT). The conference will taken on the basis of any information contained include presentations by local and international speakers, thus providing an exciting platform for within this magazine. The publishers cannot accept liability for any loss arising from the late appearance delegates to learn, debate, share knowledge, benchmark, and network with like minded industry or non-publication of any advertisement for any reason colleagues. whatsoever. We, here at Westrade, are specialist organisers of shows focused on promoting the latest ISSN 1479-0815 equipment and techniques used in Trenchless Technology which is now becoming the preferred option for utility installation and repair, designed to keep traffic on the move. If you haven’t yet planned your visit to Trenchless Middle East, don’t miss this opportunity to come and see this unique line-up of products on display from exhibitors worldwide, and talk to the experts who can provide solutions to the challenges ahead. 2011 For all information on how to get here and where to stay, visit our website www.trenchlessmiddleeast.com I am sure you will find time invested here will be both profitable and enjoyable. The success of Trenchless Middle East is of course dependant on the support of the industry. We offer our thanks to all exhibitors for their participation and professional displays and of course to our sponsors. Their commitment and support to the event is greatly appreciated. International Society Paul Harwood For Trenchless Technology Sales and Marketing Director Westrade Group Ltd. Organised by Contents TRENCHLESS MIDDLE EAST is organised by CONFERENCE programme and timetable Page 24 - 25 EXHIBITION floor plan Page 26 WESTRADE GROUP LTD Westrade Group Ltd, 112-114 High Street, exhibitor profiles PAge 27 Rickmansworth, Herts, WD3 1AQ UK Tel: +44 (0) 845 094 8066 Fax: +44 (0) 870 429 9275 Web: www.westrade.co.uk product guide page 32 Sponsors
  • 4. exhibitor NEWS FULL HOUSE AT REHABILITATION PROJECT TRENchLESS MIDDLE EAST 2011, DUBAI I am very pleased to welcome you to Products and techniques are reviewed organisers of shows focused on promoting their advice and assistance in compiling in Kingdom of Saudi Arabia the fourth issue of NO-DIG WORLD, a and improved on a regular basis. New the latest equipment and techniques used our Conference programme. We also publication that doubles as the Show innovations are proven to enhance in Trenchless Technology which is rapidly welcome the support of The Institution International Aramoon Corp (IAC), is the first Trenchless Extensive cleaning was made to facilitate the CCTV During the preparation and installation of CIPP-UV Guide to the upcoming TRENCHLESS performance. Major projects are completed becoming the preferred option for utility of Civil Engineers (ICE) and we welcome Technology specialized local contractor in Saudi Arabia. robotic inspection and as a result, several problems system IAC had given very careful attention for safety MIDDLE EAST 2011 Exhibition and every day somewhere around the world, installation and repair around the world. their members to the event. Last but by The CEO President of IAC, Faiz Al-Elweet reports that were identified in the pipelines, such as infiltration, wall precautions especially when rehabilitating sewer Conference being held at the Jumeirah proving that trenchless techniques If you haven’t yet planned your visit to no means least, we acknowledge the huge IAC has recently completed a rehabilitation project in incrustations, partial blockages, severe corrosion. infrastructure in heavy traffic areas. Beach Conference Exhibition Centre in provide economic solutions and reduced TRENCHLESS MIDDLE EAST 2011, don’t support from our sponsors and exhibitors. KSA for The Water Authority of Eastern Province. The Dubai, UAE, on 10 -11 October 2011. environmental impact. The social costs are miss this opportunity to come and see client was facing severe problems in their gravity sewers Known also as No-Dig and also as minimised, benefitting communities, as this unique line-up of products on display See you at the show in Dubai, 10-11 (600mm and 700mm pipelines). NDRC (Non Disruptive Road Crossing) in well as the travelling public. from exhibitors worldwide, and talk to the October! the Gulf region, Trenchless Technology The two day exhibition will be experts who can provide solutions to the embraces techniques from micro complemented by a top quality challenges ahead. tunnelling and directional drilling, to pipe conference programme, assembled in For all information on how to get here bursting, lining and inspection systems, collaboration with the International Society and where to stay, visit our website aimed at minimising or eliminating for Trenchless Technology (ISTT). The www.trenchlessmiddleeast.com I am sure the need for disruptive excavations conference will include presentations by you will find time invested here will be 2011 whilst providing a quick, efficient and local and international speakers, thus both profitable and enjoyable. economical solution to the construction providing an exciting platform for delegates The success of Trenchless Middle East and renovation of sewers, water mains, to learn, debate, share knowledge, is of course dependant on the support of electricity cables and telecommunications benchmark, and network with like minded the industry. networks. industry colleagues. We offer our thanks to The International This is a developing global Industry. We, here at Westrade, are specialist Society (ISTT) for their support, as well as IAC combined Jet-Vacuum Truck ready for cleaning works Liner material installation CCTV inspection work in progress After evaluation and condition assessment, IAC recommended No-Dig pipe rehabilitation using CIPP-UV The CIPP-UV system is designed for fast and efficient IAC were called upon to discuss the project and system for the gravity sewer pipelines in order to restore onsite installation that minimizes the economic, social perform inspection condition assessment for the the 100% hydraulic efficiency and structural strength of and environmental impacts. IAC is well prepared to meet gravity sewers, including providing services for pipeline the pipelines. the demand in the Region and has the full capability to rehabilitation works. The pipeline material was ductile undertake such No-Dig repair rehabilitation works of iron with a total length of 2300m. The pipes were wastewater network for the clients. n located at an average depth of 4m below the ground surface in Dammam City - KSA. IAC employee prepares for working in confined space (Manhole) Site engineer operates controls the UV BKP Berolina-Liner System, the CIPP-UV system curing system supplier of equipment, liners and training, had made CCTV inspection during cleaning process the structural calculation and liner design based on the www.aramoon.com information provided by IAC. general@aramoon.com 4 No-Dig World 2011 www.trenchlessmiddleeast.com www.trenchlessmiddleeast.com No-Dig World 2011 5
  • 5. exhibitor NEWS exhibitor NEWS Vermeer new technology IAC specialized Stop topography in the area, which included the gun barrel straight hole, a 490mm hole local Press contractor very hilly terrain, a stream, and existing opener was selected, which allowed for a wet well elevations raised many concerns. 20mm annulus. The cutter was built with The greatest challenge, however, wasn’t standard roller cone cutters, and the pipe At the time of going to press we have the topography. The line would be bored was installed successfully, averaging around learned that the ISTT (International through layered shale and limestone rock. 3m per hour. International Aramoon Corp. (IAC) is the Leak Detection and Repair for about 15,000Km successfully executed and ongoing projects Society for Trenchless Technology) A 343mm cutter was used for the pilot As the hole opener approached the softer pioneer and the first specialized local contractor of pipelines for various diameters and 550,000 for Sewer Networks are about (40,000m) are in the process of finalising the bore, and the AXIS system achieved an average rock, production increased and the last 85m in the Kingdom of Saudi Arabia with core House Connections in the various cities in including flow control diversion (i.e. By-Pass, affiliated agreement for a UAE Society production rate of 4.3m per hour. Though section was completed in under 8 hours. specialty in the field of No-Dig Pipe Inspection, Saudi Arabia. dewatering…etc), Hydro-Jet Cleaning, CCTV for Trenchless Technology. An official the pilot alone could have been considered Condition Assessment and Rehabilitation. IAC had developed locally “WATCH LEAK” Robotic Inspection, Pipelines Condition signing of the agreement will take place a challenge, the real test was yet to come. The CEO President of IAC, Eng. Faiz software, which is a Water Management Assessment, Pipelines Rehabilitation (MH-MH at Trenchless Middle East 2011. Further Rock bores had been completed for smaller Al-Elweet says (IAC) is an engineering contractor System to monitor and quantify leaks in Water Internal Lining). information about the Society will also pipe installations, but prior to this project, the which has been founded in Riyadh since 1990. Supply Networks. IAC introduces several Trenchless be available. A new technology is entering the guided pipe sizes and materials. system had not been used to upsize in rock. IAC is specialized in Water Leak Detection, The traditional water audit collects the Techniques and cost effective solutions for No- boring industry, primarily focused on gravity A recent project was the successful In order to install the HDPE with an OD of Test and Repair for Water and Sewer Networks data manually during a single historic time, Dig Pipes Rehabilitation such as Cured In Place sewer installations. The AXIS™ Guided installation of a 153m section of 450mm 470mm, a larger hole would need to be cut, without Excavation, by using Trenchless but “WATCHLEAK” collect real-time network Pipe System using Ultra Violet Rays (CIPP-UV) Boring System is capable of achieving HDPE pipe. The goal was to eliminate a while still maintaining the perfect line and Technology. information. This software is a GIS based web and Spiral Wounding System as well as Spot pinpoint line and grade accuracy in a variety pump station and convert the existing sewer grade achieved on the pilot shot. Head Office of IAC is in Riyadh and it has interface tool in order to help the Water Network Lining Technique for sectional repair of all types of ground conditions, and for many different from a forced main to gravity flow. The Requiring a minimum over-cut due to branch offices in Dammam/ Al-Khobar, Ahsa, Operation Maintenance staff to identify of host pipes. Tabuk, Madinah and Abha in KSA. District Meter Area (DMA) with higher water We have undertaken projects throughout usage and to react before developing a visible International Society Bursting with rope Saudi Arabia and since last five years we have executed ( progressing) projects for Water and costly failure. During the last five years, IAC has For Trenchless Technology ABS Trenchless has introduced tonnes, the 420 m section was reached in the rope bursting system – the only one drill string. Project Manager Marco world’s first large pipe bursting Wulff said “This is the first time that a 420 system with a rope as the pulling m section was burst in only one string.” mechanism and a pulling force of Trenchless techniques were chosen for more than 1,000 kN. this job as the site was close to a nature reserve and for the preservation of trees. In addition to this, due to the amount of water that was involved, it would have been impossible to do use the traditional open-cut method. Special tools were needed as the concrete pipes had curves and bends that are quite difficult to crack. The advantage to using a rope is that it can be redirected with a pulley and can burst more of the diameter. Only taking The rope bursting system (RBS), pipes. The single operator is able to control Roping in France two days to complete the bursting, the full from the ABS Trenchless GmbH company everything from a safe distance above the ABS Trenchless, with Entreprise de Travaux project was done in just one week. in Germany, uses an innovative clamping pulling unit, as the Burster is operated by Publics GIROUD GARANPON, Isére, France, technology in order to complete relining radio remote control – an important safety recently completed a project in Vorion, near jobs with long pulling distances exceeding feature to the machine. Grenoble, France with the RBS helping to 1,000 m. This is done in one run, using In addition to the safe handling, the new supply cleaner drinking water to the town. only one machine pit in certain soil rope pull technology makes the work much For this project the team used a RBS conditions. The RBS-Burster line is available easier for the operator as there is no need 1,200 machine to burst through two with pulling capacities between 40 and for rods to be removed. sections of water pipelines. The old pipes, 190 tonnes. Along with pipe bursting, the pulling which had an OD 250 mm for a 420 m With the use of return pulleys, this system can also be adapted for slip lining, section and an OD 200 mm for a 210 m technology also makes it possible to relining and swagelining jobs, making the section were replaced with new HDPE OD overdrive larger doglegs and bent old machine very versatile. 250 mm pipes. With a pulling force of 40 6 No-Dig World 2011 www.trenchlessmiddleeast.com www.trenchlessmiddleeast.com No-Dig World 2011 7
  • 6. exhibitor NEWS exhibitor NEWS ConShield Solutions Launch of the Goodeng HDD machine - GD 8000-LL China-Burma oil gas pipeline it was off the assembly line on 22nd channel has taken shape, which are the finished successfully. It was designed by For thirty years, ConShield has engineered PERMACAST® is our engineered mortar highly resistant to abrasion. This process also studs. All inlet and outlet pipe connections are Project, contracted by PetroChina of January and immediately loaded for northeast of China (China-Russia crude Zhongyuan Petroleum Explore Bureau solutions to reinforce, seal and protect existing liner system for manholes. Specially provides waterproofing, sealing, structural sealed directly to the inlet/outlet pipes so they Daqing Oilfield Construction Group. shipment to be sent to “China-Burma oil oil pipeline), Northwest (Central Asia Gas Projects Construction Main Company and underground structures for both storm water formulated ultra-high strength mortar is reinforcement and corrosion protection, www. cannot leak. gas pipeline project” worksite in Burma on Pipeline), Southwest Land (China-Burma oil constructed by Jiangsu Keyi Company using and sanitary environments; from manholes centrifugally cast from our patented robotic centripipe.com For severe corrosion, our COR+GARD® The launch ceremony of GD8000-LL HDD behalf of China Petroleum. and gas pipelines) and marine (sea lanes Goodeng Machine Model GD8000-LL. to catch basins, wet wells and lift stations as applicator. It guarantees a consistently dense PERMAFORM® is the system for complete 100% solids epoxy is spun on to form a Machine for China-Burma oil gas pipeline Except for the structural parts, the power, through the Malacca Strait). It diversifies The horizontal length of the project is well as CMP to RCP, because just one product and uniform liner at whatever thickness (1/2” replacement of old manholes without digging protective, composite barrier. In all cases, project was held in Goodeng machine’s hydraulic, electrical, the appliance control the oil transport channels and protects the 1887.52 meters and the real working length cannot effectively overcome every problem in to 2”) is best suited for the condition, depth, or disrupting flows. This process pours a each material is applied safely and uniformly production base – Jiangsu Goodeng are all imported from abroad. It uses split energy supply security in China. It is the is 1890.34 meters (The width of the Gan every system. diameter, traffic loading, and ground water seamless and structurally independent from above without entry into the manhole. Engineering Machinery Assembling Co., Ltd and double caterpillar. The maximum pull fourth energy import channel after the Sino- river is 1363.82 m, the width of sand and ConmicShield®, the liquid additive that pressure. The highest quality is guaranteed “manhole within a manhole” for the best long- The II Barrier® is the best solution we on Jan. 23rd , 2011. On this day, a colourful push force is 8100KN, the maximum torque Kazakhstan oil pipeline, the Central Asian riverbank is 526.52 m). The project pipe is prevents Microbiologically Induced Corrosion each and every time since application does term solution to serious manhole problems. have found for sealing the chimney when ball swayed to welcome every guest, and is 165000N.M, which was independently natural gas pipeline, oil pipeline between 508×10L415 diameter arc welding steel pipe. (MIC) in concrete sewer pipe and structures. It not depend upon a person working inside When biogenic or chemical corrosion is resetting frames and covers. COR+FLEX® gun salutes declared the beginning of the researched, developed, and manufactured China and Russia; it relieves China’s Which adopts strengthen three-coat PE is dosed directly into the concrete mix that can cramped and hazardous conditions. Our the problem, a plastic liner is embedded into works best when doing an internal chimney ceremony. by Goodeng machine. With advanced dependence on the Malacca Strait and anti-rotten. be used in shotcrete, precast and ready mix, formulations are high-strength, quick-setting the structurally independent concrete wall and seal without digging. Guests included the general manager of senses, excellent performance, top quality reduces the risk of importing crude oil at sea. The entry angle is 9°and out is 6°. for both new structures and can be used to and corrosion-resistant. www.permaform.net anchored securely with its interlocking tees or Daqing Oilfield Construction Group Pipeline service, the large-scale machine produced by The curvature radius is 762m (150 OD). rehab existing structures. ConmicShield®, has CentriPipeTM Centrifugally Cast Concrete Crossing Company, Mr. Guan Lizhi, Dafeng Goodeng machine has become the preferred Goodeng Machine Model GD8000- The project crosses the Jiangxi Gan river. proven performance since 1996 with several Pipe. is a cost-effective, NO DIG solution for people’s government mayor, Mr. Wang Hai, product for China National Petroleum LL Finishes the following project The geology of the river bed is very case studies from all over the country. structural lining of culverts using a spin caster Jiangsu Goodeng Engineering Machinery Corporation, China Petroleum Chemical successfully: Jiangxi Province Main complex because it contains a fault area, ConmicShield®, has a 100 year design and our specialty mortar, PL-8000. Assembling Co., Ltd general manager, Chen Corporation, and many other construction project.The first step of Jiangxi pebble stone area, gravel sand area and life and offers full thickness protection for The precisely placed and compacted Fenggang, and other management leaders. units. Province gas pipeline—Gan river HDD rough soft clay (including many stones). It is a fraction of the cost of plastic liners or concrete liner is applied at the best design GD8000-LL HDD Machine was appointed The strategic meaning of China-Burma Project obvious that the project is complicated as it is polymer coatings. For case studies technical thickness for the diameter and conditions. by China National Petroleum Corporation oil gas pipeline project : with the China- also difficult to control the angle and azimuth. information and specifications go to It contains rust inhibitors to prevent Daqing oilfield Construction Group. After the Burma oil gas pipeline project started, the On May 13th, 2011, the project in The HDD project is the biggest in scale, www.conshield.com corrosion of the old metal culvert and it is successful completion of commissioning, strategic pattern of four oil and gas import Fengcheng City Jiangxi province was longest in length, most complex. impreg, cured in place pipelining then 150 miles each year and distributing their products all over the world. Cured by Steam or latest UV – Technology the iMPREG Liners are the benchmark for being the strongest, most cost effective and most environmentally friendly products in the market. Made in Germany, the iMPREG Liner is manufactured fully quality controlled according DIN EN ISO 9001. Additionally the iMPREG Liner is certified by the DIBT (German Institute for construction techniques) and meets several industry standards. Compared to conventional felt liners the iMPREG GRP Liners show five times more strength, 100% water tightness and provide A pipe section can be rehabilitated in manufacture liners up to DIA 1600! minimum 50 years of Service. less then a day. An installation range of DIA Additionally to the liner manufacture Over the years ‘cured in place pipelining’ The iMPREG Liners come already pre- 150mm – DIA 1300mm and even more iMPREG provides training on side as well methods for sewer and drainage pipes impregnated with special resins and ready can be installed in maximum lengths up as on their own training course. With two becomes more and more a key role in the to use on the job side. Shelf lives up to six to 300 meters each. In middle of 2012 own lining equipments and a team of no-dig business. months and easy container shipment keeps iMPREG is planing to open the new part professionals iMPREG provides a world wide iMPREG is currently manufacturing more your construction flexible abroad. of the production plant and is than able to support. 8 No-Dig World 2011 www.trenchlessmiddleeast.com www.trenchlessmiddleeast.com No-Dig World 2011 9
  • 7. Company News Company News of traffic. Hydraulic intermediate jacking stations serve Project data to reduce the friction forces prevailing in such long- distance tunnelling projects. Herrenknecht had already Wastewater tunnel in Warsaw, Poland adapted these interjack stations exactly to the thin walls Geology: 70% coarse and fine sand, 30% clay and loam, of the Hobas GRP pipes installed in Warsaw. The longest gravel, boulders section revealed yet another particular feature: two Tunnel lengths: total of 5,860 m, 16 drives of 80 to 930 underground curves with a radius of 450m and 900m meters had to be realized. Thanks to the Herrenknecht SLS Particular features: high groundwater level, long-distance RV navigation system the cutterhead is guided exactly driving, curve drives with millimeter precision, the machine operators also mastered this task in a precise and safe manner. Machine data December 14, 2010 saw completion of the last section representing a significant milestone for this wastewater Herrenknecht M-1083M, AVND2000AB with Extension project in Warsaw. During the construction project, the Kit, excavation diameter 3,025mm Herrenknecht Herrenknecht equipment achieved impressive advance M-1363M, AVND2400AB, excavation diameter 3,025mm rates of up to 36 meters a day (double shift) and an average of 20 meters per day. Cutterhead: mixed-soil cutterheads fitted with disc To complete the entire sewer system and connect it cutters and cutting knives with “Czajka” wastewater treatment plant (WWTP), PRG Max. torque: 780kNm, 1,200kNm Metro Sp.z.o.o. and Hydrobudowa 9 S.A. are additionally realizing the 1,300m long Vistula River Crossing tunnel with Tunnel lining: Pipe Jacking a Herrenknecht large diameter tunnel boring machine. The Mixshield S-642 with a diameter of 5.35m was successfully accepted in February 2011 in the Schwanau/Germany plant of Herrenknecht. Once this tunnel is completed the Czajka WWTP could go into operation. n Warsaw: Major pipe jacking process successfully completed Clean water for the Vistula river The underground connection to the new “Czajka” banks of the Vistula over the long term. Hydrobudowa dewater and seal the requisite construction shafts prior wastewater treatment plant in Warsaw has been 9 S.A., PRG Metro Sp.z.o.o. and KWG (PBG Group) to tunnelling. The Herrenknecht AVND pipe jacking completed successfully and on time. Two Herrenknecht have been commissioned to connect the plant with the machines proved its worth during this tunnelling AVND micromachines handled the difficult drives with underground wastewater network. process. Where required, these machines secure the a total of 5,860 meters with bravura. Apart from pipe The Polish contractors selected the pipe jacking tunnel face using a support fluid (bentonite and water jacking with extraordinarily large diameters of 3 meters, method for their tunnel project and relied on the mixture) and an additional compressed air cushion in the extreme winter conditions and a high groundwater two AVND2000AB (with Extension Kit, Ø 3,025mm) the split excavation chamber, allowing safe tunnelling level demanded top performance by everyone involved. and AVND2400AB (Ø 3,025mm) hydroshields from under water pressure. The separation of solids of the With performances of up to 36 meters a day, the Herrenknecht. This type of machine is worldwide in excavated material from fluids was realized with the Herrenknecht machines blazed the trail for an efficient use in the construction of supply and disposal tunnels; Herrenknecht Separation Plant HSP500, providing a new wastewater system in the Polish capital fast and they master tunnelling through groundwater and can capacity of 400 to 500 m3/h depending on the particle efficiently. penetrate a wide range of heterogeneous soils. In size distribution. Warsaw, Poland / Schwanau, Germany, 6. April Warsaw, the machines tunnelled at depths of 10 to 14 During the particularly cold winter months of 2010, 2011. Wastewater systems in many large cities have meters reaching their final targets after boring through the site team continued tunnelling work despite some already reached their limits requiring modernization 5,860 meters of soil comprising coarse and fine sand, extremely low temperatures and a lengthy period of frost. or expansion in order to avoid overflowing into nearby clay, loam, gravel and boulders. The Herrenknecht micromachines completed a total rivers. For this reason, the city of Warsaw is investing Apart from the unusually large diameter of 3 meters of 16 drives, some with short distances starting at 80 in the construction of a state-of-the-art wastewater for the pipe jacking method, another challenge was meters, but also including long-distance sections of 800 treatment system. This will treat the wastewater represented by a high groundwater level which in meters and more. The longest individual drive was 930 produced by 80 percent of Warsaw’s inhabitants, some places reached up to 8 meters above the top meters. The hydroshields safely underpassed a six-lane thereby improving the quality of water and life along the of the pipes. The site teams were therefore obliged to highway without having any negative impact on the flow 10 10 No-Dig World 2011 Global Focus Middle East 2009 www.trenchlessmiddleeast.com
  • 8. Company News beton rohrbau highly customer-orientated beton rohrbau is one of the leading companies in civil of beton rohrbau have many years of experience in treatment plants and pumping stations, micro-tunnelling and construction engineering for the public sector. providing water and sewage services for the public sector and pipe jacking, the laying and sinking of pipes, caissons Throughout Germany and abroad, clients in the public and have been recruited from the regions where the and storm water clarification plants and as well as turnkey water and sewage sector provide beton rohrbau with a projects take place. With the most up-to-date and innovative civil engineering projects is one of the main reasons why it high level of confidence. With nationwide branches beton technology, the equipment and machinery of beton enjoys the confidence of its clients in the public sector. rohrbau is well equipped and highly customer-orientated. rohrbau satisfy all current requirements. The technical With a workforce of some 500 members of staff the Besides Germany projects are also executed through and commercial capabilities have made it a consistent beton rohrbau group meanwhile achieves an annual subsidiaries and holding companies in Bahrain, Bulgaria, partner for the public water and sewage sector in Germany turnover of around 100 mi. Euros. At its various regional Georgia, Kazakhstan, Mauritius, Nigeria, Romania, Russian and Abroad. The scope of beton rohrbau encompasses locations, beton rohrbau is one of the most efficient Federation, Turkey and the United Kingdom. The employees sewer pipes, portable water, pressurized pipes, sewage and productive companies. n 12 No-Dig World 2011 www.trenchlessmiddleeast.com
  • 9. Company News TT-Middle East/TT-UK, successes in Oman, Saudi Arabia and the UAE TT-Middle East/TT-UK have been offering their range of Trenchless Technology (NDRC) products throughout the Middle East for many years with notable successes in Oman, Saudi Arabia and the UAE. A 30” diameter x 110m long steel oil pipeline exchange project under a major highway between Damman and Riyadh was completed using a Grundoram Taurus. Grundodrill HDD working in Oman HDD drill rod rescue using Grundoram technology saved the company DCL significant financial implications such as the total cost of a lost drilled bore, contractual penalties, ongoing cost delays in commissioning the final pipelines and all associated costs involved in planning a new bore and the actual costs of duplicating all the undertakings of a new bore/installation, etc… Taurus Grundoram installing a 30” steel pipe under the Damman-Riyadh Highway Grundomat Soil Displacement Hammers and Grundodrill HDD rigs are now in daily use throughout the region laying fibre optic network systems; notable success has been achieved by Omani companies with Grundomats and a Grundodrill 15X. HDD Drill Rod Rescue using Grundoram Due to the success of the HDD Drill Rod Rescue above, DCL went on to purchase a Prime Drilling PD 250/90 HDD System. n Grundomat road crossing in Oman Prime Drilling PD 250/90 System 14 No-Dig World 2011 www.trenchlessmiddleeast.com
  • 10. Company News Save Water, Save Money … Innovative shaft sealing cleaned up before being disposed as waste water. technologies for tunnelling This means you have to pay for supply, cleaning and removing the sealing water every day of tunnelling. As pumps – no additional sealing alternative grease lubricated packing glands are used water required associated with reduced wear life of the gland and shaft sleeve. Though our Earth is made up of 2/3 water, only 1/100 Nevertheless a permanent greasing of the gland using of that water is drinkable. The rest is salt water or a grease pump is necessary as well as periodic on-site permanently frozen and we can’t drink it, wash with it, or refilling of the storage tank. use it to water plants. Water is a limited resource! Our experienced team of engineers and technicians Therefore, it is important that we use our water designed an innovative shaft sealing solution tailored to wisely and do not waste it. For future generations we the task. Our experience which we have gained in a large all must do our part to save water, particularly in industrial number of applications is included in the development application. and design of our own mechanical seal type HGD which Most of these efforts can be reached priceless and as is available in single- acting and double-acting designs. a benefit you can save money by saving water - In double acting design this seal is supplied with sealing using innovative shaft sealing technologies for your slurry water from an unpressurized storage tank. Continuous pumps. As a standard for slurry pumps in tunnelling external sealing water distribution is therefore not packing glands and expeller units combined with packing essential. In single acting design no additional sealing rings are installed as state of the art shaft sealing water is required while pump operation. technologies. Shaft seals of pumps which convey sludges For rough conditions in tunnelling we use application- and slurries containing solid particles require constant optimized materials for the sliding and counter rings. supply of sealing water in order to cool, lubricate and This ensures reliable operation in a large number of keep the seal clean. Furthermore a permanent dripping slurry pump applications in direct pipe, utility- and traffic- of sealing water is essential for a trouble free operation tunnelling today. of packing glands. While boring the tunnel a constant Save Water using innovative shaft sealing technologies sealing water supply to discharge and feed pumps must for tunnelling pumps. n be assured. After having been charged with particles it has to be See Arthur Habermann Gmbh Co. Kg on stand 53. 16 No-Dig World 2011 www.trenchlessmiddleeast.com
  • 11. Company News Company News also offer support as a competent partners in all technical and commercial issues. The technologies on offer from Fluvius include full lining systems for pipelines in diameters from 28 mm up to 800 mm using CIPP technology as well as lateral lining and lateral sealing systems that can negotiate bends up to 90o and diameter transitions in a single installation. Liners are also offered for localised repairs (‘patches’) where full length rehabilitation is not required in diameters from 100 mm up to 900 mm. In larger man-entry diameters Fluvius also offers a range of Kevlar/EPDM manually installed pipe joint seals. For manhole rehabilitation the company has cementitious grout lining options offering structural repair and saltwater resistance, as well as localised manhole leak sealing systems. Fluvius offers ‘patch’ repair localised lining systems Commenting on the event Sebastian Schmitz, Managing Director of Fluvius said: “Trenchless Middle East 2011 will give us another springboard into areas of the world that require the sort of technology we have on offer. Our technical Full length lining utilising an inversion drum installation technique team will be at the event offering current and any potential new clientelle guidance through the Fluvius range of systems.” n EUROPEAN REHABILITATION TECHNOLOGY GOES GLOBAL Fluvius GmbH of Germany, in association with its Eastern European partner Sanikom in Slovenia, sells products primarily for the trenchless repair of wastewater pipe systems with the product focus being mainly on full-length and localised repair up to a pipe diameter of 800 mm. The company’s range includes the full spectrum of consumables, such as resin systems, liners, fibreglass complexes, renovation packers and products for flow control and test technology as well as accessories, that are required for trenchless installations in wastewater systems, as well as specialist technical equipment that is designed either in-house to the highest quality standards or as products sourced from other renowned manufacturers. The various renovation methods offered carry a range of globally recognised industry approvals and certificates. Fluvius can provide clients with solution proposals and entire systems for the renovation and maintenance of defective wastewater pipes. With experienced employees that have been active in this Manhole rehabilitation systems are included in the Fluvius range. industry sector for many years, the company can 18 No-Dig World 2011 www.trenchlessmiddleeast.com www.trenchlessmiddleeast.com No-Dig World 2011 19
  • 12. Company News Company News Horizontal directional drilling technique for DN 900 pipes Horizontal directional drilling technique The horizontal directional drilling technique used for pipe-by-pipe pulling-in of DN 900 using ductile iron pipes ductile iron pipes in Belgium Pipes having the positive locking BLS®/VRS®-T Fig. 7, left : Opening leading into socket on push-in joint (Fig. 1), combined with a cement DN 600 to DN 1000 size BLS®/VRS®-T push-in Introduction mortar coating to EN 15542 [1] as an external joints Constantly spreading built-up areas, wide multi-lane protection able to withstand high mechanical Fig. 8, right : Insertion of locking segments roads or complicated routes are making it loads (Fig. 2), are available for the trenchless increasingly difficult and expensive to replace installation of ductile iron pipes by the horizontal existing pipeline systems, or lay new ones, by directional drilling (HDD) technique. Fig 3. Construction of the DN 900 BLS®/VRS®-T the open trench technique. This is why trenchless The BLS®/VRS®-T push-in joint is a restrained push-in joint with fixing clip for trenchless installation techniques have been under socket joint in which a welding bead is applied to pipeline installation development and in use for some 30 years now. the spigot end in the factory. A locking chamber Ductile iron pipes can be trenchlessly installed The continuing development of the machinery cast into the socket receives the locks or locking by the HDD technique both as a fully assembled used is going hand in hand with the modification segments which, once the spigot end has been pipe string and by pipe-by-pipe connection. The Fig 4. 1000 kN drilling rig of a pipe material with a great tradition, pushed into the socket, are inserted through possible length of pipeline which can be pulled in is namely ductile iron, and with changes in the openings in the end-face of the socket which determined by the permitted tractive force technology of making restrained joints between lead into the locking chamber. If axial tractive on the restrained push-in joint. Details can be Installation of a drinking water pipeline pipes of this material. A successful example of forces are exerted on the joint, either by the found in DVGW-Arbeitsblatt GW 321 [2] and using DN 900 ductile iron pipes such new joints is the positive locking BLS®/ internal pressure or by the use of the pipes for in the manual entitled “Trenchless Installation Pidpa is one of the largest Flemish water suppliers and Fig. 9: Pulling-in of the pipes; the push-in joint VRS®-T push-in joint. This joint is flexible and a trenchless pulling-in technique, the welding of Ductile Cast Iron Pipes” [3]. Because of supplies fresh drinking water to more than a million people. is protected by shrink-on material and a sheet- enables pipes to be laid to tight radiuses by an bead is supported against these locks or locking the results of externally monitored type tests The company distributes its drinking water by means metal cone slid over the top angular deflection at the sockets. The welding segments and in this way transmits a very high (internal pressure tests under product standard of a 12,581 km long pipeline network. The municipality bead, which is applied to the spigot end in the force (Fig. 3). EN 545 [4]), the values of permitted tractive of Grobbendonk (a small town with just over 10,000 damage from being done to the shrink-on sleeve in the bore factory, and the metallic locking segments, which force specified in the latter are in some cases inhabitants), is situated right next to the Albert Canal, an Fig. 5: Upsizing heads as the pipeline is subsequently being pulled in. are supported in the locking chamber cast into higher than those specified in DVGW-Arbeitsblatt artificial waterway 129.5 km long which connects the two the socket, enable very high longitudinal forces GW 321 [2] (Table 1). Belgian towns of Liège and Antwerp. The existing pipeline To sum up to be transmitted. needed to be relaid due to the construction of a new bridge. Ductile iron pipes with restrained BLS®/VRS®-T In part of the area, the new pipeline runs directly along push-in joints are very well suited to trenchless the Albert Canal. If open trenches had been used, the water installation and have already shown this to be the case on a would have had to be predrained from them, an expensive large number of completed projects. undertaking. This was avoided by the trenchless installation The possibility of particularly high forces being of ductile iron pipes by the horizontal directional drilling Fig. 6: Pipes being connected on a connecting transmitted from pipe to pipe allows economical and cost- technique with the pipes pulled in pipe-by-pipe. ramp saving installation and enables very long runs of pipe to be It was possible to make use in this case of the experience pulled in when using trenchless installation techniques. n gained on a project involving DN 600 nominal size pipes DN 900 BLS®/VRS®-T push-in joint are inserted, once the Fig 1. The BLS®/VRS®-T push-in joint which was completed in 2008 in the town of Ghent [5], also spigot end of the pipe has been inserted in the next socket, Project data in Belgium. in the locking chamber (Fig. 8) through the opening leading • HDD installation of individually connected A 1000 kN drilling rig (Fig. 4) was used for the drilling into the socket (Fig. 7) and are distributed around the • DN 900 BLS® pipes and the subsequent pulling-in of the ductile iron pipes. The circumference of the pipe alternately to the left and the right. • Pipe external protection: cement mortar pilot bore having been made, it was widened step by step by In a trenchless installation technique, the segments are • coating to EN 15542 [1] special upsizing heads (Fig. 5). The pipes were connected then secured with a steel fixing clip. • Length of pipeline: 342 m on one by one on a special connecting ramp. The first pipe This ensures that the locking segments are at all • Drilling rig: 1,000 kN was connected (Fig. 6) to the traction string and the barrel times firmly in abutment as the pipe is pulled in. • Permitted tractive force for DN 900 BLS® reamer by means of a BLS®/VRS®-T traction head with Once the locking segments have been inserted, the • pipes: 1,845 kN built-in force-measuring equipment. socket joints are protected by a shrink-on sleeve. The sheet- • Max. tractive force which occurred: 500 kN To make the connection, the segments for locking the metal cone (Fig. 9) which is slid on prevents any possible See Duktus Pipe Systems Fzco on stand 13. References Fig 2. The cement mortar coating to EN 15542 [1] EN 15542, Ductile iron pipes, fittings and accessories - External cement mortar coating for pipes – requirements and test methods 2008 [2] DVGW-Arbeitsblatt GW 321, Horizontal directional drilling for gas and water pipelines – requirements, quality assurance and testing 2003-10 [3] Buderus Manual - Trenchless Installation of Ductile Cast Iron Pipes 2009-07 [4] EN 545, Ductile iron pipes, fittings, accessories and their joints for water pipelines - requirements and test methods 2006 [5] Ertelt, S.: Einzelrohreinzug ductiler Gussrohre beim HDD-Verfahren – Fortsetzung einer Erfolgsgeschichte [Pipe-by-pipe pulling-in of ductile iron pipes by the HDD technique – a continuing success story] GUSSROHR-TECHNIK 43 (2009), p. 72 ff 20 No-Dig World 2011 www.trenchlessmiddleeast.com