What Does a LIMS Really Cost?
Thu, 10/21/2010 - 11:52am
Siri H. Segalstad
What Does a LIMS Really Cost?
It is critical to consider the complete picture
An Internet discussion group on LIMS has two topics that frequently give very heated
discussions. One of them is regarding who is best-suited to be the LIMS project
manager/system manager: an IT or a laboratory person. The other is whether we should
build or buy a new LIMS — let’s examine this question in more detail…
Build it yourself
Advocates for building a new LIMS usually state that their lab is so unique they cannot use a
commercial LIMS. However, very few are truly unique — it is actually their products that are
unique. Labs, in general, work the same way:
They obtain a sample from somewhere. The sample may be external or internal. The
latter includes, for example, raw material, R&D, production or study. This sample then
may be split into several samples to be analyzed.
Analyses are done in various labs based on sites, laboratory type, or projects /
products. Analytical methods may be manual or instrumental, and the manual ones
may include what the sample looks or smells like. The instrumental methods may be
virtually everything else that uses one or more instruments to obtain results.
The result is often compared to specifications to see that the sample conforms. A
manager approves or authorizes the results before the results are reported, often on a
Certificate of Analysis (CoA).
In reality, the only things that are unique are that every lab has their own
types of samples
set of instruments, analytical methods and specifications.
Time and flexibility
Advocates of homemade LIMS also say that they can build a LIMS in a few months in an
Oracle, Access or SQL database. Of course, this will be completely tailored to their needs
and will be much cheaper than a commercial system. Let’s discuss these statements:
It may be possible to build LIMS in a few months. However, this requires that there is a
very, very good user requirements specification that covers everything the lab ever does —
and will do in the future. Few are able to write such a specification, especially to include how
they will work in the future. So, risks are very high that a home-made LIMS will not be
flexible enough to allow for future changes.
There is a good chance that programming a build-it-yourself LIMS actually will take a lot
longer than a few months. By then, the users will likely have found many more things that
should be included in the system, and these requirements will be added. We get what is
generally called scope creep, and the result is inevitably that the project takes longer than
anticipated. Bear in mind that a commercial LIMS includes several decenniums, or even
centennials, of man-working days in its planning, programming and testing.
If a programmer is brought in to build the LIMS, he will probably not know enough about
laboratories to even ask the right questions when he is in doubt. On the other hand, if using
a laboratory person, he will probably not know enough about programming to do a good
job. And, unless either of these is very skilled in quality assurance, chances are that they
will program without creating enough documentation, such as requirements specification,
other specifications and plans, test plans, testing, reports, etcetera.
In any case, the lab would definitely have GAMP1 Category 5 software. This means
extensive validation, which will cost a lot more than a purchased Category 4 system, A
homemade system will be frowned upon and scrutinized by the U.S. Food & Drug
Administration (FDA) and European authorities — and probably not pass the inspection.
Back to square one.
Very few companies build in-house systems these days. However, some old systems, also
called bespoke systems, are still in use. Regulators for e.g. the pharmaceutical industry
scrutinize these systems, and find everything wrong with them. The question is whether the
company is a pharmaceutical company or a software developer. Some companies have
received severe ‘Warning Letters’ from the FDA2 for their innovative programming and lack
of system maintenance.
So you see, it simply does not make sense to create your own LIMS. Even if your IT people
would love to create it for you in only a few months, don’t believe them. History has shown
that, regardless of the amount of time spent programming an in-house system, it is never
as good and as flexible as buying a commercial LIMS. In addition, in-house projects are
very likely to suffer delays, and will invariably be more expensive than expected. It is better
to spend your money on a commercial system and get what you need, instead of spending
on a programmer from whom, if you are lucky, you will get some of the functionality you
need, but not the flexibility, and at a much later time than expected. Chances are that,
when you finally get the homegrown system, your needs will have changed, too, and the
system is no longer what you want.
For all of the reasons cited above, I recommend that you kill the build-it-yourself thought
immediately. You are not going to get a 100-percent system even if you build it yourself.
So, you may just as well make do with a 90- to 95-percent system purchased from a
commercial supplier.
Assessing cost
It is difficult to calculate if a LIMS is cheaper than a paper-based lab. This is a cumbersome
assessment that needs to be done in each case where cost is the main consideration for
implementing LIMS.
Daily use without LIMS includes how much time is spent on
writing (and often also finding) the lab notebooks and logbooks
performing calculations
writing results on results documents
controlling results and other items
transferring the data from one medium to the other
the Certificate of Analysis
Daily use with LIMS will definitely reduce labor time for these items. However, in order to
get a workable LIMS system, a lot of time has to be spent implementing the static data, also
called template data, into the LIMS. A LIMS is bought without any static data, and even the
smallest measure unit has to be entered. It is possible to calculate the time spent on
implementation, and the chosen supplier can definitely help using his experience.
Implementation time depends on the number of instruments, products, laboratories,
etcetera, that shall be implemented.
Initial costs = C+I, where:
C = Cost for purchase of system, including supplier’s implementation time
I = Internal training time, and implementation and validation time cost for the system itself
and for all items to be implemented in LIMS. These are the implementation expenses until
the system is taken into use. Any changes after the implementation phase will be included
in the system maintenance.
Annual cost/benefit = M+L+Tn–To, where:
M = Maintenance cost per year for changes, qualification/validation, error handling,
backups, helpdesk
L = License for the LIMS system, typically calculated as percentage of initial cost per year.
Depends on number of concurrent users.
Tn = Cost of time spent using new LIMS
To = Cost of time spent using old paper-based system.
Tn and To can be calculated from an average batch type (or per time if a continuous process
is used, e.g. oil refinery), and multiplied by the number of batches (or time units) per year.
It would be simple if this was the whole story, but it is not. A LIMS will generally add quality
to the products, by flagging problems, forcing people to do things in correct sequence and in
the correct way. The cost of discarded products, recalled products, etcetera, is possible to
measure if the numbers exist. However, it is more difficult to assess the value of loss of
possible reputation due to bad quality.
The purchase price and license are the only items with real price tags, and that is often
what the boss wants to know. You usually pay for each hour the supplier spends meeting
with you after the sales phase, but you also may have many of your own people in that
meeting, usually at a much higher cost. Another problem is that implementation of LIMS
usually includes changes in work procedures, responsibilities, and a lot of other things. This
may influence both the old and the new ways of working, as well as the quality of the result.
Finally, it is important to bear in mind that, in heavily regulated industries like
pharmaceuticals, the quality is more important than the actual monetary return on
investment (ROI).
In securing funding for a LIMS, you can try a couple of tactics:
Can our company live without a LIMS? We certainly could not live without accounting
software.
Find a larger project, like enterprise resource planning (ERP) or material resource
planning (MRP), and get LIMS attached to it. The LIMS budget will be tiny compared
to the larger project. In other words, make LIMS a part of a larger project. These
systems communicate well, and LIMS adds information that an ERP / MRP system is
not able to handle in a good way.
Conclusion
The price of LIMS actually is a lot higher than the stated prices for purchase,
implementation costs and annual license costs. The monetary return of interest can be
calculated, and may or may not be positive. However, the real benefit of LIMS is difficult to
calculate: the added quality to the products.
References
1. GAMP 5 Good Automated Manufacturing Practice (GAMP) Guide for ARisk-Based Approach
to Compliant GxP Computerized Systems, February 2008, International Society for
Pharmaceutical Engineering (ISPE), Fifth Edition, ISBN 1-931879-61-3, www.ispe.org.
2. See www.fda.gov for warning letters.
Note: This article is based on the book International IT Regulations and Compliance, by Siri
H. Segalstad. Wiley 2008, ISBN 978-0-470-75882-3.
SiriSegalstad is Principal, Segalstad Consulting AS. She may be reached
at editor@ScientificComputing.com

Más contenido relacionado

Similar a What does a lims really cost

Whitepaper: How to perform better test on SAP PI/PO
Whitepaper: How to perform better test on SAP PI/POWhitepaper: How to perform better test on SAP PI/PO
Whitepaper: How to perform better test on SAP PI/PODaniel Graversen
 
QSM Executive Primer Estimation and demand Management
QSM Executive Primer Estimation and demand ManagementQSM Executive Primer Estimation and demand Management
QSM Executive Primer Estimation and demand ManagementTaylor Putnam-Majarian
 
QSM Executive Primer final version
QSM Executive Primer final versionQSM Executive Primer final version
QSM Executive Primer final versionDoug Putnam
 
Agile ERP_ Continuous Improvements Through Rapid, Incremental Implementations...
Agile ERP_ Continuous Improvements Through Rapid, Incremental Implementations...Agile ERP_ Continuous Improvements Through Rapid, Incremental Implementations...
Agile ERP_ Continuous Improvements Through Rapid, Incremental Implementations...Steven Parker
 
Towards preventing software from becoming legacy a road map
Towards preventing software from becoming legacy a road mapTowards preventing software from becoming legacy a road map
Towards preventing software from becoming legacy a road mapIAEME Publication
 
Rules in Artificial Intelligence
Rules in Artificial IntelligenceRules in Artificial Intelligence
Rules in Artificial IntelligencePierre Feillet
 
Test Data Management: The Underestimated Pain
Test Data Management: The Underestimated PainTest Data Management: The Underestimated Pain
Test Data Management: The Underestimated PainChelsea Frischknecht
 
Whitepaper:Barriers to Effective and Strategic SPM Compensation
Whitepaper:Barriers to Effective and Strategic SPM CompensationWhitepaper:Barriers to Effective and Strategic SPM Compensation
Whitepaper:Barriers to Effective and Strategic SPM CompensationIconixx
 
Taking A Look At The Platinum Concepts Pty. Ltd.
Taking A Look At The Platinum Concepts Pty. Ltd.Taking A Look At The Platinum Concepts Pty. Ltd.
Taking A Look At The Platinum Concepts Pty. Ltd.Gina Alfaro
 
The DevOps promise: IT delivery that’s hot-off-the-catwalk and made-to-last
The DevOps promise:  IT delivery that’s hot-off-the-catwalk and made-to-lastThe DevOps promise:  IT delivery that’s hot-off-the-catwalk and made-to-last
The DevOps promise: IT delivery that’s hot-off-the-catwalk and made-to-lastPeter Shirley-Quirk
 
Netreo whitepaper 5 ways to avoid it management becoming shelfware
Netreo whitepaper   5 ways to avoid it management becoming shelfwareNetreo whitepaper   5 ways to avoid it management becoming shelfware
Netreo whitepaper 5 ways to avoid it management becoming shelfwarePeter Reynolds
 
7 steps to choosing the right erp for a small manufacturing business
7 steps to choosing the right erp for a small manufacturing business7 steps to choosing the right erp for a small manufacturing business
7 steps to choosing the right erp for a small manufacturing businessMRPeasy
 
Meeting the challenges to adopt visual production management systems hms-whit...
Meeting the challenges to adopt visual production management systems hms-whit...Meeting the challenges to adopt visual production management systems hms-whit...
Meeting the challenges to adopt visual production management systems hms-whit...Ariel Lerer
 
DESIGN DOCUMENTAnalyticsAnalytics is that the discovery a.docx
DESIGN DOCUMENTAnalyticsAnalytics is that the discovery a.docxDESIGN DOCUMENTAnalyticsAnalytics is that the discovery a.docx
DESIGN DOCUMENTAnalyticsAnalytics is that the discovery a.docxtheodorelove43763
 
Understanding True CRM Costs before Implementing an Enterprise Solution
Understanding True CRM Costs before Implementing an Enterprise SolutionUnderstanding True CRM Costs before Implementing an Enterprise Solution
Understanding True CRM Costs before Implementing an Enterprise Solutionwilliamsjohnseoexperts
 
Blue Prism_White Paper_ Technical Kickstarter
Blue Prism_White Paper_ Technical KickstarterBlue Prism_White Paper_ Technical Kickstarter
Blue Prism_White Paper_ Technical KickstarterKeith Bowman
 
Building Reliability - The Realities of Observability
Building Reliability - The Realities of ObservabilityBuilding Reliability - The Realities of Observability
Building Reliability - The Realities of ObservabilityAll Things Open
 
7 signs that show you need to start using an mrp system
7 signs that show you need to start using an mrp system7 signs that show you need to start using an mrp system
7 signs that show you need to start using an mrp systemMRPeasy
 
Success with on line CRM
Success with on line CRMSuccess with on line CRM
Success with on line CRMJames Bogue
 
Scheduling Survival Guide
Scheduling Survival Guide Scheduling Survival Guide
Scheduling Survival Guide HelpSystems
 

Similar a What does a lims really cost (20)

Whitepaper: How to perform better test on SAP PI/PO
Whitepaper: How to perform better test on SAP PI/POWhitepaper: How to perform better test on SAP PI/PO
Whitepaper: How to perform better test on SAP PI/PO
 
QSM Executive Primer Estimation and demand Management
QSM Executive Primer Estimation and demand ManagementQSM Executive Primer Estimation and demand Management
QSM Executive Primer Estimation and demand Management
 
QSM Executive Primer final version
QSM Executive Primer final versionQSM Executive Primer final version
QSM Executive Primer final version
 
Agile ERP_ Continuous Improvements Through Rapid, Incremental Implementations...
Agile ERP_ Continuous Improvements Through Rapid, Incremental Implementations...Agile ERP_ Continuous Improvements Through Rapid, Incremental Implementations...
Agile ERP_ Continuous Improvements Through Rapid, Incremental Implementations...
 
Towards preventing software from becoming legacy a road map
Towards preventing software from becoming legacy a road mapTowards preventing software from becoming legacy a road map
Towards preventing software from becoming legacy a road map
 
Rules in Artificial Intelligence
Rules in Artificial IntelligenceRules in Artificial Intelligence
Rules in Artificial Intelligence
 
Test Data Management: The Underestimated Pain
Test Data Management: The Underestimated PainTest Data Management: The Underestimated Pain
Test Data Management: The Underestimated Pain
 
Whitepaper:Barriers to Effective and Strategic SPM Compensation
Whitepaper:Barriers to Effective and Strategic SPM CompensationWhitepaper:Barriers to Effective and Strategic SPM Compensation
Whitepaper:Barriers to Effective and Strategic SPM Compensation
 
Taking A Look At The Platinum Concepts Pty. Ltd.
Taking A Look At The Platinum Concepts Pty. Ltd.Taking A Look At The Platinum Concepts Pty. Ltd.
Taking A Look At The Platinum Concepts Pty. Ltd.
 
The DevOps promise: IT delivery that’s hot-off-the-catwalk and made-to-last
The DevOps promise:  IT delivery that’s hot-off-the-catwalk and made-to-lastThe DevOps promise:  IT delivery that’s hot-off-the-catwalk and made-to-last
The DevOps promise: IT delivery that’s hot-off-the-catwalk and made-to-last
 
Netreo whitepaper 5 ways to avoid it management becoming shelfware
Netreo whitepaper   5 ways to avoid it management becoming shelfwareNetreo whitepaper   5 ways to avoid it management becoming shelfware
Netreo whitepaper 5 ways to avoid it management becoming shelfware
 
7 steps to choosing the right erp for a small manufacturing business
7 steps to choosing the right erp for a small manufacturing business7 steps to choosing the right erp for a small manufacturing business
7 steps to choosing the right erp for a small manufacturing business
 
Meeting the challenges to adopt visual production management systems hms-whit...
Meeting the challenges to adopt visual production management systems hms-whit...Meeting the challenges to adopt visual production management systems hms-whit...
Meeting the challenges to adopt visual production management systems hms-whit...
 
DESIGN DOCUMENTAnalyticsAnalytics is that the discovery a.docx
DESIGN DOCUMENTAnalyticsAnalytics is that the discovery a.docxDESIGN DOCUMENTAnalyticsAnalytics is that the discovery a.docx
DESIGN DOCUMENTAnalyticsAnalytics is that the discovery a.docx
 
Understanding True CRM Costs before Implementing an Enterprise Solution
Understanding True CRM Costs before Implementing an Enterprise SolutionUnderstanding True CRM Costs before Implementing an Enterprise Solution
Understanding True CRM Costs before Implementing an Enterprise Solution
 
Blue Prism_White Paper_ Technical Kickstarter
Blue Prism_White Paper_ Technical KickstarterBlue Prism_White Paper_ Technical Kickstarter
Blue Prism_White Paper_ Technical Kickstarter
 
Building Reliability - The Realities of Observability
Building Reliability - The Realities of ObservabilityBuilding Reliability - The Realities of Observability
Building Reliability - The Realities of Observability
 
7 signs that show you need to start using an mrp system
7 signs that show you need to start using an mrp system7 signs that show you need to start using an mrp system
7 signs that show you need to start using an mrp system
 
Success with on line CRM
Success with on line CRMSuccess with on line CRM
Success with on line CRM
 
Scheduling Survival Guide
Scheduling Survival Guide Scheduling Survival Guide
Scheduling Survival Guide
 

Más de National Institute of Biologics

Defining your-target-product-profile in-vitro-diagnostic-products
Defining your-target-product-profile in-vitro-diagnostic-productsDefining your-target-product-profile in-vitro-diagnostic-products
Defining your-target-product-profile in-vitro-diagnostic-productsNational Institute of Biologics
 
Accelerating development and approval of targeted cancer therapies
Accelerating development and approval of targeted cancer therapiesAccelerating development and approval of targeted cancer therapies
Accelerating development and approval of targeted cancer therapiesNational Institute of Biologics
 
Canonical structures for the hypervariable regions of immunoglobulins
Canonical structures for the hypervariable regions of immunoglobulinsCanonical structures for the hypervariable regions of immunoglobulins
Canonical structures for the hypervariable regions of immunoglobulinsNational Institute of Biologics
 
Development trends for human monoclonal antibody therapeutics
Development trends for human monoclonal antibody therapeuticsDevelopment trends for human monoclonal antibody therapeutics
Development trends for human monoclonal antibody therapeuticsNational Institute of Biologics
 
Therapeutic fc fusion proteins and peptides as successful alternatives to ant...
Therapeutic fc fusion proteins and peptides as successful alternatives to ant...Therapeutic fc fusion proteins and peptides as successful alternatives to ant...
Therapeutic fc fusion proteins and peptides as successful alternatives to ant...National Institute of Biologics
 
Fc fusion proteins and fc rn - structural insights for longer-lasting and mor...
Fc fusion proteins and fc rn - structural insights for longer-lasting and mor...Fc fusion proteins and fc rn - structural insights for longer-lasting and mor...
Fc fusion proteins and fc rn - structural insights for longer-lasting and mor...National Institute of Biologics
 
Therapeutic antibodies for autoimmunity and inflammation
Therapeutic antibodies for autoimmunity and inflammationTherapeutic antibodies for autoimmunity and inflammation
Therapeutic antibodies for autoimmunity and inflammationNational Institute of Biologics
 
Introduction to current and future protein therapeutics - a protein engineeri...
Introduction to current and future protein therapeutics - a protein engineeri...Introduction to current and future protein therapeutics - a protein engineeri...
Introduction to current and future protein therapeutics - a protein engineeri...National Institute of Biologics
 
Pharmaceutical monoclonal antibodies production - guidelines to cell engine...
Pharmaceutical monoclonal antibodies   production - guidelines to cell engine...Pharmaceutical monoclonal antibodies   production - guidelines to cell engine...
Pharmaceutical monoclonal antibodies production - guidelines to cell engine...National Institute of Biologics
 
Intended use of reference products & who international standards or reference...
Intended use of reference products & who international standards or reference...Intended use of reference products & who international standards or reference...
Intended use of reference products & who international standards or reference...National Institute of Biologics
 
Evaluation of similar biotherapeutic products (SBP's) scientific principles ...
Evaluation of similar biotherapeutic products (SBP's)   scientific principles ...Evaluation of similar biotherapeutic products (SBP's)   scientific principles ...
Evaluation of similar biotherapeutic products (SBP's) scientific principles ...National Institute of Biologics
 

Más de National Institute of Biologics (20)

Waters protein therapeutics application proctocols
Waters protein therapeutics application proctocolsWaters protein therapeutics application proctocols
Waters protein therapeutics application proctocols
 
Potential aggregation prone regions in biotherapeutics
Potential aggregation prone regions in biotherapeuticsPotential aggregation prone regions in biotherapeutics
Potential aggregation prone regions in biotherapeutics
 
How the biologics landscape is evolving
How the biologics landscape is evolvingHow the biologics landscape is evolving
How the biologics landscape is evolving
 
Evaluation of antibody drugs quality safety
Evaluation of antibody drugs quality safetyEvaluation of antibody drugs quality safety
Evaluation of antibody drugs quality safety
 
Approved m abs_feb_2015
Approved m abs_feb_2015Approved m abs_feb_2015
Approved m abs_feb_2015
 
Translating next generation sequencing to practice
Translating next generation sequencing to practiceTranslating next generation sequencing to practice
Translating next generation sequencing to practice
 
From biomarkers to diagnostics –the road to success
From biomarkers to diagnostics –the road to successFrom biomarkers to diagnostics –the road to success
From biomarkers to diagnostics –the road to success
 
Defining your-target-product-profile in-vitro-diagnostic-products
Defining your-target-product-profile in-vitro-diagnostic-productsDefining your-target-product-profile in-vitro-diagnostic-products
Defining your-target-product-profile in-vitro-diagnostic-products
 
Accelerating development and approval of targeted cancer therapies
Accelerating development and approval of targeted cancer therapiesAccelerating development and approval of targeted cancer therapies
Accelerating development and approval of targeted cancer therapies
 
Canonical structures for the hypervariable regions of immunoglobulins
Canonical structures for the hypervariable regions of immunoglobulinsCanonical structures for the hypervariable regions of immunoglobulins
Canonical structures for the hypervariable regions of immunoglobulins
 
Canonical correlation
Canonical correlationCanonical correlation
Canonical correlation
 
Development trends for human monoclonal antibody therapeutics
Development trends for human monoclonal antibody therapeuticsDevelopment trends for human monoclonal antibody therapeutics
Development trends for human monoclonal antibody therapeutics
 
Therapeutic fc fusion proteins and peptides as successful alternatives to ant...
Therapeutic fc fusion proteins and peptides as successful alternatives to ant...Therapeutic fc fusion proteins and peptides as successful alternatives to ant...
Therapeutic fc fusion proteins and peptides as successful alternatives to ant...
 
Fc fusion proteins and fc rn - structural insights for longer-lasting and mor...
Fc fusion proteins and fc rn - structural insights for longer-lasting and mor...Fc fusion proteins and fc rn - structural insights for longer-lasting and mor...
Fc fusion proteins and fc rn - structural insights for longer-lasting and mor...
 
Therapeutic antibodies for autoimmunity and inflammation
Therapeutic antibodies for autoimmunity and inflammationTherapeutic antibodies for autoimmunity and inflammation
Therapeutic antibodies for autoimmunity and inflammation
 
Introduction to current and future protein therapeutics - a protein engineeri...
Introduction to current and future protein therapeutics - a protein engineeri...Introduction to current and future protein therapeutics - a protein engineeri...
Introduction to current and future protein therapeutics - a protein engineeri...
 
Pharmaceutical monoclonal antibodies production - guidelines to cell engine...
Pharmaceutical monoclonal antibodies   production - guidelines to cell engine...Pharmaceutical monoclonal antibodies   production - guidelines to cell engine...
Pharmaceutical monoclonal antibodies production - guidelines to cell engine...
 
Intended use of reference products & who international standards or reference...
Intended use of reference products & who international standards or reference...Intended use of reference products & who international standards or reference...
Intended use of reference products & who international standards or reference...
 
How dissimilarly similar are biosimilars
How dissimilarly similar are biosimilarsHow dissimilarly similar are biosimilars
How dissimilarly similar are biosimilars
 
Evaluation of similar biotherapeutic products (SBP's) scientific principles ...
Evaluation of similar biotherapeutic products (SBP's)   scientific principles ...Evaluation of similar biotherapeutic products (SBP's)   scientific principles ...
Evaluation of similar biotherapeutic products (SBP's) scientific principles ...
 

Último

How to Add a New Field in Existing Kanban View in Odoo 17
How to Add a New Field in Existing Kanban View in Odoo 17How to Add a New Field in Existing Kanban View in Odoo 17
How to Add a New Field in Existing Kanban View in Odoo 17Celine George
 
How to Make a Field read-only in Odoo 17
How to Make a Field read-only in Odoo 17How to Make a Field read-only in Odoo 17
How to Make a Field read-only in Odoo 17Celine George
 
What is the Future of QuickBooks DeskTop?
What is the Future of QuickBooks DeskTop?What is the Future of QuickBooks DeskTop?
What is the Future of QuickBooks DeskTop?TechSoup
 
Presentation on the Basics of Writing. Writing a Paragraph
Presentation on the Basics of Writing. Writing a ParagraphPresentation on the Basics of Writing. Writing a Paragraph
Presentation on the Basics of Writing. Writing a ParagraphNetziValdelomar1
 
Philosophy of Education and Educational Philosophy
Philosophy of Education  and Educational PhilosophyPhilosophy of Education  and Educational Philosophy
Philosophy of Education and Educational PhilosophyShuvankar Madhu
 
5 charts on South Africa as a source country for international student recrui...
5 charts on South Africa as a source country for international student recrui...5 charts on South Africa as a source country for international student recrui...
5 charts on South Africa as a source country for international student recrui...CaraSkikne1
 
HED Office Sohayok Exam Question Solution 2023.pdf
HED Office Sohayok Exam Question Solution 2023.pdfHED Office Sohayok Exam Question Solution 2023.pdf
HED Office Sohayok Exam Question Solution 2023.pdfMohonDas
 
Patient Counselling. Definition of patient counseling; steps involved in pati...
Patient Counselling. Definition of patient counseling; steps involved in pati...Patient Counselling. Definition of patient counseling; steps involved in pati...
Patient Counselling. Definition of patient counseling; steps involved in pati...raviapr7
 
Human-AI Co-Creation of Worked Examples for Programming Classes
Human-AI Co-Creation of Worked Examples for Programming ClassesHuman-AI Co-Creation of Worked Examples for Programming Classes
Human-AI Co-Creation of Worked Examples for Programming ClassesMohammad Hassany
 
P4C x ELT = P4ELT: Its Theoretical Background (Kanazawa, 2024 March).pdf
P4C x ELT = P4ELT: Its Theoretical Background (Kanazawa, 2024 March).pdfP4C x ELT = P4ELT: Its Theoretical Background (Kanazawa, 2024 March).pdf
P4C x ELT = P4ELT: Its Theoretical Background (Kanazawa, 2024 March).pdfYu Kanazawa / Osaka University
 
CHUYÊN ĐỀ DẠY THÊM TIẾNG ANH LỚP 11 - GLOBAL SUCCESS - NĂM HỌC 2023-2024 - HK...
CHUYÊN ĐỀ DẠY THÊM TIẾNG ANH LỚP 11 - GLOBAL SUCCESS - NĂM HỌC 2023-2024 - HK...CHUYÊN ĐỀ DẠY THÊM TIẾNG ANH LỚP 11 - GLOBAL SUCCESS - NĂM HỌC 2023-2024 - HK...
CHUYÊN ĐỀ DẠY THÊM TIẾNG ANH LỚP 11 - GLOBAL SUCCESS - NĂM HỌC 2023-2024 - HK...Nguyen Thanh Tu Collection
 
PISA-VET launch_El Iza Mohamedou_19 March 2024.pptx
PISA-VET launch_El Iza Mohamedou_19 March 2024.pptxPISA-VET launch_El Iza Mohamedou_19 March 2024.pptx
PISA-VET launch_El Iza Mohamedou_19 March 2024.pptxEduSkills OECD
 
Maximizing Impact_ Nonprofit Website Planning, Budgeting, and Design.pdf
Maximizing Impact_ Nonprofit Website Planning, Budgeting, and Design.pdfMaximizing Impact_ Nonprofit Website Planning, Budgeting, and Design.pdf
Maximizing Impact_ Nonprofit Website Planning, Budgeting, and Design.pdfTechSoup
 
Education and training program in the hospital APR.pptx
Education and training program in the hospital APR.pptxEducation and training program in the hospital APR.pptx
Education and training program in the hospital APR.pptxraviapr7
 
Ultra structure and life cycle of Plasmodium.pptx
Ultra structure and life cycle of Plasmodium.pptxUltra structure and life cycle of Plasmodium.pptx
Ultra structure and life cycle of Plasmodium.pptxDr. Asif Anas
 
UKCGE Parental Leave Discussion March 2024
UKCGE Parental Leave Discussion March 2024UKCGE Parental Leave Discussion March 2024
UKCGE Parental Leave Discussion March 2024UKCGE
 
Benefits & Challenges of Inclusive Education
Benefits & Challenges of Inclusive EducationBenefits & Challenges of Inclusive Education
Benefits & Challenges of Inclusive EducationMJDuyan
 
Easter in the USA presentation by Chloe.
Easter in the USA presentation by Chloe.Easter in the USA presentation by Chloe.
Easter in the USA presentation by Chloe.EnglishCEIPdeSigeiro
 
In - Vivo and In - Vitro Correlation.pptx
In - Vivo and In - Vitro Correlation.pptxIn - Vivo and In - Vitro Correlation.pptx
In - Vivo and In - Vitro Correlation.pptxAditiChauhan701637
 
Prescribed medication order and communication skills.pptx
Prescribed medication order and communication skills.pptxPrescribed medication order and communication skills.pptx
Prescribed medication order and communication skills.pptxraviapr7
 

Último (20)

How to Add a New Field in Existing Kanban View in Odoo 17
How to Add a New Field in Existing Kanban View in Odoo 17How to Add a New Field in Existing Kanban View in Odoo 17
How to Add a New Field in Existing Kanban View in Odoo 17
 
How to Make a Field read-only in Odoo 17
How to Make a Field read-only in Odoo 17How to Make a Field read-only in Odoo 17
How to Make a Field read-only in Odoo 17
 
What is the Future of QuickBooks DeskTop?
What is the Future of QuickBooks DeskTop?What is the Future of QuickBooks DeskTop?
What is the Future of QuickBooks DeskTop?
 
Presentation on the Basics of Writing. Writing a Paragraph
Presentation on the Basics of Writing. Writing a ParagraphPresentation on the Basics of Writing. Writing a Paragraph
Presentation on the Basics of Writing. Writing a Paragraph
 
Philosophy of Education and Educational Philosophy
Philosophy of Education  and Educational PhilosophyPhilosophy of Education  and Educational Philosophy
Philosophy of Education and Educational Philosophy
 
5 charts on South Africa as a source country for international student recrui...
5 charts on South Africa as a source country for international student recrui...5 charts on South Africa as a source country for international student recrui...
5 charts on South Africa as a source country for international student recrui...
 
HED Office Sohayok Exam Question Solution 2023.pdf
HED Office Sohayok Exam Question Solution 2023.pdfHED Office Sohayok Exam Question Solution 2023.pdf
HED Office Sohayok Exam Question Solution 2023.pdf
 
Patient Counselling. Definition of patient counseling; steps involved in pati...
Patient Counselling. Definition of patient counseling; steps involved in pati...Patient Counselling. Definition of patient counseling; steps involved in pati...
Patient Counselling. Definition of patient counseling; steps involved in pati...
 
Human-AI Co-Creation of Worked Examples for Programming Classes
Human-AI Co-Creation of Worked Examples for Programming ClassesHuman-AI Co-Creation of Worked Examples for Programming Classes
Human-AI Co-Creation of Worked Examples for Programming Classes
 
P4C x ELT = P4ELT: Its Theoretical Background (Kanazawa, 2024 March).pdf
P4C x ELT = P4ELT: Its Theoretical Background (Kanazawa, 2024 March).pdfP4C x ELT = P4ELT: Its Theoretical Background (Kanazawa, 2024 March).pdf
P4C x ELT = P4ELT: Its Theoretical Background (Kanazawa, 2024 March).pdf
 
CHUYÊN ĐỀ DẠY THÊM TIẾNG ANH LỚP 11 - GLOBAL SUCCESS - NĂM HỌC 2023-2024 - HK...
CHUYÊN ĐỀ DẠY THÊM TIẾNG ANH LỚP 11 - GLOBAL SUCCESS - NĂM HỌC 2023-2024 - HK...CHUYÊN ĐỀ DẠY THÊM TIẾNG ANH LỚP 11 - GLOBAL SUCCESS - NĂM HỌC 2023-2024 - HK...
CHUYÊN ĐỀ DẠY THÊM TIẾNG ANH LỚP 11 - GLOBAL SUCCESS - NĂM HỌC 2023-2024 - HK...
 
PISA-VET launch_El Iza Mohamedou_19 March 2024.pptx
PISA-VET launch_El Iza Mohamedou_19 March 2024.pptxPISA-VET launch_El Iza Mohamedou_19 March 2024.pptx
PISA-VET launch_El Iza Mohamedou_19 March 2024.pptx
 
Maximizing Impact_ Nonprofit Website Planning, Budgeting, and Design.pdf
Maximizing Impact_ Nonprofit Website Planning, Budgeting, and Design.pdfMaximizing Impact_ Nonprofit Website Planning, Budgeting, and Design.pdf
Maximizing Impact_ Nonprofit Website Planning, Budgeting, and Design.pdf
 
Education and training program in the hospital APR.pptx
Education and training program in the hospital APR.pptxEducation and training program in the hospital APR.pptx
Education and training program in the hospital APR.pptx
 
Ultra structure and life cycle of Plasmodium.pptx
Ultra structure and life cycle of Plasmodium.pptxUltra structure and life cycle of Plasmodium.pptx
Ultra structure and life cycle of Plasmodium.pptx
 
UKCGE Parental Leave Discussion March 2024
UKCGE Parental Leave Discussion March 2024UKCGE Parental Leave Discussion March 2024
UKCGE Parental Leave Discussion March 2024
 
Benefits & Challenges of Inclusive Education
Benefits & Challenges of Inclusive EducationBenefits & Challenges of Inclusive Education
Benefits & Challenges of Inclusive Education
 
Easter in the USA presentation by Chloe.
Easter in the USA presentation by Chloe.Easter in the USA presentation by Chloe.
Easter in the USA presentation by Chloe.
 
In - Vivo and In - Vitro Correlation.pptx
In - Vivo and In - Vitro Correlation.pptxIn - Vivo and In - Vitro Correlation.pptx
In - Vivo and In - Vitro Correlation.pptx
 
Prescribed medication order and communication skills.pptx
Prescribed medication order and communication skills.pptxPrescribed medication order and communication skills.pptx
Prescribed medication order and communication skills.pptx
 

What does a lims really cost

  • 1. http://www.scientificcomputing.com/articles/2010/10/what-does-lims-really-cost#.UlZUolA_uAk What Does a LIMS Really Cost? Thu, 10/21/2010 - 11:52am Siri H. Segalstad What Does a LIMS Really Cost? It is critical to consider the complete picture An Internet discussion group on LIMS has two topics that frequently give very heated discussions. One of them is regarding who is best-suited to be the LIMS project manager/system manager: an IT or a laboratory person. The other is whether we should build or buy a new LIMS — let’s examine this question in more detail… Build it yourself Advocates for building a new LIMS usually state that their lab is so unique they cannot use a commercial LIMS. However, very few are truly unique — it is actually their products that are unique. Labs, in general, work the same way: They obtain a sample from somewhere. The sample may be external or internal. The latter includes, for example, raw material, R&D, production or study. This sample then may be split into several samples to be analyzed. Analyses are done in various labs based on sites, laboratory type, or projects / products. Analytical methods may be manual or instrumental, and the manual ones may include what the sample looks or smells like. The instrumental methods may be virtually everything else that uses one or more instruments to obtain results. The result is often compared to specifications to see that the sample conforms. A manager approves or authorizes the results before the results are reported, often on a Certificate of Analysis (CoA). In reality, the only things that are unique are that every lab has their own types of samples set of instruments, analytical methods and specifications. Time and flexibility Advocates of homemade LIMS also say that they can build a LIMS in a few months in an Oracle, Access or SQL database. Of course, this will be completely tailored to their needs and will be much cheaper than a commercial system. Let’s discuss these statements: It may be possible to build LIMS in a few months. However, this requires that there is a very, very good user requirements specification that covers everything the lab ever does — and will do in the future. Few are able to write such a specification, especially to include how they will work in the future. So, risks are very high that a home-made LIMS will not be flexible enough to allow for future changes.
  • 2. There is a good chance that programming a build-it-yourself LIMS actually will take a lot longer than a few months. By then, the users will likely have found many more things that should be included in the system, and these requirements will be added. We get what is generally called scope creep, and the result is inevitably that the project takes longer than anticipated. Bear in mind that a commercial LIMS includes several decenniums, or even centennials, of man-working days in its planning, programming and testing. If a programmer is brought in to build the LIMS, he will probably not know enough about laboratories to even ask the right questions when he is in doubt. On the other hand, if using a laboratory person, he will probably not know enough about programming to do a good job. And, unless either of these is very skilled in quality assurance, chances are that they will program without creating enough documentation, such as requirements specification, other specifications and plans, test plans, testing, reports, etcetera. In any case, the lab would definitely have GAMP1 Category 5 software. This means extensive validation, which will cost a lot more than a purchased Category 4 system, A homemade system will be frowned upon and scrutinized by the U.S. Food & Drug Administration (FDA) and European authorities — and probably not pass the inspection. Back to square one. Very few companies build in-house systems these days. However, some old systems, also called bespoke systems, are still in use. Regulators for e.g. the pharmaceutical industry scrutinize these systems, and find everything wrong with them. The question is whether the company is a pharmaceutical company or a software developer. Some companies have received severe ‘Warning Letters’ from the FDA2 for their innovative programming and lack of system maintenance. So you see, it simply does not make sense to create your own LIMS. Even if your IT people would love to create it for you in only a few months, don’t believe them. History has shown that, regardless of the amount of time spent programming an in-house system, it is never as good and as flexible as buying a commercial LIMS. In addition, in-house projects are very likely to suffer delays, and will invariably be more expensive than expected. It is better to spend your money on a commercial system and get what you need, instead of spending on a programmer from whom, if you are lucky, you will get some of the functionality you need, but not the flexibility, and at a much later time than expected. Chances are that, when you finally get the homegrown system, your needs will have changed, too, and the system is no longer what you want. For all of the reasons cited above, I recommend that you kill the build-it-yourself thought immediately. You are not going to get a 100-percent system even if you build it yourself. So, you may just as well make do with a 90- to 95-percent system purchased from a commercial supplier.
  • 3. Assessing cost It is difficult to calculate if a LIMS is cheaper than a paper-based lab. This is a cumbersome assessment that needs to be done in each case where cost is the main consideration for implementing LIMS. Daily use without LIMS includes how much time is spent on writing (and often also finding) the lab notebooks and logbooks performing calculations writing results on results documents controlling results and other items transferring the data from one medium to the other the Certificate of Analysis Daily use with LIMS will definitely reduce labor time for these items. However, in order to get a workable LIMS system, a lot of time has to be spent implementing the static data, also called template data, into the LIMS. A LIMS is bought without any static data, and even the smallest measure unit has to be entered. It is possible to calculate the time spent on implementation, and the chosen supplier can definitely help using his experience. Implementation time depends on the number of instruments, products, laboratories, etcetera, that shall be implemented. Initial costs = C+I, where: C = Cost for purchase of system, including supplier’s implementation time I = Internal training time, and implementation and validation time cost for the system itself and for all items to be implemented in LIMS. These are the implementation expenses until the system is taken into use. Any changes after the implementation phase will be included in the system maintenance. Annual cost/benefit = M+L+Tn–To, where: M = Maintenance cost per year for changes, qualification/validation, error handling, backups, helpdesk L = License for the LIMS system, typically calculated as percentage of initial cost per year. Depends on number of concurrent users. Tn = Cost of time spent using new LIMS To = Cost of time spent using old paper-based system. Tn and To can be calculated from an average batch type (or per time if a continuous process is used, e.g. oil refinery), and multiplied by the number of batches (or time units) per year. It would be simple if this was the whole story, but it is not. A LIMS will generally add quality to the products, by flagging problems, forcing people to do things in correct sequence and in the correct way. The cost of discarded products, recalled products, etcetera, is possible to
  • 4. measure if the numbers exist. However, it is more difficult to assess the value of loss of possible reputation due to bad quality. The purchase price and license are the only items with real price tags, and that is often what the boss wants to know. You usually pay for each hour the supplier spends meeting with you after the sales phase, but you also may have many of your own people in that meeting, usually at a much higher cost. Another problem is that implementation of LIMS usually includes changes in work procedures, responsibilities, and a lot of other things. This may influence both the old and the new ways of working, as well as the quality of the result. Finally, it is important to bear in mind that, in heavily regulated industries like pharmaceuticals, the quality is more important than the actual monetary return on investment (ROI). In securing funding for a LIMS, you can try a couple of tactics: Can our company live without a LIMS? We certainly could not live without accounting software. Find a larger project, like enterprise resource planning (ERP) or material resource planning (MRP), and get LIMS attached to it. The LIMS budget will be tiny compared to the larger project. In other words, make LIMS a part of a larger project. These systems communicate well, and LIMS adds information that an ERP / MRP system is not able to handle in a good way. Conclusion The price of LIMS actually is a lot higher than the stated prices for purchase, implementation costs and annual license costs. The monetary return of interest can be calculated, and may or may not be positive. However, the real benefit of LIMS is difficult to calculate: the added quality to the products. References 1. GAMP 5 Good Automated Manufacturing Practice (GAMP) Guide for ARisk-Based Approach to Compliant GxP Computerized Systems, February 2008, International Society for Pharmaceutical Engineering (ISPE), Fifth Edition, ISBN 1-931879-61-3, www.ispe.org. 2. See www.fda.gov for warning letters. Note: This article is based on the book International IT Regulations and Compliance, by Siri H. Segalstad. Wiley 2008, ISBN 978-0-470-75882-3. SiriSegalstad is Principal, Segalstad Consulting AS. She may be reached at editor@ScientificComputing.com