SlideShare una empresa de Scribd logo
1 de 54
Descargar para leer sin conexión
City of Oak Harbor


                                                WASTEWATER FACILITIES PLAN
                                                                   Executive Summary
                                                                                        DRAFT

                                                                                    March 2013




1218 THIRD AVENUE, SUITE 1600                      •    SEATTLE, WASHINGTON 98101                 •   P. 206.684.6532   •   F. 206.903.0419
pw://Carollo/Documents/Client/WA/Oak Harbor/8549A00/Deliverables/Facilities Plan/Cover_TOC.docx
ASSOCIATED FIRMS



    This Wastewater Facilities Plan was developed in coordination with:




CAROLLO ENGINEERS                                                                                      DRAFT – March 2013
pw://Carollo/Documents/Client/WA/Oak Harbor/8549A00/Deliverables/Facilities Plan/Cover_TOC.docx
City of Oak Harbor

                                                        Wastewater Facilities Plan

                                                            TABLE OF CONTENTS

                                                                                                                    Page No.
ES.1         INTRODUCTION ....................................................................................................... 1 
             ES.1.1   Project Need ............................................................................................ 1 
             ES.1.2   Project Goal ............................................................................................. 1 
ES.2         PLANNING AREA CHARACTERISTICS .................................................................. 2 
             ES.2.1   Service Area ............................................................................................ 2 
ES.3         EXISTING FACILITIES.............................................................................................. 2 
             ES.3.1   Existing Treatment Facilities .................................................................... 2 
             ES.3.2   Existing Effluent Outfalls .......................................................................... 4 
             ES.3.3   Existing Wastewater Collection System .................................................. 4 
ES.4         WASTEWATER FLOWS AND LOADS ..................................................................... 5 
             ES.4.1   Flow and Load Projections ...................................................................... 5 
             ES.4.2   Phasing Scenarios For Growth ................................................................ 7 
ES.5         REGULATORY REQUIREMENTS ............................................................................ 8 
             ES.5.1   Effluent Quality Goals .............................................................................. 8 
             ES.5.2   Biosolids Management .......................................................................... 10 
             ES.5.3   Other Environmental Documents ........................................................... 10 
ES.6         ALTERNATIVES DEVELOPMENT AND EVALUATION ......................................... 11 
             ES.6.1   Project Objectives and Evaluation Criteria ............................................ 11 
             ES.6.2   Preliminary Alternatives ......................................................................... 11 
             ES.6.3   Initially Proposed Sites .......................................................................... 13 
             ES.6.4   Final Sites and Alternatives ................................................................... 18 
ES.7         PROPOSED ALTERNATIVE................................................................................... 22 
             ES.7.1   Wastewater Treatment Facility .............................................................. 22 
             ES.7.2   Wastewater Conveyance System .......................................................... 24 
             ES.7.3   Treated Effluent Outfall .......................................................................... 24 
             ES.7.4   Project Phasing Scenarios..................................................................... 24 
             ES.7.5   Phase 1 Cost Summary ......................................................................... 26 
ES.8         IMPLEMENTATION PLAN ...................................................................................... 28 
             ES.8.1   Financial Analysis Summary .................................................................. 28 




CAROLLO ENGINEERS                                                             i                         DRAFT – March 2013
pw://Carollo/Documents/Client/WA/Oak Harbor/8549A00/Deliverables/Facilities Plan/Cover_TOC.docx
LIST OF TABLES

Table ES.1                Population Projections ................................................................................... 5 
Table ES.2                Current Flows and Loads............................................................................... 6 
Table ES.3                Projected Flows and Loads ........................................................................... 7 
Table ES.4                Effluent Quality Goals .................................................................................... 8 
Table ES.5                Windjammer Vicinity MBR Key Considerations ........................................... 21 
Table ES.6                Crescent Harbor North MBR Key Considerations ....................................... 21 
Table ES.7                Crescent Harbor North AS Key Considerations........................................... 22 
Table ES.8                Phase 1 Capacity Summary ........................................................................ 26 
Table ES.9                Total Phase 1 Cost Comparison (in millions)............................................... 28 
Table ES.10               City Share of Phase 1 Capital Costs (escalated, in millions) ....................... 30 


                                                                LIST OF FIGURES

Figure ES.1               Study Area, Topography, and Existing System ............................................. 3 
Figure ES.2               Growth Scenarios for Phasing ....................................................................... 9 
Figure ES.3               Project Objectives ........................................................................................ 12 
Figure ES.4               Potential WWTP Sites ................................................................................. 14 
Figure ES.5.              TBL+ Analysis of Preliminary Alternatives ................................................... 15 
Figure ES.6               Six Sites For Further Evaluation .................................................................. 16 
Figure ES.7               TBL+ Analysis of Refined Alternatives ........................................................ 17 
Figure ES.8               Windjammer Vicinity Charrette Results ....................................................... 19 
Figure ES.9               Crescent Harbor North Charrette Results.................................................... 20 
Figure ES.10              Treatment Process Flow Schematic ............................................................ 23 
Figure ES.11              Conveyance Improvements for Scenario 1.................................................. 25 
Figure ES.12              Estimated Phase 1 Project Costs ................................................................ 27 
Figure ES.13              Proposed Schedule ..................................................................................... 29 
Figure ES.14              Monthly Sewer Rate Analysis ...................................................................... 31 




CAROLLO ENGINEERS                                                             ii                            DRAFT – March 2013
pw://Carollo/Documents/Client/WA/Oak Harbor/8549A00/Deliverables/Facilities Plan/Cover_TOC.docx
City of Oak Harbor

                                                        Wastewater Facilities Plan

                                                            TABLE OF CONTENTS

                                                                                                                    Page No.
ES.1         INTRODUCTION ....................................................................................................... 1 
             ES.1.1   Project Need ............................................................................................ 1 
             ES.1.2   Project Goal ............................................................................................. 1 
ES.2         PLANNING AREA CHARACTERISTICS .................................................................. 2 
             ES.2.1   Service Area ............................................................................................ 2 
ES.3         EXISTING FACILITIES.............................................................................................. 2 
             ES.3.1   Existing Treatment Facilities .................................................................... 2 
             ES.3.2   Existing Effluent Outfalls .......................................................................... 4 
             ES.3.3   Existing Wastewater Collection System .................................................. 4 
ES.4         WASTEWATER FLOWS AND LOADS ..................................................................... 5 
             ES.4.1   Flow and Load Projections ...................................................................... 5 
             ES.4.2   Phasing Scenarios For Growth ................................................................ 7 
ES.5         REGULATORY REQUIREMENTS ............................................................................ 8 
             ES.5.1   Effluent Quality Goals .............................................................................. 8 
             ES.5.2   Biosolids Management .......................................................................... 10 
             ES.5.3   Other Environmental Documents ........................................................... 10 
ES.6         ALTERNATIVES DEVELOPMENT AND EVALUATION ......................................... 11 
             ES.6.1   Project Objectives and Evaluation Criteria ............................................ 11 
             ES.6.2   Preliminary Alternatives ......................................................................... 11 
             ES.6.3   Initially Proposed Sites .......................................................................... 13 
             ES.6.4   Final Sites and Alternatives ................................................................... 18 
ES.7         PROPOSED ALTERNATIVE................................................................................... 22 
             ES.7.1   Wastewater Treatment Facility .............................................................. 22 
             ES.7.2   Wastewater Conveyance System .......................................................... 24 
             ES.7.3   Treated Effluent Outfall .......................................................................... 24 
             ES.7.4   Project Phasing Scenarios..................................................................... 24 
             ES.7.5   Phase 1 Cost Summary ......................................................................... 26 
ES.8         IMPLEMENTATION PLAN ...................................................................................... 28 
             ES.8.1   Financial Analysis Summary .................................................................. 28 




CAROLLO ENGINEERS                                                             i                         DRAFT – March 2013
pw://Carollo/Documents/Client/WA/Oak Harbor/8549A00/Deliverables/Facilities Plan/Cover_TOC.docx
LIST OF TABLES

Table ES.1                Population Projections ................................................................................... 5 
Table ES.2                Current Flows and Loads............................................................................... 6 
Table ES.3                Projected Flows and Loads ........................................................................... 7 
Table ES.4                Effluent Quality Goals .................................................................................... 8 
Table ES.5                Windjammer Vicinity MBR Key Considerations ........................................... 21 
Table ES.6                Crescent Harbor North MBR Key Considerations ....................................... 21 
Table ES.7                Crescent Harbor North AS Key Considerations........................................... 22 
Table ES.8                Phase 1 Capacity Summary ........................................................................ 26 
Table ES.9                Total Phase 1 Cost Comparison (in millions)............................................... 28 
Table ES.10               City Share of Phase 1 Capital Costs (escalated, in millions) ....................... 30 


                                                                LIST OF FIGURES

Figure ES.1               Study Area, Topography, and Existing System ............................................. 3 
Figure ES.2               Growth Scenarios for Phasing ....................................................................... 9 
Figure ES.3               Project Objectives ........................................................................................ 12 
Figure ES.4               Potential WWTP Sites ................................................................................. 14 
Figure ES.5.              TBL+ Analysis of Preliminary Alternatives ................................................... 15 
Figure ES.6               Six Sites For Further Evaluation .................................................................. 16 
Figure ES.7               TBL+ Analysis of Refined Alternatives ........................................................ 17 
Figure ES.8               Windjammer Vicinity Charrette Results ....................................................... 19 
Figure ES.9               Crescent Harbor North Charrette Results.................................................... 20 
Figure ES.10              Treatment Process Flow Schematic ............................................................ 23 
Figure ES.11              Conveyance Improvements for Scenario 1.................................................. 25 
Figure ES.12              Estimated Phase 1 Project Costs ................................................................ 27 
Figure ES.13              Proposed Schedule ..................................................................................... 29 
Figure ES.14              Monthly Sewer Rate Analysis ...................................................................... 31 




CAROLLO ENGINEERS                                                             ii                            DRAFT – March 2013
pw://Carollo/Documents/Client/WA/Oak Harbor/8549A00/Deliverables/Facilities Plan/Cover_TOC.docx
Acronyms & Abbreviations
AA                                              annual average
AACE                                            Associate of the Advancement of Cost Engineering
AAF                                             average annual flow
AC                                              asbestos cement
ADA                                             Americans with Disability Act
AS                                              Activated Sludge
BAF                                             Biologically Aerated Filter
BOD                                             biochemical oxygen demand
BWF                                             base wastewater flow
CBD                                             Central Business District
CCI                                             Construction Cost Index
CCP                                             concrete cylinder pipe
CDBG                                            Community Development Block Grant
CERB                                            Community Economic Revitalization Board
CFR                                             Code of Federal Regulations
City                                            City of Oak Harbor
CMP                                             corrugated metal pipe
DHAP                                            Department of Archaeology & Historic Preservation
DI                                              ductile iron
DIN                                             dissolved inorganic nitrogen
DMR                                             discharge monthly report
DNS                                             determination of nonsignificance
DO                                              dissolved oxygen
DOH                                             Washington State Department of Health
DS                                              determination of significance
DWF                                             dry weather flow
Ecology                                         Washing State Department of Ecology
EDC                                             endocrine disrupting compuonds
EFH                                             essential fish habitat
EID                                             Environmental Information Document
EIS                                             Environmental Impact Statement
ENR                                             Engineering News-Record
EPA                                             Environmental Protection Agency


CAROLLO ENGINEERS                                                                    i           DRAFT – March 2013
pw://Carollo/Documents/Client/WA/Oak Harbor/8549A00/Deliverables/Facilities Plan/Acronyms.docx
Acronyms & Abbreviations
F/M ratio                                       food-microorganism ratio
FDA                                             Food and Drug Administration
GMA                                             Growth Management Act
gpad                                            gallons per are per day
gpcd                                            gallons per capita per day
gpd                                             gallons per day
gpd/sf                                          gallons per day per square foot
gpm                                             gallons per minute
GT                                              gravity thickener
HDPE                                            high –density polyethylene
hp                                              horsepower
HPA                                             Hydraulic Project Approval
HRT                                             hydraulic retention time
IFAS                                            integrated fixed film activated sludge
I/I                                             Infiltration and inflow
JARPA                                           Joint Aquatic Resources Permit Application
JPA                                             Joint Planning area
Lagoon Plant                                    Seaplane Base Lagoon WWTP
LOTT                                            Lakehaven, Olympia, Tacoma, Tumwater area
MBR                                             membrane bioreactor
MBBR                                            moving bed bioreactor
MDNS                                            mitigated determination of nonsignificance
mg/L                                            milligrams per liter
mgd                                             millions of gallons per day
MHHW                                            mean higher high water
MHI                                             median household income
MLE                                             Modified Ludzack Ettinger
MLLW                                            mean lower – low water
MLR                                             mixed liquor return
MLSS                                            mixed liquor suspended solids
MM                                              maximum month
MMF                                             maximum month flow
MR                                              Marine Reach


CAROLLO ENGINEERS                                                                    ii          DRAFT – March 2013
pw://Carollo/Documents/Client/WA/Oak Harbor/8549A00/Deliverables/Facilities Plan/Acronyms.docx
Acronyms & Abbreviations
NAS                                             Naval Air Station
NH3                                             ammonia
NHPA                                            National Historic Preservation Act of 1966
NOAA                                            National Oceanic and Atmospheric Administration
NPDES                                           National Pollutions Discharge Elimination System
NRDC                                            Natural Resources Defense Council
NTU                                             nephelometric turbidity units
NWCAA                                           Northwest Clean Air Agency
O&M                                             Operation and Maintenance
OHMC                                            Oak Harbor Municipal Code
OS                                              Open Space
PBP                                             Planned Business Park
PD                                              peak day
PDF                                             peak day flow
PF                                              public facilities
pH                                              chemical balance measurement
PHF                                             peak hour flow
PIP                                             Planned Industrial Park
Plan                                            Facilities Plan
POTW                                            publicly owned treatment works
pp                                              pounds per day
ppcd                                            pounds per capita per day
ppd                                             pounds per day
PRE                                             Planned Residential Estate
PVC                                             polyvinyl chloride
PWTF                                            Public Works Trust Fund
RBC                                             Rotating biological contactor
RCP                                             reinforced concrete pipe
ROW                                             right-of-way
SDC                                             system development charges
SERP                                            State Environment Review Process
SLR                                             solids loading rate
SOR                                             surface overflow rate


CAROLLO ENGINEERS                                                                   iii            DRAFT – March 2013
pw://Carollo/Documents/Client/WA/Oak Harbor/8549A00/Deliverables/Facilities Plan/Acronyms.docx
Acronyms & Abbreviations
SRF                                             State Revolving Fund
SRT                                             solids retention time
STAG                                            State and Tribal Assistance Grants
SVI                                             sludge volume index
TBL+                                            Triple Bottom Line Plus Technical
TF                                              Trickling Filter
TF/SC                                           Trickling Filter/Solids Contact
TIN                                             total inorganic nitrogen
TMDL                                            total maximum daily load
TOrC                                            trace organic chemical
TSS                                             total suspended solids
UFC                                             Uniform Fire Code
UGA                                             Urban growth area
USEDA                                           United States Economic Development Administration
USDA-RD                                         United States Department of Agriculture-Rural Development
UV                                              ultraviolet
UVT                                             ultraviolet transmittance
VFD                                             variable frequency drive
VFW                                             Veterans of Foreign Wars
WAC                                             Washington Administrative Code
WDFW                                            table 6.8
WDNR                                            Washington State Department of Natural Resources
WSEC                                            Washington State Energy Code
WWTP                                            Wastewater treatment plant




CAROLLO ENGINEERS                                                                   iv           DRAFT – March 2013
pw://Carollo/Documents/Client/WA/Oak Harbor/8549A00/Deliverables/Facilities Plan/Acronyms.docx
Executive Summary
                                                                            WASTEWATER FACILITIES PLAN

ES.1 INTRODUCTION
The City of Oak Harbor (City) must replace two aging wastewater treatment facilities with a
new facility that meets modern standards for reliability and performance. This Wastewater
Facilities Plan (Plan) describes the proposed alternative for wastewater collection,
treatment, and effluent discharge (marine and/or reclamation), in accordance with
Washington Administrative Code (WAC) 173-240. Completing the projects recommended in
this Plan will allow the City to provide continued reliable wastewater service to the
community of Oak Harbor while protecting and preserving the surrounding environment.

ES.1.1 Project Need
The City’s wastewater system serves approximately 24,000 people within the City and the
Navy Seaplane Base. Wastewater is currently treated at two facilities: a rotating biological
contactor (RBC) facility near Windjammer Park, and a lagoon facility on the Navy’s
Seaplane Base. A project is needed to replace the City’s two existing treatment facilities
with a modern facility capable of meeting the objectives listed below. Although the existing
facilities are currently able to meet the requirements of the City’s National Pollution
Discharge Elimination System (NPDES) Permit, they are not able to provide reliable long-
term service for a number of reasons:
         The existing RBC facility is nearing the end of its useful life.
         Both the RBC and Lagoon Plants lack the technology to meet increasingly stringent
          water quality standards, and have inadequate capacity to keep pace with anticipated
          population growth.

         Both effluent outfalls have seen major failures; the RBC Oak Harbor outfall no longer
          functions and the Crescent Harbor outfall is functional but damaged.

         The area surrounding the Seaplane Base Lagoon Plant was reclaimed as a saltwater
          marsh in 2009. The lagoons are now surrounded by environmentally sensitive areas
          and are subject to frequent high water conditions, making expansion or modifications
          to the new lagoons infeasible.

ES.1.2 Project Goal
The goal of this project is to “obtain the highest level of water quality practical while
recognizing the limitations of the rate payers of the City to fund the improvements.” Specific
project objectives include:
1.        Providing continued reliable wastewater treatment service;
2.        Meeting high standards for water quality;


CAROLLO ENGINEERS                                                          ES-1              DRAFT – March 2013
pw://Carollo/Documents/Client/WA/Oak Harbor/8549A00/Deliverables/Facilities Plan/ES.docx
3.        Allowing phased expansion to meet future demands; and
4.        Delivering construction and operation of a new facility by 2017 in a cost-effective
          manner.


ES.2 PLANNING AREA CHARACTERISTICS
The City of Oak Harbor is located near the northern end of Whidbey Island in Island
County, Washington. The United States Navy operates two bases on Whidbey Island: the
Seaplane Base located in the eastern portion of the City, and Ault Field which lies to the
north of the City. The City covers approximately 6,030 acres (9.4 square miles), of which
2,820 acres (4.4 square miles) is occupied by the Navy’s Seaplane Base. The City’s Urban
Growth Area (UGA) includes all of the City of Oak Harbor, as well as unincorporated areas
to the north, between the City and Ault Field, and to the south and west of the City. The
UGA represents the vicinity that is likely to be needed to accommodate growth over the
next 20 years.

ES.2.1 Service Area
Figure ES.1 shows the study and service areas for this Plan, which includes all of the UGA,
encompassing 7,540 acres (11.8 square miles) of land. A Joint Planning Area (JPA) which
includes areas that may be developed beyond the 20-year planning period is not included
in the study area, as these areas are not expected to require City sewer service within the
next 20 years. An estimated 136 households within the current city limits are not connected
to the City’s sewer system and are using on-site sewer systems. This equates to less than
two percent of the City’s population. For the purpose of estimating future flows and loads,
this Plan assumes that all currently unsewered areas will be served by the City within the
20-year planning horizon.


ES.3 EXISTING FACILITIES
The locations of the City’s existing wastewater facilities are shown in Figure ES.1. Existing
facilities include two treatment plants, two effluent outfalls, approximately 74 miles of pipe,
and 11 wastewater lift stations.

ES.3.1 Existing Treatment Facilities
Wastewater flows and loads treated at the City’s existing RBC Plant are approaching
permitted limits, triggering the need for this Plan. Portions of the RBC Plant are over 50
years old and have reached the end of their service life. In recent years the City has
experienced an increasing number of mechanical failures at the RBC Plant, particularly for
outdated treatment equipment that is no longer prevalent in the treatment industry. Various
analyses completed prior to this Plan have concluded that there is little or no salvage value
in the existing RBC Plant. Due to its age and condition, and an inability to meet future



CAROLLO ENGINEERS                                                          ES-2            DRAFT – March 2013
pw://Carollo/Documents/Client/WA/Oak Harbor/8549A00/Deliverables/Facilities Plan/ES.docx
/HJHQG
                                                                                                                                                                                                                                                                                                                                                                                                                                        1                        
                                                                                                                                                                                                                                                                                                                         




                                                                                                                                                                                                                                                                                                                     
                                                                                                                                                                                                                                                                                                                                                                                                                                                    *5




                                                                   
                                                                                                                                                                                                                                                                                                                                                                                                                                                                           




                          




                                                                                                                                                                                                                                                                                                                   
                                                                                                                                                                                                                                                                                                                                                                                                               (1                                      (
                                                                                                                                                                                                                                                                                                                                                                                         6HZHU ROOHFWLRQ 6VWHP




                                                                                                                                                                                                                                         :,/621 5'
                                                                                                                                                                                                                                                                                                                                                                                                                                                                      5'




                                                                                                                                                                                                                                                                                                                                                     
                                                                                                                                                                                                                                                                                                                         




                                                                                                                                                                                                                                                                                                                                                 
                                                                                                                                                                                                                                                                                                                     
                                                                                                                                                                                                                                                                                                                                                                                              /LIW 6WDWLRQV
                                                                                                                                                                                                                                                                                                                                                                                     ( '( 95,(6 5'

                                                                                                                                                                                                                                                                                                                                                                                                
       

                                                                                                                                                                                                                                                                                                                                                                                                 ::73V




                                                                                                                                                                                                                                                                                                                                                                                                                                     
                                                                                                             $8/7 ),(/' 5'                                                                                                                                                                                                                                                                           ROOHFWLRQ 6VWHP
                                                                                                                                                                                                                                )$..(0$ 5'
                                                                                                                                                                                                                                                                                                                                                                                                    RQWRXUV
                                                                                                                                                                                                                                                                                                                                                                                                     LW /LPLWV




                                                                                                                                                                                                                                                                                 7$/25 5'
                                                                                                                    
                                                                                                                                                                                                                                                                                                                                                                                                     8*$  RXQW $GRSWHG
                                *2/) 2856( 5'




                                                                                                                      
                                                                                                                                                                                                                                                                                                                                                          
                                                                                                                                                                                                                                                                                                                                                     




                                                                                                                                                                                                                                                                                                                                                                                                                   52%,1 /1
                                                                                                                                                                                                                                                                                                                                                                                                     8*$  LW $GRSWHG




                                                                                                                                                                 *2/',( 5'




                                                                                                                                                                                                                                                                                                                                                              




                                                                                                                                                                                                                                                                                                                                                                                                                                                                 1  (
                                                                                                                        


                                                                                                                              
                                                                                       +(//(5 5'




                                                                                                                                                                              




                                                                                                                                                                                                                                                                                                                                                                                     1  (
                                                                                                          
                                                                                                       




                                                                                                                                                                                                                                                                                                                                                                                                                                                                6/$7(5 5'
                                                                                                                                                                                                                                                           +817 5'
                      526% 5'                                                                                                                                                                                                                                                              6,/9(5 /$.( 5'
                                                            




                                                                                                                                    2$. +$5%25 5'
                                                          
                                                                                                                                                                                                                                                                                                                                                                                                                            




                                                                                                                                                                                                                                                                                                                                        




                                                                                                                                                                                                                                                                                                                                                                                                                 (
                                                                                                                                                                                                                                                                                                                                                                                                    

                                                                                                                                                                             #
                                                                                                                                                                             
                                                                                                                                                                             Š
                                                           $,5/,1( :$




                                                                                                                                                                                          
                                                                                                                                                                                                                                                                                                        5(6(17 +$5%25 5'




                                                                                                                                                                                                                                                                                                                                                                                                                                     +,*+ 32,17 /1267(5 :$
                                                                                                                                                                                                                                                                                                                                                                                      
                                                                                                                                                                                                                                                                                                                                                                                                                                                                 
                        




                                                                                                                                                                                                                                                                                                                                                                    5(6(59$7,21 5'
                                                                                                                                                                                                                      72




                                                                                                                                                                                                                                                                                                                                                                                                              %86% 5'
                                                                                                                                                                                                                         5
                                                                                                                                                                                                                        3(




                                                                                                                                                                                                                                                                                                                                                                                                                               
                                                                                                                                                                                                                            '2




                                                                                                                                                                                                                                                                                                                                                                                                                              
                                                                                                                                                                                                                             5'
                                                                                                                                                                                                                                    




                                                                                                                                                                                                                                                                                                                                                                                                                                                                            1  (
                                                                                                                                                                                                                                    




                                                                                                                                                                                                                                                                                                                                                                                                                                                               
                                                          




                                                 
                                                    
                                                                                                                                                     6( (/ 67




                                                                                                                                                                                                                                                                                                                                
                                                                                                                                                                                                                                                                                                             




                                                                                                                                                                                                                                                                                                                                               
                                                                                                                                                                                                                                                                                                                                   




                                                                                                                                                                                                                                                                                                                                                                                                                                                        
                                                                                                                                                                                                                                                                                                                                                                                                                .




                                                                                                                                                                                                                                                                                                                          
                                                                                                                                                                                                                                                                                                                                                                                                         




                                                                                                                                                                                                                                                                                                                            
                                                                                                                                                                                                                                                                                                                                                                                                    




                                                                                                                                                                                                                      
                                                                                                                                                                                                                                                     ([LVWLQJ /DJRRQ 3ODQW




                                                                                                                                                                                                                                                                                                                                                                                                                                                                  
                                                                                                                                                                                                                                                                                                                                                                                                                              
                                                                                                                                                                                                                                                                                                                                                                                                     
                                                                                                                                                                                7+ $9(
                                                                                                                                                                                                                                                                                                                                                                                                                                                     )HHW
                                                                         6:                                                                                                                                                                                                                                                                                                                                                                 
                                                                                                                                                                         5 :$
                                                                           $1                                                                                      3,21((
                                                                                72




                                                                                                                                                                                                                       
                                                                                   :




                                                                                                                                                                                                         25$
                                                                                     1
                                                                                          $9
                                                                                                                                                     
                                                                                                                                                     




                                                                                                                                                                                                                            




                                                                                                                                                                                                                                                                                                                                       0
                                                                                             (




                                                                                                                                                                                                                                                                                                                                        ,'
                                                                                                                                                                                                              /




                                                                                                                                                                                                                                                                                                                                         :
                                                                                                                                                                                                           6 ($ $




                                                                                                                                                                                                                                                                                                                                          $
                                                                                                                                                                                                                                                                                                                                              %/
                                                                                                                                                                    ([LVWLQJ 5% 3ODQW                                                                                                                                                                                                                       32
                                                                                                                                                                                                                                                                             UHVFHQW +DUERU




                                                                                                                                                                                                                                                                                                                                                9'
                                                                                                                                                                                                                                                                                                                                                                                                                /1
                                                                                                                                                                                                                 9(
                                )257 18*(17 $9(
                                                                            




                                                                                                                                                                                                                                                                                                                                                                                                                   (          //
                                                                                                                                                                                                                                                                                                                                                                                                                                 5   '
 




                                                                                                                                                                                                                                                                                                                                                                                              7H[W                                 
                                                                                                      




                                                                                                                                                                                                     
                                                                                                                                                                                                


                                                                                                                                    2DN +DUERU
            %221 5'




                                                                                                                                                                                                                                                                                                                                                      
                                                                         :$7(5/22 5'




                                                                                                                                                                                                                                                                                                                                                 
                                                                                                                  %$/'$ 5'




                                                                                                                                                                                                                        




                                                                                                                                                                                                                                                                                                                                                                                                 )LJXUH (6
                                                                                                                                                                                                                                                                                                                                                                                          LW RI 2DN +DUERU 6WXG
                                                                                                            




                                                                                                                                                                                                                                                                                                                                                                                           $UHD DQG 7RSRJUDSK
                                                                                                                                                                                                                                                                                                                                                                                          :DVWHZDWHU )DFLOLWLHV 3ODQ
                                                                                                             0,//(5 5'
                                                                                                                                                                                                                                                                                                                                                                                              LW RI 2DN +DUERU
regulatory requirements using installed technology, alternatives presented in this Plan
assume the existing RBC Plant will be abandoned and demolished.

The Seaplane Base Lagoon Plant (Lagoon Plant) was constructed and originally operated
by NAS Whidbey to serve the Seaplane Base. In 1990 the City secured a 50-year lease
from the Navy to operate the Lagoon Plant. Wastewater flows and loads treated at the
Lagoon Plant are approaching permitted limits, triggering the need for this Plan. The current
lagoon treatment process does not provide sufficient capacity to accommodate projected
City growth. A capacity increase at the lagoons will trigger more stringent effluent standards
that cannot be met with conventional lagoon treatment. Expansion or modification of the
existing lagoons is infeasible due to surrounding environmentally sensitive areas. Due to
capacity limitations, an inability to meet future regulatory requirements, access issues
during flood events, and surrounding environmentally sensitive areas, alternatives
presented in this Plan assume the existing Lagoon Plant will not be used in the future to
treat wastewater from the City’s collection system.

ES.3.2 Existing Effluent Outfalls
Historically, effluent treated at the RBC Plant was discharged through an 18-inch diameter
corrugated metal pipe outfall and diffuser into Oak Harbor, terminating at approximately
minus 15 feet mean lower low water (MLLW). The diffuser has had a history of sediment
buildup and blockage. In the summer of 2010 a significant portion of the diffuser was found
to be filled with sediments. In September 2010 the outfall failed and was abandoned. Since
that time all flow treated at the RBC Plant has been pumped to the Lagoon Plant.

Effluent treated at the Lagoon Plant is currently discharged through an 18-inch diameter
concrete pipe outfall and diffuser into Crescent Harbor, terminating at approximately minus
15 feet MLLW. The outfall was inspected in October 2010. Several sections of leaking pipe
and joints were identified at that time. Portions of the pipe and diffuser will need to be
repaired, replaced, and up-sized if the outfall is used as a component of the City’s future
wastewater system.

ES.3.3 Existing Wastewater Collection System
The collection system was analyzed in previous planning efforts to determine the capacity
of the existing network and to identify other issues that would trigger upgrades or
improvements over the next 20 years. The results indicate a maximum peak hour flow of
7.9 million gallons per day (mgd) would be generated in the collection system discharging
to the City’s existing RBC plant. Additionally, approximately 2 mgd of peak flow is
generated on the Seaplane Base. The sum of these peak hour flows (9.9 mgd) provides the
basis for peak hydraulic treatment capacity under current conditions.




CAROLLO ENGINEERS                                                          ES-4            DRAFT – March 2013
pw://Carollo/Documents/Client/WA/Oak Harbor/8549A00/Deliverables/Facilities Plan/ES.docx
Potential capacity limitations were identified in portions of the sewer system, and certain
segments of the existing collection system were identified as being under-capacity for
current flows. However, no segments require upgrades in the initial years of planning
unless flow from the Navy is routed to existing gravity pipe segments that are near capacity.
The timing for collection system capacity improvements is evaluated as a component of the
alternatives analysis presented in this Plan.


ES.4 WASTEWATER FLOWS AND LOADS
Influent flow is derived from residential and commercial sources that discharge to the City’s
RBC Plant, and from the Seaplane Base. There are no significant industrial sources in the
City’s service area. Existing data were analyzed to determine current flows and loads on a
total and per-capita basis. Future flows and loads were projected using current per-capita
values and estimates for future population that are consistent with the City’s comprehensive
planning documents.

ES.4.1 Flow and Load Projections
Existing and projected population data are shown in Table ES.1. Current wastewater flows
and loads are shown in Table ES.2 and project wastewater flows and loads are shown in
Table ES.3.



Table ES.1                 Population Projections
                           Wastewater Facilities Plan
                           City of Oak Harbor
                                               Navy Seaplane
          Year                      City                                                   UGA Sewered(2)      Total
                                                   Base(1)
         2000                     15,395(3)        4,400                                         0            19,795(4)
         2010                          17,675(3)                          4,400                  0            22,075(4)
         2030                           23,776                            4,400                 731            28,907
         2060                           36,654                            4,400                1,637           42,691
Notes:
(1) Summarized from the City of Oak Harbor Comprehensive Sewer Plan (Tetra Tech,
    December 2008) Table 3-2.
(2) Assumes the UGA is not served currently and will be linearly incorporated into the service
    area from 2012 through 2060.
(3) Total flow minus Navy flow.
(4) US Census data (2010).




CAROLLO ENGINEERS                                                          ES-5                             DRAFT – March 2013
pw://Carollo/Documents/Client/WA/Oak Harbor/8549A00/Deliverables/Facilities Plan/ES.docx
Table ES.2                Current Flows and Loads
                          Wastewater Facilities Plan
                          City of Oak Harbor
Parameter                                                                      City         Total
Flow, mgd(1)
  BWF                                                                           1.4          1.8
  AAF                                                                           1.7          2.1
  MMF                                                                           2.3          3.0
  PDF                                                                           3.4          4.7
  PHF                                                                           7.9          9.9
BOD, ppd(2,3)
  AA                                                                          3,556         4,127
  MM                                                                          4,412         5,049
  PD                                                                          5,556         6,510
TSS, ppd(2,4)
  AA                                                                          2,931         3,371
  MM                                                                          4,153         4,792
  PD                                                                          7,383         8,373
NH3, ppd(2,5)
  AA                                                                            390          487
  MM                                                                            470          586
  PD                                                                            596          745
Notes:
(1) Total flow includes both City flow and flow from Navy facilities. Since the Navy population is
    projected to remain constant through 2060, the Navy flows are projected to equal 0.37 mgd for
    BWF, 0.43 mgd for AAF, 0.65 mgd for MMF and 1.23 for PDF.
(2) Total load includes load from both the City and the Navy facilities.
(3) The Navy BOD load is projected to equal 514 ppd for AA, 732 ppd for MM, and 942 for PD.
(4) The Navy TSS load is projected to equal 440 ppd for AA, 638 ppd for MM, and 990 ppd for PD.
(5) The Navy NH3 load is projected to equal 84 ppd for AA, 110 ppd for MM, and 128 ppd for PD.




CAROLLO ENGINEERS                                                          ES-6            DRAFT – March 2013
pw://Carollo/Documents/Client/WA/Oak Harbor/8549A00/Deliverables/Facilities Plan/ES.docx
Table ES.3                Projected Flows and Loads
                          Wastewater Facilities Plan
                          City of Oak Harbor
                                                             2030                                   2060
Parameters
                                             City                             Total         City           Total
                  (1)
Flow, mgd
  BWF                                         1.9                              2.3          3.0              3.4
  AAF                                         2.4                               2.8          3.7             4.1
  MMF                                         3.2                               3.9          5.0             5.7
  PDF                                         4.6                               6.0          7.4             8.6
  PHF                                         9.0                              11.0         11.4            13.4
BOD, ppd(2,3)
  AA                                        4,931                             5,444         7,704           8,217
  MM                                        6,117                             6,849         9,557          10,290
  PD                                        7,704                             8,646        12,037          12,979
TSS, ppd(2,4)
  AA                                        4,064                            4,504         7,704           6,789
  MM                                        5,759                             6,397         9,557           9,636
  PD                                       10,237                            11,227        12,037          16,984
NH3, ppd(2,5)
  AA                                          541                               638         845             942
  MM                                          651                               768        1,017           1,134
  PD                                          827                               975        1,292           1,440
Notes:
(1) Total flow includes both City flow and flow from Navy facilities. Since the Navy population is
    projected to remain constant through 2060, the Navy flows are projected to equal 0.37 mgd for
    BWF, 0.43 mgd for AAF, 0.65 mgd for MMF and 1.23 for PDF.
(2) Total load includes load from both the City and the Navy facilities.
(3) The Navy BOD load is projected to equal 514 ppd for AA, 732 ppd for MM, and 942 for PD.
(4) The Navy TSS load is projected to equal 440 ppd for AA, 638 ppd for MM, and 990 ppd for PD.
(5) The Navy NH3 load is projected to equal 84 ppd for AA, 110 ppd for MM, and 128 ppd for PD.

Population projections for the City are based on the City’s Draft Water System Plan. Navy
population (and associated flows and loads) on the Seaplane Base are assumed to be
constant over the planning period. Future flow and load projections also assume that the
UGA will be uniformly incorporated into the sewer service area by Year 2060.

ES.4.2 Phasing Scenarios For Growth
Throughout this planning effort, year 2060 flows and loads are used to determine “ultimate”
land area requirements for a WWTP that will serve the City’s needs well into the future.
Year 2030 flows and loads are used to size and compare alternatives on a capital and life-
cycle cost basis. The actual rate of growth of the City’s population, and corresponding
increases in flows and loads, will likely be different than the values used for planning. To


CAROLLO ENGINEERS                                                          ES-7                     DRAFT – March 2013
pw://Carollo/Documents/Client/WA/Oak Harbor/8549A00/Deliverables/Facilities Plan/ES.docx
account for these potential differences, phasing options are developed for the selected
alternative to achieve the right balance between reliable capacity and affordability. Figure
ES.2 shows the range of growth scenarios used for this analysis. Phase 1 facilities
proposed in this Plan are based on the moderate growth scenario (approximately one
percent annual growth in City population).


ES.5 REGULATORY REQUIREMENTS
Recognizing that the City is connected to the waters of Puget Sound via Oak Harbor and
Crescent Harbor, the City’s goal is to obtain the highest level of water quality practical while
recognizing the limitations of the rate payers of the City to fund improvements. A primary
goal of the City is the continued protection of the water quality of the waters in and around
Oak Harbor, thereby meeting the goals outlined in the Puget Sound Action Plan developed
by the Puget Sound Partnership for the Cleanup and Protection of Puget Sound.

ES.5.1 Effluent Quality Goals
The City has established the effluent quality goals for conventional pollutants that are more
stringent than the City’s current NPDES permit limits. These effluent goals are summarized
in Table ES.4.



Table ES.4                Effluent Quality Goals
                          Wastewater Facilities Plan
                          City of Oak Harbor
                                        RBC Plant NPDES                              Lagoon Plant            New Facilities
                                          Permit Limit                             NPDES Permit Limit        Target / Goal
TSS                                               30 mg/L                                     75 mg/L           10 mg/L
                                             85% removal                                   85% removal       95% removal
CBOD5                                             25 mg/L                                     25 mg/L           10 mg/L
                                             85% removal                                   85% removal       95% removal
Turbidity                                   Not applicable                                 Not applicable       1 NTU
Chlorine Residual                              0.114 mg/L                                    0.5 mg/L        No discharge
Fecal Coliform                                200/100 mL                                    200/100 mL       100/100 mL




CAROLLO ENGINEERS                                                          ES-8                             DRAFT – March 2013
pw://Carollo/Documents/Client/WA/Oak Harbor/8549A00/Deliverables/Facilities Plan/ES.docx
4.5
                                                                        Measured Data
                                                                        Scenario 1, No Growth
                                                              4.0
                                                                        Scenario 2, Intermediate Growth
                                                                        Scenario 3, Comprehensive Plan
                                                                                                                                 3
                                                              3.5
                                                                                                                     2
                                                                                                         1
                                                              3.0


                                                              2.5


                                                              2.0




                                    Maximum Month Flow, mgd
                                                              1.5


                                                              1.0   Notes:
                                                                    1
                                                                    1:  Current measured capacity is 3.0 mgd.
                                                                    2
                                                                    2:  Capacity required at projected year of startup (2017) ranges from 3.0 to 3.2 mgd.
                                                              0.5   3:  Assuming 3.4 mgd of capacity is constructed in Phase 1, years of service 
                                                                    3
                                                                        (prior to Phase 2) range from 4 to 13 years.

                                                              0.0
                                                                 2000         2005                2010       2015           2020           2025             2030          2035

                                                                                                                                                               GROWTH SCENARIOS
                                                                                                                                                                  FOR PHASING
                                                                                                                                                                         FIGURE ES.2

                                                                                                                                                                      CITY OF OAK HARBOR
                                                                                                                                                                   WASTEWATER FACILITIES PLAN

pw://Carollo/Documents/Client/WA/Oak Harbor/8549A00/Deliverables/Facilities Plan/Fig_ES_02.docx
Alternatives are evaluated largely on their ability to meet current NPDES permit limits.
However, the flexibility to adapt to future regulatory requirements is an important planning
consideration for the City. Potential future NPDES permit limits considered in this analysis
include the ability to meet nutrient (nitrogen) limits and potential future trace organic
chemical (TOrC) limits. While it is not yet clear how Ecology will establish future limits on
these or other parameters, a number of Western Washington municipalities have begun to
evaluate future nitrogen removal. In evaluating alternatives for Oak Harbor, the City is
considering the need to meet a TIN level of 8 mg/L in the future, should these limits be
enforced in subsequent permit cycles. Also, the City is interested in technologies that have
demonstrated some ability to reduce TOrC concentrations in treated effluent, such as the
MBR process or AS process with an extended solids residence time (SRT).

ES.5.2 Biosolids Management
The federal document that regulates the use and disposal of sewage sludge is the CFR,
Part 503 (40 CFR §503, EPA 1993). Land-applied biosolids must meet requirements in the
Part 503 regulations for reducing pathogens and vector attraction. The rule establishes two
basic classes for pathogen reduction: Class A and Class B. The City is considering
alternatives that will meet the 503 requirements for Class B initially, and Class A in future
phases.

ES.5.3 Other Environmental Documents
The City has adopted the policies of the State Environmental Policy Act (SEPA) by
reference (OHMC 20.04.010). A SEPA review will be completed to ensure that there are no
adverse environmental impacts from proposed projects. The City will issue a threshold
determination as to whether significant environmental impact may be expected as a result
of the projects recommended by this Plan. This determination will be sent to Ecology for
concurrence.

To be eligible for financial assistance from the State Water Pollution Control Revolving
Fund, this Plan must also comply with the State Environmental Review Process (SERP;
WAC 173-98-100). The SERP was established “to help ensure that environmentally sound
alternatives are selected and to satisfy the state’s responsibility to help ensure that
recipients comply with the NEPA and other applicable environmental laws, regulations, and
executive orders.” Other environmental components of this Plan include a Biological
Assessment (BA) that will be submitted to the Corps of Engineers, as well as documents
prepared in accordance with Section 106 of the National Historic Preservation Act (NHPA).




CAROLLO ENGINEERS                                                         ES-10            DRAFT – March 2013
pw://Carollo/Documents/Client/WA/Oak Harbor/8549A00/Deliverables/Facilities Plan/ES.docx
ES.6 ALTERNATIVES DEVELOPMENT AND EVALUATION
Alternatives presented in this Plan are comprised of three components: 1) a Wastewater
Treatment Process; 2) an Effluent Discharge (Outfall) Location; and 3) a Wastewater
Treatment Facility Site. At the onset of the Project, the City took a position that all sites,
outfall locations, and treatment processes should be considered potentially viable.

The project team used a comprehensive process to develop project objectives and
evaluation criteria; and to identify and screen alternatives. The process generally consisted
of major milestones between December 2010 and August 2012. Community input was a
critically important factor in the development, evaluation and selection of alternatives. The
City began proactively working with stakeholders in November of 2010 and continues to
integrate a high level of community input to implement the proposed alternative.

ES.6.1 Project Objectives and Evaluation Criteria
The City’s 2009 Comprehensive Plan states that the City “…recognizes the value of its
natural environmental and supports environmental protection and enhancement. The
community recognizes that total preservation may not be feasible in an urban area. Rather,
the City should seek to implement environmental goals within the context of planned
growth.” To reflect the City’s values, the project team evaluated alternatives for upgrading
the City’s wastewater treatment system considering impacts and benefits of the project to
the community as a whole. The Triple Bottom Line is a commonly used approach that
weighs three areas of cost and benefit: financial, social, and environmental. The category of
“Technical” was included in this analysis to address industry standards in related to
performance, implementability, operations, and maintenance. The approach of combining
these four perspectives is referred to herein as “TBL+”.

For this evaluation, each of the four TBL+ categories was divided into three, equally
weighted objectives. City staff meetings, stakeholder workshops, and community interviews
were completed to establish project objectives and evaluation criteria for comparing
alternatives. A summary of the TBL+ objectives and criteria is illustrated in Figure ES.3.

ES.6.2 Preliminary Alternatives
After a preliminary evaluation, the City selected two wastewater treatment processes as the
basis for alternatives development: a membrane bioreactor (MBR) process and an
activated sludge (AS) process with tertiary treatment. Analysis of outfall locations was also
completed early in the Project. Oak Harbor was determined to be the most cost-effective
and preferred location, largely to eliminate the risk of impact fees that could be assessed
through the aquatic land use lease process. Once these decisions had been made, the
process of developing and evaluating alternatives was focused on selecting a site for the
City’s new treatment facility.




CAROLLO ENGINEERS                                                         ES-11            DRAFT – March 2013
pw://Carollo/Documents/Client/WA/Oak Harbor/8549A00/Deliverables/Facilities Plan/ES.docx
PROJECT OBJECTIVES
                                                                                                         FIGURE ES.3

                                                                                                      CITY OF OAK HARBOR
                                                                                                   WASTEWATER FACILITIES PLAN



pw://Carollo/Documents/Client/WA/Oak Harbor/8549A00/Deliverables/Facilities Plan/Fig_ES_03.docx
ES.6.3 Initially Proposed Sites
In December 2010, stakeholder and community input was used to identify 22 sites
illustrated by the yellow dots on Figure ES.4. Two additional sites were added based on
public input received later in the process (illustrated by yellow triangles on the figure). Over
the next several months the Project team considered public input and technical criteria to
develop 13 preliminary alternatives on eight potential sites, shown in blue on Figure ES.4.

Following the March 2011 City Council meeting, the project team completed an initial TBL+
evaluation of 13 preliminary alternatives (shown in Figure ES.5), generated by combining
the eight potential sites with the two potential treatment processes options, each
discharging to Oak Harbor. In the spring of 2011, additional coordination between the City
and US Navy resulted in one previously identified site (Crescent Harbor) being added back
to the list of potential sites. Over the next six months, the Project team conducted a series
of public involvement efforts additional technical analysis, and coordination with the US
Navy. During this time, the City was approached by the owners of property inside of the
UGA and adjacent to Crescent Harbor Drive. As a result of the discussions that followed,
the City elected to add this site (Crescent Harbor North) to the sites being considered.
Figure ES.6 shows the six sites proposed for further evaluation. They include:
         Windjammer Park
         Marina/Seaplane Base
         Old City Shops
         Beachview Farm
         Crescent Harbor
         Crescent Harbor North

To better illustrate differences between the six sites being considered further, the TBL+
analysis was modified to compare all alternatives on an equal basis (i.e. assuming MBR
process discharging treated effluent to Oak Harbor). Figure ES.7 shows the modified TBL+
comparison of the refined alternatives. Based on this analysis, the City elected to complete
a more detailed comparison of three final alternatives:

         Windjammer Vicinity MBR
         Crescent Harbor North MBR
         Crescent Harbor North AS




CAROLLO ENGINEERS                                                         ES-13            DRAFT – March 2013
pw://Carollo/Documents/Client/WA/Oak Harbor/8549A00/Deliverables/Facilities Plan/ES.docx
Volume i executive summary
Volume i executive summary
Volume i executive summary
Volume i executive summary
Volume i executive summary
Volume i executive summary
Volume i executive summary
Volume i executive summary
Volume i executive summary
Volume i executive summary
Volume i executive summary
Volume i executive summary
Volume i executive summary
Volume i executive summary
Volume i executive summary
Volume i executive summary
Volume i executive summary
Volume i executive summary
Volume i executive summary
Volume i executive summary
Volume i executive summary
Volume i executive summary
Volume i executive summary
Volume i executive summary
Volume i executive summary
Volume i executive summary
Volume i executive summary

Más contenido relacionado

La actualidad más candente

..plane g430 manual
..plane g430 manual..plane g430 manual
..plane g430 manualYasinKhan63
 
FastTrack Schedule 10 User Manual
FastTrack Schedule 10 User ManualFastTrack Schedule 10 User Manual
FastTrack Schedule 10 User ManualAEC Software
 
FastTrack Schedule 10 Tutorials
FastTrack Schedule 10 TutorialsFastTrack Schedule 10 Tutorials
FastTrack Schedule 10 TutorialsAEC Software
 
Import export procedure flowchart
Import export procedure flowchartImport export procedure flowchart
Import export procedure flowchartTushar G
 
Proyecto Minero Magistral ffs 43-101
Proyecto Minero Magistral ffs 43-101Proyecto Minero Magistral ffs 43-101
Proyecto Minero Magistral ffs 43-101Elvis Gomez Tique
 

La actualidad más candente (7)

Sga Model
Sga ModelSga Model
Sga Model
 
..plane g430 manual
..plane g430 manual..plane g430 manual
..plane g430 manual
 
FastTrack Schedule 10 User Manual
FastTrack Schedule 10 User ManualFastTrack Schedule 10 User Manual
FastTrack Schedule 10 User Manual
 
FastTrack Schedule 10 Tutorials
FastTrack Schedule 10 TutorialsFastTrack Schedule 10 Tutorials
FastTrack Schedule 10 Tutorials
 
UOSA_CAFR2014_Final
UOSA_CAFR2014_FinalUOSA_CAFR2014_Final
UOSA_CAFR2014_Final
 
Import export procedure flowchart
Import export procedure flowchartImport export procedure flowchart
Import export procedure flowchart
 
Proyecto Minero Magistral ffs 43-101
Proyecto Minero Magistral ffs 43-101Proyecto Minero Magistral ffs 43-101
Proyecto Minero Magistral ffs 43-101
 

Destacado

July 31 City Council Workshop Presentation
July 31 City Council Workshop PresentationJuly 31 City Council Workshop Presentation
July 31 City Council Workshop Presentationpublicinvolvement
 
150604 Oak Harbor Wastewater Treatment Plant Update
150604 Oak Harbor Wastewater Treatment Plant Update150604 Oak Harbor Wastewater Treatment Plant Update
150604 Oak Harbor Wastewater Treatment Plant Updatepublicinvolvement
 
January 13 City Council Workshop
January 13 City Council WorkshopJanuary 13 City Council Workshop
January 13 City Council Workshoppublicinvolvement
 
Oak Harbor Design Open House summary
Oak Harbor Design Open House summaryOak Harbor Design Open House summary
Oak Harbor Design Open House summarypublicinvolvement
 
C5 council workshop 111128_final
C5 council workshop 111128_finalC5 council workshop 111128_final
C5 council workshop 111128_finalpublicinvolvement
 
January 13, 2011 City Council Workshop
January 13, 2011 City Council WorkshopJanuary 13, 2011 City Council Workshop
January 13, 2011 City Council Workshoppublicinvolvement
 
2015 04-07 city-council_workshop_presentation
2015 04-07 city-council_workshop_presentation2015 04-07 city-council_workshop_presentation
2015 04-07 city-council_workshop_presentationpublicinvolvement
 
July 31 public forum & workshop
July 31 public forum & workshopJuly 31 public forum & workshop
July 31 public forum & workshoppublicinvolvement
 

Destacado (8)

July 31 City Council Workshop Presentation
July 31 City Council Workshop PresentationJuly 31 City Council Workshop Presentation
July 31 City Council Workshop Presentation
 
150604 Oak Harbor Wastewater Treatment Plant Update
150604 Oak Harbor Wastewater Treatment Plant Update150604 Oak Harbor Wastewater Treatment Plant Update
150604 Oak Harbor Wastewater Treatment Plant Update
 
January 13 City Council Workshop
January 13 City Council WorkshopJanuary 13 City Council Workshop
January 13 City Council Workshop
 
Oak Harbor Design Open House summary
Oak Harbor Design Open House summaryOak Harbor Design Open House summary
Oak Harbor Design Open House summary
 
C5 council workshop 111128_final
C5 council workshop 111128_finalC5 council workshop 111128_final
C5 council workshop 111128_final
 
January 13, 2011 City Council Workshop
January 13, 2011 City Council WorkshopJanuary 13, 2011 City Council Workshop
January 13, 2011 City Council Workshop
 
2015 04-07 city-council_workshop_presentation
2015 04-07 city-council_workshop_presentation2015 04-07 city-council_workshop_presentation
2015 04-07 city-council_workshop_presentation
 
July 31 public forum & workshop
July 31 public forum & workshopJuly 31 public forum & workshop
July 31 public forum & workshop
 

Similar a Volume i executive summary

Final feasiblity reprtmarina
Final feasiblity reprtmarinaFinal feasiblity reprtmarina
Final feasiblity reprtmarinaanil sharma
 
Red Sea - Dead Sea Water Conveyance - Feasibility Study - report summary
Red Sea - Dead Sea Water Conveyance - Feasibility Study - report summaryRed Sea - Dead Sea Water Conveyance - Feasibility Study - report summary
Red Sea - Dead Sea Water Conveyance - Feasibility Study - report summaryasafeiran
 
Project Implementation Review of the NEPAD Infrastructure Short Term Action P...
Project Implementation Review of the NEPAD Infrastructure Short Term Action P...Project Implementation Review of the NEPAD Infrastructure Short Term Action P...
Project Implementation Review of the NEPAD Infrastructure Short Term Action P...Dr Lendy Spires
 
2012 Water & Wastewater Master Plan
2012 Water & Wastewater Master Plan2012 Water & Wastewater Master Plan
2012 Water & Wastewater Master PlanCityofKilleen
 
Eia addendum 2 for 1.00 km
Eia addendum 2 for 1.00 kmEia addendum 2 for 1.00 km
Eia addendum 2 for 1.00 kmzubeditufail
 
ENGS_90_Final_Report_TeamTara.pdf
ENGS_90_Final_Report_TeamTara.pdfENGS_90_Final_Report_TeamTara.pdf
ENGS_90_Final_Report_TeamTara.pdfHanaBaSabaa
 
litrature finale.docx
litrature finale.docxlitrature finale.docx
litrature finale.docxAbrshWubishet
 
Chapter 14 bridge hydraulics
Chapter 14 bridge hydraulicsChapter 14 bridge hydraulics
Chapter 14 bridge hydraulicsmarco tacco
 
WVU Report on Shale Drilling Pits and Impoundments - Dec 2012
WVU Report on Shale Drilling Pits and Impoundments - Dec 2012WVU Report on Shale Drilling Pits and Impoundments - Dec 2012
WVU Report on Shale Drilling Pits and Impoundments - Dec 2012Marcellus Drilling News
 
Archaeological Report - Stagpark 1, Co. Cork (Ireland)
Archaeological Report - Stagpark 1, Co. Cork (Ireland)Archaeological Report - Stagpark 1, Co. Cork (Ireland)
Archaeological Report - Stagpark 1, Co. Cork (Ireland)John Tierney
 
Greater gabbard optimization project
Greater gabbard optimization projectGreater gabbard optimization project
Greater gabbard optimization projectJavier Criado Risco
 
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - DraftEnvironmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - DraftStopHermosaBeachOil
 
EPA -- Vapor Intrusion Considerations For Brownfields Redevelopment
EPA -- Vapor Intrusion Considerations For Brownfields RedevelopmentEPA -- Vapor Intrusion Considerations For Brownfields Redevelopment
EPA -- Vapor Intrusion Considerations For Brownfields RedevelopmentHarryONeill
 
TA-8111 PH - Revised Road Map_CLEANED
TA-8111 PH - Revised Road Map_CLEANEDTA-8111 PH - Revised Road Map_CLEANED
TA-8111 PH - Revised Road Map_CLEANEDElmer Mercado
 
Design manual-pump-station
Design manual-pump-stationDesign manual-pump-station
Design manual-pump-stationAreej Al-Azzawi
 
Hydropower Assessment finalDraft 20Feb-5
Hydropower Assessment finalDraft 20Feb-5Hydropower Assessment finalDraft 20Feb-5
Hydropower Assessment finalDraft 20Feb-5Izhar Hunzai
 
Hydropower Assessment finalDraft 20Feb-4
Hydropower Assessment finalDraft 20Feb-4Hydropower Assessment finalDraft 20Feb-4
Hydropower Assessment finalDraft 20Feb-4Izhar Hunzai
 

Similar a Volume i executive summary (20)

Final feasiblity reprtmarina
Final feasiblity reprtmarinaFinal feasiblity reprtmarina
Final feasiblity reprtmarina
 
Red Sea - Dead Sea Water Conveyance - Feasibility Study - report summary
Red Sea - Dead Sea Water Conveyance - Feasibility Study - report summaryRed Sea - Dead Sea Water Conveyance - Feasibility Study - report summary
Red Sea - Dead Sea Water Conveyance - Feasibility Study - report summary
 
Project Implementation Review of the NEPAD Infrastructure Short Term Action P...
Project Implementation Review of the NEPAD Infrastructure Short Term Action P...Project Implementation Review of the NEPAD Infrastructure Short Term Action P...
Project Implementation Review of the NEPAD Infrastructure Short Term Action P...
 
2012 Water & Wastewater Master Plan
2012 Water & Wastewater Master Plan2012 Water & Wastewater Master Plan
2012 Water & Wastewater Master Plan
 
NASA_RCMGuide.pdf
NASA_RCMGuide.pdfNASA_RCMGuide.pdf
NASA_RCMGuide.pdf
 
Eia addendum 2 for 1.00 km
Eia addendum 2 for 1.00 kmEia addendum 2 for 1.00 km
Eia addendum 2 for 1.00 km
 
FinalReport-1
FinalReport-1FinalReport-1
FinalReport-1
 
ENGS_90_Final_Report_TeamTara.pdf
ENGS_90_Final_Report_TeamTara.pdfENGS_90_Final_Report_TeamTara.pdf
ENGS_90_Final_Report_TeamTara.pdf
 
litrature finale.docx
litrature finale.docxlitrature finale.docx
litrature finale.docx
 
Chapter 14 bridge hydraulics
Chapter 14 bridge hydraulicsChapter 14 bridge hydraulics
Chapter 14 bridge hydraulics
 
WVU Report on Shale Drilling Pits and Impoundments - Dec 2012
WVU Report on Shale Drilling Pits and Impoundments - Dec 2012WVU Report on Shale Drilling Pits and Impoundments - Dec 2012
WVU Report on Shale Drilling Pits and Impoundments - Dec 2012
 
Archaeological Report - Stagpark 1, Co. Cork (Ireland)
Archaeological Report - Stagpark 1, Co. Cork (Ireland)Archaeological Report - Stagpark 1, Co. Cork (Ireland)
Archaeological Report - Stagpark 1, Co. Cork (Ireland)
 
Greater gabbard optimization project
Greater gabbard optimization projectGreater gabbard optimization project
Greater gabbard optimization project
 
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - DraftEnvironmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
 
EPA -- Vapor Intrusion Considerations For Brownfields Redevelopment
EPA -- Vapor Intrusion Considerations For Brownfields RedevelopmentEPA -- Vapor Intrusion Considerations For Brownfields Redevelopment
EPA -- Vapor Intrusion Considerations For Brownfields Redevelopment
 
EIA-Final-Report (1)
EIA-Final-Report (1)EIA-Final-Report (1)
EIA-Final-Report (1)
 
TA-8111 PH - Revised Road Map_CLEANED
TA-8111 PH - Revised Road Map_CLEANEDTA-8111 PH - Revised Road Map_CLEANED
TA-8111 PH - Revised Road Map_CLEANED
 
Design manual-pump-station
Design manual-pump-stationDesign manual-pump-station
Design manual-pump-station
 
Hydropower Assessment finalDraft 20Feb-5
Hydropower Assessment finalDraft 20Feb-5Hydropower Assessment finalDraft 20Feb-5
Hydropower Assessment finalDraft 20Feb-5
 
Hydropower Assessment finalDraft 20Feb-4
Hydropower Assessment finalDraft 20Feb-4Hydropower Assessment finalDraft 20Feb-4
Hydropower Assessment finalDraft 20Feb-4
 

Más de publicinvolvement

Guaranteed Maximum Price Amendment #13
Guaranteed Maximum Price Amendment #13Guaranteed Maximum Price Amendment #13
Guaranteed Maximum Price Amendment #13publicinvolvement
 
Presentation of Windjammer Park 60% Design to City Council
Presentation of Windjammer Park 60% Design to City CouncilPresentation of Windjammer Park 60% Design to City Council
Presentation of Windjammer Park 60% Design to City Councilpublicinvolvement
 
Preview of Windjammer Park 30% Design to City Council
Preview of Windjammer Park 30% Design to City CouncilPreview of Windjammer Park 30% Design to City Council
Preview of Windjammer Park 30% Design to City Councilpublicinvolvement
 
Windjammer Park Phase 1 Design Open House
Windjammer Park Phase 1 Design Open HouseWindjammer Park Phase 1 Design Open House
Windjammer Park Phase 1 Design Open Housepublicinvolvement
 
Oak Harbor City Council Meeting: GMP 9
Oak Harbor City Council Meeting: GMP 9Oak Harbor City Council Meeting: GMP 9
Oak Harbor City Council Meeting: GMP 9publicinvolvement
 
Presentation of Windjammer Park Integration Plan to City Council
Presentation of Windjammer Park Integration Plan to City CouncilPresentation of Windjammer Park Integration Plan to City Council
Presentation of Windjammer Park Integration Plan to City Councilpublicinvolvement
 
Windjammer Park Integration Plan Community Advisory Group meeting 5
Windjammer Park Integration Plan Community Advisory Group meeting 5Windjammer Park Integration Plan Community Advisory Group meeting 5
Windjammer Park Integration Plan Community Advisory Group meeting 5publicinvolvement
 
Community Advisory Group meeting 5
Community Advisory Group meeting 5Community Advisory Group meeting 5
Community Advisory Group meeting 5publicinvolvement
 
Oak Harbor City Council Workshop: Design Update
Oak Harbor City Council Workshop: Design UpdateOak Harbor City Council Workshop: Design Update
Oak Harbor City Council Workshop: Design Updatepublicinvolvement
 
Oak Harbor Clean Water Facility GMP #7
Oak Harbor Clean Water Facility GMP #7Oak Harbor Clean Water Facility GMP #7
Oak Harbor Clean Water Facility GMP #7publicinvolvement
 
Windjammer Park Integration Plan Community Advisory Group meeting 4
Windjammer Park Integration Plan Community Advisory Group meeting 4Windjammer Park Integration Plan Community Advisory Group meeting 4
Windjammer Park Integration Plan Community Advisory Group meeting 4publicinvolvement
 
Oak Harbor Windjammer Park Integration Plan
Oak Harbor Windjammer Park Integration Plan Oak Harbor Windjammer Park Integration Plan
Oak Harbor Windjammer Park Integration Plan publicinvolvement
 
Oak Harbor Community Advisory Group meeing 2 and public open house
Oak Harbor Community Advisory Group meeing 2 and public open houseOak Harbor Community Advisory Group meeing 2 and public open house
Oak Harbor Community Advisory Group meeing 2 and public open housepublicinvolvement
 
Windjammer Park Integration Plan CAG meeting 1
Windjammer Park Integration Plan CAG meeting 1Windjammer Park Integration Plan CAG meeting 1
Windjammer Park Integration Plan CAG meeting 1publicinvolvement
 
Windjammer Park Integration Plan - Council presentation
Windjammer Park Integration Plan - Council presentationWindjammer Park Integration Plan - Council presentation
Windjammer Park Integration Plan - Council presentationpublicinvolvement
 
Oak Harbor Wastewater Treatment Facility: Resolution 15-34, Community Room
Oak Harbor Wastewater Treatment Facility: Resolution 15-34, Community RoomOak Harbor Wastewater Treatment Facility: Resolution 15-34, Community Room
Oak Harbor Wastewater Treatment Facility: Resolution 15-34, Community Roompublicinvolvement
 
Special Workshop presentation on Finance
Special Workshop presentation on FinanceSpecial Workshop presentation on Finance
Special Workshop presentation on Financepublicinvolvement
 
60% Design and Cost Estimate
60% Design and Cost Estimate60% Design and Cost Estimate
60% Design and Cost Estimatepublicinvolvement
 
Clean Water Facility 60% Cost Estimate Preview
Clean Water Facility 60% Cost Estimate PreviewClean Water Facility 60% Cost Estimate Preview
Clean Water Facility 60% Cost Estimate Previewpublicinvolvement
 

Más de publicinvolvement (20)

Guaranteed Maximum Price Amendment #13
Guaranteed Maximum Price Amendment #13Guaranteed Maximum Price Amendment #13
Guaranteed Maximum Price Amendment #13
 
Presentation of Windjammer Park 60% Design to City Council
Presentation of Windjammer Park 60% Design to City CouncilPresentation of Windjammer Park 60% Design to City Council
Presentation of Windjammer Park 60% Design to City Council
 
Preview of Windjammer Park 30% Design to City Council
Preview of Windjammer Park 30% Design to City CouncilPreview of Windjammer Park 30% Design to City Council
Preview of Windjammer Park 30% Design to City Council
 
Windjammer Park Phase 1 Design Open House
Windjammer Park Phase 1 Design Open HouseWindjammer Park Phase 1 Design Open House
Windjammer Park Phase 1 Design Open House
 
Oak Harbor City Council Meeting: GMP 9
Oak Harbor City Council Meeting: GMP 9Oak Harbor City Council Meeting: GMP 9
Oak Harbor City Council Meeting: GMP 9
 
Presentation of Windjammer Park Integration Plan to City Council
Presentation of Windjammer Park Integration Plan to City CouncilPresentation of Windjammer Park Integration Plan to City Council
Presentation of Windjammer Park Integration Plan to City Council
 
Windjammer Park Integration Plan Community Advisory Group meeting 5
Windjammer Park Integration Plan Community Advisory Group meeting 5Windjammer Park Integration Plan Community Advisory Group meeting 5
Windjammer Park Integration Plan Community Advisory Group meeting 5
 
Community Advisory Group meeting 5
Community Advisory Group meeting 5Community Advisory Group meeting 5
Community Advisory Group meeting 5
 
Oak Harbor City Council Workshop: Design Update
Oak Harbor City Council Workshop: Design UpdateOak Harbor City Council Workshop: Design Update
Oak Harbor City Council Workshop: Design Update
 
Oak Harbor Clean Water Facility GMP #7
Oak Harbor Clean Water Facility GMP #7Oak Harbor Clean Water Facility GMP #7
Oak Harbor Clean Water Facility GMP #7
 
Windjammer Park Integration Plan Community Advisory Group meeting 4
Windjammer Park Integration Plan Community Advisory Group meeting 4Windjammer Park Integration Plan Community Advisory Group meeting 4
Windjammer Park Integration Plan Community Advisory Group meeting 4
 
Oak Harbor Windjammer Park Integration Plan
Oak Harbor Windjammer Park Integration Plan Oak Harbor Windjammer Park Integration Plan
Oak Harbor Windjammer Park Integration Plan
 
Oak Harbor Community Advisory Group meeing 2 and public open house
Oak Harbor Community Advisory Group meeing 2 and public open houseOak Harbor Community Advisory Group meeing 2 and public open house
Oak Harbor Community Advisory Group meeing 2 and public open house
 
Windjammer Park Integration Plan CAG meeting 1
Windjammer Park Integration Plan CAG meeting 1Windjammer Park Integration Plan CAG meeting 1
Windjammer Park Integration Plan CAG meeting 1
 
Windjammer Park Integration Plan - Council presentation
Windjammer Park Integration Plan - Council presentationWindjammer Park Integration Plan - Council presentation
Windjammer Park Integration Plan - Council presentation
 
Oak Harbor Wastewater Treatment Facility: Resolution 15-34, Community Room
Oak Harbor Wastewater Treatment Facility: Resolution 15-34, Community RoomOak Harbor Wastewater Treatment Facility: Resolution 15-34, Community Room
Oak Harbor Wastewater Treatment Facility: Resolution 15-34, Community Room
 
Special Workshop presentation on Finance
Special Workshop presentation on FinanceSpecial Workshop presentation on Finance
Special Workshop presentation on Finance
 
60% Design and Cost Estimate
60% Design and Cost Estimate60% Design and Cost Estimate
60% Design and Cost Estimate
 
Oak Harbor Rate Study
Oak Harbor Rate StudyOak Harbor Rate Study
Oak Harbor Rate Study
 
Clean Water Facility 60% Cost Estimate Preview
Clean Water Facility 60% Cost Estimate PreviewClean Water Facility 60% Cost Estimate Preview
Clean Water Facility 60% Cost Estimate Preview
 

Volume i executive summary

  • 1.
  • 2.
  • 3. City of Oak Harbor WASTEWATER FACILITIES PLAN Executive Summary DRAFT March 2013 1218 THIRD AVENUE, SUITE 1600 • SEATTLE, WASHINGTON 98101 • P. 206.684.6532 • F. 206.903.0419 pw://Carollo/Documents/Client/WA/Oak Harbor/8549A00/Deliverables/Facilities Plan/Cover_TOC.docx
  • 4. ASSOCIATED FIRMS This Wastewater Facilities Plan was developed in coordination with: CAROLLO ENGINEERS DRAFT – March 2013 pw://Carollo/Documents/Client/WA/Oak Harbor/8549A00/Deliverables/Facilities Plan/Cover_TOC.docx
  • 5. City of Oak Harbor Wastewater Facilities Plan TABLE OF CONTENTS Page No. ES.1  INTRODUCTION ....................................................................................................... 1  ES.1.1  Project Need ............................................................................................ 1  ES.1.2  Project Goal ............................................................................................. 1  ES.2  PLANNING AREA CHARACTERISTICS .................................................................. 2  ES.2.1  Service Area ............................................................................................ 2  ES.3  EXISTING FACILITIES.............................................................................................. 2  ES.3.1  Existing Treatment Facilities .................................................................... 2  ES.3.2  Existing Effluent Outfalls .......................................................................... 4  ES.3.3  Existing Wastewater Collection System .................................................. 4  ES.4  WASTEWATER FLOWS AND LOADS ..................................................................... 5  ES.4.1  Flow and Load Projections ...................................................................... 5  ES.4.2  Phasing Scenarios For Growth ................................................................ 7  ES.5  REGULATORY REQUIREMENTS ............................................................................ 8  ES.5.1  Effluent Quality Goals .............................................................................. 8  ES.5.2  Biosolids Management .......................................................................... 10  ES.5.3  Other Environmental Documents ........................................................... 10  ES.6  ALTERNATIVES DEVELOPMENT AND EVALUATION ......................................... 11  ES.6.1  Project Objectives and Evaluation Criteria ............................................ 11  ES.6.2  Preliminary Alternatives ......................................................................... 11  ES.6.3  Initially Proposed Sites .......................................................................... 13  ES.6.4  Final Sites and Alternatives ................................................................... 18  ES.7  PROPOSED ALTERNATIVE................................................................................... 22  ES.7.1  Wastewater Treatment Facility .............................................................. 22  ES.7.2  Wastewater Conveyance System .......................................................... 24  ES.7.3  Treated Effluent Outfall .......................................................................... 24  ES.7.4  Project Phasing Scenarios..................................................................... 24  ES.7.5  Phase 1 Cost Summary ......................................................................... 26  ES.8  IMPLEMENTATION PLAN ...................................................................................... 28  ES.8.1  Financial Analysis Summary .................................................................. 28  CAROLLO ENGINEERS i DRAFT – March 2013 pw://Carollo/Documents/Client/WA/Oak Harbor/8549A00/Deliverables/Facilities Plan/Cover_TOC.docx
  • 6. LIST OF TABLES Table ES.1  Population Projections ................................................................................... 5  Table ES.2  Current Flows and Loads............................................................................... 6  Table ES.3  Projected Flows and Loads ........................................................................... 7  Table ES.4  Effluent Quality Goals .................................................................................... 8  Table ES.5  Windjammer Vicinity MBR Key Considerations ........................................... 21  Table ES.6  Crescent Harbor North MBR Key Considerations ....................................... 21  Table ES.7  Crescent Harbor North AS Key Considerations........................................... 22  Table ES.8  Phase 1 Capacity Summary ........................................................................ 26  Table ES.9  Total Phase 1 Cost Comparison (in millions)............................................... 28  Table ES.10  City Share of Phase 1 Capital Costs (escalated, in millions) ....................... 30  LIST OF FIGURES Figure ES.1  Study Area, Topography, and Existing System ............................................. 3  Figure ES.2  Growth Scenarios for Phasing ....................................................................... 9  Figure ES.3  Project Objectives ........................................................................................ 12  Figure ES.4  Potential WWTP Sites ................................................................................. 14  Figure ES.5.  TBL+ Analysis of Preliminary Alternatives ................................................... 15  Figure ES.6  Six Sites For Further Evaluation .................................................................. 16  Figure ES.7  TBL+ Analysis of Refined Alternatives ........................................................ 17  Figure ES.8  Windjammer Vicinity Charrette Results ....................................................... 19  Figure ES.9  Crescent Harbor North Charrette Results.................................................... 20  Figure ES.10  Treatment Process Flow Schematic ............................................................ 23  Figure ES.11  Conveyance Improvements for Scenario 1.................................................. 25  Figure ES.12  Estimated Phase 1 Project Costs ................................................................ 27  Figure ES.13  Proposed Schedule ..................................................................................... 29  Figure ES.14  Monthly Sewer Rate Analysis ...................................................................... 31  CAROLLO ENGINEERS ii DRAFT – March 2013 pw://Carollo/Documents/Client/WA/Oak Harbor/8549A00/Deliverables/Facilities Plan/Cover_TOC.docx
  • 7. City of Oak Harbor Wastewater Facilities Plan TABLE OF CONTENTS Page No. ES.1  INTRODUCTION ....................................................................................................... 1  ES.1.1  Project Need ............................................................................................ 1  ES.1.2  Project Goal ............................................................................................. 1  ES.2  PLANNING AREA CHARACTERISTICS .................................................................. 2  ES.2.1  Service Area ............................................................................................ 2  ES.3  EXISTING FACILITIES.............................................................................................. 2  ES.3.1  Existing Treatment Facilities .................................................................... 2  ES.3.2  Existing Effluent Outfalls .......................................................................... 4  ES.3.3  Existing Wastewater Collection System .................................................. 4  ES.4  WASTEWATER FLOWS AND LOADS ..................................................................... 5  ES.4.1  Flow and Load Projections ...................................................................... 5  ES.4.2  Phasing Scenarios For Growth ................................................................ 7  ES.5  REGULATORY REQUIREMENTS ............................................................................ 8  ES.5.1  Effluent Quality Goals .............................................................................. 8  ES.5.2  Biosolids Management .......................................................................... 10  ES.5.3  Other Environmental Documents ........................................................... 10  ES.6  ALTERNATIVES DEVELOPMENT AND EVALUATION ......................................... 11  ES.6.1  Project Objectives and Evaluation Criteria ............................................ 11  ES.6.2  Preliminary Alternatives ......................................................................... 11  ES.6.3  Initially Proposed Sites .......................................................................... 13  ES.6.4  Final Sites and Alternatives ................................................................... 18  ES.7  PROPOSED ALTERNATIVE................................................................................... 22  ES.7.1  Wastewater Treatment Facility .............................................................. 22  ES.7.2  Wastewater Conveyance System .......................................................... 24  ES.7.3  Treated Effluent Outfall .......................................................................... 24  ES.7.4  Project Phasing Scenarios..................................................................... 24  ES.7.5  Phase 1 Cost Summary ......................................................................... 26  ES.8  IMPLEMENTATION PLAN ...................................................................................... 28  ES.8.1  Financial Analysis Summary .................................................................. 28  CAROLLO ENGINEERS i DRAFT – March 2013 pw://Carollo/Documents/Client/WA/Oak Harbor/8549A00/Deliverables/Facilities Plan/Cover_TOC.docx
  • 8. LIST OF TABLES Table ES.1  Population Projections ................................................................................... 5  Table ES.2  Current Flows and Loads............................................................................... 6  Table ES.3  Projected Flows and Loads ........................................................................... 7  Table ES.4  Effluent Quality Goals .................................................................................... 8  Table ES.5  Windjammer Vicinity MBR Key Considerations ........................................... 21  Table ES.6  Crescent Harbor North MBR Key Considerations ....................................... 21  Table ES.7  Crescent Harbor North AS Key Considerations........................................... 22  Table ES.8  Phase 1 Capacity Summary ........................................................................ 26  Table ES.9  Total Phase 1 Cost Comparison (in millions)............................................... 28  Table ES.10  City Share of Phase 1 Capital Costs (escalated, in millions) ....................... 30  LIST OF FIGURES Figure ES.1  Study Area, Topography, and Existing System ............................................. 3  Figure ES.2  Growth Scenarios for Phasing ....................................................................... 9  Figure ES.3  Project Objectives ........................................................................................ 12  Figure ES.4  Potential WWTP Sites ................................................................................. 14  Figure ES.5.  TBL+ Analysis of Preliminary Alternatives ................................................... 15  Figure ES.6  Six Sites For Further Evaluation .................................................................. 16  Figure ES.7  TBL+ Analysis of Refined Alternatives ........................................................ 17  Figure ES.8  Windjammer Vicinity Charrette Results ....................................................... 19  Figure ES.9  Crescent Harbor North Charrette Results.................................................... 20  Figure ES.10  Treatment Process Flow Schematic ............................................................ 23  Figure ES.11  Conveyance Improvements for Scenario 1.................................................. 25  Figure ES.12  Estimated Phase 1 Project Costs ................................................................ 27  Figure ES.13  Proposed Schedule ..................................................................................... 29  Figure ES.14  Monthly Sewer Rate Analysis ...................................................................... 31  CAROLLO ENGINEERS ii DRAFT – March 2013 pw://Carollo/Documents/Client/WA/Oak Harbor/8549A00/Deliverables/Facilities Plan/Cover_TOC.docx
  • 9. Acronyms & Abbreviations AA annual average AACE Associate of the Advancement of Cost Engineering AAF average annual flow AC asbestos cement ADA Americans with Disability Act AS Activated Sludge BAF Biologically Aerated Filter BOD biochemical oxygen demand BWF base wastewater flow CBD Central Business District CCI Construction Cost Index CCP concrete cylinder pipe CDBG Community Development Block Grant CERB Community Economic Revitalization Board CFR Code of Federal Regulations City City of Oak Harbor CMP corrugated metal pipe DHAP Department of Archaeology & Historic Preservation DI ductile iron DIN dissolved inorganic nitrogen DMR discharge monthly report DNS determination of nonsignificance DO dissolved oxygen DOH Washington State Department of Health DS determination of significance DWF dry weather flow Ecology Washing State Department of Ecology EDC endocrine disrupting compuonds EFH essential fish habitat EID Environmental Information Document EIS Environmental Impact Statement ENR Engineering News-Record EPA Environmental Protection Agency CAROLLO ENGINEERS i DRAFT – March 2013 pw://Carollo/Documents/Client/WA/Oak Harbor/8549A00/Deliverables/Facilities Plan/Acronyms.docx
  • 10. Acronyms & Abbreviations F/M ratio food-microorganism ratio FDA Food and Drug Administration GMA Growth Management Act gpad gallons per are per day gpcd gallons per capita per day gpd gallons per day gpd/sf gallons per day per square foot gpm gallons per minute GT gravity thickener HDPE high –density polyethylene hp horsepower HPA Hydraulic Project Approval HRT hydraulic retention time IFAS integrated fixed film activated sludge I/I Infiltration and inflow JARPA Joint Aquatic Resources Permit Application JPA Joint Planning area Lagoon Plant Seaplane Base Lagoon WWTP LOTT Lakehaven, Olympia, Tacoma, Tumwater area MBR membrane bioreactor MBBR moving bed bioreactor MDNS mitigated determination of nonsignificance mg/L milligrams per liter mgd millions of gallons per day MHHW mean higher high water MHI median household income MLE Modified Ludzack Ettinger MLLW mean lower – low water MLR mixed liquor return MLSS mixed liquor suspended solids MM maximum month MMF maximum month flow MR Marine Reach CAROLLO ENGINEERS ii DRAFT – March 2013 pw://Carollo/Documents/Client/WA/Oak Harbor/8549A00/Deliverables/Facilities Plan/Acronyms.docx
  • 11. Acronyms & Abbreviations NAS Naval Air Station NH3 ammonia NHPA National Historic Preservation Act of 1966 NOAA National Oceanic and Atmospheric Administration NPDES National Pollutions Discharge Elimination System NRDC Natural Resources Defense Council NTU nephelometric turbidity units NWCAA Northwest Clean Air Agency O&M Operation and Maintenance OHMC Oak Harbor Municipal Code OS Open Space PBP Planned Business Park PD peak day PDF peak day flow PF public facilities pH chemical balance measurement PHF peak hour flow PIP Planned Industrial Park Plan Facilities Plan POTW publicly owned treatment works pp pounds per day ppcd pounds per capita per day ppd pounds per day PRE Planned Residential Estate PVC polyvinyl chloride PWTF Public Works Trust Fund RBC Rotating biological contactor RCP reinforced concrete pipe ROW right-of-way SDC system development charges SERP State Environment Review Process SLR solids loading rate SOR surface overflow rate CAROLLO ENGINEERS iii DRAFT – March 2013 pw://Carollo/Documents/Client/WA/Oak Harbor/8549A00/Deliverables/Facilities Plan/Acronyms.docx
  • 12. Acronyms & Abbreviations SRF State Revolving Fund SRT solids retention time STAG State and Tribal Assistance Grants SVI sludge volume index TBL+ Triple Bottom Line Plus Technical TF Trickling Filter TF/SC Trickling Filter/Solids Contact TIN total inorganic nitrogen TMDL total maximum daily load TOrC trace organic chemical TSS total suspended solids UFC Uniform Fire Code UGA Urban growth area USEDA United States Economic Development Administration USDA-RD United States Department of Agriculture-Rural Development UV ultraviolet UVT ultraviolet transmittance VFD variable frequency drive VFW Veterans of Foreign Wars WAC Washington Administrative Code WDFW table 6.8 WDNR Washington State Department of Natural Resources WSEC Washington State Energy Code WWTP Wastewater treatment plant CAROLLO ENGINEERS iv DRAFT – March 2013 pw://Carollo/Documents/Client/WA/Oak Harbor/8549A00/Deliverables/Facilities Plan/Acronyms.docx
  • 13. Executive Summary WASTEWATER FACILITIES PLAN ES.1 INTRODUCTION The City of Oak Harbor (City) must replace two aging wastewater treatment facilities with a new facility that meets modern standards for reliability and performance. This Wastewater Facilities Plan (Plan) describes the proposed alternative for wastewater collection, treatment, and effluent discharge (marine and/or reclamation), in accordance with Washington Administrative Code (WAC) 173-240. Completing the projects recommended in this Plan will allow the City to provide continued reliable wastewater service to the community of Oak Harbor while protecting and preserving the surrounding environment. ES.1.1 Project Need The City’s wastewater system serves approximately 24,000 people within the City and the Navy Seaplane Base. Wastewater is currently treated at two facilities: a rotating biological contactor (RBC) facility near Windjammer Park, and a lagoon facility on the Navy’s Seaplane Base. A project is needed to replace the City’s two existing treatment facilities with a modern facility capable of meeting the objectives listed below. Although the existing facilities are currently able to meet the requirements of the City’s National Pollution Discharge Elimination System (NPDES) Permit, they are not able to provide reliable long- term service for a number of reasons:  The existing RBC facility is nearing the end of its useful life.  Both the RBC and Lagoon Plants lack the technology to meet increasingly stringent water quality standards, and have inadequate capacity to keep pace with anticipated population growth.  Both effluent outfalls have seen major failures; the RBC Oak Harbor outfall no longer functions and the Crescent Harbor outfall is functional but damaged.  The area surrounding the Seaplane Base Lagoon Plant was reclaimed as a saltwater marsh in 2009. The lagoons are now surrounded by environmentally sensitive areas and are subject to frequent high water conditions, making expansion or modifications to the new lagoons infeasible. ES.1.2 Project Goal The goal of this project is to “obtain the highest level of water quality practical while recognizing the limitations of the rate payers of the City to fund the improvements.” Specific project objectives include: 1. Providing continued reliable wastewater treatment service; 2. Meeting high standards for water quality; CAROLLO ENGINEERS ES-1 DRAFT – March 2013 pw://Carollo/Documents/Client/WA/Oak Harbor/8549A00/Deliverables/Facilities Plan/ES.docx
  • 14. 3. Allowing phased expansion to meet future demands; and 4. Delivering construction and operation of a new facility by 2017 in a cost-effective manner. ES.2 PLANNING AREA CHARACTERISTICS The City of Oak Harbor is located near the northern end of Whidbey Island in Island County, Washington. The United States Navy operates two bases on Whidbey Island: the Seaplane Base located in the eastern portion of the City, and Ault Field which lies to the north of the City. The City covers approximately 6,030 acres (9.4 square miles), of which 2,820 acres (4.4 square miles) is occupied by the Navy’s Seaplane Base. The City’s Urban Growth Area (UGA) includes all of the City of Oak Harbor, as well as unincorporated areas to the north, between the City and Ault Field, and to the south and west of the City. The UGA represents the vicinity that is likely to be needed to accommodate growth over the next 20 years. ES.2.1 Service Area Figure ES.1 shows the study and service areas for this Plan, which includes all of the UGA, encompassing 7,540 acres (11.8 square miles) of land. A Joint Planning Area (JPA) which includes areas that may be developed beyond the 20-year planning period is not included in the study area, as these areas are not expected to require City sewer service within the next 20 years. An estimated 136 households within the current city limits are not connected to the City’s sewer system and are using on-site sewer systems. This equates to less than two percent of the City’s population. For the purpose of estimating future flows and loads, this Plan assumes that all currently unsewered areas will be served by the City within the 20-year planning horizon. ES.3 EXISTING FACILITIES The locations of the City’s existing wastewater facilities are shown in Figure ES.1. Existing facilities include two treatment plants, two effluent outfalls, approximately 74 miles of pipe, and 11 wastewater lift stations. ES.3.1 Existing Treatment Facilities Wastewater flows and loads treated at the City’s existing RBC Plant are approaching permitted limits, triggering the need for this Plan. Portions of the RBC Plant are over 50 years old and have reached the end of their service life. In recent years the City has experienced an increasing number of mechanical failures at the RBC Plant, particularly for outdated treatment equipment that is no longer prevalent in the treatment industry. Various analyses completed prior to this Plan have concluded that there is little or no salvage value in the existing RBC Plant. Due to its age and condition, and an inability to meet future CAROLLO ENGINEERS ES-2 DRAFT – March 2013 pw://Carollo/Documents/Client/WA/Oak Harbor/8549A00/Deliverables/Facilities Plan/ES.docx
  • 15. /HJHQG 1 *5 (1 ( 6HZHU ROOHFWLRQ 6VWHP :,/621 5' 5' /LIW 6WDWLRQV ( '( 95,(6 5' ::73V $8/7 ),(/' 5' ROOHFWLRQ 6VWHP )$..(0$ 5' RQWRXUV LW /LPLWV 7$/25 5' 8*$ RXQW $GRSWHG *2/) 2856( 5' 52%,1 /1 8*$ LW $GRSWHG *2/',( 5' 1 ( +(//(5 5' 1 ( 6/$7(5 5' +817 5' 526% 5' 6,/9(5 /$.( 5' 2$. +$5%25 5' ( # Š $,5/,1( :$ 5(6(17 +$5%25 5' +,*+ 32,17 /1267(5 :$ 5(6(59$7,21 5' 72 %86% 5' 5 3( '2 5' 1 ( 6( (/ 67 . ([LVWLQJ /DJRRQ 3ODQW 7+ $9( )HHW 6: 5 :$ $1 3,21(( 72 : 25$ 1 $9 0 ( ,' / : 6 ($ $ $ %/ ([LVWLQJ 5% 3ODQW 32 UHVFHQW +DUERU 9' /1 9( )257 18*(17 $9( ( // 5 ' 7H[W 2DN +DUERU %221 5' :$7(5/22 5' %$/'$ 5' )LJXUH (6 LW RI 2DN +DUERU 6WXG $UHD DQG 7RSRJUDSK :DVWHZDWHU )DFLOLWLHV 3ODQ 0,//(5 5' LW RI 2DN +DUERU
  • 16.
  • 17. regulatory requirements using installed technology, alternatives presented in this Plan assume the existing RBC Plant will be abandoned and demolished. The Seaplane Base Lagoon Plant (Lagoon Plant) was constructed and originally operated by NAS Whidbey to serve the Seaplane Base. In 1990 the City secured a 50-year lease from the Navy to operate the Lagoon Plant. Wastewater flows and loads treated at the Lagoon Plant are approaching permitted limits, triggering the need for this Plan. The current lagoon treatment process does not provide sufficient capacity to accommodate projected City growth. A capacity increase at the lagoons will trigger more stringent effluent standards that cannot be met with conventional lagoon treatment. Expansion or modification of the existing lagoons is infeasible due to surrounding environmentally sensitive areas. Due to capacity limitations, an inability to meet future regulatory requirements, access issues during flood events, and surrounding environmentally sensitive areas, alternatives presented in this Plan assume the existing Lagoon Plant will not be used in the future to treat wastewater from the City’s collection system. ES.3.2 Existing Effluent Outfalls Historically, effluent treated at the RBC Plant was discharged through an 18-inch diameter corrugated metal pipe outfall and diffuser into Oak Harbor, terminating at approximately minus 15 feet mean lower low water (MLLW). The diffuser has had a history of sediment buildup and blockage. In the summer of 2010 a significant portion of the diffuser was found to be filled with sediments. In September 2010 the outfall failed and was abandoned. Since that time all flow treated at the RBC Plant has been pumped to the Lagoon Plant. Effluent treated at the Lagoon Plant is currently discharged through an 18-inch diameter concrete pipe outfall and diffuser into Crescent Harbor, terminating at approximately minus 15 feet MLLW. The outfall was inspected in October 2010. Several sections of leaking pipe and joints were identified at that time. Portions of the pipe and diffuser will need to be repaired, replaced, and up-sized if the outfall is used as a component of the City’s future wastewater system. ES.3.3 Existing Wastewater Collection System The collection system was analyzed in previous planning efforts to determine the capacity of the existing network and to identify other issues that would trigger upgrades or improvements over the next 20 years. The results indicate a maximum peak hour flow of 7.9 million gallons per day (mgd) would be generated in the collection system discharging to the City’s existing RBC plant. Additionally, approximately 2 mgd of peak flow is generated on the Seaplane Base. The sum of these peak hour flows (9.9 mgd) provides the basis for peak hydraulic treatment capacity under current conditions. CAROLLO ENGINEERS ES-4 DRAFT – March 2013 pw://Carollo/Documents/Client/WA/Oak Harbor/8549A00/Deliverables/Facilities Plan/ES.docx
  • 18. Potential capacity limitations were identified in portions of the sewer system, and certain segments of the existing collection system were identified as being under-capacity for current flows. However, no segments require upgrades in the initial years of planning unless flow from the Navy is routed to existing gravity pipe segments that are near capacity. The timing for collection system capacity improvements is evaluated as a component of the alternatives analysis presented in this Plan. ES.4 WASTEWATER FLOWS AND LOADS Influent flow is derived from residential and commercial sources that discharge to the City’s RBC Plant, and from the Seaplane Base. There are no significant industrial sources in the City’s service area. Existing data were analyzed to determine current flows and loads on a total and per-capita basis. Future flows and loads were projected using current per-capita values and estimates for future population that are consistent with the City’s comprehensive planning documents. ES.4.1 Flow and Load Projections Existing and projected population data are shown in Table ES.1. Current wastewater flows and loads are shown in Table ES.2 and project wastewater flows and loads are shown in Table ES.3. Table ES.1 Population Projections Wastewater Facilities Plan City of Oak Harbor Navy Seaplane Year City UGA Sewered(2) Total Base(1) 2000 15,395(3) 4,400 0 19,795(4) 2010 17,675(3) 4,400 0 22,075(4) 2030 23,776 4,400 731 28,907 2060 36,654 4,400 1,637 42,691 Notes: (1) Summarized from the City of Oak Harbor Comprehensive Sewer Plan (Tetra Tech, December 2008) Table 3-2. (2) Assumes the UGA is not served currently and will be linearly incorporated into the service area from 2012 through 2060. (3) Total flow minus Navy flow. (4) US Census data (2010). CAROLLO ENGINEERS ES-5 DRAFT – March 2013 pw://Carollo/Documents/Client/WA/Oak Harbor/8549A00/Deliverables/Facilities Plan/ES.docx
  • 19. Table ES.2 Current Flows and Loads Wastewater Facilities Plan City of Oak Harbor Parameter City Total Flow, mgd(1) BWF 1.4 1.8 AAF 1.7 2.1 MMF 2.3 3.0 PDF 3.4 4.7 PHF 7.9 9.9 BOD, ppd(2,3) AA 3,556 4,127 MM 4,412 5,049 PD 5,556 6,510 TSS, ppd(2,4) AA 2,931 3,371 MM 4,153 4,792 PD 7,383 8,373 NH3, ppd(2,5) AA 390 487 MM 470 586 PD 596 745 Notes: (1) Total flow includes both City flow and flow from Navy facilities. Since the Navy population is projected to remain constant through 2060, the Navy flows are projected to equal 0.37 mgd for BWF, 0.43 mgd for AAF, 0.65 mgd for MMF and 1.23 for PDF. (2) Total load includes load from both the City and the Navy facilities. (3) The Navy BOD load is projected to equal 514 ppd for AA, 732 ppd for MM, and 942 for PD. (4) The Navy TSS load is projected to equal 440 ppd for AA, 638 ppd for MM, and 990 ppd for PD. (5) The Navy NH3 load is projected to equal 84 ppd for AA, 110 ppd for MM, and 128 ppd for PD. CAROLLO ENGINEERS ES-6 DRAFT – March 2013 pw://Carollo/Documents/Client/WA/Oak Harbor/8549A00/Deliverables/Facilities Plan/ES.docx
  • 20. Table ES.3 Projected Flows and Loads Wastewater Facilities Plan City of Oak Harbor 2030 2060 Parameters City Total City Total (1) Flow, mgd BWF 1.9 2.3 3.0 3.4 AAF 2.4 2.8 3.7 4.1 MMF 3.2 3.9 5.0 5.7 PDF 4.6 6.0 7.4 8.6 PHF 9.0 11.0 11.4 13.4 BOD, ppd(2,3) AA 4,931 5,444 7,704 8,217 MM 6,117 6,849 9,557 10,290 PD 7,704 8,646 12,037 12,979 TSS, ppd(2,4) AA 4,064 4,504 7,704 6,789 MM 5,759 6,397 9,557 9,636 PD 10,237 11,227 12,037 16,984 NH3, ppd(2,5) AA 541 638 845 942 MM 651 768 1,017 1,134 PD 827 975 1,292 1,440 Notes: (1) Total flow includes both City flow and flow from Navy facilities. Since the Navy population is projected to remain constant through 2060, the Navy flows are projected to equal 0.37 mgd for BWF, 0.43 mgd for AAF, 0.65 mgd for MMF and 1.23 for PDF. (2) Total load includes load from both the City and the Navy facilities. (3) The Navy BOD load is projected to equal 514 ppd for AA, 732 ppd for MM, and 942 for PD. (4) The Navy TSS load is projected to equal 440 ppd for AA, 638 ppd for MM, and 990 ppd for PD. (5) The Navy NH3 load is projected to equal 84 ppd for AA, 110 ppd for MM, and 128 ppd for PD. Population projections for the City are based on the City’s Draft Water System Plan. Navy population (and associated flows and loads) on the Seaplane Base are assumed to be constant over the planning period. Future flow and load projections also assume that the UGA will be uniformly incorporated into the sewer service area by Year 2060. ES.4.2 Phasing Scenarios For Growth Throughout this planning effort, year 2060 flows and loads are used to determine “ultimate” land area requirements for a WWTP that will serve the City’s needs well into the future. Year 2030 flows and loads are used to size and compare alternatives on a capital and life- cycle cost basis. The actual rate of growth of the City’s population, and corresponding increases in flows and loads, will likely be different than the values used for planning. To CAROLLO ENGINEERS ES-7 DRAFT – March 2013 pw://Carollo/Documents/Client/WA/Oak Harbor/8549A00/Deliverables/Facilities Plan/ES.docx
  • 21. account for these potential differences, phasing options are developed for the selected alternative to achieve the right balance between reliable capacity and affordability. Figure ES.2 shows the range of growth scenarios used for this analysis. Phase 1 facilities proposed in this Plan are based on the moderate growth scenario (approximately one percent annual growth in City population). ES.5 REGULATORY REQUIREMENTS Recognizing that the City is connected to the waters of Puget Sound via Oak Harbor and Crescent Harbor, the City’s goal is to obtain the highest level of water quality practical while recognizing the limitations of the rate payers of the City to fund improvements. A primary goal of the City is the continued protection of the water quality of the waters in and around Oak Harbor, thereby meeting the goals outlined in the Puget Sound Action Plan developed by the Puget Sound Partnership for the Cleanup and Protection of Puget Sound. ES.5.1 Effluent Quality Goals The City has established the effluent quality goals for conventional pollutants that are more stringent than the City’s current NPDES permit limits. These effluent goals are summarized in Table ES.4. Table ES.4 Effluent Quality Goals Wastewater Facilities Plan City of Oak Harbor RBC Plant NPDES Lagoon Plant New Facilities Permit Limit NPDES Permit Limit Target / Goal TSS 30 mg/L 75 mg/L 10 mg/L 85% removal 85% removal 95% removal CBOD5 25 mg/L 25 mg/L 10 mg/L 85% removal 85% removal 95% removal Turbidity Not applicable Not applicable 1 NTU Chlorine Residual 0.114 mg/L 0.5 mg/L No discharge Fecal Coliform 200/100 mL 200/100 mL 100/100 mL CAROLLO ENGINEERS ES-8 DRAFT – March 2013 pw://Carollo/Documents/Client/WA/Oak Harbor/8549A00/Deliverables/Facilities Plan/ES.docx
  • 22. 4.5 Measured Data Scenario 1, No Growth 4.0 Scenario 2, Intermediate Growth Scenario 3, Comprehensive Plan 3 3.5 2 1 3.0 2.5 2.0 Maximum Month Flow, mgd 1.5 1.0 Notes: 1 1:  Current measured capacity is 3.0 mgd. 2 2:  Capacity required at projected year of startup (2017) ranges from 3.0 to 3.2 mgd. 0.5 3:  Assuming 3.4 mgd of capacity is constructed in Phase 1, years of service  3 (prior to Phase 2) range from 4 to 13 years. 0.0 2000 2005 2010 2015 2020 2025 2030 2035 GROWTH SCENARIOS FOR PHASING FIGURE ES.2 CITY OF OAK HARBOR WASTEWATER FACILITIES PLAN pw://Carollo/Documents/Client/WA/Oak Harbor/8549A00/Deliverables/Facilities Plan/Fig_ES_02.docx
  • 23. Alternatives are evaluated largely on their ability to meet current NPDES permit limits. However, the flexibility to adapt to future regulatory requirements is an important planning consideration for the City. Potential future NPDES permit limits considered in this analysis include the ability to meet nutrient (nitrogen) limits and potential future trace organic chemical (TOrC) limits. While it is not yet clear how Ecology will establish future limits on these or other parameters, a number of Western Washington municipalities have begun to evaluate future nitrogen removal. In evaluating alternatives for Oak Harbor, the City is considering the need to meet a TIN level of 8 mg/L in the future, should these limits be enforced in subsequent permit cycles. Also, the City is interested in technologies that have demonstrated some ability to reduce TOrC concentrations in treated effluent, such as the MBR process or AS process with an extended solids residence time (SRT). ES.5.2 Biosolids Management The federal document that regulates the use and disposal of sewage sludge is the CFR, Part 503 (40 CFR §503, EPA 1993). Land-applied biosolids must meet requirements in the Part 503 regulations for reducing pathogens and vector attraction. The rule establishes two basic classes for pathogen reduction: Class A and Class B. The City is considering alternatives that will meet the 503 requirements for Class B initially, and Class A in future phases. ES.5.3 Other Environmental Documents The City has adopted the policies of the State Environmental Policy Act (SEPA) by reference (OHMC 20.04.010). A SEPA review will be completed to ensure that there are no adverse environmental impacts from proposed projects. The City will issue a threshold determination as to whether significant environmental impact may be expected as a result of the projects recommended by this Plan. This determination will be sent to Ecology for concurrence. To be eligible for financial assistance from the State Water Pollution Control Revolving Fund, this Plan must also comply with the State Environmental Review Process (SERP; WAC 173-98-100). The SERP was established “to help ensure that environmentally sound alternatives are selected and to satisfy the state’s responsibility to help ensure that recipients comply with the NEPA and other applicable environmental laws, regulations, and executive orders.” Other environmental components of this Plan include a Biological Assessment (BA) that will be submitted to the Corps of Engineers, as well as documents prepared in accordance with Section 106 of the National Historic Preservation Act (NHPA). CAROLLO ENGINEERS ES-10 DRAFT – March 2013 pw://Carollo/Documents/Client/WA/Oak Harbor/8549A00/Deliverables/Facilities Plan/ES.docx
  • 24. ES.6 ALTERNATIVES DEVELOPMENT AND EVALUATION Alternatives presented in this Plan are comprised of three components: 1) a Wastewater Treatment Process; 2) an Effluent Discharge (Outfall) Location; and 3) a Wastewater Treatment Facility Site. At the onset of the Project, the City took a position that all sites, outfall locations, and treatment processes should be considered potentially viable. The project team used a comprehensive process to develop project objectives and evaluation criteria; and to identify and screen alternatives. The process generally consisted of major milestones between December 2010 and August 2012. Community input was a critically important factor in the development, evaluation and selection of alternatives. The City began proactively working with stakeholders in November of 2010 and continues to integrate a high level of community input to implement the proposed alternative. ES.6.1 Project Objectives and Evaluation Criteria The City’s 2009 Comprehensive Plan states that the City “…recognizes the value of its natural environmental and supports environmental protection and enhancement. The community recognizes that total preservation may not be feasible in an urban area. Rather, the City should seek to implement environmental goals within the context of planned growth.” To reflect the City’s values, the project team evaluated alternatives for upgrading the City’s wastewater treatment system considering impacts and benefits of the project to the community as a whole. The Triple Bottom Line is a commonly used approach that weighs three areas of cost and benefit: financial, social, and environmental. The category of “Technical” was included in this analysis to address industry standards in related to performance, implementability, operations, and maintenance. The approach of combining these four perspectives is referred to herein as “TBL+”. For this evaluation, each of the four TBL+ categories was divided into three, equally weighted objectives. City staff meetings, stakeholder workshops, and community interviews were completed to establish project objectives and evaluation criteria for comparing alternatives. A summary of the TBL+ objectives and criteria is illustrated in Figure ES.3. ES.6.2 Preliminary Alternatives After a preliminary evaluation, the City selected two wastewater treatment processes as the basis for alternatives development: a membrane bioreactor (MBR) process and an activated sludge (AS) process with tertiary treatment. Analysis of outfall locations was also completed early in the Project. Oak Harbor was determined to be the most cost-effective and preferred location, largely to eliminate the risk of impact fees that could be assessed through the aquatic land use lease process. Once these decisions had been made, the process of developing and evaluating alternatives was focused on selecting a site for the City’s new treatment facility. CAROLLO ENGINEERS ES-11 DRAFT – March 2013 pw://Carollo/Documents/Client/WA/Oak Harbor/8549A00/Deliverables/Facilities Plan/ES.docx
  • 25. PROJECT OBJECTIVES FIGURE ES.3 CITY OF OAK HARBOR WASTEWATER FACILITIES PLAN pw://Carollo/Documents/Client/WA/Oak Harbor/8549A00/Deliverables/Facilities Plan/Fig_ES_03.docx
  • 26.
  • 27. ES.6.3 Initially Proposed Sites In December 2010, stakeholder and community input was used to identify 22 sites illustrated by the yellow dots on Figure ES.4. Two additional sites were added based on public input received later in the process (illustrated by yellow triangles on the figure). Over the next several months the Project team considered public input and technical criteria to develop 13 preliminary alternatives on eight potential sites, shown in blue on Figure ES.4. Following the March 2011 City Council meeting, the project team completed an initial TBL+ evaluation of 13 preliminary alternatives (shown in Figure ES.5), generated by combining the eight potential sites with the two potential treatment processes options, each discharging to Oak Harbor. In the spring of 2011, additional coordination between the City and US Navy resulted in one previously identified site (Crescent Harbor) being added back to the list of potential sites. Over the next six months, the Project team conducted a series of public involvement efforts additional technical analysis, and coordination with the US Navy. During this time, the City was approached by the owners of property inside of the UGA and adjacent to Crescent Harbor Drive. As a result of the discussions that followed, the City elected to add this site (Crescent Harbor North) to the sites being considered. Figure ES.6 shows the six sites proposed for further evaluation. They include:  Windjammer Park  Marina/Seaplane Base  Old City Shops  Beachview Farm  Crescent Harbor  Crescent Harbor North To better illustrate differences between the six sites being considered further, the TBL+ analysis was modified to compare all alternatives on an equal basis (i.e. assuming MBR process discharging treated effluent to Oak Harbor). Figure ES.7 shows the modified TBL+ comparison of the refined alternatives. Based on this analysis, the City elected to complete a more detailed comparison of three final alternatives:  Windjammer Vicinity MBR  Crescent Harbor North MBR  Crescent Harbor North AS CAROLLO ENGINEERS ES-13 DRAFT – March 2013 pw://Carollo/Documents/Client/WA/Oak Harbor/8549A00/Deliverables/Facilities Plan/ES.docx