SlideShare una empresa de Scribd logo
1 de 81
Descargar para leer sin conexión
INTERNSHIP PROGRAME
                    LUCKY CEMENT COMPANY LIMITED




DEPARTMENT OF




      MEHRAN UNIVERSITY OF ENGINEERING & TECHNOLOGY, JAMSHORO




                     (Internship Program Report)
                LUCKY CEMENT LIMITED , KARACHI
                  Date : 22-06-2011 To 30-07-2011

   Submitted To:
                   HUMAN RESORCE DEPARTMENT
  Submitted By:

  MOHAMMAD YOUNUS                     (08IN70)
  SUHAIL AHMED PALIJO                (08IN36)
  MANSOOR ALI SOLANGI                (08IN106)



                PREPARED BY MOHAMMAD YOUNUS (08IN70)            1
                       SUHAIL AHMED (08IN36) &
                    MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
               LUCKY CEMENT COMPANY LIMITED




                     PREFACE
                     This report has been give by the
authors to convey the information about different
departments of lucky cement limited , which has been
visited during our industrial training. We have
discussed the different specifications , processing and
production of the department we              visited. We
have tried to give some history of the processes ,
    literature , survey and importance of the processing
as well.



                          MOAHAMMD YOUNUS (08IN70)

                        SUHAIL AHMED PALIJO (08IN36)

                                   &
                   MANSOOR AHMED SOLANGI (08IN106)




           PREPARED BY MOHAMMAD YOUNUS (08IN70)        2
                  SUHAIL AHMED (08IN36) &
               MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                   LUCKY CEMENT COMPANY LIMITED




               ACKNOWLEDGEMENT
First of all we would like to thanks Al-mighty Allah , The Most
Beneficent and Merciful . We are very happy to avail this
golden opportunity of getting training at lucky cement plant .
We are thankful to General Manager of Lucky cement plant
at Karachi Mr. Mashkoor Ahmed who provided us such a
valuable opportunity.

A lot of thanks to MECHANICAL Manager M.K PASHA who
provided us assistance in such a friendly environment.

                      We are Also thankful to

ASSISTANCE MANAGER SHAHID ZAMAN
ASSISTANCE MANAGER SAAD
SENIOR ASSISTANCE MANAGER HAFEEZ SHAHAB
        For providing us information about the plants.
This report is a result of handwork of not a single person but
many persons have aided by volunteering their services to
create this text . Their kindness thus improving this report
with their Additional technical knowledge has contributed
mightly to the quality of this work. We got much practical
knowledge which was not possible to gain in the university
during studies.

Overall , we are thankful to all the Officers & the workers of Lucky cement
                                     Ltd.


              PREPARED BY MOHAMMAD YOUNUS (08IN70)                            3
                     SUHAIL AHMED (08IN36) &
                  MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                 LUCKY CEMENT COMPANY LIMITED




                   CONTENTS

UNIT’S                     DISCRIPTION                     PAGE

                         INTRODUCTION
UNIT NO. 1        • INTRODUCTION TO CEMENT.
                  • TYPES OF CEMNT
                  • LUCKY CEMENT LIMITED
                     CONCRETE PROGRESS,
                     KARACHI.
                  • PRODUCTS.                             7 to 11
                  • Quality policy , vision , mission &
                     values.
                  • Overall flow diagram of lucky
                     cement plant.


                  RAW MATERIAL USED…
UNIT NO. 2        •   Limestone
                  •   Clay
                  •   Laterite                            12 to 16
                  •   Bauxite
                  •   Slag
                  •   Gypsum
                  •   Coal
                  •   Furnance oil




             PREPARED BY MOHAMMAD YOUNUS (08IN70)                    4
                    SUHAIL AHMED (08IN36) &
                 MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                 LUCKY CEMENT COMPANY LIMITED




                          LABORATORY
UNIT NO. 3        •   Coal testing
                  •   Limestone sample
                  •   Latirite sample
                  •   Bauxite sample                17 to 23
                  •   Clay sample


                            CRUSHER
UNIT NO. 4        • Hammer crusher                  24 to 27
                  • Production of crusher
                  • Limestone yard
                  •

UNIT NO. 5        PROPORTIONING TOWER                28 to 29
                  • Way feeder
                  • Decision of percentage of raw
                    material


UNIT NO. 6            GRIDING OF COAL               30 to 31

                  •   Coal grinding
                  •   Pulverize coal
                  •   Coal mill
                  •   Coal storage bin
                  •   Fire extinguisher system
                  •   Coal transportation to
                  •   Pre-calciner
                  •   main burner (klin)


             PREPARED BY MOHAMMAD YOUNUS (08IN70)               5
                    SUHAIL AHMED (08IN36) &
                 MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                 LUCKY CEMENT COMPANY LIMITED




               GRIDING OF RAW MATERIAL
                  • Transportation of ingredients
                  • Rotary valve                     32 to 36
UNIT NO. 7        • I.D fan
                  • System fan
                  • Vertical raw mill
                  • Inlet of hot Air
                  • Outlet of Air
                  • Cyclones
                  • Air slides
                  • Bag house
                  • Bag house fan
                  • Outlet of extra gases
                  • Storage of powder grinded raw
                    material to the Silo
                  • Homogenization of grinded raw
                    material


                  CALCINATION AND HEAT
                       EXCHANGER
                  •   Pre-heater
UNIT NO. 8        •   Inlet of feed to pre-heater   37 to 39
                  •   Construction of feed silo
                  •   Rizor
                  •   Cyclones of pre-heater
                  •   Pre-calciner burner
                  •   Pre-calcination
                  •   Heat exchange
                  •   Primary duck



             PREPARED BY MOHAMMAD YOUNUS (08IN70)               6
                    SUHAIL AHMED (08IN36) &
                 MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                  LUCKY CEMENT COMPANY LIMITED




                   KILN AREA
                   •   Introduction to kiln
UNIT NO. 9         •   Ignition of kiln                40 to 48
                   •   Reaction at kiln
                   •   Formation of clinker
                   •   Hard burning and soft burning
                   •   Outlet of clicker


                       COOLING AND STORAGE
UNIT NO. 10                OF CLINKER
                   •   Construction of cooler
                   •   Cooler crusher
                   •   Pan conveyer
                   •   Storage of clinker


                       CEMENT MILL
UNIT NO. 11        •   Proportionating tower
                   •   Flow diagram of cement mill
                   •   Roller crusher
                   •   Crushing Separator
                   •   Storage bin
                   •   Ball mill
                   •   Grinding aid
                   •   Storage of cement


UNIT NO. 12            PACKING PLANT
                   • Loose cement
                   • Packed cement
                   • Loose cement storage and ship
              PREPARED BY MOHAMMAD YOUNUS (08IN70)                7
                     SUHAIL AHMED (08IN36) &
                  MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                  LUCKY CEMENT COMPANY LIMITED




                       loading terminal at Berth – 25
                       west wharf , Karachi Port


UNIT NO. 13            QUALITY CONTROL LAB
                   • Collection of sample
                   • Testing of sample at different stages


UNIT NO. 14            POWER GENERATION
                   •   Furnace oil generator
                   •   Natural gas generator
                   •   Dual fuel generator
                   •   Generation of power house


UNIT NO. 15       OVER ALL PERFORMANCE OF
                    LUCKY CEMENT FACTORY
                  • Aims and missions


UNIT NO. 16          ENVIRONMENTAL SAFETY
                   • Global warming and the dangers
                     of GHG


UNIT NO. 17            CONCLUSION




              PREPARED BY MOHAMMAD YOUNUS (08IN70)           8
                     SUHAIL AHMED (08IN36) &
                  MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
    LUCKY CEMENT COMPANY LIMITED




PREPARED BY MOHAMMAD YOUNUS (08IN70)   9
       SUHAIL AHMED (08IN36) &
    MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                    LUCKY CEMENT COMPANY LIMITED




INTRODUCTION TO CEMENT
Cement is the non metallic bonding material used for construction
                                 Or
Cement is binding material which is used in construction


HISTORY OF CEMENT
          History of cement is very old as human civilization. Romans
used volcanic tuff mixed raw material for their construction .Egyptians
used it for the construction of PYRAMIDES.
          In 1824 English man Joseph Aspdin,           patented artificial
cement made by the calcinations of an argillaceous lime stone. He cal
edit “Portland” because concrete made from it resembles with a famous
building stone obtained from land near England

TYPES OF CEMENT
ASTM C150

There are five types of Portland cements with variations of the first three
according to ASTM( AMERICAN SOCITY OF TESTING MATERIAL )
C150.

1.COMMON or GENERAL PURPOSE CEMENT
         It is generally assumed unless another type is specified. It is
commonly used for general construction especially when making precast
and precast-prestressed concrete that is not to be in contact with soils or
ground water. The typical compound compositions of this type are:

55% (C3S), 19% (C2S), 10% (C3A), 7% (C4AF), 2.8% MgO, 2.9% (SO3),
1.0% Ignition loss, and 1.0% free CaO.
               PREPARED BY MOHAMMAD YOUNUS (08IN70)                           10
                      SUHAIL AHMED (08IN36) &
                   MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                    LUCKY CEMENT COMPANY LIMITED




A limitation on the composition is that the (C3A) shall not exceed fifteen
percent.

2. SULPHATE RESISTANCE CEMENT
Type II is intended to have moderate sulfate resistance with or without
moderate heat of hydration. This type of cement costs about the same as
Type I. Its typical compound composition is:

51% (C3S), 24% (C2S), 6% (C3A), 11% (C4AF), 2.9% MgO, 2.5% (SO3),
0.8% Ignition loss, and 1.0% free CaO.

A limitation on the composition is that the (C3A) shall not exceed eight
percent which reduces its vulnerability to sulfates

3. RAPID HARDENING CEMENT
Type III is has relatively high early strength. Its typical compound
composition is:

57% (C3S), 19% (C2S), 10% (C3A), 7% (C4AF), 3.0% MgO, 3.1% (SO3),
0.9% Ignition loss, and 1.3% free CaO.

This cement is similar to Type I, but ground finer. Some manufacturers
make a separate clinker with higher C3S and/or C3A content, but this is
increasingly rare, and the general purpose clinker is usually used, ground
to a specific surface typically 50-80% higher. The gypsum level may also
be increased a small amount

4.LOW HEAR OF HYDRATION CEMENT
Type IV Portland cement is generally known for its low heat of hydration.
Its typical compound composition is:

28% (C3S), 49% (C2S), 4% (C3A), 12% (C4AF), 1.8% MgO, 1.9% (SO3),
0.9% Ignition loss, and 0.8% free CaO.

               PREPARED BY MOHAMMAD YOUNUS (08IN70)                          11
                      SUHAIL AHMED (08IN36) &
                   MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                    LUCKY CEMENT COMPANY LIMITED




The percentages of (C2S) and (C4AF) are relatively high and (C3S) and
(C3A) are relatively low. A limitation on this type is that the maximum
percentage of (C3A) is seven, and the maximum percentage of (C3S) is
thirty-five.

5. SULPHATE RESISTANCE
Type V is used where sulfate resistance is important. Its typical compound
composition is:

38% (C3S), 43% (C2S), 4% (C3A), 9% (C4AF), 1.9% MgO, 1.8% (SO3),
0.9% Ignition loss, and 0.8% free CaO.

This cement has a very low (C3A) composition which accounts for its high
sulfate resistance. The maximum content of (C3A) allowed is five percent



                About YUNUS Brothers Group
              Lucky Cement Limited has been sponsored by Yunus
Brothers Group (YB Group) which is one of the largest business groups of
the Country based in Karachi and has grown up remarkably over the last
50 years. The YB Group is engaged in diversified manufacturing activities
including Textile, Spinning, Weaving, Processing, Finishing, Stitching and
Power Generation. The Group consists of a number of industrial
establishments other then Lucky Cement Limited, they include:

1.   Lucky Textile Mills
2.   Fazal Textile Mills Limited
3.   Gadoon Textile Mills Limited
4.   Lucky Energy (Private) Limited
5.   Yunus Textile Mills

Lucky Textile Mills - established in 1983

              PREPARED BY MOHAMMAD YOUNUS (08IN70)                        12
                     SUHAIL AHMED (08IN36) &
                  MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                    LUCKY CEMENT COMPANY LIMITED




- Fully computerized weaving and stitching unit
- Consists of 3 weaving plants comprising of 800 looms, 250 stitching
machines, 3.4 million meter/month Grey fabric capacity, 83 million
meters/ annum processing and 15 million meters/ annum made ups
capacity
- Power generation capacity 6.20 MW
- Expertise in ready-made curtains and accessories for foreign markets

Fazal Textile Mills Limited - established in 1987

- One of the top spinning mill in the country with 59,508 installed spindles
- Produces 100% Grey Cotton Ring Spun Yarn and wide range of Blended
and Heather Yarns?
- ISO – 9001:2000 certified

Gadoon Textile Mills Limited - established in 1988

- First of the only two mills in the world producing Compact Core Spun
yarn
- 194,392 installed spindles. Produces high quality Compact yarn, Murata
Jet Spinning yarn, Core Spun yarn and 100% Grey Cotton Ring Spun yarn
- Also has a power plant of 34 MW
- OKO – Tex Standard 100 certified


Lucky Energy (PVT) Limited - established in 1993

- Captive power unit
- Supplies uninterruptible power to Lucky Textiles, Fazal
- Textiles & Lucky Knitwear
- Generation capacity of 17.4 MW

Yunus Textile Mills Limited - established in 1998

- State of the art machinery for weaving, printing and dyeing
               PREPARED BY MOHAMMAD YOUNUS (08IN70)                       13
                      SUHAIL AHMED (08IN36) &
                   MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                    LUCKY CEMENT COMPANY LIMITED




- Self power generation capacity of 14 MW
- 250 Air Jet looms installed
- Completely vertically integrated textile mill
- Major Player in home textile and garment exports

BUSINESS STRATEGY

              To be the leading exporter of cement from Pakistan for the
regional countries as well as to explore other potential export markets. Our
future strategy is to explore investment possibilities outside Pakistan in the
cement industry to become a leading global producer.

EXPLORING AND ESTABLISHING EXPORT MARKETS

         We have a firm commitment in exploring new markets for
sustainable business growth. Lucky Cement has been successful in
establishing its brand in several export markets including Middle East,
India, Sri Lanka and East and South African countries. We are also
planning to setup some offshore facilities to further strengthen our export
business on regular basis.

ABOUT LUCKY CEMENT LIMITED CONCRETE
PROGRESS, KARACHI.
Founder Mr. Abdul Razzak Tabba

           Lucky cement limited concrete progress is Sponsor by well
known “Yunus Brothers Group” – one of the largest export houses of
Pakistan, Lucky Cement Limited currently has the capacity of producing
25,000 tons per day of dry process Cement.
        Lucky Cement came into existence in 1996 with a daily
production capacity of 4,200 tons per day, currently is an omnipotent
cement plant of Pakistan, and rated amongst the few best plants in Asia.


               PREPARED BY MOHAMMAD YOUNUS (08IN70)                           14
                      SUHAIL AHMED (08IN36) &
                   MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                    LUCKY CEMENT COMPANY LIMITED




With production facilities in Pezu (Production capacity: 13,000 Tons per
day) as well as in Karachi (Production capacity: 12,000 tons per day), it
has the tendency to become the hub of cement production in Asia. Lucky
Cement Limited has been sponsored by Yunus Brothers Group (YB
Group) which is one of the largest business groups of the Country based in
Karachi and has grown up remarkably over the last 50 years.

PRODUCTS PF LUCKY CEMENT
        Lucky Cement aims at producing cement to suit every user. The
following types of cement are available:

1. Ordinary Portland Cement
2. Sulphate Resistant Cement
3. Slag Cement

ORDINARY PORTLAND CEMENT (OPC)
            Ordinary Portland cement is available in darker shade as well as
in light shades in Lucky Star with different brand names to suit the
requirement of users.
            It is used in all general constructions especially in major
prestigious projects where cement is to meet stringent quality
requirements; it can be used in concrete mortars and grouts etc. Ordinary
Portland cement is compatible/consumable with admixture/ retarders etc.

SULPHATE RESISTANT CEMENT (SRC)
            Sulphate resistant Cement’s best quality is to provide effective
and long lasting strength against sulphate attacks and is very suitable for
constructions near sea shores as well as for canals linings. It provides very
effective protection against alkali attacks.

SLAG CEMENT
         Slag cement is also available for specific user requirements.
        Slag cement, has been incorporated into concrete projects for over
a century to improve durability and reduce life cycle costs. Among its
measurable benefits in concrete are better workability and finish ability,
               PREPARED BY MOHAMMAD YOUNUS (08IN70)                         15
                      SUHAIL AHMED (08IN36) &
                   MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                    LUCKY CEMENT COMPANY LIMITED




higher compressive and flexural strengths, and improved resistance to
aggressive chemicals.


BRANDS AVAILABLE AT LUCKY CEMENT
   • Lucky CEMENT (REGULAR) Lucky STAR
   • Lucky GOLD Lucky SULPHATE RESISTANT CEMENT (SRC)

QUALITY POLICY
Quality of cement

ISO CERTIFICATION
              Lucky's Cement plant is one of the best maintained plants of
Pakistan and is managed by qualified and expert cement field specialists.
The Company has also got ISO 9001:2000 certifications, for
manufacturing and sales of cement by UKAS Quality Management,
Pakistan National Accreditation Council and Moody International.

QUALITY MANAGEMENT
             Lucky Cement always gives major emphasis in manufacturing
high quality cement through stringent quality control techniques and
computerized control systems using state of the art sophisticated
equipments like Distributed Control System (DCS), Programmable Logic
Controllers (PLCs) and on line X-Ray Analyzers. The Company has got
one of the best equipped laboratories, having all facilities for the analysis
of raw material, semi furnished product, furnished product and fuel, to
ensure the supply of high quality product to market.

The quality of Company’s cement has been tested and found to be superior
in many respects to the specifications mentioned in Pakistan and British
Standards.

               PREPARED BY MOHAMMAD YOUNUS (08IN70)                        16
                      SUHAIL AHMED (08IN36) &
                   MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                    LUCKY CEMENT COMPANY LIMITED




SUPERIOR STRENGTH, OPTIMUM SETTING TIMES AND
MINIMUM EXPANSION
           These are the three benchmarks adopted by Lucky Cement
Limited which is emerging to be the largest cement plant of Asia and
committed to provide the best quality cement to its customers around the
globe through stringent quality control and application of most modern
quality control techniques.

SUPERIOR STRENGTH
          The compressive strength is a very important factor of cement.
The Ordinary Portland Cement achieves its maximum strength in 28 days.
The Pakistan standard PSS 232-1883 (R) & British Standard EN 197 Class
42.5 N provides for 28 days strength of 5000Psi and 5950 Psi respectively
for mortar cubes. As compared to this Lucky Cement has a 28 days
compressive strength of more than 7,000 psi to bear heavy loads.

OPTIMUM SETTING TIME
           Optimal initial & final setting times are ensured by adopting
special production parameters using most modern control techniques.

SOUNDENESS
          By using most modern Kiln feeding system, it is ensured that
lime entering into the Kiln should be in such a shape that it should totally
combine with oxides during the burning process. The result is that the
frees lime content is very low and soundness of Lucky Cement is less than
1 mm which is far better than 10 mm prescribed by Pakistan Standard PSS
232-1983 ( R) and / or British Standard EN 197 Class 42.5 N.
         Lucky Power Generators is one of the best maintained power
generation facilities of the country and is maintained and operated round
the clock by expert engineers and technicians.

VARIETY TO SUIT EVERYONE
            Lucky Cement aims at producing cement to suit every user. At
present, it is producing Grey Portland Cement and also Sulphate Resistant
cement. The customers are able to get Portland Cement both in dark shade
               PREPARED BY MOHAMMAD YOUNUS (08IN70)                        17
                      SUHAIL AHMED (08IN36) &
                   MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                    LUCKY CEMENT COMPANY LIMITED




as well as in light shade with different brand names to suit the requirement
of user. The Portland cement specifically made for prefabrication industry
with a lower setting time is also available. In addition, the plant also
produce Slag cement for specific users.
Overall flow diagram of lucky cement plant.




               PREPARED BY MOHAMMAD YOUNUS (08IN70)                        18
                      SUHAIL AHMED (08IN36) &
                   MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                   LUCKY CEMENT COMPANY LIMITED




Schematic explanation of Portland cement production

There are three fundamental stages in the production of Portland cement:

   1. Preparation of the raw mixture
   2. Production of the clinker
   3. Preparation of the cement




              PREPARED BY MOHAMMAD YOUNUS (08IN70)                         19
                     SUHAIL AHMED (08IN36) &
                  MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
    LUCKY CEMENT COMPANY LIMITED




PREPARED BY MOHAMMAD YOUNUS (08IN70)   20
       SUHAIL AHMED (08IN36) &
    MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                    LUCKY CEMENT COMPANY LIMITED




RAW MATERIAL’S
Cement is manufactured into two stages
First stage :
            from crusher to kiln
Second stage :
             from clinker yard to cement mill
That’s why raw material is also divided into two stages

      First stage raw material             Second stage raw material
             Lime stone                             Clinker
        Clay or Lucky clay                         Gypsum
               Latirite                              Slag
               Bauxite

 Following basic raw materials are generally used in the manufacture of
cement

      LIMESTONE
Limestone is a sedimentary rock composed largely of the mineral calcite
(calcium carbonate: CaCO3). The deposition of limestone strata is often a
by-product and indicator of biological activity in the geologic record.
Calcium (along with nitrogen, phosphorus, and potassium) is a key
mineral to plant nutrition: soils overlying limestone bedrock tend to be
pre-fertilized with calcium. Limestone is an important stone for masonry
and architecture, vying with only granite and sandstone to be the most
commonly used architectural stone. Limestone is a key ingredient of
quicklime, mortar, cement, and concrete. The solubility of limestone in
water and weak acid solutions leads to important phenomena. Regions
overlying limestone bedrock tend to have fewer visible groundwater
sources (ponds and streams), as surface water easily drains downward
through cracks in the limestone. While draining, water slowly (over
thousands or millions of years) enlarges these cracks; dissolving the
              PREPARED BY MOHAMMAD YOUNUS (08IN70)                          21
                     SUHAIL AHMED (08IN36) &
                  MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                     LUCKY CEMENT COMPANY LIMITED




calcium-carbonate and carrying it away in solution. Most well-known
natural cave systems are through limestone bedrock.

uses include:

   •   The manufacture of quicklime (calcium oxide) and slaked lime
       (calcium hydroxide);
   •   Cement and mortar;
   •   Pulverized limestone is used as a soil conditioner to neutralize acidic
       soil conditions;
   •   Crushed for use as aggregate—the solid base for many roads;
   •   Geological formations of limestone are among the best petroleum
       reservoirs;
   •   As a reagent in desulphurization;
   •   Glass making, in some circumstances;
   •   Added to paper, plastics, paint, tiles, and other materials as both
       white pigment and cheap filler.
   •   Toothpaste
   •   Suppression of methane explosions in underground coal mines
   •   Added to bread and cereals as a source of calcium

       SEDIMENTARY ROCK
Sedimentary rock is one of the three main rock types (the others being
igneous and metamorphic rock). Sedimentary rock is formed by deposition
and consolidation of mineral and organic material and from precipitation
of minerals from solution. The processes that form sedimentary rock occur
at the surface of the Earth and within bodies of water. Rock formed from
sediments covers 75-80% of the Earth's land area, and includes common
types such as limestone, chalk, dolostone, sandstone, conglomerate, some
types of breccia, and shale.)

       CLAY
Clay is a naturally occurring material composed primarily of fine-grained
minerals, which show plasticity through a variable range of water content,
                PREPARED BY MOHAMMAD YOUNUS (08IN70)                        22
                       SUHAIL AHMED (08IN36) &
                    MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                     LUCKY CEMENT COMPANY LIMITED




and which can be hardened when dried and/or fired. Clay deposits are
mostly composed of clay minerals (phyllosilicate minerals), minerals
which impart plasticity and harden when fired and/or dried, and variable
amounts of water trapped in the mineral structure by polar attraction.
Organic materials which do not impart plasticity may also be a part of clay
deposits.

      LATRITE
 Latrite is redish brown color and it contains iron content ,
.It is less harder than gypsum but harder than limestone.

      BAUXITE
Bauxite is the most important aluminium ore. It consists largely of the
minerals gibbsite Al(OH)3, boehmite γ-AlO(OH), and diaspore α-
AlO(OH), together with the iron oxides goethite and hematite, the clay
mineral kaolinite and small amounts of anatase TiO2. It was named after
the village Les Baux in southern France, where it was first discovered in
1821 by the geologist Pierre Berthier.

      SLAG
Slag is the mixture of iron and some metallic impurities. It is obtained
from steel mills. The cement made from slag is full of strength.

         GYPSUM (Ca SO4)

It is obtained from the N.W.F.P
And 5% is added with clinker obtained from kiln in cement mill and then
grinded to get cement.
It is used for refresh ness of cement.




               PREPARED BY MOHAMMAD YOUNUS (08IN70)                         23
                      SUHAIL AHMED (08IN36) &
                   MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                    LUCKY CEMENT COMPANY LIMITED




MANUFACTURING AIDS
   • COAL
         In lucky cement industry coal is the major source of fuel, for this
purpose coal is imported from
      1. south Africa
      2. Indonesia

Some time lucky also uses a mixture of south African and Indonesian coal.

   • FURNANCE OIL

   Furnace oil is also used in cement industry for burning the kiln initially.
   It help us to maintain the temperature of the kiln.




               PREPARED BY MOHAMMAD YOUNUS (08IN70)                         24
                      SUHAIL AHMED (08IN36) &
                   MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
    LUCKY CEMENT COMPANY LIMITED




PREPARED BY MOHAMMAD YOUNUS (08IN70)   25
       SUHAIL AHMED (08IN36) &
    MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                    LUCKY CEMENT COMPANY LIMITED




   LABORATARY
                   When plant is designed it is decided that which type and
   quality of raw material is used for the manufacture of desired product.
   So a laboratory is established that take care of the raw material which is
   suitable for the plant.
                   For this purpose the samples of raw material is checked
   at the time of purchasing. For ensuring the good quality of the product.

         TITRATION

                Laboratory also decide the titration or ratio of raw material
   used in the plant . In practice, the raw material for rawmix is controlled
   by frequent chemical analysis (hourly by X-Ray fluorescence analysis,
   or every three minutes by prompt gamma neutron activation analysis).
   The analysis data is used to make automatic adjustments to raw
   material feed rates.

         TESTING

                     In lucky cement industry a laboratory is also working
   for the same purpose that every sample of raw material is checked
   before and After purchasing the raw material. Fuel used for burning in
   the kiln is also tested because of some safety reasons.

      TESTING OF COAL

            Coal is the main fuel in cement industry that why it is tested
very .
Testing of caol has been didvided into three stages
   • Presence of moisture
       To find the moisture in coal a coal sample is get from the fresh
       supply or last day or present morning truck
       Then sample is divided into two categories
              1. Crushed coal
               PREPARED BY MOHAMMAD YOUNUS (08IN70)                          26
                      SUHAIL AHMED (08IN36) &
                   MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                    LUCKY CEMENT COMPANY LIMITED




             2. Grinded coal

Crushed coal is used to find the RM (Received Moisture) by using
moisture analyzer

Powdered or Grinded coal is used to find the TM (Total Moisture) by
using moisture analyzer

Air moisture is find by taking the coal in a glass dish and weight and place
it in decicator to remove moisture with the help of silica gel and after 30
minutes put out the dish and weight it .

Inherent moisture is the moisture which is possessed by the coal it self so
it can be calculated as follows
              Total moisture - Air moisture = Inherent moisture
    • Loss on ignition
To calculate the loss on ignition we have to first calculate the volatile
matter
Then by using formula we can calculate loss on ignition

   • Presense of sulphur

      TESTING OF RAW MATERIAL

Following basic raw materials are used in the lucky cement industry to
check this thing that the purchased raw material is suitable or not for plant
raw materials are tested .
   • Limestone
   • Bauxite
   • Latrite
   • Clay
   • Gypsum
   • Slag


               PREPARED BY MOHAMMAD YOUNUS (08IN70)                           27
                      SUHAIL AHMED (08IN36) &
                   MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                       LUCKY CEMENT COMPANY LIMITED




   For testing the above raw material X-Ray Flourescence Spectrometry
   method is used it is a Computer operated machine in which a ring sample
   is introduced .
   This machine takes few minutes and give as two things
       1. name of compound or element present in the sample
       2. concentration of the element or compound

   some X-Ray Flourescence Spectrometry results are given
   below

         lime stone at crusher

   L.O SiO Al2         Fe2    Ca    Mg SO Na2 K2 Cl LS S A
    .I  2   O3          O3     O     O   3   O    O       F M M
   42. 3.8 0.77        0.92   52.   1.1 0.0 0.19 0.1 0.0 4.3 2.2 0.8
   69                         68     7   1        3   5   3   4   3

         Clay

SiO2 Al2O3 Fe2O3 CaO MgO SO3 Na2O K2O Cl LSF SM AM
68.57 12.48 4.29 4.3 1.48 0.01 0.84 2.43 0.14 0.02 4.09 2.91
74.06 11.29 5.15 2.82 1.39 0.02 0.89 2.16 0.16 0.02 4.51 2.19

         Latrite

SiO2 Al2O3 Fe2O3 CaO MgO SO3 Na2O K2O Cl LSF SM AM
17.81 7.41 48.51 7.79 0.51 0.11 0.34 0.08 0.05 0.09 0.32 0.15
29.22 9.25 45.05 4.32 0.47 0.04 0.35 0.11 0.36 0.03 0.54 0.21




                   PREPARED BY MOHAMMAD YOUNUS (08IN70)                      28
                          SUHAIL AHMED (08IN36) &
                       MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
    LUCKY CEMENT COMPANY LIMITED




PREPARED BY MOHAMMAD YOUNUS (08IN70)   29
       SUHAIL AHMED (08IN36) &
    MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                    LUCKY CEMENT COMPANY LIMITED




CRUSHER
HAMMER CRUSHER

In lucky cement industry hammer crusher are used for crushing the lime
stone
The hammer crusher contain 5 rows and 9 hammers in each row it means
that hammer crusher has 45 hammers.

A hammer mill is a machine whose purpose is to shred material into fine
particles. They have many sorts of applications in many industries,
including:

WORKING AND CONDITION

The basic principle is straightforward. A hammer mill is essentially a steel
drum containing a vertical or horizontal rotating shaft or drum on which
hammers are mounted. The hammers are free to swing on the ends of the
cross, or fixed to the central rotor. The rotor is spun at a high speed inside
the drum while material is fed into a feed hopper. The material is impacted
by the hammer bars and is thereby shredded and expelled through screens
in the drum of a selected size.

Small grain hammer mills can be operated on household current. Large
automobile shredders can use one or more 2000 horsepower (1.5 MW)
diesel engines to power the hammer mill.

The Screen less hammer mill uses air flow to separate small particles from
larger ones. It is designed to be more reliable, and is also claimed to be
much cheaper and more energy efficient than regular hammer mills.

PRODUCTION OF CRUSHER

In lucky cement industry two lime stone crusher are Assembled both are
hammer crusher
Hammer mill at lucky reduces the size of I meter stone into 70 to 80 mm
               PREPARED BY MOHAMMAD YOUNUS (08IN70)                         30
                      SUHAIL AHMED (08IN36) &
                   MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                   LUCKY CEMENT COMPANY LIMITED




The crushing capacity of hammer mill is 800 to 900 ton/hour .
The weight of each hammer is 120 kg .

LIMESTONE YARD
      A yard is made for the storage of crushed limestone in form of
piles .
A limestone pile being built by a boom stacker and prehomogenization of
pile is made with the help of reclaimer.
Crushed limestone is transported by a 90 m long belt to the storage yard
then it drop the material on chand belt then chand belt drop on boom belt
then with the help of boom stacker piles are made then after
prehomogenization the lime stone is transported to the proportionating
building by buckets then on long belt .




              PREPARED BY MOHAMMAD YOUNUS (08IN70)                      31
                     SUHAIL AHMED (08IN36) &
                  MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
    LUCKY CEMENT COMPANY LIMITED




PREPARED BY MOHAMMAD YOUNUS (08IN70)   32
       SUHAIL AHMED (08IN36) &
    MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                       LUCKY CEMENT COMPANY LIMITED




PROPORTIONATING TOWER
INTRODUCTION

In lucky cement there is a Proportionting tower. It is a building which
store raw material Silos of individual raw materials are arranged. It has
hoppers which provide feed to weigh-feeder. Accurately controlled
proportions of each material are delivered onto the belt by weigh-feeders.
The proportion of raw material is decided by Laboratory usually luck
cement industry works on following titration .

   •   limestone           75 to 85 %
   •   purchase clay        6 to 7 %
   •   lucky clay            5 to 6 %
   •   bauxite              1 to 2 %


WEIGH FEEDER

Weigh feeder is a machine which weigh’s the material according to the
defined composition and supply to the conveyer belt which take the
material to the work place.


Decision of proportion of raw material for grinding.

. In practice, the raw material for rawmix is controlled by frequent
chemical analysis (hourly by X-Ray fluorescence analysis in the
laboratory, or every three minutes by prompt gamma neutron activation
analysis). The analysis data is used to make automatic adjustments to raw
material feed rates.

               PREPARED BY MOHAMMAD YOUNUS (08IN70)                          33
                      SUHAIL AHMED (08IN36) &
                   MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                    LUCKY CEMENT COMPANY LIMITED




VERTICAL RAW MILL or RAW MILL
These are the standard form in modern installations, occasionally called
vertical spindle mills. In a typical arrangement, the material is fed onto a
rotating table, onto which steel rollers press down. A high velocity of hot
gas flow is maintained close to the dish so that fine particles are swept
away as soon as they are produced. The gas flow carries the fines into an
integral air separator, which returns larger particles to the grinding path.
The fine material is swept out in the exhaust gas and is captured by a
cyclone before being pumped to storage. Feed size can be up to 100 mm.
Roller mills are efficient, using about half the energy of a ball mill, and
there seems to be no limit to the size available. Roller mills with output in
excess of 800 tonnes per hour have been installed. Unlike ball mills, feed
to the mill must be regular and uninterrupted; otherwise damaging
resonant vibration sets in.

. In the case of a dry process, the rawmill also dries the raw materials,
usually by passing hot exhaust gases from the kiln through the mill, so that
the rawmix emerges as a fine powder. This is conveyed to the blending
system by conveyor belt or by a powder pump.

VRM section in Lucky cement plant
      In lucky cement plant the Vertical raw mill is used for the grinding
of Raw material and coal.

       Approximately 180 to 210 tons of feed per hour is provided to the
VRM . According to the introduction of VRM there are some rollers in the
mill. VRM at lucky has 4 rollers weight of each roller is 22 ton.

        Inlet temperature of VRM is 287 C for 230 ton/h feed acorrding
to design capacity

               PREPARED BY MOHAMMAD YOUNUS (08IN70)                         34
                      SUHAIL AHMED (08IN36) &
                   MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                LUCKY CEMENT COMPANY LIMITED




VRM (Vertical Raw Mil) or Roller Mill.




           PREPARED BY MOHAMMAD YOUNUS (08IN70)   35
                  SUHAIL AHMED (08IN36) &
               MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
    LUCKY CEMENT COMPANY LIMITED




PREPARED BY MOHAMMAD YOUNUS (08IN70)   36
       SUHAIL AHMED (08IN36) &
    MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                    LUCKY CEMENT COMPANY LIMITED




                       GRIDING OF COAL
COAL MILL

In Lucky Coal mill is the place where coal is grinded into fine powder for
this purpose a small Roller mill or VRM (Vertical Raw Mill) is used.

COAL GRINDING

Grinding of coal Also take place in a small roller mill or VRM (Vertical
Raw Mill) but it has only two Stationary Rollers other working is same as
define above for the VRM .

Coal mill design capacity is 25 tons/h and its inlet temperature is 92 C .

PULVERIZE COAL

Fine powdered coal is called Pulverize coal. The coal is grind to fine
powder because the fine coal is very easy to burn in the kiln or PC (pre-
calciner)

COAL STORAGE BIN

After Grinding the coal is stored in a bin whose capacity is 100 tonn but in
lucky cement only 25 to 30 % bin is filled because coal can catch fire from
the surrounding.

FIRE EXTINGUISHER SYSTEM

A latest fire extinguisher system is installed in the Coal mill area which is
fully automatic and can Also be control through the PLC(Programmable
Logic Controller).



               PREPARED BY MOHAMMAD YOUNUS (08IN70)                          37
                      SUHAIL AHMED (08IN36) &
                   MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                    LUCKY CEMENT COMPANY LIMITED




COAL TRANSPORTATION TO
   1. Pre-calciner (PC)
   2. main burner (kiln)

The Grinded coal is used as a fuel in PC and kiln so it is transported to
them through the Delta Blowers.

In Lucky 4 Delta Blowers are used , 2 are used for transportation of coal to
the PC and 2 are used for the transportation of coal to the main Burner at
kiln




               PREPARED BY MOHAMMAD YOUNUS (08IN70)                         38
                      SUHAIL AHMED (08IN36) &
                   MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
    LUCKY CEMENT COMPANY LIMITED




PREPARED BY MOHAMMAD YOUNUS (08IN70)   39
       SUHAIL AHMED (08IN36) &
    MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                     LUCKY CEMENT COMPANY LIMITED




GRINDING OF RAW MATERIAL
After deciding the ratio of raw material at proportioning tower the next
step is grinding of raw material.
In Lucky cement Industry Vertical Raw Mill is used for Grinding the raw
material.

VERTICAL RAW MILL USED FOR GRINDHING THE
RAW MAERIAL

The raw materials are next ground together in a rawmill.
VRM used here is consisting of 4 continuously moving Rollers. The
fineness of rawmix is specified in terms of the size of the largest particles,
and is usually controlled so that there are less than 5%-15% by mass of
particles exceeding 90 µm in diameter. It is important that the rawmix
contains no large particles in order to complete the chemical reactions in
the kiln,

TRANSPORTATION OF INGREDIENTS
 The Silos of individual raw materials are arranged (Proportionting tower)
over the feed conveyor belt. Accurately controlled proportions of each
material are delivered onto the belt by weigh-feeders. Passing into the
rawmill, the mixture is ground to rawmix.

ROTARY VALVE

Rotary valve is a valve which control the flow of feed at raw mill and
helps in maintaining the pressure in the mill.
I.D FAN

I.D fan or induce Draft fan is the fan which provides hot air to the VRM
from the preheater. It also produces negative pressure in the kiln and
preheater.


               PREPARED BY MOHAMMAD YOUNUS (08IN70)                          40
                      SUHAIL AHMED (08IN36) &
                   MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                    LUCKY CEMENT COMPANY LIMITED




SYSTEM FAN

System fan is also an I.D fan but it is used for the suction of air from the
VRM through the cyclones. It sucks the hot air from the VRM and send it
to Bag house. It also works for maintaining the negative pressure into the
VRM.

TRAVELING OG HOT AIR

In the plant area or VRM area the hot Air flows from one place to another
through the Ducts.

Ducts are pipe lines of very big dia which are used for transportation
purpose.

CYCLONE

A cyclone is a conical vessel into
 which a dust-bearing gas-stream is
 passed tangentially. This produces a
 vortex within the vessel. The gas leaves
 the vessel through a co-axial "vortex-finder".
 The solids are thrown to the outside edge
 of the vessel by centrifugal action, and leave
through a valve in the vertex of the cone.
 Cyclones were originally used to clean up
 the dust-laden gases leaving simple dry
 process kilns.

In lucky cement plant 4 cyclones are used in the VRM area which purify
the hot gas which is coming from VRM .




               PREPARED BY MOHAMMAD YOUNUS (08IN70)                        41
                      SUHAIL AHMED (08IN36) &
                   MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                    LUCKY CEMENT COMPANY LIMITED




AIR SLIDES

Air Slides is a mean of transportation in the cement plant it take the
material from one place to another with the help of air. Bags and blowers
are used in air slides. Air slides are normally used at the bottom of
cyclones.


BAG HOUSE

Bag house is a collective name of many bag filters. Bag house has 20
chambers and each chamber contains 104 bags. It is also known as Dust
Collector or Fabric filters.
In lucky the most common type of bag filters are used which operates with
a velocity of about 0.01 m/s across the bag surface.

BAG HOUSE FAN

Bag house fan is a suction fan which helps the bag house in filtering the
hot air from cyclones. If it does not work properly then there is a need to
shutdown the plant because it also helps in producing the negative pressure
and prevention of atmosphere from pollution.

OUTLET OF EXTRA GASES

The bag house remove fine raw mix particles from the hot air then
remaining extra gases containing SOx , NOx , CO and CO2 released in the
atmosphere.

STORAGE OF POWDER GRINDED RAW MATERIAL TO
THE SILO
Raw material in required ratio is grinded by the Vertical Raw mill is
separated by the cyclones is sent to the __65__ m silo having capacity

              PREPARED BY MOHAMMAD YOUNUS (08IN70)                          42
                     SUHAIL AHMED (08IN36) &
                  MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                   LUCKY CEMENT COMPANY LIMITED




__3300___ tons with the help of air slides, screw conveyers and bucket
elevators .
This silo is also used to give feed to the pre-heater

HOMOGENIZATION OF GRINDED RAW MATERIAL

As the raw mix is stored in the silo that’s why its need to homogenize it
for this purpose heavy compressor are used which through's air from the
downward due to which a continuous motion occurs in the material and
Homogenization of grinded raw material takes place.




              PREPARED BY MOHAMMAD YOUNUS (08IN70)                       43
                     SUHAIL AHMED (08IN36) &
                  MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
    LUCKY CEMENT COMPANY LIMITED




PREPARED BY MOHAMMAD YOUNUS (08IN70)   44
       SUHAIL AHMED (08IN36) &
    MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                    LUCKY CEMENT COMPANY LIMITED




CALCINATION & HEAT EXCHANGE
Raw material enters the pre heater for pre heating before sending to the
rotatary kiln it is also known as four stage tower it is about 87m high
,consisting of cyclones , riser duct (gas duct) and pre calciner,(pc).
     To conserve energy most modern cement plants pre heat raw material
before they enter the kiln using the exhaust gases from kiln itself.

In Lucky cement plant a 5 stage pre-heater is used.
Pre-heater is divided into two section
   • Cyclones of pre-heater .
   Where heat exchange takes place between the feed (raw mix) and hot
   air .
   • Precalciner (P.C)
Where calcinations takes place . In pre calciner abut 75-80% calcination
(formation of cao) take place by decomposition of CaCO3 into CaO &
CO2.
               CaCO3___________CaO+CO2 (calcination)

To understand a pre-heater completely I have given a 4 stage pre-heater
description with diagram.

Gas-suspension preheaters
Cutaway view of cyclone showing air path
The key component of the gas-suspension
 pre-heater is the cyclone and the precalciner.
 A cyclone is a conical vessel into which a
 dust-bearing gas-stream is passed tangentially.
This produces a vortex within the vessel.
The gas leaves the vessel through a co-axial
 "vortex-finder". The solids are thrown to the
 outside edge of the vessel by centrifugal action,
and leave through a valve in the vertex of the cone. Cyclones were
originally used to clean up the dust-laden gases leaving simple dry process
kilns. If, instead, the entire feed of raw mix is encouraged to pass through
               PREPARED BY MOHAMMAD YOUNUS (08IN70)                        45
                      SUHAIL AHMED (08IN36) &
                   MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                    LUCKY CEMENT COMPANY LIMITED




the cyclone, it is found that a very efficient heat exchange takes place: the
gas is efficiently cooled, hence producing less waste of heat to the
atmosphere, and the raw mix is efficiently heated. This efficiency is
     sphere,
further increased if a number of cyclones are connected in series.




4-Stage preheater, showing path of feed
  Stage
               PREPARED BY MOHAMMAD YOUNUS (08IN70)                         46
                      SUHAIL AHMED (08IN36) &
                   MANSOOR ALI SOLANGI (08IN106
                                        (08IN106)
INTERNSHIP PROGRAME
                    LUCKY CEMENT COMPANY LIMITED




The number of cyclones stages used in practice varies from 1 to 6. Energy,
in the form of fan-power, is required to draw the gases through the string
of cyclones, and at a string of 6 cyclones, the cost of the added fan-power
needed for an extra cyclone exceeds the efficiency advantage gained. It is
normal to use the warm exhaust gas to dry the raw materials in the raw
mill, and if the raw materials are wet, hot gas from a less efficient
preheater is desirable. For this reason, the most commonly encountered
suspension preheaters have 4 cyclones. The hot feed that leaves the base of
the preheater string is typically 20% calcined, so the kiln has less
subsequent processing to do, and can therefore achieve a higher specific
output. Typical large systems installed in the early 1970s had cyclones 6 m
in diameter, a rotary kiln of 5 x 75 m, making 2500 tones per day, using
about 0.11-0.12 tonnes of coal fuel for every tones of clinker produced.

A penalty paid for the efficiency of suspension preheaters is their tendency
to block up. Salts, such as the sulfate and chloride of sodium and
potassium, tend to evaporate in the burning zone of the kiln. They are
carried back in vapor form, and re-condense when a sufficiently low
temperature is encountered. Because these salts re-circulate back into the
rawmix and re-enter the burning zone, a recirculation cycle establishes
itself. A kiln with 0.1% chloride in the rawmix and clinker may have 5%
chloride in the mid-kiln material. Condensation usually occurs in the
preheater, and a sticky deposit of liquid salts glues dusty raw mix into a
hard deposit, typically on surfaces against which the gas-flow is
impacting. This can choke the preheater to the point that air-flow can no
longer be maintained in the kiln. It then becomes necessary to manually
break the build-up away. Modern installations often have automatic
devices installed at vulnerable points to knock out build-up regularly. An
alternative approach is to "bleed off" some of the kiln exhaust at the kiln
inlet where the salts are still in the vapor phase, and remove and discard
the solids in this. This is usually termed an "alkali bleed" and it breaks the
recirculation cycle. It can also be of advantage for cement quality reasons,
since it reduces the alkali content of the clinker. However, hot gas is run to
waste so the process is inefficient and increases kiln fuel consumption.


               PREPARED BY MOHAMMAD YOUNUS (08IN70)                         47
                      SUHAIL AHMED (08IN36) &
                   MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                    LUCKY CEMENT COMPANY LIMITED




Cement plant pre heater Designed by Polysius, this new plant includes a
four-stage precalciner with a 158-foot (48-meter) long by 13-foot (4-
meter) diameter two-station kiln to produce 2,500 tons per day of clinker.
Air Cannons were not included in the design of this new plant. But based
on his 25 years in the cement industry, Production Manager Tom Messer
knew they would be required to avoid shutdowns due to blockages of the
material flow through the kiln pre-heater. “I’ve seen the problems that can
arise from plugs and choking of the pre-heater,” Messer explains. “I’ve
seen the high labor costs and the production losses that come from having
to shut down the tower to break up a blockage.”

Messer and Martin Engineering developed a plan for the installation of 45
big blasters and air canons on the brand new pre-heater. Crews from
Martin Engineering’s Martin Services group installed the pre-heater air
cannon system. Feed is entered from feed silo to risor of cyclone 2.

                            Pre calciners




             % of North American Capacity using Precalciners




              PREPARED BY MOHAMMAD YOUNUS (08IN70)                       48
                     SUHAIL AHMED (08IN36) &
                  MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                     LUCKY CEMENT COMPANY LIMITED




          Mean Daily Output (tonnes) of North American Kilns

In the 1970s the precalciner was pioneered in Japan, and has subsequently
                                                        ,         sub
become the equipment of choice for new large installations world world-wide[7].
The precalciner is a development of the suspension preheater. The
philosophy is this: the amount of fuel that can be burned in the kiln is
                        e
directly related to the size of the kiln. If part of the fuel necessary to burn
the rawmix is burned outside the kiln, the output of the system can be
increased for a given kiln size. Users of suspension preheaters found that
                                                          preheaters
output could be increased by injecting extra fuel into the base of the
preheater. The logical development was to install a specially designed
combustion chamber at the base of the preheater, into which pulverized
coal is injected. This is referred to as an "air through" precalciner, because
                                            "air-through"
the combustion air for both the kiln fuel and the calciner fuel all passes
through the kiln. This kind of precalciner can burn up to 30% (typically
20%) of its fuel in the calciner. If more fuel were injected in the calciner,
the extra amount of air drawn through the kiln would cool the kiln flame
excessively. The feed is 40 60% calcined before it enters the rotary kiln.
                           40-60%

The ultimate development is the "air separate" precalciner, in which the
                                  "air-separate"
hot combustion air for the calciner arrives in a duct directly from the
          ustion
cooler, bypassing the kiln. Typically, 60 75% of the fuel is burned in the
                                       60-75%
precalciner. In these systems, the feed entering the rotary kiln is 100%
calcined. The kiln has only to raise the feed to sintering temperature. In
                                          feed
               PREPARED BY MOHAMMAD YOUNUS (08IN70)                          49
                      SUHAIL AHMED (08IN36) &
                   MANSOOR ALI SOLANGI (08IN106
                                        (08IN106)
INTERNSHIP PROGRAME
                    LUCKY CEMENT COMPANY LIMITED




theory the maximum efficiency would be achieved if all the fuel were
burned in the preheater, but the sintering operation involves partial melting
and nodulization to make clinker, and the rolling action of the rotary kiln
remains the most efficient way of doing this. Large modern installations
typically have two parallel strings of 4 or 5 cyclones, with one attached to
the kiln and the other attached to the precalciner chamber. A rotary kiln of
6 x 100 m makes 8,000–10,000 tonnes per day, using about 0.10-0.11
tonnes of coal fuel for every tones of clinker produced. The kiln is dwarfed
by the massive preheater tower and cooler in these installations. Such a
kiln produces 3 million tonnes of clinker per year, and consumes 300,000
tones of coal. A diameter of 6 m appears to be the limit of size of rotary
kilns, because the flexibility of the steel shell becomes unmanageable at or
above this size, and the firebrick lining tends to fail when the kiln flexes.

A particular advantage of the air-separate precalciner is that a large
proportion, or even 100%, of the alkali-laden kiln exhaust gas can be taken
off as alkali bleed (see above). Because this accounts for only 40% of the
system heat input, it can be done with lower heat wastage than in a simple
suspension preheater bleed. Because of this, air-separate precalciners are
now always prescribed when only high-alkali raw materials are available
at a cement plant.

TARGET OF PRE-HEATER

  Pre-heater is used for heat exchange and calcinations .
In lucky cement plant Pre-heater’s inlet temperature is 800 to 1000 C and
out let temperature is 250 to 280 C .
The raw material is burned in the pre-heater for 52 seconds and then it is
sent to kiln . 75-80 % calcination is done..
It increases the production capacity, it reduces the specific heat
consumption also reduces specific power consumption.
ADVANTAGE OF PRE-HEATER

   • Improved kiln operation efficiency.
   • Reduced production cost.
               PREPARED BY MOHAMMAD YOUNUS (08IN70)                          50
                      SUHAIL AHMED (08IN36) &
                   MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                    LUCKY CEMENT COMPANY LIMITED




   • Environmental protection.

INLET OF FEED TO PRE-HEATER

Feed is entered through the feed silo in the risor of cyclone 2 with help of
bucket elevators.

CONSTRUCTION OF FEED SILO

The capacity of this silo is mentioned above here I want to tell u that
below the silo there is a bin where feed to pre-heater is homogenized and
weighed the capacity of this bin is 100 ton .
This bin is connected to 8 gates of air slides which opens in the opposite
pair of two and provide feed to the main air slide on the rate of 215 Ton/h.

BIN STORAGE AND SILOS

Bins are cylindrical or rectangular vessels of concrete or metals .a silo is
tall and relatively small in diameter .a bin is not so tall and usually fairly
wide .silos and bins are loaded from top by some kind of elevator.
Discharging is done from the bottom .

PRESSURE IN BINS AND SILOS

When solid or semi solids are placed in a bin or silo the lateral pressure
exerted On the wall at any point is less than predicted from the head of
material above that point .there usually is friction between walls and
solids. The friction Force at the wall tends to off set the weight of solid
and reduces the pressure exerted by mass on the floor of container .in
general when height of solids column is greater than about 3 times
diameter of the container ,additional solids have no effect on the pressure
at the base.



               PREPARED BY MOHAMMAD YOUNUS (08IN70)                            51
                      SUHAIL AHMED (08IN36) &
                   MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                    LUCKY CEMENT COMPANY LIMITED




FLOW OUT OF BINS

solids tend to flow out of any openings near the bottom of bin but are best
discharged through an opening in the floor .flow through a side openings
tends to be un certain an increase the lateral pressure on the other side of
bin while the solids are flowing.
  When out let at bottom of a bin containing free flowing is opened , the
material immediately above the opening begins to flow . one of two flow
pattern will develop , depending on steepness of the walls in the bottom
section of the bin and on the coefficient of friction between the solids and
the bin walls. tunnel flow develops in the bins with a shallow cone angle
or with vertical walls and central opening in the floor. here a vertical
column of solids above the openings moves downward with out disturbing
the material at the sides. eventually lateral flow begins ,first from the top
most layer of solids.
  The rate of flow of solids by gravity through a circular opening in the
bottom of a bin depends on the diameter of the openings and on the
properties of the solid
   With cohesive solids it is often hard to start flow .once flow does start,
however, it again begin in the material directly above the discharge
opening. sticky solids and even some dry powder adhere strongly to
vertical surfaces and have enough shear strength to support a plug of
considerable diameter above an open discharge .thus to get flow started
and to keep the material moving , vibrators on the in walls , internal plows
near the bin floor, or jets of air in the discharge opening are often needed.


PRE-CALCINER BURNER

 Pre calciner burner is composed of two chambers vortex chamber and
reaction chamber ,the vortex chamber is situated at the end of tertiary air
duct ,close to the entry to the kiln gases , they can therefore get
preliminarily mixed. the tertiary air is drawn from the middle part of the
burner and is therefore of medium temperature about 750 to 850 C. in
these conditions a condensations of volatile components of the feed occurs
               PREPARED BY MOHAMMAD YOUNUS (08IN70)                        52
                      SUHAIL AHMED (08IN36) &
                   MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                    LUCKY CEMENT COMPANY LIMITED




on the grains of raw material and they are recycled to the kiln ,which
allows the formations of accretions on the walls of precalciner to be
avoided. the raw mix is fed to side upper part of reaction chamber, while
in lower part 2 burners are arranged readily round the shaft of the chamber.
      Due to vortex motion of the gases in the of the gases in the axis of
reaction chamber negative pressure is developed, facilitating the
introduction of the grains of the fuel and meal to the fuel and meal to the
inside chamber.

PRE- CALCINATIONS

A first principle model of cement precalcination system is developed for
the purpose of controller’s design and synthesis. The dynamic model is
based on the mass and energy balance principle and consists of a set of
ordinary differential equations. Based on some logical assumptions, the
model not only considers the reaction mechanisms but also reduces the
complexity of precalciner system. The model is divided into a preheater
sub model and a calciner sub model. Separate sub model for preheater and
calciner are initially developed and coupled together to build an integrated
model. The model takes the gas content into account and can obtain the
values of all key output variables in precalcination process.

OVERALL PRE-HEATER PROCESS

In lucky cement plant feed is entered in the risor of cyclone 2 than hot air
take the feed to Cyclone 1A and 1B,
outlet of cyclone 1A and 1B drop the material in risor R-3 than hot air
take the material to C-2 ,
out let of C-2 drop the feed into R-4 than hot air takes the material to C-3 ,
outlet of C-3 drop the material into R-5 than hot air takes the feed into C-4
,
the outlet of C-4 drops the material in P.C. where calcinations of raw mix
take place . here two burners are used for this purpose fresh air is also
given to the burners. Burners use pulverize coal for burning . the
temperature of P.C is 850 to 900 C and has an pressure of -813 pascal ,
               PREPARED BY MOHAMMAD YOUNUS (08IN70)                         53
                      SUHAIL AHMED (08IN36) &
                   MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                      LUCKY CEMENT COMPANY LIMITED




After the calcinations hot air takes the material in C-5 through the goose
neck of P.C. ,
This reaction takes place in the calcination zone
                         CaCO3 → CaO + CO2
                         (lime stone)         (lime)

The outlet of C-5 drops the material into KILN INLET OR SMOKE
CHAMBER OR INLET CHAMBER .

S:NO             STAGES                 TEMP
PRESSURE

1               Klin                    900-950
2.6-3.6
2               Riser duct                                              10-
11
3               P.C                     900-930                          8-
10
4               Cyclone -4              810-850
18-12
5               Cyclone-3               750-770
30-35
6               Cyclone -2              550-600
40-55
7                Cyclone -1             350-380
55-65
8                I.D fan                350- 370
65-70
9                Secondry              1100-1150                         ---
---
10               Tertiary                630-670                         --
----

               PREPARED BY MOHAMMAD YOUNUS (08IN70)                           54
                      SUHAIL AHMED (08IN36) &
                   MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                     LUCKY CEMENT COMPANY LIMITED




PRIMARY DUCT

         A method and apparatus for controlling the combustion of fuel
modules charged into a preheater or precalciner kiln above the transition
shelf, typically into the riser duct, is described. The apparatus includes a
sensor for providing signals indicative of the status in the region of
combustion of the fuel modules, and a controller for a fuel module feed
mechanism is provided to receive signals indicative of the status of the
combustion region and adjust the rate of delivery of the fuel module into
the combustion region responsive to the sensed conditions in the
combustion region.




               PREPARED BY MOHAMMAD YOUNUS (08IN70)                            55
                      SUHAIL AHMED (08IN36) &
                   MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
    LUCKY CEMENT COMPANY LIMITED




PREPARED BY MOHAMMAD YOUNUS (08IN70)   56
       SUHAIL AHMED (08IN36) &
    MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                     LUCKY CEMENT COMPANY LIMITED




KILN AREA

INTRIDUCTION TO KILN

Cement kilns are used for the pyroprocessing stage of manufacture of
Portland and other types of hydraulic cement, in which calcium carbonate
reacts with silica-bearing minerals to form a mixture of calcium silicates.
Over a billion tonnes of cement are made per year, and cement kilns are
the heart of this production process: their capacity usually define the
capacity of the cement plant. As the main energy-consuming and
greenhouse-gas–emitting stage of cement manufacture, improvement of
their efficiency has been the central concern of cement manufacturing
technology.

Kiln is consist of 4 zones ;
   • Calcinations zone
   • Transition zone
   • Burning zone
   • Cooling zone

Kiln used at Lucky cement plant is
   • 64 meter in length ,
   • total dia of kiln is 4.3 meter and effective dia is 3.9 meter .
   • Slop of kiln is 3.5 %.
   • Migration of kiln is 4-5 rpm.




               PREPARED BY MOHAMMAD YOUNUS (08IN70)                      57
                      SUHAIL AHMED (08IN36) &
                   MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                    LUCKY CEMENT COMPANY LIMITED




                          THE ROTARY KILN




  General layout of a rotary kiln

The rotary kiln consists of a tube made from steel plate, and lined with
firebrick. The tube slopes slightly (1
         .                           (1–4°) and slowly rotates on its axis at
between 30 and 250 revolutions per hour. Rawmix is fed in at the upper
end, and the rotation of the kiln causes it gradually to move downhill to the
other end of the kiln. At the other end fuel, in the form of gas, oil, or
pulverized solid fuel, is blown in through the "burner pipe", producing a
large concentric flame in the lower part of the kiln tube. As material moves
under the flame, it reaches its peak temperature, before dropping out of the
                                                   before
kiln tube into the cooler. Air is drawn first through the cooler and then
through the kiln for combustion of the fuel. In the cooler the air is heated
by the cooling clinker, so that it may be 400 to 800 °C before it enters the
kiln, thus causing intense and rapid combustion of the fuel.

Kiln are typically stopped only for a few days once or twice a year for
essential maintenance.


IGNITION OF KILN

               Some time once or twice in a year kiln is shutdown for
   maintenance purpose . after the the completion of maintenance the kiln
   is again ignited.

               PREPARED BY MOHAMMAD YOUNUS (08IN70)                        58
                      SUHAIL AHMED (08IN36) &
                   MANSOOR ALI SOLANGI (08IN106
                                        (08IN106)
INTERNSHIP PROGRAME
                    LUCKY CEMENT COMPANY LIMITED




                For the ignition of kiln first of all furnace oil is used
   because it has higher calorific value 9760 cal Furnace oil used for kiln
   main burner is first treated in a boiler to decrease its viscosity at
   minimum level due to which it flows very well. when the required
   initial temperature of kiln is maintained than kiln is burned on pulverize
   coal whose calorific value is 5800 cal .
                 As we know that oxygen is necessary for ignition that’s
   why blowers are used which provides fresh air to the main burner.


KILN PROCESS

IN LUCKY CEMENT PLANT

After pre heating and pre calcinated material enters in burning and clinker
zone of kilns where temp ranges from 1000C-1350C. Here CaO reacts
with other oxides to form cementeous materal. Burning of kiln involves
the following steps ;
   1. evaporation of free water at temperature upto 100 C
   2. removal of absorbed water in clay material 100-300 C
   3. removal of chemically bounded water 450-900 C
   4. calcinations of carbonate materials 700-850 C
   5. formation of C2S, Aluminates and ferrite’s 800-1250 C
   6. formation of liquid phase melt > 1250 C
   7. formation of C3S 1330-1450 C
   8. cooling of clinker to solidify liquid phase 1300-1240 C
   9. final clinker microstructure frozen in clinker < 1200 C
   10.       clinker cooled in cooler 1250-100 C

the final product as it comes out the kiln is known as clinker .

REACTION AT KILN

 Following major reactions take place inside the kiln. )

               PREPARED BY MOHAMMAD YOUNUS (08IN70)                        59
                      SUHAIL AHMED (08IN36) &
                   MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                  LUCKY CEMENT COMPANY LIMITED




2CaO + SiO2  → 2CaO.SiO2
               (Dicalcium silicate)
3CaO + SiO2 → 3CaO.SiO2
            (Tri Calcium Silicate)

 3CaO + Al2O3 → 3CaO.Al2O3
             (TRI CALCIUM ALUMINATE)
.
4CaO+AlO3+Fe2O3 → 4CaO.Al2O3.Fe2O3
                   (Tetra Calcium Aluminum Ferrate)


FORMATION OF CLINKER

  At about 1280 0C And above clinker is formed which is in the form of
compound that is known as cement compound. The composition of clinker
is as followed .

COMPOSITION OF CLINKER

C3S                                                55-56%
C2S                                              21-22%
C3A                                           5-6(FOR OPC)
C3A                                                <3.5(FOR SRC)
C4AF                                             12-13(FOR OPC)
C4AF                                              16-17(FOR SRC




              PREPARED BY MOHAMMAD YOUNUS (08IN70)                  60
                     SUHAIL AHMED (08IN36) &
                  MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                  LUCKY CEMENT COMPANY LIMITED




OUTLET OF CLINKER

   AT ABOUT 1280 C And above clinker is formed which is in the form
of compound that is known as cement compound . hot clinker is dropped
into the cooler.
OUTER VEIW OF KILN




             PREPARED BY MOHAMMAD YOUNUS (08IN70)                       61
                    SUHAIL AHMED (08IN36) &
                 MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
    LUCKY CEMENT COMPANY LIMITED




PREPARED BY MOHAMMAD YOUNUS (08IN70)   62
       SUHAIL AHMED (08IN36) &
    MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                    LUCKY CEMENT COMPANY LIMITED




        COOLING AND STORAGE OF CLINKER
In lucky cement a grate cooler is used to cool the clinker . These coolers
have two main advantages: they cool the clinker rapidly, which is desirable
from a quality point of view, and, because they don't rotate (rotating
coolers used in early ages) , hot air can be ducted out of them for use in
fuel drying, or for use as precalciner combustion air.

FAN FOR COOLER.

8 Fans are also used to force air through the cooler bed or grates.

CONSTRUCTION OF COOLER

This consists of a perforated grate through which cold air is blown,
enclosed in a rectangular chamber. A bed of clinker up to 0.5 m deep
moves along the grate. The grates are moved with the help of a hydraulic
system.

COOLER CRUSHER

Rotary crushers are used at the out let of a cooler. These crushers crush the
big pieces of cooled clinker into small ones.

PAN CONVERYER

Pan conveyer is the medium used for transportation of material in heavy
amount. It consist of a chain of pan joined with each other in the form of a
belt. Motors are used to run them.

STORAGE OF CLINKER
Cooled clinker from the cooler is transported to the clinker storage yard
with the help of pan conveyer.


               PREPARED BY MOHAMMAD YOUNUS (08IN70)                         63
                      SUHAIL AHMED (08IN36) &
                   MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
    LUCKY CEMENT COMPANY LIMITED




PREPARED BY MOHAMMAD YOUNUS (08IN70)   64
       SUHAIL AHMED (08IN36) &
    MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                    LUCKY CEMENT COMPANY LIMITED




CEMENT MILL
Cement mill is the area where finally cement is manufacture by the
addition of second stage raw materials (Slag , Gypsum and clinker) it
consist of following parts


Diagram of CEMENT MILL




Flow diagram of cement mill



Roller press or crusher
Crushing Separator
Storage bin
Ball mill
In lucky cement plant the cement mill is used is actually a ball mill.
               PREPARED BY MOHAMMAD YOUNUS (08IN70)                      65
                      SUHAIL AHMED (08IN36) &
                   MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                    LUCKY CEMENT COMPANY LIMITED




The length of ball mill is 13 meter . it is divided into two chambers .
Its 1st chamber is 3 meter long and 2nd chamber is 10 meter long .
The efficiency of ball mill depends on the size and weight of media or
grinding medium.
Media size in 1st chamber is 30,40,50 and 60 mm and in 2nd chamber is 10
x12 , 12x14 mm .
Weight of media in ball mill is 180 ton .

Grinding aid
Glycol is used as grinding aid in ball mill . due to high temperature
gypsum under goes hydration so lumps form in the mill which chock the
out let of ball mill so glycol stops this phenomena

Storage of cement




              PREPARED BY MOHAMMAD YOUNUS (08IN70)                      66
                     SUHAIL AHMED (08IN36) &
                  MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
    LUCKY CEMENT COMPANY LIMITED




PREPARED BY MOHAMMAD YOUNUS (08IN70)   67
       SUHAIL AHMED (08IN36) &
    MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                   LUCKY CEMENT COMPANY LIMITED




PACKING PLANT
LOOSE CEMENT

       Lucky cement also export loose cement by loading it into through
bunker. Daily it export    ton per day.
      loose cement storage and ship loading terminal at berth -25 west
wharf karachi port


PACKED CEMENT




              PREPARED BY MOHAMMAD YOUNUS (08IN70)                        68
                     SUHAIL AHMED (08IN36) &
                  MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
    LUCKY CEMENT COMPANY LIMITED




PREPARED BY MOHAMMAD YOUNUS (08IN70)   69
       SUHAIL AHMED (08IN36) &
    MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                    LUCKY CEMENT COMPANY LIMITED




QUALITY CONTROL LAB
COLLECTION OF SAMPLE

For quality management samples of material and cement is taken from
following places ,

   •   Query
   •   Limestone yard
   •   Proportionating building
   •   Vertical Raw mill Air slide
   •   Raw mix silo
   •   Preheater
   •   Cooler
   •   Ball mill

Testing of sample at different stages

ANALYSIS OF COAL

 In order to access the quality of the coal the following two types of
analyses are made.
    • PROXIMATE ANALYSES
    • ULTIMATE ANALYSES

PROXIMATE ANALYSIS

It is the analyses on compound basis which involves the following
determinations.
1.moisture
               PREPARED BY MOHAMMAD YOUNUS (08IN70)                      70
                      SUHAIL AHMED (08IN36) &
                   MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                    LUCKY CEMENT COMPANY LIMITED




2.volatile matter
3.ash
4.fixed carbon
1. MOISTURE:
      about 1gm of finaly powdered air dried coal sample is weighed in a
crucible . the crucible is placed inside an electronic hot air oven
maintained at 105_110 0C the crucible is allowed to remain in oven for 1
hour and then taken out. (with the help of pair of tongs) cooled in a
desecator and weighed .
       loss in weight is reported as moisture on % basis.
FORMULA FOR FINDING MOISTURE

% of moisture =( loss in weight /     weight of coal taken )*100

2.VOLATILE MATTER

the dried sample of coal left in a crucible in crucible in (1) is then covered
with a lid and placed in an electric furnace(muffle furnace) maintained at
925+25oC or 925-25oC .the crucible is taken out of the oven after 7
minutes heating. The crucible is cooled 1st in air then inside dedicator and
weighed again loss in weight is reported as volatile matter i,e
Formula For Finding Volatile Matter

volatile matter (v m) = loss in weight due to removal of volatile matter x
100
                              wt of coal sample taken
3.ASH
   the residual coal in the crucible in (2) is then heated without lid in a
muffle at about 500C for half an hour .the crucible is taken out cooled 1st
in air then in desiccators and weighed ,heating, cooling and weighing is
repeated till a constant weight is obtained the residue is reported as ash on
%basis.

FORMULA FOR FINDING % OF ASH
    The % of ash = wt of ash left     x 100
               PREPARED BY MOHAMMAD YOUNUS (08IN70)                         71
                      SUHAIL AHMED (08IN36) &
                   MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                   LUCKY CEMENT COMPANY LIMITED




                   wt of coal taken


4.FIXED CARBON

% of fixed carbon = 100 -% of (moisture + volatile matter +ash)

ULTIMATE ANALYSIS

It is the analysis on elemental basis which      involves the following
determinations.
1. carbon and hydrogen
2. Nitrogen
3. sulpher
4. oxygen

1. CARBON AND HYDROGEN;
         about 0.2gms of accurately weighed coal sample is burnt in a
current of oxygen in a combustion apparatus .C and H of the coal are
converted into CO2 and H2O respectively. The gaseous products are
absorbed respectively in KOH and CaCl2 tubes of known weights, the
increase in weight of these tubes are then determined

    C + O2 → CO2

    2KOH + CO2 → K2CO3 + H2O

    CaCl2 + 7H2O → CaCl2 .7H2O


% OF C = Increase in weight of KOH tube x 12 x 100
      Weight of coal sample taken x 44



              PREPARED BY MOHAMMAD YOUNUS (08IN70)                   72
                     SUHAIL AHMED (08IN36) &
                  MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                   LUCKY CEMENT COMPANY LIMITED




% of H2= increase in weight of CaCl2 tube x 2 x 100
         weight of coal sample taken x 18

  1. NITROGEN

About 1 gm of accurately weighed powdered coal is heated with
concentrated H2SO4 along necked flask called kejeld’s flask, after the
solution becomes clear it is treated with excess of KOH and LIBERATED
AMMOUNT is distilled over and absorbed in a known volume of standard
acid solution. The unused acid is then determined by lack titration with
standard NAOH FROM the volume of acid by ammonia liberated % of N
in coal is calculated as follows

  % OF N =volume of acid used x normality x14 x 100
              weight of coal taken

  3.SULPHER
            Sulpher is determined from washings obtained from the
  known mass sample of coal used in a bomb calorimeter for
  determination of calorific value during determination. Sulpher is
  converted into sulphate , the washings are with barium chloride solution
  BaCl2, when BaSO4 is precipitated this filtrate washed and heated to
  constant weight.

  % of sulphur in coal = wt of bariam sulphate obtained x 32  x 100
                        233 x wt of coal sample taken in bomb

  4.Oxygen
           Oxygen determined by
     % of oxygen = 100 - % of (C + S + H + N + Ash




              PREPARED BY MOHAMMAD YOUNUS (08IN70)                      73
                     SUHAIL AHMED (08IN36) &
                  MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
    LUCKY CEMENT COMPANY LIMITED




PREPARED BY MOHAMMAD YOUNUS (08IN70)   74
       SUHAIL AHMED (08IN36) &
    MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                    LUCKY CEMENT COMPANY LIMITED




POWER GENERATION
There is also a power generation plant in lucky cement industry. 11
generators are used some of them required furnace oil and some Natural
gas.

Furnance oil generator or Dual fuel generator

There are 2 dual fuel or furnace oil generators are used. Dual fuel
generators are those which uses furnace oil and natural gas as fuel for
power generation. Each generator produces 7.4 Mega Watt electricity.

Natural gas generator

There are 9 other generators used to generate electricity by natural gas.
  • 5 of them is of CAT MAC company and has an efficiency of
      generating electricity nearly 5.9 Mega Watt.
  • 3 of Roll Royce company having efficiency of 6.9 Mega Watt.
  • 1 of Roll Royce company having efficiency of 8.5 Mega Watt

Generation of power house

In lucky cement industry total power consumption is 48.5 Mega Watt .
Power house can generate 75 Mega Watt electricity.




               PREPARED BY MOHAMMAD YOUNUS (08IN70)                         75
                      SUHAIL AHMED (08IN36) &
                   MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
    LUCKY CEMENT COMPANY LIMITED




PREPARED BY MOHAMMAD YOUNUS (08IN70)   76
       SUHAIL AHMED (08IN36) &
    MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                    LUCKY CEMENT COMPANY LIMITED




 OVERALL PERFORMANCE OF LUCKY CEMENT
               LIMITED
        Aims and missions
        F uture plan

        Expansion plan

Our Company has emerged as the largest exporter of cement in Pakistan.
We have been able to capture new markets where our brand is now very
well established and known for its high quality of cement produced by us.
The location of our Karachi project is ideal for exports by sea for which
we have already setup state-of-the-art infrastructure at Plants & Karachi
Port.

Currently the total production capacity of Lucky Cement is 25,000 tons
per day. Our Company has adopted the same hybrid technology experience
for this expansion plan which was earlier used for the existing production
lines by acquiring the latest technology fuel consuming components from
European suppliers with the combination of Chinese plant and machinery
which helps to minimize expansion cost. It will ensure great efficiency for
producing cement at lower cost.

The power requirement for the expansion lines will be met through captive
gas based power generation for which additional supply of gas has been
arranged.




              PREPARED BY MOHAMMAD YOUNUS (08IN70)                       77
                     SUHAIL AHMED (08IN36) &
                  MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
    LUCKY CEMENT COMPANY LIMITED




PREPARED BY MOHAMMAD YOUNUS (08IN70)   78
       SUHAIL AHMED (08IN36) &
    MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                    LUCKY CEMENT COMPANY LIMITED




ENVIRONMENTAL SAFETY

GLOBAL WARMING AND THE DANGERS OF GHG


WASTE HEAT RECOVERY
Lucky Cement, being aware of Global warming and the dangers of GHG,
has decided to play an active role in participating in reduction of global
warming and creating an environmental friendly atmosphere. In this regard
Lucky cement has taken a step to contribute in this Global effort to control
carbon emission.

Lucky Cement Limited is now in the process of installing a waste heat
recovery system which will utilize the waste heat generated during clinker
production into electrical power with zero emission of carbon and without
consuming any fuel. This effort of producing 25 MW electricity, although
a costly effort , but looking at the circumstances both nationally and
internationally will help in contributing in production of electricity in a
nation where the power generation sector is in crisis and in a world which
feels the dangers to environment and global warming.




              PREPARED BY MOHAMMAD YOUNUS (08IN70)                        79
                     SUHAIL AHMED (08IN36) &
                  MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
                  LUCKY CEMENT COMPANY LIMITED




CONCLUSION
 Lucky cement industry is a day by day growing industry and counted in
 Pakistan’s most biggest and popular industry.

 We have observed all units process and operations used in a chemical
 industry and got good working experience in lucky.

 Internship is most important for the engineering students as it develops
 confidence and practical knowledge in students during their studies.

 As far as the production of lucky concrete progress plant is concerned,
 it is in very huge quantity and of good quality.

 Lucky is famous for manufacturing OPC of very good quality.




            PREPARED BY MOHAMMAD YOUNUS (08IN70)                       80
                   SUHAIL AHMED (08IN36) &
                MANSOOR ALI SOLANGI (08IN106)
INTERNSHIP PROGRAME
    LUCKY CEMENT COMPANY LIMITED




PREPARED BY MOHAMMAD YOUNUS (08IN70)   81
       SUHAIL AHMED (08IN36) &
    MANSOOR ALI SOLANGI (08IN106
                         (08IN106)

Más contenido relacionado

La actualidad más candente

Final project Report on cement industry
Final project Report on cement industryFinal project Report on cement industry
Final project Report on cement industryMudassar Nazar
 
Cement Industry and Audit Presentation
Cement Industry and Audit PresentationCement Industry and Audit Presentation
Cement Industry and Audit PresentationSaurabh Pandey
 
Cement Manufacturing Plant Construction
Cement Manufacturing Plant ConstructionCement Manufacturing Plant Construction
Cement Manufacturing Plant ConstructionShyam Anandjiwala
 
Presentation on Industrial Training in UltraTech Cement , Ratnagiri (Narmada ...
Presentation on Industrial Training in UltraTech Cement , Ratnagiri (Narmada ...Presentation on Industrial Training in UltraTech Cement , Ratnagiri (Narmada ...
Presentation on Industrial Training in UltraTech Cement , Ratnagiri (Narmada ...Sufiyan Naik
 
Cement Industry Pakistan
Cement Industry PakistanCement Industry Pakistan
Cement Industry PakistanYumna Qaiser
 
Industrial training report Satna Cement Works (Birla Corp Ltd), Satna, Madhya...
Industrial training report Satna Cement Works (Birla Corp Ltd), Satna, Madhya...Industrial training report Satna Cement Works (Birla Corp Ltd), Satna, Madhya...
Industrial training report Satna Cement Works (Birla Corp Ltd), Satna, Madhya...Sushant Siddhey
 
Cement Plant Process and Instruments Used
Cement Plant Process and Instruments UsedCement Plant Process and Instruments Used
Cement Plant Process and Instruments UsedRavi Roy
 
Jk lakshmi cement ltd
Jk lakshmi cement ltdJk lakshmi cement ltd
Jk lakshmi cement ltdCyber4Tech
 
Cement Plant Introduction
Cement Plant IntroductionCement Plant Introduction
Cement Plant IntroductionSummer Wei
 
Summer tranning report at jk cement works ltd
Summer tranning report at jk cement works ltdSummer tranning report at jk cement works ltd
Summer tranning report at jk cement works ltdNARENDRA SINGH
 
Cement Manufacuring Training presentation
Cement Manufacuring Training presentationCement Manufacuring Training presentation
Cement Manufacuring Training presentationSumit Gupta
 
Dg annual report_2021
Dg annual report_2021Dg annual report_2021
Dg annual report_2021ssuserc8163a
 
Manufacturing and Quality Control of Cement.
Manufacturing and Quality Control of Cement.Manufacturing and Quality Control of Cement.
Manufacturing and Quality Control of Cement.Abhishek Garai
 
Cement Production Process
Cement Production ProcessCement Production Process
Cement Production ProcessDeepesh Mishra
 
Aditya birla cement training report
Aditya birla cement training reportAditya birla cement training report
Aditya birla cement training reportravi kant
 
Internship report-2 D.G cement company limited (d.g khan)
Internship report-2   D.G cement company limited (d.g khan)Internship report-2   D.G cement company limited (d.g khan)
Internship report-2 D.G cement company limited (d.g khan)Zuhair Bin Jawaid
 

La actualidad más candente (20)

Final project Report on cement industry
Final project Report on cement industryFinal project Report on cement industry
Final project Report on cement industry
 
Cement Industry and Audit Presentation
Cement Industry and Audit PresentationCement Industry and Audit Presentation
Cement Industry and Audit Presentation
 
Cement Manufacturing Plant Construction
Cement Manufacturing Plant ConstructionCement Manufacturing Plant Construction
Cement Manufacturing Plant Construction
 
TATA STEEL PPT
TATA STEEL PPTTATA STEEL PPT
TATA STEEL PPT
 
Project report_raw meal
Project report_raw mealProject report_raw meal
Project report_raw meal
 
Presentation on Industrial Training in UltraTech Cement , Ratnagiri (Narmada ...
Presentation on Industrial Training in UltraTech Cement , Ratnagiri (Narmada ...Presentation on Industrial Training in UltraTech Cement , Ratnagiri (Narmada ...
Presentation on Industrial Training in UltraTech Cement , Ratnagiri (Narmada ...
 
Cement Industry Pakistan
Cement Industry PakistanCement Industry Pakistan
Cement Industry Pakistan
 
Cement industry
Cement industryCement industry
Cement industry
 
Project of lucky cement .
Project of lucky cement .Project of lucky cement .
Project of lucky cement .
 
Industrial training report Satna Cement Works (Birla Corp Ltd), Satna, Madhya...
Industrial training report Satna Cement Works (Birla Corp Ltd), Satna, Madhya...Industrial training report Satna Cement Works (Birla Corp Ltd), Satna, Madhya...
Industrial training report Satna Cement Works (Birla Corp Ltd), Satna, Madhya...
 
Cement Plant Process and Instruments Used
Cement Plant Process and Instruments UsedCement Plant Process and Instruments Used
Cement Plant Process and Instruments Used
 
Jk lakshmi cement ltd
Jk lakshmi cement ltdJk lakshmi cement ltd
Jk lakshmi cement ltd
 
Cement Plant Introduction
Cement Plant IntroductionCement Plant Introduction
Cement Plant Introduction
 
Summer tranning report at jk cement works ltd
Summer tranning report at jk cement works ltdSummer tranning report at jk cement works ltd
Summer tranning report at jk cement works ltd
 
Cement Manufacuring Training presentation
Cement Manufacuring Training presentationCement Manufacuring Training presentation
Cement Manufacuring Training presentation
 
Dg annual report_2021
Dg annual report_2021Dg annual report_2021
Dg annual report_2021
 
Manufacturing and Quality Control of Cement.
Manufacturing and Quality Control of Cement.Manufacturing and Quality Control of Cement.
Manufacturing and Quality Control of Cement.
 
Cement Production Process
Cement Production ProcessCement Production Process
Cement Production Process
 
Aditya birla cement training report
Aditya birla cement training reportAditya birla cement training report
Aditya birla cement training report
 
Internship report-2 D.G cement company limited (d.g khan)
Internship report-2   D.G cement company limited (d.g khan)Internship report-2   D.G cement company limited (d.g khan)
Internship report-2 D.G cement company limited (d.g khan)
 

Destacado

Lucky final ppt strategic management report on lucky cement (karachi universi...
Lucky final ppt strategic management report on lucky cement (karachi universi...Lucky final ppt strategic management report on lucky cement (karachi universi...
Lucky final ppt strategic management report on lucky cement (karachi universi...tabanis school of accountancy
 
Organizational Behaviour at Lucky Cement.
Organizational Behaviour at Lucky Cement.Organizational Behaviour at Lucky Cement.
Organizational Behaviour at Lucky Cement.Rafia Afreen
 
Report writting presentation ppt
Report writting presentation pptReport writting presentation ppt
Report writting presentation pptAnni's Della
 
Summer Internship Report TRDP PDF
Summer Internship Report TRDP PDFSummer Internship Report TRDP PDF
Summer Internship Report TRDP PDF03363635718
 
Financial analysis of lucky cement
Financial analysis of lucky cementFinancial analysis of lucky cement
Financial analysis of lucky cementthawban baig
 
Financial analysis of lucky cement
Financial analysis of lucky cementFinancial analysis of lucky cement
Financial analysis of lucky cementtayyabaways
 
Internship report
Internship reportInternship report
Internship reportKati Kokab
 
Online shopping habits-questionnaire
Online shopping habits-questionnaireOnline shopping habits-questionnaire
Online shopping habits-questionnairemanuelmathew1
 
An introduction to bit coins and bit coin mining
An introduction to bit coins and bit coin miningAn introduction to bit coins and bit coin mining
An introduction to bit coins and bit coin miningAnirudh Kadevari
 
Marketing online shopping - consumer’s perception on online shopping
Marketing   online shopping - consumer’s perception on online shoppingMarketing   online shopping - consumer’s perception on online shopping
Marketing online shopping - consumer’s perception on online shoppingRadhe Jha
 

Destacado (12)

Lucky final ppt strategic management report on lucky cement (karachi universi...
Lucky final ppt strategic management report on lucky cement (karachi universi...Lucky final ppt strategic management report on lucky cement (karachi universi...
Lucky final ppt strategic management report on lucky cement (karachi universi...
 
Organizational Behaviour at Lucky Cement.
Organizational Behaviour at Lucky Cement.Organizational Behaviour at Lucky Cement.
Organizational Behaviour at Lucky Cement.
 
Financial Statement Analysis of Lucky cement
Financial Statement Analysis of Lucky cementFinancial Statement Analysis of Lucky cement
Financial Statement Analysis of Lucky cement
 
Report writting presentation ppt
Report writting presentation pptReport writting presentation ppt
Report writting presentation ppt
 
Summer Internship Report TRDP PDF
Summer Internship Report TRDP PDFSummer Internship Report TRDP PDF
Summer Internship Report TRDP PDF
 
Financial analysis of lucky cement
Financial analysis of lucky cementFinancial analysis of lucky cement
Financial analysis of lucky cement
 
Financial analysis of lucky cement
Financial analysis of lucky cementFinancial analysis of lucky cement
Financial analysis of lucky cement
 
Murabaha prsentation for nrsp
Murabaha prsentation for nrspMurabaha prsentation for nrsp
Murabaha prsentation for nrsp
 
Internship report
Internship reportInternship report
Internship report
 
Online shopping habits-questionnaire
Online shopping habits-questionnaireOnline shopping habits-questionnaire
Online shopping habits-questionnaire
 
An introduction to bit coins and bit coin mining
An introduction to bit coins and bit coin miningAn introduction to bit coins and bit coin mining
An introduction to bit coins and bit coin mining
 
Marketing online shopping - consumer’s perception on online shopping
Marketing   online shopping - consumer’s perception on online shoppingMarketing   online shopping - consumer’s perception on online shopping
Marketing online shopping - consumer’s perception on online shopping
 

Similar a Lucky cement factory internship report

Rmc plant
Rmc plantRmc plant
Rmc plantKp Ahm
 
Program Development of Cement Industry at Jamshoro, Sindh
Program Development of Cement Industry at Jamshoro, SindhProgram Development of Cement Industry at Jamshoro, Sindh
Program Development of Cement Industry at Jamshoro, SindhRana Ahtisham
 
Basic of cement-Amit Payal
Basic of cement-Amit Payal Basic of cement-Amit Payal
Basic of cement-Amit Payal AMIT PAYAL
 
Cement industry : grinding process of ball mill
Cement industry : grinding process of ball millCement industry : grinding process of ball mill
Cement industry : grinding process of ball millPankaj Verma
 
cement industry program development
cement industry program developmentcement industry program development
cement industry program developmentHyder Ali Larik
 
training report on Jyoti cnc automation ltd.
training report on Jyoti cnc automation ltd.training report on Jyoti cnc automation ltd.
training report on Jyoti cnc automation ltd.Ketan Gojiya
 
dokumen.tips_training-report-on-jyoti-cnc-automation-ltd(1).pptx
dokumen.tips_training-report-on-jyoti-cnc-automation-ltd(1).pptxdokumen.tips_training-report-on-jyoti-cnc-automation-ltd(1).pptx
dokumen.tips_training-report-on-jyoti-cnc-automation-ltd(1).pptxsameerjena6
 
Ultimate hevi sand
Ultimate hevi sandUltimate hevi sand
Ultimate hevi sandSAIFoundry
 
Sintering technology by VIKAS KUMAR.
Sintering technology by VIKAS KUMAR.Sintering technology by VIKAS KUMAR.
Sintering technology by VIKAS KUMAR.VikasKumar1998
 
Loesche Mills for Cement and Granulated Blast Furnace Slag
Loesche Mills for Cement and Granulated Blast Furnace SlagLoesche Mills for Cement and Granulated Blast Furnace Slag
Loesche Mills for Cement and Granulated Blast Furnace SlagLOESCHE
 
A Winter Project Report on Production Department Analysis of "Italia Ceramics...
A Winter Project Report on Production Department Analysis of "Italia Ceramics...A Winter Project Report on Production Department Analysis of "Italia Ceramics...
A Winter Project Report on Production Department Analysis of "Italia Ceramics...Bhavik Parmar
 
cement-plant-operation-handbook
cement-plant-operation-handbookcement-plant-operation-handbook
cement-plant-operation-handbookVijay Kumar
 
Cement Processing Report
Cement Processing ReportCement Processing Report
Cement Processing ReportMuhammad Ahmed
 
Ready mix concrete
Ready mix concreteReady mix concrete
Ready mix concreteBala murali
 
Dawlance internship report
Dawlance internship reportDawlance internship report
Dawlance internship reportMohammad Younus
 

Similar a Lucky cement factory internship report (20)

Rmc plant
Rmc plantRmc plant
Rmc plant
 
Program Development of Cement Industry at Jamshoro, Sindh
Program Development of Cement Industry at Jamshoro, SindhProgram Development of Cement Industry at Jamshoro, Sindh
Program Development of Cement Industry at Jamshoro, Sindh
 
Basic of cement-Amit Payal
Basic of cement-Amit Payal Basic of cement-Amit Payal
Basic of cement-Amit Payal
 
Cement industry : grinding process of ball mill
Cement industry : grinding process of ball millCement industry : grinding process of ball mill
Cement industry : grinding process of ball mill
 
ppt project
ppt projectppt project
ppt project
 
CEMNAT MANUFACTRING
CEMNAT MANUFACTRINGCEMNAT MANUFACTRING
CEMNAT MANUFACTRING
 
Foundryequipment
FoundryequipmentFoundryequipment
Foundryequipment
 
cement industry program development
cement industry program developmentcement industry program development
cement industry program development
 
training report on Jyoti cnc automation ltd.
training report on Jyoti cnc automation ltd.training report on Jyoti cnc automation ltd.
training report on Jyoti cnc automation ltd.
 
dokumen.tips_training-report-on-jyoti-cnc-automation-ltd(1).pptx
dokumen.tips_training-report-on-jyoti-cnc-automation-ltd(1).pptxdokumen.tips_training-report-on-jyoti-cnc-automation-ltd(1).pptx
dokumen.tips_training-report-on-jyoti-cnc-automation-ltd(1).pptx
 
Ultimate hevi sand
Ultimate hevi sandUltimate hevi sand
Ultimate hevi sand
 
Sintering technology by VIKAS KUMAR.
Sintering technology by VIKAS KUMAR.Sintering technology by VIKAS KUMAR.
Sintering technology by VIKAS KUMAR.
 
Loesche Mills for Cement and Granulated Blast Furnace Slag
Loesche Mills for Cement and Granulated Blast Furnace SlagLoesche Mills for Cement and Granulated Blast Furnace Slag
Loesche Mills for Cement and Granulated Blast Furnace Slag
 
A Winter Project Report on Production Department Analysis of "Italia Ceramics...
A Winter Project Report on Production Department Analysis of "Italia Ceramics...A Winter Project Report on Production Department Analysis of "Italia Ceramics...
A Winter Project Report on Production Department Analysis of "Italia Ceramics...
 
ashwini
ashwiniashwini
ashwini
 
Rotary kiln
Rotary kilnRotary kiln
Rotary kiln
 
cement-plant-operation-handbook
cement-plant-operation-handbookcement-plant-operation-handbook
cement-plant-operation-handbook
 
Cement Processing Report
Cement Processing ReportCement Processing Report
Cement Processing Report
 
Ready mix concrete
Ready mix concreteReady mix concrete
Ready mix concrete
 
Dawlance internship report
Dawlance internship reportDawlance internship report
Dawlance internship report
 

Más de Mohammad Younus

Jab zindagi-shuru-ho-gee
Jab zindagi-shuru-ho-geeJab zindagi-shuru-ho-gee
Jab zindagi-shuru-ho-geeMohammad Younus
 
1947 ke mazalim ki kahani
1947 ke mazalim ki kahani1947 ke mazalim ki kahani
1947 ke mazalim ki kahaniMohammad Younus
 
Technical terms in oracle apps explained through real time example
Technical terms in oracle apps explained through real time exampleTechnical terms in oracle apps explained through real time example
Technical terms in oracle apps explained through real time exampleMohammad Younus
 
AME Requisition Approval Heirarchy
AME Requisition Approval Heirarchy AME Requisition Approval Heirarchy
AME Requisition Approval Heirarchy Mohammad Younus
 
Requisition Hierarchy Based on the Item Catagory
Requisition Hierarchy Based on the Item Catagory Requisition Hierarchy Based on the Item Catagory
Requisition Hierarchy Based on the Item Catagory Mohammad Younus
 
Incentives and remuneration lecture presentation
Incentives and remuneration lecture presentation Incentives and remuneration lecture presentation
Incentives and remuneration lecture presentation Mohammad Younus
 
Incentives and remuneration
Incentives and remunerationIncentives and remuneration
Incentives and remunerationMohammad Younus
 
incentives and remuneration
incentives and remuneration incentives and remuneration
incentives and remuneration Mohammad Younus
 
Autocade 2D complete course
Autocade 2D complete course Autocade 2D complete course
Autocade 2D complete course Mohammad Younus
 
speed up sales using CRM system
speed up sales using CRM system speed up sales using CRM system
speed up sales using CRM system Mohammad Younus
 
Education system in pakistan
Education system in pakistan Education system in pakistan
Education system in pakistan Mohammad Younus
 
industrial accidents and their types , preventions
industrial accidents and their types , preventionsindustrial accidents and their types , preventions
industrial accidents and their types , preventionsMohammad Younus
 
Operation research's CPM techniques
Operation research's CPM techniques Operation research's CPM techniques
Operation research's CPM techniques Mohammad Younus
 

Más de Mohammad Younus (20)

Jab zindagi-shuru-ho-gee
Jab zindagi-shuru-ho-geeJab zindagi-shuru-ho-gee
Jab zindagi-shuru-ho-gee
 
1947 ke mazalim ki kahani
1947 ke mazalim ki kahani1947 ke mazalim ki kahani
1947 ke mazalim ki kahani
 
Qasam us waqt_ki
Qasam us waqt_kiQasam us waqt_ki
Qasam us waqt_ki
 
Technical terms in oracle apps explained through real time example
Technical terms in oracle apps explained through real time exampleTechnical terms in oracle apps explained through real time example
Technical terms in oracle apps explained through real time example
 
AME Requisition Approval Heirarchy
AME Requisition Approval Heirarchy AME Requisition Approval Heirarchy
AME Requisition Approval Heirarchy
 
Requisition Hierarchy Based on the Item Catagory
Requisition Hierarchy Based on the Item Catagory Requisition Hierarchy Based on the Item Catagory
Requisition Hierarchy Based on the Item Catagory
 
Incentives and remuneration lecture presentation
Incentives and remuneration lecture presentation Incentives and remuneration lecture presentation
Incentives and remuneration lecture presentation
 
Incentives and remuneration
Incentives and remunerationIncentives and remuneration
Incentives and remuneration
 
PSD Assignments
PSD Assignments PSD Assignments
PSD Assignments
 
incentives and remuneration
incentives and remuneration incentives and remuneration
incentives and remuneration
 
Autocade 2D complete course
Autocade 2D complete course Autocade 2D complete course
Autocade 2D complete course
 
Conflict management
Conflict managementConflict management
Conflict management
 
speed up sales using CRM system
speed up sales using CRM system speed up sales using CRM system
speed up sales using CRM system
 
human machine system
human machine system human machine system
human machine system
 
Education system in pakistan
Education system in pakistan Education system in pakistan
Education system in pakistan
 
industrial accidents and their types , preventions
industrial accidents and their types , preventionsindustrial accidents and their types , preventions
industrial accidents and their types , preventions
 
PRODUCTION CYCLE
PRODUCTION CYCLE PRODUCTION CYCLE
PRODUCTION CYCLE
 
Operation research's CPM techniques
Operation research's CPM techniques Operation research's CPM techniques
Operation research's CPM techniques
 
Hfe practicle final
Hfe practicle finalHfe practicle final
Hfe practicle final
 
Aging work force
Aging work forceAging work force
Aging work force
 

Último

RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableSeo
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Sheetaleventcompany
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentationuneakwhite
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noidadlhescort
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...amitlee9823
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture conceptP&CO
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLkapoorjyoti4444
 

Último (20)

RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 

Lucky cement factory internship report

  • 1. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED DEPARTMENT OF MEHRAN UNIVERSITY OF ENGINEERING & TECHNOLOGY, JAMSHORO (Internship Program Report) LUCKY CEMENT LIMITED , KARACHI Date : 22-06-2011 To 30-07-2011 Submitted To: HUMAN RESORCE DEPARTMENT Submitted By: MOHAMMAD YOUNUS (08IN70) SUHAIL AHMED PALIJO (08IN36) MANSOOR ALI SOLANGI (08IN106) PREPARED BY MOHAMMAD YOUNUS (08IN70) 1 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 2. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED PREFACE This report has been give by the authors to convey the information about different departments of lucky cement limited , which has been visited during our industrial training. We have discussed the different specifications , processing and production of the department we visited. We have tried to give some history of the processes , literature , survey and importance of the processing as well. MOAHAMMD YOUNUS (08IN70) SUHAIL AHMED PALIJO (08IN36) & MANSOOR AHMED SOLANGI (08IN106) PREPARED BY MOHAMMAD YOUNUS (08IN70) 2 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 3. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED ACKNOWLEDGEMENT First of all we would like to thanks Al-mighty Allah , The Most Beneficent and Merciful . We are very happy to avail this golden opportunity of getting training at lucky cement plant . We are thankful to General Manager of Lucky cement plant at Karachi Mr. Mashkoor Ahmed who provided us such a valuable opportunity. A lot of thanks to MECHANICAL Manager M.K PASHA who provided us assistance in such a friendly environment. We are Also thankful to ASSISTANCE MANAGER SHAHID ZAMAN ASSISTANCE MANAGER SAAD SENIOR ASSISTANCE MANAGER HAFEEZ SHAHAB For providing us information about the plants. This report is a result of handwork of not a single person but many persons have aided by volunteering their services to create this text . Their kindness thus improving this report with their Additional technical knowledge has contributed mightly to the quality of this work. We got much practical knowledge which was not possible to gain in the university during studies. Overall , we are thankful to all the Officers & the workers of Lucky cement Ltd. PREPARED BY MOHAMMAD YOUNUS (08IN70) 3 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 4. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED CONTENTS UNIT’S DISCRIPTION PAGE INTRODUCTION UNIT NO. 1 • INTRODUCTION TO CEMENT. • TYPES OF CEMNT • LUCKY CEMENT LIMITED CONCRETE PROGRESS, KARACHI. • PRODUCTS. 7 to 11 • Quality policy , vision , mission & values. • Overall flow diagram of lucky cement plant. RAW MATERIAL USED… UNIT NO. 2 • Limestone • Clay • Laterite 12 to 16 • Bauxite • Slag • Gypsum • Coal • Furnance oil PREPARED BY MOHAMMAD YOUNUS (08IN70) 4 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 5. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED LABORATORY UNIT NO. 3 • Coal testing • Limestone sample • Latirite sample • Bauxite sample 17 to 23 • Clay sample CRUSHER UNIT NO. 4 • Hammer crusher 24 to 27 • Production of crusher • Limestone yard • UNIT NO. 5 PROPORTIONING TOWER 28 to 29 • Way feeder • Decision of percentage of raw material UNIT NO. 6 GRIDING OF COAL 30 to 31 • Coal grinding • Pulverize coal • Coal mill • Coal storage bin • Fire extinguisher system • Coal transportation to • Pre-calciner • main burner (klin) PREPARED BY MOHAMMAD YOUNUS (08IN70) 5 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 6. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED GRIDING OF RAW MATERIAL • Transportation of ingredients • Rotary valve 32 to 36 UNIT NO. 7 • I.D fan • System fan • Vertical raw mill • Inlet of hot Air • Outlet of Air • Cyclones • Air slides • Bag house • Bag house fan • Outlet of extra gases • Storage of powder grinded raw material to the Silo • Homogenization of grinded raw material CALCINATION AND HEAT EXCHANGER • Pre-heater UNIT NO. 8 • Inlet of feed to pre-heater 37 to 39 • Construction of feed silo • Rizor • Cyclones of pre-heater • Pre-calciner burner • Pre-calcination • Heat exchange • Primary duck PREPARED BY MOHAMMAD YOUNUS (08IN70) 6 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 7. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED KILN AREA • Introduction to kiln UNIT NO. 9 • Ignition of kiln 40 to 48 • Reaction at kiln • Formation of clinker • Hard burning and soft burning • Outlet of clicker COOLING AND STORAGE UNIT NO. 10 OF CLINKER • Construction of cooler • Cooler crusher • Pan conveyer • Storage of clinker CEMENT MILL UNIT NO. 11 • Proportionating tower • Flow diagram of cement mill • Roller crusher • Crushing Separator • Storage bin • Ball mill • Grinding aid • Storage of cement UNIT NO. 12 PACKING PLANT • Loose cement • Packed cement • Loose cement storage and ship PREPARED BY MOHAMMAD YOUNUS (08IN70) 7 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 8. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED loading terminal at Berth – 25 west wharf , Karachi Port UNIT NO. 13 QUALITY CONTROL LAB • Collection of sample • Testing of sample at different stages UNIT NO. 14 POWER GENERATION • Furnace oil generator • Natural gas generator • Dual fuel generator • Generation of power house UNIT NO. 15 OVER ALL PERFORMANCE OF LUCKY CEMENT FACTORY • Aims and missions UNIT NO. 16 ENVIRONMENTAL SAFETY • Global warming and the dangers of GHG UNIT NO. 17 CONCLUSION PREPARED BY MOHAMMAD YOUNUS (08IN70) 8 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 9. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED PREPARED BY MOHAMMAD YOUNUS (08IN70) 9 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 10. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED INTRODUCTION TO CEMENT Cement is the non metallic bonding material used for construction Or Cement is binding material which is used in construction HISTORY OF CEMENT History of cement is very old as human civilization. Romans used volcanic tuff mixed raw material for their construction .Egyptians used it for the construction of PYRAMIDES. In 1824 English man Joseph Aspdin, patented artificial cement made by the calcinations of an argillaceous lime stone. He cal edit “Portland” because concrete made from it resembles with a famous building stone obtained from land near England TYPES OF CEMENT ASTM C150 There are five types of Portland cements with variations of the first three according to ASTM( AMERICAN SOCITY OF TESTING MATERIAL ) C150. 1.COMMON or GENERAL PURPOSE CEMENT It is generally assumed unless another type is specified. It is commonly used for general construction especially when making precast and precast-prestressed concrete that is not to be in contact with soils or ground water. The typical compound compositions of this type are: 55% (C3S), 19% (C2S), 10% (C3A), 7% (C4AF), 2.8% MgO, 2.9% (SO3), 1.0% Ignition loss, and 1.0% free CaO. PREPARED BY MOHAMMAD YOUNUS (08IN70) 10 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 11. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED A limitation on the composition is that the (C3A) shall not exceed fifteen percent. 2. SULPHATE RESISTANCE CEMENT Type II is intended to have moderate sulfate resistance with or without moderate heat of hydration. This type of cement costs about the same as Type I. Its typical compound composition is: 51% (C3S), 24% (C2S), 6% (C3A), 11% (C4AF), 2.9% MgO, 2.5% (SO3), 0.8% Ignition loss, and 1.0% free CaO. A limitation on the composition is that the (C3A) shall not exceed eight percent which reduces its vulnerability to sulfates 3. RAPID HARDENING CEMENT Type III is has relatively high early strength. Its typical compound composition is: 57% (C3S), 19% (C2S), 10% (C3A), 7% (C4AF), 3.0% MgO, 3.1% (SO3), 0.9% Ignition loss, and 1.3% free CaO. This cement is similar to Type I, but ground finer. Some manufacturers make a separate clinker with higher C3S and/or C3A content, but this is increasingly rare, and the general purpose clinker is usually used, ground to a specific surface typically 50-80% higher. The gypsum level may also be increased a small amount 4.LOW HEAR OF HYDRATION CEMENT Type IV Portland cement is generally known for its low heat of hydration. Its typical compound composition is: 28% (C3S), 49% (C2S), 4% (C3A), 12% (C4AF), 1.8% MgO, 1.9% (SO3), 0.9% Ignition loss, and 0.8% free CaO. PREPARED BY MOHAMMAD YOUNUS (08IN70) 11 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 12. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED The percentages of (C2S) and (C4AF) are relatively high and (C3S) and (C3A) are relatively low. A limitation on this type is that the maximum percentage of (C3A) is seven, and the maximum percentage of (C3S) is thirty-five. 5. SULPHATE RESISTANCE Type V is used where sulfate resistance is important. Its typical compound composition is: 38% (C3S), 43% (C2S), 4% (C3A), 9% (C4AF), 1.9% MgO, 1.8% (SO3), 0.9% Ignition loss, and 0.8% free CaO. This cement has a very low (C3A) composition which accounts for its high sulfate resistance. The maximum content of (C3A) allowed is five percent About YUNUS Brothers Group Lucky Cement Limited has been sponsored by Yunus Brothers Group (YB Group) which is one of the largest business groups of the Country based in Karachi and has grown up remarkably over the last 50 years. The YB Group is engaged in diversified manufacturing activities including Textile, Spinning, Weaving, Processing, Finishing, Stitching and Power Generation. The Group consists of a number of industrial establishments other then Lucky Cement Limited, they include: 1. Lucky Textile Mills 2. Fazal Textile Mills Limited 3. Gadoon Textile Mills Limited 4. Lucky Energy (Private) Limited 5. Yunus Textile Mills Lucky Textile Mills - established in 1983 PREPARED BY MOHAMMAD YOUNUS (08IN70) 12 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 13. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED - Fully computerized weaving and stitching unit - Consists of 3 weaving plants comprising of 800 looms, 250 stitching machines, 3.4 million meter/month Grey fabric capacity, 83 million meters/ annum processing and 15 million meters/ annum made ups capacity - Power generation capacity 6.20 MW - Expertise in ready-made curtains and accessories for foreign markets Fazal Textile Mills Limited - established in 1987 - One of the top spinning mill in the country with 59,508 installed spindles - Produces 100% Grey Cotton Ring Spun Yarn and wide range of Blended and Heather Yarns? - ISO – 9001:2000 certified Gadoon Textile Mills Limited - established in 1988 - First of the only two mills in the world producing Compact Core Spun yarn - 194,392 installed spindles. Produces high quality Compact yarn, Murata Jet Spinning yarn, Core Spun yarn and 100% Grey Cotton Ring Spun yarn - Also has a power plant of 34 MW - OKO – Tex Standard 100 certified Lucky Energy (PVT) Limited - established in 1993 - Captive power unit - Supplies uninterruptible power to Lucky Textiles, Fazal - Textiles & Lucky Knitwear - Generation capacity of 17.4 MW Yunus Textile Mills Limited - established in 1998 - State of the art machinery for weaving, printing and dyeing PREPARED BY MOHAMMAD YOUNUS (08IN70) 13 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 14. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED - Self power generation capacity of 14 MW - 250 Air Jet looms installed - Completely vertically integrated textile mill - Major Player in home textile and garment exports BUSINESS STRATEGY To be the leading exporter of cement from Pakistan for the regional countries as well as to explore other potential export markets. Our future strategy is to explore investment possibilities outside Pakistan in the cement industry to become a leading global producer. EXPLORING AND ESTABLISHING EXPORT MARKETS We have a firm commitment in exploring new markets for sustainable business growth. Lucky Cement has been successful in establishing its brand in several export markets including Middle East, India, Sri Lanka and East and South African countries. We are also planning to setup some offshore facilities to further strengthen our export business on regular basis. ABOUT LUCKY CEMENT LIMITED CONCRETE PROGRESS, KARACHI. Founder Mr. Abdul Razzak Tabba Lucky cement limited concrete progress is Sponsor by well known “Yunus Brothers Group” – one of the largest export houses of Pakistan, Lucky Cement Limited currently has the capacity of producing 25,000 tons per day of dry process Cement. Lucky Cement came into existence in 1996 with a daily production capacity of 4,200 tons per day, currently is an omnipotent cement plant of Pakistan, and rated amongst the few best plants in Asia. PREPARED BY MOHAMMAD YOUNUS (08IN70) 14 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 15. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED With production facilities in Pezu (Production capacity: 13,000 Tons per day) as well as in Karachi (Production capacity: 12,000 tons per day), it has the tendency to become the hub of cement production in Asia. Lucky Cement Limited has been sponsored by Yunus Brothers Group (YB Group) which is one of the largest business groups of the Country based in Karachi and has grown up remarkably over the last 50 years. PRODUCTS PF LUCKY CEMENT Lucky Cement aims at producing cement to suit every user. The following types of cement are available: 1. Ordinary Portland Cement 2. Sulphate Resistant Cement 3. Slag Cement ORDINARY PORTLAND CEMENT (OPC) Ordinary Portland cement is available in darker shade as well as in light shades in Lucky Star with different brand names to suit the requirement of users. It is used in all general constructions especially in major prestigious projects where cement is to meet stringent quality requirements; it can be used in concrete mortars and grouts etc. Ordinary Portland cement is compatible/consumable with admixture/ retarders etc. SULPHATE RESISTANT CEMENT (SRC) Sulphate resistant Cement’s best quality is to provide effective and long lasting strength against sulphate attacks and is very suitable for constructions near sea shores as well as for canals linings. It provides very effective protection against alkali attacks. SLAG CEMENT Slag cement is also available for specific user requirements. Slag cement, has been incorporated into concrete projects for over a century to improve durability and reduce life cycle costs. Among its measurable benefits in concrete are better workability and finish ability, PREPARED BY MOHAMMAD YOUNUS (08IN70) 15 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 16. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED higher compressive and flexural strengths, and improved resistance to aggressive chemicals. BRANDS AVAILABLE AT LUCKY CEMENT • Lucky CEMENT (REGULAR) Lucky STAR • Lucky GOLD Lucky SULPHATE RESISTANT CEMENT (SRC) QUALITY POLICY Quality of cement ISO CERTIFICATION Lucky's Cement plant is one of the best maintained plants of Pakistan and is managed by qualified and expert cement field specialists. The Company has also got ISO 9001:2000 certifications, for manufacturing and sales of cement by UKAS Quality Management, Pakistan National Accreditation Council and Moody International. QUALITY MANAGEMENT Lucky Cement always gives major emphasis in manufacturing high quality cement through stringent quality control techniques and computerized control systems using state of the art sophisticated equipments like Distributed Control System (DCS), Programmable Logic Controllers (PLCs) and on line X-Ray Analyzers. The Company has got one of the best equipped laboratories, having all facilities for the analysis of raw material, semi furnished product, furnished product and fuel, to ensure the supply of high quality product to market. The quality of Company’s cement has been tested and found to be superior in many respects to the specifications mentioned in Pakistan and British Standards. PREPARED BY MOHAMMAD YOUNUS (08IN70) 16 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 17. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED SUPERIOR STRENGTH, OPTIMUM SETTING TIMES AND MINIMUM EXPANSION These are the three benchmarks adopted by Lucky Cement Limited which is emerging to be the largest cement plant of Asia and committed to provide the best quality cement to its customers around the globe through stringent quality control and application of most modern quality control techniques. SUPERIOR STRENGTH The compressive strength is a very important factor of cement. The Ordinary Portland Cement achieves its maximum strength in 28 days. The Pakistan standard PSS 232-1883 (R) & British Standard EN 197 Class 42.5 N provides for 28 days strength of 5000Psi and 5950 Psi respectively for mortar cubes. As compared to this Lucky Cement has a 28 days compressive strength of more than 7,000 psi to bear heavy loads. OPTIMUM SETTING TIME Optimal initial & final setting times are ensured by adopting special production parameters using most modern control techniques. SOUNDENESS By using most modern Kiln feeding system, it is ensured that lime entering into the Kiln should be in such a shape that it should totally combine with oxides during the burning process. The result is that the frees lime content is very low and soundness of Lucky Cement is less than 1 mm which is far better than 10 mm prescribed by Pakistan Standard PSS 232-1983 ( R) and / or British Standard EN 197 Class 42.5 N. Lucky Power Generators is one of the best maintained power generation facilities of the country and is maintained and operated round the clock by expert engineers and technicians. VARIETY TO SUIT EVERYONE Lucky Cement aims at producing cement to suit every user. At present, it is producing Grey Portland Cement and also Sulphate Resistant cement. The customers are able to get Portland Cement both in dark shade PREPARED BY MOHAMMAD YOUNUS (08IN70) 17 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 18. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED as well as in light shade with different brand names to suit the requirement of user. The Portland cement specifically made for prefabrication industry with a lower setting time is also available. In addition, the plant also produce Slag cement for specific users. Overall flow diagram of lucky cement plant. PREPARED BY MOHAMMAD YOUNUS (08IN70) 18 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 19. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED Schematic explanation of Portland cement production There are three fundamental stages in the production of Portland cement: 1. Preparation of the raw mixture 2. Production of the clinker 3. Preparation of the cement PREPARED BY MOHAMMAD YOUNUS (08IN70) 19 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 20. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED PREPARED BY MOHAMMAD YOUNUS (08IN70) 20 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 21. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED RAW MATERIAL’S Cement is manufactured into two stages First stage : from crusher to kiln Second stage : from clinker yard to cement mill That’s why raw material is also divided into two stages First stage raw material Second stage raw material Lime stone Clinker Clay or Lucky clay Gypsum Latirite Slag Bauxite Following basic raw materials are generally used in the manufacture of cement LIMESTONE Limestone is a sedimentary rock composed largely of the mineral calcite (calcium carbonate: CaCO3). The deposition of limestone strata is often a by-product and indicator of biological activity in the geologic record. Calcium (along with nitrogen, phosphorus, and potassium) is a key mineral to plant nutrition: soils overlying limestone bedrock tend to be pre-fertilized with calcium. Limestone is an important stone for masonry and architecture, vying with only granite and sandstone to be the most commonly used architectural stone. Limestone is a key ingredient of quicklime, mortar, cement, and concrete. The solubility of limestone in water and weak acid solutions leads to important phenomena. Regions overlying limestone bedrock tend to have fewer visible groundwater sources (ponds and streams), as surface water easily drains downward through cracks in the limestone. While draining, water slowly (over thousands or millions of years) enlarges these cracks; dissolving the PREPARED BY MOHAMMAD YOUNUS (08IN70) 21 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 22. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED calcium-carbonate and carrying it away in solution. Most well-known natural cave systems are through limestone bedrock. uses include: • The manufacture of quicklime (calcium oxide) and slaked lime (calcium hydroxide); • Cement and mortar; • Pulverized limestone is used as a soil conditioner to neutralize acidic soil conditions; • Crushed for use as aggregate—the solid base for many roads; • Geological formations of limestone are among the best petroleum reservoirs; • As a reagent in desulphurization; • Glass making, in some circumstances; • Added to paper, plastics, paint, tiles, and other materials as both white pigment and cheap filler. • Toothpaste • Suppression of methane explosions in underground coal mines • Added to bread and cereals as a source of calcium SEDIMENTARY ROCK Sedimentary rock is one of the three main rock types (the others being igneous and metamorphic rock). Sedimentary rock is formed by deposition and consolidation of mineral and organic material and from precipitation of minerals from solution. The processes that form sedimentary rock occur at the surface of the Earth and within bodies of water. Rock formed from sediments covers 75-80% of the Earth's land area, and includes common types such as limestone, chalk, dolostone, sandstone, conglomerate, some types of breccia, and shale.) CLAY Clay is a naturally occurring material composed primarily of fine-grained minerals, which show plasticity through a variable range of water content, PREPARED BY MOHAMMAD YOUNUS (08IN70) 22 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 23. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED and which can be hardened when dried and/or fired. Clay deposits are mostly composed of clay minerals (phyllosilicate minerals), minerals which impart plasticity and harden when fired and/or dried, and variable amounts of water trapped in the mineral structure by polar attraction. Organic materials which do not impart plasticity may also be a part of clay deposits. LATRITE Latrite is redish brown color and it contains iron content , .It is less harder than gypsum but harder than limestone. BAUXITE Bauxite is the most important aluminium ore. It consists largely of the minerals gibbsite Al(OH)3, boehmite γ-AlO(OH), and diaspore α- AlO(OH), together with the iron oxides goethite and hematite, the clay mineral kaolinite and small amounts of anatase TiO2. It was named after the village Les Baux in southern France, where it was first discovered in 1821 by the geologist Pierre Berthier. SLAG Slag is the mixture of iron and some metallic impurities. It is obtained from steel mills. The cement made from slag is full of strength. GYPSUM (Ca SO4) It is obtained from the N.W.F.P And 5% is added with clinker obtained from kiln in cement mill and then grinded to get cement. It is used for refresh ness of cement. PREPARED BY MOHAMMAD YOUNUS (08IN70) 23 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 24. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED MANUFACTURING AIDS • COAL In lucky cement industry coal is the major source of fuel, for this purpose coal is imported from 1. south Africa 2. Indonesia Some time lucky also uses a mixture of south African and Indonesian coal. • FURNANCE OIL Furnace oil is also used in cement industry for burning the kiln initially. It help us to maintain the temperature of the kiln. PREPARED BY MOHAMMAD YOUNUS (08IN70) 24 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 25. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED PREPARED BY MOHAMMAD YOUNUS (08IN70) 25 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 26. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED LABORATARY When plant is designed it is decided that which type and quality of raw material is used for the manufacture of desired product. So a laboratory is established that take care of the raw material which is suitable for the plant. For this purpose the samples of raw material is checked at the time of purchasing. For ensuring the good quality of the product. TITRATION Laboratory also decide the titration or ratio of raw material used in the plant . In practice, the raw material for rawmix is controlled by frequent chemical analysis (hourly by X-Ray fluorescence analysis, or every three minutes by prompt gamma neutron activation analysis). The analysis data is used to make automatic adjustments to raw material feed rates. TESTING In lucky cement industry a laboratory is also working for the same purpose that every sample of raw material is checked before and After purchasing the raw material. Fuel used for burning in the kiln is also tested because of some safety reasons. TESTING OF COAL Coal is the main fuel in cement industry that why it is tested very . Testing of caol has been didvided into three stages • Presence of moisture To find the moisture in coal a coal sample is get from the fresh supply or last day or present morning truck Then sample is divided into two categories 1. Crushed coal PREPARED BY MOHAMMAD YOUNUS (08IN70) 26 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 27. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED 2. Grinded coal Crushed coal is used to find the RM (Received Moisture) by using moisture analyzer Powdered or Grinded coal is used to find the TM (Total Moisture) by using moisture analyzer Air moisture is find by taking the coal in a glass dish and weight and place it in decicator to remove moisture with the help of silica gel and after 30 minutes put out the dish and weight it . Inherent moisture is the moisture which is possessed by the coal it self so it can be calculated as follows Total moisture - Air moisture = Inherent moisture • Loss on ignition To calculate the loss on ignition we have to first calculate the volatile matter Then by using formula we can calculate loss on ignition • Presense of sulphur TESTING OF RAW MATERIAL Following basic raw materials are used in the lucky cement industry to check this thing that the purchased raw material is suitable or not for plant raw materials are tested . • Limestone • Bauxite • Latrite • Clay • Gypsum • Slag PREPARED BY MOHAMMAD YOUNUS (08IN70) 27 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 28. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED For testing the above raw material X-Ray Flourescence Spectrometry method is used it is a Computer operated machine in which a ring sample is introduced . This machine takes few minutes and give as two things 1. name of compound or element present in the sample 2. concentration of the element or compound some X-Ray Flourescence Spectrometry results are given below lime stone at crusher L.O SiO Al2 Fe2 Ca Mg SO Na2 K2 Cl LS S A .I 2 O3 O3 O O 3 O O F M M 42. 3.8 0.77 0.92 52. 1.1 0.0 0.19 0.1 0.0 4.3 2.2 0.8 69 68 7 1 3 5 3 4 3 Clay SiO2 Al2O3 Fe2O3 CaO MgO SO3 Na2O K2O Cl LSF SM AM 68.57 12.48 4.29 4.3 1.48 0.01 0.84 2.43 0.14 0.02 4.09 2.91 74.06 11.29 5.15 2.82 1.39 0.02 0.89 2.16 0.16 0.02 4.51 2.19 Latrite SiO2 Al2O3 Fe2O3 CaO MgO SO3 Na2O K2O Cl LSF SM AM 17.81 7.41 48.51 7.79 0.51 0.11 0.34 0.08 0.05 0.09 0.32 0.15 29.22 9.25 45.05 4.32 0.47 0.04 0.35 0.11 0.36 0.03 0.54 0.21 PREPARED BY MOHAMMAD YOUNUS (08IN70) 28 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 29. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED PREPARED BY MOHAMMAD YOUNUS (08IN70) 29 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 30. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED CRUSHER HAMMER CRUSHER In lucky cement industry hammer crusher are used for crushing the lime stone The hammer crusher contain 5 rows and 9 hammers in each row it means that hammer crusher has 45 hammers. A hammer mill is a machine whose purpose is to shred material into fine particles. They have many sorts of applications in many industries, including: WORKING AND CONDITION The basic principle is straightforward. A hammer mill is essentially a steel drum containing a vertical or horizontal rotating shaft or drum on which hammers are mounted. The hammers are free to swing on the ends of the cross, or fixed to the central rotor. The rotor is spun at a high speed inside the drum while material is fed into a feed hopper. The material is impacted by the hammer bars and is thereby shredded and expelled through screens in the drum of a selected size. Small grain hammer mills can be operated on household current. Large automobile shredders can use one or more 2000 horsepower (1.5 MW) diesel engines to power the hammer mill. The Screen less hammer mill uses air flow to separate small particles from larger ones. It is designed to be more reliable, and is also claimed to be much cheaper and more energy efficient than regular hammer mills. PRODUCTION OF CRUSHER In lucky cement industry two lime stone crusher are Assembled both are hammer crusher Hammer mill at lucky reduces the size of I meter stone into 70 to 80 mm PREPARED BY MOHAMMAD YOUNUS (08IN70) 30 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 31. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED The crushing capacity of hammer mill is 800 to 900 ton/hour . The weight of each hammer is 120 kg . LIMESTONE YARD A yard is made for the storage of crushed limestone in form of piles . A limestone pile being built by a boom stacker and prehomogenization of pile is made with the help of reclaimer. Crushed limestone is transported by a 90 m long belt to the storage yard then it drop the material on chand belt then chand belt drop on boom belt then with the help of boom stacker piles are made then after prehomogenization the lime stone is transported to the proportionating building by buckets then on long belt . PREPARED BY MOHAMMAD YOUNUS (08IN70) 31 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 32. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED PREPARED BY MOHAMMAD YOUNUS (08IN70) 32 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 33. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED PROPORTIONATING TOWER INTRODUCTION In lucky cement there is a Proportionting tower. It is a building which store raw material Silos of individual raw materials are arranged. It has hoppers which provide feed to weigh-feeder. Accurately controlled proportions of each material are delivered onto the belt by weigh-feeders. The proportion of raw material is decided by Laboratory usually luck cement industry works on following titration . • limestone 75 to 85 % • purchase clay 6 to 7 % • lucky clay 5 to 6 % • bauxite 1 to 2 % WEIGH FEEDER Weigh feeder is a machine which weigh’s the material according to the defined composition and supply to the conveyer belt which take the material to the work place. Decision of proportion of raw material for grinding. . In practice, the raw material for rawmix is controlled by frequent chemical analysis (hourly by X-Ray fluorescence analysis in the laboratory, or every three minutes by prompt gamma neutron activation analysis). The analysis data is used to make automatic adjustments to raw material feed rates. PREPARED BY MOHAMMAD YOUNUS (08IN70) 33 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 34. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED VERTICAL RAW MILL or RAW MILL These are the standard form in modern installations, occasionally called vertical spindle mills. In a typical arrangement, the material is fed onto a rotating table, onto which steel rollers press down. A high velocity of hot gas flow is maintained close to the dish so that fine particles are swept away as soon as they are produced. The gas flow carries the fines into an integral air separator, which returns larger particles to the grinding path. The fine material is swept out in the exhaust gas and is captured by a cyclone before being pumped to storage. Feed size can be up to 100 mm. Roller mills are efficient, using about half the energy of a ball mill, and there seems to be no limit to the size available. Roller mills with output in excess of 800 tonnes per hour have been installed. Unlike ball mills, feed to the mill must be regular and uninterrupted; otherwise damaging resonant vibration sets in. . In the case of a dry process, the rawmill also dries the raw materials, usually by passing hot exhaust gases from the kiln through the mill, so that the rawmix emerges as a fine powder. This is conveyed to the blending system by conveyor belt or by a powder pump. VRM section in Lucky cement plant In lucky cement plant the Vertical raw mill is used for the grinding of Raw material and coal. Approximately 180 to 210 tons of feed per hour is provided to the VRM . According to the introduction of VRM there are some rollers in the mill. VRM at lucky has 4 rollers weight of each roller is 22 ton. Inlet temperature of VRM is 287 C for 230 ton/h feed acorrding to design capacity PREPARED BY MOHAMMAD YOUNUS (08IN70) 34 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 35. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED VRM (Vertical Raw Mil) or Roller Mill. PREPARED BY MOHAMMAD YOUNUS (08IN70) 35 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 36. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED PREPARED BY MOHAMMAD YOUNUS (08IN70) 36 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 37. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED GRIDING OF COAL COAL MILL In Lucky Coal mill is the place where coal is grinded into fine powder for this purpose a small Roller mill or VRM (Vertical Raw Mill) is used. COAL GRINDING Grinding of coal Also take place in a small roller mill or VRM (Vertical Raw Mill) but it has only two Stationary Rollers other working is same as define above for the VRM . Coal mill design capacity is 25 tons/h and its inlet temperature is 92 C . PULVERIZE COAL Fine powdered coal is called Pulverize coal. The coal is grind to fine powder because the fine coal is very easy to burn in the kiln or PC (pre- calciner) COAL STORAGE BIN After Grinding the coal is stored in a bin whose capacity is 100 tonn but in lucky cement only 25 to 30 % bin is filled because coal can catch fire from the surrounding. FIRE EXTINGUISHER SYSTEM A latest fire extinguisher system is installed in the Coal mill area which is fully automatic and can Also be control through the PLC(Programmable Logic Controller). PREPARED BY MOHAMMAD YOUNUS (08IN70) 37 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 38. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED COAL TRANSPORTATION TO 1. Pre-calciner (PC) 2. main burner (kiln) The Grinded coal is used as a fuel in PC and kiln so it is transported to them through the Delta Blowers. In Lucky 4 Delta Blowers are used , 2 are used for transportation of coal to the PC and 2 are used for the transportation of coal to the main Burner at kiln PREPARED BY MOHAMMAD YOUNUS (08IN70) 38 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 39. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED PREPARED BY MOHAMMAD YOUNUS (08IN70) 39 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 40. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED GRINDING OF RAW MATERIAL After deciding the ratio of raw material at proportioning tower the next step is grinding of raw material. In Lucky cement Industry Vertical Raw Mill is used for Grinding the raw material. VERTICAL RAW MILL USED FOR GRINDHING THE RAW MAERIAL The raw materials are next ground together in a rawmill. VRM used here is consisting of 4 continuously moving Rollers. The fineness of rawmix is specified in terms of the size of the largest particles, and is usually controlled so that there are less than 5%-15% by mass of particles exceeding 90 µm in diameter. It is important that the rawmix contains no large particles in order to complete the chemical reactions in the kiln, TRANSPORTATION OF INGREDIENTS The Silos of individual raw materials are arranged (Proportionting tower) over the feed conveyor belt. Accurately controlled proportions of each material are delivered onto the belt by weigh-feeders. Passing into the rawmill, the mixture is ground to rawmix. ROTARY VALVE Rotary valve is a valve which control the flow of feed at raw mill and helps in maintaining the pressure in the mill. I.D FAN I.D fan or induce Draft fan is the fan which provides hot air to the VRM from the preheater. It also produces negative pressure in the kiln and preheater. PREPARED BY MOHAMMAD YOUNUS (08IN70) 40 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 41. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED SYSTEM FAN System fan is also an I.D fan but it is used for the suction of air from the VRM through the cyclones. It sucks the hot air from the VRM and send it to Bag house. It also works for maintaining the negative pressure into the VRM. TRAVELING OG HOT AIR In the plant area or VRM area the hot Air flows from one place to another through the Ducts. Ducts are pipe lines of very big dia which are used for transportation purpose. CYCLONE A cyclone is a conical vessel into which a dust-bearing gas-stream is passed tangentially. This produces a vortex within the vessel. The gas leaves the vessel through a co-axial "vortex-finder". The solids are thrown to the outside edge of the vessel by centrifugal action, and leave through a valve in the vertex of the cone. Cyclones were originally used to clean up the dust-laden gases leaving simple dry process kilns. In lucky cement plant 4 cyclones are used in the VRM area which purify the hot gas which is coming from VRM . PREPARED BY MOHAMMAD YOUNUS (08IN70) 41 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 42. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED AIR SLIDES Air Slides is a mean of transportation in the cement plant it take the material from one place to another with the help of air. Bags and blowers are used in air slides. Air slides are normally used at the bottom of cyclones. BAG HOUSE Bag house is a collective name of many bag filters. Bag house has 20 chambers and each chamber contains 104 bags. It is also known as Dust Collector or Fabric filters. In lucky the most common type of bag filters are used which operates with a velocity of about 0.01 m/s across the bag surface. BAG HOUSE FAN Bag house fan is a suction fan which helps the bag house in filtering the hot air from cyclones. If it does not work properly then there is a need to shutdown the plant because it also helps in producing the negative pressure and prevention of atmosphere from pollution. OUTLET OF EXTRA GASES The bag house remove fine raw mix particles from the hot air then remaining extra gases containing SOx , NOx , CO and CO2 released in the atmosphere. STORAGE OF POWDER GRINDED RAW MATERIAL TO THE SILO Raw material in required ratio is grinded by the Vertical Raw mill is separated by the cyclones is sent to the __65__ m silo having capacity PREPARED BY MOHAMMAD YOUNUS (08IN70) 42 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 43. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED __3300___ tons with the help of air slides, screw conveyers and bucket elevators . This silo is also used to give feed to the pre-heater HOMOGENIZATION OF GRINDED RAW MATERIAL As the raw mix is stored in the silo that’s why its need to homogenize it for this purpose heavy compressor are used which through's air from the downward due to which a continuous motion occurs in the material and Homogenization of grinded raw material takes place. PREPARED BY MOHAMMAD YOUNUS (08IN70) 43 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 44. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED PREPARED BY MOHAMMAD YOUNUS (08IN70) 44 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 45. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED CALCINATION & HEAT EXCHANGE Raw material enters the pre heater for pre heating before sending to the rotatary kiln it is also known as four stage tower it is about 87m high ,consisting of cyclones , riser duct (gas duct) and pre calciner,(pc). To conserve energy most modern cement plants pre heat raw material before they enter the kiln using the exhaust gases from kiln itself. In Lucky cement plant a 5 stage pre-heater is used. Pre-heater is divided into two section • Cyclones of pre-heater . Where heat exchange takes place between the feed (raw mix) and hot air . • Precalciner (P.C) Where calcinations takes place . In pre calciner abut 75-80% calcination (formation of cao) take place by decomposition of CaCO3 into CaO & CO2. CaCO3___________CaO+CO2 (calcination) To understand a pre-heater completely I have given a 4 stage pre-heater description with diagram. Gas-suspension preheaters Cutaway view of cyclone showing air path The key component of the gas-suspension pre-heater is the cyclone and the precalciner. A cyclone is a conical vessel into which a dust-bearing gas-stream is passed tangentially. This produces a vortex within the vessel. The gas leaves the vessel through a co-axial "vortex-finder". The solids are thrown to the outside edge of the vessel by centrifugal action, and leave through a valve in the vertex of the cone. Cyclones were originally used to clean up the dust-laden gases leaving simple dry process kilns. If, instead, the entire feed of raw mix is encouraged to pass through PREPARED BY MOHAMMAD YOUNUS (08IN70) 45 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 46. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED the cyclone, it is found that a very efficient heat exchange takes place: the gas is efficiently cooled, hence producing less waste of heat to the atmosphere, and the raw mix is efficiently heated. This efficiency is sphere, further increased if a number of cyclones are connected in series. 4-Stage preheater, showing path of feed Stage PREPARED BY MOHAMMAD YOUNUS (08IN70) 46 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106 (08IN106)
  • 47. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED The number of cyclones stages used in practice varies from 1 to 6. Energy, in the form of fan-power, is required to draw the gases through the string of cyclones, and at a string of 6 cyclones, the cost of the added fan-power needed for an extra cyclone exceeds the efficiency advantage gained. It is normal to use the warm exhaust gas to dry the raw materials in the raw mill, and if the raw materials are wet, hot gas from a less efficient preheater is desirable. For this reason, the most commonly encountered suspension preheaters have 4 cyclones. The hot feed that leaves the base of the preheater string is typically 20% calcined, so the kiln has less subsequent processing to do, and can therefore achieve a higher specific output. Typical large systems installed in the early 1970s had cyclones 6 m in diameter, a rotary kiln of 5 x 75 m, making 2500 tones per day, using about 0.11-0.12 tonnes of coal fuel for every tones of clinker produced. A penalty paid for the efficiency of suspension preheaters is their tendency to block up. Salts, such as the sulfate and chloride of sodium and potassium, tend to evaporate in the burning zone of the kiln. They are carried back in vapor form, and re-condense when a sufficiently low temperature is encountered. Because these salts re-circulate back into the rawmix and re-enter the burning zone, a recirculation cycle establishes itself. A kiln with 0.1% chloride in the rawmix and clinker may have 5% chloride in the mid-kiln material. Condensation usually occurs in the preheater, and a sticky deposit of liquid salts glues dusty raw mix into a hard deposit, typically on surfaces against which the gas-flow is impacting. This can choke the preheater to the point that air-flow can no longer be maintained in the kiln. It then becomes necessary to manually break the build-up away. Modern installations often have automatic devices installed at vulnerable points to knock out build-up regularly. An alternative approach is to "bleed off" some of the kiln exhaust at the kiln inlet where the salts are still in the vapor phase, and remove and discard the solids in this. This is usually termed an "alkali bleed" and it breaks the recirculation cycle. It can also be of advantage for cement quality reasons, since it reduces the alkali content of the clinker. However, hot gas is run to waste so the process is inefficient and increases kiln fuel consumption. PREPARED BY MOHAMMAD YOUNUS (08IN70) 47 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 48. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED Cement plant pre heater Designed by Polysius, this new plant includes a four-stage precalciner with a 158-foot (48-meter) long by 13-foot (4- meter) diameter two-station kiln to produce 2,500 tons per day of clinker. Air Cannons were not included in the design of this new plant. But based on his 25 years in the cement industry, Production Manager Tom Messer knew they would be required to avoid shutdowns due to blockages of the material flow through the kiln pre-heater. “I’ve seen the problems that can arise from plugs and choking of the pre-heater,” Messer explains. “I’ve seen the high labor costs and the production losses that come from having to shut down the tower to break up a blockage.” Messer and Martin Engineering developed a plan for the installation of 45 big blasters and air canons on the brand new pre-heater. Crews from Martin Engineering’s Martin Services group installed the pre-heater air cannon system. Feed is entered from feed silo to risor of cyclone 2. Pre calciners % of North American Capacity using Precalciners PREPARED BY MOHAMMAD YOUNUS (08IN70) 48 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 49. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED Mean Daily Output (tonnes) of North American Kilns In the 1970s the precalciner was pioneered in Japan, and has subsequently , sub become the equipment of choice for new large installations world world-wide[7]. The precalciner is a development of the suspension preheater. The philosophy is this: the amount of fuel that can be burned in the kiln is e directly related to the size of the kiln. If part of the fuel necessary to burn the rawmix is burned outside the kiln, the output of the system can be increased for a given kiln size. Users of suspension preheaters found that preheaters output could be increased by injecting extra fuel into the base of the preheater. The logical development was to install a specially designed combustion chamber at the base of the preheater, into which pulverized coal is injected. This is referred to as an "air through" precalciner, because "air-through" the combustion air for both the kiln fuel and the calciner fuel all passes through the kiln. This kind of precalciner can burn up to 30% (typically 20%) of its fuel in the calciner. If more fuel were injected in the calciner, the extra amount of air drawn through the kiln would cool the kiln flame excessively. The feed is 40 60% calcined before it enters the rotary kiln. 40-60% The ultimate development is the "air separate" precalciner, in which the "air-separate" hot combustion air for the calciner arrives in a duct directly from the ustion cooler, bypassing the kiln. Typically, 60 75% of the fuel is burned in the 60-75% precalciner. In these systems, the feed entering the rotary kiln is 100% calcined. The kiln has only to raise the feed to sintering temperature. In feed PREPARED BY MOHAMMAD YOUNUS (08IN70) 49 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106 (08IN106)
  • 50. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED theory the maximum efficiency would be achieved if all the fuel were burned in the preheater, but the sintering operation involves partial melting and nodulization to make clinker, and the rolling action of the rotary kiln remains the most efficient way of doing this. Large modern installations typically have two parallel strings of 4 or 5 cyclones, with one attached to the kiln and the other attached to the precalciner chamber. A rotary kiln of 6 x 100 m makes 8,000–10,000 tonnes per day, using about 0.10-0.11 tonnes of coal fuel for every tones of clinker produced. The kiln is dwarfed by the massive preheater tower and cooler in these installations. Such a kiln produces 3 million tonnes of clinker per year, and consumes 300,000 tones of coal. A diameter of 6 m appears to be the limit of size of rotary kilns, because the flexibility of the steel shell becomes unmanageable at or above this size, and the firebrick lining tends to fail when the kiln flexes. A particular advantage of the air-separate precalciner is that a large proportion, or even 100%, of the alkali-laden kiln exhaust gas can be taken off as alkali bleed (see above). Because this accounts for only 40% of the system heat input, it can be done with lower heat wastage than in a simple suspension preheater bleed. Because of this, air-separate precalciners are now always prescribed when only high-alkali raw materials are available at a cement plant. TARGET OF PRE-HEATER Pre-heater is used for heat exchange and calcinations . In lucky cement plant Pre-heater’s inlet temperature is 800 to 1000 C and out let temperature is 250 to 280 C . The raw material is burned in the pre-heater for 52 seconds and then it is sent to kiln . 75-80 % calcination is done.. It increases the production capacity, it reduces the specific heat consumption also reduces specific power consumption. ADVANTAGE OF PRE-HEATER • Improved kiln operation efficiency. • Reduced production cost. PREPARED BY MOHAMMAD YOUNUS (08IN70) 50 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 51. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED • Environmental protection. INLET OF FEED TO PRE-HEATER Feed is entered through the feed silo in the risor of cyclone 2 with help of bucket elevators. CONSTRUCTION OF FEED SILO The capacity of this silo is mentioned above here I want to tell u that below the silo there is a bin where feed to pre-heater is homogenized and weighed the capacity of this bin is 100 ton . This bin is connected to 8 gates of air slides which opens in the opposite pair of two and provide feed to the main air slide on the rate of 215 Ton/h. BIN STORAGE AND SILOS Bins are cylindrical or rectangular vessels of concrete or metals .a silo is tall and relatively small in diameter .a bin is not so tall and usually fairly wide .silos and bins are loaded from top by some kind of elevator. Discharging is done from the bottom . PRESSURE IN BINS AND SILOS When solid or semi solids are placed in a bin or silo the lateral pressure exerted On the wall at any point is less than predicted from the head of material above that point .there usually is friction between walls and solids. The friction Force at the wall tends to off set the weight of solid and reduces the pressure exerted by mass on the floor of container .in general when height of solids column is greater than about 3 times diameter of the container ,additional solids have no effect on the pressure at the base. PREPARED BY MOHAMMAD YOUNUS (08IN70) 51 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 52. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED FLOW OUT OF BINS solids tend to flow out of any openings near the bottom of bin but are best discharged through an opening in the floor .flow through a side openings tends to be un certain an increase the lateral pressure on the other side of bin while the solids are flowing. When out let at bottom of a bin containing free flowing is opened , the material immediately above the opening begins to flow . one of two flow pattern will develop , depending on steepness of the walls in the bottom section of the bin and on the coefficient of friction between the solids and the bin walls. tunnel flow develops in the bins with a shallow cone angle or with vertical walls and central opening in the floor. here a vertical column of solids above the openings moves downward with out disturbing the material at the sides. eventually lateral flow begins ,first from the top most layer of solids. The rate of flow of solids by gravity through a circular opening in the bottom of a bin depends on the diameter of the openings and on the properties of the solid With cohesive solids it is often hard to start flow .once flow does start, however, it again begin in the material directly above the discharge opening. sticky solids and even some dry powder adhere strongly to vertical surfaces and have enough shear strength to support a plug of considerable diameter above an open discharge .thus to get flow started and to keep the material moving , vibrators on the in walls , internal plows near the bin floor, or jets of air in the discharge opening are often needed. PRE-CALCINER BURNER Pre calciner burner is composed of two chambers vortex chamber and reaction chamber ,the vortex chamber is situated at the end of tertiary air duct ,close to the entry to the kiln gases , they can therefore get preliminarily mixed. the tertiary air is drawn from the middle part of the burner and is therefore of medium temperature about 750 to 850 C. in these conditions a condensations of volatile components of the feed occurs PREPARED BY MOHAMMAD YOUNUS (08IN70) 52 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 53. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED on the grains of raw material and they are recycled to the kiln ,which allows the formations of accretions on the walls of precalciner to be avoided. the raw mix is fed to side upper part of reaction chamber, while in lower part 2 burners are arranged readily round the shaft of the chamber. Due to vortex motion of the gases in the of the gases in the axis of reaction chamber negative pressure is developed, facilitating the introduction of the grains of the fuel and meal to the fuel and meal to the inside chamber. PRE- CALCINATIONS A first principle model of cement precalcination system is developed for the purpose of controller’s design and synthesis. The dynamic model is based on the mass and energy balance principle and consists of a set of ordinary differential equations. Based on some logical assumptions, the model not only considers the reaction mechanisms but also reduces the complexity of precalciner system. The model is divided into a preheater sub model and a calciner sub model. Separate sub model for preheater and calciner are initially developed and coupled together to build an integrated model. The model takes the gas content into account and can obtain the values of all key output variables in precalcination process. OVERALL PRE-HEATER PROCESS In lucky cement plant feed is entered in the risor of cyclone 2 than hot air take the feed to Cyclone 1A and 1B, outlet of cyclone 1A and 1B drop the material in risor R-3 than hot air take the material to C-2 , out let of C-2 drop the feed into R-4 than hot air takes the material to C-3 , outlet of C-3 drop the material into R-5 than hot air takes the feed into C-4 , the outlet of C-4 drops the material in P.C. where calcinations of raw mix take place . here two burners are used for this purpose fresh air is also given to the burners. Burners use pulverize coal for burning . the temperature of P.C is 850 to 900 C and has an pressure of -813 pascal , PREPARED BY MOHAMMAD YOUNUS (08IN70) 53 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 54. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED After the calcinations hot air takes the material in C-5 through the goose neck of P.C. , This reaction takes place in the calcination zone CaCO3 → CaO + CO2 (lime stone) (lime) The outlet of C-5 drops the material into KILN INLET OR SMOKE CHAMBER OR INLET CHAMBER . S:NO STAGES TEMP PRESSURE 1 Klin 900-950 2.6-3.6 2 Riser duct 10- 11 3 P.C 900-930 8- 10 4 Cyclone -4 810-850 18-12 5 Cyclone-3 750-770 30-35 6 Cyclone -2 550-600 40-55 7 Cyclone -1 350-380 55-65 8 I.D fan 350- 370 65-70 9 Secondry 1100-1150 --- --- 10 Tertiary 630-670 -- ---- PREPARED BY MOHAMMAD YOUNUS (08IN70) 54 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 55. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED PRIMARY DUCT A method and apparatus for controlling the combustion of fuel modules charged into a preheater or precalciner kiln above the transition shelf, typically into the riser duct, is described. The apparatus includes a sensor for providing signals indicative of the status in the region of combustion of the fuel modules, and a controller for a fuel module feed mechanism is provided to receive signals indicative of the status of the combustion region and adjust the rate of delivery of the fuel module into the combustion region responsive to the sensed conditions in the combustion region. PREPARED BY MOHAMMAD YOUNUS (08IN70) 55 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 56. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED PREPARED BY MOHAMMAD YOUNUS (08IN70) 56 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 57. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED KILN AREA INTRIDUCTION TO KILN Cement kilns are used for the pyroprocessing stage of manufacture of Portland and other types of hydraulic cement, in which calcium carbonate reacts with silica-bearing minerals to form a mixture of calcium silicates. Over a billion tonnes of cement are made per year, and cement kilns are the heart of this production process: their capacity usually define the capacity of the cement plant. As the main energy-consuming and greenhouse-gas–emitting stage of cement manufacture, improvement of their efficiency has been the central concern of cement manufacturing technology. Kiln is consist of 4 zones ; • Calcinations zone • Transition zone • Burning zone • Cooling zone Kiln used at Lucky cement plant is • 64 meter in length , • total dia of kiln is 4.3 meter and effective dia is 3.9 meter . • Slop of kiln is 3.5 %. • Migration of kiln is 4-5 rpm. PREPARED BY MOHAMMAD YOUNUS (08IN70) 57 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 58. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED THE ROTARY KILN General layout of a rotary kiln The rotary kiln consists of a tube made from steel plate, and lined with firebrick. The tube slopes slightly (1 . (1–4°) and slowly rotates on its axis at between 30 and 250 revolutions per hour. Rawmix is fed in at the upper end, and the rotation of the kiln causes it gradually to move downhill to the other end of the kiln. At the other end fuel, in the form of gas, oil, or pulverized solid fuel, is blown in through the "burner pipe", producing a large concentric flame in the lower part of the kiln tube. As material moves under the flame, it reaches its peak temperature, before dropping out of the before kiln tube into the cooler. Air is drawn first through the cooler and then through the kiln for combustion of the fuel. In the cooler the air is heated by the cooling clinker, so that it may be 400 to 800 °C before it enters the kiln, thus causing intense and rapid combustion of the fuel. Kiln are typically stopped only for a few days once or twice a year for essential maintenance. IGNITION OF KILN Some time once or twice in a year kiln is shutdown for maintenance purpose . after the the completion of maintenance the kiln is again ignited. PREPARED BY MOHAMMAD YOUNUS (08IN70) 58 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106 (08IN106)
  • 59. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED For the ignition of kiln first of all furnace oil is used because it has higher calorific value 9760 cal Furnace oil used for kiln main burner is first treated in a boiler to decrease its viscosity at minimum level due to which it flows very well. when the required initial temperature of kiln is maintained than kiln is burned on pulverize coal whose calorific value is 5800 cal . As we know that oxygen is necessary for ignition that’s why blowers are used which provides fresh air to the main burner. KILN PROCESS IN LUCKY CEMENT PLANT After pre heating and pre calcinated material enters in burning and clinker zone of kilns where temp ranges from 1000C-1350C. Here CaO reacts with other oxides to form cementeous materal. Burning of kiln involves the following steps ; 1. evaporation of free water at temperature upto 100 C 2. removal of absorbed water in clay material 100-300 C 3. removal of chemically bounded water 450-900 C 4. calcinations of carbonate materials 700-850 C 5. formation of C2S, Aluminates and ferrite’s 800-1250 C 6. formation of liquid phase melt > 1250 C 7. formation of C3S 1330-1450 C 8. cooling of clinker to solidify liquid phase 1300-1240 C 9. final clinker microstructure frozen in clinker < 1200 C 10. clinker cooled in cooler 1250-100 C the final product as it comes out the kiln is known as clinker . REACTION AT KILN Following major reactions take place inside the kiln. ) PREPARED BY MOHAMMAD YOUNUS (08IN70) 59 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 60. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED 2CaO + SiO2 → 2CaO.SiO2 (Dicalcium silicate) 3CaO + SiO2 → 3CaO.SiO2 (Tri Calcium Silicate) 3CaO + Al2O3 → 3CaO.Al2O3 (TRI CALCIUM ALUMINATE) . 4CaO+AlO3+Fe2O3 → 4CaO.Al2O3.Fe2O3 (Tetra Calcium Aluminum Ferrate) FORMATION OF CLINKER At about 1280 0C And above clinker is formed which is in the form of compound that is known as cement compound. The composition of clinker is as followed . COMPOSITION OF CLINKER C3S 55-56% C2S 21-22% C3A 5-6(FOR OPC) C3A <3.5(FOR SRC) C4AF 12-13(FOR OPC) C4AF 16-17(FOR SRC PREPARED BY MOHAMMAD YOUNUS (08IN70) 60 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 61. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED OUTLET OF CLINKER AT ABOUT 1280 C And above clinker is formed which is in the form of compound that is known as cement compound . hot clinker is dropped into the cooler. OUTER VEIW OF KILN PREPARED BY MOHAMMAD YOUNUS (08IN70) 61 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 62. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED PREPARED BY MOHAMMAD YOUNUS (08IN70) 62 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 63. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED COOLING AND STORAGE OF CLINKER In lucky cement a grate cooler is used to cool the clinker . These coolers have two main advantages: they cool the clinker rapidly, which is desirable from a quality point of view, and, because they don't rotate (rotating coolers used in early ages) , hot air can be ducted out of them for use in fuel drying, or for use as precalciner combustion air. FAN FOR COOLER. 8 Fans are also used to force air through the cooler bed or grates. CONSTRUCTION OF COOLER This consists of a perforated grate through which cold air is blown, enclosed in a rectangular chamber. A bed of clinker up to 0.5 m deep moves along the grate. The grates are moved with the help of a hydraulic system. COOLER CRUSHER Rotary crushers are used at the out let of a cooler. These crushers crush the big pieces of cooled clinker into small ones. PAN CONVERYER Pan conveyer is the medium used for transportation of material in heavy amount. It consist of a chain of pan joined with each other in the form of a belt. Motors are used to run them. STORAGE OF CLINKER Cooled clinker from the cooler is transported to the clinker storage yard with the help of pan conveyer. PREPARED BY MOHAMMAD YOUNUS (08IN70) 63 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 64. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED PREPARED BY MOHAMMAD YOUNUS (08IN70) 64 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 65. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED CEMENT MILL Cement mill is the area where finally cement is manufacture by the addition of second stage raw materials (Slag , Gypsum and clinker) it consist of following parts Diagram of CEMENT MILL Flow diagram of cement mill Roller press or crusher Crushing Separator Storage bin Ball mill In lucky cement plant the cement mill is used is actually a ball mill. PREPARED BY MOHAMMAD YOUNUS (08IN70) 65 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 66. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED The length of ball mill is 13 meter . it is divided into two chambers . Its 1st chamber is 3 meter long and 2nd chamber is 10 meter long . The efficiency of ball mill depends on the size and weight of media or grinding medium. Media size in 1st chamber is 30,40,50 and 60 mm and in 2nd chamber is 10 x12 , 12x14 mm . Weight of media in ball mill is 180 ton . Grinding aid Glycol is used as grinding aid in ball mill . due to high temperature gypsum under goes hydration so lumps form in the mill which chock the out let of ball mill so glycol stops this phenomena Storage of cement PREPARED BY MOHAMMAD YOUNUS (08IN70) 66 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 67. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED PREPARED BY MOHAMMAD YOUNUS (08IN70) 67 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 68. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED PACKING PLANT LOOSE CEMENT Lucky cement also export loose cement by loading it into through bunker. Daily it export ton per day. loose cement storage and ship loading terminal at berth -25 west wharf karachi port PACKED CEMENT PREPARED BY MOHAMMAD YOUNUS (08IN70) 68 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 69. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED PREPARED BY MOHAMMAD YOUNUS (08IN70) 69 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 70. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED QUALITY CONTROL LAB COLLECTION OF SAMPLE For quality management samples of material and cement is taken from following places , • Query • Limestone yard • Proportionating building • Vertical Raw mill Air slide • Raw mix silo • Preheater • Cooler • Ball mill Testing of sample at different stages ANALYSIS OF COAL In order to access the quality of the coal the following two types of analyses are made. • PROXIMATE ANALYSES • ULTIMATE ANALYSES PROXIMATE ANALYSIS It is the analyses on compound basis which involves the following determinations. 1.moisture PREPARED BY MOHAMMAD YOUNUS (08IN70) 70 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 71. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED 2.volatile matter 3.ash 4.fixed carbon 1. MOISTURE: about 1gm of finaly powdered air dried coal sample is weighed in a crucible . the crucible is placed inside an electronic hot air oven maintained at 105_110 0C the crucible is allowed to remain in oven for 1 hour and then taken out. (with the help of pair of tongs) cooled in a desecator and weighed . loss in weight is reported as moisture on % basis. FORMULA FOR FINDING MOISTURE % of moisture =( loss in weight / weight of coal taken )*100 2.VOLATILE MATTER the dried sample of coal left in a crucible in crucible in (1) is then covered with a lid and placed in an electric furnace(muffle furnace) maintained at 925+25oC or 925-25oC .the crucible is taken out of the oven after 7 minutes heating. The crucible is cooled 1st in air then inside dedicator and weighed again loss in weight is reported as volatile matter i,e Formula For Finding Volatile Matter volatile matter (v m) = loss in weight due to removal of volatile matter x 100 wt of coal sample taken 3.ASH the residual coal in the crucible in (2) is then heated without lid in a muffle at about 500C for half an hour .the crucible is taken out cooled 1st in air then in desiccators and weighed ,heating, cooling and weighing is repeated till a constant weight is obtained the residue is reported as ash on %basis. FORMULA FOR FINDING % OF ASH The % of ash = wt of ash left x 100 PREPARED BY MOHAMMAD YOUNUS (08IN70) 71 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 72. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED wt of coal taken 4.FIXED CARBON % of fixed carbon = 100 -% of (moisture + volatile matter +ash) ULTIMATE ANALYSIS It is the analysis on elemental basis which involves the following determinations. 1. carbon and hydrogen 2. Nitrogen 3. sulpher 4. oxygen 1. CARBON AND HYDROGEN; about 0.2gms of accurately weighed coal sample is burnt in a current of oxygen in a combustion apparatus .C and H of the coal are converted into CO2 and H2O respectively. The gaseous products are absorbed respectively in KOH and CaCl2 tubes of known weights, the increase in weight of these tubes are then determined C + O2 → CO2 2KOH + CO2 → K2CO3 + H2O CaCl2 + 7H2O → CaCl2 .7H2O % OF C = Increase in weight of KOH tube x 12 x 100 Weight of coal sample taken x 44 PREPARED BY MOHAMMAD YOUNUS (08IN70) 72 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 73. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED % of H2= increase in weight of CaCl2 tube x 2 x 100 weight of coal sample taken x 18 1. NITROGEN About 1 gm of accurately weighed powdered coal is heated with concentrated H2SO4 along necked flask called kejeld’s flask, after the solution becomes clear it is treated with excess of KOH and LIBERATED AMMOUNT is distilled over and absorbed in a known volume of standard acid solution. The unused acid is then determined by lack titration with standard NAOH FROM the volume of acid by ammonia liberated % of N in coal is calculated as follows % OF N =volume of acid used x normality x14 x 100 weight of coal taken 3.SULPHER Sulpher is determined from washings obtained from the known mass sample of coal used in a bomb calorimeter for determination of calorific value during determination. Sulpher is converted into sulphate , the washings are with barium chloride solution BaCl2, when BaSO4 is precipitated this filtrate washed and heated to constant weight. % of sulphur in coal = wt of bariam sulphate obtained x 32 x 100 233 x wt of coal sample taken in bomb 4.Oxygen Oxygen determined by % of oxygen = 100 - % of (C + S + H + N + Ash PREPARED BY MOHAMMAD YOUNUS (08IN70) 73 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 74. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED PREPARED BY MOHAMMAD YOUNUS (08IN70) 74 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 75. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED POWER GENERATION There is also a power generation plant in lucky cement industry. 11 generators are used some of them required furnace oil and some Natural gas. Furnance oil generator or Dual fuel generator There are 2 dual fuel or furnace oil generators are used. Dual fuel generators are those which uses furnace oil and natural gas as fuel for power generation. Each generator produces 7.4 Mega Watt electricity. Natural gas generator There are 9 other generators used to generate electricity by natural gas. • 5 of them is of CAT MAC company and has an efficiency of generating electricity nearly 5.9 Mega Watt. • 3 of Roll Royce company having efficiency of 6.9 Mega Watt. • 1 of Roll Royce company having efficiency of 8.5 Mega Watt Generation of power house In lucky cement industry total power consumption is 48.5 Mega Watt . Power house can generate 75 Mega Watt electricity. PREPARED BY MOHAMMAD YOUNUS (08IN70) 75 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 76. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED PREPARED BY MOHAMMAD YOUNUS (08IN70) 76 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 77. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED OVERALL PERFORMANCE OF LUCKY CEMENT LIMITED Aims and missions F uture plan Expansion plan Our Company has emerged as the largest exporter of cement in Pakistan. We have been able to capture new markets where our brand is now very well established and known for its high quality of cement produced by us. The location of our Karachi project is ideal for exports by sea for which we have already setup state-of-the-art infrastructure at Plants & Karachi Port. Currently the total production capacity of Lucky Cement is 25,000 tons per day. Our Company has adopted the same hybrid technology experience for this expansion plan which was earlier used for the existing production lines by acquiring the latest technology fuel consuming components from European suppliers with the combination of Chinese plant and machinery which helps to minimize expansion cost. It will ensure great efficiency for producing cement at lower cost. The power requirement for the expansion lines will be met through captive gas based power generation for which additional supply of gas has been arranged. PREPARED BY MOHAMMAD YOUNUS (08IN70) 77 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 78. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED PREPARED BY MOHAMMAD YOUNUS (08IN70) 78 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 79. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED ENVIRONMENTAL SAFETY GLOBAL WARMING AND THE DANGERS OF GHG WASTE HEAT RECOVERY Lucky Cement, being aware of Global warming and the dangers of GHG, has decided to play an active role in participating in reduction of global warming and creating an environmental friendly atmosphere. In this regard Lucky cement has taken a step to contribute in this Global effort to control carbon emission. Lucky Cement Limited is now in the process of installing a waste heat recovery system which will utilize the waste heat generated during clinker production into electrical power with zero emission of carbon and without consuming any fuel. This effort of producing 25 MW electricity, although a costly effort , but looking at the circumstances both nationally and internationally will help in contributing in production of electricity in a nation where the power generation sector is in crisis and in a world which feels the dangers to environment and global warming. PREPARED BY MOHAMMAD YOUNUS (08IN70) 79 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 80. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED CONCLUSION Lucky cement industry is a day by day growing industry and counted in Pakistan’s most biggest and popular industry. We have observed all units process and operations used in a chemical industry and got good working experience in lucky. Internship is most important for the engineering students as it develops confidence and practical knowledge in students during their studies. As far as the production of lucky concrete progress plant is concerned, it is in very huge quantity and of good quality. Lucky is famous for manufacturing OPC of very good quality. PREPARED BY MOHAMMAD YOUNUS (08IN70) 80 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106)
  • 81. INTERNSHIP PROGRAME LUCKY CEMENT COMPANY LIMITED PREPARED BY MOHAMMAD YOUNUS (08IN70) 81 SUHAIL AHMED (08IN36) & MANSOOR ALI SOLANGI (08IN106 (08IN106)