SlideShare una empresa de Scribd logo
1 de 11
100 MW “Turnkey Ready” Wind Farm Building Project March - 2012
[email_address] Marzo  -  2012 Company Who are we?. 100 MW “Turnkey Ready” Wind Farm Building Project QE   is pledged to ensuring a sustainable future    Our company is fully committed to using natural resources to deliver non-polluting energy systems Here at QE  we are aware of the signs that the planet is becoming exhausted. The vast majority of industrialised countries depend on energy sources that lie outside their frontiers, and hence from both the environmental and strategic perspectives it is crucial that we all take on board the idea that energy generation and saving are the key factors in ensuring an efficient and secure future We are on hand to advise our customers at all times, and we provide a comprehensive turnkey service for bringing their equipment into operation that goes from initial design and dealing with licenses and subsidies right up to installation and maintenance.  Innovation, research and development and continuous improvement are some of our fundamental principles. Our commitment to the environment and society is evidenced by our sustainable and cost-effective equipment, our sports and cultural sponsorship and our partnerships with NGOs. It is a challenge which we meet every day.
[email_address] Marzo  -  2012 100 Mw Latvia The  Project 100 MW “Turnkey Ready” Wind Farm Building Project
[email_address] Marzo  -  2012 100 Mw Latvia The Project . 100 MW “Turnkey Ready” Wind Farm Building Project To purpose of this document is to convey a business opportunity to investors who desire to acquire a wind energy electric facility that provides an important source of renewable energy to the electrical system in the area near Riga (Latvia). The company, has developed the 100 MW “turnkey ready” wind project next to the town of Riga, Latvia (see Figure 1) based on the sale of electricity, from energy produced by its wind turbines Figure 1: Project Geographic Location.
[email_address] Marzo  -  2012 100 Mw Latvia Project Description 100 MW “Turnkey Ready” Wind Farm Building Project This project proposes the development of a wind generated facility with 50 turbines at 2 MW of potential power each for a total potential power of 100 MW. Aside from the wind turbines, the project has a historical reading of wind resources through a permanent weather station tower installed in 2008, a gravel access road system, an underground electrical tracking system, an operations and maintenance center, and a collector substation or point of interconnection from substation transformers. Some of the advantages of wind energy are: Wind energy is financially competitive (like coal and the rise in gas prices). Wind turbines do not consume water (in contrast with fossil fuel plants and nuclear energy). Wind energy is a local source, energy that is locally harvested that contributes to national security Wind energy is inexhaustible and infinitely renewable (in contrast with conventional fossil fuels). Wind energy is a clean energy that does not produce CO2 emissions. Wind energy can be used in a variety of ways basic needs services. The wind farm is basically made up of: Wind turbines. Wind turbine foundations. Roads. High voltage line (wind turbine-substation). Substation. Interconnection line, high voltage (substation-electrical system). Communication and remote control system.
[email_address] Marzo  -  2012 100 Mw Latvia Project Description 100 MW “Turnkey Ready” Wind Farm Building Project For the calculation of wind resources for the WIND FARM 100 MW project measurements were taken between 1-6-2008 through 1-6-2010, an average wind speed of 6,2 m/s was obtained at a height of 50 m (P 50). The total estimated losses for wind resource production is considered to be approx. 8 %. Therefore, the wind farm will have a gross production of 260.85 GWh and a net production of  240.00  GWh, its equivalent net hours are  2,400 . For comparison we can offer the average wind speed of other European countries: In Germany – 3.5 - 6 m/s In Austria – 3.5 - 4.5 m/s In Great Britain – 4.5 - >6 m/s In Scandinavian Countries - 4.5 - >6 m/s In Lithuania, Latvia, Estonia – 4 - >6 m/s
[email_address] Marzo  -  2012 100 Mw Latvia Project Description   WORK RESULTS   FASE 0. Project Start. Step achieved. Location of the site. 1. Found and evaluated suitable site for installation OBTAINED Study the rules of Spain. 2. First evaluation of documented and favorable OBTAINED OBTAINED Contact for evacuation of electricity to the grid. business.     3. Retrieved grid connection preconditions.   FASE 1. Previous Confirmation of positive energy resource Determining the real power of the wind farm. Application networking Wind Farm. Preliminary design of the wind farm. 1. Confirmation of suitable location for the installation OBTAINED Engineering - Resource and optimal energy resource to develop the project. OBTAINED OBTAINED Assessment. Step 2. Retrieved networking conditions   achieved. 3. Retrieved grid connection preconditions.   FASE 2. Administrative Details basic projects (wind turbines, substation, 1. Building permits and blueprints required for OBTAINED and Other Authorizations connection to high voltage line, ...). licensing. OBTAINED - Detailed Engineering. Environmental impact study. 2. Network Connection Agreement highest obtained. OBTAINED Step achieved. Management agreement line connection to the electric 3. Energy sales contract (PPA) OBTAINED   CIA 4. Environmental study approved. OBTAINED   Management - Meeting with environmentalists in the area. 5. Transfers of favorable step. OBTAINED   Licensing municipal planning (fees paid). 6. Favorable environmental efforts. OBTAINED   Studies incompatibildad (other projects, agriculture, 7. Incompatibility efforts favorable. OBTAINED   airports, etc 8. And prices for subprojects. OBTAINED   Management of assignments of step. 9. Plan Business-Economic Survey updated. OBTAINED   Request for Proposals equipment and material (wind       turbines, substation, high voltage line connection ...).       Management of infrastructure and logistics.       Updating the economic study.       Determining the price of energy (Grind Conection)     FASE 3. Project stage Finding investors for sale of wind farm under their ACTUAL STAGES PENDING WIND FARM 100 MW.ACTUAL STAGES "turnkey".   Draft prepared for physical implementation. FASE 4. Building of the wind farm. Final negotiation and contracting of outsourced projects   PENDING (wind turbines, substation connection line AT,...). Implementation and project closure.
[email_address] Marzo  -  2012 100 Mw Latvia Market Study 1100 MW “Turnkey Ready” Wind Farm Building Project In terms of renewable energy, Latvia is a virgin market. The potential for wind energy in Latvia is considered one of the highest in northwest Europe (Baltic Sea Region). Through its progressive legislation, the government is creating one of the most welcoming environments in Europe for developers of renewable energy and is encouraging future investments in the wind sector. Latvia has made a commitment to the EU (Directive 2009/28CE) that by 2020 20% of energy consumption will come from renewable energy. Latvia law is clear and concise in project development and subsequent legalization. The free market sale of energy in Latvia is very mature. All laws governing the sale of wind energy have been ratified by the Latvia government and follow the guidelines of the EU The success is due mainly to strong regulatory framework, which  is also the sector after 2020. Wind energy will not only contribute substantially to the European  commitment to reducing emissions of greenhouse gases, but strongly accelerate the exchange model based on expensive   fossil fuels, create jobs, will make Europe more competitive and provide energy production safe and renewable.  
[email_address] Marzo  -  2012 100 Mw Latvia Market Study 100 MW “Turnkey Ready” Wind Farm Building Project It is expected that wind energy production to increase from the 182 TWh, which accounted for 5.5% of total European demand in   2010 to 581 TWh, 15.7% in 2020. Then, wind power will cover the total consumption of households in France, Germany, Poland, Spain and United Kingdom together. The "Pure Power" also shows that wind power will grow differently   in the 27 Member States by 2020. The following table is assignd to the factor by multiplying the installed capacity and the percentage will then wind on the total electricity demand in each country.   Latvian  law  subvention  wind  power generation with a grant of 60 € / MWh.  This law is approved and ratified by the Latvian   government and  binding. The remuneration system is similar tothe one made in Italy, France and Spain.   Country Increment  Wind energy VS Total energy Germany 1,8 17% Austria 3,5 10% Belgium 4,3 10% Bulgaria 8 18% Slovakia 3 5% Slovenia 0 to 50 MW 6% Spain 1,9 27% Estonia 3,4 11% Finland 9,6 5% Grecee 5,4 23% Hungary 3 4% Ireland 4,2 52% Latvia 6,4 5% Lithuania 6,5 18% Luxembourg 7,1 7% Malta 0 to 100 MW 8% Poland  Portugal 1,9 14% Czech Republic 7,4 4% Romania 6,5 10%
[email_address] Marzo  -  2012 100 Mw Latvia Market Study 100 MW “Turnkey Ready” Wind Farm Building Project Income levels are attached in the table below, with an estimated income for the wind farm. The price of energy produced is conservatively estimated at 100 €/MWh for the first 20 years (40 € /MWh_Free market + 60 €/MWh_Subvention). We estimate that the price component of free market energy will average 40 €/MWh. This value is based on tracking the free market over the last few years in Latvia ( www.nordpoolspot.com ). At the same time, , subención law mandates a additional incentive for wind energy production from 60 € / MWh. Therefore the final price is 100 € MWh / WWH, studied from a conservative viewpoint. In summary, the estimate of energy prices (€/MWh) has been made conservatively for the WIND FARM 100 MW wind farm project
CONTACT INFORMATION Antoni Guardia [email_address] Office:  +34 93 4081938 Mobile: +34  669 76 65 72   Skype: toni.guardia Javier Dopazo [email_address] Office:  +34 93 4081938 Mobile: +34 649 30 28 06 Qualityenergies.com Londres num 2 , 1º4 Barcelona Office:  +34 93 4081938 Fax:  +34  93 4087131

Más contenido relacionado

La actualidad más candente

Presentation STEAG Trading & Optimization
Presentation STEAG Trading & OptimizationPresentation STEAG Trading & Optimization
Presentation STEAG Trading & OptimizationMelanie Klopp
 
Morocco industrial integration of csp technologies
Morocco industrial integration of csp technologiesMorocco industrial integration of csp technologies
Morocco industrial integration of csp technologiesParti Djibouti
 
SETT seminar presentation, RU2
SETT seminar presentation, RU2SETT seminar presentation, RU2
SETT seminar presentation, RU2artursskroderis
 
The impact of photovoltaic on power market in Italy - D.Migali, R.Covicchio, ...
The impact of photovoltaic on power market in Italy - D.Migali, R.Covicchio, ...The impact of photovoltaic on power market in Italy - D.Migali, R.Covicchio, ...
The impact of photovoltaic on power market in Italy - D.Migali, R.Covicchio, ...Gestore dei Servizi Energetici
 
RCREEE-enerMENA_NREA Srategy_ jordan august 2013
RCREEE-enerMENA_NREA Srategy_ jordan august 2013RCREEE-enerMENA_NREA Srategy_ jordan august 2013
RCREEE-enerMENA_NREA Srategy_ jordan august 2013RCREEE
 
The Role of Storage in Smart Energy Systems | Henrik Lund
The Role of Storage in Smart Energy Systems | Henrik LundThe Role of Storage in Smart Energy Systems | Henrik Lund
The Role of Storage in Smart Energy Systems | Henrik Lundicarb
 
20032015_paper_on_smart_charging_of_electric_vehicles_finalpsf-2015-2301-0001...
20032015_paper_on_smart_charging_of_electric_vehicles_finalpsf-2015-2301-0001...20032015_paper_on_smart_charging_of_electric_vehicles_finalpsf-2015-2301-0001...
20032015_paper_on_smart_charging_of_electric_vehicles_finalpsf-2015-2301-0001...Aura Caramizaru
 
Energy Storage Innovation – Li-ion and beyond
Energy Storage Innovation – Li-ion and beyondEnergy Storage Innovation – Li-ion and beyond
Energy Storage Innovation – Li-ion and beyondEMEX
 
Energy Transition in Belgium – Choices and Costs
Energy Transition in Belgium – Choices and CostsEnergy Transition in Belgium – Choices and Costs
Energy Transition in Belgium – Choices and CostsIEA-ETSAP
 
Why Energy Storage? | Grant Wilson
Why Energy Storage? | Grant WilsonWhy Energy Storage? | Grant Wilson
Why Energy Storage? | Grant Wilsonicarb
 
Moroccan solar project
Moroccan solar projectMoroccan solar project
Moroccan solar projectZakaria El
 
R cleantech finland bd to hungary - hungarian energy market by finpro debrecz...
R cleantech finland bd to hungary - hungarian energy market by finpro debrecz...R cleantech finland bd to hungary - hungarian energy market by finpro debrecz...
R cleantech finland bd to hungary - hungarian energy market by finpro debrecz...Finpro
 
Crown eco capital management/Renewable Energy: The Vision And A Dose Of Reali...
Crown eco capital management/Renewable Energy: The Vision And A Dose Of Reali...Crown eco capital management/Renewable Energy: The Vision And A Dose Of Reali...
Crown eco capital management/Renewable Energy: The Vision And A Dose Of Reali...Emilio Deiryme
 
Emerging Scottish Policy to Promote Energy Storage | Chris Stark
Emerging Scottish Policy to Promote Energy Storage | Chris StarkEmerging Scottish Policy to Promote Energy Storage | Chris Stark
Emerging Scottish Policy to Promote Energy Storage | Chris Starkicarb
 
Tor Eigil Hodne - Interconnecting Germany and Norway: Nordlink in the Context...
Tor Eigil Hodne - Interconnecting Germany and Norway: Nordlink in the Context...Tor Eigil Hodne - Interconnecting Germany and Norway: Nordlink in the Context...
Tor Eigil Hodne - Interconnecting Germany and Norway: Nordlink in the Context...Innovation Norway
 

La actualidad más candente (20)

Presentation STEAG Trading & Optimization
Presentation STEAG Trading & OptimizationPresentation STEAG Trading & Optimization
Presentation STEAG Trading & Optimization
 
Morocco industrial integration of csp technologies
Morocco industrial integration of csp technologiesMorocco industrial integration of csp technologies
Morocco industrial integration of csp technologies
 
Pv market business and price developments in italy
Pv market business and price developments in italy  Pv market business and price developments in italy
Pv market business and price developments in italy
 
SETT seminar presentation, RU2
SETT seminar presentation, RU2SETT seminar presentation, RU2
SETT seminar presentation, RU2
 
The impact of photovoltaic on power market in Italy - D.Migali, R.Covicchio, ...
The impact of photovoltaic on power market in Italy - D.Migali, R.Covicchio, ...The impact of photovoltaic on power market in Italy - D.Migali, R.Covicchio, ...
The impact of photovoltaic on power market in Italy - D.Migali, R.Covicchio, ...
 
RCREEE-enerMENA_NREA Srategy_ jordan august 2013
RCREEE-enerMENA_NREA Srategy_ jordan august 2013RCREEE-enerMENA_NREA Srategy_ jordan august 2013
RCREEE-enerMENA_NREA Srategy_ jordan august 2013
 
The Role of Storage in Smart Energy Systems | Henrik Lund
The Role of Storage in Smart Energy Systems | Henrik LundThe Role of Storage in Smart Energy Systems | Henrik Lund
The Role of Storage in Smart Energy Systems | Henrik Lund
 
20032015_paper_on_smart_charging_of_electric_vehicles_finalpsf-2015-2301-0001...
20032015_paper_on_smart_charging_of_electric_vehicles_finalpsf-2015-2301-0001...20032015_paper_on_smart_charging_of_electric_vehicles_finalpsf-2015-2301-0001...
20032015_paper_on_smart_charging_of_electric_vehicles_finalpsf-2015-2301-0001...
 
Energy Storage Innovation – Li-ion and beyond
Energy Storage Innovation – Li-ion and beyondEnergy Storage Innovation – Li-ion and beyond
Energy Storage Innovation – Li-ion and beyond
 
Task 24 The Swiss Energy Story
Task 24 The Swiss Energy StoryTask 24 The Swiss Energy Story
Task 24 The Swiss Energy Story
 
Energy Transition in Belgium – Choices and Costs
Energy Transition in Belgium – Choices and CostsEnergy Transition in Belgium – Choices and Costs
Energy Transition in Belgium – Choices and Costs
 
Why Energy Storage? | Grant Wilson
Why Energy Storage? | Grant WilsonWhy Energy Storage? | Grant Wilson
Why Energy Storage? | Grant Wilson
 
Moroccan solar project
Moroccan solar projectMoroccan solar project
Moroccan solar project
 
R cleantech finland bd to hungary - hungarian energy market by finpro debrecz...
R cleantech finland bd to hungary - hungarian energy market by finpro debrecz...R cleantech finland bd to hungary - hungarian energy market by finpro debrecz...
R cleantech finland bd to hungary - hungarian energy market by finpro debrecz...
 
Res evolution italy_gse
Res evolution italy_gseRes evolution italy_gse
Res evolution italy_gse
 
Crown eco capital management/Renewable Energy: The Vision And A Dose Of Reali...
Crown eco capital management/Renewable Energy: The Vision And A Dose Of Reali...Crown eco capital management/Renewable Energy: The Vision And A Dose Of Reali...
Crown eco capital management/Renewable Energy: The Vision And A Dose Of Reali...
 
RWF PR90
RWF PR90RWF PR90
RWF PR90
 
Emerging Scottish Policy to Promote Energy Storage | Chris Stark
Emerging Scottish Policy to Promote Energy Storage | Chris StarkEmerging Scottish Policy to Promote Energy Storage | Chris Stark
Emerging Scottish Policy to Promote Energy Storage | Chris Stark
 
Tor Eigil Hodne - Interconnecting Germany and Norway: Nordlink in the Context...
Tor Eigil Hodne - Interconnecting Germany and Norway: Nordlink in the Context...Tor Eigil Hodne - Interconnecting Germany and Norway: Nordlink in the Context...
Tor Eigil Hodne - Interconnecting Germany and Norway: Nordlink in the Context...
 
New Swiss Energy Strategy 2050: A brief introduction
New Swiss Energy Strategy 2050: A brief introduction New Swiss Energy Strategy 2050: A brief introduction
New Swiss Energy Strategy 2050: A brief introduction
 

Similar a Quality Energy Investment Opportunities 100mw letonia

Opportunities in the Hungarian Wind Energy Market
Opportunities in the Hungarian Wind Energy MarketOpportunities in the Hungarian Wind Energy Market
Opportunities in the Hungarian Wind Energy MarketEnerjimiz Güneş
 
Brian britton greenexpo
Brian britton greenexpoBrian britton greenexpo
Brian britton greenexpoDamian Connon
 
Webinaire : Innovation et infrastructure - Moteurs de la transition energetiq...
Webinaire : Innovation et infrastructure - Moteurs de la transition energetiq...Webinaire : Innovation et infrastructure - Moteurs de la transition energetiq...
Webinaire : Innovation et infrastructure - Moteurs de la transition energetiq...Cluster TWEED
 
General situation of solar thermal energy - Eduardo Iglesias (Protermosolar)
General situation of solar thermal energy - Eduardo Iglesias (Protermosolar)General situation of solar thermal energy - Eduardo Iglesias (Protermosolar)
General situation of solar thermal energy - Eduardo Iglesias (Protermosolar)IrSOLaV Pomares
 
Miro Zeman - Department of Electrical Sustainable Energy
Miro Zeman - Department of Electrical Sustainable EnergyMiro Zeman - Department of Electrical Sustainable Energy
Miro Zeman - Department of Electrical Sustainable EnergyDutch Power
 
Wind energy projects integration in electricity grids portugal and med tso e...
Wind energy projects integration in electricity grids  portugal and med tso e...Wind energy projects integration in electricity grids  portugal and med tso e...
Wind energy projects integration in electricity grids portugal and med tso e...RCREEE
 
Bankability of clean energy projects - South Africa case
Bankability of clean energy projects - South Africa caseBankability of clean energy projects - South Africa case
Bankability of clean energy projects - South Africa caseLeonardo ENERGY
 
Bankability of Clean Energy Projects: the case of South Africa - 6 GW
Bankability of Clean Energy Projects: the case of South Africa - 6 GWBankability of Clean Energy Projects: the case of South Africa - 6 GW
Bankability of Clean Energy Projects: the case of South Africa - 6 GWLeonardo ENERGY
 
Romelectro_presentation 2017
Romelectro_presentation 2017Romelectro_presentation 2017
Romelectro_presentation 2017Anka Volintiru
 
Climate Change Mitigation & Adaptation
Climate Change  Mitigation & AdaptationClimate Change  Mitigation & Adaptation
Climate Change Mitigation & AdaptationLaurence Mills
 
Scaling up energy efficiency in morocco
Scaling up energy efficiency in moroccoScaling up energy efficiency in morocco
Scaling up energy efficiency in moroccoRCREEE
 
Wind Energy Basque Country Catalogue 2017
Wind Energy Basque Country Catalogue 2017Wind Energy Basque Country Catalogue 2017
Wind Energy Basque Country Catalogue 2017Cluster_Energia
 
The role of technology and innovation in facilitating the transition towards ...
The role of technology and innovation in facilitating the transition towards ...The role of technology and innovation in facilitating the transition towards ...
The role of technology and innovation in facilitating the transition towards ...RCREEE
 
Is Sustainable Energy Feasible Without Nuclear?
Is Sustainable Energy Feasible Without Nuclear?Is Sustainable Energy Feasible Without Nuclear?
Is Sustainable Energy Feasible Without Nuclear?Alexander Wolski
 

Similar a Quality Energy Investment Opportunities 100mw letonia (20)

Opportunities in the Hungarian Wind Energy Market
Opportunities in the Hungarian Wind Energy MarketOpportunities in the Hungarian Wind Energy Market
Opportunities in the Hungarian Wind Energy Market
 
Brian britton greenexpo
Brian britton greenexpoBrian britton greenexpo
Brian britton greenexpo
 
Sgcp13proctor
Sgcp13proctorSgcp13proctor
Sgcp13proctor
 
Webinaire : Innovation et infrastructure - Moteurs de la transition energetiq...
Webinaire : Innovation et infrastructure - Moteurs de la transition energetiq...Webinaire : Innovation et infrastructure - Moteurs de la transition energetiq...
Webinaire : Innovation et infrastructure - Moteurs de la transition energetiq...
 
ENERGIAS-MARINAS_CAT_EN
ENERGIAS-MARINAS_CAT_ENENERGIAS-MARINAS_CAT_EN
ENERGIAS-MARINAS_CAT_EN
 
General situation of solar thermal energy - Eduardo Iglesias (Protermosolar)
General situation of solar thermal energy - Eduardo Iglesias (Protermosolar)General situation of solar thermal energy - Eduardo Iglesias (Protermosolar)
General situation of solar thermal energy - Eduardo Iglesias (Protermosolar)
 
Sei ipcc seminarrium
Sei  ipcc seminarriumSei  ipcc seminarrium
Sei ipcc seminarrium
 
SW Cleantech pack
SW Cleantech packSW Cleantech pack
SW Cleantech pack
 
Miro Zeman - Department of Electrical Sustainable Energy
Miro Zeman - Department of Electrical Sustainable EnergyMiro Zeman - Department of Electrical Sustainable Energy
Miro Zeman - Department of Electrical Sustainable Energy
 
Wind energy projects integration in electricity grids portugal and med tso e...
Wind energy projects integration in electricity grids  portugal and med tso e...Wind energy projects integration in electricity grids  portugal and med tso e...
Wind energy projects integration in electricity grids portugal and med tso e...
 
Bankability of clean energy projects - South Africa case
Bankability of clean energy projects - South Africa caseBankability of clean energy projects - South Africa case
Bankability of clean energy projects - South Africa case
 
Bankability of Clean Energy Projects: the case of South Africa - 6 GW
Bankability of Clean Energy Projects: the case of South Africa - 6 GWBankability of Clean Energy Projects: the case of South Africa - 6 GW
Bankability of Clean Energy Projects: the case of South Africa - 6 GW
 
Romelectro_presentation 2017
Romelectro_presentation 2017Romelectro_presentation 2017
Romelectro_presentation 2017
 
Ch1
Ch1Ch1
Ch1
 
Climate Change Mitigation & Adaptation
Climate Change  Mitigation & AdaptationClimate Change  Mitigation & Adaptation
Climate Change Mitigation & Adaptation
 
Scaling up energy efficiency in morocco
Scaling up energy efficiency in moroccoScaling up energy efficiency in morocco
Scaling up energy efficiency in morocco
 
Lithuania
LithuaniaLithuania
Lithuania
 
Wind Energy Basque Country Catalogue 2017
Wind Energy Basque Country Catalogue 2017Wind Energy Basque Country Catalogue 2017
Wind Energy Basque Country Catalogue 2017
 
The role of technology and innovation in facilitating the transition towards ...
The role of technology and innovation in facilitating the transition towards ...The role of technology and innovation in facilitating the transition towards ...
The role of technology and innovation in facilitating the transition towards ...
 
Is Sustainable Energy Feasible Without Nuclear?
Is Sustainable Energy Feasible Without Nuclear?Is Sustainable Energy Feasible Without Nuclear?
Is Sustainable Energy Feasible Without Nuclear?
 

Último

7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfAmzadHosen3
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756dollysharma2066
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 

Último (20)

7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 

Quality Energy Investment Opportunities 100mw letonia

  • 1. 100 MW “Turnkey Ready” Wind Farm Building Project March - 2012
  • 2. [email_address] Marzo - 2012 Company Who are we?. 100 MW “Turnkey Ready” Wind Farm Building Project QE   is pledged to ensuring a sustainable future   Our company is fully committed to using natural resources to deliver non-polluting energy systems Here at QE we are aware of the signs that the planet is becoming exhausted. The vast majority of industrialised countries depend on energy sources that lie outside their frontiers, and hence from both the environmental and strategic perspectives it is crucial that we all take on board the idea that energy generation and saving are the key factors in ensuring an efficient and secure future We are on hand to advise our customers at all times, and we provide a comprehensive turnkey service for bringing their equipment into operation that goes from initial design and dealing with licenses and subsidies right up to installation and maintenance. Innovation, research and development and continuous improvement are some of our fundamental principles. Our commitment to the environment and society is evidenced by our sustainable and cost-effective equipment, our sports and cultural sponsorship and our partnerships with NGOs. It is a challenge which we meet every day.
  • 3. [email_address] Marzo - 2012 100 Mw Latvia The Project 100 MW “Turnkey Ready” Wind Farm Building Project
  • 4. [email_address] Marzo - 2012 100 Mw Latvia The Project . 100 MW “Turnkey Ready” Wind Farm Building Project To purpose of this document is to convey a business opportunity to investors who desire to acquire a wind energy electric facility that provides an important source of renewable energy to the electrical system in the area near Riga (Latvia). The company, has developed the 100 MW “turnkey ready” wind project next to the town of Riga, Latvia (see Figure 1) based on the sale of electricity, from energy produced by its wind turbines Figure 1: Project Geographic Location.
  • 5. [email_address] Marzo - 2012 100 Mw Latvia Project Description 100 MW “Turnkey Ready” Wind Farm Building Project This project proposes the development of a wind generated facility with 50 turbines at 2 MW of potential power each for a total potential power of 100 MW. Aside from the wind turbines, the project has a historical reading of wind resources through a permanent weather station tower installed in 2008, a gravel access road system, an underground electrical tracking system, an operations and maintenance center, and a collector substation or point of interconnection from substation transformers. Some of the advantages of wind energy are: Wind energy is financially competitive (like coal and the rise in gas prices). Wind turbines do not consume water (in contrast with fossil fuel plants and nuclear energy). Wind energy is a local source, energy that is locally harvested that contributes to national security Wind energy is inexhaustible and infinitely renewable (in contrast with conventional fossil fuels). Wind energy is a clean energy that does not produce CO2 emissions. Wind energy can be used in a variety of ways basic needs services. The wind farm is basically made up of: Wind turbines. Wind turbine foundations. Roads. High voltage line (wind turbine-substation). Substation. Interconnection line, high voltage (substation-electrical system). Communication and remote control system.
  • 6. [email_address] Marzo - 2012 100 Mw Latvia Project Description 100 MW “Turnkey Ready” Wind Farm Building Project For the calculation of wind resources for the WIND FARM 100 MW project measurements were taken between 1-6-2008 through 1-6-2010, an average wind speed of 6,2 m/s was obtained at a height of 50 m (P 50). The total estimated losses for wind resource production is considered to be approx. 8 %. Therefore, the wind farm will have a gross production of 260.85 GWh and a net production of 240.00 GWh, its equivalent net hours are 2,400 . For comparison we can offer the average wind speed of other European countries: In Germany – 3.5 - 6 m/s In Austria – 3.5 - 4.5 m/s In Great Britain – 4.5 - >6 m/s In Scandinavian Countries - 4.5 - >6 m/s In Lithuania, Latvia, Estonia – 4 - >6 m/s
  • 7. [email_address] Marzo - 2012 100 Mw Latvia Project Description   WORK RESULTS   FASE 0. Project Start. Step achieved. Location of the site. 1. Found and evaluated suitable site for installation OBTAINED Study the rules of Spain. 2. First evaluation of documented and favorable OBTAINED OBTAINED Contact for evacuation of electricity to the grid. business.     3. Retrieved grid connection preconditions.   FASE 1. Previous Confirmation of positive energy resource Determining the real power of the wind farm. Application networking Wind Farm. Preliminary design of the wind farm. 1. Confirmation of suitable location for the installation OBTAINED Engineering - Resource and optimal energy resource to develop the project. OBTAINED OBTAINED Assessment. Step 2. Retrieved networking conditions   achieved. 3. Retrieved grid connection preconditions.   FASE 2. Administrative Details basic projects (wind turbines, substation, 1. Building permits and blueprints required for OBTAINED and Other Authorizations connection to high voltage line, ...). licensing. OBTAINED - Detailed Engineering. Environmental impact study. 2. Network Connection Agreement highest obtained. OBTAINED Step achieved. Management agreement line connection to the electric 3. Energy sales contract (PPA) OBTAINED   CIA 4. Environmental study approved. OBTAINED   Management - Meeting with environmentalists in the area. 5. Transfers of favorable step. OBTAINED   Licensing municipal planning (fees paid). 6. Favorable environmental efforts. OBTAINED   Studies incompatibildad (other projects, agriculture, 7. Incompatibility efforts favorable. OBTAINED   airports, etc 8. And prices for subprojects. OBTAINED   Management of assignments of step. 9. Plan Business-Economic Survey updated. OBTAINED   Request for Proposals equipment and material (wind       turbines, substation, high voltage line connection ...).       Management of infrastructure and logistics.       Updating the economic study.       Determining the price of energy (Grind Conection)     FASE 3. Project stage Finding investors for sale of wind farm under their ACTUAL STAGES PENDING WIND FARM 100 MW.ACTUAL STAGES "turnkey".   Draft prepared for physical implementation. FASE 4. Building of the wind farm. Final negotiation and contracting of outsourced projects   PENDING (wind turbines, substation connection line AT,...). Implementation and project closure.
  • 8. [email_address] Marzo - 2012 100 Mw Latvia Market Study 1100 MW “Turnkey Ready” Wind Farm Building Project In terms of renewable energy, Latvia is a virgin market. The potential for wind energy in Latvia is considered one of the highest in northwest Europe (Baltic Sea Region). Through its progressive legislation, the government is creating one of the most welcoming environments in Europe for developers of renewable energy and is encouraging future investments in the wind sector. Latvia has made a commitment to the EU (Directive 2009/28CE) that by 2020 20% of energy consumption will come from renewable energy. Latvia law is clear and concise in project development and subsequent legalization. The free market sale of energy in Latvia is very mature. All laws governing the sale of wind energy have been ratified by the Latvia government and follow the guidelines of the EU The success is due mainly to strong regulatory framework, which is also the sector after 2020. Wind energy will not only contribute substantially to the European commitment to reducing emissions of greenhouse gases, but strongly accelerate the exchange model based on expensive fossil fuels, create jobs, will make Europe more competitive and provide energy production safe and renewable.  
  • 9. [email_address] Marzo - 2012 100 Mw Latvia Market Study 100 MW “Turnkey Ready” Wind Farm Building Project It is expected that wind energy production to increase from the 182 TWh, which accounted for 5.5% of total European demand in   2010 to 581 TWh, 15.7% in 2020. Then, wind power will cover the total consumption of households in France, Germany, Poland, Spain and United Kingdom together. The "Pure Power" also shows that wind power will grow differently   in the 27 Member States by 2020. The following table is assignd to the factor by multiplying the installed capacity and the percentage will then wind on the total electricity demand in each country.   Latvian law subvention wind power generation with a grant of 60 € / MWh. This law is approved and ratified by the Latvian government and binding. The remuneration system is similar tothe one made in Italy, France and Spain.   Country Increment Wind energy VS Total energy Germany 1,8 17% Austria 3,5 10% Belgium 4,3 10% Bulgaria 8 18% Slovakia 3 5% Slovenia 0 to 50 MW 6% Spain 1,9 27% Estonia 3,4 11% Finland 9,6 5% Grecee 5,4 23% Hungary 3 4% Ireland 4,2 52% Latvia 6,4 5% Lithuania 6,5 18% Luxembourg 7,1 7% Malta 0 to 100 MW 8% Poland Portugal 1,9 14% Czech Republic 7,4 4% Romania 6,5 10%
  • 10. [email_address] Marzo - 2012 100 Mw Latvia Market Study 100 MW “Turnkey Ready” Wind Farm Building Project Income levels are attached in the table below, with an estimated income for the wind farm. The price of energy produced is conservatively estimated at 100 €/MWh for the first 20 years (40 € /MWh_Free market + 60 €/MWh_Subvention). We estimate that the price component of free market energy will average 40 €/MWh. This value is based on tracking the free market over the last few years in Latvia ( www.nordpoolspot.com ). At the same time, , subención law mandates a additional incentive for wind energy production from 60 € / MWh. Therefore the final price is 100 € MWh / WWH, studied from a conservative viewpoint. In summary, the estimate of energy prices (€/MWh) has been made conservatively for the WIND FARM 100 MW wind farm project
  • 11. CONTACT INFORMATION Antoni Guardia [email_address] Office: +34 93 4081938 Mobile: +34 669 76 65 72 Skype: toni.guardia Javier Dopazo [email_address] Office: +34 93 4081938 Mobile: +34 649 30 28 06 Qualityenergies.com Londres num 2 , 1º4 Barcelona Office: +34 93 4081938 Fax: +34 93 4087131